Loading...
HomeMy WebLinkAbout75-97 RESOLUTIONRESOLUTION NO. 7 s-e7 A RESOLUTION APPROVING AN ENGINEERING CONTRACT WITH MILHOLLAND COMPANY, ENGINEERING AND ST]RVEYING, IN AN AMOUNT NOT TO EXCEED $60,350, FOR THE DEVELOPMENT OF DETAILED PLANS AND SPECIFICATIONS FOR THE POPLAR STREET IMPROVEMENTS PROJECT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. The City Council hereby approves a engineering contract with Milholland Company, Engineering and Surveying, in an amount not to exceed $60,350, for the development of detailed plans and specifications for the Poplar Sheet Improvements Project; and authorizes the Mayor and City Clerk to execute said contract. A copy of the contract is attached hereto marked Exhibit rrA'r and made apart hereof. .PTASSP,P.AND APPROVED this l qth day of August ,1997. SCANNED ,/s ATTEST APPROVED: By Hanna, Mayor Traci Paul, City Clerk + EXHIBIT A AGREEMENT FOR ENGII\EERING SERVICES FOR STREET & DRAINAGE IMPROVEMENTS OF ..POPLAR STREET" B-490 THIS AGREEMEIYT, made and entered into this /q/A day of by and between the CITY OF FAYETTEVILLE, ARKANSAS, 1997, as thereferred to "OWNER", and MILHOLLAND COMPAI\rY, ENGINEERING AI\D SURVBYING, Consulting Engineers of Fayetteville, Arkansas, hereinafter referred to as the "ENGINEER", WITNESS THAT: WHEREAS, the OWNER desires to have a Drainage Study, plus Street and Drainage Improvements designed for the re-construction of a section of Poplar Street, approximately 2,500 L.F. in length, located between the center lines of North Leverett and Gregg Avenues. The DRAINAGE STUDY shall consider storm water run-off from adjacent properties, drainage facilities and streets onto said Poplar Street. The limits of the drainage study shall be that necessary for the design of drainage improvements adequate to collect and to transport storm waters north from Poplar Street to Skull Creek. The DESIGN of the Re-construction of Poplar Street shall consist of a street section with curbs twenty-eight feet (28') back-to-back, a sidewalk five feet (5') in width, on both sides, and a storm sewer system. Upgrading of public utilities are not anticipated during the construction of said street and drainage improvements. A section of Poplar Street across Skull Creek was recently improved, and the Owner does not plan to alter nor re-design this section of street as a part of this Agreement. WHEREAS, the ENGINEER has sufficient experienced personnel and equipment to perform the work described in this agreement, NOW THEREFORE, in consideration of the mutual covenants and agreements herein contained, the OWNER and the ENGINEER, the parties hereto, stipulate and agree that the OWNER does hereby employ the ENGINEER to perform the required engineering services as hereinafter set out; and the ENGINEER agrees to provide said services. rnx =u, II {1 , A. SECTION 1: DESCRIPTION OF PHASES: The Phases of the Project for which engineering and surveying services are to be provided are specifically named, as follows: PHASE NO. 1 - RIGHT-OF-WAY SURVEY PHASE NO. 2 - DRAINAGE STUDY PHASE NO. 3 - DESIGN OF STREET AND DRAINAGE IMPROVEMENTS PHASE NO. 4 - CONTRACT AMENDMENTS which are generally described as follows: PHASE NO. 1: RIGHT-OF-WAY SURVEY AIIID MAP: Research the City Records, and survey said existing City record street right-of-way for Poplar Street and it's tributary public accesses. Provide the City Engineering Department a "Right-of-Easement Map" and, as an EXTRA Expense, "Descriptions" to acquire necessary Right-of-Way Easements for the purpose of new construction. Abstract title nor court house research for right-of-way dedication by individual land owners adjacent to said Poplar Street are excepted, and will performed only when requested in writing by the City Engineer, as an additional expense. B.PHASE NO.2: DRAINAGE STLJDY: A Drainage Study, in accordance with the City of Fayetteville's latest "Storm Water Design Ordinance", shall be performed on that part of the watershed immediately south of Poplar Street which would discharge storm water runoff into and/or across said street, and/or into a storm sewer system paralleling or crossing said street. The study will provide adequate data for the design of a storm sewer system to transport said storm waters into Skull Creek north of Poplar Street. C.PHASE NO. 3: DESIGN OF STREET AIIID DRAINAGE IMPROYEMENTS: Design and preparation of Detailed Plans and Specifications for said improvement project as specified herein, and in accordance with City of Fayetteville's Ordinances regulating street and drainage construction. D.PHASE NO.4: CONTRACT AMENDMENT: In the event the owner desires services in addition to those depict above, the OWNER shall request such services in writing to the Engineer. Such services would consist of plats and documents necessary for additional street Right-of-Way, Drainage or Utility Easements, or Temporary Construction Easements. 2 SECTION 2: SCOPE OF ENGINEERING SERVICES: The ENGINEER shall provide a suitable staff to perform Basic Engineering and Surveying Services, which shall include a Drainage Study, Street Right-of-Way Survey and Map, Project Design and Bid Documents, and as an extra item, Right-of-Way Plats and Descriptions for each individual Right-of-Way Acquisition. These various types of work are more specifically defined as follows: BASIC ENGINEERING AND SURVEYING SERVICES: The ENGINEER shall provide a suitable staff to perform all Basic Engineering and Surveying Services. Work to be done under this item shall consist generally of the following: tll Research and survey of City Record Right-of-Way for Poplar Streeq l2l Storm Drainage Study for the Design of a Storm Sewer System. The Water Shed Area shall be determined from two foot (2') contour maps, provided by the City of Fayetteville; ) Make field engineering surveys of the various sites to establish the data necessary for the preparation of plans and specifications in order to build the proposed improvements. The field engineering surveys shall include the location of all existing utilities within construction Right-of-Ways as best can be located without excavation; Meet with representatives of all involved utility companies and governmental agencies to coordinate the overall project; t3I l4l tsI Advise the OWNER as to soil investigations that might be required and assist in the coordinating of the same; and t6l Prepare detailed plans and specifications for the proposed improvements. The plans shall show the location of the construction center line. ENGINEER shall provide OWNER with two (2) complete sets of the plans and specifications; l7l Prepare construction cost estimates. CONTRACT AMEI\DMENTS: Contract Amendments will be considered when scope of work is Changed at the request of the OWNER, or additional services are necessitated by some condition which could not have been reasonably anticipated. Payments for the work described in the above shall be made as further defined in SECTION 3 of this contract. 3 SECTION 3: COMPENSATION: Compensation for the various types of services to be provided under this Contract shall be made as follows: A. PHASE NO. 1: RIGHT-OF-WAY SURVEY: Compensation for Basic Surveying Services to determine Record Right-of-Way for said street, shall be a MAXIMUM'NOT'TO'EXCEED amount of $5,500. This MAXIMUM- NOT-TO-EXCEED FIGURE includes full compensation for every item of work as described in SECTION 2, PHASE NO. 1, and is based on an estimate of the various classifications of work at an hourly rate, plus profit, as depicted in TABLE I of this document. The hourly rates include direct cost plus allowances for indirect labor costs and overhead. B. PHASE NO.2: DRAINAGE STUDY: BASIC ENGINEERING SERVICES: Compensation for said Engineering Services shall be a MAXIMUM-NOT-TO-EXCEED amount of $8,000. This MAXIMUM-NOT-TO- EXCEED FIGURE includes full compensation for every item of work as described in SECTION 2, PHASE NO. 2 and is based on an estimate of the various classifications of work at an hourly rate, plus profit, as depicted in TABLE II of this document. The hourly rates include direct cost plus allowances for indirect labor costs and overhead. C. PHASE NO. 3: DESIGN OF STREET AND DRAINAGE IMPROVEMENTS: Compensation for said Engineering Services shall be for the various classifications of personnel as depicted in TABLE III of this document with a MAXIMUM-NOT-TO- EXCEED AMOUNT of $46,850, including profit. D. PHASE NO.4: CONTRACT AMENDMENT: In the event a Contract Amendment for Engineering Services is necessary, the ENGINEER'S compensation shall be based on the HOURLY RATES of the various classifications of personnel set forth in SECTION 3.E. - 'HOURLY RATE PER CLASSIFICATION." However, if requested by the City Engineer, the ENGINEER shall provide a Plat and a Deed or Easement for each single tract for the purpose of Acquisition of items so stated in SECTION I.D. at a cost of $325.00 per tract. The ENGINEER estimates eight (8) Right-of- Way Takings, PLUS five (5) Utility Easement and Drainage Easements for an EXTRA cost of $4,225. 4 l E. F SECTION 3: COMPENSATION, Cont.: HOURLY RATE PER CLASSIFICATION: The hourly rates to be charged for the various classifications of personnel are set out below: Survey Crew. . . o . . . . . . . . . . . . (?men @) o o . . .$2S.00 per hour $55.00 per hour $40.00 per hour $9S.00 per hour Professional Land Surveyor AutoCAD/Drafting. Professional Engineer. . . . . . . Enginegrrs Aidg. . . . . . o .. . $65.00 per hour Office Computations. Research and Compiling Data. FieldCoordinator. . . . . . . . . . . . . . . . . . . . . . . . . . SgCretary.. . . . o . . . . . o . . . . . . . . . . . . . o . . . . . . . Printing: 8-1 12" X 11" Blueprints. Mylar Mileage. Out-of-Pocket Expenses (Long-distance phone calls, etc.) The hourly rates shown above include total compensation to the ENGINEER for all expenses for said services described in PHASE NO. 4: CONTRACT AMENDMENT. METHOD OF PAYMENT: Partial payments to the ENGINEER shall be made monthly as long as the accumulative of payments do not exceed the following: BASIC ENGINEERING AND SURVEYING SERVICES: PHASE NO. 1: Ninety percent (907o) upon completion of field Right-of-Way surveys and delivery of Righrof-Way Map depicting Existing Record Acquisition. Ten percent (107o) upon completion of Right-of-Way Map depicting existing and newly acquired Acquisitions, and submittal of same to the OWNER. PHASE NO. 2: Eighty-five percent (857o) upon completion of field engineering surveys for Drainage Study, and submittal of First Draft to the OWNER. Fifteen percent (157o) upon completion of Drainage Study and submittal of 'FINAL'DRAFT of Drainage Study to the OWNER. $35.00 per hour $SS.00 per hour $40.00 per hour $2S.00 per hour $00.25 per sheet $03.50 per sheet (any size) $tS.00 per sheet (any size) $00.30 per mile Actual Cost 5 SECTION 3: COMPENSATION, Cont.: PHASE NO. 3: Ninety percent (907o1upon completion of Design of Street and Drainage Improvements, and submitted to the OWNER for review comments. Ten percent (LlVo) upon Final Design completion and submittal to the OWNER with Project Specifications and Bid Documents. PHASE NO.4: One hundred percent (1007o) upon delivery of the requested services to the OWNER, such as, "Individual Tract Acquisition Plat and Taking Document (Deed, Utility Easement, Drainage Easement or Temporary Construction Easement"). 6 A SECTION 4. GENERAL CONSIDERATIONS: Termination of Contract for Cause If, through any cause, the ENGINEER shall fail to fulfill in timely and proper manner his obligations under this contract, or if the ENGINEER shall violate any of the covenants, agreements, or stipulations of the contract, the OWNER shall thereupon have the right to terminate this contract by giving written notice to the ENGINEER of such termination and specifying the effective date thereof, at least five (5) days before the effective date of such termination. In such event, all finished or unfinished documents, data, studies, and reports prepared by the ENGINEER under this contract shall, at the option of the OWNER, become its property, and the ENGINEER shall be entitled to receive just and equitable compensation under this contract for any satisfactory work completed on such documents. Notwithstanding the above, the ENGINEER shall not be relieved of liability of the OWNER for damages sustained by the OWNER by virtue of any breach of the contract by the ENGINEER, and the OWNER may withhold any payments to the ENGINEER for the purpose of set off until such time as the exact amount of damages due the OWNER from the ENGINEER is determined. Termination of Convenience of OWNER The OWNER may terminate this contract at any time by a notice in writing from the OWNER to the ENGINEER. If the contract is terminated by the OWNER as provided herein, the ENGINEER will received just and equitable compensation under this contract. Changes The OWNER may from time-to-time request changes in the scope of the services of the ENGINEER to be performed hereunder. Such changes, including any increase or decrease in the amount of the ENGINEER's compensation, which are mutually agreed upon by and between the OWNER and the ENGINEER, shall be incorporated in further written amendments to this contract. Personnel tl] The ENGINEER represents that he has, or will secure at his own expense, all personnel required in performing the services under this contract. Such personnel shall not be employees of or have any contractual relationship with the OWNER. l2l All services required hereunder will be performed by the ENGINEER or under his supervision and all personnel engaged in the work shall be fully qualified and shall be authorized or permitted under state and local law to perform such services. t3] No person who is serving sentence in a penal or correctional institution shall be employed on work under this contract. B C D 7 F E. G H. SECTION 4. GENERAL CONSIDERATIONS, Cont.: Compliance with Local Laws The ENGINEER shall comply with all applicable laws, ordinances, and codes of the state and local governments and shall commit no trespass on any public or private property in performing any of the work embraced by this contract. Assignability The ENGINEER shall not assign any interest in this contract and shall not transfer any interest in the same (whether by assignment or novation) without the prior written approval of the OWNER; provided, however, that claims for money due or to become due the ENGINEER from the OWNER under this contract may be assigned to a bank, trust company, or other financial institution, or to a trustee in bankruptcy, without such approval. Notice of any such assignment or transfer shall be furnished promptly to the OWNER. Access to Records The OWNER, the U.S. Department of Housing and Urban Development, the Comptroller General of the United States, or any of their duly authorized representatives, shall have access to any books, documents, papers, and records of the ENGINEER doing work under this contract which are directly pertinent to a specific grant program for the purpose of making audits, examinations, excerpts, and transcriptions. Estimates Since the ENGINEER has no control over the cost of labot materials or equipment, or over the methods of determining prices, or over competitive bidding or market conditions, the estimates of costs provided are to be made on the basis of the ENGINEER's experience and qualifications and represent his best judgment, being familiar with the industry, but the ENGINEER cannot and does not guarantee that established costs will not vary from estimates prepared. Insurance The ENGINEER shall secure and maintain such insurance as will protect him from claims under the Workman's Compensation acts and from claims for bodily injury, death or property damage which may arise from the performance of his services under this contract. Successors and Assigns Each party of this contract binds himself and his partners, successors, executors, administrators and assigns to the other party of this contract in respect to all covenants of this contract. Neither party shall assign, sublet or transfer his interest in this contract without the written consent of the other. I. J 8 SECTION 5. EQUAL OPPORTUNITY PROVISIONS: During the performance of this contract, the ENGINEER agrees, as follows: tAl The ENGINEER will not discriminate against any employee or applicant for employment because of rate, color, religion, sex, or national origin. The ENGINEER will take affirmative action to ensure that applicants are employed, and that the employees are treated during employment, without regard to their race, color, religion, sex, or national origin. Such action shall include, but not limited to the following: employment upgrading, demotion, or transfer, recruitment or recruitment advertising; layoff or training, including apprenticeship. The ENGINEER agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided by the Contracting Officer setting forth the provisions of this nondiscrimination clause. tBl The ENGINEER will, in all solicitations or advertisements for employees placed by or on behalf of the ENGINEER, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, or national origin. 9 SECTION 6. CONFLICT OF INTEREST: tAl Interest of OWNER No officer, employee, or agent of the OWNER who exercises any functions or responsibilities in the review or approval or in connection with the carrying out of the project to which this contract pertains shall have any personal interest, direct or indirect, in this contract. tB] Interest of Certain Federal Officials No member of or delegate of the Congress of the United States, and no Resident Commissioner, shall be admitted to any share or part of this contract or to any benefit to arise here from. lC] Interest of Engineer The ENGINEER covenants that he presently has no interest and shall not acquire any interest, direct or indirect, in the above described project area or any parcels therein or any other interest which would conflict in any manner or degree with the performance of his services hereunder. The ENGINEER further covenants that in the performance of this contract, no person having any such interest shall be employed. 10 SECTION 7. OTHER PROVISIONS: In connection with the project, the OWNER shall: tAl Give thorough consideration to all documents presented by the ENGINEER and inform the ENGINEER of all decisions within a reasonable time so as not to delay the work of the ENGINEER. tBl Make provisions for employees of the ENGINEER to enter public and private lands as required for the ENGINEER to perform necessary preliminary surveys and investigations. tcl Obtain the necessary lands, easements, and Right-of-Ways for the construction of the work. tD] Furnish the ENGINEER such plans and records of construction and operation of existing facilities, or copies of same, bearing on the proposed work as may be in the possession of the OWNER. Such documents or data will be retumed to the OWNER upon completion of the work or upon the request of the OWNER. IE] Pay the cost of making necessary soundings, borings, analysis of materials and laboratory work performed by an Independent Certified Materials Lab exclusive of the ENGINEER's supervision thereof. tF] Pay all plan review costs and all cost of advertising in connection with the project. Original documents, plans, design, and survey notes represent the product and training, experience, and professional skill, and accordingly belong to and remain the property of the ENGINEER who produced them regardless of whether the instruments were copyrighted or whether the project for which they were prepared is executed. The ENGINEER shall fumish the OWNER two copies of "As-Built" drawings of each phase of the project at his expense; and the OWNER may, at his expense, retain reproducible copies of drawings and copies of other documents. This agreement shall be binding upon the parties hereto, their partners, heirs, successors, administrators, and assigns; and neither party shall assign, sublet or transfer his interest in this agreement without the prior written consent of the other party hereto. 11 AGREEMENT FOR ENGINEERING SERVICES: IN WITNESS WHEREOF, the OWNER has caused these presents to be executed in its behalf by its dgly authorized representatives, and the said ENGINEER by its duly authorized representatives, anti.Ur-e galtie3 hereto have set their hands and seals on the date heretofore set out. 't'ri - f . .' . .'I n ' l.t ..'J r- t t' ,' !-'t' 1 T .( ''' 'j : .rlt 't , ;"r;l - .rr ;i L Attestl ." 1, i ''h').ot,Ql/ CITY OF FAYETTEVILLE, ARKANSAS lowNERl MILHOLLAND COMPANY: Melvin L. Milholland, [ENGINEER] Traci Paul, City Clerk Attest: n- Ct-6/ W Secretary a t2 Poplar Street Improvements Proiect No. E490 Estimated Hourly Charges Milholland Engineering & Surveying 205 Vlf. Genter St, Fayetteville, AR 72701 Telephone/Fax: (50 11 4434724147 07 TABLE I PHASE NO. 1: RIGHT-OF-W SURVEY A) Research City Records B) Compute Right-of-Way C) Survey Existing Right-of-Way Draw HOURLY RATE TOTAL COSTS PHASE NO.2i DRAINAGE STUDY 10.00 $56.50 00 COMPANY PROFIT: PHASE NO. 1 - TOTAL MAXIMUM.NOT.TO EXCEED AMOUNT: TABLE U 5.00 $74.00 .00 TOTALS 15.00 25.00 62.00 26.00 780.00 $720.00 $5,500.00 C ENGINEERIN V IV TECH II SURVEYOR II CLERICAL SURVEYOR 10.005.00 15.00 15.00 10.00 31.00 5.00 31.00 6.00 $45.00 00 15.00 $35.00 $525.00 61.00 $40.00 $2.440.00 31.00 $25.00 $775.00 6.00 $17.50 $105.00 ENGINEERING SERVICES V IV 25.00 6.00 25.00 $56.50 164.00 13.00 $45.00 23.00 $35.00 25.00 $40.00 000.001.00 $74.00 00 A) Water Shed Boundary from Contour Map B) Visual Verification of Contour Map C) Survey Verification of Contour Map D) Determination of Flows E) Water Shed Map Drawing Meet with to Review Data 4.00 10.00 10.00 7.00 20.00 4.00 5.00 6.00 2.00 5.00 5.00 18.00 5.00 25.00 $25.00 6.00 $17.50 21 .00 12.00 57.00 29.00 28.00 10.00 157.00 00 $1,o5o.oo $8,000.00 TOTAL HOURS HOURLY RATE 00 105.00 COMPANY PROFIT: PHASE NO. 2 - TOTAL MAXIMUM.NOT-TO-EXCEED AMOUNT: TOTAL Poplar Street Improvements Proiect No. E490 Estimated Hourly Charges Milholland Engineering & Surveying 205 l,U. Center St, Fayetteville, AR 72701 Telephone/Fax: (50 1l 4/,34724l/47 07 TABLE III NO. 3: DESIGN OF STREET AND DRAINAGE IMP A) Locate Existing Utilities B) Cross Section Areas Download and PIot NATE A) Meet and Review Plans with Utility Companies Meet and Review Plans with ST COORDINATI SOIL INVESTIGATIONS PECIFI A) Design Street Location B) Design Street Elevation C) Design Drainage System D) Prepare Drainage Design Report E) Prepare Plan Drawings F) Prepare Detailed Drawings Plans TOTALS 90.00 1 10.00 75.00 31.00 45.00 30.00 85.00- 55.00 70.00 82.00 103.00 65.00 38.00 29.00 750.00 COMPANY PROFIT (15o/ol= $6,{00.00 PHASE NO. 3 - TOTAL MAXIMUM-NOT-TO-EXCEED AMOUNT: $46,850.00 TOTAL HOURS HOURLY RATE SECTION 2: BASIC ENGINEERING SERVICES E,NGI.VMGI-(. V tsNGI-VMGR. M E,NGR/MGR.CADD TECH I! SURVEYOR II SURVEYOR CLERICAL 2.00 2.00 4.00 4.00 4.00 4.00 4.00 4.00 50.00 40.00 50.00 5.00 40.00 50.00 5.00 7.00 IGS 6.00 10.00 10.00 20.00 10.00 10.00 5.00 5.00 2.00 G 4.00 8.00 5.00 4.00 7.00 15.00 15.00 20.00 20.00 8.00 10.00 ) 20.00 30.00 40.00 30.00 20.00 20.00 10.00 10.00 10.00 20.00 15.00 15.00 60.00 20.00 16.00 20.00 12.00 22.00 20.00 COST ESTIMATE 5.00 4.00 20.00 1 15.00 $74.00 $8.510.00 210.00 $56.50 $1 1.865.00 140.00 $45.00 $6,300.00 156.00 $35.00 $5,460.00 120.00 $40.00 $4,800.00 1 19.00 $25.00 $2,975.00 48.00 $17.50 $840.00 lr 5w.€be, ,' ,' t#N6 #l STAFF REVIEW FORM g/TTU &s 7h?? €n? RECEtVffiffi APR 2S M CIif Y 9F F,AMETIT,EY l.L L EM*$ronsffn[qE tr I,fufEM AGENDA REQUEST X CONTRACT REVIEW GRANT REVTEW For the Faye ttevill-e City Counci 1 meet, ing of FROM: Name Enqineerincr Public Works Divi s ion Depar tment, ACTION REQUIRED: Approval Sweetser Construction Co. , amount of $4 5 , 67 0 . the Change Order # f to the contract, with Poplar Street and Drainage Impvts. , in the of for COST TO CTTY: s4s.670 tLL r8 s Cost of this Request,CaLegory / Proj ect Budget Category/ Proj ect Name Street /Drainqe Program Name Sales Tax Fund 4470-9470-5809-00 AccounL Number 97023-0020 Pro j ect, Number '7 Funds Used DaEe l'L4. t rl Remaining Balance BUDGET REVIEW: CoordinaEor X Budgeted Item Budget Adjustment Attached Administrative Services DirecEor colirrR.Acr / enarw / LatsE REvr EW : C At, t, GRANTTNG AGENCY: Coordina Audi Lor 4-/h -oo -a-/ o^v. ,//n. lnY(Ul@ Datetu n Date t,e Dat, e Purchasing Officer Srerr RECoMMENDATToN: Approval of the change order. wsion Head rtment Director Cross Reference New It,em: YeS Prev Ord/Res #: NoX 4/-q7M @ Date Dat e ,1h Orig Cont,ract #-7 l8 Depa 1 t ive ces Director Date Orig Contract Date ,-/ Staff Review Form ?br 5+,)-yn J tsDescription/--- Proj ect Name Meeting Dat Comment,s: Budget Director Ref erence Comment, s : Accounting Manager City Attorney Purchasing Officer ADA Coordinator Internal Audi-tor TTEVILLE a THE CITY OF FAYEITEVITIE, ARXANSAS DEPARTMENTAT CORRESPONDENCE To: Fred Hanna , Mayor Thru: Charl es Venabl e, Publ'i c Works Di rector J 1m Beavers , Ci ty Eng tneeV$ From:S1 d Norbash, Staff Engi neer Apri 1 17, 2000Date Re: Popl ar Street Improvements The attached Change Order #1 to the above referenced contract has been necess'itated because of certain field adjustments and necessities. The main item, however, is the replacement of the 18" clay sewer line that is located in the street at this time. Th'i s line'is made of clay, and will not withstand the construction due to the lack of depth The change order will allow the replacement of this 'line with SDR 26 PUC pipe, which wi I'l be more sui tabl e. We request approval of this change order, which wi'l'l be funded with the project contingency approved by the Council. SN/ sn attachment s RESOLUTION NO. 9 r -'9 9 A RESOLUTION AWARDING BID NO. 99-55 IN THE AMOUNT OF 5845,8I6, PLUS A PROJECT CONTINCENCY AMOUNT OF s126,873 (15%) TO SWEETSER CONSTRUCTION, FOR TESTING, QUANT ITY VARI.ATIONS, T,TTLITY RELOCATIONS, AND CHANGES ASSOCIATED WITH THE POPLAR STREET IMPROVEMENTS/CONSTRUCTION; AUTHORIZING THE MAYOR'S EXPENDING THE FLTLL PROJECT CONTINCENCY AS HE DEEMS NECESSARY FOR THE COMPLETION OF THE POPLAR STREET PROJECT; AND APPROVAL OF A BUDGET ADJUSTMENT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section l. That the City Council hereby awards Bid No. 99-55 in the amount of 5845,816, plus a project contingency amount of S126,873 (15%) to Sweetser Construction, for testing, quantity variations, utility relocations, and changes associated with the Poplar Street Improvements/Construction. A copy of the bid tabulation is attached hereto marked Exhibit "A" and macle a part hereof. Sec.ti.,cn2. The City Council authorizes the Mayor's expending the full project contingency as he deems necessary for the completion of the Poplar Street Project. ,S-edii:r-i3-. The City Council approves a budget adjustment in the amount of S 160,143 increasing Street Improvements, Acct. No. 4470 9470 5809 00, Project No. 97023 20 decreasing Drainage Improvements, Acct. No. 4470 9470 5817 00, Project No. 97038 10. A copy of budget adjustment is attached hereto marked Exhibit "B" and made a part hereof. ill,, ll 1ii t. I i i" :{ir :- l, r ' II I lili itil iiiI \ r'r[' t t'lt Ed \ 1\. - <l : \ tt AND t 't<' PASSt It - .a ttt APPROVED this -6'h day of Jrrly , 1999 ,:r APPRO a.r.f: I \. ' , aa J.? .. .! l.t,\Hanna, Mayor lr. Byt I. o o. a . l. \ i" ATTEST: By: Hcathcr Woodru[[, City () .n \\ a CHANGE ORDER CONTRACT FOR:POPLAR STREET CONSTRUCTION OWNER:CITY OF FAYETTEVILLE ARKANSAS ADDITIONAL ITEMS & BASE BID ITEM CHANGES ORDER NO. 1 DATE March 10 2000 STATE ATKANSAS COUNry Wa To: J. D. Sweetser Construction Company, Inc.590 W. Poplar;Arkansas 72703 (Contractor) You are JUSTIFICATION to with the from the contract and Upgrading clay line to PVC due to shallow depth and susceptibility to crushing, due to construction loads. This docurnent will a supplement to the contract and all provisions will apply hereto .il/r, (Date) 4^ // -/62'p (Date)4-// - Pozo Item No.Quant.Unit Unit Cost Add Delete New DESCRIPTION OF CHANGES (Supplemental Plans & Specifications Attached) Contract Price DECREASE Contract Price INCREASE PART "B'' l.A.240 LF $6.00 New Up-size 8" SDR-26 to 10" SDR -26 pVC pipe $ I ,440.00 VI.A 407 LF $78.00 New 18" SDR-26PVC Pipe w/Bedding and 2x24,,x 24" x 25' Concrete Vertical Supports $3 1,746.00 VI.B 6 LF $29.00 New 8" SDR-26PVC Pipe with Bedding $ I 74.00 II.D.32.3 VF $ t 90.00 New Manhole Cast dHeavy DuU Ring & Lid $6,1 37 .00 PART 6'C'' V 250 Ton $ r 2.00 Add Class 7 Base Trench Backfill $3,000.00 XII.407 LF $2.00 Add Trench Excavation Safety Systems $8 r 4.00 XIII.8 CY $48.00 New Sand Bedding: Pipe Under Box Culvert $3 84.00 PART 36D" I.I l8 LF $ 12.50 New Attach 4' Chainlink Fence to Concrete Channel $ I ,475.00 III.4 HR $ r 25.00 New Spread Mulch for Tree Protection $500.00 TOTALS $0.00 $45,670.00 CONTRACT CHANGE $$45,670.00 CHANGE IN CONTRACT PRICE:CHANGE IN CONTRACT TIMES Original Contract Price $ 845,815.50 Original Contract Time: 260 days (days or dates) Net lncrease (Decrease) from Previous Change Orders _ to _: $0.00 Net change form previous Change Orders _ to _: 0 (days) Contract Price prior to this Change Order: $ 845,81 5.50 Contract Times prior to this Change Order: 260 days (days or dates) Net increase (dcerease) of this Change Order: $ 45,670.00 Net increase (deerease) this Change O.rder: 60 (days) Contract Price with all approved Change Orders: $ 891 ,485.50 Contract Times with all approved Change Orders: 320 days (days or dates) ENGINEER CONTRACTOR OWNER (Owner's (Date) O o k€. T.-frs/ % /r//0,STAFF REVIEW FORM X CONTRACT REVIEW _ GRANT REVIEW MlcE f3trTT,h,fEI) For t,he Fayettevi IIe CitY Council meeting of Mayor's Approval FROM: Engineering Divi s ion Public Works Depar t,mentName ACTION REQUIRED3 APP Sweetser Construct,ion Co - , amount of #32 ,209 - 60 for Pop1ar Street and Drainage Impvts., in the roval of the Change Order #Z to the contract with COST TO CITY: s?2 .209 -60 se22 .8 8 g Cost of this Request Category / Proj ect, Budget Poolar St. ImDVts. Catego ry / Pro j ect, Name St reet . Tnnr eItu Program Name Sales Tax Fund 4470-9470-5809-00 AccounE, Number 97 023 - 0020 Proj ect Number Funds Used To Date s944.0 6 s R.79? Remaining Balance BI]DGET REVIEW:X Budgeted Item Budget Adjustment Attached Administrative Senrices DirecLorCoordinat,or coilflrRjAer/GRLI{T / t'E'tsE REVTEW : Account GRLTiTTING AGENCY: bru ].na tor ernal AudiLor b-^;'ca Date Date Date Date Dat e {6'ru Purchasing Officer STAFF RECOMMENDATION:Approval of the change order. Divi s Head a/nfd: Date 6,-?7o Da tet,recE,or CI/ol^ I Cross Reference New Item: Yes No X Prev Ord/Res # :75-9'7 Orig Contract,#7187b Ma at, ive DirecEor Dat, e Orig Contract Date:7 -5-99 \ o O Staff Review Form Descript, i or-/ Hwy 265 Water & Sewer Reloc . Proj ect Name Meeting Date 3-2-99 Comments: Budget, Director Reference Comment,s: Accounting Manager City Attorney Purchasing Officer ADA Coordinat,or Int,ernal Auditor o O Staff Review Form Description/ - Meeting Dat Project Name Comments: Budget, Director Reference Comments: Accounting Manager City Attorney Purchasing Officer ADA Coordinator Internal Auditor EiA'k' fg' f .'E' x{ \/ #, }-, E:, o THE CITY OF FAYETTEVILIE, ARXANSAS DEPARTMENTAL CORRESPO N DENCE To: Fred Hanna , MaYor Cha rl es Venabl e , Publ 'i c Works Di rector Jim Beavers, Clty Engineerl/ Thru o-J From Si d Norbash, Staff Engt neer June 26, 2000Date: Re: Popl ar Street Improvements - Change 0rder #Z The attached Change 0rder #2 to the above referenced contract has been necessitated because of certain field adiustments and necessit'ies. These items are detailed on the attached change order, and the justifications for the addit'ion of these changes are stated by Milholland, the engineer for th'is project. We request approval of this change order, which will be funded w'ith the project contingency approved by the Counc'il (a copy of the resolution is attached). SN/ sn attachments IaOLUTTON NO. ,e r-e9' O A RESOLUTION AWARDINC BID NO. 99-55 tN THE AMOUNT OF 5845,8I6, PLUS A PROJECT CONTINGENCY AMOUNT OF s126,873 (15%) TO SWEETSER CONSTRUCTION, FOR TESTINC, QUANTITY VARLATIONS, UTLIry RELOCATIONS, AND CHANCES ASSOCIATED WITH THE POPLAR STREET IMPROVEMENTS/CONSTRUCTION; AUTHORIZING THE MAYOR'S EXPENDINC THE FULL PROJECT CONTINCENCY AS HE DEEMS NECESSARY FOR THE COMPLETION OF THE POPLAR STREET PROJECT; AND APPROVAI OF A BI.IDGET ADJUSTMENT. BE IT RESOLVED BY THE CITY COUNCTL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section l. That the City Council hereby awards Bid No. 99-55 in the amount of 5845,816, plus a project contingency amount of $126,873 (15%) to Sweetser Construction, for testing, quantity variations, utility relocations, and changes associated with the Poplar Street Improvements/Construction. A copy of the bid tabulation is attached hereto marked Exhibit "A" and made a part hereof. S.ecflon2. The City Council authorizes the Mayor's expending the full project contingency as he deems necessary for the completion of the Poplar Street Project. Sectinn 3. The City Council approves a budget adjustment in the amount of S160,143 increasing Street Improvements, Acct. No. 4470 9470 5809 00, Project No. 97023 ?0 decreasing Drainage lmprovements, Acct. No.4470 9470 5817 00, Project No.97038 10. A copy of budget adjustment is attached hereto marked Exhibit "8" and made a part hereof. PROVED this -6'h day of Jrrly , 1999. B \,.' .L I ,t.. ATTEST: B . ? " '! . "' , lr.t l !r red Hanna, Mayor Hcathcr Woodruff, City I I I I : : i i I I I I I l.)) I I a a ! 't ., I II I t I , It a 1 \( l1 C) O o ADDITIONAL ITEMS & BASE BID ITEM CHANGES CHANGE ORDER CONTRACT FOR: POPLAR STREET CONSTRUCTION OWNER: CITY OF FAYETTEVI LLE.ARKANSAS To: J. D. Sweetser Consfirrction Inc.s90 w Arkansas 72703 You are to with the from the contract and JUSTIFICATION: ' Traffic Control Plan developed to allow safe movement of traffic through the construction zone. ORDER NO.2 DATE May 10, 2000 STATE Arkansas COUNTY Washington Item No.Quant.Unit Unit Cost addIhlac !ew DESCRIPTION OF CHANGES (Supplemental Plans & Specifi cations Attached) Contract Price DECREASE Contract Price INCREASE CONTRACT PART "B' I.A.25 LF $3s.00 A 8" SDR-26PYC @ t%$875.00 II.D.r0 VF $ 190.00 A New Manhole w/ Heavy, Ring & Lid $ 1,900.00 II.E.I LS $400.00 N Appurtenances for Drop Manhole $400.00 VI.I LS $600.00 N Remove and Dispose Manhole $600.00 VII I LS $2,650.00 N Bypass Pumping for Ext. 8" Line $2,650.00 CONTRACT PART 66C'' I.C.I 350 SF $ 12.40 N Construction Zone Signing $4,340.00 t.c.2 40 LF $30.00 N Type III Barricade s 1,200.00 I.C.3 502 HR $27.30 N Provide Flagman $ 13,704.60 I.C.4 I LS $2,220.00 N Equipment for Maintaining Traffrc s2,220.00 IV4 96 LF $45.00 A Handrails for Existing Scull Creek Box Culvert $4,320.00 TOTALS $0.00 $32,209.60 CONTRACT CHANGE $$32,209.60 ffi h "E',E- *' r Ei V t,i]a-,r,, THT CITY OT FAYETIEVITTE, ARKANSAS DEPARTMENTAL CORRESPO N DENCE o To: Sid Norbash, Engineering Division From: Heather Woodruff, City Clerk Date: July 12,2000 Attached is a copy of the Change Order #2to the contract with Sweetser Construction Co. for Poplar Street and drainage improvements (Reference: Resolution 9l-99). The original will be microfilmed and filed with the City Clerk. cc:Nancy Smith, Internal Auditor Dla ;4r/ rn'1' ,J' J (/"Z*/z<//7t /tzt ORDER NO 2 DATE May 10, 2000 STATE Arkansas COUNTY Washington ADDITIONAL ITEMS & BASE BID ITEM CHANGES CHANGE ORDER CONTRACT FOR:POPLAR STREET CONSTRUCTION OWNER: CITY OF FAYETTEVILLE, ARKANSAS To: J. D. Sweetser Construction . Inc.: 590 W.Fayetteville, Arkansas 72703 Contract Price INCREASE Contract Price DECREASE DESCRIPTION OF CHANGES (Supplemental Plans & Specifications Attached) Unit Cost add Delete New Item No.Quant.Unit CONTRACT PART "B' $875.00A8" SDR-26PVC @ l%25 LF $3 5.00I.A. $ 1,900.00ANew Manhole w/ Heavy, Ring & LidVF$ 190.00II.D l0 s400.00Appurtenances for DroP Manhole$400.00 NII.E.I LS s600.00NRemove and Dispose ManholeILS$600.00VI. $2,650.00NBypass Pumping for Ext. 8" LineILS$2,650.00VII CONTRACT PART 36C'' $4,340.00Construction Zone SigningSF$ 12.40 NI.C. I 350 s 1,200.00s30.00 N Type III Barricadet.c.2 40 LF $ 13,704.60NProvide Flagman502HR$27.30I.C.3 $2,220.00Equipment for Maintaining TraffrcLS$2,220.00 NI.C.4 I s4,320.00AHandrails for Existing Scull Creek Box Culvert96LF$45.00IV4 $32,209.60$0.00TOTALS $32,209.60CONTRACT CHANGE $ (Contractor) You are to with the from the contract and JUSTIFICATION: . Traffic Control Plan developed to allow safe movement of traflic through the construction zone. . Handrails added per direction of Chuck Rutherford and Don Bunn, May l5' 2000. . Drop Manhole required to allow for 36" SRMP installation. This document will become a supplement to the contract and all provisions will apply hereto. (Owner) tllct\ o{ (Date) 0 r /f-oo ENGINEER CONTRACTOR OWNER (Date) /.r'-oo CHANGE IN CONTRACT PRICE:CHANGE TN CONTRACT TIMES Original Contract Price $ 845,815.50 Orieinal Contract Time: ,26Q (days or dates) Net increase (deerrcase) from Previous Change Orders I to I : $ 45,670.00 Net chzuree form orevious Chanee Orders I to I : . 60 (days) Contract Price prior to this Change $ 891,485 Order: .50 Contract Times orior to this Chanee Order: ,320, (days or dates) Net frkererse) th is Order:1 (days)Net increase (dccrease) of this Change Order: $32,209.60 Contract Price with all approved Change Orders: $923,695. I 0 Contract with all Chanse Orders:727 Recommended: (Contractor) ;- (Date) COPIES TO: RESOLUTION NO. el-ee A RESOLUTION AWARDING BID NO. 99-55 IN THE AMOUNT OF $845,816, PLUS A PROJECT CONTINGENCY AMOUNT OF $126,873 (15%) TO SWEETSER CONSTRUCTION, FOR TESTING, QUANTITY VARIATIONS, UTILITY RELOCATIONS, AND CHANGES ASSOCIATED WITH THE POPLAR STREET IMPROVEMENTS/CONSTRUCTION; AUTHORIZING THE MAYOR'S DGENDING TIIE FULL PROJECT CONTINGENCY AS HE DEEMS NECESSARY FOR THE COMPLETION OF THE POPLAR STREET PROJECT; AND APPROVAL OF A BUDGET ADruSTMENT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKAITISAS: Section l. That the City Council hereby awards Bid No. 99-55 in the amount of $845,816, plus a project contingency amount of $126,873 (15%) to Sweetser Construction, for testing, quantity variations, utility relocations, ffid changes associated with the Poplar Street Improvements/Construction. A copy of the bid tabulation is attached hereto marked Exhibit "A" and made aptrthereof. Section 2. The City Council authorizes the Mayor's expending the full project contingency as he deems necessary for the completion of the Poplar Street Project. Section 3. The City Council approves a budget adjustment in the amount of $160,143 increasing Street Improvements, Acct. No. 4470 9470 5809 00, Project No. 97023 20 decreasing Drainage Improvements, Acct. No. 4470 9470 5817 00, Project No. 97038 10. A copy of budget adjustment is attached hereto marked Exhibit rrBrr and made a part hereof. APPROVED this -6ft day of July ,1999 By Hanna, Mayor ATTEST: B Heather Woodruff, City MtcR aFrI,&fED * FAYETTEVTLLE THE CITY OF FAYETTEVITLE, ARKANSAS DEPARTMENTAL CORRESPO N DENCE To: From: Date: Re: Jim Beavers, Chief Engineer Theresa Johnson, Deputy City Clerk July 20, 1999 Res. 9l-99, Poplar Street Improvements, Sweetser Construction Attached please find a copy of the resolution and its backup pages. Other copies of the bound contract and bid documents were forwarded to your office last week when they were executed. cc:Yolanda Fields, Internal Audit Steve Davis, Budget STAFF REVIEW.FORM x x AGENDA REQUEST CONTRACT REVIEW GRANT REVIEW For the Fayetteville CitV Council meeting of FROM: Jim Beavers Public Works Nornp Divicinn hpnorf rrranf ACTION REQUIRED: Approval of: A. Proposed construction contract in the amount of $845,815.50 with Sweetser Construction, Inc. B. Approval of a project contingency in the amount of 5126,872.33 (15%) for use as needed for testing, quantity variations, utility relocations, changes ... C. Council's approval for the Mayor to expend the full project continency as the Mayor deems necessary for the completion the Poplar Street project. D. Proposed budget adjustment for the project in the amount of $160,142.83. COST TO CITY: s972.687.83 Poplar Street 4470-9470-5809.00 $ 102.046 Funds Used To Date e Sales tax Fund Account Number 97023-0020 $g 12.545 Pioject Number Budget Coordinator CONTRACT/GRANT/LEASE REVIEW: t, x Budgeted Item b-/7 -4cr Date -,/ ?'f , G-lE*1 ot Adjustment Attachede Administrative Services Director Auditor 0 Date ADA Coordinator Date ,t^L STAFF RECOMMENDATION: Approval of items a -d above. ,fi* n'11 Cross Reference 4 (,tcfi 2tlvNt( New Item: Yes No x Prev Ord/Res #: 75-97 Orig Contract Date: 19 Aug 97 Ensineerins s91 4.s91 Page 2 STAFF REVIEW FORM Description Ponlar Street Imorovements Meeting Date Julv 6. 1999 Comments: Budget Coordinator Reference Comments: Accounting Manager City Attorney hrrchasing Officer ADA Coordinator 2 Internal Auditor 3 FAYE,TTEVILLE, THE CITY OF FAYETTEVITTE, ARKANSAS DEPARTMENTAT CORRESPO N D ENCE To: Fred Hanna, Mayor Thm: Charles Venable, Public Works Director 0/ Contract Review From: Jim Beavers, City Enfi""ft Date: June 16, 1999 Re: Agenda Request, Council Meeting of July 6, 1999 A. Proposed construction contract in the amount of $845,815.50 with Sweetser Construction, Inc. B. Approval of a project contingency in the amount of $126,872.33 (15%) for use as needed for testing, quantity variations, utility relocations, changes ... C. Council's approval for the Mayor to expend the full project continency as the Mayor deems necessary for the completion the Poplar Street project. D. Proposed budget adjustnent for the project in the amount of $160,142.83 1. ProjectBackground. The engineering design contract for the street and drainage improvements was approved by the City Council August 19,1997. The engineering contract did not include bidding and construction management. 2. Construction contract. The design and right-of-way acquisitions have been completed and the project bids taken. The project bids were opened on June 10, 1999. The City received two bids as follows: McClinton-Anchor $945, I 5 5.00. Sweetser Construction $845,8 1 5.50 Page 1 of 2 The low bid of $845,815.50 from Sweetser Construction is within l0% of the engineer's estimate. The Project Engineer, Milholland Company, ffid staff recommend that the City award the construction to the low Bidder, Sweetser Construction. 3. Budget and requested budget adjustment. The 1999 project budget is $914,591.00. The 1999 expenditures are $102,046.00. The current budget balance is $812,545.00. The total of the construction contract ($845,815.50) and the l5o/o contingency ($126,872.33) is $972,687.83. A budget adjustment of $ 160, 142.83 is requested at this time. Please note, that some utility relocations may be required during construction. The majority of the franchised utility relocations should be gt the utility companies' expense. However, some expense for utility relocations may be required to *Snrnaed frtm the requested contingency. Additionaf information will be provided if relocation agreements are found to be necessary. enclosures: 1. Vicinity map 2. Construction contract (one original) 3. Budget Adjustment. Page 2 of 2 (,o LrJtr(, \, Y \ / / \ II/E tt I a , I I , I t I I I I , I I I I I I i"' " "'l .l,i I.., UJ2zo c)uI / /.\.,l/ J PROJECNY OF RIME}ITAI.FARM t a a I e-._a":e -.E.:E. REAP DR... z o:. Iul;. E q , I \. g 5 : ,EI E] f t II ! ; ? t : I I 1 6 TIAPLE ^trorJs .UI -:" 'f 180 540 71 T- 17-N T- 1 6-N {oo $ 4 o g i I a I I I I UNTIERSrrY OF ARIO}.ISAS EXPERIMENTAL FARM ,r t.. I I i ''r -l l GreborV Pork 718 -.t- I I I I ,''r' I a t a, t- I ;ii "v i' --J lfi,Lson Pork 7F 't UNIVERSITY LN OF ARIGNSAS 9 I I t UNIVERSITY / -. (,z v, lt1o G, C) t : I , I I , I i , I I I i a I , I , I I ,l ':- "i F,// V_/cr v J.lglHXSss ^ bb' T.fj 52' m4'otoo't * el<*'J)v, t@vZocd ?}VqC/ -a -do-'-557 l>,r Depanment: Sales Tax Capital Improvement Fund Division: Program: Date Requested 06/17 /99 City of Fayetteville, Arkansas Budget Adjustment Forrn EXHIBIT B Budget Year r.999 Adjustment # Project or ltem Requested: Additional funding is requested for Poplar Strcet Improvements project. Project or Item Deleted: None. A ponion of the funding for Drainage Study and Master Plan is proposed for this adjustment. Justification of this Increase: The low bid tor the project with contingency is greater than the remaining funds budgeted. Justification of this Decrease: The Poplar Street Improvements project will address drainage issues along Poplar Street in addition to irnproving the street. Increase Expense (Decrease Revenue) Account Name Amount Account Number Project Number St,reeE, Improvements 150,L43 4470 9470 5809 00 97 023 20 Decrease Expense (Increase Revenue) Account Name Account Number Project Number Drainage Improvement,s 1"50,L43 447 0 947 0 5817 00 97038 10 Approval Signatures Budget Office Use Only Date Type: A B C E e -(1-71 Date Date of Approval C e9 Date Posted to Ceneral lrdger Posted to Project Accounting Entcred in Catcgory Log Blue Copv: Buclget & Research / Ycllow CctpT': Requester D;\DA TA\99 B U D C ET\B U D GTA D J\P O P L -S o zJJut{fr ,a STAFF REVIEW FORM c l'a( tCt 7o l,',r,;/S*J7--' MICROFILMEd I oKLff5 t AGENDA REQUEST X CONTRACT REVIEW GRANT REVIEW For the Fayet, t evi IIe Ci ty CounciL meeting of Mavor's Anproval FROM: Enqineerinq Public Works Name Divi s ion Depar t,ment, ACTION REQUIRED: Approval of the Change Order #g to the contract with Sweetser Construction Co., for Poplar Street and Drainage Impvts., in the decrease amount of -$21,894.50 COST TO CITY: ($2t,282.50) t &ti-Cost of this Request 4470-9470-5809-00 Account, Number 97 023 -oo20 Pro j ect, Number sg22. ggg Category / Proj ect, Budget s 3z'I ,1u,,- Funds Used ho Date $-*sr ts3 Remaining Balance Cat,egory / Proj ect Name Street Impvts. Program Name Sal- es Tax Fund Ponlar .ql. T s. BT'DGET X Budgeted Item Budget Adjustment Attached Admini strat, ive Services DirectortCoordinator cotflrRAcT/ GRAIIT / t'ge'sE REVT EW : cir Purchasing Officer GRjA]ITTING AGENCY: fu', iru ADA CoordinaLor DaEe t/ro / Dat,e 7)oLt,,&" A-ru-^- Dat,e Date Internal $uartor STAFF RECOMMEIIDATION: Approval of the change order. ,M sion Head t -01 Cross Reference New ltem: Yeg No X Prev Ord/Res # :75-97 Orig Contract Dat,e (r--4 l,tb, t Mayor E,rat ].\/e cLor ces Director Date Orig Cont,ract Date:7-6-99 #718/,((M o !} ITAYETTEVILLE THE CITY OF FAYETTEVILTE, ARXANSAS DEPARTMENTAL CORRESPO N DENCE To: Dan Coo dy , I"laYor Si d Norbash, Staff Engi neer December 12, 2000 Thru: Charl es Venabl e, Publ i c Works Di rector J 1m Beavers , Ci ty Engi nee , h'bJf ^d,JFrom Date Re : Pop'l ar Street Improvements - Change Order #g The attached Change 0rder #3 to the above referenced contract has been necessitated because of certain fjeld adjustments and necessjt'ies. These items are detailed on the attached change order, and the justificat'ions for the addition of these changes are stated by Milholland, the engineer for this project. t^te request approval of this change order, which w'ill reduce the coSt of the contract by $21 ,28?.50. SN/ sn attachments TTEVTLLE 4 THE CITY OT FAYETTEVITTE, ARXANSAS DEPARTMENTAT CORRESPO N DENCE To: Sid Norbash, Engineering From: Heather Woodrufl City Clerk Date: January 23,200L Attached is a copy of the completed staff review form and signed change order no. 3 to the contract with Sweetser construction for Poplar Street and drainage improvements. I am also returning tU6'originals to you. The original will be microfilmed and filed with the City Clerk. cc Nancy Smith, lnternal Auditor ORDER NO.3 DATE November 8, 2000 STATE Arkansas COUNTY Washington ADDITIONAL ITEMS & BASE BID ITEM GHANGES CHANGE ORDER CONTRAGT FOR: POPLAR STREET CONSTRUCTION OWNER: CITY OF FAYETTEVILLE, ARKANSAS To: J. D. Sweetser Construction Compstry, Inc.;590 W. Poplar: Fayetteville. Arkansas 72703 (Conlraclor) You are to with the fol JUSTIFICATION:. Summary of Added, Deleted and Reduced Quantities (Avner's Engineer) from the contract and 35 This document will become a supplement to the contract and all provisions will apply hereto. 0 )r /t/,r (Date) COPIES TO: rt'.c //*/o -6!o (Date) //- /7- od sr f,t ti 'i {1 Contract Price TNCREASE Item No.Quant.Unit Unit Cost add Delete !.* DESCRIPTION OF CHANGES (Supplemental Plans & Specifications Attached) Contract Price DECREASE CONTRACT PART 'OA'' A Valve Box Crade Adjustment $ I .800.00I.6 EA $300.00 II.I EA $4,700.00 A Water Main Relocation $4,700.00 III.I EA $ I ,500.00 A Fire Hydrant Relocation $ I ,500.00 $4,500.00IV9EA$s00.00 A Water Meter Relocation $ 1,500.00V3EA$500.00 A Water Service Line Relocation $ I ,900.00VI.I LS $ I ,900.00 N Potable water continuity during main relocation CONTRACT PART '(BTT III.-2 EA $300.00 D Manhole Ring & Lid Adjustment ($600.00) $ I ,500.00VIEA$ 1,500.00 A Sanitary Sewer Service Line Relocation CONTRACT PART "C'T LF $7.00 A Concrete Curb and Gutter $ 1,939.00III. A I 277 235 LF $ 13.7s A 5' Wide x 4" Thick Concrete Sidewalk s3,231.25III. D $9.198.00III. E 328.5 SY $2 8.00 A Concrete Driveways, Ramp & Parking ($7o0.oo)IV. 6 I EA $700.00 D Grate Adjustment $ 1,600.00VII. 3 A 8 CY $200.00 N Concrete Slurry for Rip Rap Sodded Swale Ditching ($ 1,800.00)IX. I -r50 LF $ 12.00 D D French Drain Construction ($4,000.00)x.-500 LF $8.00 D OSHA Trench Safety ($400.00)XI.-200 LF $2.00 CON'I'RACT PAR'I' I'DTT ($48,887.75)I -575.15 CY $8s.00 D Rock Excavation $ I , 125.00III.5 EA $22s.00 N 6" Pipe Bollard (Painted) N 4" Schedule 40 Signal Conduit $612.00IV5lLF$ t 2.00 TOTALS ($56,387.75) CONTRACT CIIANGE $($2 L,292 . 50 CHANGE IN CONTRACT PRICE:CHANGE IN CONTRACT TIMES: Original Contract Price $ 845,815.50 Orieinal Contract'l'ime:260 (days or dates) Net increase (deerease) fronr Previous Change Orders I to 2 : $ 77,879.60 Net change form previous Clrange Ordcrs I to 2:63 (days) Contract Price prior to this Change Order: $ 923,695.10 Contract Times prior to this Charree Order: (days or dates) Net (inercase) decreasc of this Change Order: ',$ . i, aHi. Sb Net (inercase) decrease this Change Order:-0- ' .1,r. 'r. rt 9ra-t J, Contract Price witlr all approved Change Orders: $ 901 ,800.60 Contract Tinres with all approved Orders:323 (days or dates) XENGINEER CONTRACTOR OWNFR Recomrnende di- -''" (Contractor)(Date) 323 n MICROFILMED Ze= z*77 h5: ro/ro/or O***^r/ #-SSTAFF REVIEW FORM - AGENDA REQUEST X CONTRACT REVIEW GRANT REVIEW For the Fa tevi-I1e Cit Council meeti of f FROM: Engineering Divi s ion Publ i c orks Name rtment ACTfON REQUfRED: Approval- of the Amendment 3 (F 1 ) to the enqineering contract with Milholland Company, for Folr1ar Street and Drainage Iupvts., in the amount of $16,947 .43 COST TO CTTY: sL6,941 .43 Cost of this Request s71 .499 . oo (2oo11 Poplar St. Impvts. Category / Pro j ect Name 4410-9410-5809-00 Category /Proj ect Budget s4,320 St- reet s- Account Number 97023-0010 Funds Used To Date s65.266 Program Name Sales Tax Proj ect Number Remaining Balance Fund REI/IEW:X Budgeted Item Budget Adjustment Attached tor Administrative Services Director coNTRACT/eneXT/r.tASE RE1TrEW :GRANTING AGENCY: t,rt/dtr Date *b r '\ gIor Accounti ng ADA Coordinator Date rc( yl ot Date'ry ttorney Int tor U /b4 Purchasing Officer Date STAtr'F RECOUMNDATION: Approval of the Amendment #3 to the Eng. Contract. /* La/b"P'2-olDi/i"ion Head Date Cross Reference /o -3-o (New rtem: Yes- No X Di rector Date /t ,/#t /rb Prev ord/Res #z 15-g7 /qe-11 Admin ative Services Director ,0,,nM^,Oriq Contract *6tO-J M.yot Date Orig Contract Date:8- a a\ Staff Review Form Description/ Popl-ar St. Impvts Proj ect Name Eng. Amendment #3 Meeting Date N'A Comment s :Reference Comments: Budget Director Accounting Manager City Attorney Purchasing Officer ADA Coordinator fnternal Auditor )i =[ h-* o- { c, An*Pn-^.. cl^*r I (X-l-r^.-o )lo\ V J IIAYE,TTEVILLE THE CITY OF FAYETTEVITIE, ARKANSAS DEPARTMENTAL CORRESPO N D ENCE To: Thru: From: Date: Re: Dan Coody, Mayor Greg Boettcher, Public Works Director Jim Beavers, Ciry nnsinee)fatbuw ISid Norbash, Staff Engineer /^-/ September 28, 20Ol Poplar Street Iuprovuantc - Engineering Contract eoendnont #3 The attached amendment #3 to the above referenced contract has been necessitated because of the change in the scope of this contract, and certain field adjustments and conditions. The justification of the extra engineering expenses are as follows: (1) Gas and Phone companies specifically asked for elevations, control points, and aligrunents to be able to do their adjustments. Since this work was not included in our origi-nal contract with Milholland, this field work was added to the scope of our contract. (2) The 18" CIay pipe Sanitary sewer main was located in the street and it began failing, causing delays and problems. It was then decided by the PWD and Dave.rurgens to design for replacement of this se!{er main. Milholland was directed to design the replacement sewer, and conduct construction management. (3) After the construction began, there were numerous complaints about the traffic flow and delays resulted because of the construction. At this time Millholland was asked to do a brief traffic study, and find a better solution to the traffic problem. Milholland These items are detailed on the attached Amendment #3, and the cost justifications for these additions are stated by MiIhoIland, the engineer for this project. Rather than making a formal Amendment #3 at that time, it was decided to allow the Engineer to charge the actual hours, since we already have an hourly pay schedule by Milholland. Milholland's final costs have been submitted, and the total cost submitted for the above items are 918r833.50. However Staff has negotiated this item to be lowered by $1,886.07 (less 14t profit). Please note that the Engineer had honored the not to exceed figures on each item submitted previously, even though the Engineer incured actual expenses. The Staff is requesting approval of this amendment in the total amount of $L6,947.43 to close out this contract. please note that we understand the instructions given to us by the Public Works Director, that after the fact change orders or amendments are to be avoided. This case is an old instance, and there might be a few more that have already occurred this way, however for the future contracts Staff wiII try to adhere to the policy stated above. SN/sn attachments RESOLUTION NO. 9l - 99 A RESOLUTION AWARDING BID NO. 99.55 tN THE AMOUNT OF 5845,8 I6, PLUS A PROJECT CONTINGENCY AMOUNT OF s126,873 (t5%) TO SWEETSER CONSTRUCTTON, FOR TEST ING, QUANTITY VARI.ATIONS, UTILITY RELOCATIONS, AI{D CHANGES ASSOCIATED WITH THE POPLAR STREET IMPROVEMENTS/CONSTRUCTION; AUTHORTZING THE MAYOR'S EXPENDING THE FIJLL PROJECT CONTINCENCY AS HE DEEMS MCESSARY FOR THE COMPLETION OF THE POPLAR STREET PROJECT; AND APPROVAL OF A BIIDGET ADJUSTMENT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEYILLE, ART(AT{SAS: Section I. That the City Council hereby awards Bid No. 99-55 in the amount of 5845,816, plus a project contingency amount of $126,873 (15%) to Sweetser Construction, for testing, quantity variations, utility relocations, and changes associated with the poplar Street Improvements/Construction. A copy of the bid tabulation is aftached hereto marked Exhibit "A', and made a part hereof. S.efiion2. The City Council authorizes the Mayor's expending the full project contingency as he deems necessary for the completion of the Poplar Street project. 'S-e,clicni. The City Council approves a budget adjustment in rhe amount of S160,143 increasing street Improvements, Acct. No. 4470 9470 5809 00, Project No. 97023 20 decreasing Drainage lmprovements, Acct. No. 4470 9470 5817 00, Project No. 97038 10. A copy of budget adjustment is attached hereto marked Exhibit "B" and made a part hereof. \ ,.P ASS Ia' [. EU APPROVED this 6'h day sf _.hrly , 1999. liri ( a, AryD t tco ,'\. - \ ,'I tIa r.L I ! . 'l .' t! ' . l.t,l APPRO By a I red Hanna, Mayor lr ATTEST: By: Hcathcr Woodruf[, City I . l[ir il[ ljrl ilrlrjii iti Ir iit iii tl li ll I' I Il. t ! li Ir a, I i ! Ii' !:l' CONTRACT AMENDMENT NO. 3 FOR ENGTNEERING SERVICES PROJECT: POPLAR STREET IMPROVEMENTS E-541 THE ORIGINAL CONTRACT was made and entered into on August 19, 1997, AND THIS CONTRACT AMENDMENT NO. 3, made and entered into on this ,/r' day of 2 /rtn , 2001, by and between the CITY OF FAYETTEVILLE, Arkansas, hereinafter referred to as the "OWNER", and MILHOLLAND COMPANY, Engineering and Surveying, Consulting Engineers of Fayetteville, Arkansas, hereinafter referred to as the "ENGNEER", WITNESSED THAT: WHEREAS, the OWNER Originally desired to Re-Construct POPLAR STREET 28 feet in width from LEVERETT AVENUE East to GREGG AVENUE centered in a Right-Of-Way fifty varying from forty (40') to feet (50') in width, AND WHEREAS, the OWNER has AMENDED its desires several times previously, AND WHEREAS, the OWNER has added into "PHASE IV: CONTRACT AMENDMENT," Amendment No. I and Amendment No. 2, as follows: Amendment No. l: Amendment No.2: C.O. No. I by Resolution No. 25-98 in the amount of $ 4,425.00; C.O. No. 2 by Resolution No. 92-99 in the amount of $71,601.00; AND, WHEREAS, the OWNER desires to add Amendment No. 3 to said PHASE IV to provide for the following items: ITEMNo. 1: S-2196: Field Stake Poplar Street Right-of-WayforRelocation " ::"::::: Y:',lii'::': :::T ::: :'ll:''1 Tl :::':: :':1* Yf i,,, u, o Design 377 LF of a new 18" SDR-26 Sanitary Sewer Main to replace old clay pipe and laterals under Poplar Street; AND Re-Design Poplar Street intersection with Gregg Avenue and the Arkansas-Missouri Railroad Crossing . . $ 9,857.00 1 ITEMNo.2 t Amendment No. 3; PHASE IV; POPLAR STREET IMPROVEMENTS, Cont. Page Two (2) ITEM No. 3: Design a "Traffic Control Plan" with Detours and Construction Signage for use to provide control for 'oOne-Way" Traffic during Construction of said street . . . . .$ 1,700.00 ITEMNo.4: Additional Engineering Services resulting from delayed Construction and Additional Items . $ 5,500.00 THEREFORE, the OWNER desires the ENGINEER to provide said services in C.O. No. 3 for a Total Fee Amount of . . THEREFORE, the ADJUSTED TOTAL PHASE IV CONTRACT Price Equals . . . . $94,859.50 4- WHEREAS, the OWNER deemed it essential to delay and modiff its original plans, and Amend, AND, WHEREAS, the ENGINEER has sufficient experienced personnel and equipment to perform the work described in this Agreement, as Amended, NOW THEREFORE, in consideration ofthe mutual covenants and agreements herein contained, the OWNER and the ENGINEER, the parties hereto, stipulate and agree that the OWNER does hereby employ the ENGNEER to perform the required engineering services as herein above set out; AND the ENGINEER agrees to provide said ADDITIONAL SERVICES. IN WITNESS WHEREOF, the OWNER has caused these presents to be executed in its behalf by its duly authorized representatives, and the said ENGINEER by it duly authorized representatives, and the parties hereto have set their hands and seals on the date heretofore set out. CITY OF FAYETTEVILLE, ARKANSAS Attest: Dan Coody, Mayor City Attest: S18,833.50 See' att' Inv.S;3uf e 0nm QurnA-. 2 Secretary a L., Surveyor I 7W;/1,//*nJ Co*pany Cngineerirug €, Surunfinr REGISTRATICNS: PE: AR, OK, MC PLS: AR, OKMelvin L. Milholland, PEIPLS INVOICE City of Fayetteville Mr. Sid Norbash, Engineer I 13 West Mountain Street Fayetteville, Arkansas 72701 Project No.: E-541 Date: July 10, 2001 Invoice Work Performed: 8/19197 - 6130101 PROJECT: POPLARSTREETIMPROVEMENTS CONTRACTOR: Jerry D. Sweetser,lnc. DESCRIPTION: Engineering Services per Service Agreement, dated August 1997, providing a Rightof-Way Survey, Drainage Study, plus Street and Drainage Improvements designed for the Re-Construction of a section of Poplar Street, approximately 2,500 LF in length, located between the center lines of North Leverett and Gregg Avenues, plus C.O. No. l, C.O. No.2 and C.O. No. 3: SECTION 3 - COMPENSATION: I. PHASE NO. I: RIGHT-OF-WAY SURVEY: Compensation for Basic Engineering Services shallbe based on a cost plus basis with a "MAXIMUM-NOT-TO-EXCEED" fee amount of $5,500. Break down of hours and expenses on Table I ...$ 5,500.00 II. PHASE NO. II: DRAINAGE STUDY: Compensation for Basic Engineering Services shall be based on a cost plus basis with a "MAXIMUM-NOT-TO-EXCEED" fee amount of $8,000. Break down of hours and expenses on Table II III PHASE NO. III: DESIGN OF STREET & DRAINAGE IMPROVEMENT: ...s 8,000.00 Compensation for Basic Engineering Services shall be based on a cost plus basis with a "MAXIMUM- NOT-TO-EXCEED" fee amount of S46,85 0. Break down of hours and expenses on Table III $ 46,850.00 TOTAL DUE: PHASE I,II. AND III (Maximum-Not-To-Exceed $60,350)..... $ 60.350.00 IV. PHASE IV: CONTRACT AMENDMENT: Amendment No. I : Change Order No. l: 7 /21/99: Easement Plats for Acquisition, per Resolution 25-98, (Maximum-Not-To-Exceed$4,425) ......... $4,425.00 TOTAL CHANGE ORDER No. I $ 4,425.00 Amendment No. 2: Change Order No. 2:7121/99: Construction Observation, requested by City Engineer, per P.O. #00-0053405-003 Resolution No. 92-99 (Maximum-Not-To- Exceed of $7 1,601)s 71,601 .00 TOTALCHANGERORDERNo.2 . ...... $71,601.00 Amendment No. 3: Change Order No. 3: Field Stake Right-of-Ways, Design 18" Sanitary Sewer Main, Re-desigr Railroad and Poplar Street Intersection, Design "Traffic Control Plan" and additional Engineering Services from delaved construction s I 8.833.50 TOTAL CHANGER ORDER No.3 o Review Fees for Arkansas Health Department (Paid bv MCO)$ 90.00 Mileage: 6,876.00 mile (@ $0.30/mile . . . . .$ 2,062.80 TOTAL DUE TO DATE (ORTGINAL AND CHANGE ORDERS 1,2 & 3) (-)LessPreviousPayments.... .... ..... $1551209.50 . $ I 36.376.00 BALANCE DUE .. O aaaaaaaaaa n - --Il(rco/ioT,n DFou.c uL-<D - -( lbr?r) THANKYOU! $lA',--. (3 /&" 1/,i/ot 'lJ 205WestCenterStreet; tayetteville,Arkansas 72701; Telephone: (501) 443-4724; tax (501) 443-4707; E-mail: l,lC0engr@swbell.net t . s 18,833.50 o Poplar Streetu Gonstruction Bidding & Observation Project No. E-54{ (Amendments No. l-3) Hourly Gharses (7 121 11999 - 7 11 l2OO{ ) Milholland Engineering & Surveying 2OS West Genter St, Fayetteville, AR 72701 Telephone/Fax: (sOt ) 44347241470T Article 1, Section B CONSTRUCTION MANAGEMENT ENGR/MGR. V ENGR/MGR. IV ENGR/MGR. III CADD TECH II SURVEYOR il SURVEYOR I CLERICAL TOTALS [1] RECETPT OF PROPOSALS A) Bid Procedure 2.00 17.50 2.00 7.25 28.75 B) Analyze Bids and Recommendation 2.00 8.00 1.00 4.00 15.00 C) Prepare Agreements 3.50 10.50 2.00 7.50 23.50 [2] DURTNG CONSTRUCTTON A) Conference & Meetings 12.50 12.50 14.25 2.50 4.25 4.00 3.00 53.00 B) Construction Staking 19.75 12.50 28.25 26.75 23.50 1.50 112.25 C) Prepare Monthly Pay Estimates 16.25 40.75 23.00 4.50 0.00 0.00 48.50 133.00 D) Construction Observation 12.50 17.25 1130.25 30.00 1 190.00 E) Prepare Deficiency Lists 0.00 0.00 0.00 0.00 0.00 0.00 0.00 F) As-Built Drawings 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TOTAL HOURS 48.75 126.25 1 185.00 65.25 31 .00 27.50 71.75 1555.50 AVERAGE WAGE RATE PER HOUR $75.00 $56.50 $40.00 $35.00 $40.00 $25.00 $20.00 TOTAL COSTS $3,656.25 $7,133.13 $47,400.00 $2,293.75 $1,240.00 $687.50 $1 ,435.00 $63,835.63 GOMPANY PROFIT: ($9,e85.63) TOTAL MAXIMUM-NOT-TO-EXGEED AMOUNT: $60,350.00 t a Poplar Stree* Gonstruction Bidding & Observation Project No. E-54{ (Amendments No. {-3) Hourly Gharges (7 121 11999 - 7 11 l2OO{ ) Milholland Engineering & Surveying 2OS West Genter St, Fayetteville, AR 72701 Telephone/Farc (5O{ ) 44347241 47OT EXTRA SERVICES AS REQUESTED AND APPROVED BY CITY ENGIN PAID PER RESOLUTION 92-99 EXTRA SERVICES CONTRACT AMENDMENT No. 3: Additional TOTAL MAXIMUM-NOT-TO-EXCEED: $7{,60{.OO) Services resulti from Construction and Additional ltems: TOTAL MAXIMUM-NOT-TO-EXGEED: $5,5OO.OO 1 Field Crew:22 hrs. @ $86.00/hr $1,892.00 2.Professional Eng i neer:44 hrs. @ $95.00/hr $4,180.00 3.Engineering Aide:25 hrs. @ $65.00/hr.$1,625.00 4.lnspector 40 hrs. @ $45.00/hr.$1,800.00 5.Report: Secretary:12 hrs. @ $30.00/hr.$360.00 6.TOTAL:SERVICES PERFORMED ON DEMAND $9,857.00 AMENDMENT NO. 3 Engineering Service ltem No. 4 ENGR/MGR. V ENGR/MGR. IV ENGR/MGR. Iil CADD TECH II SURVEYOR SURVEYOR I CLERICAL TOTALS [1] Delayed Construction Cost 5.00 6.50 56.25 4.50 5.00 5.00 7.00 89.25 [2] Punch List Deficiencies 1.75 2.50 4.00 2.25 0.00 0.00 3.50 14.00 [3] As-Builts of Changes and Extras 1.00 3.50 2.25 27.25 12.00 12.00 9.00 67.00 TOTAL HOURS 7.75 12.50 62.50 34.00 17.00 17.00 19.50 170.25 AVERAGE WAGE RATE PER HOUR $75.00 $56.50 $40.00 $35.00 $40.00 $25.00 $20.00 TOTAL COSTS $581.25 $706.25 $2,500.00 $1 ,190.00 $680.00 $425.00 $390.00 $6,472.50 I I TTEVILLE THE CITY OF FAYETTEVI[TE, ARKANSAS DEPARTMENTAL CORRESPO N DENCE To: Sid Norbash, Engineering From: Heather Woodruff, City Clerk Date: October 1 1, 200I Attache is a copy of the completed staff review form and signed amendment no. 3 to the contract with Milholland for Poplar Road and Drainage Improvements. I am also returning two originals to you. One original will be microfilmed and filed with the City Clerk. cc:Nancy Smith, Internal Audit