RESOLUTION NO. 6e-e7
A RESOLUTION AUTHORIZING THE MAYOR AND CITY
CLERK TO EXECUTE A CONTRACT IN THE AMOUNT NOT
TO EXCEED $21,915 WITH MCCLELLAND CONSULTING
ENGINEERS FOR THE DESIGN AND CONSTRUCTION
SUPERVISION OF TWO ADDITIONAL SOCCER FIELDS AT
THE LEWIS SOCCER COMPLEX.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section l. That the City Council hereby authorizes the Mayor and City Clerk to execute
a contract in the amount not to exceed $21,915 with McClelland Consulting Engineers for the design
and construction supervision of two additional soccer fields at the Lewis Soccer Complex. A copy
of the contract is attached hereto marked Exhibit "A" and made a part hereof.
APPROVED this 5th day of t ugust , 1997 .
v(l .
Fred Hanna, Mayor
SCANNED
.t
I
J
)
t a I
\
\.-
By
Traci Paul, City Clerk
4
t !
l
)\
)l I 'e'
v
+
FAYE,TTE, VILLE
THE CITY OF FAYETTEVITIE, ARKANSAS
DEPARTMENTAL CORRESPO N DENCE
March 3, 1999
McClelland Engineering
John Quirur
P.O. Box 1229
Fayetteville, AR 72702
Dear Mr. Quinn,
Please immediately suspend work on our contract on the Lewis Park soccer fields due to
modifications of our present needs. This should be in compliance as per section 15 of our
contract dated 815197 on project number FY972100. Please provide us with all the plans, survey
data, diskettes, and cost estimates as stated in our contract.
Thank you for your cooperation in this project.
Sincerely,
c{
Connie Edmonston
Parks & Recreation Superintendent
/,*
cc Yolanda Fields - internal auditor reference 609
Peggy Vice - close purchase order
Heather Woodruff - "fi\,
l
EXHIBIT A
CIry OF FAYETTEVILLE
AGREEMENT FOR ENGINEERING SERVICES
STATE OF ARKANSAS
COUNTY OF WASHINGTON
This Agreement entered into and executed thisS/4 day of A ug usl ,
1997, by and between the City of Fayetteville acting by and through its Mayor
hereinafter called the "OWNER" and McClelland Consulting Engineers, lnc. with offices
in Fayetteville, Arkansas, hereinafter called the "ENGINEER".
WITNESSETH:
Whereas, the "OWNER" is planning to construct two additional soccer fields at the
Lewis Ave Soccer Complex; and Whereas the "OWNER'S'forces are fully employed on
other urgent work that prevents their early assignment to the aforementioned work; and
Whereas, the "ENGINEER'S" staff is adequate and well qualified and it has been
determined that its current work load wil! permit completion of the plans for the project
on schedule;
Now therefore, it is considered to be in the best public interest for the "OWNER" to
obtain assistance of the 'ENGINEER'S" organization in connection with said
engineering services. ln consideration of the faithful performance of each party of the
mutual covenants and agreements set forth hereinafter, it is mutually agreed as follows:
,,
-197 1 46:engagr: rev:71 1 jm
t
SECTION I - EMPLOYMENT OF ENGINEER
The "OWNER" agrees to employ the .ENGINEER" to perform, and the "ENGINEER"
agrees to perform, professional engineering services in connection with the project set
forth in the Sections to follow; and the "OWNER" agrees to pay and the "ENGINEER"
agrees to accept, as specified in the Sections to follow as full and final compensation
for work accomplished in the specified time.
SECTION !I . DESCRIPTION OF THE PROJECT
This project includes two new soccer fields at the Lewis Avenue Soccer Complex. The
south soccer field is to be planned for use with a "special sand base" (80% sand
mixl2}o/o debris free river bottom topsoil, 4-6 inches in depth)rturf playing field with
underground drainage, irrigation, and sprigged with Tifrryay 419 Bermuda. The northeast
field is to be planned for irrigation and sprigging with Tifiray 419 Bermuda. The
northeast field, in the future, is to have a "special sand base" turf and underground
drainage system. Avoid over-compaction of the sub-base and scarifo subbase before
installing topsoil on both fields. The City wishes to develop quality athletic fields for all
sports and has technical assistance from the Turf Agronomy Department at the College
of Agriculture of the University of Arkansas. Both fields are to have a 1-2o/o crown. A
predesign meeting is to be held with the OWNER before beginning work.
971 46:engagr: rev:71 1 jm -2
tr
SECTION III I INFORMATION & SERVICES
The "OWNER" willfurnish any specifications, standards and other information which
may relate to the project including GPS survey data. Aerial mapping data wil! be
provided, free of charge, to the ENGINEER on magnetic media.
SECTION IV . SERVICES TO BE FURNISHED BY THE "ENGINEER" DURING..DESIGN'' PHASE
The project will be designed and constructed to meet local standards in accordance
with the "OWNER'S" criteria. Construction specifications shall be based on "Standard
Specifications for Highway Construction Edition 1996 of the AHTD" and latest special
provisions and City of Fayetteville Specifications, except that metric units will not be
used. The design concept with regard to soccer field layout, cross sections, geometrics,
and utility relocation (if required) shall be submitted by the "ENGINEER" and approved
by the'OWNER" prior to beginning design work.
The "ENGINEER" shall provide all field survey data from field work for designing the
project and this shall be tied to the "OWNER'S" GPS control network.
The "ENGINEER" shall conduct preliminary design and prepare preliminary
construction limits for each project including grading requirements, construction limits,
and perform stability analyses, as required.
The "ENGINEER" shallfurnish plans to all utility companies affected by the project and
shall conduct a coordination meeting among al! affected utility companies to enable
them to develop utility agreements regarding any necessary utility relocations.
97146:engagr:rev:71 1jm - 3
During the "design" phase of the project, the "ENGINEER" shall conduct final designs to
prepare construction plans and specifications including final construction details and
quantities, special provisions, cost estimates, make final design field inspection with
'OWNER", make any needed plan changes as a result of the final design field
inspection and al! other work required to advertise and receive bids for the Soccer
Fields only.
Prior to the start of construction, the "ENGINEER" shall establish benchmarks for
elevation control and tie layout work to Fayetteville's GPS and provide construction
reference points/alignment at the Soccer Fields
SECTION V - COORDINATION WITH "OWNER"
The "ENGINEER" shall hold conferences throughout the design of the project with
representatives of the "OWNER" to the end that the design, as perfected, shall have full
benefit of the "OWNER'S" knowledge and be consistent with the current policies and
construction practices of the "OWNER". The "OWNER" reserves the right to accept or
reject any or all plans, but this stipulation will not relieve the "ENGINEER" of
responsibility for the design of the project.
SECTION VI . OFFICE LOCATION FOR REVIEW OF WORK
Review of the work as it progresses under this Agreement shall be made at the
"OWNER'S" City Engineer's olfice
97 1 46:engagr: rev:71 1 jm -4
r' I I
SECTION VI! . PRELIMINARY DESIGN SUBMISSION
The "ENGINEER" shall prepare Preliminary Engineering Plans and Cost Estimates to
address soccer field design with a quality playing turf.
The "ENGINEER" shall submit three (3) sets of preliminary plans for the 65 percent
submittal and meet with the "OWNER'S" staff following the submittal.
SECTION VIII . FINAL DESIGN SUBMISSION
The final submission for the construction contract, for the Soccer Fields, shall consist of
the following:
A. One (1) copy of all design calculations.
B. The originals of all drawings, specifications and contract documents. All
design drawings on magnetic media shall be submitted on disks compatible
with AutoCAD Release 12 software.
C. The estimated cost of construction and a detailed estimate of time in calendar
days required for completion of the contract.
D. Three (3) copies of the final plans for "OWNER'S" use.
SECTION IX. ENGINEER RESPONSIBILITY DURING "BIDDING" AND
..CONSTRUCTION'' PHASES
During the "Bidding" phase of the project, the "ENGINEER'shall provide all engineering
and administrative services needed to obtain bids for the construction project, evaluate
97 1 46:engag r: rev :7 1 1 jm -5
,"
the bids, and consult with and advise the 'OWNER" as to the acceptability of the best
bidder.
During the "Construction" phase of work, the "ENGINEER" shal! provide administrative
and engineering services including periodic construction observation services to
determine whether the Contractor has met the requirements of the design plans and
specifications. The "ENGINEER" shall review the Contractor's progress payment
requests based on the actual quantities of contract items completed and accepted, and
shall make a recommendation to the "OWNER" regarding payment.
SECTION X . SUBCONTRACTING
Subcontracting by the "ENGINEER" of any of the services provided herein, other than
the subcontract with (not applicable) as attached to this Agreement shall require prior
approval by the "OWNER"
SECTION XI . TIME OF BEGINNING AND COMPLETION
The "ENGINEER' shall begin work under this Agreement within ten (10) days of notice
to proceed and shall complete the plans for the construction contract within 60
calendar days for the Soccer Fields.
The above completion time is predicated upon the fact that the "OWNER" will cause to
be processed approvals of interim work in an expeditious manner (5 working days per
submittal).
97 1 46:engag r: rev: 7 1 1 jm -6
,t
A.
SECTION XII . FEES AND PAYMENTS
Title lServices (Engineering Planning and Design Services Preceding
Construction).
The ENGINEER sha!! provide, as hereafter enumerated individually, design, and
bidding, services for a total not-to-exceed cost of $ 15.200.00, including a total
fixed fee of $ 1.629.00, for the Lewis Ave. Soccer Fields.
1. "Design" Phase Services:
For, and in consideration of, the services to be rendered by the'ENGINEER",
the "OWNER" shall pay the 'ENGINEER" on the basis of actual salary costs
for work-time directly connected with work chargeable to the project, plus
payroll additives and general overhead costs of 1760/o of direct labor costs,
plus a fixed fee which are payable as follows:
Soccer Fields
a) "Design" phase services, not to exceed: $ 9,875.00
b) Fixed fee for "Design" services: $ 1,185.00
c) Engineering contract amount for "Design" phase
services not to exceed: $11,060.00
The basis of this upper limit and justification for the fee is contained in
Appendix "A" attached hereto. Adjustment of the upper limit may be made
should the "ENGINEER'establish and the "OWNER" agree that there has
97 1 46:engag r: rcv:7 1 1 jm -7
been or is to be a significant change in scope, complexity or character of the
services to be performed; or if the "OWNER" decides to shorten the duration
of work from the time period specified in the Agreement for completion of
work and such modification warrants such adjustment.
Appendix "8" covers the classification of personnel and the salary rate for all
personnel anticipated to be assigned to this project by the 'ENGINEER".
Final payment for Design services shall be made upon the "OWNER'S"
approval and acceptance with the satisfactory completion of the "Design"
phase for the project.
2. "Bidding" Phase Services:
For "bidding" phase services rendered by the "ENGINEER", the'OWNER'
shall pay the "ENGINEER" on the basis of salary costs for work-time directly
connected with the project, plus payroll additives and general overhead costs
of 1760/o of direct labor costs, plus a fixed fee which are as follows:
Soccer Fields
a) "Bidding" phase services costs not to exceed: $ 1,111.00
b) Fixed fee for "Bidding" services: $ 134.00
c) Engineering contract amount for "Bidding"
phase services not to exceed: $ 1,245.00
97 1 46:engagr: rev:71 1 jm -8
B.
Final payment for "Bidding" phase services shall be made upon the
"OWNER'S" approval and acceptance with the satisfactory completion of the
"Bidding" phase of the project.
3. "Special" Services:
For "Field Survey" services, the "OWNER" shall pay the "ENGINEER" on the
basis of salary costs for work-time directly connected with the project, plus
payroll additives and general overhead costs ol 1760/o of direct labor costs,
plus a fixed fee which are as follows:
Soccer Fields
a) "Field Survey" services costs not to exceed: $ 2,585.00
b) Fixed fee for "Field Survey" services: $ 310.00
c) Engineering Contract amount for "Field Survey"
services not to exceed: $ 2,895.00
Final payment for field survey services shall be made upon the OWNER's
approval and acceptance of the field survey phase of the project.
Title ll Services (Construction Phase Services):
The ENGINEER shall provide, as hereafter enumerated individually, construction
phase and construction staking services for a total not-to-exceed cost of
$6.715.00, including a total fixed fee of $ 720.00, for the Lewis Avenue Soccer
Fields.
1. "Construction" Phase Services:
97 1 46:engagr: rev :7 1 1 jm -9
For "Construction" phase services rendered by the "ENGINEER", the
'OWNER" shall pay the "ENGINEER" on the basis of salary costs for work-
time directly connected with the project, plus payrol! additives and general
overhead costs of 176% of direct labor costs, plus a fixed fee which are as
follows:
Soccer Fields
a) "Construction " phase services costs
not to exceed: $ 5,678.00
b) Fixed fee for "construction" phase services: $ 682.00
c) Engineering contract amount for "Construction"
phase services not to exceed $ 6,360.00
(based upon providing an average of 2 hrs/day of observation during an
assumed construction period not to exceed 60 calendar days)
Fina! payment for "Construction" phase services shall be made upon the
'OWNER'S" approval and acceptance with the satisfactory completion of the
"construction" phase of the project.
2. "Construction Staking" Senrices:
For "Construction Staking" services, if authorized in writing separately from
this Agreement, the "ENGINEER'shall establish rough grade staking with
offset staking on one side at 100-ft. stations, establish finish grade staking
with offset staking on each side at 10O-foot stations, and perform drainage
structures staking. This construction staking is to be performed by the
97 1 46:engagr: rev:7 1 1 jm - 10
"ENGINEER" one time only, with additional staking to be the responsibility of
the Contractor. For this work, the "OWNER" shall pay the "ENGINEER" on
the basis of actual salary cost for work-time directly connected with
construction staking, plus payroll additives and general overhead costs of
176% of direct labor costs, plus a fixed fee payable as follows:
Soccer Fields
a) "Construction Staking" costs not to exceed: $ 317.00
b) Fixed fee for "construction staking": $ 38.00
c) Engineering contract amount for "construction
staking" services not to exceed $ 355.00
SECTION XIII . CHANGES
The "OWNER" may at any time, by written order, make changes within the general
scope of the contract in the work and services to be performed. lf any such change
causes an increase or decrease in the cost of, or the time required for, performance of
this contract, an equitable increase or decrease shall be made in the upper limit
contract amount, including fee or time of required performance, or both, and the
contract sha!! be modified in writing accordingly.
Any claim by the 'ENGINEER" for adjustment under this clause must be asserted within
thirty (30) days from the date of receipt by the .ENGINEER" of the notification of
change; provided, however, that the 'OWNER", if it decides that the facts justify such
action, may receive and act upon any such claim asserted at any time prior to the date
-11971 46:engagr: rev:71 1 jm
of final payment under this contract. Failure to agree to any adjustment shall be cause
for a dispute concerning a question of fact within the meaning of the clause of this
contract entitled SECTION XVll - MISCELLANEOUS PROVISIONS, (1) Dispute
Resolutions. However, nothing in this clause shal! excuse the "ENGINEER" from
proceeding with the contract as changed.
SECTION XIV . OWNERSHIP OF DOCUMENTS
A!! documents, including original drawings, disks of CADD drawings and cross sections,
estimates, specification field notes, and data are and remain the property of the
"OWNER". The "ENGINEER" may retain reproduced copies of drawings and copies of
other documents.
SECTION XV . POSTPONEMENT OR CANCELLATION OF THE CONTRACT
It is understood that the "OWNER" will have the right to suspend or cancel the work at
any time.
A. Postponement - Should the'OWNER", for any reason whatsoever, decide to
postpone the work at any time, the'OWNER" will notifi7 the "ENGINEER",
who will immediately suspend work. Should the "OWNER" decide during
such suspension not to resume the work, or should such suspension not be
terminated within a year, the work shal! be canceled as hereinafter provided.
B. Cancellation - Should the "OWNER", for any reason whatsoever, decide to
cancel or to terminate the use of the "ENGINEER'S" service, the "OWNER"
will give written notice thereof to the "ENGINEER", who will immediately
97 1 46:engagr: rev:71 1 jm -12
terminate the work. lf the 'OWNER" so elects, the "ENGINEER' may be
instructed to bring a reasonable stage of completion to those items whose
value would otherwise be lost. The "ENGINEER'shallturn over all data,
charts, survey notes, figures, drawings and other records or information
collected or produced hereunder whether partial or complete. Upon such
termination of the'ENGINEER'S" services, the "ENGINEER" shal! be paid on
an proportiona! amount of the tota! fee, less prior partia! payments, based on
the ratio of work done to the total amount of work to be performed.
SECTION XVII . MISCELLANEOUS PROVISIONS
1. Dispute resolution - Any dispute concerning a question of fact in connection
with the work and having a financial value of $10,000, or less, shall be
referred for determination to the Mayor of the City of Fayetteville whose
decisions in the matter shall be final and conclusive. Disputes resulting from
claims greater than $10,000 shall be subject to mediation.
2. Responsibility for Claims and Liability - The "ENGINEER" sha!! save harmless
the "OWNER" from all claim and liability due to its (the "ENGINEER'S")
activities, or those subcontractors, its agents, or its employees during the
time this contract is in force.
3. General Compliance with Laws - The .ENGINEER" shall comply with all
federal, state and local laws and ordinances applicable to the work. lt shall
be a professiona! engineer, licensed in the State of Arkansas.
97 1 46:engag r: rev :7 1 1 jm - 13
4. Engineer's Endorsement - The'ENGINEER" shall endorse and recommend
all plans, specifications, estimates and engineering data finished by it. All
design shall be checked in accordance with accepted engineering practices.
All plan quantities sha!! be checked and verified.
SECTION XVIII . SUCCESSORS AND ASSIGNS
The "OWNER" and the "ENGINEER' each binds itself and its partners, successors,
executors, administrators, and assigns to the other party of this Agreement, except as
above, neither the "OWNER" nor the "ENGINEER' shall assign, sublet or transfer its
interest in this Agreement without written consent of the other. Nothing herein shall be
construed as creating any possible personal liability on the part of any officer or agent
of any public body which may be party hereto.
SECTION XIX . COVENANT AGAINST CONTINGENT FEES
The "ENGINEER" warrants that it has not employed or retained by company or person,
other than a bonafide employee working solely for the 'ENGINEER", to solicit or secure
this contract, and that it has not paid or agreed to pay any company or person, other
than a bonafide employee working solely for the "ENGINEER", any fee, commission,
percentage, brokerage fee, gifts, or any other consideration, contingent upon or
resulting from the award or making of this contract.
For breach or violation of this warranty, the "OWNER" shall have the right to annul this
contract without liability.
97 1 46:engagr: rev:71 1 jm -14
lN WITNESS WHEREOF, the parties hereto have caused this Agreement to be duly
executed as of the date and year first herein written.
f iY t I t t tr.
lr
at 'rr1\
CITY OF FAYETTEVILLE
City Clerk
McCLELLAND CONSULTING ENGINEERS, INC.
By:
ATTEST:
tl.
i
u\
a\
97 1 46:engag r: rev: 7 1 1 jm - 15
,
i
.,1
a ,;
I
rl ,\
(
ar,ilr
ATTEST:
hru,fu,
APPENDIX IIAII
PROJECT NAME:
PROJECT NO.:
PROJECT MANAGER:
DATE BUDGET REVISED:
LEWIS SOCCER FIELD
FY 972100
WAYNE JONES
APRTL 30, 1997
TASK
NO.
TASK
DESCRIPTION
MANFIL)UK I'T(EAKU9WN
MILEAGE
EXTENDED
COST
IJTt()J.
DIR/MGR
rrF((JJ.
ENGR.
DSGN
ENGR.
FLS
SURV.SURV.
SURV.
CREW
GADD
TECH.
DRFT.
SUPV.
SR.
ORFT
JR.
DRFT CLER
UUNU I
ENGR.
UUN!' I
OBSER
)S
1 CONTRACT NEGOTIATIONS 2
2 PRE.DESIGN MEETING WTH O\ANER 2 2
3 NOIIUts IOP|{9UtstsU/tsts(iIN DEi IGN WORK
TS
7 COMPONENTS
I PRELIMINARY DESIGN 650/o 2 ;190
9 2 1
10 1
1 6
1 I
465
2
4
2
1'Z
18
19 1 3 305
:o
MtstsIINGWIIHOVVNtsI,(65"h 1 1
6
1 8
1 4
27
28 Erosion Control 1 2 1 I
29 DETAILED COST ESTIMATES 1 2 4 2 515
4 4 400
12
33 QA REVIEW OF DETAILED
34 RE.EVALUATE SCHEDULE & BUDGET 1
i5 1 1 125
;A I !(JNS 375
2
13 44 65 0 0 0 0 10 0 56 22 0 0 0
QP6. 1 :972 I 00: FAY-PARK.WB2 :WJ Pago 1
bc
wlth PIans {3Sets}
QA REVIEW OF PRELIMIT\rRY ENGR. REPORT
1tt3
rIELD REVIEW
AL
APPENDIX IIAII
PROJECT NAME:
PROJECT NO.:
PROJECT MANAGER:
DATE BUDGET REVISED:
LEWIS SOCCER FIELD
FY 9721 00
WAYNE JONES
APRTL 30, 1997
TASK
NO.
TASK
DESCRIPTION
MANHOUR BREAKDOWN
MILEAGE
EXTENDED
COST
PK(JJ.
D!R/MGR
l,t{gJ.
ENGR.
USGN
ENGR.
TJLS
SURV.SURV
SUI<V
CREW
(;AL'L'
TECH.
DT<FI
SUPV
SR.
DRFT
JR.
DRFT CLER
GONST
ENGR.
CONST
OBSER
38 ADVERTISE FOR BIDS 2
39 BIDDING PERIOD 1
)PEN BIDS 2 1
/}OMMEND AWARD OF CONTRACT 2
]ISION BY O\A/I.IER TO AWARD CONTRACT
JE NOTICE OF AWARD TO CONTRACTOR
BIDDING PHASE SUBTOTAL 0 14 1 0 0 0 0 0 0 0 7 0 0 0
44 REVIEW BONDS/INSURANCE DOCUMENTS 1 'l
)RE.CONSTRUCTION CONFERENCE/NOTICE TO PROCEED 1 z
)ONSTRUCTION PERIOD ( 75 Calendar Days | ( 22 DAY/MO @ 2 HR/DAY )1 U
SHOP DRAWNGS 1 4 4
;INAL INSPECT!ON 1 1
]ONTRACT CLOSE-OUT/F!N!SH PUNCHLIS I 1 4
5r ,REPARE RECORD DRAWINGS 1
CONSTRUCTION PHASE SUBTOTAL 0 7 13 0 0 0 0 0 0 0 0 1t 91 0 ;6,360
SPECIAL SERVICES
51 ;IELD SURVEYS 1 s70
52 NOTIFY UTILITY COMPANIES TO MARK THEIR I.ACILII ItsS s4s
53 UTILITY COMPANIES TO MARK THE!R FAC!LITIES $40
54 EXECUTION OF FIELD SURVEYS fo
55 FIELD WORK $2.050
56 NOTE REDUCTION/DRAFTING 5750
:IELD SURVEYS PHASE SUBTOTAL !0 0 3 2 32 20 0 o o I s2.E95
57 ]ONSTRUCTION STAKING 1 $1 1s
58 SETTING BENCHMARKS & GONTROL POINTS I s240
CONSTRUCTION STAKING PHASE SUETOT AL 1 1 4 )0 u 0 0 o o o 5355
SPEL;IAL SERVIUES SUt' I(JI AL o 1 o 4 Z 30 0 o )0 $3,250
LEWIS AVE. SOGCER, FI
QP6. I :972 1 0O: FAY-PARK.WB2 :WJ Page 2
/
t!t
APPENDIX 33E-,,
CITY OF FAYETTEVILLE
LEWIS AVENUE SOCCER FIELD
SALARY RANGES
Principal Engineer
Project Manager
Project Engineer
Design Engineer
Project Surveyor
Surveyor
Survey Crew (2 men)
Survey Crew (3 men)
CADD Technician
Clerical
Senior Engr. Tech.
Engineering Tech.
Chief Draftsman
Senior Draftsman
Junior Draftsman
Construction Engineer
Sr. Construction Observer
Jr. Construction Observer
LOWER
END
$3+.00
22.00
19.00
13.50
13.00
10.00
18.00
25.00
9.00
7.00
16.50
12.00
15.00
10.00
6.50
15.00
16.50
12.00
UPPER
END
$45.00
35.00
25.00
19.00
22.00
15.00
22.00
30.00
13.00
11.00
19.50
19.00
20.00
15.00
10.00
22.00
19.50
18.00
LEWIS AVENUE SOCCER:SALSKD:jm
o
APPENDJX (5C"
CONSTRUCTION MATERIALS LABORATORY
FEE SCHEDULE
October l, 1996
GENERAL:
Laboratory Field Technician *
Engineering Technician *
Senior Engineering Technician
Lab Supervisor
Consultation, * *
Design Engineer
Project Engineer
Project Manager
Principal Engineer
Lab Reports
SOILS:
Soils Field Technician
In-Place Compaction Test-Nuclear Gauge-ASTM D 2922
Sample Pickup
Liquid Limit, Plastic Limit, Plasticity Index ( 3 point)-ASTM D 4318
Sieve Analysis-Washed No. 200 (WetFASTM D I140
Sieve Analysis-Dry-ASTM D 422
Hydrometer Analysis-ASTM D 422
Specific Gravity-ASTM D 854
Soils Classification, Unified or AASHTG-ASTM D 2487 or AASHTO M 145
Laboratory Maximum Compaction Test-ASTM D 698 or AASHTO T 99
Laboratory Maximum Compaction Test-ASTM D 1557 or AASHTO T 180
Potential Volume Change-Swell Pressure
California Bearing Ratio-CBR (including Proctor CuTeFASTM D 1883
Shrinkage-AsTM D 427
Non-ASTM Procedures Available On Request
CONCRETE:
Concrete Mix Design
Review Concrete Mix Design (Lab Supervisor)
Confirm Concrete Mix Design
Concrete Field Technician *
Unit Weight and Yield of Freshly Mixed Concrete-ASTM C 138
Concrete Cylinder or Beam Molding-ASTM C 3l
Concrete Cylinder or Beam Pickup
Concrete Slump Test-ASTM C 143
Concrete Air Content Test-ASTM C 231 or C 173
Rebound Hammer Testing-ASTM C 823
Cement Mortar or Group Sampling
Compressive Strength of Concrete Test Cylinders-AsTM C 39
Spare Cylinders Specimens Processed but not Tested
$ 27 .50 per hour
40.00 per hour
55.00 per hour
45.00 per hour
* ACI Grade I Concrete Field Testing Technician** Subject to adjustment annually, on/about July I
ACCREDITED by AASHTblnspected by AMRL and CCRL
LEW|S AVE SOCCER:FEE:MAT-|-AB.O96:jm
50.00 per hour
70.00 per hour
85.00 per hour
98.00 per hour
25.00 per hour
27 .50 per hour
45.00 each
20.00 per sieve
6.50 per sieve
55.00 each
35.00 each
100.00 each
100.00 each
100.00 each
100.00 each
250.00 each
50.00 each
Price on Request
45.00 per hour
Price on Request
27 .50 per hour
7 .50 each
7 .50 each
Page 1 of 2
!t
a
APPENDIX 56C"
CONSTRUCTION MATERIALS LABORATORY
FEE SCHEDULE
October 1, 1996
CONCRETE (Continued):
Flexural Strength of Concrete Beams-ASTM C 78 or C 293
Spare Beam Specimens Processed but not Tested
Compressive Strength of Grout Cubes
Compressive Strength of Cement Mortar Cubes
Concrete Coring (3" or 4"):
Core Machin e & Lab Technician
Additional Lab Technician, if required
Compressive Strength of Concrete Cores (3" or 4")
Other Core Sizes
Aggregate Sieve Analysis:
Dry Sieve-ASTM C 136
Wet Sieve-ASTM C ll7
Specific Gravity and Absorption of Aggregate-AsTM C 127 &, C 128
Dry Rodded Unit Weight of Aggregate-AsTM C 29
Sodium or Magnesium Sulfate Soundness (5 cycles)-AsTM C 88
Additional Cycles
25.00 each
ASPHALT:
Asphalt Mix Design
Review Asphalt Mix Design (Lab Supervisor)
In-Place Compaction Test-Nuclear Gauge (Lab Technician)
Marshall Test including Stability, Flow, Laboratory Density, Percent Air Voids,
Percent Voids in Mineral Aggregate (3 specimens per test)
Extraction including percent Bitumen and Aggregate Gradation
Laboratory Density of Cored Plugs including Depth Measurement
Asphalt Coring (3" or 4"):
Core Machine & Lab Technician
Additional Lab Technician, if required
Sample Pickup
FIREPROOFING:
Unit Weight, Bonding Strength, Thickness and Sampling
(actual time required for Lab Technicians)
Report Preparation (Lab Supervisor)
STRUCTURAL STEEL:
Bolt Torque Testing: Lab Technician(s)
Design Engineer
Pneumatic Torque Wrench Calibration (twice per day)
Visual Weld Inspection Design Engineer
15.00 each
15.00 each
15.00 each
7 .50 each
50.00 per hour
27 .50 per hour
25.00 each
Price on Request
6.50 each
20.00 each
75.00 each
50.00 each
250.00 each
Price on Request
45.00 per hour
27 .50 per hour
17 5.00 each
125.00 each
18.00 each
50.00 per hour
27 .50 per hour
27 .50 per hour/Tech.
45.00 per hour
27 .50 per hour
50.00 per hour
50.00 each
50.00 per hour
* * Subject to adjustment annually, on/about July I .
Seruices not Listed are Available on Request
ACCREDITED by AASHTHlnspected by AMRL and CCRL
LEWS AVE SOCCER: FEE:MAT-LAB.O96:jm Page 2 of 2