Loading...
HomeMy WebLinkAbout37-97 RESOLUTIONI I a A RESOLUTION AWARDING BID NO. 97-1, IN THE AMOUNT OF $137,681.50, PLUS A 15% CONTINGENCY AMOUNT OF $20,653.50, TO JERRY D. SWEETSER, INC., FOR THE CONSTRUCTION OF NORTH STREET AND MISSION BOULEVARD INTERSECTION IMPROVEMENTS. BE IT RESOLVED BY TIM CITY COI]NCIL OF TIIE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council hereby awards Bid No. 97-1, in the amount of $137,681.50, plus a 15% contingency amount of $20,653.50, to Jerry D. Sweetser, Inc., for the construction of North Street and Mission Boulevard intersection improvements; and the Mayor and City Clerk are authorized to execute a contract for said amount. A copy of the contract and bid tabulations are attached hereto marked Exhibit "A" and "B" and made a part hereof. PASSED AND APPROVED this 15th day of pril , 1997. r;rI i APPROVED l, f a I By Hanna, Mayor r! ATTEST: By Traci Paul, City Clerk r^\ RESOLUTION NO. 3t -sl SCANNED t,tIt;,t. .,. idt, t ! : rl' I \,')t I I, I .J't / City of Fayetteville, Arka-nsast'I Budget. Adj ustinent lform Department: Sales Ta< capital Improvement Fund Division: Program: Date Requested 04t0U97 Budget Year 1997 Project or Item Requested: Additional funding is requested for the Mission & North Street Intersection Improvement project. Justification of this Increase: Project scope of work has been expanded and additional funding is needed to implement expanded scope of work. Account Name Amount Street Account Name Amount Adjustment # Project or ltem Deleted: Transfer of a portion of Intersection Improvements project is proposed fund this request. Justification of this Decrease: Intersection Improvement Project will have approximately $82,300 to the 6th Street and School Street Intersection project. Increase Account Number Project Number 89,937 Decrease Account Number Proiect Number Street Improvements 88.937 4470 9470 5809 00 96022 Approval Signatures Budget Office Use Only BCD trTlpe: ABy 4-l-?7 F Department Director Date of Approval Posted to General Ledger _ Entered in Category LogAdmin. wK3 Mayor Budget Office copy u70 9470 5809 00 95024 { EXHIBIT A AGREEMEMT BEThIEEN O!{NER AIVD COI{TRACTOR dated as of the JS+A daY ofTTIIS AGREEMENT iS in the Year 1-9 9 7 by and bet ween the CitY of F ayettevi Ile , Arkansas (hereina ft,er called OWNER ) and. Jerrrr D - Sweetser Inc ' (hereinafter call CONTRACTOR) - in consideraEion of the mutual covenants agree as follows:OI^INER ANd CONTRJ\CTOR, hereinaf ter set f orth, Article 1. WORK- CONTRACTOR shall complete Ehe ConLract Documents ' f oI lows : all Work as specified or The Work is grenerallY indicated described in AS Project North StreeE Irprovements and Mission Blvd. IntersecEion DemoliEion of exisEing concreEe curb and gutter, concreLe sidewalk, and concretl island; reconstruction of asphalt pavemenEwithassociatedearthworkand'basemat.erial; construction of "orr"rJ" curb and. grutter, concrete sidewalk, concrete access ramps, and concrete median; construction of loopwiringinduct,.o,,"'.tepullboxes,andPVCconduitfor signals, pavement *.rLing", lnd all items indicated in Ehe orlwings and SPecifications ' art,icle 2. EI{GINEER' The ProjecE has been designed bY City of Fayetteville Engineering Dept' 1-13 W. Mount,ain FaYetteville, Arkansas 72701- City of FaYetteville Page 00500-l- who is hereinaft,er called EI{GINEER and. who is to act as owNER's representat.ive, assume all duties and responsibilities' and have Ehe rights and authority assigned to ENGINEER in ttre contract Document.s ir, "orrrection ,itt coipletion of the Work in accordance with the ConEract documents' Article 3 . COTiITRACT TIME ' 3 .1 The Work will be substantially completed' within 90 calendar days after the dat,e when the contract Time conrmences to run ."Eorided in paragraph 2:3 of the General Condigions ' and completed ar.a rea&y rJr iinal _payment in- accordance with paragraph 14.13 of the -ceneral Conditions within 120 calendar daysaftert,hedatewhentheContractTimecommencestorun. 3 .2 Liquid.ated. Damages. owNER and coIfiIRACTOR recognize tl?! time is of the essence of the Agreement and that owNER will suffer financial loss if the work is not completed within the times "p""iii-"a in paragraph 3.L a]oove, plus and extensions thereof allowed i-n accoia.ti.. with Article t2 of the General Conditions. They also recognize the delays' expense and difficulties inwolved. in proving the actual loss suffered by OWNER if the Work is .roi completed on time ' Accordingly' instead oi requiring any srrch proof, owner and CoNTRACTOR agreetrratasliquidateddamagesfordelay(butnotaSapenalty)CoNTRACToRshallpayoWNERT\,.lohundreddollars (S20O.OO) for each aa, tttat lxpires after the time specified in paragraph 3 .1- for i"fr"iurrt_i.i Completiol un'; 1 the Work is substanEially complete. After Sulstantial Completion' if CoIiIIRACTOR sha11 negIect., refuse or fail to complete the remainiig w"ik wighin the time specified in paragraph 3.1- for completiln and readiness for final payment or any proper extension thereof granted by OWNER, COMrRACTOR sha11 pay OWNER Tvlo hundred dollars (S2OO.Ob) for each day that expires after thetimespecified*i.p".agraph3.].forcompletionand readiness for final PaYment' Art,iClE 4. CONTRACT PRICE. oWNERshallpaycolflPRAcToRforcompletionoftheWorkin accordance with the contracL Documents an amount in current funds equal Lo the sum of the amounts determined from the following schedule of Values pursuant to paragraphs 4-t and 4 .2 below: City of FaYetteville Page 005 00-2 for all Work other than Unit Price Work, an amount equal t.o the sum of the esEablished lump sums for each separaEely identified item of Lump sum work; and for all Uniu Price Work, an amount equal to the sum of the established unit price for each separately iaentiried item of Unit irice Work times the estimated quantity of Ehat item as indicated in Ehis paragraph 4.2. PAYMEI\TT ITEIVIS 4.L 4.2 NO ITES{UNIT ESTI!,IATED QUANTITY T'NIT PRTCE TOTAL ESTI},IATED L Clearing and Grubbing Trees Lump Sum l-2500 #2,500.00 2 Site Preparation Lump Sum 1_1-5300 s15,300.00 3 Common Excavation Cu Yd 650 7 .00 $4, 550 .00 4 Rock Excavation Cu Yd 25 25.00 5625 .00 5 Compacted Embankment 18 " Subgrade FiII Cu Yd s00 7 .00 $3, 500 . oo 6 Undercut and Backfill Cu Yd L25 6 .00 $750.00 7 AggregaLe Base Course Ton 400 l-3 .00 $5 ,200.00 B 6 " Aggregate Base Driveway Sq Yd 50 12 .00 $6o0. oo 9 Concrete Driveway Sq Yd 100 30.00 $3 , ooo . oo 10 Concrete Median Sq Yd 35 30.00 $1-,050.00 1- 1-ACHM Surface Course (r1pe 2) Ton 375 40 .50 $15, 187 .50 L2 ACHM Binder Course (Tlrpe 2) Ton 800 40 .00 $32, 000 .00 r-3 One inch PVC Conduit (Schedule 4 0 Lin Ft L25 6 .45 s806.25 City of FaYetteville Page 00500-3 L4 T\nro inch PVC Conduit (Schedule 40 ) Lin Ft 50 9 ."7 5 $487 .50 L5 Three inch PVC conduit ( Schedule 40 ) Lin FE 1-50 L5 .00 #2,400.00 L6 Loop Wiring in DucE Lin FE 600 L2.LO 57 ,260. 0 0 L7 Concrete PulI Boxes ( Traf f ic Bearitg ) Each 7 300.00 i2,1-00.00 1_8 Reflect. Paint Pavmnt. Marking (Words ) Each 3 50 .00 $150 . oo 1-9 Ref lect. Paint Patrmnt. Marking (Arrows ) Each 3 33 .00 $99.00 20 Ref lect. Paint Parrmnt . I,Iarking Whi te (4" ) Lin Ft l-L00 0 .55 s605.00 2L Ref lect. Paint' Patrmnt. Marking Yeltow (4" ) Lin Ft 2400 0.55 $1,320.00 22 Ref lect. Paint Patrrnnt . Marking Whi t'e (L2" StoP f,ine ) Lin Ft'50 2 .00 $1-00.00 23 Ref lect. Paint Pavmnt,. Marking White ( 18 " Crosswalk) Lin Ft 225 4.25 $95 6 .25 24 Rip Rap Cu Yd 1-0 35.00 s350. oo 25 Concrete Sidewalk Sq Yd r- l-5 20 .00 52,300.00 26 Concret.e Access RamP Each 3 7 45 . 00 #2 ,235. 0 0 27 MainEenance of Traf fic Lump Sum 1 16200 $l-6,200.00 28 Seeding & Mulching Acre 0.35 4000 $1 ,400.00 29 Planting Trees Each 3 500 .00 $1, 5oo .00 30 TransplanLing Trees Each 3 800 .00 s2,400.00 31 Concrete Curb & Gutter Lin Ft 700 7 .50 $5, 250.00 City of FaYetteville Page 00500-4 32 Adjust WaEer Va1ve to Grade Each 2 250.00 $s00 :00 33 Adjust Manhole to Grade Each 2 450 .00 $900 . oo 34 Erosion Control Lump Sum l-800 .00 $Boo .00 3s Asphaltic Fabric Sq Yd 3250 l-.00 $3,250.00 36 Trench Excavation System Lump Sum t-50 .00 $50 . oo TOTAL BASE BID $137 ,681.5C As provided. in paraqraph l-L.9 of the General Conditions estimated quantities are not gruaranteed, and determinations of actual quantities and classifications are to be made by EI{GINEER as providedinparagraphg-.l.ooftheGeneralConditions.Unie prices have UI". Iomputea aL provided in paragraph 1"L '9 '2 of the General Conditions. article 5. PAWENT PROCEDURBS CoNTRACTOR sha1I submit Applications .for eavtnltt-.-lt accordance wiuh Article L4 of the ceriJrar Conditions or as modified in the supplementary conditiorr=.--- applicatiorrs for Payment will be processed by EMINEER as ptori&"d in the General Conditions ' 5 .1. progress pa:,1rrler:ts. owNER shaI1 make progress payments on account of the contract Price on the basis of co}flrRAcToR's appricationsforPalrmentasrecommendedbyE\IGINEER,onor aboutthelstdayofeachmont,hduringconstructionaS provided in paragr#f'" 5-'l-'l-'' 5'L'21 5'!'3'' and 5'1'4 below' A11 such pal'mentls *iff be measured by the schedule of values established.inparagraph2.goftheGeneralConditionsand based on the ,r..r*b.t of ,rt it= completed in the case of uniu PriceWorkor,intheeventthereisnoscheduleofvalues,as provided. in t'tre General Requirements ' 5.L.1 Prior to Substantial Completion' progress payments . will be made in an amount equal to the percentage . indicated below, but, in case, less the,agrgregate of payments previously made and less such amounts as ENGINEER shaI1 determine' or oWNER may withhold' in City of FaYetteville Page 00500-5 accordance with paragraph L4.7 of the General Condit'ions ' 90 percent of work complet.ed (wittr the balance of lopercentbeingretainage),IfWorkhasbeen50percent compleEed as determined by the EI'IGINEER, lnd if the character and progress of the Work have been satisfactory to owNER and ENGINEER, OWNER, on reconrmendation of EI'IGINEER, ffidY determine that as long as the characE'er and' progress of the Work t"*lir,. satisf actory to them, there will be no addit,ionalretainageonaccountofworkcompleted, in which case the remaining progrress payments prior toSubstantialCompletionwillbeinanamount equal to 100 percent of Lhe Work completed' L0O percent of materials and equipment' not incor{orated in the Work bug delivered, suitably store-il, and accompanied' by documentation satisfactorlf to OWNER as provided in paraqraph 1-4'7 of the General Conditions. That is, if any such items are seEup f or thaE tlpe payment in the Specifications. 5 .L.2. Upon SubsEantial Completion' in an amount sufficient to increase total payments to COIITRACTOR to 98 percenEoftheContractPrice(withthebalanceof2 percent being retainage) , less su.ch amounEs as B{GINEER shall determlne, or Ot6len may withhold, in accordance withparagrraphL4.ToftheGeneralConditions. 5 .3 Finat PaTrment. tlpon f inal conpletion and acceptance of the Work in ..""iE"n"" with paragraph L4.L3 of the General conditions, owNER shall pay the remainder of the contracL price as recorrEnended by mIGINEER as provided in said paragraph L4.L3. ArtsiClC 6. CONTRACTOR'S REPRESENTATIONS. In order to induce OWNER to enter into this Agreement CONTRACTOR makes the following representations: 6.1 CONTRACTOR has examined and carefully studied the conEracE DocumenEs(includingrtheAddendalistedinArticleT)andthe other related data identified in the Biddingr Documents including-i't""ht ica1 data .'' 6.2 COMIRACTOR has visited the site and become familiar with and is satisfied as to the greneral' locaI' and site conditions City of Fayetteville Page 00500-6 that, nIaY af fect cost, Frogress' the Work. perf ormance, or furnishing of 6.3 CONnRACTOR is familiar with and is sat',isfied as to all federal, state, and local Laws and RegrulaEiOns that may affecE cost, progiress, performance, and furnishing of t'he Work' 6.4CoIITRACToRhascarefullystudied'allreportsof e>q>lorationsandtestsofsubsurfacecondiEionsator contignrous to the site and all drawingrs of physical conditions in or relating-I" ""i"ting surface or subsurface structures at or contiguo.uu uo the site which have been identified in the Supplement'aryConditionsaSprovidedinparagraph4.2.Lofthe General conditions. cournectoR accepts the determination set forth in p.r.grr;Jt sc-a.z of Ehe supplemenEary conditions of the extent "i-lt-" "technical d.ata" contained in such reports and' drawings "p",, which co}flrRACToR is enE'it1ed to rely as prowided in ptJ.gt.ph 4'2 of the General Conditions' CoMTRACTOR acknowledges that such reports and drawingrs are not Contract Document.s and may not be complete for coIflrRACToR's purposes.CON'IRACTORacknowledgesthatoWNERandENGINEERdo not assum" r"=por,sibility for the accuracy or completeness of information -Lra data srro*n, or indicated in the contract Documents with respect to 'underground Facilit'ies at or contigr.rous to the site. COIflrRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all such additional supplementary "*.iirru.tions, investigations' explorations,-;rt"-,- stuaies,- ana data concerning conditions (surface,subsurface,andUndergroundFacilibies)ator conEiguoustothesiteorotherwisewhichmayaffectcosE,progress, performance, or furnishing of the Work or which relare ro ";";;;;; "r rhe means, merhods, techniques, seqluences, ..rd pro"edures of consEruction to the employed by CoMPRACToRandsafetyprecautionsandprogramsincident thereto. colfirRACTOR does noE consider that any additional examinat,ions,-'irrr"=Uigations, ocplorations, tesEs, studies' or data are necessary for the perftrmance and furnishing of Ehe Work at the Contract Price, *ier,i', the Contract Times, and in accordance with the ottrer terms and conditions of the conEract Documents. 6.5CoNTRACToRisawareofthegeneralnaEureofworktobeperformedbroWNERarrdothersatthesitethaErelatestothe Work as indlicated in the Contract Documents' 6 .6 COIiIIRACTOR has correlated ttre inf ormation known to CoNTRACTOR, information and observations obtained from visits City of Fayetteville Page 00500-7 Eo Ehe site, reporEs and drawings identified in ttre Contract Documents, .tJ-.fi additional lxaminacions' investigations' e:<plorat.ions,tesEs,sEudies'anddatawitht'heConE'ract Documents. 6.7co}f,PRACToRhasgivenENGINEERwrittennoE,iceofall confricts, .;;o;;, ambiguities' or discrepancies that CoNTRACTOR has discovered in the contract DocumenE's and the writE.en resolut,ion thereof by EI{GINEER is acceptable Eo CoNTRACTOR and the contract Docunents are generally sufficient Eo indicate and convey understand.ing of arl terms and conditionsforperformanceandfurnishingoftheWork. Art,icle 7. COilITRACT DOCU!',IEI\frs The contract Doclxnents which comprise the entire agreement between OWNER and COIflIRACTOR "orr".trirrg it" Work consisE of the following: 7.J-This Agrreement (pages L to 10 ' inclusive) ' Performance and PaymenE Bonds' (Exhibits A and B respectivelY) . Certificate of Insurance, (Exhibit C) ' DocumentaEion submitted by coltrRAcroR prior to Notice of Award (Exhibit D) . General Conditions (pages l- to 42 ' inclusiwe and e"hiiit cc-A pages L Lo 2, inclusive) ' Supplementary Conditions (pages L to L7 ' inclusive) ' SpecificationsconsistingofDivisionslthroughl6as listea in table of contents Ehereof' Addend.a numbers #l- to *2, inclusive ' Drawings (not att'actred hereto) consisE,ing of a cover sheeE and sfreets numbered L through 7 ' inclusive wiUtr each sheet U""ii"g the following general t'iE1e: 7 .2 7.3 7.4 7,5 North street and Mission Blvd. rntersectLon Street ImprovemenEs ' T.l.oThefollowingrwhichmaybedeliveredorissuedafterttreEffectiveDaE.eoftheAgreemenEandarenotat'tached City of Fayetteville Page 00500-8 7.6 7 .7 7.8 7 .9 hereEo : NoEice to Proceed All Written Amendmbnts and other documents amending, modifyingorsupplementingtheContractDocumentsp.rt"rr.rlt E,o parlgrapfrs 3 .5 and 3 ' 6 of the General Conditions. The documents listed in paragraphs 7.2 et seq. above are attached to this Agreement (except as-e*trtessly noted otherwise above) ' There are no conEract Documents other than those listed above in this Art,icle 7. The contract Documents may only be amended, mod.ified or supplemented as provided in paragraphs 3 ' 5 and 3 ' 6 of the General Conditions. Aiticle 8. II-ISCELLANEOUS. 8.1-. Terms used in the Agreement which are defined in Article L of the General Conditions will have the meanings indicaE'ed in the General Conditions ' 8.2. No assignment by a parEy hereto of any righEs under or interests in the Contract Oocuments will be binding on another party hereto without the written consent of E'he party sougtrt to be bound; and., specifically but withouE limitation, moneys trhatmaybecomeaueand'moneysthat'areduemaynoE'be assigned without such consent (except to the-extenE thaE the effect or *ris restriction may be limit.ed qr' 1aw) , and unless specifically sE,ated, to the contrary in any wriEten consent to an assignment. no assignment wili release or discharge the assignoJ from any duty or responsibility under the Contract Documents. 8.3. oWNER and' CoMTRACToR each binds itself, it partners, successors, assigns, and 1egal representatives to the other parEy hereto, iE,s partners, successors, assigns, and legal representatives in respect to all covenants, agreements and ob]-igat,ions contained in the conE,ract Documents. S.4.ArryprovisionorpartoftheContractDocumentsheldEo be void or unenforceablL under any Law or Regulation shalI be deemedsE,rickenandallremainingprovisionsshallcontinueto be.valid and binding upon stricken provision or'part thereof with a valid and enfot.Lubl" provision thag comes as close as possible e>q>ressing the intention of the stricken provision' 7 . L0 .l- 7 .L0.2 City of FaYetLeville Page 00500-9 IN WI|INESS WHEREOF, O!{NER and COI{TRACTOR have signed this Agreement f; q,r;&uplicate. one counterpart each has been delivered to 9WNER and EtrvGINEER, and EWo Counterparts have been delivered to CoNTRACTOR. A11 portions of the contract Documents have been ;i;;;d; initiaied, or idenE,if ied by owNER and coMrRACroR or idEntif ied by EI{GINEER on their behalf ' TI:is Agreement will be effective on the Effective Date of the Agreemen 997 (which is OWNER: Ci of FayeEteville COI\mRACTOR:JERRY D. SWEETSER, INC. r PRESIDENT \Ti t1e \1t tu TE SEAL]ICORPORATE SEAL] Attes Attes Ad.dress for giving notices Ad.d.ress for giving notices t) . ByBy \ ra {\.\ a I II l ( rr owNER is a public body , atLach evidence of au[horitY to sign and resolution or other documents authori zLrrg execution of Agreement ' ) License No. Agent for sell/ice of Process : ( rf CONTRACTOR is a cor^poration , attach evidence of author'itY to sign) City of FaYetteville Page 00500-l-0 l1 hY t I t', 7-.-.. a' ..a. r-l' , /,/ -i (/)--_____ 'd0 l0lslxv-l \r-,-t-,, I I I I I l I I I I XtJ II I ,l I o I t.,t4tr Y(.)t)o( r -o l__ NIRTH ST __J f NORTH l-ss_ll-n I f HSNd I I; F LaP aJ I / I I g F ) I I I I 'l I I I = ) I et \ I NORTH ST.-N/ISSION BLVD. WIDENING & INTERSECTION UPGRADE CITY ENGINEERING DEPARTMENT FAYETTEVILLE, ARKANSAS (5O'r )575-8206 UO 8r,sN, Jerry D. Sweetser I Inc. McClinton Anchor Township Builders EXHIBIT B $ L37 ,681. 50 $ L45 , o99. oo $ 159,797.00 Iow bid of $137,58L.50 was lower than BID TABULATION NORTH ST. & MISSION BLVD. INTERSECTION III{PROVEII{ENTS FAYETTEVILLE, ARKANSAS CONTRACTOR BID A},IOT'NT 1 2 3 Jerry D. Sweetser, Tnc., Engineer's estimate. MICROFITMED 4 €s J 7 ' ? 7 Sc.rcc/ J: ' l- eb r 7g :''/th3,ar/' / En). STAFF REVTEW FORM AGENDA REQUEST XXXX CONTRACT REVIEW GRANT REVTEW For the Fayetteville's City Mayor's signature. FROM: Walme Ledbetter Name Encrineerinq Public Works Divis ion AgftG{ REQIIIRED: Approval of Change Order 1 and reconc f on of quant ties to the Contract for Construction of North St. and Mission B1vd. with SweeEser Construction in the amount of $ 5, 9l-5 .66. COST TO CITY: s 5 ,9L5 .66 Cost of this Request. 447 0 -9 47 o -5809 -00 Account. Number 95024-0020 Proj ect Number Category / Proj ect Budget, s L48,343 Funds Used To Date s L3,789 Remaining Balance North St. and Mission Category / Proj ect Name Street ts Program Name Sa1es Tax Fund s L62, L32 Coordinator BTIDGET RE\IIEUI: 7 COTIITRACT/GRAI{TT/ LEASE REVIEIU : Budgeted IEem Budgret adjustment Attached Administrative Services Director GRATiTTII{tG AGETiICY : 1- Date Coordinator Dat.e Z-A!J",r: 7( "/t Date Auditor 5?0 Dat,e \,l ^{ aauq8 Purchasing Officer Date STAFF RECOffiION:Stsaff recomrends that the lfayor approve tshe Change Order uith Srceetser Constrnrction for North St. and Uission Interseetion Iqlrovements. on Head t Director z-"7% Cross Reference New Item: YeS Prev Ord/Res # : Date Date L-I1-q 3 DateMAdmitrat i Director Date Orig Contract Date: TTF]ITLLE THE CITY OF FAYTTTEVILLE, ARKANSAS DEPARTMENTAL CORRESPO N DENCE To: Mayor Fred Hanna Thru: Kevin Crosson, Public Works Directorht Charles Venable, Assistant Public Works Direclor Don Bunn, City Engtneer From: Wayne Ledbetter, Engtneering Date: February 25, 1998 RE: North St. and Mission Blvd. Intersection Improvements This project's primary reason for being built was the addition of a left turn lane for north bound traffic on Mission Boulevard. We have accomplished this and have reconstructed the pavement and added concrete curb and gutter to the street. Along the west side of Mission and the northwest corner of the intersection, concrete sidewalk with access ramps was constructed. Pedestrian signals was installed to help citizens cross the streets. ln addition to constructing the additional lane, we have overlaid with asphalt streets that adjoin Mission providing a good transition from our project to existing streets. During this construction we have encountered some situations that require changing from the Original Plans. These changes are as follows: Change Order No. I will amend the Clearing and Grubbing, Site Preparation, and Maintenance of Traffic items. It will also add items 37,38,39,40,41, and reconciliation of quantities. The accompanylng letter enumerates each item. The original bid was $ 137,681.50 with a contingency of $ 20,653.50, totaling $ 158,335.00. The amount of construction costs with this change order totals $ 143,597.16. StaffRecommendation. The Staffrecommends that the Mayor approve this Change Order I to the construction contract with Sweetser Construction for the construction ofNorth St. and Mission Blvd. intersection improvements. This amount is $ 5,915.66. -_--_ FEBI2 R EG E[V IED CHANGE ORDER (lnstructions on reverse side)No. PROJ trr-r No"th ++ 't""Wda+r';ir lll;*,ior1 B Bf;,;;i;h, Fq Tn Contract Times prior to this Change Order Substantial Comptetion: Ready for final payment 10 Net Increase (decrease) of this change order I tJ-, DATE OF ISSUANCE EFFECTIVE (.!1y er rlvwl,# OWNER's Contract No FrP*17-! coNrRACroR fFREy.D i ttC 2*?.f .?.EVt ENGTNEER ...CfY oF FA\teTEi6 r/r ae You are directed to make the following changes in the contract Documents Description: qEe {16XAteD Reason for Change Order: aEE FfrfiACflgD Attachments: (List documents supporting change) CHANGE IN CONTRACT PRICE: Original Contract Price CHANGE IN CONTRACT TIMES: Original Contract Timesltl7-7 bgl,fo Substantial Completion: Ready for final payment: ?0 or datcs Net changes from Change Orders No. _ to No.Net change from previous Orders No. _ to No. \l?e ltp OWNER $ $ $ Net $ $ By Price prior to this Change Order 6g ,fo (decrease) of this Change Order 15, Contract Price with all approved Change Orders n7./0/4v RECOMMENDE Contract Times with all approved Change orders Substantial Completion:oo Ready for final payment: days or ACCEPTED: By: or lo day's By: (A Date:Date:Date: EJCDC No. l9l0-8-B (r990 Edition) Preparetl by thc Engineers Joint contmct Documents committce and endolsed by The Associated ceneral contractors of America. I a2>- __---- contract { NETTIi\Q,T,Ti o THE CIW OF FAYETTEVILLE, ARKANSAS January 26, 1998 Mr. William Sweetser Sweetser Construction 590 West Poplar Fayetteville, AR 72703 RE: Nonh St. and Mission Blvd Intersection Improvements Fayetteville, Arkansas Change Order No. I and Reconciliation Please find enclosed revisions of the Quantities and Bid Items for the above mentioned project. I respectfully request that you review these and confirm price changes on these construction items. These changes, which have been discussed with you and your people previously, are as follows: 1. Item I : Clearing and Grubbing Trees. This Lump Sum item needs to be revised to include the additional tree removal dong the adjacent property on Mission. An additional amount of $1,000.00 has been requested. This amounts to 8 trees at $ 125.00 per each. 2. ltem2: Site Preparation. This Lump Sum item needs to be revised to include additional work This additional work includes preparation of the site not olr the original Plans. The following arumerates such items: l. Site preparation work for additional curb and gutter. Existing pavement removal and excavation. 2. Work preparing site for additional overlay work on Rush and Lakeview. 3. Sitework (removal and disposal of existing sidewalk) associated with extra sidewalk constructed on job. 4. Grading work on east side ofjob where base course was constructed. You have requested $ 3,100.00 to cover this additonal work. 3. Item No. 26, Maintenance of Traffic. Due to increasing the scope length of the project, an additional $ 600.00 to Maintenance of Traffic has been requested. I I 13 TI'EST MOUMAIN 72701 FA)( 501-521-7700 501-575-8257 I ? Dear Mr. Sweetser: oo 4. Item No.37, Adjust Fire Hydrant One @ $ 775.00 per each 5. Item No. 38, Concrete Steps. This item was added to provide a residence access to sidewalk. One @ $ 890.00 per each. 6. Item No. 39, Topsoil. This item provided topsoil where needed. 12 CY @ $ 18.00 per cubic yard. 7. Item No. 40, Chain Link Fence. This item provided fencing on the southern part of the project near Rush Street. 70 LF @ $ 10.08 per linear feet. 8. Item No. 41, Reflectorized Paint Pavement Markings White l8'. Eighteen inch wide stripe was used instead of a twelve inch stop line. There was a stripe painted around the concrete median. This striping was 170 LF @ $ 2.07 per linear foot. 7. Reconciliation of Quantities. These quantities are reflected in the following table. The changes in pay quantities are as follows: No. Item I 2 3 4 5 6 7 8 9 l0 n t2 l3 l4 l5 t6 t7 l8 l9 20 2l Unit LS LS CY CY CY CY TN SY SY SY TN TN FT FT FT FT EA EA EA LF LF Estimated Quantity Original Revised Clearing and Grubbing Site Preparation Common Excavation Rock Excavation 18" Select Fill Under Cut and Backfill Aggre gate Base Course 6" Aggregate Driveway Concrete Driveway Concrete Median ACHM Surface Course ACHM Binder Course l" PVC Conduit 2" PYC Conduit 3" PVC Conduit Loop Wiring in Duct Concrete Pull Boxes Ref. Pnt. Pvmt. Mrk. (Words) Ref. Pnt. Pvmt. Mrk. (Arrows) Ref. Pnt. Pvmt. Mrk. White 4" Ref. Pnt. Pvmt. Mrk. Yellow 4" I 1 650 25 500 r25 400 50 100 35 375 800 125 50 160 600 7 3 3 I 100 2400 1 I 488 0 468 25 57 6.9 l0l 48.4 50 642. 16 573.05 158 35 2r0 596 7 3 3 r376 2599.66 2 O Ref. Pnt. Pvmt. Mrk. White 12" Stop Line Ref. Pnt. Pvmt. Mrk. White 18" Crosswalk Rip Rap Concrete Sidewalk Concrete Access Ramp Maintenance of Traffic Seeding& Mulching Planting Trees Transplanting Trees Concrete Curb & Gutter Adjust Water Valve to Grade Adjust Manhole to Grade Erosion Control Asphaltic Fabric Trench Excavation System Adjust Fire Hydrant Concrete Steps Top Soil Chain Link Fence Ref. Pnt. Pvmt. fvlrk. White 18" Stop Line Clearing and Crrubbing 2500.00 Site Preparation 15300.00 Common Excavation 7.00 Rock Excavation 25.00 Compacted Embankment 18" Subgrade Fill (Select Hillside Material) 7.00 Undercut and Backfill 6.00 Aggregate Base Course 13.00 6" Aggregate Base Driveway 12.00 Concrete Driveway 30.00 Concrete Median 30.00 ACHM Surface Course 40.50 ACHM Binder Course 40.00 o 22 23 LF LF CY SY EA LS AC EA EA LF EA EA LS SY LS EA EA CY LF LF 50 0 225 257.5 24 25 26 l0 il5 3 I 0 35 3 3 700 18 83 207 5 70 170 3 I 0.26 0 0 27 28 29 30 3l 32 33 34 35 36 37 38 39 40 4l 845 4 2 I 0 I I 1 t2 2 2 I 3250 I 0 0 0 0 0 The prices and quantities of items before the Change Order are as follows: No. Item Unit Price Estimated ($) Quantity I 2 3 4 5 I I 650 25 500 125 400 50 100 35 375 800 Total ($) 2500 00 15300.00 4550 00 625 00 3500 00 750 00 5200 00 600 00 3000 00 1050 00 15r87 50 32000 00 6 7 8 9 l0 ll t2 3 o One inch PVC Conduit 6.45 Two inch PVC Conduit 9.75 Three inch PVC Conduit 15.00 Loop Wiring in Duct 12.10 Concrete Pull Boxes 300.00 Ref. Pnt. Pvmt. Mrk (Words) 50.00 Ref. Pnt. Pvmt. Mrk (Arrows) 33.00 Ref. Pnt. Pvmt. Mrk White 4" 0.55 Ref. Pnt. Pvmt. Mrk Yellow 4" 0.55 Ref. Pnt. Pvmt. Mrk White 12" White 2.00 Ref. Pnt. Pvmt. lvlrk White 18" White 4.25 Rip Rap 35.00 Concrete Sidewalk 20.00 Concrete Access Ramp 745.00 Maintenance of Traffic 16200.00 Seeding & Mulching 4000.00 Planting Trees 500.00 Transplanting Trees 800.00 Concrete Curb & Gutter 7.50 Adjust Water Valve to Cvrade 250.00 Adjust Manhole to Grade 450.00 Erosion Control 800.00 Asphaltic Fabric 1.00 Trench Excavation System 50.00 o l3 t4 l5 t6 t7 l8 l9 20 2l 22 23 24 25 26 28 29 30 3l 32 33 34 35 36 3 I 035 3 3 27 0 700 2 2 I 325 1 tzs 50 160 600 7 3 3 I 100 2400 50 22s l0 I l5 806 2s 487 50 2400 00 7260 00 2100.00 t 50.00 99 00 605 00 1320 00 100.00 956.25 350 00 2300.00 2235 00 t6200 00 1400 00 1 500 00 2400.00 5250 00 500 00 900 00 800 00 3250 00 50.00 Total ($) 3500 00 18400 00 3416 00 0 3276 00 150 00 7499.7A 1212 00 TOTAL $137,681 .50 Price and quantities of items after the Change Order is as foll;;l No. Item Unit Price ($) Revised Quantity I 2 3 4 5 6 7 8 Clearing and Crrubbing 3500.00 Site Preparation 18400.00 Common Excavation 7.00 Rock Excavation 25.00 Compacted Embankment 18" Subgrade (Select Hillside Material) 7.00 Under Cut & Badkfill 6 00 Aggregate Base Course 13.00 6" Aggregate Base Driveway 12.00 I I 488 0 468 25 576.9 t0t 4 a I a a o 4 2 I 0 1 I I t2 9 l0 ll t2 13 t4 l5 l6 l7 t8 t9 20 2l 22 23 24 25 26 27 28 29 30 3l 32 33 34 35 36 37 38 39 40 4l Concrete Driveway Concrete Median ACHM Surface Course ACHM Binder Course One inch PVC Conduit Two inch PVC Conduit Three inch PVC Conduit Loop Wiring in Duct Concrete Pull Boxes Ref. Pnt. Pvmt. Mrk (Words) Ref. Pnt. Pvmt. Mrk (Arrows) Ref. Pnt. Pvmt. Mrk White 4" Ref. Pnt. Fvmt. Mrk Yellow 4" Ref. Pnt. Pvmt. Mrk White 12" Ref. Pnt. Pvmt. Mrk White 18" Crosswalk Rip Rap Concrete Sidewalk Concrete Access Ramp Maintenance of Traffic Seeding & Mulching Planting Trees Transplanting Trees Concrete Curb and Gutter Adjust Water Valve to Grade Adjust Manhole to Cnade Erosion Control Asphaltic Fabric Trench Excavation System Adjust Fire Hydrant Concrete Steps Topsoil Chain Link Fence Ref. Pnt. Pvmt. Mrk White 18" Stop Line 30.00 30 00 40.50 40 00 6.45 975 15 00 12.t0 300 00 50.00 33.00 055 0 55 2.00 4.25 35 00 20 00 745.00 16800 00 4000 00 500 00 800 00 7.50 250 00 450 00 800 00 100 50 00 77 5.00 890 00 r 8.00 10 08 2.07 48.4 50 642 l6 s73 05 158 3s 210 596 3 3 ^lJ r37 6 2599.66 0 257 50 18 83 207 50 3 I 0.26 0 0 845 70 t70 t452 00 1500 00 26007 48 22922 00 1019. l0 341 .25 3150 00 72t l .60 2100 00 r50 00 99 00 7s6 80 1429.81 0 1094 .37 659 0s 4t50.00 223s.00 16800 00 1040 00 0 0 6337 .50 1000 00 900 00 800 00 0 50 00 775 00 890 00 216 00 705 60 351 90 TOTAL $ 143,597. 16 The Net Change Order Amount = Revised Total - Original Total of the items enumerated above. $ 143,597. l6 - $ 137,68 1.50 : $ 5.915.66 Please review this change order data and confirm by signing the accompanying EJCDC Change 5 o StaffEngineer Enclosures cc: Don Bunn, P.E., City Engineer File M Albert Wayne Ledbetter, P.E. )o Order. This project has mandated several items of extra work due to changes. This change order covers extra work that you claim from the beginning of the project to the date of this document. Please let me know if this is correct. Remember this change order reflects reconciliation on all pay items. Thank you for your cooperation regarding this matter. If you have any questions please contact this office at 501-444-3417. Sincerely 6