HomeMy WebLinkAbout9-97 RESOLUTION t , • SCANNED RESOLUTION NO. 9-9 7 A RESOLUTION AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AN AGREEMENT WITH McCLELLAND CONSULTING ENGINEERS, INC. FOR ENGINEERING SERVICES FOR THE CONSTRUCTION OF THE SUNBRIDGE EXTENSION PROJECT, IN THE AMOUNT OF $62,040, PLUS A 10% CONTINGENCY AMOUNT OF $6,204. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council hereby authorizes the Mayor and City Clerk to execute an agreement with McClelland Consulting Engineers, Inc. for engineering services for the construction of the Sunbridge extension project, in the amount of $62,040, plus a 10% contingency amount of$6,204. A copy of the agreement is attached hereto marked Exhibit "A" and made a part hereof. PASSED AND APPROVED this 4th day of February , 1997. ( V,- L 4.1 . . �t t ' ' APPROVED: f;, • k,: '• i F ` `, By: t� ,• j red Hanna, Mayor • ATTEST: By: Traci Paul, City Clerk CITY OF'FAYETTEVILLE EXHIBIT A AGREEMENT FOR ENGINEERING SERVICES STATE OF ARKANSAS COUNTY OF WASHINGTON This Agreement entered into and executed this `-7/X day of Fe-6rc-,ar y , 1997, by and between the City of Fayetteville acting by and through its Mayor hereinafter called the "OWNER" and McClelland Consulting Engineers, Inc. with offices in Fayetteville, Arkansas, hereinafter called the "ENGINEER". WITNESSETH: Whereas, the "OWNER" is planning to extend Sunbridge Drive from Villa Drive to College Avenue; and Whereas the "OWNER'S" forces are fully employed on other urgent work that prevents their early assignment to the aforementioned work; and Whereas, the "ENGINEER'S" staff is adequate and well qualified and it has been determined that its current work load will permit completion of the plans for the project on schedule; Now therefore, it is considered to be in the best public interest for the "OWNER" to obtain assistance of the "ENGINEER'S" organization in connection with said engineering services. In consideration of the faithful performance of each party of the mutual covenants and agreements set forth hereinafter, it is mutually agreed as follows: SECTION I - EMPLOYMENT OF ENGINEER The "OWNER" agrees to employ the "ENGINEER" to perform, and the "ENGINEER" agrees to perform, professional engineering services in connection with the project set forth in the Sections FY96166:ENGAGR:REV1/10/97:jm -1 to follow; and the "OWNER" agrees to pay end the "ENGINEER" agrees to accept, as specified in the Sections to follow as full and final compensation for work accomplished in the specified time. SECTION II - DESCRIPTION OF THE PROJECT Construction of approximately 700 linear feet of street improvements to Sunbridge Drive beginning approximately 175 feet west of Villa Drive and extending eastward to College Avenue. A paved section will be designed with curb and gutter, sidewalk and drainage section improvements meeting the "OWNER'S" present pavement and drainage design criteria. The ENGINEER will prepare a traffic study which recommends typical pavement section(s), the number of traffic lanes, and the length of the respective traffic lanes. Roadway realignment, utility relocations, pipeline crossings, and traffic signalization are included in project scope. SECTION III - INFORMATION & SERVICES The "OWNER" will furnish any specifications, standards and other information which may relate to the project including GPS survey data. Aerial mapping data will be provided, free of charge, to the ENGINEER on magnetic media. SECTION IV - SERVICES TO BE FURNISHED BY THE "ENGINEER" DURING "DESIGN" PHASE The project will be designed and constructed to meet local street standards in accordance with the "OWNER'S" pavement design and drainage criteria. Construction specifications shall be based on "Standard Specifications for Highway Construction Edition 1996 of the AHTD" and latest special provisions and City of Fayetteville Specifications except that metric units will not be used. The design concept with regard to street alignment, pavement section, geometrics, FY96166:ENGAGR:REV1/10/97:jm -2 detours, right-of-way, and utility relocation shall be-submitted by the "ENGINEER" and approved by the "OWNER" prior to beginning design work. The "ENGINEER" shall provide all field survey data from field work for designing the project and this shall be tied to the "OWNER'S" GPS control network. The "ENGINEER" shall be responsible for obtaining, interpreting and evaluating geotechnical data for pavement design and embankment stability. The "ENGINEER" shall conduct preliminary design and prepare preliminary construction limits, required right of way, ownership map, perform all needed stability analyses, design of detours where needed, and preparation of maintenance of traffic plans detailing needed signing and striping during construction, as well as for permanent application after the completion of street construction. The "ENGINEER" shall provide surveying, mapping, and related services as required to prepare Right-of-Way/Easement documents for the "OWNER'S" use in acquisition activities. The "ENGINEER" shall furnish plans to all utility companies affected by the project and shall conduct a coordination meeting among all affected utility companies to enable them to develop utility agreements regarding any necessary utility relocations. During the "design" phase of the project, the "ENGINEER" shall perform a traffic and signalization study which recommends typical pavement sections, number/length of traffic lanes, and automatic signalization equipment. After the OWNER's authorization, the ENGINEER shall conduct final designs to prepare construction plans and specifications including final construction details and quantities, special provisions, cost estimates, make final field inspection with "OWNER", make any needed plan changes as a result of the final field inspection and all other FY96166:ENGAGR:REV1/10/97:jm -3 • • • work required to advertise and receive bids. - Prior to the start of construction, the "ENGINEER" shall establish benchmarks for elevation control and tie layout work to Fayetteville's GPS and provide centerline construction reference points/alignment at all PCs, PTs, and at 4 POTs for the proposed roadway. SECTION V - COORDINATION WITH "OWNER" The "ENGINEER" shall hold conferences throughout the design of the project with representatives of the "OWNER" to the end that the design, as perfected, shall have full benefit of the "OWNER'S" knowledge and be consistent with the current policies and construction practices of the "OWNER". The "OWNER" reserves the right to accept or reject any or all plans, but this stipulation will not relieve the "ENGINEER" of responsibility for the design of the project. SECTION VI - OFFICE LOCATION FOR REVIEW OF WORK Review of the work as it progresses under this Agreement shall be made at the "OWNER'S" City Engineer's office. SECTION VII - PRELIMINARY SUBMISSION The "ENGINEER" shall submit three (3) sets of preliminary plans for each submittal at 35%, 65%, and 95%, and meet with the "OWNER'S" staff following each submittal. SECTION VIII - FINAL SUBMISSION The final submission for the construction contract shall consist of the following: A. One (1) copy of all design calculations FY96166:ENGAGR:REV1/10/97:jm -4 B. The originals of all drawings, specifications and contract documents. All design drawings on magnetic media shall be submitted on disks compatible with AutoCAD Release 12 software. C. The estimated cost of construction and a detailed estimate of time in calendar days required for completion of the contract. D. Three (3) copies of the final plans for"OWNER'S" use. SECTION IX - ENGINEER RESPONSIBILITY DURING "BIDDING" AND "CONSTRUCTION" PHASES During the "Bidding" phase of the project, the "ENGINEER" shall provide all engineering and administrative services needed to obtain bids for the construction project, evaluate the bids, and consult with and advise the "OWNER" as to the acceptability of the best bidder. During the "Construction" phase of work, the "ENGINEER" shall provide administrative and engineering services including resident construction observation services to determine whether the Contractor has met the requirements of the design plans and specifications. The "ENGINEER" shall review the Contractor's progress payment requests based on the actual quantities of contract items completed and accepted, and shall make a recommendation to the "OWNER" regarding payment. SECTION X - SUBCONTRACTING Subcontracting by the "ENGINEER" of any of the services provided herein, other than the subcontract with (not applicable) as attached to this Agreement shall require prior approval by the "OWNER". FY96166:ENGAGR:REV1/10/97:jm -5 SECTION XI - TIME OF BEGINNING AND COMPLETION The "ENGINEER" shall begin work under this Agreement within ten (10) days of notice to proceed and shall complete the plans for the construction contract within 120 calendar days. The above completion time is predicated upon the fact that the "OWNER" will provide the traffic counts for the Traffic Study on College Avenue, and cause to be processed approvals of interim work in an expeditious manner (5 working days per submittal). SECTION XII - FEES AND PAYMENTS A. Title I Services (Engineering Planning and Design Services Preceding Construction). The ENGINEER shall provide, as hereafter enumerated individually, design, bidding, geotechnical, and easement preparation services for a total not-to-exceed cost of $ 41,150.00 , including a total fixed fee of $ 4,224.00 . 1. "Design" Phase Services: For, and in consideration of, the services to be rendered by the "ENGINEER", the "OWNER" shall pay the "ENGINEER" on the basis of actual salary costs for work-time directly connected with work chargeable to the project, plus payroll additives and general overhead costs of 176% of direct labor costs, plus direct reimbursable expenses associated with the project, plus a fixed fee which are payable as follows: a) "Design" phase services, "surveying services", and preparation of the Ownership Map/Right-of-Way Plan Costs not to exceed: $31,268.00 FY96166:ENGAGR:REV1/10/97:jm -6 • b) Fixed fee for"Design" services: - $ 3,752.00 c) Engineering contract amount for "Design" phase services not to exceed: $35,020.00 The basis of this upper limit and justification for the fee is contained in Appendix "A" attached hereto. Adjustment of the upper limit may be made should the "ENGINEER" establish and the "OWNER" agree that there has been or is to be a significant change in scope, complexity or character of the services to be performed; or if the "OWNER" decides to shorten the duration of work from the time period specified in the Agreement for completion of work and such modification warrants such adjustment. Appendix"B" covers the classification of personnel and the salary rate for all personnel anticipated to be assigned to this project by the "ENGINEER". Final payment for Design services shall be made upon the "OWNER'S" approval and acceptance with the satisfactory completion of the "Design" phase for the project. 2. "Bidding" Phase Services: For"bidding" phase services rendered by the "ENGINEER", the "OWNER" shall pay the "ENGINEER" on the basis of salary costs for work-time directly connected with the project, plus payroll additives and general overhead costs of 176% of direct labor costs (plus direct reimbursable expenses associated with the project), plus a fixed fee which are as follows: a) "Bidding" phase services costs not to exceed: $1,210.00 b) Fixed fee for "Bidding" services: $ 145.00 FY96166:ENGAGR:REV1/10/97:jm -7 • c) Engineering contract amount for"Bidding" phase services not to exceed: $1,355.00 Final payment for "Bidding" phase services shall be made upon the "OWNER'S" approval and acceptance with the satisfactory completion of the "Bidding" phase of the project. 3. "Geotechnical Investigation" Services: For geotechnical investigative services associated with design, the "OWNER" shall pay the "ENGINEER" on the basis of hourly rates and unit prices set forth in Appendix "C" a fee not to exceed $ 1,725.00 . The basis of this upper limit and justification for the fee is contained in Appendix "D", attached hereto. 4. "Easement Preparation" Services: For"Easement preparation" services, the "OWNER" shall pay the "ENGINEER" on the basis of salary costs for work-time directly connected with the project, plus payroll additives and general overhead costs of 176% of direct labor costs (plus direct reimbursable expenses associated with the project), plus a fixed fee which are as follows: a. "Easement preparation" services costs not to exceed: $2,723.00 b. Fixed fee for "easement preparation" services: $327.00 c. Engineering Contract amount for "easement preparation" services not to exceed: $3,050.00 FY96166:ENGAGR:REV1/10/97:jm -8 Final payment for easement preparation services shall be made upon the OWNER's approval and acceptance of the easement documents. B. Title II Services (Construction Phase Services): The ENGINEER shall provide, as hereafter enumerated individually, construction phase and construction staking services for a total not-to-exceed cost of $ 20.890.00 including a total fixed fee of $ 2.240.00 . 1. "Construction" Phase Services: For"Construction" phase services rendered by the "ENGINEER", the "OWNER" shall pay the "ENGINEER" on the basis of salary costs for work-time directly connected with the project, plus payroll additives and general overhead costs of 176% of direct labor costs (plus direct reimbursable expenses associated with the project), plus a fixed fee which are as follows: a) "Construction " phase services costs not to exceed: $17,320.00 b) Fixed fee for "construction" phase services: $ 2,080.00 c) Engineering contract amount for "Construction" phase services not to exceed $19,400.00 (based upon providing an average of 6 hrs/day of observation during an assumed construction period not to exceed 75 calendar days) Final payment for "Construction" phase services shall be made upon the "OWNER'S" approval and acceptance with the satisfactory completion of the "construction" phase of the project. FY96166:ENGAGR:REV1/10/97:jm -9 • 2. "Construction Staking" Services: For "Construction Staking" services, if authorized in writing separately from this Agreement, the "ENGINEER" shall establish roadway centerline rough grade staking with offset staking on one side at 100-ft. stations, establish curb and gutter staking on both sides at 100-ft. stations along tangents and 50-ft. stations along curves, and perform drainage structures staking. This construction staking is to be performed by the "ENGINEER" one time only, with additional staking to be the responsibility of the Contractor. For this work, the "OWNER" shall pay the "ENGINEER" on the basis of actual salary cost for work-time directly connected with construction staking, plus payroll additives and general overhead costs of 176% of direct labor costs, plus direct reimbursable expenses, plus a fixed fee payable as follows: a) "Construction Staking" costs not to exceed: $1,330.00 b) Fixed fee for "construction staking": $ 160.00 c) Engineering contract amount for "construction staking" services not to exceed $1,490.00 SECTION XIII - CHANGES The "OWNER" may at any time, by written order, make changes within the general scope of the contract in the work and services to be performed. If any such change causes an increase or decrease in the cost of, or the time required for, performance of this contract, an equitable increase or decrease shall be made in the upper limit contract amount, including fee or time of required performance, or both, and the contract shall be modified in writing accordingly. FY96166:ENGAGR:REV1/10/97:jm -10 Any claim by the "ENGINEER" for adjustment under this clause must be asserted with thirty (30) days from the date of receipt by the "ENGINEER" of the notification of change; provided, however, that the "OWNER", if it decides that the facts justify such action, may receive and act upon any such claim asserted at any time prior to the date of final payment under this contract. Failure to agree to any adjustment shall be cause for a dispute concerning a question of fact within the meaning of the clause of this contract entitled SECTION XVII - MISCELLANEOUS PROVISIONS, (1) Dispute Resolutions. However, nothing in this clause shall excuse the "ENGINEER" from proceeding with the contract as changed. SECTION XIV - OWNERSHIP OF DOCUMENTS All documents, including original drawings, disks of CADD drawings and cross sections, estimates, specification field notes, and data are and remain the property of the "OWNER". The "ENGINEER" may retain reproduced copies of drawings and copies of other documents. SECTION XV - POSTPONEMENT OR CANCELLATION OF THE CONTRACT It is understood that the "OWNER" will have the right to suspend or cancel the work at any time. A. Postponement - Should the "OWNER", for any reason whatsoever, decide to postpone the work at any time, the "OWNER" will notify the "ENGINEER", who will immediately suspend work. Should the "OWNER" decide during such suspension not to resume the work, or should such suspension not be terminated within a year, the work shall be canceled as hereinafter provided. B. Cancellation - Should the "OWNER", for any reason whatsoever, decide to cancel or to terminate the use of the "ENGINEER'S" service, the "OWNER" will give written FY96166:ENGAGR:REV1/10/97:jm -11 . notice thereof to the "ENGINEER", who will immediately terminate the work. If the "OWNER" so elects, the "ENGINEER" may be instructed to bring a reasonable stage of completion to those items whose value would otherwise be lost. The "ENGINEER" shall turn over all data, charts, survey notes, figures, drawings and other records or information collected or produced hereunder whether partial or complete. Upon such termination of the "ENGINEER'S" services, the "ENGINEER" shall be paid on an proportional amount of the total fee, less prior partial payments, based on the ratio of work done to the total amount of work to be performed. SECTION XVII - MISCELLANEOUS PROVISIONS 1. Dispute resolution - Any dispute concerning a question of fact in connection with the work and having a financial value of $10,000, or less, shall be referred for determination to the Mayor of the City of Fayetteville whose decisions in the matter shall be final and conclusive. Disputes resulting from claims greater than $10,000 shall be subject to mediation. 2. Responsibility for Claims and Liability - The "ENGINEER" shall save harmless the "OWNER"from all claim and liability due to its (the "ENGINEER's") activities, or those subcontractors, its agents, or its employees during the time this contract is in force. 3. General Compliance with Laws -The "ENGINEER" shall comply with all federal, state and local laws and ordinances applicable to the work. It shall be a professional engineer, licensed in the State of Arkansas. 4. Engineer's Endorsement -The "ENGINEER" shall endorse and recommend all plans, specifications, estimates and engineering data finished by it. All design shall be FY96166:ENGAGR:REV1/10/97:jm -12 • / checked in accordance with accepted engineering practices. All plan quantities shall be checked and verified. SECTION XVIII - SUCCESSORS AND ASSIGNS The "OWNER" and the "ENGINEER" each binds itself and its partners, successors, executors, administrators, and assigns to the other party of this Agreement, except as above, neither the "OWNER" nor the "ENGINEER" shall assign, sublet or transfer its interest in this Agreement without written consent of the other. Nothing herein shall be construed as creating any possible personal liability on the part of any officer or agent of any public body which may be party hereto. SECTION XIX - COVENANT AGAINST CONTINGENT FEES The "ENGINEER" warrants that it has not employed or retained by company or person, other than a bonafide employee working solely for the "ENGINEER", to solicit or secure this contract, and that it has not paid or agreed to pay any company or person, other than a bonafide employee working solely for the "ENGINEER", any fee, commission, percentage, brokerage fee, gifts, or any other consideration, contingent upon or resulting from the award or making of this contract. For breach or violation of this warranty, the "OWNER" shall have the right to annul this contract without liability. FY96166:ENGAGR:REV1/10/97:jm -13 N WITNEStSr\THEREOF, the parties hereto have caused this Agreement to be duly executed / •, QS of the date•andcyear first herein written. ��; 4 T = CITY OF FAYETTEVILLE . ¢ �t �0 ;:� 3 F, .tv fir 4 S • p/i44444‘. ATTES . " 42,eki. / City Clerk McCLELLAND CONSULTING ENGINEERS, INC. Bj64Q,....C.-, Y ATT Vice President FY96166:ENGAGR:REV1/10/97:jm -14 APPENDIX "A" PROJECT NAME: Sunbridge Drive Extension PROJECT NO.: FY 962166 PROJECT MANAGER: WAYNE JONES DATE BUDGET REVISED: January 10,1997 PROJ. PROJ. DSGN S.E.T. PLS SURV. CADD DRFT. SR. JR. CONST CONST OTHER EXTENDED TASK TASK DIR/MGR ENGR. ENGR. TECH. SURV. SURV. CREW TECH. SUPV_ DRFT DRFT CLER ENGR. OBSER MILEAGE DIR.EXP COST NO. DESCRIPTION HRLY.RATE _ $ 1 1 CONTRACT NEGOTIATIONS 5 4 J $755 2 PRE-DESIGN MEETING WITH OWNER 3 3 - _ - $495 3 NOTICE TO PROCEED/BEGIN DESIGN WORK J - - $0 4 EXECUTE CONTRACT 2 $190 5 SCHEDULING 8 BUDGETING 1 $95 6 IDENTIFY/LIST PROJECT COMPONENTS 2 2 $330 7 DEVELOP DESIGN CRITERIA FOR COMPONENTS 2 $140 8 TRAFFIC and SIGNALIZATION STUDY 8 24 160 32 2 12 -- 8 $500 614,110 9 SCHEMATIC DESIGN PHASE (35%) . $0 10 Plan,Profile 8 Cross Section 6 16 _ $1,300 11 Drainage 6 _ J $420 12 Preliminary Report 3 12 - $870 13 Initial ROW/Easement Map r 5 1 $260 14 Meeting with Owner 2 2 - - $330 15 PLANNING FOR FIELD SURVEYS 3 $135 16 NOTIFY UTILITY COMPANIES TO MARK THEIR FACILITIES - 1 - - - - $40 17 UTILITY COMPANIES TO MARK THEIR FACILITIES - - 60 18 EXECUTION OF FIELD SURVEYS $0 19 FIELD WORK _ 16 $960 20 NOTE REDUCTION/DRAFTING . 10 - $380 21 PRELIMINARY DESIGN (65% ) " - SO 22 Prepare Mini Plans 2 - $140 23 Cover Sheet 1 - $70 24 Typical Section 1 _ 1 4 $265 25 Plan and Profile Sheets . 2 5 . 2 10 6875 26 Detail Sheets _ 2 2 _ _ _ - 4 - $390 27 Cross Section Sheets 2 4 _ 2 16 _ $f,039 ' 28 Utility relocations 1 - 2 - $180. 28A Erosion Control Plans 1 2 $140 29 Signalization 2 4 16 _ 16 61,910 30 OUTLINE SPECIFICATIONS 4 $280 31 PRELIMINARY COST ESTIMATE 4 I . 1 2 - $375 32 PRELIMINARY ENGR.REPORT with Plans (3 Sets) 1 6 $250 33 QA REVIEW OF PRELIMINARY ENGR.REPORT 1 4 - 4 6535, 34 OWNER'S REVIEW OF PRELIMINARY ENGR.REPORT&PLANS 2 2 . $330 35 MEETING WITH OWNER ( 65% ) SO 36 DETAILED DESIGN $0 37 DRAWINGS 60 38 Plan and Profile Sheets 2 6 " - 2 8 $860 39 Details - 4 1 8 $615 40 Cross Sections 1 2 - - 1 4 $376 41 Drainage _ 2 4 - - 4 $500 42 Utilities - 2 1 $175 42A Erosion Control 1 _ - - - 2 _ $140 43 Signalization 1 4 12 16 $1,595 44 DETAILED COST ESTIMATES 2 - - - $140 45 PROJECT MANUAL _ 12 2 $900 46 front-end documents _ 8 $240 47 technical specifications . $0 48 OA REVIEW OF DETAILED DESIGN 2 4 4 $630 49 RE-EVALUATE SCHEDULE 8 BUDGET 1 2 5235 50 OWNER'S REVIEW with FIELD REVIEW - _ - 60 51 REVISIONS TO PLANS 8 SPECIFICATIONS - _ 8 - 1 8 - $895 52 RE-EVALUATE SCHEDULE 8 BUDGET - 60 53 SUBMITTALS TO AHTD and UTILITY COMPANIES - - - S0 54 REVIEW BY AHTD -I SO 55 FINAL PLANS (3 SETS ) - 4 $140 DESIGN PHASE SUBTOTAL 32 119 - 249 32 3 6 17 10 12 0 120 26 8 0 0 $500 635,020 OW 1:962166:SUNBRID3.WB2:WJ Page 1 APPENDIX "A" PROJECT NAME: Sunbridge Drive Extension PROJECT NO.: FY 962166 PROJECT MANAGER: WAYNE JONES DATE BUDGET REVISED: January 10,1997 PROJ. PROJ. DSGN S.E.T. PLS SURV. CADD DRFT. SR. JR. CONST CONST OTHER EXTENDED TASK TASK DIR/MGR ENGR. ENGR. TECH. SURV. SURV. CREW TECH. SUPV. DRFT , DRFT CLER ENGR. OBSER MILEAGE DIR.EXP COST NO. DESCRIPTION HRLY.RATE $ 56 ADVERTISE FOR BIDS 1 - - - 3 J $160 57 BIDDING PERIOD 8 - $560 58 OPEN BIDS _ _ 2 $140 59 RE-EVALUATE SCHEDULE 6 BUDGET 2 3 $230 60 RECOMMEND AWARD OF CONTRACT _ 1 1 $125 61 DECISION BY OWNER TO AWARD CONTRACT 2 $140 62 ISSUE NOTICE OF AWARD TO CONTRACTOR J f0 BIDDING PHASE SUBTOTAL 0 16 0 0 - 0 7 0 0 0 0 _ 0 0 6 1 0 0 0 $1,355 63 REVIEW BONDS/INSURANCE DOCUMENTS - - 4 $220 64 PRE-CONSTRUCTION CONFERENCE/NOTICE TO PROCEED - 2 _ - 2 $250 65 CONSTRUCTION PERIOD(75 Calendar Days I(22 DAY/MO(5 6 FIR/DAY I _ 40 330 S17,050 66 REVIEW SHOP DRAWINGS 4 I - 2 $390 67 FINAL INSPECTION _ ' 4 _ 4 J 2 $590 68 CONTRACT CLOSE-OUT/FINISH PUNCHLIST - 8 _ $360 69 PREPARE RECORD DRAWINGS _ 1 _ - 2 _ 8 _ $516 CONSTRUCTION PHASE SUBTOTAL 0 , 11 0 0 1 0 . 0 0 0 2 8 0 0 52 340 0 0 $19,376 SPECIAL SERVICES - - — - 70 PLANNING FOR CONSTRUCTION STAKING 2 $90 71 SETTING BENCHMARKS $0 - 72 ROUGH STAKING OF CENTERLINE&OFFSET STAKING AT RO _ _ 12 - 2 _ - $796 73 STAKING DRAINAGE PIPE AND STRUCTURES - 4 - $240 74 STAKING CURB AND GUTTER a 100 FT. 6 a 50 FT.IN CURVE _ 6 _ $360 10 r CONSTRUCTION STAKING PHASE SUBTOTAL 0 0 0 0 2 0 _ 32 2 _ 0 0 0 0 0 0 0 0 $1,486, - 75 FINAL EASEMENT PREPARATION _ - -. + -$0 76 DEVELOP FINAL RIGHT-OF-WAY MAP/EASEMENT PLAN 1 8 " 20 I $1,230 77 PREPARE INDIVIDUAL EASEMENT PLANS a 1 4 12 4 5850 r 78 PREPARE EASEMENT/ACQUISITION DOCUMENTS 1 4 12 8 $970• EASEMENT PREPARATION SUBTOTAL 0 3 _ 0 0 16 44 0 0 0 0 0 12 0 0 0 0 $3,050 SPECIAL SERVICES SUBTOTAL - 0 3 0 0 18 44 32 2 0 0 0 12 0 0 0 0 $4,536 ITOTALEFFORT 32 1 149 I 249 I 32 T 21 ( 50 j 49 12 ( 14 1 8 J 120 1 44 1 61 1 340 I: 0 1 500 I 560,287I GEOTECHNICAL SERVICES 78 PLANNING FOR GEOTECHNICAL INVESTIGATION 1 - $70 79 EXECUTION OF GEOTECHNICAL INVESTIGATION S0 80 FIELD WORK _ - 581 $581 81 LABORATORY WORK _ 754 $754 82 REPORT 1 1 3 2 $330 GEOTECHNICAL SERVICES SUBTOTAL 1 2 0 0 _ 0 0 0 0 0 0 3 2 0 0 0 1335 $1,736 OP6 1 962166 SUNBRID3 WB2.WJ Page 2 • APPENDIX "B" CITY OF FAYETTEVILLE SUNBRIDGE DRIVE EXTENSION SALARY RANGES LOWER UPPER END END Principal Engineer $34.00 $45.00 Project Manager 22.00 35.00 Project Engineer 19.00 25.00 Design Engineer 13.50 19.00 Project Surveyor 13.00 22.00 Surveyor 10.00 15.00 Survey Crew (2 men) 18.00 22.00 Survey Crew (3 men) 25.00 30.00 CADD Technician 9.00 13.00 Clerical 7.00 11.00 Senior Engr. Tech. 16.50 19.50 Engineering Tech. 12.00 18.00 Chief Draftsman 15.00 20.00 Senior Draftsman 10.00 15.00 Junior Draftsman 6.50 10.00 Construction Engineer 15.00 22.00 Sr. Construction Observer 16.50 19.50 Jr. Construction Observer 12.00 18.00 • FY96166:SALSKD:jm • • APPENDIX "C" CONSTRUCTION MATERIALS LABORATORY FEE SCHEDULE October 1,1996 GENERAL: Laboratory Field Technician* $ 27.50 per hour Engineering Technician* 40.00 per hour Senior Engineering Technician 55.00 per hour Lab Supervisor 45.00 per hour Consultation, ** Design Engineer 50.00 per hour Project Engineer 70.00 per hour Project Manager 85.00 per hour Principal Engineer 98.00 per hour Lab Reports 25.00 per hour SOILS: Soils Field Technician 27.50 per hour In-Place Compaction Test-Nuclear Gauge—ASTM D 2922 Sample Pickup Liquid Limit,Plastic Limit,Plasticity Index(3 point)—ASTM D 4318 45.00 each Sieve Analysis-Washed No. 200(Wet)—ASTM D 1140 20.00 per sieve Sieve Analysis-Dry—ASTM D 422 6.50 per sieve Hydrometer Analysis—ASTM D 422 55.00 each Specific Gravity—ASTM D 854 35.00 each Soils Classification,Unified or AASHTO—ASTM D 2487 or AASHTO M 145 100.00 each Laboratory Maximum Compaction Test—ASTM D 698 or AASHTO T 99 100.00 each Laboratory Maximum Compaction Test—ASTM D 1557 or AASHTO T 180 100.00 each Potential Volume Change-Swell Pressure 100.00 each California Bearing Ratio-CBR(including Proctor Curve)—ASTM D 1883 250.00 each Shrinkage—ASTM D 427 50.00 each Non-ASTM Procedures Available On Request • CONCRETE: Concrete.Mix Design Price on Request Review Concrete Mix Design (Lab Supervisor) 45.00 per hour Confirm Concrete Mix Design Price on Request Concrete Field Technician* 27.50 per hour Unit Weight and Yield of Freshly Mixed Concrete—ASTM C 138 Concrete Cylinder or Beam Molding—ASTM C 31 Concrete Cylinder or Beam Pickup Concrete Slump Test—ASTM C 143 Concrete Air Content Test—ASTM C 231 or C 173 Rebound Hammer Testing—ASTM C 823 Cement Mortar or Group Sampling Compressive Strength of Concrete Test Cylinders—ASTM C 39 7.50 each Spare Cylinders Specimens Processed but not Tested 7.50 each * ACI Grade I Concrete Field Testing Technician ** Subject to adjustment annually,on/about July 1. ACCREDITED by AASHTO—Inspected by AMRL and CCRL FEE:MAT-LAB.096:jm Page 1 of 2 • • APPENDIX "C" CONSTRUCTION MATERIALS LABORATORY FEE SCHEDULE October 1,1996 CONCRETE(Continued): Flexural Strength of Concrete Beams—ASTM C 78 or C 293 15.00 each Spare Beam Specimens Processed but not Tested 15.00 each Compressive Strength of Grout Cubes 15.00 each Compressive Strength of Cement Mortar Cubes 7.50 each Concrete Coring(3"or 4"): Core Machine&Lab Technician 50.00 per hour Additional Lab Technician,if required 27.50 per hour Compressive Strength of Concrete Cores(3"or 4") 25.00 each Other Core Sizes Price on Request Aggregate Sieve Analysis: Dry Sieve—ASTM C 136 6.50 each Wet Sieve—ASTM C 117 20.00 each Specific Gravity and Absorption of Aggregate—ASTM C 127&C 128 75.00 each Dry Rodded Unit Weight of Aggregate—ASTM C 29 50.00 each Sodium or Magnesium Sulfate Soundness(5 cycles)—ASTM C 88 250.00 each Additional Cycles 25.00 each ASPHALT: Asphalt Mix Design Price on Request Review Asphalt Mix Design(Lab Supervisor) 45.00 per hour In-Place Compaction Test-Nuclear Gauge(Lab Technician) 27.50 per hour Marshall Test including Stability,Flow,Laboratory Density,Percent Air Voids, Percent Voids in Mineral Aggregate (3 specimens per test) 175.00 each Extraction including percent Bitumen and Aggregate Gradation 125.00 each Laboratory Density of Cored Plugs including Depth Measurement 18.00 each Asphalt Coring(3"or 4"): Core Machine&Lab Technician 50.00 per hour Additional Lab Technician,if required 27.50 per hour Sample Pickup FIREPROOFING: Unit Weight, Bonding Strength,Thickness and Sampling (actual time required for Lab Technicians) 27.50 per hour/Tech. Report Preparation (Lab Supervisor) 45.00 per hour STRUCTURAL STEEL: Bolt Torque Testing: Lab Technician(s) 27.50 per hour Design Engineer 50.00 per hour Pneumatic Torque Wrench Calibration(twice per day) 50.00 each Visual Weld Inspection Design Engineer 50.00 per hour ** Subject to adjustment annually,on/about July 1. Services not Listed are Available on Request ACCREDITED by AASHTO—Inspected by AMRL and CCRL FEE:MAT-LAB.096:jrn Page 2 of 2 • • • APPENDIX "D" GEOTECHNICAL INVESTIGATION SCOPE AND FEE SCHEDULE SUNBRIDGE DRIVE EXTENSION FAYETTEVILLE , ARKANSAS for McClelland consulting Engineers, Inc. Fayetteville, Arkansas December 12, 1996 Item No. Item Description/ASTM Designation Quantity Units Unit Price Extended 1 Equipment Mobilization and Demobilization 1 LS $75.00 $75.00 Backhoe Rental(For CBR Samples Minimum of 4 hours) 4 HR $45.00 $180.00 Soils Technician(For CBR Samples) 4 HR $30.00 $120.00 Excavation Repair (For CBR Samples) 1 LS $50.00 $50.00 Two Flagman( For CBR Samples) HR $50.00 $0.00 Subtotal $425.00 2 Boring Setup Charges 2 EA $25.00 $50.00 Boring Layout 0.5 HR $56.00 $28.00 Subtotal $78.00 3 Soil Drilling and Sampling,ASTM D-1586&ASTM D-1587 Soil Drilling (2 Borings in Street-5 feet each) 10 LF $8.00 $80.00 Subtotal $80.00 4 Soil and Rock Laboratory Testing ASTM D-2216, Moisture Content Determination 4 EA $8.00 $32.00 ASTM D-4318, Liquid and Plastic Limit of Soils 2 EA $45.00 $90.00 ASTM D-422, Gradation Analysis of Soils (5 Sieves) 2 EA $50.00 $100.00 ASTM D-2166, Dry Unit Weight of Soil Specimans 4 EA $8.00 $32.00 ASTM D-1883,California Bearing Ratio 2 EA $250.00 $500.00 Subtotal $754.00 5 Geotechnical Report Project Manager 1 HR $95.00 $95.00 Project Engineer 2 HR $60.00 $120.00 Boring Plot Plan& Log Preparation(Draftsman) 3 HR $35.00 $105.00 Report Preparation (Clerical) 2 HR $30.00 $60.00 Subtotal $380.00 ESTIMATED GEOTECHNICAL INVESTIGATION $1,717.00 QUOTE Not to exceed $1,725.00 SUMITTED BY: . R. WAYNE JONES, P.E. Project Manger