HomeMy WebLinkAbout4-97 RESOLUTION r • - • • •, SCANN RESOLUTION NO. 4-9 7 ED A RESOLUTION AWARDING A CONTRACT IN THE AMOUNT OF $647,856, PLUS A 15% CONTINGENCY AMOUNT OF $97,178.40, TO APAC ARKANSAS, INC., A DIVISION McCLINTON-ANCHOR, FOR THE RECONSTRUCTION OF 24TH STREET; AND APPROVAL OF A BUDGET ADJUSTMENT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council hereby awards a contract in the amount of$647,856, plus a 15% contingency amount of $97,178.40 to APAC Arkansas, Inc., a division of McClinton-Anchor, for the reconstruction of 24th street; and authorizes the Mayor and City Clerk to execute said contract. A copy of the contract is attached hereto marked Exhibit A and made a part hereof. Section 2. The City Council hereby approves a budget adjustment in the amount of $745,035 increasing Street Improvements, Acct. No. 4470 9470 5809 00, Project 96043 by decreasing Use of Fund Balance, Acct. No. 4470 0947 4999 99. A copy of the budget adjustment is attached hereto marked Exhibit B and made a part hereof. P ;S,SED AND APPROVED this 7th day of January , 1997. " ` APPROVED: V . Ared' � na, Mayor y N 1 l: v ATTEST: -� By: ,Q,0.( . / Traci Paul, City Clerk DOCUMENT 00500 CONTRACT THIS AGREEMENT, made and entered into on the 71.4 day of n ca/y 19' 7 , by and between APAC Arkansas Inc., McClinton-Anchor Div. P. O. Box 1367, Fayetteville. Arkansas herein called the Contractor, and the City of Fayetteville, Arkansas, hereinafter called the Owner: WITNESSETH: That the Contractor, for the consideration hereinafter fully set out, hereby agrees with the Owner as follows: 1. That the Contractor shall furnish all the materials, and perform all of the work in manner and form as provided by the following enumerated Drawings, Specifications, and Documents,which are attached hereto and made a part hereof, as if fully contained herein and are entitled 24th Street Reconstruction from School Avenue to Ravenswood Lane , dated Revised November, 1996. Advertisement for Bids Payment Bond Instructions to Bidders General Conditions Bid and acceptance thereof Supplemental Conditions Performance Bond Specifications Drawings (Sheet 1 thru 19, see Index on Cover Sheet) 2. That the Owner hereby agrees to pay to the Contractor for the faithful performance of this Agreement, subject to additions and deductions as provided in the Specifications or Bid, in lawful money of the United States,the amount of: Six Hundred Forty-seven Thousand, Eight Hundred Fifty-six and No/100 Dollars ($647.856.00). 3. The Work will be substantially completed within 180 days after the date when the Contract Time commences to run as provided in Notice to Proceed, and completed and ready for final payment in accordance with the General Conditions within 210 days after the date when the Contract Time commences to run. 00500- 1 • 4. Liquidated Damages: Owner and Contractor recognize that time is of the essence of this Agreement and the Owner will suffer financial loss if the Work is not completed within the times specified in above, plus any extensions thereof allowed in accordance with the General Conditions. They also recognize the delays, expense, and difficulties involved in proving the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty) Contractor shall pay Owner Five Hundred Dollars ($500.00) for each day that expires after the time specified in Paragraph 3 for Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the time specified in Paragraph 3 above for final payment or any proper extension thereof granted by Owner, Contractor shall pay Owner Five Hundred Dollars ($500.00) for each day that expires after the time specified in Paragraph 3 for completion and readiness for final payment. 5. On receipt of an approved payment request, the Owner will make all the required internal review. The Owner will make every effort to pay the Contractor within 30 days, but the owner can not guarantee this 30 day period can be met each time. The Owner shall make partial payments to the Contractor on the basis of a duly certified and approved estimate of work performed during the preceding calendar month by the Contractor, LESS the retainage provided in the General Conditions, which is to be withheld by the Owner until all work within a particular part has been performed strictly in accordance with this Agreement and until such work has been accepted by the Owner. 6. That upon submission by the Contractor of evidence satisfactory to the Owner that all payrolls, material bills, and other costs incurred by the Contractor in connection with the construction of the work have been paid in full, final payment on account of this Agreement shall be made within 60 days after the completion by the Contractor of all work covered by this Agreement and the acceptance of such work by the Owner. 7. It is further mutually agreed between the parties hereto that if, at any time after the execution of this Agreement and the Surety Bond hereto attached for its faithful performance and payment, the Owner shall deem the Surety or Sureties upon such bond to be unsatisfactory or if, for any reason such bond ceases to be adequate to cover the performance of the work, the Contractor shall, at his expense, within 5 days after the receipt of notice from the Owner, furnish an additional bond or bonds in such form and amount and with such Surety or Sureties as shall be satisfactory to the Owner. In such event, no further payment to the Contractor shall be deemed to be due under this Agreement until such new or additional security for the faithful performance of the work shall be furnished in manner and form satisfactory to the Owner. 8. No additional work or extras shall be done unless the same shall be duly authorized by appropriate action by the Owner in writing. 00500-2 IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the day and date first above written, in three (3) counterparts, each of which shall, without proof or accounting for the other counterpart be deemed an original Contract. SEAL: APAC Arkansas. Inc.. McClinton=A_ Thor Div, CONTRACTOR WITNESSES: • �'• �`S By 4i1) 7 . /If • 4l �1G3lC/�/J2T oV Title CITY OF FAYETTEVILLE, ARKANSAS ATTEST: OWNER Q� By /l Clerk Mayor • �i9n `. 00500-3 City of Fayetteville,Ark:,nsas Budget Adjustment.Form Budget Year Department: Sales Tax Capital Improvement Fund Date Requested Adjustment# 1997 Division: 12/20/96 Program: Project or Item Requested: Project or Item Deleted: Approval of a roll forward of project funds for 24th Street from 1996 and Funding for this request is from the Joyce Boulevard-Old Missouri to HWY increasing the project budget. 265 project. Justification of this Increase: Justification of this Decrease: The roll forward budget adjustment is requested to fund the construction The Joyce Boulevard project has$208,519 budget remaining beyond the contract and project contingency for 24th Street Project. requirements for the engineering,construction contracts and contingencies.The 24th Street project needs$147,424. Increase Account Name Amount Account Number Project Number Street Improvements 745,035 4470 9470 5809 00 96043 Decrease Account Name Amount Account Number Project Number Use of Fund Balance 745,035 4470 0947 4999 99 Approval Signatures Budget Office Use Only Iz/ 1 z// e ested B Type: A B C D E F CD ..„..__4_,, (2--(Z e(qc,. Bud et C ordinator Date of Approval Department Director Posted to General Ledger Admin.S ices irecto Entered in Category Log , V;74 /c/i.44'7')/..---- /H9.2 Mayo C:\APP\97BUD\97WORK\24THBA.WK3 Budget Office Copy NOTICE OF AWARD TO: APAC Arkanas, Inc., McClinton-Anchor Division P. O. Box 1367 Fayetteville, AR 72702 PROJECT DESCRIPTION: The OWNER has considered the BID submitted by you for the above described WORK in response to its Advertisement for Bids dated Nov 17. 1996 and Instructions to Bidders. You are hereby notified that your BID has been accepted in the amount of: Six Hundred Forty-seven Thousand, Eight Hundred Fifty-six and No./100 Dollars ($647,856.00) Pending the approval of Fayetteville's City Council on Jan 7, 1997. You are required by the Instructions to Bidders to execute the Contract and furnish the required CONTRACTOR'S Performance BOND, Payment BOND, and certificates of insurance within fifteen(15) calendar days from the date of this Notice to you. If you fail to execute said Contract and to furnish said BONDS withing fifteen(15)days from the date of this Notice, said OWNER will be entitled to consider all your rights arising of your BID BOND. The OWNER will be entitled to such other rights as may be granted by law. You are required to return an acknowledged copy of this NOTICE OF AWARD to the OWNER. Dated this 10th day of December, 199 6 McCLELLAND C NSULTING ENG ERS, INC. By f Arnold D. Rankin Title Project Engineer ACCEPTANCE OF NOTICE Receipt of the above NOTICE OF AWARD is hereby acknowledged by AP4 AAikaN S'i1 1/{?c., I�C�h tri - ncA r Cowl St ui-' this the day of �-//i , 1996 By d;;:ntii) /4. 66. Title /�� 'I /u- 7" R•es . '/-97 7-a - 97 sec/ h4oh -Cihcli0#' STAFF REVIEW FORM /9- p� C - AGENDA REQUEST XXXX CONTRACT REVIEW GIB Hoc . Ord1 /1 a i3 GRANT REVIEW p. L/ 4-1, S4 For the Fayetteville City Mayor ' s signature .,,. FROM: N.r:;,. .. Wayne Ledbetter Engineering Public Works Name Division Department ACTION REQUIRED: Approval of Change Orders 1, 2, & 3 to the Contract for Reconstruction of 24th Street with APAC Arkansas Inc . , McClinton-Anchor Div. in the amount of $ 6, 960 . 00 . COST TO CITY: $ 6, 960 . 00 $ 800, 914 24th Street Cost of this Request Category/Project Budget Category/Project Name 4470-9470-5809-00 $ 714, 294 Street Improvements Account Number Funds Used To Date Program Name 96043-0010 $ 86, 620 Sales Tax Project Number Remaining Balance Fund BUD ET xxxx Budgeted Item Budget Adjustment Attached u et oordinator Administrative Services Director CONTRACT/GRANT/LEASE REVIEW: GRANTING AGENCY: 1/K 97 . �� 7/2,21y7 Acco in ag Date Coo inator/ Date 7 z/—mil e /1'-1 2 City Attorney Date I rnal Auditor 5 6/ Date '? \) 12irt --b21:91 Purchasing Officer Date STAFF RECOMMENDATION: Staff recommends that the Mayor approve the Change Orders with McClinton-Anchor for the 24th Street Reconstruction. ivision H ad Date Cross Reference 7�z�" 7 New Item: Yes epartm n irectorp Date 7/2 h7 : Prey Or /Res l / Adminis tive c s Director Date 7/'2x/72 Orig Contract Date: Mayor l 1 I` I w( S f?,cc.. Date FAYETTEVILLE . : THE CITY OF FAYETTEVILLE,ARKANSAS DEPARTMENTAL CORRESPONDENCE To: Mayor Fred Hanna Thru: Kevin Crosson, Public Works Director Charles Venable, Assistant Public Works Director Don Bunn, City Engineer 606- me_From: Wayne Ledbetter, Engineering Date: July 17, 1997 RE: 24th Street Reconstruction 24th Street and a portion of Country Club Drive is being constructed according to the City of Fayetteville's present pavement and drainage criteria. This street will be a thirty-one (31) foot ( measured from back of curb to back of curb) wide paved section beginning at School Avenue and ending near 26th Street(2400'+/-). The pavement section will be asphalt with concrete curb and gutter and pedestrian sidewalk. Additional improvements include drainage construction. From 26th Street to Ravenswood Lane there is approximately 400 feet of minor improvements to pavement. During this construction we have encountered situations that require changing from the original Plans. These changes are as follows: Change Order No. 1 modified 4 drop inlet structures to accommodate the existing 8" waterline. This change order had a net increase of$ 1,200.00. Change Order No.2 dealt with backfilling around proposed structures and deleted the compacted Class 7 base under the sidewalk. This change order had a net decrease of $ 3,850.00. Change Order No. 3 added at two different locations a water line extension and fire assembly for protection and for future use. These assemblies allow line extensions without tearing up the pavement in the future. This change order had a net increase if$ 9,610.00. $ 745.034.40 was budgeted for the construction contract with McClinton Anchor. The original bid was $ 647,856.00 with a contingency of$ 97,178.40. 3. Staff Recommendation. The Staff recommends that the Mayor approve the Change Orders to the construction contract with McClinton Anchor for the reconstruction of 24th Street. This amount is $ 6,960.00. CHANGE ORDER NO. 1 PROJECT: 24th Street Reconstruction from School Avenue to Ravenswood Lane PROJECT NUMBER: FY962102 CONTRACT DATE: January 7, 1997 DATE OF ISSUANCE: April 2, 1997 EFFECTIVE DATE: April 2, 1997 OWNER: City of Fayetteville, AR CONTRACTOR: APAC-Arkansas, McClinton-Anchor Div. Reason for Change: Differing Site Condition - an existing 8" water line from Station 5+50 Rt to Station 10+50 Rt is shallower than expected. This caused the 24" storm drain and associated curb inlets to be moved 3 feet right. Extensions are needed for the three affected curb inlets as bridges over the water line. Change the Contract Documents as follows: Relocate and Modify Inlet Boxes 6, 7, 8, and 9, with the addition of reinforced concrete throat extensions. The extensions SiBi1 span the distance from th e relocated inlets to tahC proposed curb and gutter arid shall slope downward from the curb and gutter at a slope to match the depressed gutter of Detail B-14. Concrete shall attain a strength of no less than 3,500 p.s.i. at 28 days and shall meet the requirements of Section 03300. Reinforcing steel for the bottom of the throats shall be #5 bars at 10" OCBW. Reinforcing steel for the top shall be as shown in Details A-14 and B-14 except that the pattern shall be extended approximately three feet. Move the 24" drain pipe to the right far enough to clear the existing 8" water line (approximately 3 feet) from Station 5+50 to 10+50. Shorten the flared end section drainage pipes at Inlet Boxes 8 and 9 so that the inlet for the flared end sections remains as shown on Drawing Sheet 3. CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIMES Original Price: Original Contract Times $647,856.00 Substantial Completion (days): 180 Ready for final payment (days): 210 Net Changes from previous Amendments or Changes: Net Changes from previous Amendments or Changes: Substantial Completion (days): N/A $ N/A Ready for Final Payment (days): N/A Net Increase (1 *la ) for this Change: Net Increase (Decrease) for this Change: Substantial Completion (days): -0- $ 1,200.00 Ready for final payment (days): -0- Revised Contract Price: Revise Contract Times: Substantial Completion (days): 180 $649,056.00 Ready for final payment (days): 210 Revised Completion Dates: Substantial Completion: TBD Ready for final payment: TBD RECOMMENDED: ACCEPTED: APPROVED: Ly: 4. 44 By: PV, By: 6/ Engineer Contractor Owner Date: /w/7 Date: I/7/9/7 Date: Zz 7 RECE{IVE7"7 / fire/ o>r' APR - 9 997 96102:CO-1:403:jm ` -2 /q , -1 .rr�� ��//��'❑❑ 1997 CHANC i�S'D F ..JU2N 4 PROJECT: 24th Street Reconstruction from School Avenue to Ravenswood Lane PROJECT NUMBER: FY962102 CONTRACT DATE: January 7. 1997 DATE OF ISSUANCE: May 2, 1997 EFFECTIVE ON DATE APPROVED BY OWNER OWNER: City of Fayetteville. AR CONTRACTOR: APAC-Arkansas, McClinton-Anchor Div. Reason for Change: 1. Contractor requested relief from requirement to wait seven days before backfilling around reinforced concrete drainage structures. Traffic safety issue. 2. Owner requested deletion of compacted, class 7 base from underneath sidewalks in order to reduce costs. Change: 1. Add the following to Specification 3.10.A on page 02200-7 of the project manual: "Contractor at his own option may backfill around reinforced concrete drainage structures after the concrete has cured for at least 72 hours. By exercising this option, the Contractor assumes full and complete responsibility for damage to the structures." 2. From Detail A-12 of the Drawings delete the requirement for 4-inch, Class 7 Base underneath the sidewalk on the right side. Reduce the unit price for Bid item 27, 4-ft Sidewalks, from $24.25/SY to $20.75/SY. Deduct $3,850.00 (3.50 * 1100 SY). Compact the sidewalk subgrade to 95% of ASTM D-698 Proctor maximum. CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIMES Original Price: Original Contract Times $647,856.00 Substantial Completion (days): 180 Ready for final payment(days): 210 Net Changes from previous Amendments or Changes: Net Changes from previous Amendments or Changes: Substantial Completion (days): N/A $ 1,200.00 Ready for Final Payment(days): N/A Net Decrease for this Change: Net Increase (Decrease) for this Change: Substantial Completion (days): -0- $ 3,850.00 Ready for final payment(days): -0- Revised Contract Price: Revise Contract Times: Substantial Completion (days): 180 $ 645,206.00 Ready for final payment(days): 210 Revised Completion Dates: Substantial Completion: October 13, 1997 Ready for final payment: November 10, 1997 RECOMMENDED: ACCEPTED: APPROVED: By: LII474. By: By: 4 Contractor Owner Engineer Date: �Z�92 Date: 4/01 Date: 1 6 f 7 RECEVEED ,I1,slT 96102:CO-2:501:cr J U N 0 1997 °r -1 CHANGE ORDER NO. 3 JUN 1 2 i991 ZCc‘ PROJECT: 24th Street Reconstruction from School Avenue to Ravenswood Lane PROJECT NUMBER: FY962102 CONTRACT DATE: January 7, 1997 DATE OF ISSUANCE: June 4, 1997 EFFECTIVE ON DATE APPROVED BY OWNER OWNER: City of Fayetteville, AR CONTRACTOR: APAC-Arkansas, McClinton-Anchor Div. Reason for Change: Owner requested the installation of additional fire hydrants to provide fire protection for future development on vacant lots adjacent to the site. Change: Install fire hydrant assemblies on existing waterlines at Stations 7+00(Lt) and 10+60(Rt). Materials, equipment, and installation shall be per the Contract Documents. Add the following Items to Document 00300 Bid Form: a. Item 31a, Fire Hydrant Assembly at Sta. 7+100 (Lt), consisting of 24"x8" tapping sleeve and valve, 15 LF of 8" DIP, 1 ea 8"x6" reducer, an 8' direct bury fire hydrant with valve as previously approved, and compacted Class 7 backfill. Payment to be Lump Sum of $5,450.00. b. Item 31b, Fire Hydrant Assembly at Sta. 10+60(Rt), consisting of 8"x8" tapping sleeve and valve, 18 LF of 8" DIP, 1 ea. 8"x6" reducer, a 6' direct bury fire hydrant with valve as previously approved, and compacted Class 7 backfill as required. Payment to be Lump Sum of $4,160.00. CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIMES Original Price: Original Contract Times Substantial Completion (days): 180 $647,856.00 Ready for final payment(days): 210 Net Changes from previous Amendments or Changes: Net Changes from previous Amendments or Changes: Substantial Completion (days): N/A ($2,650.00) Ready for Final Payment(days): N/A Net(Decrease)for this Change: Net Increase (Decrease) for this Change: Substantial Completion (days): -0- $ 9,610.00 Ready for final payment(days): -0- ' Revised Contract Price: Revise Contract T im ;s: Substantial Completion (days): 180 $ 654,816.00 Ready for final payment(days): 210 Revised Completion Dates: Substantial Completion: October 13, 1997 Ready for final payment: November 10, 1997 RECOMMENDED: ACCEPTED: APPROVED: By: /) liL By: k A, 64, By: (, vl Engineer Contractor Owner Date: Date: 419747 Date: r./i/ a, 961 02:CO3:604:jm -";Gk' �42.2. 7 -1 Res. y- 7 • • STAFF REVIEW FORM kl on AGENDA REQUEST 7-/c'- cj 7 XXXX CONTRACT REVIEW GRANT REVIEW For the Fayetteville City Mayor ' s signature. L'IICROFILMED FROM: Wayne Ledbetter Engineering Public Works Name Division Department ACTION REQUIRED: Approval of Change Order 4 to the Contract for Reconstruction of 24th Street with APAC Arkansas Inc . , McClinton-Anchor Div. in the amount of $ 48, 190 . 00 COST TO CITY: $ 48, 190 . 00 $ 800, 914 24th Street Cost of this Request Category/Project Budget Category/Project Name 4470-9470-5809-00 $ 719, 645 Street Improvements Account Number Funds Used To Date Program Name 96043-0010 $ 81, 269 Sales Tax Project Number Remaining Balance Fund BUDGET REVIEW: xxxx Budgeted Item Budget Adjustment Attached Bud et Coordinator Administrative Services Director CONTRACT/GRANT/LEASE REVIEW: GRANTING AGENCY: _ I/9-17 Account g ager Date � /��ADA Coordin Date Ili City Attorn Date ' ternal Auditor 6-7 1 Date Purchasing Officer Date STAFF RECOMMENDATION: Staff recommends that the Mayor approve the Change Orders with McClinton-Anchor for the 24th Street Reconstruction. 0 ,( Y /lZk7 'v' ion ea Date Cross Reference 04/c7 New Item: Yes Department Director Date /.12/q7 Prey Ord/Res #: Admin' trat've ervices Director Dat Orig Contract Date: May r Date FAYETTE`'I LLE THE CITY OF FAYETTEVILLE,ARKANSAS DEPARTMENTAL CORRESPONDENCE To: Mayor Fred Hanna Thru: Kevin Crosson, Public Works Director Charles Venable, Assistant Pub i Works Director Don Bunn, City Engineer From: Wayne Ledbetter, Engineering Date: August 19, 1997 RE: 24th Street Reconstruction 24th Street and a portion of Country Club Drive is being constructed according to the City of Fayetteville's present pavement and drainage criteria. This street will be a thirty-one(31) foot ( measured from back of curb to back of curb)wide paved section beginning at School Avenue and ending near 26th Street(2400'+/-). The pavement section will be asphalt with concrete curb and gutter and pedestrian sidewalk. Additional improvements include drainage construction. From 26th Street to Ravenswood Lane there is approximately 400 feet of minor improvements to pavement. During this construction we have encountered a situation that requires changing from the original Plans. This change is as follows: Change Order No. 4 will delete a concrete retaining wall and add common and rock excavation from Station 14 thru 23. There are some miscellaneous items involved in this change. A driveway will need to be reconstructed and the entrance walls relocated. There will also be a need for a modular retaining wall in various locations. This change order has a net increase of$48,190.00. Please find enclosed Change Order#4 enumerating the various before mentioned items $ 745,034.40 was budgeted for the construction contract with McClinton Anchor. The original bid was $ 647,856.00 with a contingency of$ 97,178.40. 3. Staff Recommendation. The Staff recommends that the Mayor approve this Change Order to the construction contract with McClinton Anchor for the reconstruction of 24th Street. This amount is $ 48,190.00. RECEIVED CHANGE ORDER NO. 4 Jul 2 5 1997 PROJECT: 24th Street Reconstruction from School Avenue to Ravenswood Lane PROJECT NUMBER: FY962102 CONTRACT DATE: January 7, 1997 DATE OF ISSUANCE: July 18, 1997 EFFECTIVE ON DATE APPROVED BY OWNER OWNER: City of Fayetteville, AR CONTRACTOR: APAC-Arkansas, McClinton-Anchor Div. Reason for Change: OWNER REQUEST Owner requested a major grade reduction through the superelevated portion of the project (Stations 14+00 through 23+00). Change: 1. Delete Drawing Sheets 4, 5, 8, 9, 10, 11, 15, and 16. Replace them with revised Drawing Sheets 4, 5, 8, 9, 10, 11, 15, and 16. 2, Change Document 00300, Bid Form, per the attached revision. CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIMES Original Price: Original Contract Times Substantial Completion(days): 180 $647,856.00 Ready for final payment(days): 210 Net Changes from previous Amendments or Changes: Net Changes from previous Amendments or Changes: Substantial Completion (days): -0 - $6,960.00 Ready for Final Payment(days): -0- Net Increase for this Change: Net Increase (Decrease) for this Change: Substantial Completion (days): 30 $48,190.00 Ready for final payment(days): 30 Revised Contract Price: Revise Contract Times: Substantial Completion (days): 210 $703,006.00 Ready for final payment(days): 240 Revised Completion Dates: Substantial Completion: November 10, 1997 Ready for final payment: December 10, 1997 RECOMMENDED: ACCEPTED: APPROVED: By: 1/) B . ; � v By: .Af/e/%11444 .---- G'�irnt�J Engineer Contractor Owner Date: 7 (D/ ! 7 Date: 7/Z3/97 Date: 8—.2 S " 9 7 QL. 96102:CO3:604:jm to q -1 ,( • FY962102 24th Street Reconstruction, Change Order No. 4 Bid Unit Plan Plan Item Description Unit Price Qty $ 1 Trench&Excavation Safety Syst. LS ' $2,000.00 1 $2,000.00 2 Mobilization LS $17,950.00 I $17,950.00 3 Clearing and Grubbing STA $750.00 23.8 $17,850.00 4 Site Preparation STA ' $2,600.00 27.8 $72,280.00 5 Existing Pavement Removal SY $1.60 5800 $9,280.00 6 Remove&Dispose of Culv.Pipe LF $6.00 544 $3,264.00 7 Remove&Dispose of Concrete Inlets and Junction Box EA $426.00 3 $1,278.00 8 Remove&Dispose of Concrete Headwall EA $365.00 4 $1,460.00 9 Drop Inlet,Type 1 .EA $2,200.00 15 $33,000.00 10 Junction Box,Type I EA $3,500.00 1 $3,500.00 11 Extended Throat LF $120.00 80 $9,600.00 12 Energy Dissipator,Sta 14+13 LS $5,000.00 l $5,000.00 13 18"Drainage Pipe LF $22.00 935 $20,570.00 14 24"Drainage Pipe LF $24.00 570 $13,680.00 ' 15 18"F.E.S.Including Curtain Wall EA $600.00 2 $1,200.00 16 Rip Rap TN $23.00 45 $1,035.00 17 Seeding&Mulching LS $21,000.00 I $21,000.00 18 12"Subgrade Fill(Select Material) CY $6.50 ' 3815 $24,797.50 19 4"Binder Course.Transition&Repair Section SY $9.90 450 $4,455.00 20 2"Asphalt Surface Course(Overlays between 26th&27th Circles) SY $5.50 840 $4,620.00 21 Class 7 Base(7")Transition&Repair Section SY $5.80 500 $2,900.00 22 Leveling Course(between 24th&27th Circles) TN $50.00 150 $7,500.00 23 Geogrid Reinforced Earth LF $170.00 200 $34,000.00 24 Gravel Driveway SY $6.50 90 $585.00 25 Asphalt Driveways SY $11.50 200 $2,300.00 26 6"Concrete Driveway SY $30.00 120 $3,600.00 27 4'Sidewalks Chg 2 SY $20.75 1100 $22,825.00 28 Undercut&Backfill CY $12.00 800 $9,600.00 29 Temporary Crushed Stone Surfacing TN $9.00 5000 $45,000.00 30 12"AWWA CI 200,C900 PVC LF $20.50 830 $17,015.00 31 Fire Hydrant Assembly EA $1,540.00 2 $3,080.00 31 a Fire Hydrant Assy,7+00 Chg 3 LS $5,450.00 1 $5,450.00 31 b Fir Hydrant Assy, 10+60 Chg 3 LS $4,160.00 I $4,160.00 32 Ductile Iron Fittings LB $2.60 1570 $4,082.00 33 8"Tapping Sleeve&Valve EA $1,550.00 1 $1,550.00 34 Realign Ditch(Sheet 5) LS $1,000.00 l $1,000.00 35 Remove&Reinstall Existing Street Regulation Signs LS $735.00 1 $735.00 36 Traffic Control&Maintenance of Traffic LS $5,200.00 1 $5,200.00 37 Storm Water&Erosion Control LS $5,000.00 1 $5,000.00 38 Pipe Underdrain LF $12.00 450 $5,400.00 39 Remove&Relocate Wood Fence Sta 0+06 to 1+50 LF $6.70 160 $1,072.00 40 Quad Mail Box Relocation,Including Base,Sta 21+35 LS $300.00 l $300.00 41 Mail Box Relocation,Including 4x4 Support Post EA $100.00 1 $100.00 42 Guard Rail LS $1,000.00 l $1,000.00 Page 1 Bold,italic print denotes a Change 4 Item • FY962102 24th Street Reconstruction, Change Order No. 4 Bid Unit Plan Plan Item Description Unit Price Qty $ 43 Traffic Paint,Pavement Center Line Markings LF $0.60 5600 $3,360.00 44 Traffic Paint,Crosswalks EA $850.00 1 $850.00 44A Air Release Vault EA $2,475.00 I $2,475.00 45 Retaining Wall,deleted by Cleg 4 LS $25,000.00 . 0 ' $0.00 46A Class 7 Base(7") SY $4.80 9250 $44,400.00 47A 4"Asphalt Binder Course SY $7.90 7650 $60,435.00 ' 48A 2"Asphalt Surface Course SY $4.15 . 7650 $31,747.50 49A Curb&Gutter LF $7.25 4700 $34,075.00 CI Realign Drain Pipe&4 Inlets LS - $1,200.00 I $1,200.00 C4-1 Additional Common &Rock Excavation, Grade Change, STA $6,355.00 9 $57,195.00 Stations 14 thru 23 C4-2 Demolish &Reconstruct Wall at Askew Drive LS $7,250.00 1 $7,250.00 C4-3 Keystone Block Wall at Telephone Equipment,Station 20-21 Rt SF $24.00 . 165 $3,960.00 (per SF of wall face) C4-4 Handrail at Keystone Wall LF $55.00 66 $3,630.00 C4-5 4"Compacted Cl. 7 Base at Askew Drive(95%Modified SY $5.00 110 $550.00 Proctor) C4-6 2"Hot Mix Asphalt Surface Course at Askew Drive SY $5.50 110 $605.00 Revised Contract Price Including Change Number 4 $703,006.00 Total Additions due to Change Number 4 $48,190.00 • Page 2 Bold, italic print denotes a Change 4 Item es • 47' " g7 , • chf'li. Ora/. .- • STAFF REVIEW FORM /�P/9 C zh G AGENDA REQUEST nir /d) XXXX CONTRACT REVIEW /- b 1i E GRANT REVIEW For the Fayetteville City Mayor ' s signature . MICROFILMED FROM: Wayne Ledbetter Engineering Public Works Name Division Department ACTION REQUIRED: Approval of Change Order 5 to the Contract for Reconstruction of 24th Street with APAC Arkansas Inc . , McClinton-Anchor Div. in the amount of $ 5, 022 .44 . COST TO CITY: S 5, 022 .44 $ 800, 914 24th Street Cost of this Request Category/Project Budget Category/Project Name 4470-9470-5809-00 $ 774, 795 Street Improvements Account Number Funds Used To Date Program Name 96043-0010 $ 26, 119 Sales Tax Project Number Remaining Balance Fund BUDGET REVIEW: xxxx Budgeted Item Budget Adjustment Attached 1 y/Z67 Budget Coordinator Administrative Services Director CONTRACT/GRANT/LEASE REVIEW: GRANTING AGENCY: Lfki,�1? ' t / -l47 Accounting Mi ger Date A oordinator Date l i z ZS y _3/_9 7✓ City Atto ney 7 Date In nal Auditor 5 1/ Date V LA- D ia-a9 -97 Purchasing Officer Date STAFF RECOMMENDATION: Staff recommends that the Mayor approve the Change Ord ith McClinton-Anchor for the 24th Street Reconstruction. /2-Z,-57 sion Head Date Cross Reference 7Z-34-4 7 New Item: YENS Department Director Date rjr-Ai 11`5/1 7 Prey Ord/Res #: Adminf,r attiivvve vices Director Date / 1/6/7//fi r Orig Contract Date: Mayor Date FAYETTE`'I LLE THE CITY OF FAYETTEVILLE,ARKANSAS DEPARTMENTAL CORRESPONDENCE To: Mayor Fred Hanna Thru: Kevin Crosson, Public Works Director Charles Venable, Assistant Public orks Director Don Bunn, City Engineer 0I From: fri--- Wayne Ledbetter, Engineering Date: December 26, 1997 RE: 24th Street Reconstruction 24th Street and a portion of Country Club Drive is being constructed according to the City of Fayetteville's present pavement and drainage criteria. This street will be a thirty-one (31) foot ( measured from back of curb to back of curb) wide paved section beginning at School Avenue and ending near 26th Street(2400'+/_). The pavement section will be asphalt with concrete curb and gutter and pedestrian sidewalk. Additional improvements include drainage construction. From 26th Street to Ravenswood Lane there is approximately 400 feet of minor improvements to pavement. During this construction we have encountered a situation that requires changing from the original Plans. This change is as follows: Change Order No. 5 deals with some additional work due to grade changes. These changes are as follows: 1. Place 356.7 tons of additional Class 7 base @ $12.35 /TN= $4,405.24. 2. Raise Junction Box @ $ 200.00. 3. Remove and dispose of 140 LF curb and gutter @ $ 2.50/LF = $ 350.00. 4. Remove and dispose of 21 SY existing pavement @ $ 3.20/SY= $ 67.20. This change order has a net increase of$ 5,022.44. Please find enclosed Change Order# 5 enumerating the various items. $ 745.034.40 was budgeted for the construction contract with McClinton Anchor. The original bid was $ 647,856.00 with a contingency of$ 97,178.40. 3. Staff Recommendation. The Staff recommends that the Mayor approve this Change Order to the construction contract with McClinton Anchor for the reconstruction of 24th Street. This amount is $ 5,022.44. f ' f CHANGE ORDER NO. 5 PROJECT: 24th Street Reconstruction from School Avenue to Ravenswood Lane PROJECT NUMBER: FY962102 CONTRACT DATE: January 7, 1997 DATE OF ISSUANCE: Dec 1, 1997 EFFECTIVE ON DATE APPROVED BY OWNER //(/ ga) OWNER: City of Fayetteville, AR CONTRACTOR: APAC-Arkansas, McClinton-Anchor Div. Reason for Change: Owner requested a grade change between station 12+50 to 14+50. Change: 1. Change Document 00300, Bid Form, per the attached revision. CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIMES Original Price: Original Contract Times Substantial Completion (days): 180 $647,856.00 Ready for final payment(days): 210 Net Changes from previous Amendments or Changes: Net Changes from previous Amendments or Changes: Substantial Completion (days): 30 $55,150.00 Ready for Final Payment (days) 30 Net Increase for this Change: Net Increase (Decrease) for this Change: Substantial Completion (days): 0 $ 5,022.44 Ready for final payment(days): 0 Revised Contract Price: Revise Contract Times: Substantial Completion (days) 210 $708,028.44 Ready for final payment (days): 240 Revised Completion Dates: Substantial Completion: November 10, 1997 Ready for final payment: December 10, 1997 RECOMMENDED: ACCEPTED: APPROVED: By:afrhel/D1,...L.- By: By: /11'killAll Engineer Contractor Owner Date: /2 /- -97 Date: 1 Z/0¢(07 Date: /- 6 RECEIIMEDD DEC 0 419 OV/kPi- 92165:CO1-Ph2.718jm • FY962102 24th Street Reconstruction change Order No. 5 Bid Item Description Unit Unit Price Plan Qty Plan $ 1 Trench & Excavation Safety Syst. LS $2,000.00 1 $2,000.00 2 Mobilization LS $17,950.00 1 $17,950.00 3 Clearing and Grubbing STA $750.00 23.8 $17,850.00 4 Site Preparation STA $2,600.00 27.8 $72,280.00 5 Existing Pavement Removal SY $1.60 5800 $9,280.00 6 Remove & Dispose of Culy. Pipe LF $6.00 544 $3,264.00 7 Remove & Dispose of Concrete Inlets and Junction Box EA $426.00 3 $1,278.00 8 Remove & Dispose of Concrete Headwall EA $365.00 4 $1,460.00 9 Drop Inlet, Type I EA $2,200.00 15 $33,000.00 10 Junction Box, Type I EA $3,500.00 1 $3,500.00 11 Extended Throat LF $120.00 80 $9,600.00 12 Energy Dissipator, Sta 14+13 LS $5,000.00 1 $5,000.00 13 18" Drainage Pipe LF $22.00 935 $20,570.00 14 24" Drainage Pipe LF $24.00 570 $13,680.00 15 18" F.E.S. Including Curtain Wall EA $600.00 2 $1,200.00 16 Rip Rap TN $23.00 45 $1,035.00 17 Seeding & Mulching LS $21,000.00 1 $21,000.00 18 12"Subgrade Fill (Select Material) CY $6.50 3815 $24,797.50 19 4" Binder Course. Transition & Repair Section SY $9.90 450 $4,455.00 2"Asphalt Surface Course (Overlays between 26th & 27th 20 Circles) SY $5.50 840 $4,620.00 21 Class 7 Base (7") Transition & Repair Section SY $5.80 500 $2,900.00 22 Leveling Course (between 24th & 27th Circles) TN $50.00 150 $7,500.00 23 Geogrid Reinforced Earth LF S170.00 200 $34,000.00 24 Gravel Driveway SY $6.50 90 $585.00 25 Asphalt Driveways SY $11.50 200 $2,300.00 26 6" concrete Driveway SY $30.00 120 $3,600.00 27 4" Sidewalks Chg 2 SY $20.75 1100 $22,825.00 28 Undercut& Backfill CY $12.00 800 $9,600.00 29 Temporary Crushed Stone Surfacing TN $9.00 5000 $45,000.00 30 12"AWWA C1 200, C900 PVC LF $20.50 830 $17,015.00 31 Fire Hydrant Assembly EA $1,540.00 2 $3,080.00 31a Fire Hydrant Assy. 7+00 Chg 3 LS $5,450.00 1 $5,450.00 31b Fire Hydrant Assy. 10+60 Chg 3 LS $4,160.00 1 $4,160.00 32 Ductile Iron Fittings LB $2.60 1570 $4,082.00 33 8"Tapping Sleeve & Valve EA $1,550.00 1 $1,550.00 34 Realign Ditch (Sheet 5) LS $1,000.00 1 $1,000.00 35 Remove& Reinstall Existing Street Regulation Signs LS $735.00 1 $735.00 36 Traffice Control & Maintenance of Traffic LS $5,200.00 1 $5,200.00 37 Storm Water& Erosion Control LS $5,000.00 1 $5,000.00 38 Pipe Underdrain LF $12.00 450 $5,400.00 39 Remove & Relocate Wood Fence Sta-+06 to 1+50 LF $6.70 160 $1,072.00 40 Qual Mail Box Relocation, Including Base, Sta 21+35 LS $300.00 1 $300.00 41 Mail Box Relocation, Including 4x4 Support Post EA $100.00 1 $100.00 42 Guard Rail LS $1,000.00 1 $1,000.00 43 Traffic Paint, Pavement Center Line Markings LF $0.60 5600 $3,360.00 44 Traffic Paint, Crosswalks EA $850.00 1 $850.00 44a Air Release Vault EA $2,475.00 1 $2,475.00 45 Retaining Wall, deleted by Chg 4 LS $25,000.00 0 $0.00 46a Class 7 Base (7") SY $4.80 9250 $44,400.00 47a 4"Asphalt Binder Course SY $7.90 7650 $60,435.00 48a 2"Asphalt Surface Course SY $4.15 7650 $31,747.50 49a Curb& Gutter LF $7.25 4700 $34,075.00 C1 Realign Drain Pipe &4 Inlets LS $1,200.00 1 $1,200.00 Additional Common & Rock Excavation, Grade Change, Stations C4-1 14 thru 23 STA $6,355.00 9 $57,195.00 C4-2+Demolish &Reconstruct Wall at Askew Drive LS $7,250.00 1 $7,250.00 Keystone Block Wall at Telephone Equipment, Station 20-21 Rt C4-3 (per SF of wall face) SF $24.00 165 $3,960.00 C4-4 Handrail at Keystone Wall LF $55.00 66 $3,630.00 • • C4-5 4"Compacted Ct. 7 Base at Askew Drive(95%Modified Proctor) SY $5.00 110 $550.00 C4-6 2"Hot Mix Asphalt Surface Course at Askew Drive SY $5.50 110 $605.00 C5-1 Additional Class 7 Base TN $12.35 356.7 $4,405.24 C5-2 Raise Junction Box Sta 14+13 LS $200.00 1 $200.00 C5-3 Remove& Dispose of Curb&Gutter LF $2.50 140 $350.00 C5-4 Remove & Dispose of Existing Asphalt Binder SY $3.20 21 $67.20 Revised Contract Price including Change Number 5 $708,028.44 Total Addition due to Change Number 5 $5,022.44