Loading...
HomeMy WebLinkAbout109-26 RESOLUTION Page 1 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 109-26 File Number: 2026-1343 A RESOLUTION TO AWARD RFQ 26-01, SELECTION #1 AND AUTHORIZE THE PURCHASE OF ON- CALL MATERIALS TESTING SERVICES FROM MCCLELLAND CONSULTING ENGINEERS, INC., OLSSON ASSOCIATES, INC., AND GTS, INC. AS NEEDED THROUGH APRIL 30, 2027, WITHIN THE APPROVED BUDGET BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards RFQ 26-01, Selection #1 and authorizes the purchase of on-call materials services from McClelland Consulting Engineers, Inc., Olsson Associates, Inc., and GTS, Inc. for the rates attached to this Resolution and based on availability as needed through April 30, 2027, within the approved budget. PASSED and APPROVED on May 5, 2026 Approved: _______________________________ Molly Rawn, Mayor Attest: _______________________________ Kara Paxton, City Clerk Treasurer Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 Mailing address: 113 W. Mountain Street Fayetteville, AR 72701 www.fayetteville-ar.gov CITY COUNCIL MEMO 2026-1343 MEETING OF MAY 5, 2026 TO: Mayor Rawn and City Council THROUGH: Chris Brown, Public Works Director FROM: Justin Bland, City Engineer SUBJECT: On-Call materials services as needed RECOMMENDATION: Approval of a resolution to award RFQ 26-01, Selection #1 to McClelland Consulting Engineers, Inc., Olsson, Inc. and GTS, Inc. as primary providers based on rates provided and availability for on-call materials services as needed through April 30, 2027. BACKGROUND: As part of each of the City’s street, drainage, water and sewer projects, a materials testing lab is contracted to perform materials testing for the design and construction. The testing includes asphalt, gravel base, concrete and various other materials used during the construction of these projects. The testing is done to ensure that the materials and the installation meet the City requirements and the project’s specifications. DISCUSSION: An engineering selection committee selected McClelland Consulting Engineers, Inc., Olsson, Inc. and GTS, Inc. to be used for on-call materials testing services for street, drainage and utilities projects through April 30, 2027. BUDGET/STAFF IMPACT: Funds for the material testing have been budgeted in various capital projects with the Sales Tax Capital Improvements Fund, the Transportation Bond Fund, Drainage Bond Fund and the Water and Sewer Fund. ATTACHMENTS: 3. Staff Review Form, 4. Olsson Hourly Fee Sheet, 5. GTS Hourly Fee Sheet, 6. MCE Hourly Fee Sheet Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 Page 1 City of Fayetteville, Arkansas Legislation Text 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 File #: 2026-1343 A RESOLUTION TO AWARD RFQ 26-01, SELECTION #1 AND AUTHORIZE THE PURCHASE OF ON-CALL MATERIALS TESTING SERVICES FROM MCCLELLAND CONSULTING ENGINEERS, INC., OLSSON ASSOCIATES, INC., AND GTS, INC. AS NEEDED THROUGH APRIL 30, 2027, WITHIN THE APPROVED BUDGET BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards RFQ 26-01, Selection #1 and authorizes the purchase of on-call materials services from McClelland Consulting Engineers, Inc., Olsson Associates, Inc., and GTS, Inc. for the rates attached to this Resolution and based on availability as needed through April 30, 2027, within the approved budget. Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 Comments: Purchase Order Number: Change Order Number: Previous Ordinance or Resolution # Approval Date: Original Contract Number: Project Number Budget Impact: FundAccount Number Project Title City of Fayetteville Staff Review Form 2026-1343 Item ID 5/5/2026 City Council Meeting Date - Agenda Item Only Approval of a resolution to award RFQ 26-01, Selection #1 to McClelland Consulting Engineers, Inc., Olsson, Inc. and GTS, Inc. as primary providers based on rates provided and availability for on-call materials services as needed through April 30, 2027. N/A for Non-Agenda Item Action Recommendation: Submitted By Sara Combs ENGINEERING (621) Division / Department 4/10/2026 Submitted Date No -$ V20221130 Budgeted Item? Does item have a direct cost? Is a Budget Adjustment attached? Total Amended Budget Expenses (Actual+Encum) Available Budget Item Cost Budget Adjustment Remaining Budget No No -$ -$ Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 2026 Field Operations Services Unit Rate Schedule Special Inspections and Construction Materials Testing Services Testing Services (3-Hour Minimum) Field Technician ................................................................................................Hour $75.00 Senior Technician ..............................................................................................Hour $90.00 Steel Technician ................................................................................................Hour $110.00 Field Manager ....................................................................................................Hour $115.00 Project Manager / Project Engineer ...................................................................Hour $175.00 Technical Leader/Engineer ...............................................................................Hour $250.00 Senior Project Manager / Senior Engineer .........................................................Hour $230.00 Administrative Coordinator.................................................................................Hour $75.00 Mileage ..............................................................................................................Mile $0.85 Laboratory Testing Services Aggregate Testing Abrasion - LA Machine ......................................................................................Each $500.00 Atterberg Limit (Plasticity Index) .......................................................................Each $125.00 Bulk Density (Unit Weight) and Voids ...............................................................Each $115.00 Deleterious - Clay Lumps and Friable Particles ................................................Each $200.00 Deleterious - Flat & Elongated Particles ............................................................Each $375.00 Deleterious - Lightweight Particles ....................................................................Each $230.00 Deleterious - Organic Impurities ........................................................................Each $150.00 Material Finer than No. 200 Sieve .....................................................................Each $85.00 Minimum & Maximum Index Density (Vibratory Table) ......................................Each $260.00 Moisture Content ..............................................................................................Each $25.00 Oversize Particle Correction .............................................................................Each $125.00 Particle Size (Gradation) - Sieve Analysis <3/4" ...............................................Each $140.00 Particle Size (Gradation) - Sieve Analysis >3/4" ...............................................Each $220.00 Percent Fractured Particles in Coarse Aggregate .............................................Each $280.00 Proctor - Modified .............................................................................................Each $270.00 Proctor - Standard ............................................................................................Each $230.00 Sand Equivalent of Fine Aggregate ..................................................................Each $245.00 Soundness Aggregates (Sodium or Magnesium) ...............................................Each $305.00 Specific Gravity of Aggregate Coarse or Fine Aggregate ...................................Each $200.00 Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 Uncompacted Void Content of Fine Aggregate ..................................................Each $80.00 Asphalt Testing Asphalt Binder Content by Ignition .....................................................................Each $150.00 Gradation of Extracted Aggregates (Includes Binder by Ignition) .......................Each $200.00 Bulk Specific Gravity/ Pavement Cores (1pt) .....................................................Each $75.00 Marshall Density (3pt) ........................................................................................Each $250.00 Marshall Stability and Flow (3pt) ........................................................................Each $350.00 Percent Air Voids in Compacted Paving Mix ......................................................Each $50.00 Preparation & Density of Superpave Gyratory Compaction Specimens (2pt) .....Each $330.00 Theoretical Maximum Specific Gravity (Rice) (Gmm) .........................................Each $160.00 Cement, Concrete, & Masonry Testing Chloride Ion .......................................................................................................Each $200.00 Compressive Strength – Block or Block Prism ...................................................Each $230.00 Compressive Strength - Concrete Cores ...........................................................Each $100.00 Compressive Strength - Cube (Grout & Mortar) .................................................Each $50.00 Compressive Strength - Cylinders .....................................................................Each $25.00 Density, Absorption & Voids of Hardened Concrete ...........................................Each $630.00 Flexural Strength of Concrete ............................................................................Each $75.00 Length Change of Hardened Hydraulic-Cement Mortar and Concrete ...............Each $400.00 Measuring Thickness of Concrete Elements (Drilled Cores) ..............................Each $70.00 Potential Alkali Silica Reactivity (ASR) ...............................................................Each $830.00 Equipment Core Machine/Sampling ...................................................................................Day $300.00 Dynamic Cone Penetrometer (DCP) .................................................................Day $250.00 Electrical Resistivity - Field (AEMC Gauge) ......................................................Day $100.00 Floor Flatness Equipment .................................................................................Day $300.00 Relative Humidity Probe/Sensor .......................................................................Each $100.00 Settlement Monitoring Plate ..............................................................................Each $300.00 Standard Field Equipment ................................................................................Day $25.00 Vapor Emission Test Kit ...................................................................................Each $75.00 Sand Cone Equipment .......................................................................................Day $25.00 Ten Foot Rolling Straight Edge ..........................................................................Day $350.00 Soil Testing Atterberg Limits (Plasticity Index) ......................................................................Each $125.00 CBR Laboratory Compacted (3pt) .....................................................................Each $630.00 CBR Laboratory Compacted (1pt) .....................................................................Each $230.00 Density (Wet/Dry) .............................................................................................Each $30.00 Direct Shear Test of Soils (Consolidated Drained) (3pt) ....................................Each $1,600.00 Dispersion - Crumb ...........................................................................................Each $95.00 Dispersion - Pinhole ..........................................................................................Each $190.00 Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 Material Finer than No. 200 Sieve .....................................................................Each $85.00 Moisture Content ..............................................................................................Each $25.00 Moisture Content - Microwave ..........................................................................Each $50.00 One-Dimensional Consolidation Test ................................................................Each $440.00 Organic Content - Soils .....................................................................................Each $105.00 Oversize Particle Correction .............................................................................Each $125.00 Particle Size (Gradation) - Hydrometer .............................................................Each $250.00 Particle Size (Gradation) - Sieve Analysis ..........................................................Each $140.00 Permeability - Flexible Wall Permeameter (Intact) ............................................Each $550.00 Permeability - Flexible Wall Permeameter (Remold) ..........................................Each $650.00 Proctor - Modified .............................................................................................Each $270.00 Proctor - Modified w/Additive ............................................................................Each $350.00 Proctor - Standard ............................................................................................Each $230.00 Proctor - Standard w/Chem Additive .................................................................Each $300.00 Swell or Collapse (One Dimensional) ................................................................Each $315.00 Triaxial Compression – Consolidated Drained (Intact) ......................................Each $1,730.00 Triaxial Compression – Consolidated Drained (Remold) ....................................Each $1,930.00 Triaxial Compression – Consolidated Undrained (Intact) ..................................Each $1,575.00 Triaxial Compression – Consolidated Undrained (Remold) ................................Each $1,775.00 Triaxial Compression – Unconsolidated Undrained ...........................................Each $180.00 Unconfined Compressive Strength - Intact Rock ...............................................Each $125.00 Unconfined Compressive Strength - Soils .........................................................Each $95.00 Sprayed Fire Resistive Materials (SFRM) Adhesion of SFRM to Structural Members (Field) ..............................................Each $50.00 Thickness and Density of SFRM to Structural Members ....................................Each $100.00 General Terms and Conditions 1. These Unit Fees are in effect until January 1, 2027. Services and fees not listed above will be quoted upon request. 2. All services charged are portal-to-portal. 3. Services provided on Saturday, Sunday, Holidays, or in excess of 8-hours/day will be charged at 1.5 times the unit fee. 4. Services provided before 6:00 a.m. and after 6:00 p.m. will be charged at 1.5 times the unit fee. 5. Mileage Rate subject to change based on Federal and IRS rate changes. 6. Subcontracted services and expenses will be invoiced at our cost plus 20% 7. Project Manager time will be included for project coordination and report review. 8. Per Diem will be billed at actual cost + 15% unless otherwise specified. Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 office 479-521-7645 fax 479-521-6232 Category Name of Test Description Relevant ASTM and AASHTO Hourly Rate Equipment Fee (if applicable) Soil Density Testing Materials Testing Technician performing in- place soil densities AASHTO T310, ASTM D6938 $65.00 $15 Gauge Fee Per Trip Soil/Aggregate Sample Pick up On site sampling of soils and aggregates for laboratory testing AASHTO T2, ASTM D 75 $65.00 NA Proofroll and Undercut Observation Engineering observation of on site soils prior to placement of fill material or after undercut has been completed NA $125.00 NA Field Concrete Testing Slump, air content, temperature, and casting of cylinders for compressive strength testing AASHTO T23, T119, T141, T152, T309, ASTM C31, C143, C172, C231, C1064 $65.00 NA Concrete Cylinder Pick up (per set charge) Retrieving concrete test specimens made by GTS or by the client NA $35.00 NA Concrete Rebound Hammer (Schmidt Hammer) Assess the in-place uniformity of concrete and to estimate in-place strength ASTM C805 $125.00 $15.00 1915 N. Shiloh Drive Fayetteville, Arkansas 72704 Field Materials Testing Services (please call for unlisted items) Fayetteville, Arkansas Office Effective January 2025 Concrete Earthwork and Soils Page 1 of 7 Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 office 479-521-7645 fax 479-521-6232 Category Name of Test Description Relevant ASTM and AASHTO Hourly Rate Equipment Fee (if applicable) 1915 N. Shiloh Drive Fayetteville, Arkansas 72704 Field Materials Testing Services (please call for unlisted items) Fayetteville, Arkansas Office Effective January 2025 Concrete Coring and Sampling Coring and sampling of hardened concrete including backfilling with grout AASHTO T24 ASTM C42 $65.00 $250.00 Concrete maturity and temperature testing Placement and downloading of maturity and temperature information and equipment ASTM C1074 $125.00 $50.00 per site visit Concrete maturity and temperature sensors (per sensor fee) Field Sensors ASTM C1074 $125.00 $50.00 Per Test Floor Flatness Determination Evaluating and providing statistical (and graphical) information concerning floor surface profiles ASTM E1155 $125.00 .02 per square foot Concrete Floor Vapor Emission Testing Obtaining a quantitative value indicating the rate or moisture vapor emission from a concrete floor ASTM F1869 $125.00 $35 per kit Concrete Ph testing Evaluating the Ph of concrete floors ASTM F710 $125.00 $10 per kit Concrete mortar time of setting testing Time of setting concrete by means of penetration resistance method ASTM C403 $125.00 $150.00 Concrete Concrete Floor Relative Humidity Insitu Testing Quantitative determination of percent relative humidity in concrete slabs ASTM F2170 $125.00 $50.00 per site visit and $50.00 per Sensor Test Concrete Page 2 of 7 Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 office 479-521-7645 fax 479-521-6232 Category Name of Test Description Relevant ASTM and AASHTO Hourly Rate Equipment Fee (if applicable) 1915 N. Shiloh Drive Fayetteville, Arkansas 72704 Field Materials Testing Services (please call for unlisted items) Fayetteville, Arkansas Office Effective January 2025 Field Grout Testing On site sampling, testing and making grout test specimens of freshly mixed grout AASHTO T23, T119, T309, ASTM C1019, C143, C1064 $65.00 NA Field Observation of CMU Block Wall Construction Visual observation of CMU reinforcing, joint placement, bond beams etc.NA $125.00 NA Field Mortar Testing This test assigns an empirical value to the relative amount, fineness, and character of claylike material present in the specimen.ASTM C1714 $65.00 NA Asphalt Rolling Pattern Evaluation of density with passes of compaction equipment of fresh hot mix asphalt ASTM D2950 $75.00 $15 Gauge Fee Asphalt coring and sampling Coring and sampling of in place asphalt including backfilling with grout ASTM D979, AASHTO T168 $65.00 $100.00 Per Site Visit Construction Observation and additional Special Inspections Observation of straight shaft drilled piers Observation of soil type, depth, reinforcing bars, bearing capacity, etc.NA $125.00 NA Masonry, Grout and Mortar Asphalt Page 3 of 7 Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 office 479-521-7645 fax 479-521-6232 Category Name of Test Description Relevant ASTM and AASHTO Hourly Rate Equipment Fee (if applicable) 1915 N. Shiloh Drive Fayetteville, Arkansas 72704 Field Materials Testing Services (please call for unlisted items) Fayetteville, Arkansas Office Effective January 2025 Observation of Geopier foundations Observation of soil type, depth, compactive effort, bearing capacity, etc.NA $125.00 NA Observation of retaining wall installation Observation of retaining wall construction NA $125.00 NA Observation of soil bearing capacity for foundation elements Observation of soil types and bearing capacity NA $125.00 NA Observation of reinforcing bars for foundation and structural elements Observation of size, number and placement of reinforcing bars NA $125.00 NA Observation of driven pile foundations Observation of driven piles, number of blows, pile size, etc.NA $125.00 NA Observation of soil nail reinforcement Observation of soil nails, bar size, bar length, grout type and strength, etc.NA $125.00 NA Observation of micropile foundations observation of micropiles, bar size, bar length, grout type and strength, etc.NA $125.00 NA Construction Observation and additional Special Inspections Observation of Post Tension concrete systems observation of installation and tensioning of post tension cables NA $125.00 NA Construction Observation and additional Special Inspections Page 4 of 7 Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 office 479-521-7645 fax 479-521-6232 Category Name of Test Description Relevant ASTM and AASHTO Hourly Rate Equipment Fee (if applicable) 1915 N. Shiloh Drive Fayetteville, Arkansas 72704 Field Materials Testing Services (please call for unlisted items) Fayetteville, Arkansas Office Effective January 2025 Construction Observation and additional Special Inspections Fireproofing Observation observation of fireproofing for thickness, density and cohesion ASTM E605 $125.00 Paint Thickness Gauge per day $100.00 / Adhesions $40.00 per Test / Density $60.00 per Test Principal Professional Engineer Professional Engineer services in the field or report writing NA $175.00 NA Staff Professional Engineer Professional Engineer services in the field or report writing NA $150.00 NA Intern-Engineer Intern engineer services in the field or report writing NA $125.00 NA Structural Steel Certified Welding Inspector (CWI)Code compliance, visual and ultrasonic weld inspection, bolt inspection, impact wrench calibration, etc. Varies $150.00 NA Reinforcing Bar Locating Locating reinforcing bars, conduits, post tension cables, etc. in concrete slabs Varies $150.00 $250 per half day Skidmore Wilhelm Tension Calibrator Varies $150.00 $40.00 Torque Multiplier Used in conjunction with torque wrench for high strength bolt testing NA $150.00 $100.00 Torque Wrench Used for testing torque of high strength bolts Varies $150.00 $20.00 Structural Steel Engineering Page 5 of 7 Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 office 479-521-7645 fax 479-521-6232 Category Name of Test Description Relevant ASTM and AASHTO Hourly Rate Equipment Fee (if applicable) 1915 N. Shiloh Drive Fayetteville, Arkansas 72704 Field Materials Testing Services (please call for unlisted items) Fayetteville, Arkansas Office Effective January 2025 Ultra Sonic Testing Phased UT Machine Varies $150.00 $300.00 Mag Particle Testing Mag Particle Yoke Varies $150.00 $100.00 x-ray services x-ray of structural welds Varies Call for Quote upon request Bolt Pulling Test Used to check the suitability and allowable loads of an anchor type and check they have been installed correctly Varies $150.00 Varies by Project Forensic Testing Impact Echo Services Using sound waves to determine flaws and/or thicknesses in concrete structures NA $175.00 $250.00 Ground Penetrating Radar Using radar to locate, reinforcing bars or conduits in concrete, underground utilities, underground structures or tanks, etc. NA $150.00 $250 per half day Forensic Testing Sonic Echo Impulse Response Non-Destructive method of determining length and integrity of concrete foundations NA $175.00 $1,000.00 Structural Steel Page 6 of 7 Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 office 479-521-7645 fax 479-521-6232 Category Name of Test Description Relevant ASTM and AASHTO Hourly Rate Equipment Fee (if applicable) 1915 N. Shiloh Drive Fayetteville, Arkansas 72704 Field Materials Testing Services (please call for unlisted items) Fayetteville, Arkansas Office Effective January 2025 FLIR Infrared Camera Imaging Infrared imaging of building components using a Flir E60 camera NA $150.00 $400.00 Administrative and Mileage Mileage Based on published current IRS government mileage rates plus 5% (minimum $40 fee) NA Report Preparation and Review (Per Report) Administative costs for distribution. (Technician reports and Associated Lab field reports only) NA $20.00 NA Project Management Fee 10% Will be added to all invoice subtotals for Project Management, Dispatch, and Administation NA 10%NA Overtime, Weekend, and Holiday Rates Minimum Time Charge Work requested to be performed on Saturdays or prior to 6:00am and after 6:00pm Monday through Friday will be billed 1.5 times the normal hourly rates listed above. Sunday testing will be Double and Holiday will be Triple the normal hourly rates. Any test scheduled between 6:00pm to 5:00am but not performed by no fault of GTS will be charged a premium charge of $200.00 for the cancellation (in addition to Mileage and Travel Time if onsite). There is a Minimum charge of 1 hour on site time and .5 hour travel time Based on published current IRS government mileage rates plus 5% (minimum $40 fee) Page 7 of 7 Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 office 479-521-7645 fax 479-521-6232 Category Name of Test Relevant ASTM and AASHTO Equipment Fee (if applicable) Moisture - Density Relationship AASHTO T99, ASTM D698 $160.00 Moisture - Density Relationship AASHTO T180, ASTM D1557 $185.00 Moisture Content ASTM D2216 $10.00 Atterberg Limits AASHTO T-89, AASHTO T-90, ASTM D 4318 $75.00 Sieve Analysis ASTM C136 ASTM C117 AASHTO T27 AASHTO T11 $75.00 Sieve Analysis ASTM C136 ASTM C117 AASHTO T27 AASHTO T11 $150.00 Sieve Analysis (Hydrometer) AASHTO T 88 ASTM D 422 ASTM D 7928 $130.00 Specific Gravity and Absorption ASTM C127 AASHTO T84 / ASTM C128 $60.00 California Bearing Ratio (CBR) 3-point method ASTM D 1883, AASHTO T 193 $300.00 Laboratory Materials Testing Services (please call for unlisted items) Fayetteville, Arkansas Office Effective January 2025 1915 N. Shiloh Drive Fayetteville, Arkansas 72704 Description Standard Proctor Modified Proctor Moisture Content of soils Slump, air content, temperature, and casting of cylinders for compressive strength testing Washed and dried sieve used for soil classification determination (< 5 lbs) Washed and dried oversized sieve (greater than 5 lbs) Fine Particle Size Distribution Using the Sedimentation (Hydrometer) Analysis Determination of Specific Gravity and Absorption of Fine or Coarse Aggregate Evaluating the potential strength of subgrade, subbase, and base course material, for use in road and airfield pavements. Earthwork and Soils and Aggregates Page 1 of 4 Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 office 479-521-7645 fax 479-521-6232 Category Name of Test Relevant ASTM and AASHTO Equipment Fee (if applicable) Laboratory Materials Testing Services (please call for unlisted items) Fayetteville, Arkansas Office Effective January 2025 1915 N. Shiloh Drive Fayetteville, Arkansas 72704 Description Unconfined Compressive Strength Testing ASTM D 2166, AASHTO T 208 $100.00 Triaxial testing**AASHTO T 296, ASTM D 2850 $375.00 Triaxial testing**AASHTO T 297, ASTM D 4767 $500.00 Triaxial testing**ASTM WK 3821 $750.00 Soil Consolidation ** (One- Dimensional, Interval Loading) ASTM D 2435, AASHTO T 216 $300.00 Permeability Testing (Flexible Wall)** ASTM D5084 $300.00 **NA $75.00 Consolidated - Undrained (CU) Consolidated - Drained (CD) Determining the magnitude and rate of consolidation of soil when it is restrained laterally and drained axially while subjected to incrementally applied controlled-stress loading. Laboratory Measurement of Hydraulic Conductivity sample prep or remolding Obtain a measure of compressive strength for soils that possess sufficient cohesion to permit testing in the unconfined state Unconsolidated - Undrained (UU) Earthwork and Soils and Aggregates Page 2 of 4 Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 office 479-521-7645 fax 479-521-6232 Category Name of Test Relevant ASTM and AASHTO Equipment Fee (if applicable) Laboratory Materials Testing Services (please call for unlisted items) Fayetteville, Arkansas Office Effective January 2025 1915 N. Shiloh Drive Fayetteville, Arkansas 72704 Description Sand Equivalency Test ASTM D 2419, AASHTO T 176 $450.00 Soundness of Aggregates ASTM C 88, AASHTO T 104 $500.00 LA Abrasion ASTM C 131, AASHTO T 96 $650.00 Deleterious Material Determination NA $50.00 Swell Test ** (One- Dimensional) ASTM D 4546, AASHTO T 216 $300.00 Soil Stabilization NA call for quote Laboratory Compressive Strength of Cylinders ASTM C 39, ASTM C1231, ASTM C511 $25.00 Laboratory Compressive Strength of Cylinders ASTM C 39, ASTM C1231, ASTM C511 $15.00Curing, Storing and Testing (Pad Capping) 4" x 8" cylinders This test assigns an empirical value to the relative amount, fineness, and character of claylike material present in the specimen. Standard Test Method for Soundness of Aggregates by Use of Sodium Sulfate Coring and sampling of in place asphalt including backfilling with grout determination of friable particles, clay lumps, and soft fragments in an aggregate Standard Test Method for One-Dimensional Swell or Settlement Potential of Cohesive Soils using fly ash, cement and lime to stabilize soils Curing, Storing and Testing (Pad Capping) 6" x 12" cylinders ***For any soils and aggregate lab testing not listed please call for quote*** Earthwork and Soils and Aggregates Concrete and Masonry Page 3 of 4 Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 office 479-521-7645 fax 479-521-6232 Category Name of Test Relevant ASTM and AASHTO Equipment Fee (if applicable) Laboratory Materials Testing Services (please call for unlisted items) Fayetteville, Arkansas Office Effective January 2025 1915 N. Shiloh Drive Fayetteville, Arkansas 72704 Description Laboratory Flexural Strength of Beams (per beam) ASTM C 78, ASTM C511, ASTM C1542 $45.00 Laboratory Compressive Strength of drilled cores ASTM C 42, ASTM C 39, ASTM C617 $50.00 Saw cutting cylinders and drilled cores NA $10.00 Petrographic Analysis ASTM C 457 Call for Quote Laboratory Compressive Strength of Grout Prisms ASTM C 1019 $30.00 Laboratory Compressive Strength of mortar cubes ASTM C 109 $20.00 Laboratory testing of concrete masonry units ASTM C 140 Call for Quote Asphalt Laboratory testing of Asphalt Cores AASHTO T-166 $35.00 Fireproofing Laboratory Density of Fireproofing (each density) ASTM E 605 $150.00 Laboratory Testing of asphalt cores for specific gravity (density) Curing, Storing, Measuring and Testing Curing, Storing and Testing (sulfur Capping) Microscopic analysis of hardened concrete Curing, Storing and Testing (Pad Capping) 6" x 3" x 3" prisms Curing, Storing and Testing (Pad Capping) 2" x 2" x 2" cubes Saw cutting ends of contractor formed cylinders to achieve a perpendicular surface (per end) This test methods provides various testing procedures commonly used for evaluating characteristics of concrete masonry units and related concrete units. Laboratory determination of SRFM density Concrete and Masonry Page 4 of 4 Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 1580 East Stearns Street Fayetteville, Arkansas 72703 479-443-2377 www.mce.us.comCTTP Lab No. 914810 Page 1 of 2 CONSTRUCTION MATERIALS LABORATORY FEE SCHEDULE 2026 GENERAL: CMT Technician $ 65.00 per hour Senior CMT Technician 75.00 per hour CMT Supervisor 155.00 per hour Geotechnical/CMT Specialist 150.00 per hour Engineering Technician/EIT 130.00 per hour Laboratory Supervisor 90.00 per hour Geotechnical Project Engineer 170.00 per hour Construction Observation 110.00 per hour Geotechnical Project Manager 160.00 per hour Principal Geotechnical Engineer 230.00 per hour Senior Administrative Assistant 95.00 per hour Mileage 0.75 per mile SOILS: CMT Technician Field Testing* 65.00 per hour Senior CMT Technician Field Testing* 75.00 per hour *Density Testing-Nuclear Gauge (ASTM D 2922/ AASHTO T310), Sample Pickup, or Stand-by Time Nuclear Density Gauge Fee: (per Density Test); [Minimum $15.00 per trip, per project] 18.00 each Atterberg Limits Test (3-point) ( ASTM D 4318 / AASHTO T89, T90) 65.00 each Soil Sieve Analysis w/ No. 200 Wash ( ASTM D 422, D 1140 / AASHTO T88) 100.00 each Soils Classification: Atterberg Limits & Sieve Analysis 155.00 each Standard Proctor Test ASTM D 698 or AASHTO T 99(includes Soils Classification) 415.00 each Modified Proctor Test ASTM D 1557 or AASHTO T 180(includes Soils Classification) 465.00 each California Bearing Ratio (CBR) ASTM D 1883/ AASHTO T193 400.00 each ***Additional Soil Testing Procedures Available On Request*** CONCRETE/AGGREGATE: Concrete Mix Design Price on Request Review Concrete Mix Design Submittal 170.00 per hour CMT Technician Concrete Field Testing* 65.00 per hour Senior CMT Technician Concrete Field Testing* 75.00 per hour *(1-hour minimum): [For any of the following 6 items:] · Concrete Cylinder, Grout, Mortar or Beam Molding · Concrete Cylinder or Beam Pickup · Concrete Slump Test ASTM C 143 / AASHTO T119 · Concrete Air Content Test ASTM C 231 or C 173 / AASHTO T 152 · Cement Mortar or Grout Sampling · Stand-by Time · Unit Weight and Yield of Freshly Mixed Concrete ASTM C 138 / AASHTO T121 · Sample Pickup, Transporting, and Processing/Placement Into Curing Compressive Strength of Concrete Test Cylinders C 39/T22 (pad capped) 25.00 each Compressive Strength of Concrete Test Cylinders C 39/T22 (sulfur capped) 35.00 each Spare Cylinders Specimens Processed, Stored & Cured but not Tested 25.00 each Schmidt Hammer Testing (Engineering Technician) 130.00 per hour *ACI Grade I Concrete Field Testing Technician Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 1580 East Stearns Street Fayetteville, Arkansas 72703 479-443-2377 www.mce.us.comCTTP Lab No. 914810 Page 2 of 2 CONSTRUCTION MATERIALS LABORATORY FEE SCHEDULE 2026 CONCRETE/AGGREGATE (Continued): Flexural Strength of Concrete Beams ASTM C 78 or C 293 50.00 each Spare Beam Specimens Processed, Stored & Cured but not Tested 40.00 each Compressive Strength of Grout Cubes/Prisms 40.00 each Compressive Strength of Cement Mortar Cubes 25.00 each Concrete Coring (4" diameter): Core Machine & CMT Technician 140.00 per hour Compressive Strength of Concrete Cores (4" diameter) 40.00 each Other Core Sizes (sampling and testing) Price on Request Concrete Fine Aggregate Gradation (AASHTO T11 and T27) 125.00 each Concrete Coarse Aggregate Gradation (AASHTO T11 and T27) 125.00 each Aggregate Specific Gravity Testing ASTM C 127,C 128 / AASHTO T84, T85 150.00 each Class 7 Aggregate Gradation (AASHTO T11 and T27) 250.00 each ARDOT Class 7 Sounding 25.00 each ***Additional Concrete/Aggregate Testing Procedures Available On Request*** ASPHALT: Asphalt Mix Design (Marshall Design Method) Price on Request Review Asphalt Mix Design 170.00 per hour CMT Technician Asphalt Field Testing* 65.00 per hour Senior CMT Technician Asphalt Field Testing* 75.00 per hour *In-place Spot Check Density Testing, Sample Pickup, or Stand-by Time Superpave Laboratory Analysis (Gmm, Gmb, AC Content, Air Voids, Gradation) 650.00 each Marshall Laboratory Analysis (Gmm, Gmb, AC Content, Air Voids, Gradation) 750.00 each Laboratory Density of Cored Samples including Thickness Measurement** 35.00 each Asphalt Coring Machine & CMT Technician** 140.00 per hour **Testing and Sampling of 4” or 6” diameter cores SPECIAL INSPECTIONS: Spray-Applied Fire-Resistant Material/Intumescent Coating Testing 130.00 per hour Structural Steel/Welding Inspection by CWI 100.00 per hour Non-destructive Testing on Welds (UT, MT, or Radiographic) 110.00 per hour Post-Tension Inspection 150.00 per hour Firestop/Fire Penetration Inspection 150.00 per hour Floor Flatness/Levelness Testing 150.00 per hour Services Not Listed are Available on Request All prices are subject to revision each year Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370