HomeMy WebLinkAbout108-26 RESOLUTIONPage 1 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 108-26 File Number: 2026-1369 A RESOLUTION TO REPEAL RESOLUTION 278-24 AND TO APPROVE A COST SHARE AGREEMENT WITH FLOWERS CC&D, LLC IN AN AMOUNT NOT TO EXCEED $23,289.50 FOR THE INSTALLATION OF A WATER LINE, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $4,658.00 WHEREAS, on November 1, 2024, City Council approved Resolution 278-24 approving a cost share agreement for constructing a waterline that will serve properties near East Rock Street and South Willow Avenue; and WHEREAS, this cost share has not been utilized, but the applicant wishes to proceed; and WHEREAS, new bids were requested due to the length of time that has passed and Sweetser Construction submitted the lowest construction bid. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby repeals Resolution 278-24 in its entirety. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a cost share agreement with Flowers CC&D, LLC in an amount not to exceed $23,289.50 for the installation of a water line, and further approves a project contingency in the amount of $4,658.00. PASSED and APPROVED on May 5, 2026 Approved: _______________________________ Molly Rawn, Mayor Attest: _______________________________ Kara Paxton, City Clerk Treasurer Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 Mailing address: 113 W. Mountain Street Fayetteville, AR 72701 www.fayetteville-ar.gov CITY COUNCIL MEMO 2026-1369 MEETING OF MAY 5, 2026 TO: Mayor Rawn and City Council THROUGH: Keith Macedo, Chief of Staff FROM: Tim Nyander, Utilities Director SUBJECT: Flowers CC&D, LLC - Water Line Cost Share near the corner of East Rock Street and South Willow Avenue RECOMMENDATION: Staff recommends repealing Resolution 278-24 and approving a cost share agreement with Flowers CC&D, LLC in an amount not to exceed $23,289.50, for a water line cost share near the corner of East Rock Street and South Willow Avenue, and approval of a project contingency in the amount of $4,658.00. BACKGROUND: Tommie Flowers Davis with Flowers CC&D, LLC owns property near East Rock Street and South Willow Avenue. Resolution 278-24 approved a cost share on November 1, 2024 for constructing a waterline that will serve these properties and other additional neighboring properties. DISCUSSION: This cost share has not been utilized yet, but the applicant wished to proceed. Due to the length of time that has passed, new bids were requested. Sweetser Construction submitted the lowest construction bid in the amount of $40,254.00. Additionally, there are engineering costs in the amount of $6,325.00. Staff recommends approval of a cost share agreement in an amount not to exceed $23,289.50 with Flowers CC&D, LLC for 50% of the cost of engineering and construction costs, and approval of a project contingency in the amount of $4,658.00. BUDGET/STAFF IMPACT: Funds are available in the Water & Sewer Cost Sharing account within the Water & Sewer fund. The current open purchase order for the 2024 cost share will be closed, and a new purchase order will be issued. ATTACHMENTS: 3. Staff Review Form, 4. Cost Share Request Letter, 5. Cost Share Agreement Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 Page 1 City of Fayetteville, Arkansas Legislation Text 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 File #: 2026-1369 A RESOLUTION TO REPEAL RESOLUTION 278-24 AND TO APPROVE A COST SHARE AGREEMENT WITH FLOWERS CC&D, LLC IN AN AMOUNT NOT TO EXCEED $23,289.50 FOR THE INSTALLATION OF A WATER LINE, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $4,658.00 WHEREAS, on November 1, 2024, City Council approved Resolution 278-24 approving a cost share agreement for constructing a waterline that will serve properties near East Rock Street and South Willow Avenue; and WHEREAS, this cost share has not been utilized, but the applicant wishes to proceed; and WHEREAS, new bids were requested due to the length of time that has passed and Sweetser Construction submitted the lowest construction bid. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby repeals Resolution 278-24 in its entirety. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a cost share agreement with Flowers CC&D, LLC in an amount not to exceed $23,289.50 for the installation of a water line, and further approves a project contingency in the amount of $4,658.00. Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 City of Fayetteville Staff Review Form 2026-1369 Item ID 5/5/2026 City Council Meeting Date - Agenda Item Only N/A for Non-Agenda Item Tim Nyander 4/15/2026 WATER SEWER (720) Submitted By Submitted Date Division / Department Action Recommendation: Staff recommends repealing Resolution 278-24 and approving a cost share agreement with Flowers CC&D, LLC in an amount not to exceed $23,289.50, for a waterline cost share near the corner of East Rock Street and South Willow Avenue, and approval of a project contingency in the amount of $4,658.00. Budget Impact: 5400.720.5600-5808.00 Water and Sewer Account Number Fund 04039.1 Water & Sewer Cost Sharing Project Number Project Title Budgeted Item?Yes Total Amended Budget $2,275,739.00 Expenses (Actual+Encum)$1,210,643.30 Available Budget $1,065,095.70 Does item have a direct cost?Yes Item Cost $27,947.50 Is a Budget Amendment attached?No Budget Amendment $- Remaining Budget $1,037,148.20 Purchase Order Number:Previous Ordinance or Resolution # Change Order Number:Approval Date: Original Contract Number: Comments: Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 March 4, 2026 To: Corey Granderson CC: Water and Sewer Committee; City Council Hi Corey, I am writing to formally request a modification to the existing Flowers Rock Street Project cost-share agreement for the water line, APPROVED November 2024. The proposed line facilitates immediate infill development, expands service opportunities for this and multiple adjacent parcels left without service after the City abandoned a previously active water line, and supports the City’s 2040 goals. This line addition will provide water to six new 1-bedroom units on +/- 0.16 acres of irregularly-shaped buildable area within a +/- 0.46 acre property re-zoned Urban Neighborhood in 2025. That makes 1 unit per 0.078 gross acres, including green space, parking, and walkways – or more than 12 units per acre. Yet these six units only occupy 2,252 SF (+/- 0.05 acres), leaving almost the entire remaining 0.41 acres as natural open space. These attainable housing units are naturally more affordable. This update is being requested due to a number of reasons, including an attempt to coordinate utilities with other developers who have a project on the east side of the alley from my project, Wes Bates and Konrad Siemek. An attempt to coordinate utilities for both projects resulted in complicating matters, resulting in the need to redirect my time and resources back to the original scope of my waterline cost-share request. My attempt to collaborate with these developers was based on a need to create and foster positive relationships with adjoining property owners through collaboration. Unfortunately, the challenges related to coordinating utilities resulted in further complications and a decision to circle back to my original plan. The passage of time has resulted in increasing costs. Three bids were secured from the previous three companies that initially bid on my project (attached). The initial scope of my project is connecting to the line on S. Willow Ave, running east and west down an alley; the alley will intersect with an alley that runs north and south, at which time it will take a 90 degree (two 45 degree bends) turn north in the alley toward Rock Street. My townhomes at 249 and 261(5units) will tie into the waterline. This design is less complicated than the design created by Wes, which results in a 20 foot easement that crosses their property. The revised proposals have resulted in Sweetser Construction submitting the lowest bid of $38,254. Additional costs related to the waterline include Odyssey/Flintlock engineering charges $6,325.(pd, invoices attached). Staking the waterline will be completed by Bates and Associates: proposed cost $2,000. Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 The proposed development adds an efficient density of units within the downtown Tier 1 Center in Fayetteville’s 2040 plan growth concept map. It’s directly adjacent to two public parks and walkable to downtown and public transit. It supports and directly enables the City’s following 2040 Plan goals: • 1. We will make appropriate infill and revitalization our highest priority • 2. We will discourage suburban sprawl o 3.2.2. Direct capital improvements into infrastructure that encourages and supports infill and revitalization. • 3. We will make compact, complete, and connected development the standard • 6. We will create opportunities for attainable housing o 3.6.1 Increase housing choices by encouraging a mixture of housing types and sizes dispersed throughout the city and in proximity to transit and active transportation networks The original cost share reflected: • City of Fayetteville – 50% • Tommie Flowers Davis (Parcels: 765-06329-000 & 765-06328-000) This cost share effort is directly enabling the extension of utilities to currently underserved properties and making it financially feasible to add density through infill development. It supports improved service coverage and long-term community growth. In conversing with the Mayor’s office, I have been assured that my financial responsibility will not exceed the original amount determined in the initial cost-share agreement. I respectfully request that the City proceed with modifying the original approved water line cost-share agreement (2024 Flowers Rock Street Project) to reflect the updated project cost, as outlined above. Thank you for your continued attention to this project and your assistance in advancing this infrastructure improvement. Best regards, Tommie Flowers Davis Tommie Flowers Davis Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 Page 1 of 2 WATER MAIN INSTALLATION COST SHARE AGREEMENT This Agreement, made and entered into on this _____ day of May, 2026, by and between the City of Fayetteville, Arkansas (“City”) and Flowers CC&D, LLC (“Flowers”), witnesseth: WHEREAS, Tommie Flowers Davis with Flowers CC&D, LLC has requested that the City share in the cost of constructing a 2-inch water main near the corner of East Rock Street and South Willow Avenue, a distance of approximately 282 linear feet, so that Flowers may develop a property located on East Rock Street; and WHEREAS, constructing this segment of 2-inch water main will provide for ample future capacity which the City recognizes will be necessary for the area that is served by this water main. NOW, THEREFORE, the City of Fayetteville, Arkansas and Flowers CC&D, LLC agree as follows: 1.The City of Fayetteville, Arkansas agrees to: A.Reimburse Flowers CC&D, LLC for 50.0% of the cost to install approximately 284 linear feet of 2-inch water main in the area identified in Exhibit “A” up to a maximum-not-to-exceed amount of $23,289.50, as was estimated by the builder’s representatives and shown on Exhibit “B”, attached. B.Payments due to Flowers CC&D, LLC shall be remitted within sixty (60) days after receipt of valid invoices. 2.Flowers CC&D, LLC agrees to: A.Provide the necessary and normal project management, inspection, and testing as necessary for a complete and acceptable water main installation, including submittal of plans and specifications to the City’s Engineering Department, per their standard procedures. B.Provide a copy of the invoices from the Contractor upon City approval of the water main upgrade. 5 Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 C.Pay for the water main installation ( with reimbursement of 50.0% of the cost by the City of Fayetteville in a not-to-exceed amount of $23,289.50). IN AGREEMENT WITH ALL THE TERMS AND CONDITIONS ABOVE, WE SIGN BELOW: FLOWERS CC&D, LLC Owner ATTEST: By: _________ _ CITY OF FAYETTEVILLE, ARKANSAS By:----------­MOLLY RA WN, Mayor ATTEST: By: _________ _ KARA PAXTON, City Clerk Treasurer Page 2 of2 Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 Exhibit A 0 0.01 0.010 mi 3URSRVHGinFK :DtHUOiQHExtHQtiRQ Approximately 284 linear feet Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 EXHIBIT B Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 1 Granderson, Corey From:Tommie Flowers Davis <tflowersd@gmail.com> Sent:Friday, March 6, 2026 11:21 AM To:Granderson, Corey Cc:Alli Thurmond Quinlan Subject:Re: Flowers Rock St waterline CAUTION: This email originated from outside of the City of Fayetteville. Do not click links or open attachments unless you recognize the sender and know the content is safe. Good morning, Charlie contacted me back and said to add $2000 to the staking, although it may be a little high. Another company does their staking for Sweetser. Everything else should be ok. Thank you On Fri, Mar 6, 2026 at 7:26 AM Granderson, Corey <cgranderson@fayetteville-ar.gov> wrote: Tommie, Alli, I’ve tried to summarize the original cost share and the proposed, updated cost share below. I still lack the engineering construction services (staking, inspections, etc.) number from you. Otherwise does this all look correct? We publish the agenda for Tuesday night today by noon, I’ve got a few meetings this morning but will keep an eye on email to help get this completed on time. Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 124 Grant Place, Suite E Lowell, AR 72745 Office: 479-717-7474 Item # QTY Unit Unit Price Total 1 a.1 LS $3,200.00 $3,200.00 b.1 LS $2,500.00 $2,500.00 Demo Total $5,700.00 Item # QTY Unit Unit Price Total 1 a.300 LF $20.00 $6,000.00 b.1 EA $4,000.00 $4,000.00 c.1 LS $1,000.00 $1,000.00 d.1 EA $3,500.00 $3,500.00 e. 2 EA $900.00 $1,800.00 f. 50 TNS $24.00 $1,200.00 g.300 LF $1.50 $450.00 Water Total $17,950.00 QTY Unit Unit Price Total 1 a.1 LS $7,500.00 $7,500.00 b. 1 LS $7,500.00 $7,500.00 c.1 LS $3,500.00 $3,500.00 d.1 LS $2,500.00 $2,500.00 Misc. Total $21,000.00 Total Total $44,650.00 2" Waterline (PVC ASTM D-2241 SDR 13.5) Testing Tapping Sleeve and Valve 6x2 2" Blow Off Assembly Demo Clearing and grubbing Demo Haul-off Description Flowers Waterline Extension Per Revised Plans Dated: 07/29/2024 Preliminary Cost Estimate Sitework Utilities Description Water Backfill Gravel 2" 90° Bend and Thrust Block Waterline Fittings Material testing Miscellaneous- included in total Signage Plumbing Description Misc. General Conditions Equipment Mobilization Data Prep, Staking & Layout Exclusions Electrical Landscaping/ Tree Planting Bonding Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 General Scope Limitations A-CO CONSTRUCTION CIVIL CONSTRUCTION EXCLUSIONS, CLARIFICATIONS & INFORMATIVE NOTICE** The following Exclusions, Clarifications, and Informative Notices are provided as an integral part of A-CO Construction’s proposal. These statements are intended to outline the limits of our scope, define responsibility for undisclosed conditions, and ensure project expectations are clearly understood prior to mobilization. Unless otherwise noted in writing, all items listed below shall apply in full. Schedule & Production Delays All work performed by A-CO Construction is limited solely to the items, quantities, and details explicitly listed in the proposal. Any item not specifically listed or quantified shall be considered excluded—even if commonly associated with this type of work. No verbal agreements or assumptions shall modify scope unless documented and approved through written change procedures. Undisclosed / Unforeseen Conditions A-CO Construction is not responsible for concealed or unknown conditions including, but not limited to: unmarked utilities, buried obstructions, unsuitable soil, unknown infrastructure, environmental hazards, or items not shown on plans. Work will pause in affected areas until evaluation is completed. Additional work caused by these conditions shall be treated as Extra Work and addressed through a formal Change Order. Change Orders & Plan Revisions Any deviation from the original issued drawings, specifications, or bid documents requires a written Change Order. A-CO Construction will halt production until revised drawings or instructions are formally received and reviewed. No extra or revised work will be performed without written authorization. Time or cost impacts caused by late revisions are not the responsibility of A-CO Construction. Client/Owner Responsibilities The Client/Owner must provide complete, accurate, and coordinated plan sets. Missing dimensions, incomplete details, conflicting elevations, or unspecified information must be clarified prior to execution. Delays or cost impacts due to missing or revised information will be handled through Change Orders. Site Access & Coordination A-CO Construction is not liable for delays resulting from restricted access, unprepared work areas, or coordination failures by others. Site must be accessible and clear of unrelated trades unless otherwise agreed. Any relocation, cleanup, or additional preparation outside A-CO’s scope will be treated as Extra Work. Materials & Equipment Only materials explicitly listed in the proposal are included. Upgrades or specification changes require a Change Order. Temporary utilities (water, power, lighting) shall be provided by others unless stated otherwise. Material delays or price escalations outside contractor control may result in schedule or cost adjustments. This informational section protects both parties by clarifying scope limits and eliminating assumptions. Any work not expressly included, or any condition not disclosed prior to bidding, shall be handled as additional work through a formal Change Order. Acceptance of the proposal includes acceptance of these terms. Proposed schedule assumes uninterrupted workflow and access. Delays caused by other trades, design issues, owner decisions, permitting, or late plan revisions may lead to extensions or added costs. If delays prevent continuous work, A-CO Construction may demobilize and remobilization costs may apply. Inspections & Testing Inspections, testing, compaction reports, engineering verification, and third-party services are excluded unless explicitly included. A-CO Construction is not responsible for delays due to failed tests, engineering hold-ups, or design changes resulting from testing. Warranty Limitations Warranty applies only to workmanship within A-CO’s contracted scope. Warranty does not cover failures resulting from design defects, improper maintenance, damage by other trades, subsurface conditions, or modifications made after turnover without authorization. Final Clarification Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 NO.QUANTITIY UNIT 1 1 EA 2 300 LF 3 1 EA 4 EA 5 1 LS 6 EA 7 1 LS 8 1 LS SUBTOTAL 63,290.00$ ALT $450.00 NO.QUANTITIY UNIT $0.00 ALT $450.00 WATER DESCRIPTION CONNECTION TO EXISTING MAIN LINE 2' WATER LINE INSTALLATION BLOWOFF ASSEMBLEY INSTALLATION DOUBLE 5/8" SERVICE SETTING INSTALLATION SY-CON EXCAVATION AND UTILITIES, LLC 261 N HWY 62 ROGERS, AR 72756 PH. (479) 278-4043 FLOWERS WATERLINE EXTENSION BID DATE:2/26/26 PLANS DATED :7/29/24 **All bonding, tap impact fees, and Site Layout NOT included in pricing** Trench Rock Removal 3 PRESSURE TESTING /INSPECTIONS AS NEEDED MOBILIZATION 1 TRAFFIC CONTROL MEASURES STREET PATCHING PER FAYETTEVILLE SPEC CY SEWER DESCRIPTION **This bid is all inclusive any deductions or alterations will affect pricing. Excludes all bonding and tap fees. Site Layout not included in pricing** WATER AND SEWER SUBTOTAL BID $ 63,290.00 *All bonding, tap impact fees, and Site Layout NOT included in pricing*SUBTOTAL Trench Rock Removal CY Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 ITEM UNIT QUANTITY UNIT PRICE TOTAL 2" CLASS 315 WATER LINE LF 300 125.00$ 37,500.00$ CONNECTION TO EXISTING MAIN LS 1 3,500.00$ 3,500.00$ FITTINGS & THRUST BLOCKING LS 1 5,500.00$ 5,500.00$ BLOW OFF HYDRANT EA 1 6,500.00$ 6,500.00$ 5/8" SERVICE SETTINGS EA 3 2,500.00$ 7,500.00$ MOBILIZATION LS 1 2,790.00$ 2,790.00$ TOTAL 63,290.00$ FLOWER ST WATER LINE UNIT PRICING Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 Scope Boundaries – Standard Exclusions The following exclusions are standard for Sy-Con Excavation & Utilities and are included to clearly define responsibilities, avoid scope overlap, and ensure fair allocation of cost and risk. These exclusions are not intended to delay work, but to maintain clarity and prevent misunderstandings. •Utility layout, surveying & as-builts – Typically provided by the GC or a licensed surveyor under a separate contract. Taking on this responsibility would add time, liability, and costs not included in our bid. •City impact fees, including meter fees and large tap impact fees – Paid directly to the municipality by the Owner or GC; not a construction cost. •Density testing for compaction – Performed by an independent testing agency for impartial results; outside our scope and pricing. •Hauling of materials not generated by Sy-Con's work – Prevents scope creep by limiting hauling to materials from our contracted work. •Hydrant extensions due to grade discrepancies – Considered a change in site conditions and addressed via change order. •Loss of progress due to design or plan errors – Protects against unrecoverable labor/equipment costs caused by factors beyond our control. •Concrete washout – Requires specialized containment and disposal procedures not included in our bid. •Relocation or removal of existing utilities (unless noted in proposal) – Often unpredictable and requires separate scope, coordination, and pricing. •Plumbing connections beyond meter settings – Falls under licensed plumbing scope; meters excluded unless stated otherwise. •Concrete, sidewalk, or asphalt replacement from utility installation (unless noted in proposal) – Avoids absorbing significant paving costs outside the utility scope. •Tree or shrub removal/replacement – Landscaping work is a separate trade and not included in utility installation. •Bonding costs – Performance and payment bonds excluded unless specifically included in pricing. •Permit fees – Typically handled and paid for by GC to align with prime contract requirements. •Private plumbing scope – Outside of public utility installation work and not included in our bid. •City Fire Hydrant flow testing costs - SY CON does not have this cost in any bids Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 Flowers Updated Cost Share Request Engineering and Design Invoices (4) Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 Item Type Description Amount Construction Plan Set & Documentation Prepare Design Drawings per AHJ & State Requirements. Plan set to include at a minimum: Water Main Plan, Profile, and Details. Record Drawings and As-Builts not included in scope. This line item will be billed as an hourly not-to-exceed of $1,500. $950 Billed previously on 10/31/24 $550.00 Additional Services Additional Civil Engineering Services including revisions to plans per City comments and coordination of waterline through City approval. This line item will be billed as an Hourly Not-To-Exceed $2,000 $500.00 Amount Due $1,050.00 Notes Thank you for choosing Odyssey Engineering. If you have any questions, please don't hesitate to reach out to ctilley@odysseynwa.com or call us at 479-480-3330. If paying by credit card a 3% processing fee will be added to your invoice(s). From Odyssey Engineering LLC 124 Grant Place, Suite E Lowell, AR 72745 **WE HAVE MOVED** Invoice For Tommie Flowers-DavisInvoice ID INV-0272 Issue Date 12/20/2024 Due Date 01/19/2025 (Net 30) Subject [ODY0052] Flowers Waterline Extension Page 1 of 1 Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 Item Type Description Amount Additional Services Additional Civil Engineering Services including revisions to plans per City comments and coordination of waterline through City approval. This line item will be billed as an Hourly Not-To-Exceed $2,000. $500 Billed previously on 12/20/24 $1,500.00 Amount Due $1,500.00 Notes Thank you for choosing Odyssey Engineering. If you have any questions, please don't hesitate to reach out to ctilley@odysseynwa.com or call us at 479-480-3330. If paying by credit card a 3% processing fee will be added to your invoice(s). From Odyssey Engineering LLC 124 Grant Place, Suite E Lowell, AR 72745 Invoice For Tommie Flowers-DavisInvoice ID INV-0319 Issue Date 04/30/2025 Due Date 05/30/2025 (Net 30) Subject [ODY0052] Flowers Waterline Extension Page 1 of 1 Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 WODYSSEYNGINEERING Invoice ID INV-0114 Issue Date 10/31/2023 Due Date 11 /30/2023 (Net 30) Subject ODY0052] Flowers Waterline Extension Item Type Construction Plan Set & Documentation Description From Odyssey Engineering LLC 117 Parkwood St., Suite 101 Lowell, AR 72745 Invoice For Tommie Flowers Prepare Design Drawings per AHJ & State Requirements. Plan set to include at a minimum: Water Main Plan, Profile, and Details. Amount Due Amount 950.00 950.00 Notes Thank you for choosing Odyssey Engineering. If you have any questions, please don't hesitate to reach out to ctilley@odysseynwa.com or call us at 479-480-3330. If paying by credit card a 3% processing fee will be added to your invoice(s). pp,ID paid in full on 2/j/24 Page 1 of 1 Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370 fl] 4,- nt1oc ARCHITECTURE 'LANDSCAPE Billed To Tommie Flowers Davis Date of Issue 10/31 /2024 Due Date 11 /30/2024 Invoice Number 356989 Flintlock Ltd 479.305.4807 512 N Mission Blvd Fayetteville, AR 72701 Amount Due (USD) 2,825-00 Description Rate Qty Line Total Rock St Water Line Location Design + Coordination with City $250.00 7.5 $1,875.00 of Fayetteville + Site Plans Odyssey Engineering Pass Through Cost $950.00 1 $950.00 Water Line Design for Rock St Extension Subtotal 2,825.00 Tax 0.00 Total 2,825.00 Amount Paid 0.00 Amount Due (USD) $2,825.00 Docusign Envelope ID: 53AFC179-D95E-8C7C-816A-763379733370