Water, Sewer, and Solid Waste Committee
12 May 2026
5:30 P.M. City Hall Room 101
(Or immediately following City Council Agenda Session)
Committee:Council Member Teresa Turk, Council Member Mike Wiederkehr, Council
Member Scott Berna, Council D’Andre Jones
Copy to:Mayor Molly Rawn, Keith Macedo, Steve Dotson, Jennifer Walker, Kara Paxton,
Kit Williams, Chris Brown, Alan Pugh, Jonathan Curth, Terry Gulley, Peter
Nierengarten, Brian Pugh, Corey Granderson, Drake Vinyard, Aaron Watkins,
Cody Ashworth, Scott Murphy, Brian Rowland
From:Tim Nyander, Utilities Director
______________________________________________________________________
CALL TO ORDER
UPDATES
PRESENTATIONS:
1. Overview of April’s WRRF Monthly Operations
Scott Murphy – WRRF Project Manager, Inframark
2. Overview of April’s Water & Sewer Operations
Tim Nyander – Utilities Director
OLD BUSINESS:
3. West Transmission Waterline and Other CIP Updates
Corey Granderson – Utilities Engineer
NEW BUSINESS:
4. Noland Electrical Switchgear Bid Award
This project will construct a new electrical building at the Paul R. Noland Water Resource
Recovery Facility to house high-voltage electrical switchgear equipment controlling global power
supply to the entire plant. These improvements will help safeguard this critical facility from loss
of power by increasing redundancies, replacing antiquated equipment, simplifying access and
maintainability, and will be compatible with future upgrades.
2
The major electrical equipment has already been procured (Res. 118-25) and is being
manufactured. This gear will be received and installed by the contractor for Bid #26-30. On April
30, 2026 the City of Fayetteville accepted sealed competitive bids for this project. Southern
Brothers Construction, LLC submitted the lowest bid. All bids are shown here:
Southern Brothers Construction, LLC $1,209,824.00
Kinco Constructors $1,410,712.00
Crossland Heavy Contractors, Inc. $1,625,000.00
Staff recommends awarding Bid #26-30 and approving a construction contract with Southern
Brothers Construction, LLC in the amount of $1,209,824.00 for construction of an electrical
switchgear facility at the Paul R. Noland Water Resource Recovery Facility.
STAFF REQUESTS THIS BE FORWARDED TO THE CITY COUNCIL WITH A
RECOMMENDATION FOR APPROVAL
5. Noland Switchgear Amendment with Hawkins-Weir for Construction Observation
The primary electrical feed to the Noland Water Resource Recovery Facility (WRRF) has been
identified as a concern for reliability of keeping the plant in-power continuously. This is primarily
due to the arrangement of high voltage breakers and the WRRF’s tie-in to both grid-power and
standby generator power. Hawkins-Weir Engineers was selected via RFQ# 24-01, Selection #8
to provide these professional services.
Design and bidding are complete, and the project is ready to move into construction.
Amendment No. 1 will provide necessary funds for Hawkins-Wier to be involved with project
administration, construction observation, engineering oversight, final inspections and system
start-up.
Staff recommends approval of Amendment No. 1 to the engineering services agreement with
Hawkins-Weir Engineers, Inc. for professional services associated with the Noland WRRF
Primary Switchgear Improvements Project in an amount not to exceed $195,220.00.
STAFF REQUESTS THIS BE FORWARDED TO THE CITY COUNCIL WITH A
RECOMMENDATION FOR APPROVAL
6. Change Order 2 with Goins Enterprises, Inc.
In April 2024, the City Council approved a contract with Goins Enterprises, Inc. for the
reconstruction of portions of 24-inch waterlines in southern Fayetteville from 18th Street to South
School Avenue (Res. 112-24).
Due to project costs, deductive alternates were selected after bidding to keep the project scope
within allocated funding. However, as the project neared completion and after reconciliation of
quantities and pay-items the city was able to complete portions of the original project scope via
Change Order No. 1 (approved administratively through contingency funds).
As this additional scope neared completion, several pipe fittings and materials were necessary
to make a completed connection that were beyond the approved funds, including the council
approved contingency. Therefore, Change Order No. 2 is necessary to finalize the project costs
and pay the contractor for final billable quantities.
3
Staff recommends approval of Change Order 2 to the contract with Goins Enterprises, Inc.
which will increase the contract amount by $5,672.00.
STAFF REQUESTS THIS BE FORWARDED TO THE CITY COUNCIL WITH A
RECOMMENDATION FOR APPROVAL
PRESENTATIONS
ATTACHMENTS
Bid Tabulation – Noland Electrical Switchgear Construction
Goins Enterprises Change Order No. 2
Hawkins-Weir Amendment No. 1
ADJOURN
Next Water, Sewer, Solid Waste Committee meets on
Tuesday, June 9th, 2026, at 5:30 p.m.
Line #Description QTY UOM Unit Extended Unit Extended Unit Extended
1 Mobilization 1 LS $42,849.72 $42,849.72 $56,428.00 $56,428.00 $70,000.00 $70,000.00
2 Bonds & Insurance 1 LS $12,482.33 $12,482.33 $33,798.00 $33,798.00 $20,000.00 $20,000.00
3 Trench & Excavation Safety 1 LS $7,500.00 $7,500.00 $1.00 $1.00 $2,000.00 $2,000.00
4 General Conditions 1 LS $56,482.95 $56,482.95 $104,582.00 $104,582.00 $150,000.00 $150,000.00
5 Construction of Medium Voltage Switchgear Building 1 LS $402,323.00 $402,323.00 $755,151.00 $755,151.00 $1,288,000.00 $1,288,000.00
6 Installation of Medium Voltage Switchgear 1 LS $675,500.00 $675,500.00 $430,500.00 $430,500.00 $65,000.00 $65,000.00
7 Site Restoration 1 LS $12,686.00 $12,686.00 $30,252.00 $30,252.00 $30,000.00 $30,000.00
Crossland Heavy Contractors,
Inc.
Kenny Fitch, Sr Procurement Agent
______________________________________________________________________________
Trevel Young, Procurement Agent
______________________________________________________________________________
* NOTICE: Bid award is contingent upon supplier meeting minimum specifications and formal authorization by City Officials.
Total $1,625,000.00$1,410,712.00$1,209,824.00
Southern Brothers
Construction Kinco Constructors
Certification of Funds: $1,200,000 ($1,500,000 maximum allowed)
Deadline: Thursday, April 30, 2026 at 2:00 PM
Bid 26-30, Construction - Noland WWTF Switchgear
BID TABULATION
y FFFFFFFiFFFFFFFFFtch, Sr Procurement
_________________________________________________________________________________________
Amendment No. 1 (Revised Page 1 of 2 May 4, 2026
AMENDMENT NO. 1
TO THE
AGREEMENT For PROFESSIONAL ENGINEERING SERVICES
BETWEEN
CITY OF FAYETTEVILLE, ARKANSAS
AND
HAWKINS-WEIR ENGINEERS, INC.
In accordance with the AGREEMENT For PROFESSIONAL ENGINEERING SERVICES for the Noland
WWTP Switchgear Replacement (HW Project No. 2023055), dated July 2, 2024, between the City of
Fayetteville, Arkansas (hereinafter called Owner) and Hawkins-Weir Engineers, Inc. (hereinafter called
Engineer), Owner hereby authorizes Engineer to proceed with engineering services as modified by this
Amendment No. 1.
SECTION 1 – SCOPE OF SERVICES
1.1 Amendment No. 1 is for construction phase services for the Noland WWTP Switchgear
Replacement associated with Owner’s Project No. 26-30. Services are detailed in the Engineer’s attached
Scope of Services dated May 4, 2026.
SECTION 2 – TIME OF SERVICE
2.1 The scope of services as defined above is based on addressing the defined services within a 270-
calendar day construction Contract Time in 2026 for the Owner’s Project No. 26-30. Engineer will proceed
with providing the services set forth herein immediately upon execution of this Authorization by all parties.
2023055\Appendix A Scope of Services 050426.docx Page 1 of 1
Appendix A
Scope of Services
Amendment No. 1
Noland WWTP Switchgear Replacement
City of Fayetteville, Arkansas
HW Project No. 2023055
May 4, 2026
Hawkins-Weir Engineers, Inc. (HW) proposes to provide the following construction phase
services for the Noland WWTP Switchgear Replacement project:
Task Description
D. Construction Phase – Noland WWTP Switchgear Replacement
1. Conduct Pre-Construction Conference with the Owner and Contractor
a. Field Survey to reestablish control monumentation
2. Provide periodic observation during construction
(1)
3. Conduct up to two (2) progress meetings
4. Prepare, review, and coordinate the dissemination of construction documentation
including material submittals, testing results, field orders, and change orders as directed
by the Owner
5. Review the Contractor’s constructed quantities and prepare monthly pay requests for the
Owner’s approval
6. Conduct as-built surveys of completed improvements
7. Participate in Factory Witness Test at Caterpillar in Alpharetta, Georgia, coordinate and
assist with switchgear startup testing on site
8. Coordinate and conduct a final inspection with the Contractor and the Owner, and
prepare a punch list of deficient construction items for the Contractor to address
9. Prepare Record Drawings of the completed project and provide one (1) reproducible
hard copy and one (1) electronic copy for the Owner’s archives
(1)Based on a 270-calendar day Contract Time (240-calendar days until Substantial
Completion). Periodic construction observation is based on 8-hours per day
(Monday through Friday) during the construction of the below grade improvements
(assumed at 30-calendar days) and approximately 2-hours per day (Monday through
Friday) for the remaining site construction period (assumed 240-calendar days)
through Final Completion date for the Construction Observer.
ŵĞŶĚŵĞŶƚEŽ͘ϭͲ&ĞĞWƌŽƉŽƐĂů
EŽůĂŶĚttdW^ǁŝƚĐŚŐĞĂƌ/ŵƉƌŽǀĞŵĞŶƚƐ
ŝƚLJŽĨ&ĂLJĞƚƚĞǀŝůůĞ͕ƌŬĂŶƐĂƐ
WƌŽũĞĐƚEŽ͘ϮϬϮϯϬϱϱ
DĂLJϰ͕ϮϬϮϲ
͘ŽŶƐƚƌƵĐƚŝŽŶWŚĂƐĞͲEŽůĂŶĚttdW^ǁŝƚĐŚŐĞĂƌZĞƉůĂĐĞŵĞŶƚ
ŶŐƌ ŶŐƌ ŶŐƌ KďƐĞƌǀĞƌ ^ƵƌǀĞLJŽƌ dĞĐŚ /D 'W^ ĚŵŝŶ͘ dŽƚĂů dŽƚĂů
s// s/ / /// /// /// ^ƵƌǀĞLJ ,ŽƵƌƐ ŽƐƚ
ΨϮϳϱ ΨϮϱϬ ΨϭϮϱ ΨϭϮϬ Ψϭϳϱ Ψϭϯϱ Ψϭϯϱ ΨϮϬϬ Ψϳϱ
ϭ͘ϲϭϬϰ Ϯ ϮϮϰΨϱ͕ϬϰϬ
ĂͿ &ŝĞůĚƐƵƌǀĞLJƚŽƌĞĞƐƚĂďůŝƐŚĐŽŶƚƌŽůŵŽŶƵŵĞŶƚĂƚŝŽŶ ϰ ϰ ϴ Ψϭ͕ϱϬϬ
Ϯ͘ϰϬ ϰϬ ϰϬ ϱϬϬ ϲϮϬ Ψϴϲ͕ϬϬϬ
ϯ͘ŽŶĚƵĐƚƵƉƚŽƚǁŽ;ϮͿƉƌŽŐƌĞƐƐŵĞĞƚŝŶŐƐ ϴ ϴ ϴ ϰ ϲ ϯϰ Ψϲ͕ϭϯϬ
ϰ͘ϭϲ ϰϲ Ϯϰ ϴ ϴ ϭϲ ϭϭϴ ΨϮϮ͕ϭϰϬ
ϱ͘ϮϬ ϰϬ ϴϲϴΨϭϲ͕ϭϬϬ
ϲ͘ϰϴϰ ϰϮϬΨϯ͕ϰϲϬ
ϳ͘ϭϮϬ ϲϬ ϭϴϬ ΨϰϬ͕ϱϬϬ
ϴ͘ϰϴϰϰ ϰϮϰΨϰ͕ϯϴϬ
ϵ͘ϲϰ ϰ ϴϭϲϰϰϰϲΨϳ͕ϰϳϬ
dKd>,KhZ^с ϮϮϬ ϭϲϬ ϭϰϬ ϱϯϬ ϴ ϴ Ϯϰ ϭϮ ϰϬ ϭ͕ϭϰϮ
^hdKd>K^dс ΨϲϬ͕ϱϬϬ ΨϰϬ͕ϬϬϬ Ψϭϳ͕ϱϬϬ Ψϲϯ͕ϲϬϬ Ψϭ͕ϰϬϬ Ψϭ͕ϬϴϬ Ψϯ͕ϮϰϬ ΨϮ͕ϰϬϬ Ψϯ͕ϬϬϬ ͲͲͲͲͲͲͲͲͲͲͲх ΨϭϵϮ͕ϳϮϬ
͘ZĞŝŵďƵƌƐĂďůĞdžƉĞŶƐĞƐ
dŽƚĂů
ϭ͘ΨϮ͕ϱϬϬ
ΨϮ͕ϱϬϬ
ŶŐŝŶĞĞƌŝŶŐ^ĞƌǀŝĐĞƐ^ƵŵŵĂƌLJ
͘ŽŶƐƚƌƵĐƚŝŽŶWŚĂƐĞͲEŽůĂŶĚttdW^ǁŝƚĐŚŐĞĂƌZĞƉůĂĐĞŵĞŶƚ ΨϭϵϮ͕ϳϮϬ
͘ΨϮ͕ϱϬϬ
dŽƚĂůŶŐŝŶĞĞƌŝŶŐ&ĞĞͲEŽƚdŽdžĐĞĞĚ Ψϭϵϱ͕ϮϮϬ
ZĞŝŵďƵƌƐĂďůĞdžƉĞŶƐĞƐ
dĂƐŬ
ŽŶĚƵĐƚWƌĞͲŽŶƐƚƌƵĐƚŝŽŶŽŶĨĞƌĞŶĐĞǁŝƚŚƚŚĞKǁŶĞƌĂŶĚŽŶƚƌĂĐƚŽƌ
WƌŽǀŝĚĞƉĞƌŝŽĚŝĐŽďƐĞƌǀĂƚŝŽŶĚƵƌŝŶŐĐŽŶƐƚƌƵĐƚŝŽŶ;ϭͿ
WƌĞƉĂƌĞ͕ƌĞǀŝĞǁ͕ĂŶĚĐŽŽƌĚŝŶĂƚĞƚŚĞĚŝƐƐĞŵŝŶĂƚŝŽŶŽĨĐŽŶƐƚƌƵĐƚŝŽŶ
ĚŽĐƵŵĞŶƚĂƚŝŽŶŝŶĐůƵĚŝŶŐŵĂƚĞƌŝĂůƐƵďŵŝƚƚĂůƐ͕ƚĞƐƚŝŶŐƌĞƐƵůƚƐ͕ĨŝĞůĚŽƌĚĞƌƐ͕
ĂŶĚĐŚĂŶŐĞŽƌĚĞƌƐĂƐĚŝƌĞĐƚĞĚďLJƚŚĞKǁŶĞƌ
ZĞǀŝĞǁƚŚĞŽŶƚƌĂĐƚŽƌ͛ƐĐŽŶƐƚƌƵĐƚĞĚƋƵĂŶƚŝƚŝĞƐĂŶĚƉƌĞƉĂƌĞŵŽŶƚŚůLJƉĂLJ
ƌĞƋƵĞƐƚƐĨŽƌƚŚĞKǁŶĞƌ͛ƐĂƉƉƌŽǀĂů
ŽŶĚƵĐƚĂƐͲďƵŝůƚƐƵƌǀĞLJƐŽĨĐŽŵƉůĞƚĞĚŝŵƉƌŽǀĞŵĞŶƚƐ
ŽŽƌĚŝŶĂƚĞĂŶĚĐŽŶĚƵĐƚĂĨŝŶĂůŝŶƐƉĞĐƚŝŽŶǁŝƚŚƚŚĞŽŶƚƌĂĐƚŽƌĂŶĚƚŚĞ
KǁŶĞƌ͕ĂŶĚƉƌĞƉĂƌĞĂƉƵŶĐŚůŝƐƚŽĨĚĞĨŝĐŝĞŶƚĐŽŶƐƚƌƵĐƚŝŽŶŝƚĞŵƐĨŽƌƚŚĞ
ŽŶƚƌĂĐƚŽƌƚŽĂĚĚƌĞƐƐ
WƌĞƉĂƌĞƌĞĐŽƌĚĚƌĂǁŝŶŐƐŽĨƚŚĞĐŽŵƉůĞƚĞĚƉƌŽũĞĐƚĂŶĚƉƌŽǀŝĚĞŽŶĞ;ϭͿ
ƌĞƉƌŽĚƵĐŝďůĞŚĂƌĚĐŽƉLJĂŶĚŽŶĞ;ϭͿĞůĞĐƚƌŽŶŝĐĐŽƉLJĨŽƌƚŚĞKǁŶĞƌ͛Ɛ
ĂƌĐŚŝǀĞƐ
;ϭͿĂƐĞĚŽŶĂϮϳϬͲĐĂůĞŶĚĂƌĚĂLJŽŶƚƌĂĐƚdŝŵĞ;ϮϰϬͲĐĂůĞŶĚĂƌĚĂLJƐƵŶƚŝůƐƵďƐƚĂŶƚŝĂůĐŽŵƉůĞƚŝŽŶͿ͘
WĞƌŝŽĚŝĐĐŽŶƐƚƌƵĐƚŝŽŶŽďƐĞƌǀĂƚŝŽŶŝƐďĂƐĞĚŽŶϴͲŚŽƵƌƐƉĞƌĚĂLJ;DŽŶĚĂLJƚŚƌŽƵŐŚ&ƌŝĚĂLJͿĚƵƌŝŶŐƚŚĞĐŽŶƐƚƌƵĐƚŝŽŶŽĨƚŚĞďĞůŽǁŐƌĂĚĞŝŵƉƌŽǀĞŵĞŶƚƐ
ƚŚƌŽƵŐŚĨŝŶĂůĐŽŵƉůĞƚŝŽŶĚĂƚĞĨŽƌƚŚĞŽŶƐƚƌƵĐƚŝŽŶKďƐĞƌǀĞƌ͘
/ƚĞŵ ĞƐĐƌŝƉƚŝŽŶ
ĂƚĞƌƉŝůůĂƌ&ĂĐƚŽƌLJdĞƐƚ
WĂƌƚŝĐŝƉĂƚĞŝŶ&ĂĐƚŽƌLJtŝƚŶĞƐƐdĞƐƚĂƚĂƚĞƌƉŝůůĂƌŝŶůƉŚĂƌĞƚƚĂ͕'ĞŽƌŐŝĂ͕
ĐŽŽƌĚŝŶĂƚĞĂŶĚĂƐƐŝƐƚǁŝƚŚƐǁŝƚĐŚŐĞĂƌƐƚĂƌƚƵƉƚĞƐƚŝŶŐŽŶƐŝƚĞ
dƌĂǀĞůĨŽƌ&ĂĐƚŽƌLJtŝƚŶĞƐƐdĞƐƚ;,tWĞƌƐŽŶŶĞůŽŶůLJͿ
;ĂƐƐƵŵĞĚĂƚϯϬͲĐĂůĞŶĚĂƌĚĂLJƐͿĂŶĚĂƉƉƌŽdžŝŵĂƚĞůLJϮͲŚŽƵƌƐƉĞƌĚĂLJ;DŽŶĚĂLJƚŚƌŽƵŐŚ&ƌŝĚĂLJͿĨŽƌƚŚĞƌĞŵĂŝŶŝŶŐƐŝƚĞĐŽŶƐƚƌƵĐƚŝŽŶƉĞƌŝŽĚ;ĂƐƐƵŵĞĚϮϰϬͲĐĂůĞŶĚĂƌĚĂLJƐͿ
2023055\Scope of Services and Fee Proposal -Noland WWTF Switchgear Construction Management 050426.xlsx
Hawkins-Weir Engineers, Inc.
Hourly Rate Schedule: 2026
Description Billing Rate/Hour
Engineer VII $275
Engineer VI $250
Engineer V $225
Engineer IV $200
Engineer III $175
Engineer II $150
Engineer I $125
Environmental Specialist II $130
Environmental Specialist I $110
$145
$135
$120
$100
$90
$150
$145
$135
$125
$135
$125
Designer III
Designer II
Designer I
&LYLO(QJ$VVLVWDQW,,
Civil Eng. Assistant I
Digital Design Manager
BIM Modeler III
BIM Modeler II
BIM Modeler I
CAD/GIS Technician III
CAD/GIS Technician II
CAD/GIS Technician I $115
Construction Manager II $150
Construction Manager I $130
Construction Observer IV $140
Construction Observer III $120
Construction Observer II $110
Construction Observer I $100
Surveyor $175
GPS Survey $200
Survey Technician $50
Business Manager $100
Graphic Designer $100
Administrative $75
Reimbursable Expenses
Mileage $0.77/mile
Printing @ Cost
Travel @ Cost
Expert Witness Rate x 2.0
Other Direct Costs @ Cost
Notes:
1. Hourly rates may be equitably adjusted
2. Adjustment to rate schedule will not change contract lump sum or NTE amounts
3. If a conflict exists, hourly rates & reimbursable expenses will be invoiced per terms of Agreement.
EXHIBIT B
Project Manager 01/23/26