Loading...
HomeMy WebLinkAbout092-26 RESOLUTION1 13 West Mountain Street Fayetteville, AR 72701 (47e) 57s-8323 Resolution: 92-26 File Number: 2026-822 A RESOLUTTON TO AWARD RFQ #26-01 AND AUTHORIZE A PROFESSIONAL ENGINEERING SERVICES CONTRACT WITH CRAFTON, TULL & ASSOCIATES, INC. IN THE AMOUNT OF $114,376.00 FOR THE DESIGN OF THE MARTIN LUTHER KING, JR BOULEVARD PEDESTRIAN IMPROVEMENTS PROJECT, AND TO APPROVE A MASTER AGREEMENT ADDENDUM WITH THE ARKANSAS DEPARTMENT OF TRANSPORTATION WHEREAS, in 2025, the City was awarded 5500,000.00 through the Arkansas Department of Transportation's Transportation Altematives Program for the Martin Luther King, Jr. Boulevard Pedestrian Improvements Project; and WHEREAS, on May 29, 2025, the City Council passed Resolution 127 -25 authorizing an agreement of understanding with the Arkansas Department of Transportation for the Project which will focus on connecting sidewalks along a half- mile section of the south side of Martin Luther King, Jr. Boulevard, and WHEREAS, the Arkansas Department of Transportation has partnered with Crafton, Tull & Associates, Inc. to prepare a detailed scope of work and a master agreement addendum will establish a tri-party arrangement for engineering design services among Crafton, Tull & Associates, the City of Fayetteville, and the Arkansas Department of Transportation, enabling the awarded grant funding to be applied toward the engineering fees. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section l: That the City Council of the City of Fayetteville, Arkansas hereby awards RFQ #26-01, and authorizes Mayor Rawn to sign a professional engineering services contract with Crafton, Tull & Associates, Inc. in the amount of $l 14,376.00 for the design of the Martin Luther King, Jr. Pedestrian Improvements Project. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Rawn to sign the master agreement addendum with the Arkansas Department of Transportation. PASSED and APPROVED on April 7,2026 Attest: Molly Rawn., Page 1 Kara Paxton, City C Treasurer ffi Mailing address: 113 W. Mountain Street Fayetteville, AR 72701 www.fayetteville-ar.gov CITY COUNCIL MEMO 2026-822 MEETING OF APRIL 7, 2026 TO: Mayor Rawn and City Council THROUGH: Justin Bland, City Engineer Chris Brown, Public Works Director Keith Macedo, Chief of Staff FROM: Matt Mihalevich, Active Transportation Manager SUBJECT: Crafton Tull & ARDOT Agreement - MLK Pedestrian Improvements RECOMMENDATION: Staff recommends approval of a contract in the amount of $114,376.00 with Crafton, Tull & Associates, Inc. per RFQ 26-01, selection #3 to provide professional services for the design of the MLK Pedestrian Improvements project in concurrence with the on-call selection Task Order No 060 by the Arkansas Department of Transportation and approval of a Master Agreement Addendum with the Arkansas Department of Transportation. BACKGROUND: In 2025, the City of Fayetteville was awarded $500,000 through the Arkansas Department of Transportation’s Transportation Alternatives Program. On May 29, 2025, Resolution 127-25 was approved to authorize an agreement of understanding with the Arkansas Department of Transportation for the M.L.K. Pedestrian Improvements Project. The grant amount includes funding for engineering design fees. Crafton Tull, listed on the Arkansas Department of Transportation’s on-call selection list, was also selected through RFQ 25-01, Selection 3, by Fayetteville’s selection committee to provide professional design services for the sidewalk project. The Arkansas Department of Transportation has partnered with Crafton, Tull & Associates, Inc. to prepare the detailed scope of work described in Task Order 060 through their on-call services. The master agreement addendum establishes a tri-party arrangement for engineering design services among Crafton, Tull & Associates, the City of Fayetteville, and the Arkansas Department of Transportation, enabling the awarded grant funding to be applied toward the engineering fees. DISCUSSION: The M.L.K. Walkability Project will focus on connecting sidewalks along a half-mile section of the south side of M.L.K. Boulevard between Wood Avenue and Church Avenue. In addition to sidewalks, the project includes plans for an enhanced crosswalk at M.L.K. and Willow Avenue, as well as improvements to an Ozark Regional Transit stop at that intersection. This project was originally identified in Fayetteville’s 2018 Mobility Plan through mapping analysis and a high volume of requests for pedestrian improvements in this area. It will advance Fayetteville’s active transportation goals by providing safe and accessible infrastructure, encouraging more people to choose alternative modes of transportation. BUDGET/STAFF IMPACT: Mailing address: 113 W. Mountain Street Fayetteville, AR 72701 www.fayetteville-ar.gov Funding for the engineering design will be provided with 80% from the Transportation Alternatives Program (TAP) Grant and 20% from local matching funds. ATTACHMENTS: 3. Staff Review Form, 4. RFQ 26-01, Selection 3 - Final Vote, 5. MLK Ped. Improvements Concept - Church to Wood, 6. On-Call-LP-Addendum-CTA-City-of-Fayetteville - Signed by CTA, 7. CTA Proposal Task Order 060 - Signed by CTA Page 1 City of Fayetteville, Arkansas Legislation Text 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 File #: 2026-822 A RESOLUTION TO AWARD RFQ #26-01 AND AUTHORIZE A PROFESSIONAL ENGINEERING SERVICES CONTRACT WITH CRAFTON, TULL & ASSOCIATES, INC. IN THE AMOUNT OF $114,376.00 FOR THE DESIGN OF THE MARTIN LUTHER KING, JR BOULEVARD PEDESTRIAN IMPROVEMENTS PROJECT, AND TO APPROVE A MASTER AGREEMENT ADDENDUM WITH THE ARKANSAS DEPARTMENT OF TRANSPORTATION WHEREAS, in 2025, the City was awarded $500,000.00 through the Arkansas Department of Transportation’s Transportation Alternatives Program for the Martin Luther King, Jr. Boulevard Pedestrian Improvements Project; and WHEREAS, on May 29, 2025, the City Council passed Resolution 127-25 authorizing an agreement of understanding with the Arkansas Department of Transportation for the Project which will focus on connecting sidewalks along a half-mile section of the south side of Martin Luther King, Jr. Boulevard, and WHEREAS, the Arkansas Department of Transportation has partnered with Crafton, Tull & Associates, Inc. to prepare a detailed scope of work and a master agreement addendum will establish a tri-party arrangement for engineering design services among Crafton, Tull & Associates, the City of Fayetteville, and the Arkansas Department of Transportation, enabling the awarded grant funding to be applied toward the engineering fees. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards RFQ #26-01, and authorizes Mayor Rawn to sign a professional engineering services contract with Crafton, Tull & Associates, Inc. in the amount of $114,376.00 for the design of the Martin Luther King, Jr. Pedestrian Improvements Project. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Rawn to sign the master agreement addendum with the Arkansas Department of Transportation. 3/12/2026 Submitted Date Yes 499,000.00$ 114,376.00$ Budgeted Item? Does item have a direct cost? Is a Budget Amendment attached? Total Amended Budget Expenses (Actual+Encum) Available Budget Item Cost Budget Amendment Remaining Budget 500,000.00$ 1,000.00$ Yes No -$ 384,624.00$ 46020.7216.2000 Project Number Budget Impact: Street Project Bonds - MLK Walkability Impr, Wood Ave to Church Ave Fund Bond Program Grant Matching Street Projects 2024 Bonds 4601.860.7216-5860.02 4802.860.7216-5860.02 Account Number Project Title City of Fayetteville Staff Review Form 2026-822 Item ID 4/7/2026 City Council Meeting Date - Agenda Item Only Staff recommends approval of a contract in the amount of $114,376.00 with Crafton, Tull & Associates, Inc. per RFQ 26-01, selection #3 to provide professional services for the design of the MLK Pedestrian Improvements project in concurrence with the on-call selection task order No 060 by the Arkansas Department of Transportation and approval of a master agreement addendum with the Arkanss Department of Transportation. N/A for Non-Agenda Item Action Recommendation: Submitted By Matt Mihalevich ENGINEERING (621) Division / Department Comments: Purchase Order Number: Change Order Number: Previous Ordinance or Resolution #127-25 Approval Date:5/20/2025 Original Contract Number: SELECTION COMMITTEE -VOTING RESULTS CITY OF FAYETTEVILLE . ARKANSAS Selection Description: RFQ26-01, Selection 3-MLK Pedestrian Improvements Selection Committee Date/Time: 2/25/2026 at 11:00 AM via Zoom Firms are listed in alphabetical order 1 2 3 Crafton Tull & Associates, I & S Group, Inc Kimley-Horn and Overall RANK Inc Associates, Inc 1st t ty 2nd —lit 1 1 3rd �r 1 OVERALL RANK SUMMARY SCORING 1st ranked firm: C D�—FUu_,'4— 2nd ranked firm: S Glzo U P . I N� 3rd ranked firm:�.— Tallied by: Ke y F teh, Sr. Procurement Agent Trevel/Youn6, Procurement Agent Date: C�L / Z-j / ZtD Date: a / W / ab S. W A S H I N G T O N A V E . S. W I L L O W A V E . S. W I L L O W A V E . S. W O O D A V E . X X X X X X X X X X X XXX MLK BLVD 8' WIDE SIDEWALK 8' WIDE SIDEWALK w/ 8" WIDE GREEN SPACE EXIST. SIDEWALK & GREEN SPACE TO REMAIN INSTALL HANDICAP RAMPS AND CROSSWALK RR F B RR F B 8' WIDE GREEN SPACE EA S T A V E . S. C O L L E G E A V E . MLK BLVD X X X X RR F B RR F B EXIST. SIDEWALK TO REMAIN PROP. 8' WIDE SIDEWALK 8' WIDE SIDEWALK 22' 9' 8' WIDE GREEN SPACE BL O C K A V E . S. C O L L E G E A V E . BL O C K A V E . CH U R C H A V E . MLK BLVD. CHURCH AVE. TO S. WOOD AVE. Scale: 1" = 40' Scale: 1" = 40' Page 1 of 3 MASTER AGREEMENT ADDENDUM ON-CALL SERVICES LOCAL FEDERAL AID PROJECTS (2025-2028) CRAFTON, TULL & ASSOCIATES, INC. INCORPORATION OF PROJECT SPONSOR 1.INCORPORATION OF SPONSOR 1.1. This Addendum is made and entered into as an addition to the Agreement dated February 18, 2025, between the Arkansas Department of Transportation (ARDOT) and Crafton, Tull & Associates, Inc., “Consultant”, (hereinafter referred to as the "Agreement"). The purpose of this Addendum is to incorporate the City of Fayetteville as the “Sponsor”, into the Agreement, ensuring all provisions, terms, and conditions of the Agreement are binding and applicable to the local agency. 1.2. The Sponsor is hereby added as a party to the Agreement and shall have all the rights, obligations, and responsibilities outlined in the original Agreement, as applicable. The Consultant agrees to provide services to the Sponsor as outlined in the Agreement, subject to all terms and conditions. 2.RESPONSIBILITIES 2.1. ARDOT will retain oversight and management authority to ensure compliance with applicable state and federal regulations. The Sponsor assumes responsibility for approving deliverables and milestones specific to the Sponsor's projects and coordinating directly with the Consultant for day -to-day project management and decisions. 2.2. The Consultant’s compensation for services rendered to the Sponsor shall be paid in accordance with the terms outlined in the Agreement. Payments for Sponsor-specific projects shall be made from Sponsor funds, subject to any ARDOT oversight or approval requirements as stipulated in the Agreement and reimbursed upon proof of payment for service and demonstrated adherence to Federal Acquisitions Regulation (FAR) Cost Principles. 2.3. The Sponsor shall be included alongside ARDOT in any provisions regarding indemnification, liability, or insurance requirements as outlined in the Agreement. 2.4. The Consultant shall comply with all federal, state, and local laws, regulations, and policies applicable to services performed for the Sponsor under this Agreement, as required for ARDOT administered agreements. Page 2 of 3 2.5. The Consultant shall maintain records for Sponsor-specific projects in accordance with the Agreement’s requirements for audit and financial review. ARDOT retains the authority to review and audit records for Sponsor-administered projects to ensure compliance with applicable state and federal requirements. 2.6. This Addendum may be modified or terminated only by mutual written agreement of ARDOT, the Sponsor, and the Consultant. Termination of the Agreement or this Addendum does not relieve the Consultant of obligations related to prior services performed for the Sponsor. 2.7. All terms, conditions, and provisions of the original Agreement are hereby incorporated by reference into this Addendum and made applicable to the Sponsor, unless expressly modified herein. 3.CERTIFICATION OF SPONSOR 3.1. The Mayor of the City of Fayetteville certifies that neither the aforementioned consulting firm nor its representative has not been required, either directly or indirectly, as a condition for obtaining or executing this contract, to: 3.1.1. Employ or retain any firm or person, or agree to do so. 3.1.2. Pay or agree to pay any fees, contributions, donations, or any other form of consideration to any firm, person, or organization. 3.1.3. Except as expressly stated herein (if applicable). 4, NOTICE Arkansas Department of Tranqportation 10324 lnterstate 30 Post Office Box 2261 Little Rock, AR 72203 Consu ltantContracts@ARDOT. o ov Crafton, Tu!! & Associates, lnc. Michael Burns 901 N. 47t Street, Suite 400 Rogers, AR 72756 mi ke. bu rns@craftontu ll.com City of Fayetteville Molly Rawn, Mayor 1 13 W. Mountain Street Fayetteville, AR 72701 Mayo r@fayettevi lle-a r. q ov ,rV l,yrIMSS WHEREOF, the parties execute this Agreement, to be effective upon the date set out above CRAFTON, TULL & ASSOCIATES, INC.ARKANSAS STATE HIGHWAY COMMISSION BY BY: M Burns Executive Vice President Jared D. Wiley, P.E Director CITY OF F LLE BY Molly Rawn Mayor Disclaimer: This contract is berng electronically signed. The DocExpress Document Signing History will be located on the final page ol the executed contact. This docunentwill have all dates and electronic signafures applicable to the execution of this contact. Page 3 of 3 PAGE 1 OF 2 ON-CALL SERVICES LOCAL FEDERAL AID PROJECTS (2025-2028) TASK ORDER NO. 060 JOB NO. 040993, FAYETTEVILLE M.L.K. PED. IMPVTS. (TAP-24) (S) Date: (See DocExpress Document Signing History) WHEREAS, the Arkansas State Highway Commission (“Commission”) and Crafton, Tull & Associates, Inc. (“Consultant”) entered into a Master Agreement for Engineering Services dated February 18, 2025; and WHEREAS, the Master Agreement contemplates the issuance of Task Order Agreements involving the Commission, the Consultant, and a project sponsor (“Sponsor”); and WHEREAS, the Sponsor, City of Fayetteville, has agreed to the terms and conditions of the Master Agreement through execution of the Addendum; and WHEREAS, the services to be provided under this Task Order consist of Title I services, with additional phases to be authorized by amendment as appropriate and as determined by mutual agreement; NOW, THEREFORE, the parties agree as follows: 1.CONTRACT TYPE 1.1. This Task Order shall be a Cost-Plus-Fixed-Fee Agreement, in accordance with the terms of the Master Agreement. 2.CEILING PRICES 2.1. The Total Ceiling Price for this Task Order is $114,376. 2.2. The Title I Ceiling Price is $114,376. 2.3. The Title II Ceiling Price is Not Applicable. 2.4. The Fixed Fee is $12,192. 3.INDIRECT COST RATE 3.1. The most recently accepted indirect cost rate at the time of execution is for FY2024. 3.2. The applicable indirect cost rate is 149.65%. 3.3. The applicable Facilities Capital Cost of Money (FCCM) is 1.43%. 4.ATTACHMENTS 4.1. Attachment A – Scope of Work 4.2. Attachment B – Justification of Costs and Fees 4.3. Attachment C – Master Rates 4.4. Attachment D – Project Schedule oN-cALL LOCAL FEDERAL ArD PROJECTS (202s-2028) JOB 040993, TASK ORDER NO. 060 CRAFTON, TULL & ASSOCIATES, INC. 5. COMPLETION DATE 5.1. The 30% design plans shall be submitted no later than March 1,2026. 5.2. The 60% design plans shall be submitted no later than May 1,2026. 5.3. The 90% design plans shall be submitted no later than August 1,2026. 5.4. The 100% design plans shall be submitted no later than October 1,2026. 5.5. The anticipated completion date for Title I Services is December 31,2026. 6. CORRESPONDENCE 6.1. The Sponsor, Local Programs Division, and Consultant Contracts Division shall be copied on this task order and all related correspondence, 6.2. The Sponso/s designated representative for this Task Order is Dane Eifling. 6.3. lnvoices shall be submitted to the following: ARDOT: LPA@ardot.qov Sponsor: v i a Dane Eifl i n g at d eif lin g @faygltq-vjl le.:ar:,gq.y 7. EXECUTION ,rV IyrfrVESS WHEREOF, the parties execute this Task Order, to be effective upon the Date Set Out in DocExpress. CRAFTON, TULL & ASSOCIATES, INC. By: Bums Executive Vice President ARKANSAS STATE HIGHWAY COMMISSION By: Jared D. Wiley, P.E. Director CITY OF By: Molly Mayor Disclaimer: This contact is srgned in.D..o..qf;p.Le.9.q. The Signing History with all dates and electronic signafures applicable to the execution of this Task Order is located on the final page of the executed contract. PAGE 2 OF 2 f �- ry _ • yj ` 4 rw Mild r � 0 a a? se ell 40 4� aQ@2 *NM 61, Ar b�^ j Q 67, • - ` 1 ,----------------- - -if A rl�#��*�� . _ �1 « +►•milProject Loc• Job 040993 U ARKANSAS DEPARTMENT Fayetteville M.L.K. Ped. Impvts. (TAP-24) (S) OF TRANSPORTATION Washington County o Zso soo Feet PAGE 1 OF 6 ON-CALL SERVICES LOCAL FEDERAL AID PROJECTS (2025-2028) TASK ORDER NO. 060 JOB NO. 040993, FAYETTEVILLE M.L.K. PED. IMPVTS. (TAP-24) (S) SCOPE OF WORK DESCRIPTION OF THE PROJECT The City of Fayetteville is proposing to engage a design firm or a team of design firms to provide professional engineering services for Job No. 040993: Fayetteville M.L.K. Ped. Impvts. The M.L.K. Walkability Improvements project includes enhancements along Martin Luther King, Jr. Boulevard. These improvements consist of the addition of an 8-foot-wide shared-use paved side path with greenspace separation on the south side of the street along an approximately half-mile section from Church Avenue to Wood Avenue. This section will include extending an existing box culvert around the intersection of M.L.K. and East Avenue. Improvements also include modifications to and/or relocation of 2- 4 existing transit stops, as well as a Rectangular Rapid Flashing Beacon (RRFB) enhanced crosswalk with associated curb and ADA ramp improvements across M.L.K. at Willow Ave nue on the east side of the intersection. The plans will not be required to be prepared in standard ARDOT format. SERVICES PROVIDED BY THE SPONSOR 1.SURVEYS 1.1.Provide Available Parcel Surveys 1.2.Provide Design Survey 1.3.Provide Available Topographic Surveys of the Area 2.ENVIRONMENTAL 2.1. Publish and Pay for Public Notices and Legal Notices 3.DESIGN 3.1.Provide Existing Construction Plans 3.2.Provide Project Goals 3.3.Review and Approve of All Design Plans 4.RIGHT-OF-WAY 4.1. Provide Existing Right-of-Way Plans (if available) ON-CALL LP SERVICES (2025-2028) JOB 040993, TASK ORDER NO. 060 CRAFTON, TULL & ASSOCIATES, INC. SCOPE OF WORK ATTACHMENT A - PAGE 2 OF 6 SERVICES PROVIDED BY ARDOT 5.ENVIRONMENTAL 5.1. Provide Environmental Constraints 5.2. Provide final Categorical Exclusion (CE) document 5.3. Provide guidance regarding public meetings to comply with federal requirements 5.4. Coordinate with State Historic Preservation Office (SHPO) and other agencies as necessary 6.DESIGN 6.1.Review and Approve of All Design Plans 7.RIGHT-OF-WAY 7.1. Provide Existing Right-of-Way Plans (if available) 8.UTILITIES 8.1.Review and Approve Utility Plans TITLE I SERVICES TO BE FURNISHED BY THE CONSULTANT Submit an updated cost estimate with each design review, includ ing costs for utilities, etc. as applicable. The scope of work for engineering services will generally consist of providing the following tasks: 9.CONCEPTUAL DESIGN (30% SUBMITTAL) 9.1. Submit design criteria to be used in the design of the project for approval by the Sponsor and ARDOT prior to beginning conceptual design work. 9.2. Submit 30% plans for review by the Sponsor and ARDOT to include at a minimum: the proposed alignment with horizontal curve data, grades with vertical curve data, limits of construction, existing property lines and right of way, floodway and floodplain limi ts, and existing aerial photography and/or topographic survey. 9.3. Identify utility conflicts associated with proposed alignment. 9.4. Any existing curb ramp that must be rebuilt in the project is to be compliant with the Americans with Disabilities Act (ADA) requirements. 9.5. Any new curb ramp included in this project is to be compliant with ADA requirements. 10.PRELIMINARY DESIGN (60% SUBMITTAL) 10.1. Provide concrete mix design and strength specifications for proposed project if ARDOT Standard Specifications are not used. 10.2. Include any drainage design necessary to meet design requirements and standards. ON-CALL LP SERVICES (2025-2028) JOB 040993, TASK ORDER NO. 060 CRAFTON, TULL & ASSOCIATES, INC. SCOPE OF WORK ATTACHMENT A - PAGE 3 OF 6 10.3. Preliminary plans shall be submitted at the 60% level for Sponsor and ARDOT approval of the geometric design, title sheet, and typical sections. REQUIREMENTS FOR PRELIMINARY PLANS (60% SUBMITTAL) 10.4. The Title Sheet. 10.5. The typical sections will include notes pertaining to slopes, tolerances, leveling, and other items. The typical sections will contain information depicting the width of the subgrade, sidewalk, and clear zones. The point of profile will be defined and the location of any pipes or utilities if needed will be illustrated. The location and shape for all ditches will also be depicted. 10.6. Project specific details required to properly construct elements of the job that are not covered in the standard drawings or other plan drawings will be developed as needed. 10.7. Control detail sheets of the survey baseline and design centerline with control point data. 10.8. PLAN & PROFILE SHEETS: The plan and profile sheets will contain information including the following in the plan view: proposed centerline, existing topography, existing utilities, horizontal geometry (curve data, PI’s, bearings), north arrow, sidewalk dimension, proposed drivewa ys and side streets, proposed cross drains and related construction notes, guardrail locations, turning radii, limits of existing and proposed right -of-way and control of access (including fence), permanent and temporary construction easements, construction limits, location of right- of-way points and benchmarks, floodplain limits, and other data as required; profile view: proposed vertical geometry (including VPI’s, grades, and ditch grades), existing ground profile, and drainage information. 10.9. Erosion control plans. 10.10. Make revisions necessary to respond to comments made at the 30% review. 10.11. Provide design information necessary for environmental documentation and environmental permits to be obtained by ARDOT. 11.FINAL DESIGN (90/100% SUBMITTAL) 11.1. The objective of this phase is to complete plans for the project. In the final design phase, comments from the 60% submittal will be addressed, all quantities will be calculated, plans developed, and a construction cost estimate calculated. The 90% plan s review will be performed, and comments will be incorporated into the final plans. The final design of the project will proceed with the written approval by the Sponsor and ARDOT. 11.2. Comments from the review of 60% plans will be incorporated in 90% plans and all sheets will be updated with appropriate quantity callouts once quantities are tabulated. 11.3. Survey control sheets will show the horizontal and vertical control points and horizontal alignment data in plan view at the appropriate scale. The following information will be provided: Traverse Point Table-Point number, northing, easting, and elevation (if applicable), horizontal alignment data-curve number, point type (PC/PI/PT), station, northing, and easting. The appropriate notes will also be included. ON-CALL LP SERVICES (2025-2028) JOB 040993, TASK ORDER NO. 060 CRAFTON, TULL & ASSOCIATES, INC. SCOPE OF WORK ATTACHMENT A - PAGE 4 OF 6 11.4. Erosion control plans will be developed and will include temporary measures that will be put in place at the start of construction. The information for temporary measures includes the location of silt fences (station/offset at PI’s), rock berms, sediment basins, as well as other strategies to prevent pollution of streams by stormwater runoff from the project site. Permanent erosion control measures that will be left in place after construction is complete will also be noted. 11.5. Cross sections will be shown at a 1:1 scale. In addition, any matchlines will be labeled and sections will be provided at any pipes/culverts perpendicular to centerline construction. 11.6. Plan and profile sheets related to the relocation of existing water and sewer facilities which are directly affected by the project. 11.7. Quantities will be calculated and tabulated using the 2014 Standard Specifications for Highway Construction and the appropriate supplemental and job specific special provisions and ARDOT's “Roadway Design Plan Development Guidelines” and “Roadway Design Tr aining Guide”. 11.8. Provide special provisions. 11.9. Provide construction cost estimate. 11.10. Provide one electronic pdf, MicroStation (if requested by ARDOT), and AutoCad/Civil 3D files of plans for right of way review, and 90% plan review. 11.11. Make plan changes resulting from the 90% review, subsequent reviews, and final field inspection. 11.12. Perform all other work required to advertise and receive bids. 12.PROJECT CONDITIONS OF THE WORK: 12.1. Consultant fee estimate must be agreed upon by all parties. 12.2. The facility shall be designed in accordance with the Sponsor’s Master Street Plan (if applicable), latest edition of AASHTO, “A Policy on Geometric Design of Highways and Streets”; the latest edition of NACTO, “Urban Bikeway Design Guide”; and ARDOT policies, current AREMA publications as appropriate and policies. Other appropriate AASHTO publications and guide specifications shall also be utilized. Upon completion of the contract, the Consultant shall furnish to the Sponsor all electronic files of the project design and plans, Adobe Acrobat PDF file format & AutoCad/Civil 3D file format. 12.3. All plans and surveys shall be in U.S. Foot Units and based on Arkansas State Plane Grid, localized in the existing Sponsor’s Control Network, with ties to ARDOT control points. 12.4. In addition, all design surveys and/or land surveys required and agreed upon by the ARDOT, shall be performed to Arkansas minimum standards. All survey work shall be supervised and certified (stamped) by a Professional Land Surveyor registered in Arkansas . ON-CALL LP SERVICES (2025-2028) JOB 040993, TASK ORDER NO. 060 CRAFTON, TULL & ASSOCIATES, INC. SCOPE OF WORK ATTACHMENT A - PAGE 5 OF 6 12.5. Construction specifications shall be the current edition of the Sponsor’s Standard Specifications, supplemented by the 2014 Arkansas Department of Transportation Specifications for Highway Construction. 12.6. Coordinate design and construction with franchise utility companies' relocations and/or new locations to assure adequate space for all facilities and timely relocations. 12.7. Provide right of way acquisition documents and engineering services required for acquisition of rights of way and easements, as needed. 13.TASK ORDER COORDINATION 13.1. Coordination meetings will be conducted on an as needed basis. These meetings shall include the Consultant, the Sponsor, ARDOT and others, as appropriate. The Consultant shall schedule these meetings with the Sponsor and ARDOT concurrence, and compile and distribute meeting minutes, as required. TITLE I DELIVERABLES: 14.DESIGN (10%) 14.1. Map(s) for Design 14.2. Cost Estimates 14.3. Design Criteria 15.CONCEPTUAL DESIGN PHASE (30%) 15.1. 30% Complete Plans 16.PRELIMINARY DESIGN PHASE (60%) 16.1. 60% Complete Plans 16.2. Meeting Minutes from Coordination Meetings 17.FINAL DESIGN PHASE (90/100%) 17.1. 90% Complete Design Plans 17.2. Final Design Plans signed and sealed by an Arkansas Registered Professional Engineer 17.3. Provide Special Provisions and complete Project Manual for bidding 17.4. Provide construction cost estimate 17.5. Meeting Minutes from Coordination Meetings ON-CALL LP SERVICES (2025-2028) JOB 040993, TASK ORDER NO. 060 CRAFTON, TULL & ASSOCIATES, INC. SCOPE OF WORK ATTACHMENT A - PAGE 6 OF 6 17.6. Electronic files of the project design and plans in AutoCad/Civil 3D format that is fully indexed (all reference files attached and set to load automatically.) This includes the electronic copies of project submittals, electronic files of the Project Manual, Special Provisions, design calculations, drainage report, geotechnical report, cost estimates, etc. in Adobe Acrobat PDF format and in Word and Excel format (if applicable). TITLE I SERVICES HOURS SALARY FIXED FEE EXPENSES TOTAL PROJECT MANAGEMENT 52 $8,669 $1,034 $0 $9,703 ROADWAY DESIGN & PLANS 760 $93,515 $11,158 $0 $104,673 SUBTOTAL TITLE I 812 $102,184 $12,192 $0 $114,376 TOTAL TITLE I 812 $102,184 $12,192 $0 $114,376 TOTAL PROJECT 812 $102,184 $12,192 $0 $114,376 Job No. 040993: Fayetteville M.L.K. Ped. Impvts. (TAP-24) (S) Task Order No. 060 Attachment B - Justification of Costs and Fees December 22, 2025 PROJECT SUMMARY 1 of 4 PROJECT MANAGEMENT TASK ADMIN IV ENGR CAD TECH II PROJ. ENGR. SR ENGR. MNGR. CAT5 CAT6 CAT7 TOTAL General Item 1 - Project Kickoff Meeting 2 2 4 Item 2 - 30/60/90/Final Coordination 24 24 Item 3 - Monthly Billings 10 10 20 Item 4 - Project Closeout 4 4 TOTAL MH - PROJECT MANAGEMENT 10 0 2 40 0 0 0 52 Category - Description Rate MH Amount Administrative IV $30.08 10 $301 Engineering CAD Tech II $29.82 0 $0 Project Engineer $48.64 2 $97 Sr. Engineering Manager $76.38 40 $3,055 Subtotal $3,453 Overhead 149.65%$5,167 Subtotal $8,620 Fixed Fee $1,034 FCCM 1.43%$49 Subtotal Labor Costs $9,703 ITEM Quantity Unit Rate Amount Printing (8 1/2 x 11 B&W)each $0.00 $0.00 Printing (11 x 17 B&W)each $0.00 $0.00 Printing (8 1/2 x 11 color)each $0.00 $0.00 Printing (11 x 17 Color)each $0.00 $0.00 Mileage (provide a basis for the estimate)miles $0.700 $0.00 Lodging - statewide (x nights / x persons)night $132.00 $0.00 Meals - 1st day & last day travel Statewide Lunch/Dinner (# persons)day $51.00 $0.00 Meals - Statewide B/L/D (# days x # persons)day $68.00 $0.00 (Other direct expenses - detail here and the billing units)each $0.00 $0.00 Subtotal Expenses $0.00 Subtotal Expenses (rounded)$0 TOTAL COSTS - PROJECT MANAGEMENT $9,703 LABOR COSTS EXPENSES MANHOURS Attachment B - Justification of Costs and Fees December 22, 2025 Task Order No. 060 Job No. 040993: Fayetteville M.L.K. Ped. Impvts. (TAP-24) (S) 2 of 4 ROADWAY DESIGN & PLANS TASK ADMIN IV ENGR CAD TECH II PROJ. ENGR. SR ENGR. MNGR. CAT5 CAT6 CAT7 TOTAL Preliminary Layout 8 4 12 30% Design Phase Define Design Criteria 4 4 8 30% Plans - Title, Typical, P&Ps 40 20 8 68 Submit 30% Plans 4 4 60% Design Phase Corrections per 30% Comments 16 4 20 Drainage Design 20 4 24 Hydraulic Analysis 20 8 28 Utility Coordination 24 8 32 60% Plans - 30% + Drainage/Grading + Erosion + Details 80 40 40 160 60% Estimate 4 4 8 Submit 60% Plans 4 4 90% Design Phase Corrections per 60% Comments 20 8 4 32 90% Plans - Full set 80 40 40 160 Special Provisions 20 8 28 Floodplain Development Permit (No-Rise)40 16 56 90% Construction Cost Estimate/Quantities 8 8 8 24 Submit 90% Plans 8 8 100% Design Phase Corrections per 90% Plans 24 24 20 68 Final Construction Cost Estimate 4 4 8 Submit 100% Plans + Authorization to Advertise 8 8 TOTAL MH - ROADWAY DESIGN & PLANS 0 280 280 200 0 0 0 760 Attachment B - Justification of Costs and Fees December 22, 2025 Job No. 040993: Fayetteville M.L.K. Ped. Impvts. (TAP-24) (S) Task Order No. 060 MANHOURS 3 of 4 ROADWAY DESIGN & PLANS TASK ADMIN IV ENGR CAD TECH II PROJ. ENGR. SR ENGR. MNGR. CAT5 CAT6 CAT7 TOTAL Attachment B - Justification of Costs and Fees December 22, 2025 Job No. 040993: Fayetteville M.L.K. Ped. Impvts. (TAP-24) (S) Task Order No. 060 MANHOURS Category - Description Rate MH Amount Administrative IV $30.08 0 $0 Engineering CAD Tech II $29.82 280 $8,350 Project Engineer $48.64 280 $13,619 Sr. Engineering Manager $76.38 200 $15,276 Subtotal $37,245 Overhead 149.65%$55,737 Subtotal $92,982 Fixed Fee $11,158 FCCM 1.43%$533 Subtotal Labor Costs $104,673 ITEM Quantity Unit Rate Amount Printing (8 1/2 x 11 B&W)each $0.00 $0.00 Printing (11 x 17 B&W)each $0.00 $0.00 Printing (8 1/2 x 11 color)each $0.00 $0.00 Printing (11 x 17 Color)each $0.00 $0.00 Mileage (provide a basis for the estimate)miles $0.700 $0.00 Lodging - statewide (x nights / x persons)night $132.00 $0.00 Meals - 1st day & last day travel Statewide Lunch/Dinner (# persons)day $51.00 $0.00 Meals - Statewide B/L/D (# days x # persons)day $68.00 $0.00 Subtotal Expenses $0.00 Subtotal Expenses (rounded)$0 TOTAL COSTS - ROADWAY DESIGN & PLANS $104,673 EXPENSES LABOR COSTS 4 of 4 Crafton, Tull Associates, Inc.Master Rates Attachment C Classification 2025 Max. Hourly Rate Engineering Principal $122.00 Sr. Engineering Manager $103.00 Engineering Manager $84.00 Sr. Project Engineer $78.00 Project Engineer $55.00 Engineer Intern III $52.00 Engineer Intern II $49.00 Engineer Intern I $47.00 Sr. Engineering Designer $73.00 Engineering Designer III $52.00 Engineering Designer II $47.00 Engineering Designer I $35.00 Engineering CAD Technician III $34.00 Engineering CAD Technician II $33.00 Engineering CAD Technician I $26.00 Environmental Manager $75.00 Sr. Environmental Scientist $55.00 Environmental Scientist II $40.00 Environmental Scientist I $32.00 Environmental Field Technician $25.00 Sr. Planning Manager $90.00 Planning Manager $74.00 Sr. Planner $68.00 Project Planner $60.00 Planner II $45.00 Planner I $32.00 Sr. Landscape Architect $65.00 Landscape Architect Manager $66.00 Landscape Designer II $38.00 Landscape Designer I $35.00 Sr. GIS Manager $60.00 GIS Manager $47.00 GIS Analyst $37.00 GIS Technician II $29.00 GIS Technician I $23.00 Surveying Principal $116.00 Sr. Surveying Manager $87.00 Surveying Manager $68.00 Sr. Project Surveyor $60.00 Project Surveyor $55.00 Survey Coordinator $52.00 1 of 1 Crafton, Tull Associates, Inc.Master Rates Attachment C Classification 2025 Max. Hourly Rate Surveyor Intern II $44.00 Surveyor Intern I $35.00 Crew Chief II $45.00 Crew Chief I $35.00 Field Surveyor III $32.00 Field Surveyor II $29.00 Field Surveyor I $25.00 Survey CAD Technician III $45.00 Survey CAD Technician II $32.00 Survey CAD Technician I $29.00 Administrative Principal $116.00 Administrative Manager $82.00 Administrative IV $58.00 Administrative III $52.00 Administrative II $36.00 Administrative I $21.00 2 of 2 ATTACHMENT D Schedule Job. No. 040993 – Fayetteville MLK Ped. Impvts. (Tap-24)(S) Notice to Proceed: January 2026 Project Kickoff Meeting: February 1, 2026 30% Design Package: Delivered March 1, 2026 (4 weeks) 30% Plan review (2 weeks) 60% Design Package: Delivered May 1, 2026 (6 weeks) 60% Plan review (2 weeks) Utility coordination April – June 2026 ROW Acquisition Documents: July 2026 90% Design Package: Delivered August 1, 2026 90% Plan review (2 weeks) Final Plans/Authorization to Advertise: October 1, 2026 Doc Express@ Document S Contract: CC - On-Call Local Federal igning History Aid Projects (2025-2028) - Crafton, Date Signe( 04tL412026 Brandi Mayhan Arkansas Department of Transpoftation Electron ic Sig natu re (Signed by Sponsor) 041L412026 Brandi Mayhan Arkansas Depa rtment of Tra nsportation Electron ic Sig natu re (Signed by Consultant) 041L512026 Jessica Jackson Arka nsas Depa rtment of Tra nsportation Electron ic Sig natu re (Reviewed by Consultant Contracts Division Head) 04t23t2026 David Siskowski Arkansas Department of Transportation Electronic Signature (Reviewed by Division) 04t28t2026 Keli Wylie Arka nsas Depa rtment of Transportation Electronic Signature (Signed by ACE) Doc Exp ress@ Document S Contract: CC On-Call Local Federal Tull & Asso igning History Aid Projects (2025-2028) - Crafton, 60 Date Signed By Brandi Mayhan Arkansas Depa rtment of Transportation Electronic Signature (Signed by Sponsor) 041L412026 04tL412026 Brandi Mayhan Arkansas Depa rtment of Transportation Electronic Signature (Signed by Consultant) 04fts12026 Jessica Jackson Arkansas Department of Transportation Electron ic Sig natu re (Reviewed by Consultant Contracts Division Head) 04t23t2026 David Siskowski Arkansas Department of Transportation Electronic Signature (Reviewed by Division) Keli Wylie Arkansas Department of Transportation Electron ic Sig natu re (Signed by ACE) 04t2812026