HomeMy WebLinkAbout087-26 RESOLUTION1 13 West Mountain Street
Fayetteville, AR 72701
(47e) 575-8323
Resolution z 87 -26
File Number: 2026-865
A RESOLUTION TO APPROVE AMENDMENT NO. 6 TO THE PROFESSIONAL ENGINEERING
SERVICES AGREEMENT WITH HAWKINS-WEIR ENGINEERS, INC. IN THE AMOUNT OF $I23,3OO.OO
FOR CONSTRUCTION OBSERVATION SERVICES ASSOCIATED WITH THE PROJECT TO
ALLEVIATE FLOODING NEAR THE NORTH COLLEGE AVENUE AND EAST SUNBRIDGE DRIVE
INTERSECTION
WHEREAS, on September 17,2019, the City Council passed Resolution 2ll-19 to authorize Mayor Jordan to sign a
Professional Engineering Services Agreement with Hawkins-Weir Engineers, lnc. for conceptual drainage design
services to alleviate the flooding at the intersection of North College Avenue and East Sunbridge Drive; and
WHEREAS, Amendment No. 6 provides for additional construction phase services.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section l: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Rawn to sign
Amendment No. 6 to the Professional Engineering Services Agreement with Hawkins-Weir Engineers, Inc. in an
amount of $123,300.00 for additional construction phase services associated with the Sunbridge and College Phase I
Drainage Improvements.
PASSED and APPROVED on April 7,2026
Approved:Attest:
Molly Mayor Kara Paxton,
Page 1,
CITY COUNCIL MEMO
2026-865
MEETING OF APRIL 7, 2026
TO: Mayor Rawn and City Council
THROUGH: Keith Macedo, Chief of Staff
Chris Brown, Public Works Director
FROM: Alan Pugh, Stormwater Manager
SUBJECT: Approval of a contract amendment #6 with Hawkins Weir Engineers, Inc. in the
amount of $123,300 for additional construction phase services associated with the
Sunbridge and College Phase I Drainage Improvements
RECOMMENDATION:
Staff recommend approval of a contract amendment #6 with Hawkins Weir Engineers, Inc. in the amount of
$123,300 for additional construction phase services associated with the Sunbridge and College Phase I
Drainage Improvements
BACKGROUND:
This project has been identified as one of the projects to be funded by the 2019 Drainage Bond Program.
Hawkins Weir was selected for this project by RFQ 19-01 selection #15 with the original contract being
approved through resolution 211-19. That contract included conceptual drainage work to determine the
impacts of proposed detention basins and the original proposed routing. Subsequently the contract was
amended to include an investigation of alternative storm drain routing, additional design services to include
deductive alternates prior to bidding the project and construction phase services.
DISCUSSION:
Hawkins-Weir Engineers Inc has provided a proposed scope and an additional fee/reimbursables in the
amount of $123,300 to complete additional construction phase services. The proposed contract amendment
includes construction phase services as noted on the attached scope of work but generally includes site visits,
construction observation responding to contractor requests, issuance of necessary change orders, etc… This
also includes construction staking for the services previously provided within the contractor bid.
The City has recently taken steps to bring in additional forces to complete items such as the installation of curb
and gutter, driveways, sidewalk, driveways, paving, topsoil and sod to complete the project. The completion
schedule provided by the current contractor was not acceptable given the disruption to the neighborhood to
date as it was projected to be several months beyond the required completion date. This created the need for
additional construction staking to aid City forces and other contractors to complete portions of the work. The
contract will be paid based on hourly rates for work completed, up to the total contract amount.
BUDGET/STAFF IMPACT:
The design for this project will be paid for with the funds from the 2019 Drainage Bond Project
Mailing address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
ATTACHMENTS: 3. Staff Review Form, 4. 2019070 Amendment No. 6 - Mar 2026
Mailing address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
City of Fayetteville, Arkansas 113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323 Legislation Text
File #: 2026-865
A RESOLUTION TO APPROVE AMENDMENT NO. 6 TO THE PROFESSIONAL
ENGINEERING SERVICES AGREEMENT WITH HAWKINS-WEIR ENGINEERS, INC. IN
THE AMOUNT OF $123,300.00 FOR CONSTRUCTION OBSERVATION SERVICES
ASSOCIATED WITH THE PROJECT TO ALLEVIATE FLOODING NEAR THE NORTH
COLLEGE AVENUE AND EAST SUNBRIDGE DRIVE INTERSECTION
WHEREAS, on September 17, 2019, the City Council passed Resolution 211-19 to authorize Mayor
Jordan to sign a Professional Engineering Services Agreement with Hawkins-Weir Engineers, Inc. for
conceptual drainage design services to alleviate the flooding at the intersection of North College Avenue
and East Sunbridge Drive; and
WHEREAS, Amendment No. 6 provides for additional construction phase services.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Rawn to
sign Amendment No. 6 to the Professional Engineering Services Agreement with Hawkins-Weir
Engineers, Inc. in an amount of $123,300.00 for additional construction phase services associated with
the Sunbridge and College Phase I Drainage Improvements.
Page 1
City of Fayetteville Staff Review Form
2026-865
Item ID
4/7/2026
City Council Meeting Date - Agenda Item Only
N/A for Non-Agenda Item
Chris Brown
Submitted By
3/13/2026 STORMWATER MANAGEMENT (740)
Submitted Date Division / Department
Action Recommendation:
Approval of a contract amendment #6 with Hawkins Weir Engineers, Inc. in the amount of $123,300 for additional
construction phase services associated with the Sunbridge and College Phase I Drainage Improvements.
Budget Impact:
4704.860.7415-5860.02 Sales Tax Capital
Account Number Fund
46040.7415.1000 Sunbridge and College Phase I
Project Number Project Title
Budgeted Item? Yes Total Amended Budget $ 3,351,584.00
Expenses (Actual+Encum) $ 2,809,182.30
Available Budget $ 542,401.70
Does item have a direct cost? Yes Item Cost $ 123,300.00
Is a Budget Amendment attached? No Budget Amendment
Remaining Budget $ 419,101.70
Purchase Order Number: Previous Ordinance or Resolution # 204-24
Change Order Number: Approval Date:
Original Contract Number:
Comments:
AMENDMENT NO. 6
TO THE
AGREEMENT For PROFESSIONAL ENGINEERING SERVICES
BETWEEN
CITY OF FAYETTEVILLE, ARKANSAS
AND
HAWKINS-WEIR ENGINEERS, INC.
In accordance with the AGREEMENT For PROFESSIONAL ENGINEERING SERVICES for the
Sunbridge/College, Phase 1 Drainage Project (HW Project No. 2019070), dated September 17, 2019,
between the City of Fayetteville, Arkansas (hereinafter called Owner) and Hawkins-Weir Engineers, Inc.
(hereinafter called Engineer), Owner hereby authorizes Engineer to proceed with engineering services as
modified by this Amendment No. 6.
SECTION 1 – SCOPE OF SERVICES
1.1 The City of Fayetteville Engineering Department has directed the Engineer to amend services
included in the AGREEMENT for the PROJECT. These amended services include the additional services
necessary to complete Construction Phase Services (Task 5). Detailed services included in AMENDMENT
NO. 6 are included in the attached Appendix A, Scope of Services.
SECTION 2 – TIME OF SERVICE
2.1 The additional scope of services defined as Task 5 above will be completed within 210 calendar
days added to the 1,490 calendar days provided in the AGREEMENT and previous AMENDMENT Nos.
1, 2, 3, 4, AND 5.
SECTION 3 – COMPENSATION
3.1 Owner shall compensate Engineer for providing the services set forth herein in accordance with the
terms of the Agreement. Total payment for Scope of Services described herein shall not exceed One
Hundred Twenty-Three Thousand Three Hundred and 00/100 Dollars ($123,300.00) without written
Amendment No. 6 -Mar 2026 .docx Page 1 of 2 March 4, 2026
approval of Owner. These additional services adjust the Agreement's not to exceed fee to $752,740.00 and
the not to exceed reimbursable expenses to $24,300.00, for a total contract amount of $777,040.00.
Attachments Appendix A, Scope of Services dated March 4, 2026
Appendix B, Fee Proposal Breakdown dated March 2026
AUTHORIZATION BY:
CITY OF FAYETTEVILLE, ARKANSAS
Honorable Rawn, Mayor
sere . 04107 12026
ACCEPTED BY:
HAWKINS-WEI R ENGINEERS, INC.
By
J. Kyle Sdlyer, P.E., {S.
Vice President
Date 0310412026
Amendment No 6 - Mar 2026.docx Page 2 of 2 March 4, 2026
Appendix A
Amendment No. 6 Scope of Services
Sunbridge Drive and College Avenue
Drainage Improvements
City of Fayetteville, Arkansas
HWEI Project No. 2019070
March 4, 2026
Hawkins-Weir Engineers, Inc. (HW) proposes to provide the following additional services
necessary to complete the Construction Phase Services.
Task Description:
Task 5 – Construction Phase Services (Items 1 through 10 were Included in Amendment Nos. 3
and 5)
1. Conduct a Pre-Construction Conference with the Owner and Contractor
2. Conduct a field survey to establish control monumentation
3. Prepare, review, and coordinate the dissemination of construction documentation
including material submittals, testing results, field orders, and change orders as directed
by the Owner
4. Provide a weekly project site visit during the construction of the public utilities, street, and
drainage improvements (based on 1 hour per week and a construction period of 52
weeks)
5. Assist the Owner with preparation of monthly pay requests (based on 12-month
construction period)
6. Coordinate and conduct a final inspection with the Owner and the Contractor, and
prepare a punch list of deficient construction items for the Contractor to address
7. Conduct as-built surveys of the completed water and sanitary sewer improvements
8. Conduct as-built surveys of the completed drainage improvements
9. Prepare Record Drawings of the completed project and provide one (1) reproducible hard
copy and one (1) electronic copy for the Owner’s archives
10. Provide part-time construction observation of the construction activities (based on 360
days contract time)
11. Provide part-time construction observation of the construction activities (based on
an additional 210 days contract time, 90 under current project including previously
accepted change orders, 120 days to complete new work)
12. Provide construction staking for roadway improvements (based on an initial
staking over five (5) days which can be split up as requested by the Contractor and
an additional two (2) days to reset any stakes damaged during construction, any
additional re-staking due to damage not included).
2019070\Scope of Services – Amendment No. 6.docx
Appendix B
Amendment No. 6 Fee Proposal
Sunbridge Drive and College Avenue
Drainage Improvements
City of Fayetteville, Arkansas
HWEI Project No. 2019070
March 2026
Task 5 - Construction Phase Services Engr Engr Tech Tech Insp Surveyor GPS
VII V IV I II Survey
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
TOTAL HOURS = 0 0 0 0 0 0 0
Conduct a field survey to establish control monumentation
Conduct Pre-Construction Conference with the Owner and Contractor
Provide a weekly project site visit during construction of the improvements (1)
Prepare, review, and coordinate the dissemination of construction documentation including
material submittals, field orders, and change orders as directed by the Owner
Provide part-time construction observation of the construction activities (based on 360
days)
Assists the Owner with preparation of Monthly Pay Requests
Conduct as-built surveys of completed drainage improvements
Prepare record Drawings of the completed project and provide one (1) reproducible hard
copy and one (1) electronic copy for the Owner’s archives
Conduct as-built surveys of completed water and sanitary sewer improvements
Coordinate and conduct a final inspection with the Owner and Contractor, and prepare a
punch list of deficient construction items for the Contractor to address
Task 5, Items 1 through 10
Were Included in
Amendment No. 3 and No. 5
Task Subtotal
Task 5 - Construction Phase Services Engr
VII
Engr
V
Tech
IV
Tech
I
Insp
II
Surveyor GPS
Survey
11. Provide part-time construction observation of the construction activities (1,2) 180 600
12. Provide Construction Staking (3) 16 56
TOTAL HOURS = 0 180 0 0 600 16 56
Task Subtotal $123,300
(1) Based on an additional 210-calendar day Contract Time. Based on 6-hours per week through the substantial completion date for Eng. V.
(2) Based on an additional 210-calendar day Contract Time. Construction Part-Time Inspection is based on 20-hours per week through the 210 days.
(3) Based on an initial staking over five (5) days which can be split up as requested by the Contractor and an additional two (2) days to reset any stakes damaged during
construction, any additional re-staking due to damage not included.
Engineering Services Summary
Task 5 Construction Phase Services (Items 11 and 12)
Total Amendment No. 6 Fee - Not to Exceed
$123,300
$123,300
2019070\Scope of Services and Fee Proposal Amendment No. 6.xlsx