Resolution: 47-26
File Number: 2026-191
A RESOLUTION TO APPROVE THE PURCHASE AND INSTALLATION OF A 10-TON HVAC SYSTEM
IN THE AMOUNT OF $79,797.50 FROM ELITE BUILDING SOLUTIONS FOR THE YVONNE
RICHARDSON COMMUNITY CENTER, PURSUANT TO RESOLUTION 265-21, AND TO APPROVE A
BUDGET ADJUSTMENT
WHEREAS, on November 11, 2021, City Council passed Resolution 265-21 authorizing a contract with Elite Building
Solutions for HVAC on call services; and
WHEREAS, the YRCC has a 25-ton HVAC unit that is approaching the end of its life cycle and does not have
dehumidification built in; and
WHEREAS, the recent YRCC expansion and remodel project included a new hardwood floor in the gym area and the
humidity in this space needs to be controlled for the preservation of the flooring.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes the purchase and installation of
a 10-ton HVAC system in the amount of $79,797.50 from Elite Building Solutions for the Yvonne Richardson
Community Center, pursuant to Resolution 265-21.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of
which is attached to this Resolution.
PASSED and APPROVED on February 17, 2026
Approved:
_______________________________
Molly Rawn, Mayor
Attest:
_______________________________
Kara Paxton, City Clerk Treasurer
City of Fayetteville Staff Review Form
2026-191
Item ID
2/17/2026
City Council Meeting Date - Agenda Item Only
N/A for Non-Agenda Item
Byron Humphry 1/28/2026 PARKS OPERATIONS (521)
Submitted By Submitted Date Division / Department
Action Recommendation:
A resolution to accept a quote from Elite Building Solutions and authorize the purchase and install of a 10-ton HVAC
system for the YRCC for $79,797.50 and approval of a budget adjustment.
Budget Impact:
2250.520.9255-5400.00 Parks Development
Account Number Fund
24010.7540.2601 Parks Maint & Impr - YRCC HVAC
Project Number Project Title
Budgeted Item?No Total Amended Budget $-
Expenses (Actual+Encum)$-
Available Budget $-
Does item have a direct cost?Yes Item Cost $79,797.50
Is a Budget Adjustment attached?Yes Budget Adjustment $80,000.00
$171.00 Remaining Budget $202.50
V20221130
Purchase Order Number:Previous Ordinance or Resolution #Res 265-21
Change Order Number:Approval Date:
Original Contract Number:
Comments:Elite Building Services is the City on-call HVAC vendor, per Res 265-21
2/17/26
Page 1
City of Fayetteville, Arkansas
Legislation Text
113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
File #: 2026-191
A RESOLUTION TO APPROVE THE PURCHASE AND INSTALLATION OF A 10-TON
HVAC SYSTEM IN THE AMOUNT OF $79,797.50 FROM ELITE BUILDING SOLUTIONS
FOR THE YVONNE RICHARDSON COMMUNITY CENTER, PURSUANT TO RESOLUTION
265-21, AND TO APPROVE A BUDGET ADJUSTMENT
WHEREAS, on November 11, 2021, City Council passed Resolution 265-21 authorizing a contract
with Elite Building Solutions for HVAC on call services; and
WHEREAS, the YRCC has a 25-ton HVAC unit that is approaching the end of its life cycle and does
not have dehumidification built in; and
WHEREAS, the recent YRCC expansion and remodel project included a new hardwood floor in the
gym area and the humidity in this space needs to be controlled for the preservation of the flooring.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes the purchase
and installation of a 10-ton HVAC system in the amount of $79,797.50 from Elite Building Solutions for
the Yvonne Richardson Community Center, pursuant to Resolution 265-21.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget
adjustment, a copy of which is attached to this Resolution.
Mailing address:
113 W. Mountain Street
Fayetteville, AR 72701
www.fayetteville-ar.gov
CITY COUNCIL MEMO
2026-191
MEETING OF FEBRUARY 17, 2026
TO: Mayor Rawn and City Council
THROUGH: Keith Macedo, Chief of Staff
Chris Brown, Public Works Director
FROM: Byron Humphry, Director of Park Operations and Facilities
SUBJECT: Approval of HVAC Quote from Elite Building Solutions for YRCC and a budget
adjustment
RECOMMENDATION:
A resolution to accept a quote from Elite Building Solutions and authorize the purchase and installation of a 10-
ton HVAC system for the YRCC for $79,797.50 and approval of a budget adjustment, pursuant to Bid 21-36,
On-Call HVAC Services (Res. 265-21).
BACKGROUND:
The YRCC has a 25 ton HVAC unit that is approaching the end of it’s life cycle. This old unit does not have
dehumidification built in. The recent YRCC expansion and remodel project included a new hardwood floor in
the gym area. The humidity in this space needs to be controlled for the preservation of the flooring.
DISCUSSION:
A 10 ton HVAC unit with dehumidification built-in is needed to control the temperature and humidity in the gym
at the YRCC. Elite Building solutions, the City's on-call HVAC vendor, has put together a proposal to add the
10-ton unit along with the associated ducting. This new unit will act as the primary unit and extend the life of
the existing unit and will also preserve the integrity and playability of the hardwood flooring.
BUDGET/STAFF IMPACT:
This project is needed as a result of the recent improvements made to the building and flooring in the YRCC
and the subsequent need for humidity control. It was not originally budgeted in the Parks Maintenance &
Improvements project, but sufficient funds are budgeted and available in the Neighborhood Park Development
project. Approval of the attached budget adjustment will move the funds from Neighborhood Park Development
to Parks Maintenance & Improvements.
ATTACHMENTS: 3. Staff Review Form, 4. Budget Adjustment, 5. Elite Building Solutions Quote
City of Fayetteville, Arkansas - Budget Adjustment (Agenda)
Budget Year Division
/Org2 PARKS OPERATIONS (521)
Adjustment Number
2026 Requestor:Byron Humphry
BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION:
A resolution to accept a quote from Elite Building Solutions and authorize the purchase and install of a 10-ton HVAC system
for the YRCC for $79,797.50 and approval of a budget adjustment.
COUNCIL DATE:2/17/2026
ITEM ID#:2026-191
Holly Black
1/28/2026 9:14 AM
Budget Division Date
TYPE:D - (City Council)
JOURNAL #:
GLDATE:
RESOLUTION/ORDINANCE CHKD/POSTED:/
v.202615TOTAL--
Increase / (Decrease)Project.Sub#
Account Number Expense Revenue Project Sub.Detl AT Account NameGLACCOUNTEXPENSEREVENUEPROJECTSUBATDESCRIPTION X
2250.520.9255-5315.00 (80,000)-02013 2401 EX Contract Services
2250.520.9255-5400.00 80,000 -24010 7540.2601 EX Building & Grounds - Maintenance
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
1 of 1
ELITE
JIEBUILDING
SOLUTIONS
FOR ALL OF YOUR COMMERCIAL HVAC NEEDS
Date: February 15, 2O26
City of Fayetteville
4O1 W mountain st
Fayetteville AR, 727O1
Elite Building Solutions
446 North 40th St.
Springdale, AR 72762
HVACR License # 2428360
Office: 479-770-5566
Fax: 479-927-1881
Reference: Yvonne Richardson center
Quote Number: JHQ2026004
To whom it may concern,
Elite Building Solutions is pleased to provide services
to install a new 10 -ton package unit on the west side of the
building. The new unit will be equipped with hot gas re -heat for
dehumidification control per Shane Lanning's specs. We will
also install 26" duct sock inside the building per the engineers'
specs. The square duct will come up the outside of the building
and enter through a new opening. The return will be installed
after we remove one of the existing louvers. The patching of the
outside of the building will be done by others not EBS. The pad
will have to be poured concrete by others also. Electrical and
plumbing are also excluded from this price. We will remove the
exhaust fans but someone else will have to frame and patch the
holes. The unit will come with a Bac-net controller factory
installed. We will not be able to put it on the existing Johnson
controls system. We will make the unit operate standalone off
of a wallstat and humdistat. Total price: $69,800.00 Price
excludes Taxes. Work to be performed during normal business
hours. Prices firm for (60) days. Please allow a 4-week lead time
on equipment, upon approval for logistics.
Price Break down:
Equipment: $20,500.00
Square duct: $28,000.00
Duct sock: $6,300.00
Crane: $3,500.00
Labor: $11,500.00
Bond: $3,192.00
Tax: $6,805.50
Total: $79,797.50
Regards, John Huffaker
Elite Building Solutions
Cell: 479-879-1592
Fax: 479-927-1881
Office: 479-770-5566
Execution by Authorized Representatives:
SUBMITTED BY: John Huffaker DATE: February 15, 2026
Molly Rawn
2/17/2026
Mayor