HomeMy WebLinkAbout2025-10-14 - Agendas - Final 1 Water, Sewer, and Solid Waste Committee 14 October 2025 5:30 P.M. City Hall Room 101 (Or immediately following City Council Agenda Session) Committee: Council Member Teresa Turk, Council Member Mike Wiederkehr, Council Member Scott Berna, Council Member Bob Stafford Copy to: Mayor Molly Rawn, Keith Macedo, Steve Dotson, Kara Paxton, Kit Williams, Chris Brown, Alan Pugh, Jonathan Curth, Terry Gulley, Peter Nierengarten, Brian Pugh, Corey Granderson, Drake Vineyard, Aaron Watkins, Cody Ashworth, Scott Murphy, Brian Rowland, Stephen Jeffus, Jim Jenks From: Tim Nyander, Utilities Director ______________________________________________________________________ CALL TO ORDER UPDATES PRESENTATIONS: 1. Overview of September’s WRRF Monthly Operations Scott Murphy – WRRF Project Manager, Inframark 2. Overview of September’s Water & Sewer Operations Tim Nyander – Utilities Director OLD BUSINESS: 3. Water & Sewer Rate Study and Impact Fee Study Update Stephen Dotson – Chief Financial Officer INFORMATION ONLY 4. West Transmission Waterline Update Corey Granderson – Utilities Engineer INFORMATION ONLY 2 NEW BUSINESS: 5. Waterline Condition Assessments – Engineering Amendment with RJN Group In response to historical failures on aging large-diameter waterlines in the Fayetteville system, the West Transmission Main project was expedited to install a critical third feed of treated water from Beaver Water District to Fayetteville. One goal of that project was to allow critical shut- downs and repairs on other water transmission lines that currently cannot be taken out of service due to demands for water usage in the system. Construction is progressing on-time and on-budget for the West Transmission line to be operational by Summer 2026. During this time, desktop review and planning for condition assessments of other aging large diameter waterlines has been underway with RJN Group (Resolution 245-24; October 1, 2024). This initial scope has identified the highest critical water transmission mains that should be targeted for field testing and data collection using various technologies. The proposed amendment with RJN Group will provide for ‘smart-ball’ inspection of the 36-inch diameter waterline from Beaver Water District (approximately 9.8 miles) as well as vibroacoustic inspection of approximately 8.7 miles of additional aging waterlines in town with diameters from 24-inch to 30-inch. The aim of these inspections is to further refine the areas of highest risk in our water transmission mains so that targeted repairs, rehabilitation, and replacements can proceed in the most cost-effective manner. The proposed contract amendment will allow for final planning, field coordination, preparation, and deployment of each scanning technology. It will also provide the subsequent detailed data analysis, reports, and recommendations for repair, rehab, and/or replacements along these alignments. Furthermore, a contingency is built into the fee to allow flexibility for additional field scans or other data collection if determined to be beneficial for the project to give actionable results. For example, if large portions of the 36-inch waterline from Beaver Water District are determined to have significant wall-loss using the ‘smart-ball’ technology, the team may elect to further investigate this line with additional deployment of the vibroacoustic analysis. Having contingency allows the project to only deploy the secondary scans in most-critical areas, thereby reducing scope and cost. The existing contract was able to omit soil testing that was originally scoped for a savings of $44,000 that will be applied towards Amendment 1 items. Therefore, the net contract increases for these services, including a $120,000 contingency is $890,113.00. Staff recommends approval of Amendment 1 to the Engineering Services Agreement with RJN Group for waterline condition assessments. STAFF REQUESTS THIS BE FORWARDED TO THE CITY COUNCIL FOR CONSIDERATION FOR APPROVAL 6. Environmental Consulting Operations, Inc. (ECO) Amendment No. 12 Discussion of Amendment No. 12 to the contract with Environmental Consulting Operations, Inc. in the amount of $63,500.00 for wetlands mitigation site monitoring and management for Woolsey Wet Prairie in 2026. The 2026 "Not to Exceed" cost of $63,500.00 represents a 6.6% decrease to the contract amount that was approved by the City Council for 2025. 3 Amendment No. 12 ECO Scope of Services Fee Estimate Part A - 2026 Project Administration & Management $4,000.00 Part B - 2026 Annual Ecological Restoration Monitoring $25,000.00 Part C - 2026 Annual Adaptive Management Strategy $32,000.00 Part D - 2026 Update Surplus Wetland Credit Tracking Ledger $0.00 Part E - 2026 Academic Research Project Guidance $2,500.00 Total $63,500.00 STAFF REQUESTS THIS BE FORWARDED TO THE CITY COUNCIL FOR CONSIDERATION FOR APPROVAL PRESENTATIONS September’s WRRF Report September’s Water & Sewer Operations Report ATTACHMENTS September’s WRRF Monthly Report September’s Water & Sewer Operations Report Amendment No.1 RJN Group ECO Amendment No. 12 ADJOURN Next Water, Sewer, Solid Waste Committee meets on Tuesday, November 11th, 2025, at 5:30 p.m. Inframark Monthly Report September 2025 2 | Page 2 Table of Contents Contents Inframark Monthly Report .............................................................................................. 1 September 2025 ........................................................................................................... 1 Executive Summary ....................................................................................................... 3 Compliance .................................................................................................................. 4 Financial ...................................................................................................................... 5 Hamestring .................................................................................................................. 6 Maintenance ................................................................................................................ 7 Pretreatment ................................................................................................................ 8 Biosolids Management .................................................................................................. 9 Appendix .................................................................................................................... 12 3 | Page 3 Executive Summary 1. Hamestring Lift Station:  Seal fail resulted in the flooding of the dry well and the systematic removal and service of the pumps 2. Noland Flow:  Recent storms resulted in record flows at Noland (41MGD) 3. Infiltration and Inflow:  Drainage basin smoke testing and inspection tentatively set for November 4. Woolsey Wet Prairie:  Focus on control of Reed Canary grass and Carpet Grass 5. BMS:  $22,000 in income from Hay, Fertilizer, and WTR 6. Training:  LO/TO  Hazard Recognition 7. Industrial Pretreatment:  Over $220,000 in surcharges for September 8. Financial:  Project is approximately $650,000 under budget for the year 9. Personnel:  One termination for Drug Policy violation 4 | Page 4 Compliance Paul R Noland: The Paul R Noland facility achieved perfect permit compliance for August 2025: Westside: The Westside facility achieved perfect permit compliance for August 2025 Biosolids Management Site (BMS): No effluent from Noland was been used to irrigate at BMS due to sufficient rainfall Sanitary Sewer Overflows (SSOs): 1- September 23, 2025 Hamestring Lift Station 10,000gal 5 | Page 5 Financial The Project continues to be well under budget for both the Maintenance and Chemical Rebateable accounts. Notable Expenses: 1- $11,106.74 Bypass pump rentals 2- $5418.30 Transfer switch repair Westside 3- $10,783.82 New Air Conditioner for the Noland Laboratory 4- $3936.11 New motor for LS18 5- $5394.68 Transfer switch repair Hamestring 6- $31,940 Oxygen for Noland ozone disinfection Cap Type Project Site Monthly Budget Monthly Expenses Annual Budget YTD Expenses YTD Balance Contract Months Passed % of Contract Year YTD Spend % Maintenance FAYETV 28,998.83$ 46,011.27$ 347,986.01$ 212,770.06$ 135,215.95$ 9 75% 61% Maintenance FYTNLD 61,923.31$ 87,107.59$ 743,079.72$ 298,061.07$ 445,018.65$ 9 75% 40% Maintenance FYTWSD 17,413.59$ 6,437.17$ 208,963.11$ 37,742.55$ 171,220.56$ 9 75% 18% Maintenance FYTLAB 8,169.04$ -$ 98,028.42$ 710.54$ 97,317.88$ 9 75% 1% Maintenance FYTLSM 12,661.89$ 13,089.34$ 151,942.74$ 16,620.85$ 135,321.89$ 9 75% 11% Total M&R 129,166.66$ 152,645.37$ 1,550,000.00$ 565,905.07$ 984,094.93$ 9 75% 37% Chemical FAYETV 8,419.02$ 1,016.06$ 101,028.20$ 5,973.57$ 95,054.63$ 9 75% 6% Chemical FYTNLD 17,977.74$ 45,097.76$ 215,732.82$ 286,125.73$ (70,392.91)$ 9 75% 133% Chemical FYTWSD 5,055.56$ 4,286.84$ 60,666.71$ 22,289.81$ 38,376.90$ 9 75% 37% Chemical FYTLAB 2,371.66$ -$ 28,459.86$ 100.00$ 28,359.86$ 9 75% 0% Chemical FYTLSM 3,676.03$ -$ 44,112.41$ 10,309.75$ 33,802.66$ 9 75% 23% Total Chemical 37,500.01$ 50,400.66$ 450,000.00$ 324,798.86$ 125,201.14$ 9 75% 72% Cap Summary as of September 2025 6 | Page 6 Hamestring On Sunday, September 28th at approximately 1:00am, the impeller on pump number 4 split/cracked during operation resulting in a seal fail on the pump. Within hours, several feet of water accumulated in the dry well of the station. The pump was isolated to stop the flow and the dry well pumped down over the next several hours. Maintenance and Operations staff have since removed each motor sequentially to be dried and serviced by local shops. As of this report, pumps 2,3,5,and 7 have been returned to service while we wait on parts (new impellers and wear rings) for the remaining pumps. In order to reduce the potential for recurrence, larger sump pumps are being installed, water level alarms are being reconfigured to call out on SCADA, and an annual PM has been added to inspect and service each impeller and volute. 7 | Page 7 Maintenance During a recent thunderstorm, lift station 56 (West Fork) received a lightning strike that caused considerable damage to the electrical equipment at the site. The breakers and variable frequency drives for pumps 2 and 3 were melted resulting in the loss of pumping capacity for our 2 largest pumps (100hp each). A bypass pump was immediately ordered and installed to prevent sewer overflows and remains in place as of this report. Once the City of West Fork completes their insurance claim, our staff will replace the damaged equipment and return the station to full operation. 8 | Page 8 Pretreatment For the month of September, surcharges for Tyson foods were considerably higher than any other month so far this year. The previous highest monthly charge was $106,535.23 Industrial Surcharges Industry Flow(MG) TSS (mg/l) BOD(mg) Surcharge Tyson Foods Inc. 6.837 2592.5 2292.5 $202,861.88 Hiland Dairy 1.678 1876 1576 $17,608.73 Total $220,470.61 Septic Charges Elkins BOD Loadings Hauler Loads Charges AR Portables 36 $1,800 Best Jet 10 $500 ABC Quick Pump 4 $200 Total $2,500 Influent Organic BOD Loading Loading Month Lbs. % of Design Dec-24 10897 36.7 Jan-25 12152 41 Feb-25 13180 44.4 Mar-25 12501 42.1 Apr-25 23277 78.5 May-25 10531 35.5 Jun-25 12231 41.2 Jul-25 15282 51.5 Aug-25 15523 52.3 Sep-25 13844 46.7 Oct-25 Nov-25 Dec-25 9 | Page 9 Biosolids Management Hay, fertilizer, and WTR sales were up again for the month of September. Water Treatment Res., Hay, and Fertilizer Sales: August Sales Weight Customer Amount Fertilizer 6.91 Bill Love 138.20 7.45 Bill Love 149.00 9.69 Bill Love 193.80 3.11 JB Smith 62.20 15.35 JB Smith 307.00 Hay 50.02 David Jackson 3751.50 WTR 15.50 Beaver Water District 503.75 12.80 Beaver Water District 416.00 12.54 Beaver Water District 407.55 11.64 Beaver Water District 378.30 11.25 Beaver Water District 365.63 15.25 Beaver Water District 495.63 13.09 Beaver Water District 425.43 11.01 Beaver Water District 357.83 14.23 Beaver Water District 462.48 19.05 Beaver Water District 619.13 17.62 Beaver Water District 572.65 17.55 Beaver Water District 570.38 17.61 Beaver Water District 572.33 19.45 Beaver Water District 632.13 18.22 Beaver Water District 592.15 17.98 Beaver Water District 584.35 16.93 Beaver Water District 550.23 18.11 Beaver Water District 588.58 17.72 Beaver Water District 575.90 17.87 Beaver Water District 580.78 17.67 Beaver Water District 574.28 16.94 Beaver Water District 550.55 16.75 Beaver Water District 544.38 10 | Page 10 16.86 Beaver Water District 547.95 17.62 Beaver Water District 572.65 12.64 Beaver Water District 410.80 11.88 Beaver Water District 386.10 13.68 Beaver Water District 444.60 12.63 Beaver Water District 410.48 $20,455.93 Hay Production: For September, growing conditions remained favorable, however, an army worm infestation reduced the hay quality on several of our fields. On advice from the County Extension Office, we have applied insecticide to control the worms, but hay production must be halted for several weeks to prevent toxicity issues. Woolsey Wet Prairie Below is a summary of our applications for the month: September: mostly lespedeza, reed canary grass, and carpet grass W2- spot sprayed 10 gallons of sulfo-sulfuron for Reed Canary grass control W2- manually removed over 100 seed heads from Reed Canary grass to prevent spread 11 | Page 11 Noteworthy Events On September 9th, Inframark hosted a cookout at the Westside Treatment Facility to show appreciation for our staff and City personnel. Over 75 people attended the event. 12 | Page 12 Appendix 13 | Page 13 Inframark Compliance Monthly Report Meeting Date: Project: Fayetteville, AR Report Date: September 2025 Facility: Noland WRRF Attending: Permit Compliance Parameter Monthly Actual Monthly Limit Percent Available Comments White River Flow, MGD 6.81 Effluent D.O., mg/L 15.05 11.00 37 Effluent pH max, S.U. 7.6 9.0 15 Effluent pH min, S.U. 7.5 6.0 25 Effluent Fecal Coliform, MPN 48 200 76 Effluent Ammonia, mg/L 0.07 0.5 86 Effluent Ammonia, lbs./ day 4.2 53 92 Effluent T-Phos, mg/L 0.19 1.0 81 Effluent T-Phos, lbs./ day 10.42 105 90 Effluent CBOD, mg/L 3.0 5.7 47 Effluent CBOD, lbs./ day 162 599 73 Effluent TSS, mg/L 1.4 5.0 72 Effluent TSS, lbs./ day 75 525 86 Effluent TDS, mg/L 298 500 40 Effluent TDS, lbs./ day 15,783 52,542 70 Effluent Sulfate, mg/L 45 119 62 Effluent Sulfate, lbs./ day 2,601 12,505 79 Effluent Nitrates, mg/L 6.4 Report Effluent Nitrates, lbs./ day 370 Report Influent Parameters Value Comments Influent Flow, MGD 7.48 Influent BOD, lbs./ day 13,844 Influent TSS, lbs./ day 12,907 Influent Ammonia, lbs./ day 1,153 Influent T-Phos, lbs./ day 233 14 | Page 14 Inframark Compliance Monthly Report Meeting Date: Project: Fayetteville, AR Report Date: September 2025 Facility: West Side WWRF Attending: Permit Compliance Parameter Monthly Actual Monthly Limit Percent Available Comments GC Discharge, MGD 10.72 Effluent D.O., mg/L 8.80 6.90 27.54 Effluent pH, min. S.U. 7.21 6.00 20.17 Effluent pH, max. S.U. 7.79 9.00 13.44 Effluent Fecal Coliform, MPN 30.45 200.00 84.77 Effluent CBOD, mg/L 1.98 5.30 62.69 Effluent CBOD, lbs./ day 180.70 442.00 59.12 Effluent TSS, mg/L 1.16 10.00 88.43 Effluent TSS, lbs./ day 107.43 834.00 87.12 Effluent Ammonia, mg/L 0.06 1.00 94.15 Effluent Ammonia, lbs./ day 5.65 83.40 93.22 Effluent T-Phos, mg/L 0.18 1.00 81.78 Effluent T-Phos, lbs./ day 15.27 83.40 81.69 Effluent Nitrate, mg/L 4.24 Possible Permit Limit Pending Influent Parameters Value Comments Influent Flow, MGD 10.7 Influent BOD lbs./ day 10,758.3 Influent TSS lbs./ day 13,844.0 Influent Ammonia lbs./ day 1,357.2 Influent T-Phos, lbs./ day 298.1 WATER/SEWER/METER OPERATIONS REPORT September 2025 WATER 71 work orders for distribution system maintenance completed. 32 hydrants repaired. 60 after-hours calls. 8” repair on North Independence Place. 2” main repair utilizing hydro excavation (left) and a leaking service saddle being replaced (right). Water main repair on top of Stone Mountain on East Crestline Place. This line was deep and required a large excavation! CONSTRUCTION 14 new service water and sewer taps 68 polyethylene services replaced; primarily on the east side of Fayetteville in the S Woodsprings area. SEWER 53, 457 feet of sewer mains washed. 29,644 feet of sewer main inspected via CCTV. 4 point repairs on sewer mains. 4,938 feet of sewer main inspected via smoke testing. 1 after-hours call. METER AND OTHER SERVICES 853 cellular meters installed 11,025 feet of water transmission main easement cleared 15 after-hours calls Easement near Van Asche that was cleared. YEAR TO DATE STATISTICS Water distribution system work orders completed – 887 Hydrants repaired – 63 Polyethylene water service lines replaced – 467 New service water/sewer taps – 146 Sewer mains washed/jetted – 727,782 feet Sewer mains inspected via CCTV – 259,110 Point repairs on sewer mains – 60 Total cellular meters in the system – 28,587 We conduct a group study session on Wednesday mornings. These study sessions are designed to help our employees pass their Water Distribution Operator exams. This gives an avenue for progression and promotion. DCN: OP-CON-02-20-R2 Page 1 of 16 R1605-CAC CITY OF FAYETTEVILLE, ARKANSAS AMENDMENT NO. 1 FOR PROFESSIONAL ENGINEERING SERVICES WITH RJN GROUP. INC. In accordance with the AGREEMENT for Professional Engineering Services dated October 1, 2024, between the City of Fayetteville, Arkansas (hereinafter called OWNER) and RJN GROUP, INC. (hereinafter called ENGINEER), OWNER hereby authorizes ENGINEER to proceed with the following services: Section I - Project Description Under the AGREEMENT, the OWNER retained RJN Group to provide professional engineering services. The Project involved planning, ascertaining methods of inspection, determining the level of effort, and developing cost estimates for assessing the condition of thirteen sections of critical waterlines, totaling approximately 47.3 miles of pipes. It has since been determined that additional services will be needed. Specifically, the additional services consist of certain condition assessment tasks, for certain waterlines, stemming from recommendations generated in the original scope of work. Section II - Scope The ENGINEER shall perform professional services utilizing the procedures identified in the original Scope of the AGREEMENT and as described in Exhibit A herein. Section III - Time of Service ENGINEER will proceed with providing the services set forth herein immediately upon execution of this Authorization and as described in Exhibit B herein. Section IV - Compensation OWNER shall compensate ENGINEER for providing these additional services a total sum not-to- exceed $890,113.00, as provided in the Compensation Table (Exhibit C) herein provided. All prices will remain firm for the initial term of the Agreement period. Any de- escalation/escalation in prices will be made on an annual basis thereafter at the sole discretion of the OWNER. Requests for price adjustments must be made by the ENGINEER in writing at least 60 days in advance. The baseline for determining price adjustments will be based upon the closing date of the solicitation. All requests for price increase or decrease are subject to review and approval by the ENGINEER. The maximum increase will have a ceiling of 10% annually and a net decrease of 10% annually. Changes in prices shall be based on the U.S. Bureau of Labor Statistics, Employment Cost Index, average increase or decrease for the most recent calendar year (see http://www.bls.gov/ECI; update with the appropriate ECI Index, CIU1010000100000A and Management, Professional, and Related). In consideration of the mutual covenants and Agreements herein contained, the OWNER and ENGINEER stipulate and agree that the Agreement for Professional Engineering Services dated October 1, 2024, is hereby amended as described in Exhibits A and B, attached hereto and made part of this agreement. All other provisions of the original Agreement remain in full force and effect. IN WITNESS THEREOF, the parties hereto have caused this AGREEMENT to be executed this day of ,20 . AUTHORIZED BY: CITY OF FAYETTEVILLE, Arkansas By: ___________________________________________________ Name: _______________________________________________ Title: _________________________________________________ Date: _________________________________________________ ACCEPTED BY: RJN Group, Inc. By: ___________________________________________ Name: _______________________________________ Title: _________________________________________ Date: _________________________________________ END OF AMENDMENT Daniel Jackson Sr. Vice President October 8, 2025 EXHIBIT A – SCOPE OF SERVICES RJN is proposing the following scope of services for the Water Main Assessment for the City of Fayetteville. A. Project Management and Meetings 1. Provide project management services including invoicing, scope, schedule, and fee tracking, and closeout services. 2. Provide monthly updates to City staff through the duration of the project. 3. Meet with City staff as necessary to discuss progress of the project. B. Pipeline Section 2 1. Preparatory Work, Data Review, and Planning a. Conduct a kickoff meeting with the City to discuss the project. b. Finalize determination of Pipers® launch and retrieval locations. c. Perform mock deployment planning. This may include planning for strategies/provisions such as a “dummy” Pipers multi-sensor, a clamp-on flowmeter, and/or other measures to finalize the preparation of the Pipers deployment and ensure its success. d. Prepare for a field planning visit. e. INGU Data Preparation i. Kickoff Meeting – RJN and INGU ii. INGU Deliverables iii. KMZ File of Water Main Paths 1. Mapping grade locates 2. Excel Elevation Profile(s) 3. Questionnaire(s) 2. Field Reconnaissance Visits and Equipment Preparation a. Meet with City staff on-site for site visit inspections. During visit, discuss any questions that arose during the data review process. b. Observe pump operations and take steps to measure travel time. c. Field assessment: i. Observe valve exercising by City staff to confirm operation, if possible. ii. Finalize methodology for inserting and catching Pipers. d. Discuss results of preliminary assessment with City. e. Following installation of valved taps by City, provide equipment and personnel to perform internal inspection of the water main and retrieval of the inspection tools. Customize catching devices as necessary. 3. Internal Inspections a. Contract with INGU on the rental of Pipers multi-sensors. b. Work with the City to assist in the Pipers launching. c. Perform up to three Pipers deployments, with a minimum of two successful capture and retrievals. Being that the Pipers ball is carried through the pipeline with the flow of water, the duration of time it stays within the pipeline is a function of the water velocity. We understand from the City that typical velocities in this pipeline are 2.5 fps to 3.7 fps. Thus the Pipers ball would likely need to stay in this pipeline for approximately four hours per deployment. 4. Data Evaluation and Technical Memorandum (TM) a. Review and analyze inspection results and recommendations. i. Pipers’ technology includes the following results: 1. Acoustic leak detection 2. Air and gas pocket detection 3. High resolution pressure sensing 4. Deposit, debris, and blockage locating 5. Magnetometer survey to detect variations in bulk wall thickness and internal corrosion, with a minimum wall loss threshold of 30%. The Pipers ball will ONLY be able to state “yes/no” for wall loss of 30% or greater at all points along the pipe. It does not give precise info about wall loss. (Pipes having wall losses of 30- 45% can be considered to be in “marginal” condition; beyond 45%, they can be considered to be in “distressed” condition.) The Pipers ball uses microelectromechanical systems (MEMS) magnetometers to measure the passive magnetic field within ferromagnetic pipelines. Metal loss has a significant impact on the magnetic structure of the pipeline, thereby influencing the passive magnetic field detected by the Pipers ball. Research has shown that metal loss features with a minimum depth of 30% of the nominal wall thickness consistently reduce axial and radial magnetic flux density (MFD). The average total MFD within each pipe segment is calculated and compared with the average total MFD of the parent pipeline. If the disparity exceeds an empirically determined threshold, the pipe segment is flagged as a potential candidate for containing a “metal loss” anomaly with a depth exceeding 30% of the nominal wall thickness. b. Include a summary of the work completed and results of the internal screening. c. Prepare a GIS map of the water main system, including findings from the site inspections, document review, and internal screening. d. Provide recommendations for further inspections, rehabilitation/repair, and/or maintenance of the water main. “Recommendations for further inspection”, if any, would likely entail Broadband Electro-Magnetic (BEM) inspection. This would likely be recommended in certain areas if Pipers detects wall loss of at least 30%. The BEM assessment is a non-destructive testing method of measuring wall thickness. Wall conditions are recorded along the area at which the hand scanning tool is placed. These recordings are converted using software and a calibration database to develop an apparent wall thickness. The original pipe wall thickness (“reference wall thickness”) is determined using industry handbook information that was current at the time the pipeline was constructed. Subtracting the measured wall thickness from the reference wall thickness yields a determination of wall loss. Although the BEM assessment can detect where internal and/or external wall loss has occurred, it cannot distinguish between internal and external wall loss. Compared with Pipers, the BEM would provide much more precise wall loss data at the point(s) where it is applied on the excavated pipe. It would also be appropriate during BEM inspection to make use of the excavated trench and perform soil corrosivity testing and visual inspection of the external pipe wall. The BEM and related tasks constitute the “Step 2” Condition Assessment action presented in the Water Line Condition Assessment Planning & Prep Report; “Step 2” would likely cost approximately 80% of the Pipers work (“Step 1”) proposed herein. This is based on the assumption that ten BEM excavations would be conducted for Pipeline Section 2. e. Include budgetary pricing and recommended timing (urgency) for implementation of recommendations. f. Technical Memorandum (TM) Submittal: i. Provide a digital draft of TM, ii. Revise draft based on City comments and submit a digital and two hard copies (if desired) of final TM. iii. Provide digital copies of all data, results, and photographs from inspections. iv. Submit a digital and two hard copies (if desired). C. Pipeline Sections 7, 8, 9A and 12 RJN is proposing the following scope of services for the “Advanced Vibroacoustic Analysis” (AVA) Condition Assessments: Water Transmission Pipeline Sections 7, 8, 9A, 12” project in the City of Fayetteville: 1. Preparatory Work & Data Review a. Conduct a kickoff meeting with the City to discuss the project scope, objectives, roles, and establish lines of communication for the duration of the work. b. Discuss project approach, schedule of work, and set expectations for the project. c. Share follow-up questions with the City for discussion. d. Visit the project area and investigate the access points. e. Prepare a confirmation list for the City to check accessibility to fire hydrants, valves, and vaults to meet project objectives. f. Ensure selected sites are acceptable and provide suitable locations concerning safety and equipment performance, adjust segment plans accordingly based on access availability and site conditions. 2. AVA powered by DRI™ Inspections 3. Provide all necessary AVA inspection equipment and a three-to-four-person crew to complete field work. a. Use external vibroacoustic sensors and data acquisition units at predefined access points (e.g., hydrants, valves, or hydro-excavated “potholes”) along each pipeline segment to enable AVA testing. b. Introduce Vibroacoustic signals into the water column using a centrally positioned wave generator between the sensors to excite the pipeline and capture its dynamic response. (AVA instrumentation contacts the metallic pipe/appurtenances, but does not contact the water column directly.) c. Measure the distance between access points to ensure appropriate resolution and segment coverage. d. Perform on-site and remote QA/QC of field data before demobilization to confirm data integrity. 4. Data Analysis, Report and Recommendations a. Determine if any leaks are present on the testing segments and inform the City of the location within three working days. b. Post-process the inspection data to assess localized pipe wall stiffness and identify structural anomalies using both time and frequency domain analyses. Correlate wall stiffness to wall loss averaged over the available resolution length. Post-inspection analysis in the time-frequency domain identifies and locates leaks and pipe wall distress and reports residual wall thickness for most iron pipes with a resolution of 20 to 30 feet, when access points are spaced at 1,000 feet or less. This capability will ensure that sub pipe stick levels defects are both detected and located, not lost in an average result over a longer resolution length. The AVA/Kenwave analysis is such that average pipe wall loss over the resolution length (20 to 30 feet) can be calculated to quantify and characterize wall loss as follows: “Good (Less than 5%)”, “Satisfactory (5% to 20%)”, “Sufficient (20% to 30%)”, “Marginal (30% to 40%)”, or “Distressed (Greater than 40%)”. We will use the calculated wall loss data and follow AWWA M28 guidelines to craft a recommended scope of improvements. c. Include a summary of the work completed and results of the AVA inspections delivered in a draft report including: i. A GIS map of the water main system, including findings from the AVA inspections. ii. Engineering recommendations for further inspections, rehabilitation/repair, and/or maintenance based on the inspection data. “Recommendations for further inspection”, if any, would likely entail Broadband Electro-Magnetic (BEM) inspection. This would likely be recommended in certain areas if AVA detects significant wall loss. While AVA provides precise wall loss data averaged across the entire circumference of the pipe along a resolution segment, BEM provides precise wall loss data at the exact point(s) on the pipe circumference where it is applied on the excavated pipe. It would also be appropriate during BEM inspection to make use of the excavated trench and perform soil corrosivity testing and visual inspection of the external pipe wall. The BEM and related tasks constitute the “Step 2” Condition Assessment action presented in the Water Line Condition Assessment Planning & Prep Report; “Step 2” would likely cost approximately 20% of the AVA work (“Step 1”) proposed herein. This is based on the assumption that four BEM excavations would be conducted for Pipeline Section 9A and two each would be conducted for Pipeline Sections 7, 8, and 12. iii. Budgetary pricing and recommended timing (urgency) for implementation of recommendations. d. Meet with City Staff to discuss findings and recommendations and revise draft accordingly. e. Submit a digital and two hard copies (if desired) of the final report. The basic inspection deliverable includes a condition assessment report with residual wall thickness, identified leaks, location of both leaks and pipe wall distress along the inspected watermain, and structural integrity grading 1-3 based on percent wall loss with supporting Excel tables and color-coded GIS shapefile. The report will include recommendations based on these findings. The recommendations may entail some combination of additional analysis (likely consisting of BEM and related tasks, as described above), repairs, rehabilitation, and/or replacements; all identified at specific portions of the pipeline. f. Provide digital copies of all inspection data, analysis results, and photographs from inspections, including GIS databases and shapefiles g. Upload final report and supporting documents to Clarity®. Clarity is RJN’s digital platform that unites powerful data analytics, smart AI automation, and GIS data management tools to deliver a single resource for monitoring and assessing system conditions and performance. D. Contingency This represents an allowance for unexpected issues that may arise during the course of the work and would necessitate appreciable additional effort. RJN would promptly notify the City if any such issues arise, and their related cost impact. Contingency funds could be used for subsequent AVA inspection of portions of Segment 2 should additional inspection data become necessary. In the Water Line Condition Assessment Planning & Prep Report, $44,000.00 was allocated for soil condition testing. However, as work on the report advanced it was determined that, all things considered, soil condition testing would not yet be a cost-effective expenditure, and RJN recommended that it not be performed as part of the Report. Thus, those related funds have not been, and will not be, spent as part of the Report contract. E. Items Requested from the City 1. Updated GIS geodatabases and/or shape files for the water distribution system. 2. Facilitating coordination with Beaver Water District. 3. Access to pipeline for inspection. Assistance locating and operating (i.e. opening and closing valves) facilities as required. 4. Excavation of pipes at Pipers launch and retrieval stations, sufficient for valved taps as described below. Related trench safety, backfill, compaction, and site restoration. 5. One valved pipeline tap at Pipers launch station and another one at retrieval station. Based on recent conversations with INGU, it is anticipated that a tap as large as 6” may be needed at the launch location (within BWD site) and a tap as large as 8” may be needed at the retrieval location (near Joyce Blvd. valve vault). Both locations are unpaved. These taps will need to be made at the 12 o’clock position on the pipe, a gate valve (full tap size) will need to be installed at the tapping flange, and a riser assembly projecting above the ground surface must be installed. (RJN will furnish and install the additional equipment needed for Pipers insertion and retrieval, as discussed above.) 6. Operation of valves as necessary for isolating the pipeline and launching the Pipers multi-sensor. 7. Assistance with traffic control in high traffic areas, as necessary. 8. Hydro-excavating (“potholing”) as necessary such that AVA equipment can access the pipe sufficiently. It is anticipated that a total of 22 potholes will be necessary (5 for Pipeline Segment 7, 7 for #8,10 for #9A, and 0 for #12). Further description, including cost projections, is provided in the Waterline Condition Assessment Planning & Prep Report. F. Map of All Involved Pipeline Sections G. Maps of Each Pipeline Section EXHIBIT B– PROPOSED SCHEDULE RJN is prepared to start work immediately upon an Agreement. Task Timeline Pipeline Section 2 Field Reconnaissance Visit To be completed within one month of NTP. Internal Inspections To be completed within two months of a successful Field Reconnaissance Visit. Technical Memorandum To be completed within three months of successful Internal Inspection. Pipeline Section 7, 8, 9A, 12 Site Investigation and Planning To be completed in early 2026 AVA Inspections To be completed within two months of site investigations, weather permitting (anticipated for Feb & March 2026) Preliminary Analysis Results To be completed within two months of successful inspections. Draft Report To be completed within two months of completion of analysis. EXHIBIT C – COMPENSATION SCHEDULE Pricing Terms for Invoicing: Lump Sum Original Contract Value: $267,380.00 Amendment Value: $890,113 Not-to-Exceed Total Project Cost: $1,157,493 This project will be invoiced on a lump sum, percent complete basis based on the Cost Schedule on the next page. Task Unit Price Units Fee Project Management $56,790 Pipeline Section 2 Preparatory Work, Data Review, and Planning $25,940 Field Reconnaissance Visits and Equipment Preparation $40,110 Internal Inspections $51,010 Data Evaluation and Technical Memorandum $30,450 Subtotal $147,499 Pipeline Section 7, 8, 9A, 12 Site Investigation and Planning Lump Sum $71,530 AVA Inspection $9/ft 45,417 ft $408,753 Analysis and Reporting Lump Sum $129,530 Subtotal $609,813 Total $814,113 Deletion of “Soil Corrosivity Testing (as needed)” -$44,000 Contingency $120,000 TOTAL NET AMENDMENT PRICE: $890,113 Proposal Option This Proposal can be amended to include additional work upon joint approval by the City and RJN. 092925 - ECO WWP Amendment No. 12 1 AMENDMENT NO. 12 TO AGREEMENT FOR ENVIRONMENTAL CONSULTING SERVICES BETWEEN CITY OF FAYETTEVILLE, ARKANSAS AND ENVIRONMENTAL CONSULTING OPERATIONS, INCORPORATED FOR WOOLSEY WET PRAIRIE ECOLOGICAL MONITORING AND MANAGEMENT ENVIRONMENTAL CONSULTING SERVICES THIS AMENDMENT NO. 12 to the Agreement For Professional Environmental Consulting Services, dated May 8, 2014 (the “Agreement”), by and between CITY OF FAYETTEVILLE, ARKANSAS (CITY) and ENVIRONMENTAL CONSULTING OPERATIONS, INC. (ECO) for environmental consulting services in connection with monitoring and ecological adaptive management of CITY’s wetland mitigation site known as Woolsey Wet Prairie (SITE) is made and entered into for purposes of continuity of SITE wetland habitat status in order to maintain surplus wetland credits generated at SITE and due to Corps of Engineers (Corps) regulatory requirements to manage and maintain wetland compensatory mitigation in perpetuity to assure SITE continues to meet ecological performance standards. WHEREAS, this AMENDMENT NO. 12 is a renewal of the May 8, 2014, Agreement that included a provision for automatic renewal of ECO’s annual Scope of Services beyond 2014 for additional 1-year terms upon mutual agreement by both CITY and ECO. Unless specifically stated, all other terms and conditions of the Agreement shall remain in full force and effect. Neither this Amendment nor the Agreement may be modified except in writing signed by an authorized representative of the CITY and ECO. NOW THEREFORE, the CITY and ECO agree to amend the Agreement for ECO’s Scope of Services as follows: 1. Part A - Project Administration & Management a) General administration and project management activities; b) Perform project initiation activities; c) Provide environmental regulatory and technical information to CITY; d) Meet with CITY, and/or CITY Contractors for information exchange, goal and timeline setting, reviewing management strategies, and action items; e) Perform internal project control including budgeting, scheduling, and quality control; f) Part A applies to January through December 2026. Renewal of ECO's annual Scope of Services will be reviewed by the City Council and amended upon approval for renewal of Part A services beyond 2026. 092925 - ECO WWP Amendment No. 12 2 2. Part B - Annual Ecological Restoration Monitoring a) Conduct qualitative monitoring activities throughout the growing season to maintain cumulative plant species lists, evaluations of seasonal hydrology and associated plant communities, and identification of stands of non-native / invasive plant species to be controlled; b) Observe and document total plant species richness for the mitigation SITE in historical comprehensive plant species lists; c) Record locations of concentrated stands of non-native and native invasive plant species and locations of rare Arkansas Natural Heritage Commission (ANHC) tracking plant species on wetland cell maps; d) Develop 2026 Woolsey Wet Prairie Adaptive Management Strategy & Monitoring Report No. 20 that is consistent with historical monitoring and management activities at Site in a format to be used for SITE adaptive management purposes; e) Part B applies to January through December 2026. Renewal of ECO's annual Scope of Services will be reviewed by the City Council and amended upon approval for renewal of Part B services beyond 2026. 3. Part C - Annual Adaptive Management Strategy a) Continued development and implementation of annual strategy for specific controls of invasive species via selection, coordination, and scheduling of time sensitive hydrology controls, herbicide applications, mowing, prescribed burning, and hand pulling; b) Make SITE visits throughout the growing season to make observations of hydrology, vegetation, and effectiveness of invasiv e vegetation control; c) Oversee selection, scheduling, and coordination of SITE adaptive management activities and provide guidance pertaining to SITE Deed-Restrictive Covenant restrictions to CITY and CITY’s Contractors associated with management of SITE; d) Provide restoration ecology advisory technical guidance to CITY and CITY’s Contractors associated with management of SITE for the purpose of implementation of adaptive management activities that are compliant with SITE permanent protection measures and restrictions specified in the CITY’s Corps Section 404 Permit; e) Document and maintain records of adaptive management activities implemented and the date of use; f) Make adjustments, as necessary, to timing and type of vegetation management to be implemented including, but not restricted to, hydrology management, mowing, herbicide applications, prescribed burning, and hand pulling of invasive plant species; 092925 - ECO WWP Amendment No. 12 3 g) Utilize wetland cell aerial photographs showing locations of concentrated stands of invasive and non-native plant species and locations of rare ANHC tracking plant species in order to target and prioritize areas for specific management activities; h) Develop herbicide application specifications that include specific types of herbicides to apply to specific invasive plant species by CITY contractors; i) Schedule and select type of herbicide, adjuvant, and application rate to be used for specific target non-native and invasive plant species at specific locations and document herbicide effectiveness; j) Coordinate, schedule, and observe areas where herbicide applications have been made to evaluate effectiveness for controlling invasive species by CITY contractors; k) Develop burn specifications that clearly identify prescribed Burn Contractor responsibilities as a part of CITY’s informal bid process that identify: SITE preparation, notifications, and Burn Contractor responsibilities; l) Coordinate, schedule, and observe prescribed burn to evaluate Burn Contractor’s conformance with state laws, notifications, and specifications; m) Part C applies to January through December 202 6. Renewal of ECO's annual Scope of Services will be reviewed by the City Council and amended upon approval for renewal of Part C services beyond 2026. 4. Part D - Update Credit Tracking Ledger for Surplus Wetland Credits a) SITE has generated surplus of wetland credits above those required by CITY’s Corps Section 404 permit for wetland compensatory mitigation. CITY has received Corps approval to use wetland credits to mitigate for wetland impacts caused by the CITY’s infrastructure improvement projects within Illinois River watershed HUC 11110103. b) At the time of development of this amendment under the 2025 Scope of Services, CITY has not utilized any surplus wetland credits for City infrastructure improvement projects requiring wetland compensatory mitigation. c) It is unknown at the current time, whether Part D services will be necessary for January through December 2026 and will be a function of whether or not surplus credit transactions occur. Should 2026 wetland credit transactions occur, ECO shall update wetland credit ledger accordingly for submittal to Corps at the end of 2026. 5) Part D applies to January through December 2026. Renewal of ECO’s annual Scope of Services will be reviewed by the City Council and amended upon approval for renewal of Part D services beyond 2026. 092925 - ECO WWP Amendment No. 12 4 5. Part E – Academic Research Project Review and Guidance a) During 2017, there was an increased interest in the SITE for academic research projects from various departments of the University of Arkansas ranging from herpetology to soil microbiology. While research projects at the site are exciting and encouraged, the need exists for guidance and oversight to ensure that all parties involved are made aware of the various requirements of the CITY’s Corps Section 404 permit and Deed Restricted Covenant for the SITE. Failure to manage research project activities at the SITE has the potential to result in the CITY not being in compliance with the terms and conditions of the CITY’s Corps Section 404 permit and the Deed Restricted Covenant for the SITE. b) ECO, Inc. has developed a research request form and academic research guidance document intended for use by proposed research projects that will provide project- specific relative information to ECO, Inc., CITY’s Contractors, and the CITY for review and approval, while also educating the applicant about the SITE Corps Section 404 permit requirements. ECO, Inc. will review academic research project proposals and provide project-specific guidance to parties conducting research at SITE. c) Part E applies to January through December 2026. Renewal of ECO's annual Scope of Services will be reviewed by the City Council and amended upon approval for renewal of Part E services beyond 2026. 6. Compensation For the amended Scope of Services described herein, CITY agrees to pay ECO the sum specified below on Cost Detail Table. The total payment shall be a lump sum “not to exceed” amount of SIXTY-THREE THOUSAND FIVE HUNDRED U.S. DOLLARS ($63,500.00). 092925 - ECO WWP Amendment No. 12 5 Amendment No. 12 – 2026 Cost Detail Amended ECO Scope of Services Fee Estimate Part A - 2025 Project Administration & Management $4,000 Part B - 2025 Annual Ecological Restoration Monitoring $25,000 Part C - 2025 Annual Adaptive Management Strategy $32,000 Part D - 2025 Update Surplus Wetland Credit Tracking Ledger $0 Part E - 2025 Academic Research Project Guidance $2,500 Total $63,500 The CITY and ECO intending to be legally bound, indicate their approval of this AMENDMENT NO. 12 by their signatures below: ENVIRONMENTAL CONSULTING CITY OF FAYETTEVILLE OPERATIONS, INC. By: By: Seth Pickens, President Molly Rawn, Mayor Date: September 29, 2025 Date: ATTEST: By: Kara Paxton, City Clerk/Treasurer Date: ANY PROPRIETOR/PARTNER/EXECUTIVEOFFICER/MEMBER EXCLUDED? INSR ADDL SUBRLTRINSD WVD PRODUCER CONTACTNAME: FAXPHONE(A/C, No):(A/C, No, Ext): E-MAILADDRESS: INSURER A : INSURED INSURER B : INSURER C : INSURER D : INSURER E : INSURER F : POLICY NUMBER POLICY EFF POLICY EXPTYPE OF INSURANCE LIMITS(MM/DD/YYYY) (MM/DD/YYYY) AUTOMOBILE LIABILITY UMBRELLA LIAB EXCESS LIAB WORKERS COMPENSATIONAND EMPLOYERS' LIABILITY DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) AUTHORIZED REPRESENTATIVE EACH OCCURRENCE $ DAMAGE TO RENTEDCLAIMS-MADE OCCUR $PREMISES (Ea occurrence) MED EXP (Any one person)$ PERSONAL & ADV INJURY $ GEN'L AGGREGATE LIMIT APPLIES PER:GENERAL AGGREGATE $ PRO-POLICY LOC PRODUCTS - COMP/OP AGGJECT OTHER:$ COMBINED SINGLE LIMIT $(Ea accident) ANY AUTO BODILY INJURY (Per person) $ OWNED SCHEDULED BODILY INJURY (Per accident) $AUTOS ONLY AUTOS HIRED NON-OWNED PROPERTY DAMAGE $AUTOS ONLY AUTOS ONLY (Per accident) $ OCCUR EACH OCCURRENCE CLAIMS-MADE AGGREGATE $ DED RETENTION $ PER OTH-STATUTE ER E.L. EACH ACCIDENT E.L. DISEASE - EA EMPLOYEE $ If yes, describe under E.L. DISEASE - POLICY LIMITDESCRIPTION OF OPERATIONS below INSURER(S) AFFORDING COVERAGE NAIC # COMMERCIAL GENERAL LIABILITY Y / N N / A (Mandatory in NH) SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). COVERAGES CERTIFICATE NUMBER:REVISION NUMBER: CERTIFICATE HOLDER CANCELLATION © 1988-2015 ACORD CORPORATION. All rights reserved.ACORD 25 (2016/03) CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) $ $ $ $ $ The ACORD name and logo are registered marks of ACORD 5/12/2025 (501) 778-9162 (501) 778-0533 44393 Environmental Consulting Operations, Inc. 17724 Interstate 30 Suite 5A Benton, AR 72019 24074 10172 A 2,000,000 BZW(24) 57 08 55 94 5/10/2025 5/10/2026 15,000 2,000,000 4,000,000 4,000,000 2,000,000A BZW(24) 57 08 55 94 5/10/2025 5/10/2026 1,000,000B USO(24) 57 08 55 94 5/10/2025 5/10/2026 10,000 1,000,000 A XWW(24) 57 08 55 94 5/10/2025 5/10/2026 1,000,000 1,000,000 1,000,000 C E&O/Professional Lia 16KDGHH3903 5/10/2025 Per Claim 2,000,000 C E&O/Professional Lia 16KDGHH3903 5/10/2025 5/10/2026 Aggregate 2,000,000 City of Fayetteville 113 W. Mountain Street Fayetteville, AR 72701 ENVICON-06 JERILEONARD NFP Property & Casualty Services, Inc. P.O. Box 49 Benton, AR 72018 West American Insurance Company Ohio Casualty Insurance Company Westchester Surplus Lines Insurance Company 5/10/2026 X X X X X