Resolution: 157-25
File Number: 2025-989
A RESOLUTION TO APPROVE AMENDMENT NO. 3 TO THE ENGINEERING SERVICES CONTRACT
WITH HAWKINS-WEIR ENGINEERS, INC. IN THE AMOUNT OF $46,620.00 FOR ADDITIONAL DESIGN
AND CONSTRUCTION SERVICES ASSOCIATED WITH RECYCLING AND TRASH FACILITY
IMPROVEMENTS
WHEREAS, on November 16, 2021, the City Council passed Resolution No. 282-21 approving a Professional
Engineering Services Agreement with Hawkins -Weir Engineers, Inc. for design and bidding services for recycling and
trash facility improvements; and
WHEREAS, Amendment No. 1 to the contract with Hawkins -Weir Engineers, Inc. provided for costs associated with
construction management services of the Recycling & Trash Collections (RTC) transfer station floor replacement; and
WHEREAS, Amendment No. 2 to the contract with Hawkins -Weir Engineers, Inc. provided for additional design and
construction services associated with the Fayetteville Recycling and Trash Collections Division solid waste transfer
station metal push wall replacement project; and
WHEREAS, Amendment No. 3 will provide for additional design and construction management services associated
with the materials recovery facility and compost pad repairs.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Rawn to sign
Amendment No. 3 to the engineering services contract with Hawkins -Weir Engineers, Inc. in the amount of $46,620.00
for additional design and construction services associated with recycling and trash facility improvements.
PASSED and APPROVED on July 1, 2025
Approved:
Attest:
` •JERK l'rR�.'' .
`/91� �GTYO Sz_
T .•G?
�tYarerr.cv'u-_,
's�tiM1'V, oN,OJ2�
Molly Rawn, Mayor Kara Paxton, City Clerk Treasurer
Page 1
CITY OF
FAYETTEVILLE
ARKANSAS
MEETING OF JULY 1, 2025
CITY COUNCIL MEMO
2025-989
TO: Mayor Rawn and City Council
THRU: Keith Macedo, Chief of Staff
FROM: Peter Nierengarten, Environmental Director
SUBJECT: Contract amendment #3 in the amount of $46,620 with Hawkins -Weir Engineers Inc.
for additional design and construction services associated with the Fayetteville
Recycling and Trash Collections Division — materials recovery facility and compost
pad repairs
RECOMMENDATION:
Staff recommends approval of contract amendment #3 in the amount of $46,620 with Hawkins -Weir
Engineers Inc. for additional design and construction services associated with the Fayetteville
Recycling and Trash Collections Division — materials recovery facility and compost pad repairs.
BACKGROUND:
The City of Fayetteville operates a solid waste transfer station and recycling processing facility located at 1560
S. Happy Hollow Rd. The facilities are used to receive and process solid waste and recyclables that are
collected from residents and businesses in Fayetteville. Solid waste is deposited from residential, commercial
and roll -off trucks to the transfer station floor where it is pushed and packed into open top transport trucks for
hauling to the Waste Management Landfill in Tontitown, AR
Normal wear and tear on the RTC facilities along with growth in the amount of material received over the past
several years has necessitated several improvements. In November 2021, the City Council approved a
contract with Hawkins -Weir Engineers Inc. for design and bidding services for Recycling & Trash Facility
Improvements. Amendment No. 1 provided for costs associated with construction management services of the
Recycling & Trash Collections (RTC) transfer station floor replacement. Amendment No. 2 provided for
additional design and construction services associated with the Fayetteville Recycling and Trash Collections
Division solid - solid waste transfer station metal push wall replacement project.
DISCUSSION:
Hawkins -Weir has completed the design, bidding and construction management for the first phase of Recycling
& Trash Facility improvements to the transfer station floor. Construction of the second phase of work on the
solid waste transfer station metal push wall replacement project is currently in process.
This contract amendment is for additional design and construction management services associated with the
materials recovery facility and compost pad repairs. Specifically, the work includes:
• Design and construction management of structural modifications to the bailer sump
• Design and construction management of structural modifications to the south wall in the materials
Mailing address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
recovery facility (MRF)
Construction management of improvements to the compost facility concrete pad
BUDGET/STAFF IMPACT:
Under Amendment No. 3, the maximum not -to -exceed amount authorized for these services is $46,620.
Funding for this work will come from the Recycling and Trash Collections Capital Improvement Fund.
ATTACHMENTS: 3. Staff Review Form, 4. Amendment No. 3
Mailing address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
== City of Fayetteville, Arkansas
y 113 West Mountain Street
Fayetteville, AR 72701
(479)575-8323
- Legislation Text
File #: 2025-989
A RESOLUTION TO APPROVE AMENDMENT NO. 3 TO THE ENGINEERING SERVICES
CONTRACT WITH HAWKINS-WEIR ENGINEERS, INC. IN THE AMOUNT OF $46,620.00
FOR ADDITIONAL DESIGN AND CONSTRUCTION SERVICES ASSOCIATED WITH
RECYCLING AND TRASH FACILITY IMPROVEMENTS
WHEREAS, on November 16, 2021, the City Council passed Resolution No. 282-21 approving a
Professional Engineering Services Agreement with Hawkins -Weir Engineers, Inc. for design and
bidding services for recycling and trash facility improvements; and
WHEREAS, Amendment No. 1 to the contract with Hawkins -Weir Engineers, Inc. provided for costs
associated with construction management services of the Recycling & Trash Collections (RTC) transfer
station floor replacement; and
WHEREAS, Amendment No. 2 to the contract with Hawkins -Weir Engineers, Inc. provided for
additional design and construction services associated with the Fayetteville Recycling and Trash
Collections Division solid waste transfer station metal push wall replacement project; and
WHEREAS, Amendment No. 3 will provide for additional design and construction management
services associated with the materials recovery facility and compost pad repairs.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Rawn
to sign Amendment No. 3 to the engineering services contract with Hawkins -Weir Engineers, Inc. in the
amount of $46,620.00 for additional design and construction services associated with recycling and trash
facility improvements.
Page 1
Peter Nierengarten
Submitted By
City of Fayetteville Staff Review Form
2025-989
Item ID
7/1/2025
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
6/12/2025 RECYCLING/TRASH COLLECTION (750)
Submitted Date Division / Department
Action Recommendation:
Approval of contract amendment #3 in the amount of $46,620 with Hawkins -Weir Engineers Inc. for additional
design and construction services associated with the Fayetteville Recycling and Trash Collections Division —
materials recovery facility and compost pad repairs.
5500.750.5080-5860.02
Account Number
18016.2101
Project Number
Budgeted Item? Yes
Does item have a direct cost? Yes
Is a Budget Adjustment attached? No
Purchase Order Number:
Change Order Number: 3
Original Contract Number:
Comments:
Budget Impact:
Improvements Solid Waste
Fund
RTC Master Plan Expansion
Total Amended Budget
Expenses (Actual+Encum)
Available Budget
Item Cost
Budget Adjustment
Remaining Budget
Project Title
$ 1,325,050.00
$ 762,224.81
562,825.19
$ 46,620.00
516,205.19
V20221130
Previous Ordinance or Resolution # 282-21; 220-22; 78-25
Approval Date:
AMENDMENT NO.3
TO THE
AGREEMENT For PROFESSIONAL ENGINEERING SERVICES
BETWEEN
CITY OF FAYETTEVILLE, ARKANSAS
FRO �7
HAWKINS-WEIR ENGINEERS, INC.
In accordance with the AGREEMENT For PROFESSIONAL ENGINEERING SERVICES for the
Fayetteville Transfer Station Improvements (HW Project No. 2021061), dated November 16, 2021,
between the City of Fayetteville, Arkansas (hereinafter called Owner) and Hawkins -Weir Engineers, Inc.
(hereinafter called Engineer), Owner hereby authorizes Engineer to proceed with engineering services as
modified by this Amendment No. 3.
SECTION 1— SCOPE OF SERVICES
1.1 Amendment No. 3 is for additional design services associated with the Fayetteville Transfer Station
Improvements — Material Recovery Facility (MERF) and Compost Facility (Task H) and construction phase
services (Task I) for the Fayetteville Transfer Station Improvements — Material Recovery Facility (MERF)
and Compost Facility associated with Owner's Project No. 25-31. Tasks H and I services are detailed in
the Engineer's attached Scope of Services dated June 11, 2025.
SECTION 2 — TIME OF SERVICE
2.1 The scope of services as defined above is based on completing the Task H and Task I services
within a 60-calendar day construction Contract Time Extension in 2025 for the Owner's Project No. 25-31.
Engineer will proceed with providing the services set forth herein immediately upon execution of this
Authorization by all parties.
Amendment No. 3 Pagel of 2
SECTION 3 — COMPENSATION
3.1 Owner shall compensate Engineer for providing the services set forth herein in accordance with the
terms of the Agreement. Total payment for Scope of Services described herein shall not exceed Fo -Six
Thousand Six Hundred Twenty and 00/100 Dollars ($46,620.00) without written approval of Owner. These
additional services adjust the Agreement's not to exceed fee to $287,680.00 but does not affect the not to
exceed reimbursable expenses already established at $54,080.00.
Attachments: Scope of Services dated June 11, 2025
Fee Proposal Summary dated June 11, 2025
2025 Standard Hourly Billing Rate Structure
AUTHORIZATION BY:
CITY OF FAYETTEVILLE, ARKANSAS
By:
— *
Honorable Molly Rawn, Mayor
Date: July 1, 2025
ACCEPTED BY:
HAWKINS-WEIR ENGINEERS, INC.
By: ' ' _zt � . l JR.�
Brett D. Peters, P.E.
President and CEO
Date: 0(.1 1 1,/ Q025
Amendment No. 3 Page 2 of 2
Appendix A ��
Scope of Services — Amendment No. 3
Fayetteville Transfer Station Improvements
CityHN of Fayetteville, Arkansas `ITY of
Y FAYETTEVILLE
HW Project No. 2021061 ARKANSAS
June 11, 2025
Hawkins -Weir Engineers, Inc. (HW) proposes to provide the following engineering design services
for the Fayetteville Transfer Station Improvements project:
H. Additional Design Services — Material Recovery Facility (MERF) and Compost Facility
1. Meet with the Owner and subsequently with the Contractor regarding additional design
and construction scope of services
2. Structural Modifications to the Baler Sump
3. Structural Modifications to the South PEMB Wall in the MERF
4. Administer Proposed Improvements to the Compost Facility (Design by Others)
I. Construction Phase Services — Material Recovery Facility (MERF) and Compost Facility
1. Prepare a Change Order document and solicit a proposal from the Contractor for the
Owner's Project No. 25-31
2. Provide periodic observation during construction
3. Prepare, review , and coordinate the dissemination of construction documentation
including material submittals, testing results, and field change orders as directed by the
Owner
4. Review the Contractor's constructed quantities and prepare monthly pay requests for the
Owner's approval
5. Conduct a final inspection with the Contractor and Owner, and prepare a punch list of
deficient construction items for the Contract to address
6. Prepare record drawings of the completed project and provide one (1) reproducible hard
copy and one (1) electronic copy for the Owner's archives
2021061 \Appendix A Scope of Services —Amendment No. 3 061125.docx Page 1 of 1
Appendix B
1 Amendment No. 3 Fee Proposal Summary
Fayetteville Transfer Station Improvements
City of Fayetteville, Arkansas
June 11, 2025
H. Additional Design Services - Material Recovery Facility (MERF) and Compost Facility
Task
1. Meet with the Owner and subsequently with the Contractor regarding additional design and construction scope of services
2. Structural Modifications to the Baler Sump
3. Structural Modifications to the South PEMB Wall in the MERF
4. Administer Proposed Improvements to the Compost Facility (Design by Others)
TOTAL HOURS =
SUBTOTAL COST =
I. Construction Phase Services - Material Recovery Facility (MERF) and Compost Facility
Task
1. Prepare a Change Order document and solicit a proposal from the Contractor for the Owner's Project No. 25-31
2. Provide periodic observation during construction
3. Prepare, review, and coordinate the dissemination of construction documentation including material submittals, testing results, and field change orders as directed
by the Owner
4. Review the Contractor's constructed quantities and prepare monthly pay requests for the Owner's approval
5. Conduct a final inspection with the Contractor and Owner, and prepare a punch list of deficient construction items for the Contractor to address
6. Prepare record drawings of the completed project and provide one (1) reproducible hard copy and one (1) electronic copy for the Owner's archives
TOTAL HOURS =
SUBTOTAL COST =
(1) Based on a 60-calendar day Contract Time Extension. Periodic construction observation is based on 4-hours per day (Monday through Friday) during the
construction of the Material Recovery Facility (MERF) and Compost Facility Improvements
�'
CITY OF
FAYETTEVILLE
ARKANSAS
Favefteville Transfer Sfnfinn Imnrnvemenfs
Engr
VII
Engr
VI
Engr
IV
Inspector
II
CAD
III
Doc
Proc
Total
Hours
8
4
12
16
24
4
44
8
16
4
28
8
8
4
20
40
8
0
0 1
40 1
16
1 104
$1u
Favetteville Transfer Station Improvements
Engr
VII
Engr
VI
Engr
IV
Inspector
II
CAD
III
Doc
Proc
Total
Hours
4
4
8
8
168
4
4
4
12
8
4
12
2
4
4
4
14
2
4
4
4
14
20
16
0
168
8
16
228
$27,620
ENGINEERING SERVICES SUMMARY Fayetteville Transfer Station Improvements
H. jAdditional Design Services - Material Recovery Facility (MERF) and Compost Facility I $1 ,,000
I. lConstruction Phase Services - Material Recovery Facility (MERF) and Compost Facility 1 $27,620
Total Engineering Fee - Not to Exceed =
2021061�Appendix B Scope of Services Fee Proposal Summary Amendment No. 3 061125.xlsx
Appendix C
Hawkins -Weir Engineers, Inc.
Hourly Rate Schedule: 2025
Description
Billing Rate/Hour
Engineer VII
$275
Engineer VI
$250
Engineer V
$225
Engineer IV
$200
Engineer III
$175
Engineer II
$150
Engineer I
$125
Environmental Specialist II
$130
Environmental Specialist 1
$110
Designer II
$135
Designer 1
$100
Civil Eng Assistant 11
$90
Civil Eng. Assistant 1
$80
CAD/BIM Modeler 11
$135
CAD/BIM Modeler 1
$100
CAD/GIS Technician 111
$120
CAD/GIS Technician 11
$95
CAD/GIS Technician 1
$75
Construction Manager 11
$140
Construction Manager 1
$125
Construction Observer IV
$135
Construction Observer 111
$115
Construction Observer 11
$95
Construction Observer 1
$85
Surveyor $175
GPS Survey $200
Survey Technician $50
Business Manager $100
Graphic Designer $100
Document Processor $75
Reimbursable Expenses
Mileage
$0.77/mile
Printing
@ Cost
Travel
@ Cost
Expert Witness
Rate x 2.0
Other Direct Costs
@ Cost
Notes:
1. Hourly rates may be equitably adjusted
2. Adjustment to rate schedule will not change contract lump sum or NTE amounts