HomeMy WebLinkAbout78-25 RESOLUTION113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Resolution: 78-25
File Number: 2025-297
HAWKINS-WEIR ENGINEERS, INC. (AMENDMENT NO. 2):
A RESOLUTION TO APPROVE AMENDMENT NO. 2 TO THE ENGINEERING SERVICES CONTRACT WITH
HAWKINS-WEIR ENGINEERS, INC. IN AN AMOUNT NOT TO EXCEED $65,900.00 FOR ADDITIONAL
DESIGN AND CONSTRUCTION SERVICES ASSOCIATED WITH THE FAYETTEVILLE RECYCLING AND
TRASH COLLECTIONS DIVISION
WHEREAS, on November 16, 2021, the City Council passed Resolution 282-21 approving a professional engineering
services agreement with Hawkins -Weir Engineers, Inc. for design and bidding services for Recycling and Trash
Facility improvements; and
WHEREAS, on October 4, 2022, the City Council passed Resolution 220-22 approving Amendment No. 1 to the
professional engineering services contract with Hawkins -Weir Engineers, Inc. for construction management services
for the transfer station floor slab demolition, removal and replacement; and
WHEREAS, the design, bidding and construction management for the first phase of Recycling & Trash Facility
improvements to the transfer station floor have been completed; and
WHEREAS, Amendment No. 2 will replace the existing transfer station side walls with new 'h" steel walls and rear
chute with '/4" steel, added support beams, concrete armoring, new access ladder, electrical relocation and pit approach
concrete replacement.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Rawn to sign
Amendment No. 2 to the engineering services contract with Hawkins -Weir Engineers, Inc. in an amount not to exceed
$65,900.00 for additional design and construction services associated with the Fayetteville Recycling and Trash
Collections Division.
Page 1
Resolution: 78-25
File Number: 2025-297
PASSED and APPROVED on March 18, 2025
Approved: Attest:
.................
.„
_ti�`�G\TYOT SG9_
-�FAYETTEVILLE n
��yiNGiON���oA�`
Molly Rawn, Mayor Kara Paxton, City Clerk Treasurer
Page 2
CITY OF
FAYETTEVILLE
ARKANSAS
MEETING OF MARCH 18, 2025
CITY COUNCIL MEMO
TO: Mayor Rawn and City Council
THRU: Keith Macedo, Interim Chief of Staff
FROM: Peter Nierengarten, Environmental Director
SUBJECT: HAWKINS-WEIR ENGINEERS, INC. (AMENDMENT NO. 2):
RECOMMENDATION:
2025-297
Approval of contract amendment #2 in the amount of $65,900 with Hawkins -Weir Engineers Inc. for additional
design and construction services associated with the Fayetteville Recycling and Trash Collections Division —
solid waste transfer station metal push wall replacement project
BACKGROUND:
The City of Fayetteville operates a solid waste transfer station and recycling processing facility located at
1560 S. Happy Hollow Rd. The facilities are used to receive and process solid waste and recyclables that
are collected from residents and businesses in Fayetteville. Solid Waste is deposited from residential,
commercial and roll -off trucks to the transfer station floor where it is pushed and packed into open top
transport trucks for hauling to the WM Landfill in Tontitown, AR.
Normal wear and tear on the RTC facilities over the past several years has necessitated several
improvements. In November 2021, the City Council approved a contract with Hawkins -Weir Engineers Inc.
for design and bidding services for Recycling & Trash Facility Improvements.
DISCUSSION:
Hawkins -Weir has completed the design, bidding and construction management for the first phase of
Recycling & Trash Facility improvements to the transfer station floor.
This contract amendment is for additional design and construction management services associated with
the transfer station metal push wall replacement project. The current transfer station metal push walls are
deteriorated due to daily wear and tear over the past 30 years and are in need of replacement.
Improvements will replace the existing transfer station side walls with new steel walls and rear chute
with 1/4" steel. Additional work includes added support beams, concrete armoring, new access ladder,
electrical relocation and pit approach concrete replacement.
BUDGET/STAFF IMPACT:
Under Amendment No. 2, the maximum not -to -exceed amount authorized for these services is $65,900.
Funding for this work will come from the Recycling and Trash Collections Capital Improvement Fund.
Mailing address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
ATTACHMENTS: SRF (#3) , Amendment No. 2 (#4)
Mailing address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
== City of Fayetteville, Arkansas
y 113 West Mountain Street
Fayetteville, AR 72701
(479)575-8323
- Legislation Text
File #: 2025-297
HAWKINS-WEIR ENGINEERS, INC. (AMENDMENT NO. 2):
A RESOLUTION TO APPROVE AMENDMENT NO. 2 TO THE ENGINEERING SERVICES
CONTRACT WITH HAWKINS-WEIR ENGINEERS, INC. IN AN AMOUNT NOT TO EXCEED
$65,900.00 FOR ADDITIONAL DESIGN AND CONSTRUCTION SERVICES ASSOCIATED WITH
THE FAYETTEVILLE RECYCLING AND TRASH COLLECTIONS DIVISION
WHEREAS, on November 16, 2021, the City Council passed Resolution 282-21 approving a
professional engineering services agreement with Hawkins -Weir Engineers, Inc. for design and bidding
services for Recycling and Trash Facility improvements; and
WHEREAS, on October 4, 2022, the City Council passed Resolution 220-22 approving Amendment
No. 1 to the professional engineering services contract with Hawkins -Weir Engineers, Inc. for
construction management services for the transfer station floor slab demolition, removal and
replacement; and
WHEREAS, the design, bidding and construction management for the first phase of Recycling & Trash
Facility improvements to the transfer station floor have been completed; and
WHEREAS, Amendment No. 2 will replace the existing transfer station side walls with new 1/2" steel
walls and rear chute with 1/4" steel, added support beams, concrete armoring, new access ladder,
electrical relocation and pit approach concrete replacement.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Rawn to
sign Amendment No. 2 to the engineering services contract with Hawkins -Weir Engineers, Inc. in an
amount not to exceed $65,900.00 for additional design and construction services associated with the
Fayetteville Recycling and Trash Collections Division.
Page 1
Peter Nierengarten
Submitted By
City of Fayetteville Staff Review Form
2025-297
Item ID
3/18/2025
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
2/25/2025 RECYCLING/TRASH COLLECTION (750)
Submitted Date Division / Department
Action Recommendation:
Approval of contract amendment #2 in the amount of $65,900 with Hawkins -Weir Engineers Inc. for additional
design and construction services associated with the Fayetteville Recycling and Trash Collections Division — solid
waste transfer station metal push wall replacement project
5500.750.5080-5816.00
Account Number
18016.1
Project Number
Budgeted Item? Yes
Does item have a direct cost? Yes
Is a Budget Adjustment attached? No
Budget Impact:
Improvements Solid Waste
Fund
RTC Master Plan Expansion
Project Title
Total Amended Budget
Expenses (Actual+Encum)
Available Budget
Item Cost
Budget Adjustment
Remaining Budget
$ 665,683.00
$ 665,683.00
$ 65, 900.00
599,783.00
V20221130
Purchase Order Number: Previous Ordinance or Resolution # 282-21; 220-22
Change Order Number:
Original Contract Number:
Comments:
Approval Date:
AMENDMENT NO.2
TO THE
AGREEMENT For PROFESSIONAL ENGINEERING SERVICES
BETWEEN
CITY OF FAYETTEVILLE, ARKANSAS
FRO �7
HAWKINS-WEIR ENGINEERS, INC.
In accordance with the AGREEMENT For PROFESSIONAL ENGINEERING SERVICES for the
Fayetteville Transfer Station Improvements (HW Project No. 2021061), dated November 16, 2021,
between the City of Fayetteville, Arkansas (hereinafter called Owner) and Hawkins -Weir Engineers, Inc.
(hereinafter called Engineer), Owner hereby authorizes Engineer to proceed with engineering services as
modified by this Amendment No. 2.
SECTION 1— SCOPE OF SERVICES
1.1 Amendment No. 2 is for additional design services associated with the Fayetteville Transfer Station
Improvements — Metal Push Wall Replacement project (Task E) and construction management services
(Task F) for the Fayetteville Transfer Station Improvements — Metal Push Wall Replacement associated
with Owner's Project No. 24-47). Tasks E and F services are detailed in the Engineer's attached Scope of
Services dated January 27, 2025.
SECTION 2 — TIME OF SERVICE
2.1 The scope of services as defined above is based on addressing Task E prior to the receipt of bids
on the Owner's project 24-47 in early 2025 and then completing the Task F services within a 60-calendar
day construction Contract Time in 2025 for the Owner's Project No. 24-47. Engineer will proceed with
providing the services set forth herein immediately upon execution of this Authorization by all parties.
Amendment No. 2 Pagel of 2
SECTION 3 — COMPENSATION
3.1 Owner shall compensate Engineer for providing the services set forth herein in accordance with the
terms of the Agreement. Total payment for Scope of Services described herein shall not exceed Six . -Five
Thousand Nine Hundred and 00/100 Dollars ($65,900.00) without written approval of Owner. These
additional services adjust the Agreement's not to exceed fee to $241,060.00 and increase the not to exceed
reimbursable expenses to $54,080.00.
Attachments: Scope of Services dated January 27, 2025
Fee Proposal Summary dated January 27, 2025
2025 Standard Hourly Billing Rate Structure
AUTHORIZATION BY:
CITY OF FAYETTEVILLE, ARKANSAS
By:
Honorable Molly Rawn, Mayor
Date: 03/18/2025
ACCEPTED BY:
HAWKINS-WEIR ENGINEERS, INC.
By: � Ub U C
Brett D. Peters, P.E.
President and CEO
Date: a I29 / 2025
Amendment No. 2 Page 2 of 2
Appendix A '•�
Scope of Services — Amendment No. 2
Fayetteville Transfer Station Improvements
CityHN of Fayetteville, Arkansas CITY OF
Y FAYETTEVILLE
HW Project No. 2021061 ARKANSAS
January 27, 2025
Hawkins -Weir Engineers, Inc. (HW) proposes to provide the following engineering design services
for the Fayetteville Transfer Station Improvements project:
E. Additional Design Services — Metal Push Wall Replacement
1. Waste Transfer Pit Driveway Replacement
2. Emergency Dewatering Pump Force Main
3. Waste Transfer Pit Pump electrical Improvements
4. Waste Transfer Pit Pumping Improvements
5. Development of Deductive Alternatives and Re -Bidding Services
F. Construction Management — Metal Push Wall Replacement
1. Conduct a Pre -Construction Conference with the Owner and Contractor
a. Prepare Meeting Summary
2. Provide periodic observation during construction
3. Prepare, review , and coordinate the dissemination of construction documentation
including material submittals, testing results, field orders, and change orders as directed
by the Owner
4. Review the Contractor's constructed quantities and prepare monthly pay requests for the
Owner's approval
5. Conduct a final inspection with the Contractor and Owner, and prepare a punch list of
deficient construction items for the Contract to address
6. Prepare record drawings of the completed project and provide one (1) reproducible hard
copy and one (1) electronic copy for the Owner's archives
2021061\Appendix A Scope of Services — Amendment No. 2 012725.docx Page 1 of 1
HN
E. Additional Design Services - Metal Push Wall Replacement(')
Task
1. Waste Transfer Pit Driveway Replacement
2. Emergency Dewatering Pump Force Main
3. Waste Transfer Pit Pump Electrical Improvements
4. Waste Transfer Pit Pumping Improvements
5. Development of Deductive Alternatives and Re-Biddinq Services
Appendix B
Amendment No. 2 Fee Proposal Summary
Fayetteville Transfer Station Improvements
City of Fayetteville, Arkansas
January 27, 2025
TOTAL HOURS =
SUBTOTAL COST =
(1) Approximately $18,500 was previously paid under the NTE fee amount on Task E as part of the original Agreement and Amendment No. 1
F. Construction Management - Metal Push Wall Replacement
Task
1. Conduct a Pre -Construction Conference with the Owner and Contractor
a. Prepare Meeting Summary
2. Provide periodic observation during construction
3. Prepare, review, and coordinate the dissemination of construction documentation including material submittals, testing results, field orders, and change
orders as directed by the Owner
4. Review the Contractor's constructed quantities and prepare monthly pay requests for the Owner's approval
5. Conduct a final inspection with the Contractor and Owner, and prepare a punch list of deficient construction items for the Contractor to address
6. Prepare record drawings of the completed project and provide one (1) reproducible hard copy and one (1) electronic copy for the Owner's archives
TOTAL HOURS =
SUBTOTAL COST =
(2) Based on a 60-calendar day Contract Time. Periodic construction observation is based on 4-hours per day (Monday through Friday) during the
construction of the Metal Push Walls
G. Reimbursable Expenses
I�
CITY OF
FAYETTEVILLE
ARKANSAS
Favetteville Transfer Station Imnrovements
Engr
VII
Engr
VI
Engr
IV
Inspector
II
GPS
Survey
Survey
Tech
CAD
III
BIM
II
Doc
Proc
Total
Hours
4
4
4
4
8
4
28
4
8
4
16
4
4
4
4
16
4
4
4
4
16
8
8
6
8
30
20
16
8
0
4
4
30
0
24
106
$u
Favetteville Transfer Station Improvements
$41,400
Favetteville Transfer Station Improvements
Item
Description
Total
1. Reproduction & Printing
Plans and Specifications
IGTS,
$1,000
2. Welding Inspection Services
Inc.
$6,000
Total Estimated Reimbursable Expenses =
$7,000
ENGINEERING SERVICES SUMMARY
Favetteville Transfer Station Improvements
E.
Additional Desing Services - Metal Push Wall Replacement
$17,500
F.
Construction Management - Metal Push Wall Replacement
$41,400
G.
Reimbursable Expenses
$7,000
Total Engineering Fee - Not to Exceed =
$65,900
2021061\Appendix B Scope of Services and Fee Proposal Summary Amendment No. 2 012725.xlsx
Appendix C
Hawkins -Weir Engineers, Inc.
Hourly Rate Schedule: 2025
Description
Billing Rate/Hour
Engineer VII
$275
Engineer VI
$250
Engineer V
$225
Engineer IV
$200
Engineer III
$175
Engineer II
$150
Engineer I
$125
Environmental Specialist II
$130
Environmental Specialist 1
$110
Designer II
$135
Designer 1
$100
Civil Eng Assistant 11
$90
Civil Eng. Assistant 1
$80
CAD/BIM Modeler 11
$135
CAD/BIM Modeler 1
$100
CAD/GIS Technician 111
$120
CAD/GIS Technician 11
$95
CAD/GIS Technician 1
$75
Construction Manager 11
$140
Construction Manager 1
$125
Construction Observer IV
$135
Construction Observer 111
$115
Construction Observer 11
$95
Construction Observer 1
$85
Surveyor $175
GPS Survey $200
Survey Technician $50
Business Manager $100
Graphic Designer $100
Document Processor $75
Reimbursable Expenses
Mileage
$0.77/mile
Printing
@ Cost
Travel
@ Cost
Expert Witness
Rate x 2.0
Other Direct Costs
@ Cost
Notes:
1. Hourly rates may be equitably adjusted
2. Adjustment to rate schedule will not change contract lump sum or NTE amounts
3. If a conflict exists, hourly rates & reimbursable expenses will be invoiced per terms of Agreement.