FLINTCO, LLC. (SERVICE CONTRACT):
A RESOLUTION TO AWARD RFP 24-15 AND APPROVE A CONTRACT WITH FLINTCO, LLC. IN THE
AMOUNT OF $1.00 TO PROVIDE CONSTRUCTION MANAGER AT RISK SERVICES FOR IMPROVEMENTS
TO MAPLE STREET
WHEREAS, the City and the University of Arkansas have been working together over the past 7 years toward a
common goal of improving the section of Maple Street from the Razorback Greenway west to Garland Avenue to
create a multi -modal street with a focus on safety of all users; and
WHEREAS, on March 31, 2020, the Transportation Committee recommended the City Council apply for grant
funding and authorize the allocation of 2019 bond funds as matching funds for the project; and
WHEREAS, on December 4, 2024 City Council approved Resolution 301-24 that accepted Federal aid funding in the
amount of $25,000,000.00 from the Department of Transportation Federal Highway Administration through the Safe
Streets and Roads for all program; and
WHEREAS, Maple Street has been identified as a catalyst project in the NWA Regional Bicycle and Pedestrian
Master Plan and the addition of the Maple Street connection will greatly improve the accessibility from the trail system
to this major destination for the campus's faculty, staff, visitors and students; and
WHEREAS, the proposed improvements to Maple Street include 2,475-linear feet of new roadway surface, upgraded
traffic signals, storm drainage, 8-foot-wide senior walk sidewalks, a separated two-way cycle track, enhanced mid -
block crosswalks with decorative pavement markings and passive detection bollards for activation of beacons; and
WHEREAS, a request for proposals for construction manager at risk services was advertised in late 2024 and on
February 24th, 2025, a selection committee composed of staff representatives from the City of Fayetteville and non-
voting members from the University of Arkansas selected Flintco, LLC for the construction management of the Maple
Street Improvements; and
WHEREAS, the initial contract consists of pre -construction services including working closely with design engineer
Olsson, Inc. on phasing plans, traffic control, evaluate best construction methods and bidding of the project to provide a
Guaranteed Maximum Price (GMP).
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Page 1
Resolution: 76-25
File Number: 2025-292
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards RFP 24-15 and authorizes Mayor
Rawn to sign a contract with Flintco, LLC in the amount of $1.00 to provide construction manager at risk services for
improvements to Maple Street.
PASSED and APPROVED on March 18, 2025
Approved: ^/
Molly Rawn, Mayor
Page 2
Attest:
14 cTTry ��'
Kara Paxton, City Clerk Treasurer
CITY OF
FAYETTEVILLE
ARKANS
ARKANSAS
MEETING OF MARCH 18, 2025
TO: Mayor Rawn and City Council
THRU: Chris Brown, Public Works Director
Keith Macedo, Interim Chief of Staff
FROM: Matt Mihalevich, Active Transportation Manager
SUBJECT: FLINTCO, LLC. (SERVICE CONTRACT):
CITY COUNCIL MEMO
2025-292
RECOMMENDATION:
Staff recommends approval of a contract with Flintco, LLC, who was selected by RFP 24-15 to provide
Construction Manager at Risk (CMAR) services for the Maple Street Improvements for pre -construction
services for the amount of $1.00.
BACKGROUND:
The City of Fayetteville and the University of Arkansas have been working together over the past 7 years
toward a common goal of improving the section of Maple Street from the Razorback Greenway west to
Garland Ave. to create a multi -modal street with a focus on safety of all users.
On March, 31st 2020 the Transportation Committee reviewed the Maple Street project and forwarded a
recommendation to the City Council to apply for grant funding and authorize the allocation of 2019 bond funds
as matching funds for the project. Committee members expressed support for the vegetation buffer and
recommended the wider crosswalk striping.
On December 4th, 2024 resolution 301-24 was approved to accept Federal aid funding in the amount of
$25,000,000 from the Department of Transportation Federal Highway Administration through the Safe Streets
and Roads for all program. This funding will be used for 5 construction projects with a focus on safety. The
Maple Street Improvements will be the first of the 5 projects to go to construction with a goal of starting work
when the University of Arkansas Students are out for the summer of 2025.
DISCUSSION:
The proposed improvements to Maple Street include 2,475-linear feet of new roadway surface, upgraded traffic
signals, storm drainage, 8-foot-wide senior walk sidewalks on the north and south sides and a separated two-
way cycle track along the south side extending from the Razorback Greenway to Garland Avenue. Maple
Street has been identified as a catalyst project in the Northwest Arkansas Regional Bicycle and Pedestrian
Master Plan. Currently bicycle access to the University of Arkansas campus core and the surrounding
neighborhoods is limited. The addition of the Maple Street connection will greatly improve the accessibility from
the trail system to this major destination for the campus's faculty, staff, visitors and students. The safety
upgrades will include a low vegetation buffer between the cycle track and the road. In addition, enhanced mid -
block crosswalks are proposed with decorative pavement markings and passive detection bollards for
activation of beacons.
Mailing address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
The design plans for the Maple Street project are currently being finalized by Olsson. To prepare for the
construction phase of the project, it is necessary to have a construction manager at risk on board to evaluate
the final design, recommend localized construction methods and materials and develop the construction cost.
A request for proposals (RFP 24-15) was advertised in late 2024 and qualifications were received from four
construction management companies. On February 24th, 2025, a selection committee composed of staff
representatives from the City of Fayetteville and non -voting members from the University of Arkansas selected
Flintco, LLC for the construction management of the Maple Street Improvements.
The contract for consideration with this proposal consists of pre -construction services including working closely
with Olsson on phasing plans, traffic control, evaluate best construction methods and bidding of the project to
provide a Guaranteed Maximum Price (GMP). The City will then negotiate the final construction costs which
will be reflected in the guaranteed Maximum Price (GMP). The GMP proposal will include all costs associated
with the construction of the Maple Street Improvements for approval by the City Council.
BUDGET/STAFF IMPACT:
The City has been awarded Federal funding for this project through the Safe Streets and Roads for all program
(SS4A) and approved by resolution 301-24. The contract for pre -construction services by Flintco is $1.00.
ATTACHMENTS: SRF (#3) , UofA Connections Map 8.5 x 11 (#4), RFP 24-15 - Voting Results (#5), RFP 24-
15 Contract - Flintco Signed (#6), RFP 24-15 - Appendix A - Scope or Work (#7), RFP 24-15 - Appendix B -
Pre -Con Cost (#8), RFP 24-15 - Appendix C - City Issued RFP (#9), RFP 24-15 - Submittal (#10)
Mailing address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
® City of Fayetteville, Arkansas 113 West Mountain Street
Fayetteville, AR 72701
(479)575-8323
Legislation Text
File #: 2025-292
FLINTCO, LLC. (SERVICE CONTRACT):
A RESOLUTION TO AWARD RFP 24-15 AND APPROVE A CONTRACT WITH FLINTCO, LLC.
IN THE AMOUNT OF $1.00 TO PROVIDE CONSTRUCTION MANAGER AT RISK SERVICES
FOR IMPROVEMENTS TO MAPLE STREET
WHEREAS, the City and the University of Arkansas have been working together over the past 7 years
toward a common goal of improving the section of Maple Street from the Razorback Greenway west to
Garland Avenue to create a multi -modal street with a focus on safety of all users; and
WHEREAS, on March 31, 2020, the Transportation Committee recommended the City Council apply
for grant funding and authorize the allocation of 2019 bond funds as matching funds for the project; and
WHEREAS, on December 4, 2024 City Council approved Resolution 301-24 that accepted Federal aid
funding in the amount of $25,000,000.00 from the Department of Transportation Federal Highway
Administration through the Safe Streets and Roads for all program; and
WHEREAS, Maple Street has been identified as a catalyst project in the NWA Regional Bicycle and
Pedestrian Master Plan and the addition of the Maple Street connection will greatly improve the
accessibility from the trail system to this major destination for the campus's faculty, staff, visitors and
students; and
WHEREAS, the proposed improvements to Maple Street include 2,475-linear feet of new roadway
surface, upgraded traffic signals, storm drainage, 8-foot-wide senior walk sidewalks, a separated two-
way cycle track, enhanced mid -block crosswalks with decorative pavement markings and passive
detection bollards for activation of beacons, and
WHEREAS, a request for proposals for construction manager at risk services was advertised in late
2024 and on February 24th, 2025, a selection committee composed of staff representatives from the City
of Fayetteville and non -voting members from the University of Arkansas selected Flintco, LLC for the
construction management of the Maple Street Improvements; and
WHEREAS, the initial contract consists of pre -construction services including working closely with
design engineer Olsson, Inc. on phasing plans, traffic control, evaluate best construction methods and
bidding of the project to provide a Guaranteed Maximum Price (GMP).
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Page 1
Resolution: 76-25
File !Number: 2025-292
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards RFP 24-15 and
authorizes Mayor Rawn to sign a contract with Flintco, LLC in the amount of $1.00 to provide
construction manager at risk services for improvements to Maple Street.
Page 2
City of Fayetteville Staff Review Form
2025-292
Item ID
3/18/2025
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
Matt Mihalevich 2/27/2025 ENGINEERING (621)
Submitted By Submitted Date Division / Department
Action Recommendation:
Staff recommends approval of a contract with Flintco, LLC who was selected by RFQ 24-15 to provide Construction
Manager at Risk (CMAR) services for the Maple Street Improvements in the amount of $1.00.
2235.900.9 223-5814.05
Account Number
32401.9223
Project Number
Budgeted Item? Yes
Does item have a direct cost? Yes
Is a Budget Adjustment attached? No
Purchase Order Number:
Change Order Number:
Original Contract Number:
Comments:
Budget Impact:
Safe Streets and Roads Grant
Fund
Safe Streets and Roads Grant - W Maple St
Total Amended Budget
Expenses (Actual+Encum)
Available Budget
Item Cost
Budget Adjustment
Remaining Budget
Project Title
$ 26,250,000.00
Is 26,250,000.00
$ 1.00
Is 26,249,999.00
Previous Ordinance or Resolution p
Approval Date:
V20221130
❑O
UNIVERSITY OF
ARKANSAS
CAMPUS BICYCLE
L,
CIRCUIT
7 W I-afayetle
W Watson St
W k4c
V
LEGEND
BUS ROUTES
Blue Route
Purple Route
-zZlIll Red Route
Green Route
Yellow Route
EXISTING TRAILS
-Razorback Regional
Greenway
Oak Ridge Trail/
Existing Path
PROPOSED CONNECTIONS
1 a1 1 Oak Ridge
Connector
I • 1 Garland Shared Street
1 • I Maple Cycle Track
1 kl 1 Bike Route
PREPARED BY'
a Ita
PIANNING+DESIGN
CITY OF
ATTLL
10 AAA
SELECTION COMMITTEE -VOTING RESULTSI
Selection Description: RFP 24-15, CMAR for Maple Street
Improvements
Selection Committee Date/Time: 02/24/2025 at 3:45 PM in Room #326
Firms are listed in alphabetical order
11 2
Overall RANK I Flintco, LLC I Nabholz Construction
1st
2nd
3rd
ORING
3
1st ranked firm: LLC
2nd ranked firm:
Tallied by:
t_"
eAny Fitch, Sr. Procurement Agent Amanda Beilfuss, Procurem or
Date: Z / ZS 1 ZS Date: (7� / cQ5
Docusign Envelope ID: D4FC9441-8D54-46A7-AOA2-3FAD12272FE0
CITY OF
_ FAYETTEVILLE
ARKANSAS
Contract for Construction
Manager at Risk Services
Maple Street Improvements
BETWEEN City of Fayetteville, Arkansas and
Flintco, LLC
THIS AGREEMENT is made this 18 day of March , 2025, by and between City of
Fayetteville, Arkansas, acting by and through its Mayor (hereinafter called CITY OF FAYETTEVILLE or CITY) and Flintco, LLC.
(construction manager at risk, hereinafter called CMAR, Construction Manager, Flintco OR VENDOR), and CITY OF
FAYETTEVILLE from time to time requires professional CMAR services in connection with the evaluation, design, and/or
construction supervision of capital improvement projects. Therefore, CITY OF FAYETTEVILLE and CMAR in consideration of
their mutual covenants agree as follows:
CMAR shall serve as CITY OF FAYETTEVILLE's professional CMAR consultant in those assignments to which this Agreement
applies and shall give consultation and advice to CITY OF FAYETTEVILLE during the performance of services defined in the
scope of work. All services shall be performed under the direction of a CMAR registered in the State of Arkansas and
licensed by the Arkansas Contractor's Licensing Board with a Municipal and Utility Construction classification.
1. Contracted parties and relationship:
This agreement shall be binding between all parties. Fees for CMAR services shall be provided as identified
in appendices.
i. Flintco's Tax identification number (TIN) ending in 1079
ii. Flintco's Arkansas Contractor License No. 1976870625
iii. Flintco's Secretary of State Filing No. 800188970
b. Parties agree to act on the basis of mutual trust, good faith, and fair dealing, and perform in a fiscally
responsible and timely manner. Parties shall each endeavor to promote harmony and cooperation among
all Project participants.
2. Entire Agreement and Exhibits: This Agreement sets forth the entire agreement and understanding between the
parties on the subject matter of this Agreement. Neither party shall be bound by any conditions, definitions,
representations or warranties with respect to the subject matter of this Agreement other than those as expressly
provided herein.
a. Appendices included under this agreement include the following:
i. Appendix A: Scope of Services
ii. Appendix B: CMAR Fee Schedule
iii. Appendix C: RFP 24-15, Construction Manager at Risk for Maple Street Improvements
iv. Appendix D: Flintco's Response to RFP 24-15
v. Appendix E: Flintco's current Certificate of Insurance
b. This agreement maybe modified only by a duly executed written instrument signed by the CITY and CMAR.
c. ORDER OF PRECEDENCE: In case of any inconsistency, conflict, or ambiguity among the Contract
Documents, the documents shall govern in the following order: (a) Change Orders, affidavits, and written
amendments to this Agreement which are executed by all parties; (b) the Agreement; (c) CMAR's response
to RFP 24-15 (d) City's published RFP 24-15 and associated Addenda and attachments.
RFP 24-15, CMAR for Maple Street Improvements
Page 1 of 21
Docusign Envelope ID: D4FC9441-8D54-46A7-AOA2-3FAD12272FE0
3. Notices: Any notice required under this Agreement shall be in writing, address to the appropriate party at the
following addresses:
a. City of Fayetteville: Attention: Mayor Molly A. Rawn, 113 W. Mountain, Fayetteville, AR 72701
b. Flintco, LLC.: Attention: Brent Farmer, 184 E. Fantinel Blvd., Springdale, AR 72762
4. General Provisions:
a. ETHICS: All parties shall perform with integrity. Each shall avoid conflicts of interest and promptly disclose
to any other part any conflicts that may arise. All parties warrant that it has not and shall not pay or receive
any contingent fees or gratuities to or from any other party, including agents, officer's employers,
Subcontractors, Sub subcontractors, Suppliers, Volunteers, Elected Officials, or Others to secure
preferential treatment.
b. When the Construction Documents, Guaranteed Maximum Price (GMP), and other descriptive documents
defining the work are complete, they shall be identified and included in this Agreement by mutually agreed
upon amendment to this Agreement.
c. Workmanship: The Work shall be executed in accordance with the Contract Documents in a workmanlike
manner. All materials used in the Work shall be furnished in sufficient quantities to facilitate the proper
and expeditious execution of the Work and shall be new except as otherwise provided in the Contract
Documents.
d. MATERIALS FURNISHED BY OWNER OR OTHERS: If the Work includes installation of materials or equipment
furnished by City or Others, it shall be the responsibility of Construction Manager to examine the items so
provided and thereupon handle, store, and install the items, unless otherwise provided in the Contract
Documents, with such skill and care as to provide a satisfactory and proper installation. Loss or damage due
to acts or omissions of Construction Manager shall be the responsibility of Construction Manager and may
be deducted from any amounts due or to become due Construction Manager. Any defects discovered in
such materials or equipment shall be reported at once to the City and the City's contracted third -party
Design Professional. Following receipt of written notice from Construction Manager of defects, City and
Design Professional shall promptly inform Construction Manager what action, if any, Construction Manager
shall take with regard to the defects.
e. WORKSITE VISIT: Construction Manager acknowledges that it has visited, or has had the opportunity to
visit, the Worksite to visually inspect the general and local conditions which could affect the Work.
f. If applicable, Construction Manager shall perform cutting, fitting, and patching necessary to coordinate
the various parts of the Work and to prepare its Work for the work of City or Others.
i. Cutting, patching, or altering the work of City or Others shall be done with the prior written
approval of City and Design Professional. Such approval shall not be unreasonably withheld.
g. COMPLIANCE WITH LAWS: Construction Manager shall comply with all the Law at its own cost. Construction
Manager shall be liable to City for all loss, cost, or expense attributable to any acts or omissions by
Construction Manager, its employees, subcontractors, suppliers, and agents for failure to comply with
Laws, including fines, penalties, or corrective measures.
i. CHANGES IN THE LAW: The GMP, estimated Cost of the Work, Construction Manager's Fee, Date
of Substantial Completion or Date of Final Completion, and, if appropriate, the Compensation for
Preconstruction Services shall be equitably adjusted for additional costs or time needed resulting
from Laws enacted after the date of this Agreement, including taxes.
h. COST OF CORRECTING DAMAGED OR DESTROYED WORK: With regard to damage or loss attributable to the
acts or omissions of City or Others and not to Construction Manager, City may either (a) promptly remedy
RFP 24-15, CMAR for Maple Street Improvements
Page 2 of 21
Docusign Envelope ID: D4FC9441-8D54-46A7-AOA2-3FAD12272FEO
the damage or loss and assume affected warranty responsibilities, (b) accept the damage or loss, or (c)
issue a Change Order to remedy the damage or loss. If Construction Manager incurs costs or is delayed due
to such loss or damage, Construction Manager may seek an equitable adjustment in the GMP, estimated
Cost of the Work, Construction Manager's Fee, Date of Substantial Completion or Date of Final Completion,
and, if appropriate, the Compensation for Preconstruction Services under this Agreement. Any equitable
adjustment shall be approved by all parties.
Taxes and Permits: Construction Manager shall give public authorities all notices required by law and shall
obtain and pay for all necessary permits, licenses, taxes, and renewals pertaining to the Work. Construction
Manager shall provide to City copies of all notices, permits, licenses, and renewals required under this
Agreement.
DISCOUNTS: All discounts for prompt payment shall accrue to City. All trade discounts, rebates, and
refunds, and all returns from sale of surplus materials and equipment, shall be credited to the Cost of the
Work, or directly to the City after final payment.
k. City may occupy or use completed or partially completed portions of the Work when (a) the portion of the
Work is designated in a Certificate of Substantial Completion, (b) appropriate insurer(s) consent to the
occupancy or use, and (c) public authorities authorize the occupancy or use. Construction Manager shall
not unreasonably withhold consent to partial occupancy or use.
I. JOINT DRAFTING: All Parties expressly agree that this Agreement was jointly drafted, and that both had
opportunity to negotiate its terms and to obtain the assistance of counsel in reviewing its terms before
execution. Therefore, this Agreement shall be construed neither against nor in favor of either Party but
shall be construed in a neutral manner.
m. EXTENT OF AGREEMENT: Except as expressly provided, this Agreement is for the exclusive benefit of all
Parties, and not the benefit of any third party. This Agreement represents the entire and integrated
agreement between the Parties, and supersedes all prior negotiations, representations, or agreements,
either written or oral. This Agreement and each and every provision is for the exclusive benefit of all Parties
and not for the benefit of any third party.
n. ASSIGNMENT: Except as to the assignment of proceeds, no Party shall assign their interest in this
Agreement without the written consent of the other Party. The terms and conditions of this Agreement
shall be binding upon all Parties, their partners, successors, assigns, and legal representatives. No Party
shall assign the Agreement without written consent of the other.
o. Where figures are given, they shall be preferred to scaled dimensions.
p. The drawings and specifications are complementary. If Work is shown only on one but not on the other,
Construction Manager shall perform the Work as though fully described on both. CMAR shall seek
clarification from Design Professional for any discrepancies.
q. In case of conflicts between the drawings and specifications, the specifications shall govern. In any case of
omissions or errors in figures, drawings, or specifications, Construction Manager shall immediately submit
the matter to City and Design Professional for clarification. Design Professional's clarifications are final and
binding.
r. DEBARMENT AND SUSPENSION: By execution of this agreement, CMAR certifies that to the best of its
knowledge and belief that the CMAR and its principals:
i. Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily
excluded from covered transactions by any Federal department or agency;
ii. Have not within a three year period preceding this proposal been convicted of or had a civil
judgment rendered against them for commission of fraud or a criminal offense in connection with
RFP 24-15, CMAR for Maple Street Improvements
Page 3 of 21
Docusign Envelope ID: D4FC9441-8D54-46A7-AOA2-3FAD12272FEO
obtaining, attempting to obtain, or performing a public (Federal, State, or local) transaction or
contract under a public transaction; violation of Federal or State antitrust statutes or commission
of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false
statements, or receiving stolen property;
iii. Are not presently indicted for or otherwise criminally or civilly charged by a government entity
(Federal, State, or local) with commission of any of the offenses enumerated in paragraph (2) of
this certification; and
iv. (d) Have not within a three-year period preceding this application/proposal had one or more public
transactions (Federal, State, or local) terminated for cause or default.
v. CMAR understands that a false statement on certification regarding debarment and suspension
may be grounds for rejection of this proposal or termination of the award. In addition, under 18
USC Sec. 1001, a false statement may result in a fine. I further certify that I will obtain a similar
certification for each subcontract awarded in excess of $25,000.
vi. Certifications for subcontracts or sub subcontracts executed under this agreement shall include all
language in this section.
S. Definitions:
a. Unless otherwise specifically defined in this Agreement, any terms that have well-known technical or trade
meanings shall be interpreted in accordance with their well-known meanings.
b. "Business Day" means all Days, except weekends and official federal or state holidays where the Project is
located.
c. A "Change Order" is a written order signed by all Parties after execution of this Agreement, indicating
changes in thescope of the Work, theGMP and Dateof Substantial Completion or Date of Final Completion.
d. "Contract Time" is the period between the Date of Notice to Proceed and the total time authorized to
achieve Final Completion.
e. "Cost of the Work" means the sum of all allowed direct and indirect costs necessarily and reasonably
incurred and paid by CMAR in the performance of the Work including those set forth in the Guaranteed
Maximum Price Amendment.
f. The "Construction Manager at Risk" (CMAR or CM) is the person or entity identified in this contract and
includes Construction Manager's Representative.
g. "Day" means a calendar day unless otherwise specified.
h. "Defective Work" is any portion of the Work that that does not conform with the requirements of the
Contract Documents.
i. "Design Professional" means the licensed engineer and its subconsultants retained by the City and its
subconsultants, to perform design services for the Project.
j. "Final Completion" occurs on the date when CMAR's obligations under this Agreement are complete and
accepted by City and final payment becomes due and payable. This date shall be confirmed by a Certificate
of Final Completion signed by all Parties.
k. "Hazardous Material" is any substance or material identified now or in the future as hazardous under the
Law, or any other substance or material that may be considered hazardous or otherwise subject to
statutory or regulatory requirement governing handling, disposal, or cleanup.
RFP 24-15, CMAR for Maple Street Improvements
Page 4 of 21
Docusign Envelope ID: D4FC9441-8D54-46A7-AOA2-3FAD12272FEO
I. "Interim Directive" is a written order containing change to the Work directed by and in consultation with
City and Design Professional after execution of this Agreement and before Substantial Completion. Interim
Directives shall be consolidated and formalized in a change order to be signed by all parties.
m. "Law" means federal, state, or local laws, ordinances, codes, rules, and regulations applicable to the Work
with which Construction Manager must comply that are enacted as of the Agreement date.
n. "Others" means City's other: (a) contractors/constructors, (b) suppliers, (c) subcontractors, sub
subcontractors, or suppliers of (a) and (b); and others employed directly or indirectly by (a), (b), or (c) or
any by any of them or for whose acts any of them may be liable.
o. "Overhead" means (a) payroll costs, burden, and other compensation of CMAR's employees in CMAR's
principal and branch offices for work associated with this project.
p. "Owner" is the City of Fayetteville, Arkansas (City).
q. The "Parties" are collectively City and CMAR.
r. The "Project," is the building, facility, or other improvements for which CMAR is to perform Work under
this Agreement. It may also include construction by Owner or Others.
s. The "Schedule of the Work" is the document prepared by CMAR that specifies the dates on which CMAR
plans to begin and complete various parts of the Work, including dates on which information and approvals
are required from City.
t. "Subcontractor" is a person or entity retained by CMAR as an independent contractor to provide the labor,
materials, equipment, or services necessary to complete a specific portion of the Work. The term
Subcontractor does not include Design Professional or Others.
u. "Substantial Completion" of the Work, or of a designated portion, occurs on the date when the Work is
sufficiently complete in accordance with the Contract Documents so that City may occupy or utilize the
Work, or a designated portion, for the use for which it is intended, without unapproved disruption. This
date shall be confirmed by a certificate of Substantial Completion signed by all Parties.
v. A "Sub subcontractor" is a person or entity who has an agreement with a Subcontractor or another sub
subcontractor or Supplier to perform a portion of the Subcontractor's Work or supply material or
equipm ent.
w. A "Supplier" is a person or entity retained by CMAR to provide material or equipment for the Work.
x. "Terrorism" means a violent act, or an act that is dangerous to human life, property, or infrastructure, that
is committed by an individual or individuals and that appears to be part of an effort to coerce a civilian
population or to influence the policy or affect the conduct of any government by coercion. Terrorism
includes, but is not limited to, any act certified by the United States government as an act of terrorism
pursuant to the Terrorism Risk Insurance Act, as amended.
y. "Work" means the construction and administrative and management services necessary or incidental to
fulfill Construction Manager's obligations for the Project in accordance with and reasonably inferable from
the Contract Documents. The Work may refer to the whole Project or only a part of the Project if work is
also being performed by Owner or Others.
z. "Worksite" means the area of the Project where the Work is to be performed.
aa. "Bi-monthly basis" means every fourteen to sixteen calendar days.
RFP 24-15, CMAR for Maple Street Improvements
Page 5 of 21
Docusign Envelope ID: D4FC9441-8D54-46A7-AOA2-3FAD12272FE0
6. Contract Document Review and Administration
a. Before commencing the Work, Construction Manager shall examine and compare the drawings and
specifications with information furnished by the City and Design Professional that are considered Contract
Documents, relevant field measurements made by Construction Manager, and any visible conditions at the
Worksite affecting the Work.
b. Should Construction Manager discover any errors, omissions, or inconsistencies in the Contract
Documents, Construction Manager shall promptly report them to the City and Design Professional.
Following receipt of written notice from Construction Manager of defects, City shall promptly inform
Construction Manager what action, if any, Construction Manager shall take with regard to the defect.
c. Nothing in this section shall relieve CMAR of responsibility for its own errors, inconsistencies, or omissions.
d. COST REPORTING: Construction Manager shall maintain complete, accurate, and current records that
comply with generally accepted accounting principles and calculate the proper financial management
under this Agreement. Construction Manager shall maintain a complete set of all books and records
prepared or used by Construction Manager with respect to the Project. City shall be afforded access to all
of Construction Manager's records, books, correspondence, instructions, drawings, receipts, vouchers,
memoranda, and similar data relating to this Agreement. Construction Manager shall preserve all such
records for a period of three years after the final paym ent or longer where required by Law.
7. Warranty
a. Construction Manager warrants all materials and equipment furnished under the Construction Phase of
this Agreement will be new unless otherwise specified, of good quality, in conformance with the Contract
Documents, and free from defective workmanship and materials. At City or Design Professional request,
Construction Manager shall furnish satisfactory evidence of the quality and type of materials and
equipment furnished. Construction Manager further warrants all Work shall be free from material defects
not intrinsic in the design or materials required in the Contract Documents. Construction Manager's
warranty does not include remedies for defects or damages caused by normal wear and tear during normal
usage beyond the warranty period, use for a purpose for which the Project was not intended, improper or
insufficient maintenance, modifications performed by the City or others, or abuse. Construction Manager's
warranty shall commence on the Date of Final Completion of the Project.
b. To the extent products, equipment, systems, or materials incorporated in the Work are specified and
purchased by the City, they shall be covered exclusively by the warranty of the manufacturer. There are no
warranties which extend beyond the description on the face of any such warranty. For such incorporated
items, ALL OTHER WARRANTIES EXPRESSED OR IMPLIED INCLUDING THE WARRANTY OF
MERCHANTABILITY AND THE WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE ARE EXPRESSLY
DISCLAIMED.
c. Construction Manager shall obtain from its Subcontractors and Suppliers any special or extended
warranties required by the Contract Documents. Construction Manager's liability for such warranties shall
be limited to the one-year correction period, as further defined in this Agreement. After that period
Construction Manager shall provide full and comprehensive assistance to the City in enforcing the
obligations of Subcontractors or Suppliers for such extended warranties.
d. Correction of Work within Two Years
i. If before Substantial Completion or within two -years after the date of Final Completion of the Work
any Defective Work is found, City shall promptly notify Construction Manager in writing. Unless
City provides written acceptance of the condition, Construction Manager shall promptly correct
the Defective Work at its own cost and time and bear the expense of additional services required
for correction of any Defective Work for which it is responsible. If within the two-year correction
RFP 24-15, CMAR for Maple Street Improvements
Page 6 of 21
Docusign Envelope ID: D4FC9441-8D54-46A7-AOA2-3FAD12272FEO
period City discovers and does not promptly notify Construction Manager or give Construction
Manager an opportunity to test or correct Defective Work as reasonably requested by Construction
Manager, City waives Construction Manager's obligation to correct that Defective Work as well as
City's right to claim a breach of the warranty with respect to that Defective Work.
If Construction Manager fails to correct Defective Work within a reasonable time after receipt of
written notice from City before final payment, City may correct it in accordance with Owner's right
to carry out the Work. In such case, an appropriate Change Order shall be issued deducting the
cost of correcting the Defective Work from payments then or thereafter due Construction
Manager. If payments then or thereafter due Construction Manager are not sufficient to cover such
amounts, Construction Manager shall pay the difference to City.
iii. Construction Manager's obligations and liability, if any, with respect to any Defective Work
discovered after the two-year correction period shall be determined by the Law. If, after the two-
year correction period but before the applicable limitation period has expired, City discovers any
Work which City considers Defective Work, City shall, unless the Defective Work requires
emergency correction, promptly notify Construction Manager and allow Construction Manager an
opportunity to correct the Work if Construction Manager elects to do so. If Construction Manager
elects to correct the Work, it shall provide written notice of such intent within fourteen (14) Days
of its receipt ofnoticefrom City and shall completethe correction of Work within a mutually agreed
timeframe. If Construction Manager does not elect to correct the Work, City may have the Work
corrected by itself or Others, and, if City intends to seek recovery of those costs from Construction
Manager, City shall promptly provide Construction Manager with an accounting of the actual
correction costs.
iv. If Construction Manager's correction or removal of Defective Work causes damage to or destroys
other completed or partially completed work or existing building, Construction Manager shall be
responsible for the cost of correcting the destroyed or damaged property.
v. The two-year period for correction of Defective Work does not constitute a limitation period with
respect to the enforcement of Construction Manager's other obligations under the Contract
Doc um ents.
vi. Before final payment, at City option and with Construction Manager's agreement, City may elect
to accept Defective Work rather than require its removal and correction. In such cases the GMP
shall be equitably adjusted for any diminution in the value, as determined by City, of the Project
caused by such Defective Work.
8. Safety of Persons and Property
SAFETY PROGRAMS: Construction Manager holds overall responsibility for safety programs. However, such
obligation does not relieve Subcontractors of their safety responsibilities and to comply with the Law.
Construction Manager shall prevent against injury, loss, or damage to persons or property by taking
reasonable steps to protect: (a) its employees and other persons at the Worksite; (b) materials and
equipment stored at onsite or offsite locations for use in performing the Work; and (c) property located at
the Worksite and adjacent to work areas, whether or not the property is part of the Worksite.
b. CONSTRUCTION MANAGER'S SAFETY REPRESENTATIVE: Construction Manager shall designate an individual
at the Worksite in its employ as its safety representative. Unless otherwise identified by Construction
Manager in writing to City, Construction Manager's project superintendent shall serve as its safety
representative. Construction Manager shall report promptly in writing all recordable accidents and injuries
occurring at the Worksite. When Construction Manager is required to file an accident report with a public
authority, Construction Manager shall furnish a copy of the report to City.
RFP 24-15, CMAR for Maple Street Improvements
Page 7 of 21
Docusign Envelope ID: D4FC9441-8D54-46A7-AOA2-3FAD12272FEO
c. Construction Manager shall provide City with copies of all notices required of Construction Manager by the
Law. Construction Manager's safety program shall comply with the requirements of governmental and
quasi -governmental authorities having jurisdiction.
i. Damage or loss not insured under property insurance that may arise from the Work, to the extent
caused by negligent or intentionally wrongful acts or omissions of Construction Manager, or
anyone for whose acts Construction Manager may be liable, shall be promptly remedied by
Construction Manager.
d. If City deems any part of the Work or Worksite unsafe, City, without assuming responsibility for
Construction Manager's safety program, may require Construction Manager to stop performance of the
Work, take corrective measures satisfactory to City. If Construction Manager does not adopt corrective
measures, City may perform them and deduct their cost from the GMP. Construction Manager agrees to
make no claim for damages, or an increase in the GMP, or for a change in the Dates of Substantial or Final
Completion based on Construction Manager's compliance with City s reasonable request.
9. Subcontracts:
a. BINDING OF SUBCONTRACTORS AND SUPPLIERS: Construction Manager agrees to bind every Subcontractor
and Supplier and require every Subcontractor to so bind its subcontractors and significant supplier, to the
Contract Documents as they apply to the Subcontractor's or Supplier's applicable provisions to that portion
of the Work.
b. Construction Manager agrees not to subcontract construction manager at risk related services without
prior written consent from the City.
10. Fees, Expenses, and Payments: The maximum not -to -exceed amount authorized for this agreement is included in
the breakdown shown below. Fees shall be paid to the CMAR as described in Appendix B.
a. Phase 1: Pre -Construction Services
i. The maximum not -to -exceed amount authorized for this phase is $1.00 US Dollar. Fees shall be
paid to the CMAR from the City based Lump Sum basis as described in Appendix B.
b. Phase 2: Guaranteed Maximum Price (GMP)
i. If this Agreement is executed before establishment of the Guaranteed Maximum Price and its
acceptance by the City, then the GMP and its basis shall be set forth in a GMP Change Order.
ii. The GMP proposal shall include the cost of the Work, Construction Manager's Fee, the clarifications
upon which it is based, but shall not include compensation for Preconstruction Services (Phase 1).
iii. FAILURE TO ACCEPT THE GMP PROPOSAL: Unless the City accepts the GMP Proposal in writing the
GMP Proposal shall not be effective. If City fails to accept the GMP Proposal, or rejects the GMP
Proposal, City shall have the right to:
1. suggest modifications to the GMP Proposal
2. terminate the Agreement for convenience
iv. PRE-GMP WORK: Before City acceptance of the GMP Proposal, Construction Manager shall not
incur any cost to be reimbursed as part of the Cost of the Work, except as provided in this
Agreement or by change order executed by the Parties.
v. GMP shall be itemized, including but not limited to:
1. Wages for labor directly employed by Construction Manager in the performance of the
Scope of Services.
RFP 24-15, CMAR for Maple Street Improvements
Page 8 of 21
Docusign Envelope ID: D4FC9441-8D54-46A7-AOA2-3FAD12272FEO
2. Salaries of Construction Manager's employees when stationed at the field office, in
whatever capacity employed, employees engaged on the road expediting the production
or transportation of material and equipment, and employees from the principal or branch
office as mutually agreed by the Parties in writing.
3. Cost of all employee benefits and taxes, including but not limited to, workers'
compensation, unemployment compensation, social security, health, welfare, retirement,
and other fringe benefits as required by law, labor agreements, or paid under Construction
Manager's standard personnel policy, insofar as such costs are paid to employees of
Construction Manager who are included in the Cost of the Work.
4. Transportation, travel, hotel, and moving expenses of Construction Manager's personnel
incurred in connection with the Work.
5. Cost of all materials, supplies, and equipment incorporated in the Work, including costs of
inspection and testing if not provided by City, transportation, storage, and handling.
6. Payments made by Construction Manager to Subcontractors for work performed under
this Agreement.
7. Cost, including transportation and maintenance of all materials, supplies, equipment,
temporary facilities, and hand tools not owned by the workers that are used or consumed
in the performance of the Work, less salvage value or residual value; and cost less salvage
value on such items used, but not consumed that remain the property of Construction
Manager.
8. Rental charges of all necessary machinery and equipment, exclusive of hand tools owned
by workers, used at the Worksite, whether rented from Construction Manager or others,
including installation, repair, and replacement, dismantling, removal, maintenance,
transportation, and delivery costs at competitive market rates.
9. Cost of the premiums for all insurance and surety, performance or payment bonds which
Construction Manager is required to procure or deems necessary and approved by City
including any additional premium incurred as a result of any increase in the GMP at fixed
rates approved by the City.
10. Sales, use, gross receipts, or other taxes, tariffs, or duties related to the Work for which
Construction Manager is liable.
11. Permits, taxes, fees, licenses, tests, royalties.
12. Losses, expenses, or damages to the extent not compensated by insurance or otherwise,
and thecost of corrective work during the Construction Phase and for the warranty period.
13. Costs associated with establishing, equipping, operating, maintaining, mobilizing and
demobilizing the field office.
14. Water, power, and fuel costs necessary for the Work.
15. Cost of removal of all nonhazardous substances, debris, and waste materials
16. Costs incurred due to an emergency affecting the safety of persons or property.
17. Costs directly incurred in the performance of the Work or in connection with the Project,
and not included in Construction Manager's Fee, which are reasonably inferable from the
Contract Documents.
RFP 24-15, CMAR for Maple Street Improvements
Page 9 of 21
Docusign Envelope ID: D4FC9441-8D54-46A7-AOA2-3FAD12272FEO
c. Fees set for the construction of this project are intended to be executed upon agreement of all parties in a
not to exceed form via change order. Due to the funding nature of this project, all parties agree payment
to the CMAR shall be made as follows:
i. The City shall be responsible for a not to exceed cap.
Final amounts shall be identified with a Change Order, pursuant to agreement of all parties of a
Guaranteed Maximum Price.
CMAR shall track, log and report expenses directly related to this Agreement along with invoice which shall
include schedule of values for payment for each month. Invoices shall be itemized. Invoice and payment
requests shall not exceed the percentage of work completed as defined.
e. Payment Terms: All invoices are payable upon approval and due within thirty(30) calendar days. If a portion
of an invoice or statement is disputed by CITY, the undisputed portion shall be paid. CITY OF FAYETTEVILLE
shall advise CMAR in writing of the basis for any disputed portion of any invoice. CITY shall make reasonable
effort to pay invoices within 30 calendar days of date the invoice is approved.
f. STORED MATERIALS AND EQUIPMENT: Unless otherwise provided in the contract documents,
applications for payment may include materials and equipment not yet incorporated into the Work but
delivered to and suitably stored onsite or offsite including applicable insurance, storage, and costs
incurred transporting the materials to an offsite storage facility. Approval of payment applications for
stored materials and equipment stored offsite shall be conditioned on a submission by Construction
Manager of bills of sale and proof of required insurance, or such other documentation satisfactory to City
to establish the proper valuation of the stored materials and equipment, City's title to such materials and
equipment, and to otherwise protect City's interests therein, including transportation to the Worksite.
Materials and equipment stored offsite shall be in a bonded and insured secure facility.
g. Monthly invoices for each calendar month shall be submitted to City or such parties as City may designate
for professional services consistent with CMAR's normal billing schedule. Once established, the billing
schedule shall be maintained throughout the duration of the Project. Invoices shall be made in accordance
with a format to be developed by CMAR and approved by City. Applications for payment shall be
accompanied each month by the updated project schedule as the basis for determining the value earned
as the work is accomplished. Final payment for professional services shall be made upon CITY OF
FAYETTEVILLE'S approval and acceptance with the satisfactory completion of professional services for the
Project.
i. Retainage in the amount of five percent (5%) will be withheld from each payment until project final
completion.
ii. Upon Substantial Completion, the City may release retainage on that portion of the Work a
Subcontractor has completed in whole or in part, and which City have accepted.
Final Payment: Upon satisfactory completion of the work performed under this Agreement, as a condition
before final payment under this Agreement, or as a termination settlement under this Agreement, CMAR
shall execute and deliver to CITY OF FAYETTEVILLE a release of all claims against CITY OF FAYETTEVILLE
arising under or by virtue of this Agreement, except claims which are specifically exempted by CMAR to be
set forth therein.
Unless otherwise provided in this Agreement or by State law or otherwise expressly agreed to by
the parties to this Agreement, final payment under this Agreement or settlement upon termination
of this Agreement shall not constitute a waiver of CITY OF FAYETTEVILLE's claims against CMAR or
sureties under this Agreement.
RFP 24-15, CMAR for Maple Street Improvements
Page 10 of 21
Docusign Envelope ID: D4FC9441-8D54-46A7-AOA2-3FAD12272FEO
11. Project Bonding: Performance and payment bonding. After execution of this contract by all parties, CMAR shall
provide 100% separate performance and payment bonds from a bonding company, licensed to do business in the
state of Arkansas, to the City of Fayetteville after being file marked at the Washington County Circuit Clerk's Office.
Bonds shall be inclusive of any approved contingency. Bonds shall be provided within ten (10) calendar days after
GMP change order has been executed and approved by all parties.
a. Construction contracts for the project shall not be entered into between the CMAR and sub -contractor
without 100% payment and performance bonds in the amount of the contract (including any approved
contingency) and anyamendments thereto and shall providefor the manner in which the construction shall
be managed and supervised. Bonds shall be valid and exchanged between all parties prior to the start of
work.
b. A maintenance bond shall be provided for the duration of the entire warranty period.
c. All bonds shall be listed with the U.S. Treasury Department listing of approved surety's (T-List) and shall be
rated A+ minimum by A. M. Best.
12. Time:
a. SUBSTANTIAL and FINAL COMPLETION: Date of Substantial Completion and the Date of Final Completion
shall be established in a GMP Change Order to this Agreement (GMP) as a hard not to exceed date. If
such dates are not established upon the execution of this Agreement, at such time as GMP is accepted a
Date of Substantial Completion and Date of Final Completion of the Work shall be established in a GMP
Change Order.
b. Time is of the essence with regards to the obligations of the Contract Documents.
c. Unless instructed by City in writing, Construction Manager shall not knowingly commence the Work
before the effective date of Construction Manager's required insurance and bonds.
d. Schedule of Work: Before submitting its first application for payment, Construction Manager shall submit
to City and, if directed, Design Professional a Schedule of the Work showing the dates on which
Construction Manager plans to begin and complete various parts of the Work, including dates on which
information and approvals are required from City. Except as otherwise directed by City, Construction
Manager shall comply with the approved Schedule of the Work or Construction Manager.
Unless otherwise agreed, the Schedule of the Work shall be formatted in a detailed precedence -
style critical path method that (a) provides a graphic representation of all activities and events,
including float values that will affect the critical path of the Work, and (b) identifies dates that are
critical to ensure timely and orderly completion of the Work.
Construction Manager shall update the Schedule of the Work on a bi-monthly basis or as
mutually agreed by all Parties.
iii. City may determine the sequence in which the Work shall be performed, provided it does not
unreasonably interfere with the approved project schedule. City may require Construction
Manager to make reasonable changes in the sequence at any time during the performance of the
Work in order to facilitate the performance of work by City or Others. If Construction Manager
consequently incurs additional costs or is delayed, Construction Manager may seek equitable
adjustment of the GMP or the Dates of Substantial or Final Completion, or both.
e. NOTICE OF DELAY CLAIMS: If Construction Manager requests an equitable extension of the Contract Time
or an equitable adjustment in the GMP as a result of a delay described, Construction Manager shall give
City written notice of the claim. If Construction Manager causes delay in the completion of the Work, City
shall be entitled to recover its additional costs.
RFP 24-15, CMAR for Maple Street Improvements
Page 11 of 21
Docusign Envelope ID: D4FC9441-8D54-46A7-AOA2-3FAD12272FEO
f. MONITORING PROGRESS AND COSTS: Following acceptance by City of the GMP, Construction Manager
shall establish a process for monitoring actual costs against the GMP and actual progress against the
Schedule of Work. Construction Manager shall provide written reports to City at intervals as agreed to by
all Parties on the status of the Work, showing variances between actual costs and the GMP and actual
progress as compared to the Schedule of Work, including estimates of future costs and recovery
programs if actual progress indicates that the Dates of Substantial Completion or Final Completion may
not be met.
13. Substantial Completion:
a. Construction Manager shall notify City and, if directed, Design Professional when it considers Substantial
Completion of the Work or a designated portion to have been achieved. City, with the assistance of its
Design Professional, shall promptly conduct an inspection to determine whether the Work or designated
portion can be occupied or used for its intended use by City without excessive interference in completing
any remaining unfinished Work. If City determines the Work or designated portion has not reached
Substantial Completion, City, with the assistance of its Design Professional, shall promptly compile a list of
items to be completed or corrected so City may occupy or use the Work or designated portion for its
intended use. Construction Manager shall promptly and accurately complete all items on the list.
b. When Substantial Completion of the Work or a designated portion is achieved, Construction Manager shall
prepare a Certificate of Substantial Completion establishing the date of Substantial Completion and the
respective responsibilities of each Party for interim items such as security, maintenance, utilities, insurance,
and damage to the Work, and fixing the time for completion of all items on the list accompanying the
Certificate. The Certificate of Substantial Completion shall be submitted by Construction Manager to City
and, if directed, to Design Professional for written acceptance of responsibilities assigned in the Certificate
of Substantial Completion.
c. Upon City's written acceptance of the Certificate of Substantial Completion, City shall pay to Construction
Manager the remaining retainage held by City for the Work described in the Certificate of Substantial
Completion less a sum equal to one hundred and fifty percent (150%) of the estimated cost of completing
or correcting remaining items on that part of the Work, as agreed to by the Parties as necessary to achieve
Final Completion, including all close outs. Uncompleted items shall be completed by Construction Manager
in a mutually agreed upon timeframe.
14. Final Completion:
a. Upon notification from Construction Manager that the Work is complete and ready for final inspection and
acceptance, City, with the assistance of its Design Professional shall promptly conduct an inspection to
determine if the Work has been completed and is acceptable under the Contract Documents.
b. When the Work is complete, Construction Manager shall prepare for City's written acceptance a final
application for payment stating that to the best of Construction Manager's knowledge, and based on City's
inspections, the Work has reached Final Completion in accordance with the Contract Documents.
c. Final payment of the balance of the GMP shall be made to Construction Manager within thirty (30) Days
after Construction Manager has submitted an application for final payment, pending the application has
been approved by the City, including submissions required, and a Certificate of Final Completion has been
executed by all Parties.
d. Final payment shall be due on Construction Manager's submission of the following to the City:
i. an affidavit declaring any indebtedness connected with the Work, to have been paid, satisfied, or
to be paid with the proceeds of final payment, so as not to encumber City property;
RFP 24-15, CMAR for Maple Street Improvements
Page 12 of 21
Docusign Envelope ID: D4FC9441-8D54-46A7-AOA2-3FAD12272FEO
ii. as -built drawings, manuals, copies of warranties, and all other close-out documents required by
the Contract Documents;
iii. release of any liens, conditioned on final payment being received;
iv. consent of any surety; and
v. any outstanding known and unreported accidents or injuries experienced by Construction Manager
or its Subcontractors at the Worksite.
e. If, after Substantial Completion of the Work, the Final Completion of a portion of the Work is materially
delayed through no fault of Construction Manager. The City may pay the balance due for any portion of the
Work fully completed and accepted. If the remaining contract balance for Work not fully completed and
accepted is less than the retained amount before payment, Construction Manager shall submit to City and,
if directed, Design Professional the written consent of any surety to payment of the balance due for
portions of the Work that are fully completed and accepted. Such payment shall not constitute a waiver of
claims.
f. Warranties required by the Contract Documents shall commence on the date of Final Completion of the
Work or a designated portion.
g. ACCEPTANCE OF FINAL PAYMENT: Unless Construction Manager provides written identification of
unsettled claims with an application for final payment, its acceptance of final payment constitutes a waiver
of such claims.
h. CMAR shall ensure that the City of Fayetteville receives lien waivers from all material suppliers,
subcontractors and sub -subcontractors and before work begins on the project. The contractor shall give
written notice to the material suppliers, subcontractors and sub -subcontractors providing work on the
project that states the following:
i. `According to Arkansas law, it is understood that no liens can be filed against public property if valid
and enforceable payment and performance bond is in place. Regarding this Project and Agreement,
the valid and enforceable bonds are with ( name of surety V
ii. CMAR shall direct its subcontractors to obtain a written receipt evidencing acknowledgment of this
statement from sub -subcontractors.
15. Notices: Any notice required to be given under this Agreement to either party to the other shall be sufficient if
addressed and mailed, certified mail, postage paid, delivery, fax or e-mail (receipt confirmed), or overnight courier.
16. Jurisdiction: Legal jurisdiction to resolve any disputes shall be Arkansas with Arkansas law applying to the case.
17. Venue: Venue for all legal disputes shall be Washington County, Arkansas.
18. Freedom of Information Act: City of Fayetteville contracts and documents prepared while performing contractual
work are subject to the Arkansas Freedom of Information Act. If a Freedom of Information Act request is presented
to the City of Fayetteville, the CMAR shall do everything possible to provide the documents in a prompt and timely
manner as prescribed in the Arkansas Freedom of Information Act (A.C.A. 25-19-101 et. Seq.). Only legally
authorized photo coping costs pursuant to the FOIA may be assessed for this compliance.
19. Changes in Scope or Price: Changes, modifications, or amendments in scope, price or fees to this contract shall not
be allowed without a prior formal contract amendment approved by the Mayor and the City Council in advance of
the change in scope, cost or fees.
RFP 24-15, CMAR for Maple Street Improvements
Page 13 of 21
Docusign Envelope ID: D4FC9441-8D54-46A7-AOA2-3FAD12272FE0
20.Insurance:
a. Before starting the Work and as a condition precedent to payment, Construction Manager shall procure
and maintain in force Workers' Compensation Insurance, Employers' Liability Insurance, Business
Automobile Liability Insurance, and Commercial General Liability Insurance ("CGL"). The CGL policy shall
include coverage for liability arising from premises, operations, independent contractors, products -
completed operations, personal injury and advertising injury, contractual liability, pollution coverage, and
broad form property damage. Construction Manager shall maintain completed operations liability
insurance for one year after Substantial Completion, or as required by the Contract Documents, whichever
is longer. Construction Manager's Employers' Liability, Business Automobile Liability and CGL policies shall
be written with at least the limits of liability presented in Appendix C.
b. Employers' Liability, Business Automobile Liability, and CGL coverages required may be provided by a single
policy for the full limits required or by a combination of underlying policies with the balance provided by
excess or umbrella liability policies.
c. Construction Manager shall maintain in effect all insurance coverage required with insurance companies
lawfully authorized to do business in thejurisdiction in which the Project is located. If Construction Manager
fails to obtain or maintain any insurance coverage required under this Agreement, City may purchase such
coverage and charge the expense to Construction Manager or terminate this Agreement.
d. To the extent commercially available to Construction Manager from its current insurance company,
insurance policies required shall contain a provision that the insurance company or its designee shall give
City written notice transmitted in paper and electronic format: (a) 30 Days before coverage is nonrenewed
by the insurance company and (b) within 10 Business Days after cancelation of coverage by the insurance
company. Before commencing the Work and upon renewal or replacement of the insurance policies,
Construction Manager shall furnish City with certificates of insurance until one year after Substantial
Completion or longer if required by the Contract Documents. In addition, if any insurance policy required
is not to be immediately replaced without lapse in coverage when it expires, exhausts its limits, or is to be
cancelled, Construction Manager shall give City prompt written notice upon actual or constructive
knowledge of such condition.
e. Certificates of Insurance shall list the City as Additional Insured Parties.
f. PROPERTY INSURANCE:
i. At no time shall any policy be covered by self-insurance or in a self -insured format. All policies shall
be covered by an approved commercial insurance professional properly licensed to do business in
Arkansas.
ii. Unless otherwise directed in writing by City, before starting the Work, CMAR shall obtain and
maintain a Builder's Risk Policy upon the entire Project for the full cost of replacement at the time
of loss, including existing structures. This insurance shall also (a) name Construction Manager,
Subcontractors, Sub subcontractors, and Design Professional as named insureds; (b) be written in
such form to cover all risks of physical loss except those specifically excluded by the policy; and (c)
insure at least against and not exclude:
1. the perils of fire, lightning, explosion, windstorm, hail, smoke, aircraft (except aircraft,
including helicopter, operated by or on behalf of Construction Manager) and vehicles, riot
and civil commotion, theft, vandalism, malicious mischief, debris removal, flood,
earthquake, earth movement, water damage, wind damage, testing if applicable, collapse,
however caused;
2. damage resulting from defective design, workmanship, or material;
RFP 24-15, CMAR for Maple Street Improvements
Page 14 of 21
Docusign Envelope ID: D4FC9441-8D54-46A7-AOA2-3FAD12272FEO
3. coverage extension for damage to existing buildings, plant, or other structures at the
Worksite, when the Project is contained within or attached to such existing buildings, plant
or structures. Coverage shall be to the extent loss or damage arises out of Constructor's
activities or operations at the Project;
4. equipment breakdown, including mechanical breakdown, electrical injury to electrical
devices, explosion of steam equipment, and damage to steam equipment caused by a
condition within the equipment;
5. testing coverage for running newly installed machinery and equipment at or beyond the
specified limits of their capacity to determine whether they are fit for their intended use;
and
6. physical loss resulting from Terrorism
iii. The Party that is the primary cause of a Builder's Risk Policy claim shall be responsible for any
deductible amounts or coinsurance payments. If no Party is the primary cause of a claim, then the
Party obtaining and maintaining the Builder's Risk Policy shall be responsible for the deductible
amounts or coinsurance payments. This policy shall provide for a waiver of subrogation. This
insurance shall remain in effect until final payment has been made or until no person or entity
other than City has an insurable interest in the propertyto be covered bythis insurance, whichever
is sooner. Partial occupancy or use of the Work shall not commence until City has secured the
consent of the insurance company or companies providing the coverage required in this
subsection. Before commencing the Work, City shall provide a copy of the property policy or
policies obtained.
iv. If City elects to purchase the property insurance required by this Agreement, including all of the
coverages and deductibles for the same durations specified, City shall give written notice to
Construction Manager before the Work is commenced and provide a copy of the property policy
or policies obtained in compliance with this agreement. City maythen provide insurance to protect
its interests and the interests of the Constructor, Subcontractors, Suppliers, and Sub
subcontractors. The cost of this insurance shall be paid by City in a Change Order. If City gives
written notice of its intent to purchase property insurance required by this Agreement and fails to
purchase or maintain such insurance, City shall be responsible for costs reasonably attributed to
such failure.
v. The Parties each waive all rights against each other and their respective employees, agents,
contractors, subcontractors, suppliers, sub subcontractors, and design professionals for damages
caused by risks covered by the property insurance, except such rights as they may have to the
proceeds of the insurance.
1. To the extent of the limits of Construction Manager's Commercial General Liability
Insurance, Construction Manager shall indemnify and hold harmless City against any and
all liability, claims, demands, damages, losses, and expenses, including attorneys' fees, in
connection with or arising out of any damage or alleged damage to any of City's existing
adjacent property, including personal property, that may arise from the performance of
the Work, to the extentcaused bythe negligent or intentionally wrongful acts or omissions
of Construction Manager, Subcontractor, Supplier, Sub subcontractor, or anyone
employed directly or indirectly by any of them or by anyone for whose acts any of them
may be liable.
g. RISK OF LOSS: Except to the extent a loss is covered by applicable insurance, risk of loss from damage to
the Work shall be upon the Party obtaining and maintaining the Builder's Risk until the Date of Final
Completion.
RFP 24-15, CMAR for Maple Street Improvements
Page 15 of 21
Docusign Envelope ID: D4FC9441-8D54-46A7-AOA2-3FAD12272FE0
h. ADDITIONAL GENERAL LIABILITY COVERAGE: City shall require Construction Manager to purchase and
maintain additional liability coverage. Construction Manager shall provide:
Additional Insured. City shall be named as an additional insured on Construction Manager's
Commercial General Liability (CGL) specified, for on -going operations and completed operations,
excess/umbrella liability, commercial automobile liability, and any required pollution liability, but
only with respect to liability for bodily injury, property damage, or personal and advertising injury
to the extent caused by the negligent acts or omissions of Construction Manager, or those acting
on Construction Manager's behalf, in the performance of Construction Manager's work for Owner
at the Worksite. The insurance of the Construction Manager and its Subcontractors (both primary
and excess) shall be primary to any insurance available to the Additional Insureds. Any insurance
available to the Additional Insureds shall be excess and non-contributory.
ii. OCP. Construction Manager shall provide an Owners' and Contractors' Protective Liability
Insurance ("OCP") policy with limits equal to the limits on CGL specified, or limits as otherwise
required by Owner.
Any documented additional cost in the form of a surcharge associated with procuring the additional liability
coverage in accordance with this subsection shall be paid by CMAR. Before commencing the Work,
Construction Manager shall provide either a copy of the OCP policy, or a certificate and endorsement
evidencing that City has been named as an additional insured, as applicable.
ROYALTIES, PATENTS, AND COPYRIGHTS: Construction Manager shall pay all royalties and license
fees, unless otherwise specified in the Contract Documents, which may be due on the inclusion of
any patented or copyrighted materials, methods, or systems selected by Construction Manager
and incorporated in the Work. Construction Manager shall defend, indemnify, and hold City
harmless from all suits or claims for infringement of any patent rights or copyrights arising out of
such selection unless such design, process or product of a particular manufacturer or
manufacturers is required by the Contract Documents, or where the copyright violations are
contained in documents prepared by the Owner.
PROFESSIONAL LIABILITY INSURANCE: To the extent Construction Manager is required to procure design
services, Construction Manager shall require its design professionals to obtain a commercial professional
liability insurance for claims arising from the negligent performance of professional services under this
Agreement, with a company reasonably satisfactory to City, including coverage for all professional liability
caused by any consultants to Construction Manager's design professional, written for not less than one
million US dollars ($1,000,000) per claim and in the aggregate. Construction Manager's design professional
shall pay the deductible. The Professional Liability Insurance shall contain a retroactive date providing prior
acts coverage sufficient to cover all Services performed by the Constructor's design professional for this
Project. Coverage shall be continued in effect for the entire warranty period.
21. Professional Responsibility: CMAR will exercise reasonable skill, care, and diligence in the performance of services
and will carry out its responsibilities in accordance with customarily accepted professional practices. CITY OF
FAYETTEVILLE will promptly report to CMAR any defects or suspected defects in services of which CITY OF
FAYETTEVILLE becomes aware, so CMAR can take measures to minimize the consequences of such a defect. CITY
OF FAYETTEVILLE retains all remedies to recover for its damages caused by any negligence of CMAR.
22. Responsibility of the aty of Fayetteville
a. CITY OF FAYETTEVILLE shall, within a reasonable time, so as not to delay the services of CMAR:
i. Provide full information as to the requirements for the Project.
RFP 24-15, CMAR for Maple Street Improvements
Page 16 of 21
Docusign Envelope ID: D4FC9441-8D54-46A7-A0A2-3FAD12272FEO
ii. Assist CMAR by placing at CMAR's disposal all available information pertinent to the assignment
including previous reports and any other data relative thereto.
iii. Assist CMAR in obtaining access to property reasonably necessary for CMAR to perform its services.
iv. Examine all studies, reports, sketches, cost opinions, proposals, and other documents presented
by CMAR and render in writing decisions pertaining thereto.
v. Review all documents and provide written comments to CMAR in a timely manner.
vi. The City of Fayetteville Public Works Director, or their designee, is the project representative with
respect to the services to be performed under this Agreement. The Public Works Director shall
have complete authority to transmit instructions, receive information, interpret and define policies
and decisions with respect to materials, equipment, elements and systems to be used in the
Project, and other matters pertinent to the services covered by this Agreement.
23. Cost Opinions and Projections: Cost opinions and projections prepared by the CMAR relating to construction costs
and schedules, operation and maintenance costs, equipment characteristics and performance, cost estimating, and
operating results are based on CMAR's experience, qualifications, and judgment as a CMAR professional.
24. Period of Service: This Agreement will become effective upon the first written notice by CITY OF FAYETTEVILLE
authorizing services hereunder.
a. The provisions of this Agreement have been agreed to in anticipation of the orderly progress of the Project
through completion of the services stated in the Agreement. CMAR shall proceed with providing the
authorized services immediately upon receipt of written authorization from CITY OF FAYETTEVILLE. Said
authorization shall include the scope of the services authorized and the time in which the services are to
be completed.
25. Termination:
a. This Agreement may be terminated in whole or in part in writing by either party in the event of substantial
failure by the other party to fulfill its obligations under this Agreement through no fault of the terminating
party, provided that no termination may be effected unless the other party is given:
i. Not less than ten (10) calendar days written notice (delivered by certified mail, return receipt
requested) of intent to terminate,
ii. An opportunity for consultation with the terminating party prior to termination.
b. This Agreement may be terminated in whole or in part in writing by CITY OF FAYETTEVILLE for its
convenience, provided that CMAR is given:
i. Not less than ten (10) calendar days written notice (delivered by certified mail, return receipt
requested) of intent to terminate,
ii. An opportunity for consultation with the terminating party prior to termination.
c. If termination for default is affected by CITY OF FAYETTEVILLE, an equitable adjustment in the price
provided for in this Agreement shall be made, but
i. No amount shall be allowed for anticipated profit on unperformed services or other work,
ii. Any payment due to CMAR at the time of termination may be adjusted to cover any additional
costs to CITY OF FAYETTEVILLE because of CMAR's default.
RFP 24-15, CMAR for Maple Street Improvements
Page 17 of 21
Docusign Envelope ID: D4FC9441-8D54-46A7-AOA2-3FAD12272FE0
d. If termination for default is affected by CMAR, or if termination for convenience is affected by CITY OF
FAYETTEVILLE, the equitable adjustment shall include a reasonable profit for services or other work
performed. The equitable adjustment for any termination shall provide for payment to CMAR for services
rendered and expenses incurred prior to the termination, in addition to termination settlement costs
reasonably incurred by CMAR relating to commitments which had become firm prior to the termination.
e. Upon receipt of a termination action under Paragraphs above, CMAR shall:
i. Promptly discontinue all affected work (unless the notice directs otherwise),
ii. Deliver or otherwise make available to CITY OF FAYETTEVILLE all data, drawings, specifications,
reports, estimates, summaries and such other information and materials as may have been
accumulated by CMAR in performing this Agreement, whether completed or in process.
f. Upon termination under sections above CITY OF FAYETTEVILLE may take over the work and may award
another party an agreement to complete the work under this Agreement.
g. If, after termination for failure of CMAR to fulfill contractual obligations, it is determined that CMAR had
not failed to fulfill contractual obligations, the termination shall be deemed to have been for the
convenience of CITY OF FAYETTEVILLE. In such event, adjustments of the agreement price shall be made
as provided in this agreement.
26. Delays
a. In the event the services of CMAR are suspended or delayed by CITY OF FAYETTEVILLE, or by other events
beyond CMAR's reasonable control, CMAR shall be entitled to additional compensation and time for
reasonable documented costs incurred by CMAR in temporarily closing down or delaying the Project.
b. In the event the services are suspended or delayed by CMAR, CITY shall be entitled to compensation and
time for reasonable costs incurred in temporarily closing down or delaying the Project.
27. Rights and Benefits: CMAR's services shall be performed solely for the benefit of CITY OF FAYETTEVILLE and not for
the benefit of any other persons or entities.
28. Dispute Resolution
a. Scope of Paragraph: The procedures of this Paragraph shall apply to any and all disputes between CITY OF
FAYETTEVILLE and CMAR which arise from, or in any way are related to, this Agreement, including, but not
limited to the interpretation of this Agreement, the enforcement of its terms, any acts, errors, or omissions
of CITY OF FAYETTEVILLE or CMAR in the performance of this Agreement, and disputes concerning
payment.
b. Exhaustion of Remedies Required: No action may be filed unless the parties first negotiate. If timely Notice
is given as described in this agreement, but an action is initiated prior to exhaustion of these procedures,
such action shall be stayed, upon application by either party to a court of proper jurisdiction, until the
procedures in this agreement have been complied with.
c. Notice of Dispute
i. For disputes arising prior to the making of final payment promptly after the occurrence of any
incident, action, or failure to act upon which a claim is based, the party seeking relief shall serve
the other party with a written Notice.
ii. For disputes arising within one year after the making of final payment, CITY OF FAYETTEVILLE shall
give CMAR written Notice at the address listed in this agreement within thirty (30) calendar days
after occurrence of any incident, accident, or first observance of defect or damage. In both
RFP 24-15, CMAR for Maple Street Improvements
Page 18 of 21
Docusign Envelope ID: D4FC9441-8D54-46A7-AOA2-3FAD 12272FEO
instances, the Notice shall specify the nature and amount of relief sought, the reason relief should
be granted, and the appropriate portions of this Agreement that authorize the relief requested.
iii. Negotiation: Within seven (7) calendar days of receipt of the Notice, the Project Managers for CITY
OF FAYETTEVILLE and CMAR shall confer in an effort to resolve the dispute. If the dispute cannot
be resolved at that level, then, upon written request of either side, the matter shall be referred to
the President of CMAR, and the Mayor of CITY OF FAYETTEVILLE or his or her designee. These
officers shall meet at the Project Site or such other location as is agreed upon within 30 calendar
days of the written request to resolve the dispute.
29. Sufficient Funds: The CITY represents to have sufficient funds or the means of obtaining funds to remit payment to
CMAR for services rendered by CMAR. All parties agree if funding should become insufficient to complete the
project, CMAR shall be notified in a timely manner.
30. Publications: Recognizing the importance of professional services on the part of CMAR's employees and the
importance of CMAR's public relations, CMAR may prepare publications, such as technical papers, articles for
periodicals, promotional materials, and press releases, in electronic or other format, pertaining to CMAR's services
for the Project. Such publications will be provided to CITY OF FAYETTEVILLE in draft form for CITY OF FAYETTEVILLE's
advance review. CITY OF FAYETTEVILLE shall review such drafts promptly and provide CITY OF FAYETTEVILLE's
comments to CMAR, CITY OF FAYETTEVILLE may require deletion of proprietary data or confidential information
from such publications, but otherwise CITY OF FAYETTEVILLE will not unreasonably withhold approval. Approved
materials may be used in a variety of situations and do not require additional review or approval for each use. The
cost of CMAR's activities pertaining to any such publication shall be for CMAR's account.
31. Indemnification: To the fullest extent permitted by law, the CMAR shall indemnify and hold harmless the City from
and against claims, damages, losses and expenses, including but not limited to attorneys' fees, arising out of or
resulting from performance of the Work, provided that such claim, damage, loss or expense is attributable to bodily
injury, sickness, disease or death or injury to or destruction of tangible property (other than the Work itself) but
only to the extent caused by the negligent acts or omissions of the CMAR, a Subcontractor, anyone directly or
indirectly employed by them, or anyone for whose acts they may be liable, regardless of whether or not such claim,
damage, loss, or expense is caused in part by a party indemnified hereunder. Such obligation shall not be construed
to negate, abridge, or reduce other rights or obligations of indemnity that would otherwise exist as to a party or
person described in this Agreement.
32. Ownership of Documents:
All documents provided by CITY OF FAYETTEVILLE including original drawings, CAD drawings, estimates,
field notes, and project data are and remain the property of CITY OF FAYETTEVILLE. CMAR may retain
reproduced copies of drawings and copies of other documents.
Engineering and architectural documents, computer models, drawings, specifications and other hard copy
or electronic media prepared by CMAR as part of the Services shall become the property of CITY OF
FAYETTEVILLE when CMAR has been compensated for all Services rendered, provided, however, that CMAR
shall have the unrestricted right to their use. CMAR shall, however, retain its rights in its standard drawings
details, specifications, databases, computer software, and other proprietary property. Rights to intellectual
property developed, utilized, or modified in the performance of the Services shall remain the property of
CMAR.
c. Any files delivered in electronic medium may not work on systems and software different than those with
which they were originally produced. CMAR makes no warranty as to the compatibility of these files with
any other system or software. Because of the potential degradation of electronic medium over time, in the
event of a conflict between the sealed original drawings/hard copies and the electronic files, the sealed
drawings/hard copies will govern.
RFP 24-15, CMAR for Maple Street Improvements
Page 19 of 21
Docusign Envelope ID: D4FC9441-8D54-46A7-AOA2-3FAD12272FEO
33. Additional Responslbilltles of CMAR:
a. Review, approval, or acceptance of design drawings, specifications, reports and other services furnished
hereunder by CITY shall not in any way relieve CMAR of responsibility for the technical adequacy of the
work. Review, approval or acceptance of, or payment for any of the services by CITY shall not be construed
as a waiver of any rights under this Agreement or of any cause of action arising out of the performance of
this Agreement.
b. CMAR shall be and shall remain liable, in accordance with applicable law, for all damages to CITY OF
FAYETTEVILLE caused by CMAR's negligent performance, except beyond the CMAR's normal standard of
care, of any of the services furnished under this Agreement, and except for errors, omissions or other
deficiencies to the extent attributable to CITY OF FAYETTEVILLE or CITY OF FAYETTEVILLE-furnished data.
c. CMAR's obligations under this clause are in addition to CMAR's other express or implied assurances under
this Agreement or State law and in no way diminish any other rights that CITY OF FAYETTEVILLE may have
against CMAR for faulty materials, equipment, or work.
34. Audit and Access to Records:
a. CMAR shall maintain books, records, documents and other evidence directly pertinent to performance on
work under this Agreement in accordance with generally accepted accounting principles and practices
consistently applied in effect on the date of execution of this Agreement.
b. CMAR shall also maintain the financial information and data used by CMAR in the preparation of support
of the cost submission required for any negotiated agreement or change order and send to CITY OF
FAYETTEVILLE a copy of the cost summary submitted. CITY OF FAYETTEVILLE, the State or any of their
authorized representatives shall have access to all such books, records, documents and other evidence for
the purpose of inspection, audit and copying during normal business hours. CMAR will provide proper
facilities for such access and inspection.
c. Records shall be maintained and made available during performance on assisted work under this
Agreement and until three years from the date of final payment for the project. In addition, those records
which relate to any controversy arising out of such performance, or to costs or items to which an audit
exception has been taken, shall be maintained and made available until three years after the date of
resolution of such appeal, litigation, claim or exception.
d. This right of access clause (with respect to financial records) applies to:
i. Negotiated prime agreements
ii. Negotiated change orders or agreement amendments affecting the price of any formally
advertised, competitively awarded, fixed price agreement
iii. Agreements or purchase orders under any agreement other than a formally advertised,
competitively awarded, fixed price agreement. However, this right of access does not apply to a
prime agreement, lower tier sub agreement or purchase order awarded after effective price
competition, except:
1. With respect to record pertaining directly to sub agreement performance, excluding any
financial records of CMAR;
2. If there is any indication that fraud, collusion, gross abuse or corrupt practices may be
involved;
3. If the sub agreement is terminated for default or for convenience.
RFP 24-15, CMAR for Maple Street Improvements
Page 20 of 21
Docusign Envelope ID: D4FC9441-8D54-46A7-AOA2-3FAD12272FEO
35. Covenant Against Contingent Fees: CMAR warrants that no person or selling agency has been employed or retained
to solicit or secure this Agreement upon an agreement of understanding for a commission, percentage, brokerage
orcontinentfee, excepting bona fide employees or bona fide established commercial orselling agencies maintained
by CMAR for the purpose of securing business. For breach or violation of this warranty, CITY OF FAYETTEVILLE shall
have the right to annul this Agreement without liability or at its discretion, to deduct from the contract price or
consideration, or otherwise recover, the full amount of such commission, percentage, brokerage, or contingent fee.
36. Gratuities:
a. If CITY OF FAYETTEVILLE finds after a notice and hearing that CMAR or any of CMAR agents or
representatives, offered or gave gratuities (in the form of entertainment, gifts or otherwise) to any official,
employee or agent of CITY OF FAYETTEVILLE or related third party contractor associated with this project,
in an attempt to secure an agreement or favorable treatment in awarding, amending or making any
determinations related to the performance of this Agreement, CITY OF FAYETTEVILLE may, by written
notice to CMAR terminate this Agreement. CITY OF FAYETTEVILLE may also pursue other rights and
remedies that the law or this Agreement provides. However, the existence of the facts on which CITY OF
FAYETTEVILLE bases such finding shall be in issue and may be reviewed in proceedings under the Remedies
clause of this Agreement.
b. The CITY may pursue the same remedies against CMAR as it could pursue in the event of a breach of the
Agreement by CMAR. As a penalty, in addition to any other damages to which it may be entitled by law,
CITY OF FAYETTEVILLE may pursue exemplary damages in an amount, as determined by CITY, which shall
be not less than three nor more than ten times the costs CMAR incurs in providing any such gratuities to
any such officer or employee.
37. Clarification and Understanding of all parties:
a. The citizens of Fayetteville voted to authorize the Fayetteville City Council to issue bonds to fund this
project.
b. All parties agree and acknowledge that all funds derived from the City's sale of the bonds may only be spent
or used for purposes authorized by the City voters and applicable state law.
IN WITNESS WHEREOF, CITY OF FAYETTEVILLE, ARKANSAS by and through its Mayor, and FLINTCO, LLC. by its authorized
officer have made and executed this Agreement as of the day and year first above written
CITY OF FAYETTEVILLE. ARKANSAS
N*
By:
Molly A. Rawn, Mayor
ATTEST:
�
FAYETfEVILLE �-
9'•
Bv:
.
Kara Paxton, City Clerk -Treasurer
Date Signed
3/18/2025
RFP 24-15, CMAR for Maple Street Improvements
Page 21 of 21
FLINTCO, LLC.
DoouSfgned by:
By:
Brent Farmer, Vice President/Area Manager
Date Signed:
2/26/2025 1 9:42 AM PST
APPENDIX A —SCOPE OF WORK
for
RFP 24-15, CMAR for Maple Street Improvements
1. PROJECTSUMMARY
Flintco, LLC. shall provide construction management at risk (CMAR) services for the Maple Street Improvments
Project. The project includes storm drainage, sidewalks, protected bike lane, enhanced crosswalks, turn lanes, new
traffic signals, street lighting and landscaping.
2. SCOPE OF WORK
a. Overview: Anticipated phases are identified below with associated scope of work. Scope of work is not limited to
any additional industry standard scope of work necessary to complete each phase. Flintco, LLC shall coordinate with
the design team composed of Olsson Inc., the City of Fayetteville, and the University of Arkansas in order to achieve
best value for the overall success of the project, including working to achieve maximum cost savings. Coordination
with design team is critical for all phases.
b. Phase 1: Design Development and Construction Drawings from the Current Plans to Final Plans
i. Construction Documents Phase
1. CMAR shall develop a construction phasing plan
2. CMAR shall develop a construction schedule
3. CMAR shall develop cost estimates for the most current design set and specifications and evaluate
cost reduction alternatives and control.
4. Provide industry standard construction manager services, including but not limited to development
of costs, identifying potential design changes which could result in cost savings or construction
efficiencies, interact with the design team for review of documents, etc.
5. Coordinate with Olsson on Final Design Document sets, Final Specifications, and Cost Estimates and
Schedule to present to the Design Team. (90% plan review).
6. After receiving 90% design review comments, meet with applicable City of Fayetteville and
University of Arkansas Staff to resolve comments.
7. Assist Olsson in responding in writing to all City of Fayetteville and Universityof Arkansas comments
on plans.
8. Assist Olsson in coordinating with City -owned utilities, University of Arkansas utilities, private
utilities, and service providers.
9. Attend follow up meetings with the design team.
10. Construction Documents/Plans, Specifications and Project Drawings shall be routed through the
City of Fayetteville and University of Arkansas for required approvals.
11. Assist Olsson and the City with the bid form and identify all separate trade packages.
12. Facilitate with Olsson and the Design Team in conducting cost -benefit analyses to understand
construction costs, life -cycle cost impacts and long-term maintenance costs.
RFP 24-15, CMAR for Maple Street Improvements
APPENDIX A —SCOPE OF WORK
Page 1 of 3
13. Coordinate with the design team to create plans for closure and detour of both pedestrian and
street zones based on construction phasing.
14. Provide pedestrian access and ADA accessibility plan for construction duration.
ii. Bid Phase
1. Coordinate with City Purchasing Division to ensure all procedures followed for this phase meet
state laws and City of Fayetteville Purchasing Policies.
2. Provide services for reproduction and dissemination of bid sets (project manual and stamped
drawings) to the City Design Team [PM (1), Purchasing (1) and interested bidders]. Documents
should be made available to any interested party electronically at no cost.
3. Provide distribution of plans to all interested parties:
a. Maintain open communication with the City of Fayetteville Purchasing Division throughout
the bidding process.
b. Distribution of all documents shall be done in a fair and unbiased manner while keeping all
interested parties on equal terms.
c. Document and keep an updated accurate record of plan holder's and provide updated
listings to all interested parties in a timely manner.
d. Answers to questions and inquiries shall be made in the form of an addendum and shall be
provided to all interested parties at the same time.
4. Coordinate with City Purchasing Division during pre -bid meeting, facilitate and attend the Bid
Opening.
5. Maintain open communication with the City Purchasing Division during any process involving
Request for Information (RFI).
6. Any addenda shall be provided to the Purchasing Division for review and approval in advance of
issuance. Bidders, interested parties, and plan holders shall receive all information included in
addenda at the time addenda is issued.
7. In the event the CMAR desires to self -perform a portion of the work or a trade package, the CMAR
shall submit a bid package in the same time and manner as other interested parties.
S. Assist with the design of all Bid Proposals.
9. Review Olsson's Recommendation of Award Letter that includes the following required content
(and assist with):
a. Check for math errors and reconcile any mathematical discrepancies,
b. Review for unbalance bid items,
c. Coordinate with the City Purchasing Division in finalizing a Certified Bid Tabulation
including Engineer's estimate,
d. Review of contractor's financial standing and references provided,
e. Explanation of discrepancies between the Engineer's estimate and bids, and
f. Meet with the City to provide a formal written recommendation of award.
10. Attend City Council meeting(s) for the recommendation for award of Contract(s) for construction.
a. Be able to provide a completed Affidavit of Compliance with each Change Order that
includes bids.
RFP 24-15, CMAR for Maple Street Improvements
APPENDIX A —SCOPE OF WORK
Page 2 of 3
c. Phase 2: Guaranteed Maximum Price and Construction Administration Phase
i. Construction Administration Phase
1. Put forth diligent and fiscally responsible efforts to ensure the project will be completed on time
and within budget.
2. Attend pre -construction meeting and conduct regular update meetings as jointly determined by
the design team and contracted construction companies.
3. Coordinate with Olsson and the Design Team on all Request for Change Proposals, Change Orders,
etc. including maintaining a log of all such documents.
4. The City of Fayetteville and the University of Arkansas intends to provide regular construction
administration services. Olsson will provide field services, progress meetings, and progress
payment review and assistance on a bi-monthly basis.
5. Review site visit report from the Olsson, City of Fayetteville and University of Arkansas staff team
at least twice (2) per month.
6. Coordinate with the Design Team to conduct Substantial Completion Inspection, coordinate with
architect to create punch list, substantiate that items noted are completed, and issue Substantial
Completion Certificate.
7. The Design Team shall be notified to attend all on -site meetings, review and approve all pay
requests, and change order review prior to Mayor's approval.
8. Coordinate with the design team to create plans for closure and detour of both pedestrian and
street zones based on construction phasing.
ii. Project Close Out
1. Provide Warranty Services during the entire Warranty Period. Olsson to issue Warranty Reports
and review items after the CM has notified the City that these items are complete.
2. Provide support services as needed during the project close out process.
3. Provide close-out submittal to Olsson for completeness before transmitting to the City which
include but are not limited to:
a. Contractor's red lines and as -built notes
b. Provide as -built record drawings noting any changes to the plans prepared by Olsson (both
hard copy and digital formats)
c. Produce a project narrative that provides a comprehensive review of the construction
activities for the project with a project narrative submitted for City approval at the
completion of each contract phase.
RFP 24-15, CMAR for Maple Street Improvements
APPENDIX A —SCOPE OF WORK
Page 3 of 3
SECTION A VII
Cost
Flintco greatly respects and appreciates our relationship with City of Fayetteville. We look forward to each
project as an opportunity to prove ourselves and showcase our team. For the City of Fayetteville Maple
Street Improvements project, Flintco's preconstruction fee is $1.00. There are no other fees solely
associated with preconstruction.
CITY OF FAYETTEVILLE MAPLE STREET IMPROVEMENTS I RFP 24-15 1fmAvrGD 116
CITY OF City of Fayetteville, Arkansas
Purchasing Division — Room 306
FAY E T T E V I L L E 113 W. Mountain
V
A R K A N S A S Fayetteville, AR 72701
Phone: 479.575.8256
TDD (Telecommunication Device for the Deaf): 479.521.1316
Request for Proposal: RFP 24-15, CMAR for
Maple Street Improvements
DEADLINE: Tuesday, January 7, 2025 before 2:00 al ti
PRE -PROPOSAL CONFERENCE: Tuesday, e mb 7, 24,
Roo* t�32 of Ft� eville
SR. PURCHASING AGENT: Amanda3LXJuss,
DATE OF ISSUE AND ADVE
Q TOR
At$ to e M a DJ
N MT-40WA
6100 AM, in
I I
-a r.gov
0/24
ments
No late proposals shall be acc Ps sh ubmitte�rough the City's third -party electronic
bidding platform or by submit i seale ical prep to the City of Fayetteville, Purchasing
Division at the below loca
City o F teville
4q PCrchas vision — Room 306
1 ountain Street
Fa eville, AR 72701
All proposals shall tted in accordance with the attached City of Fayetteville specifications and
documents attache ereto. Each Proposer is required to fill in every blank and shall supply all
information requested; failure to do so may be used as basis of rejection. The City of Fayetteville shall
not be responsible for lost or misdirected proposals, or for failure of proposers technical equipment.
The undersigned hereby offers to furnish & deliver the articles or services as specified, at the prices & terms
stated herein, and in strict accordance with the specifications and general conditions of bidding, all of which are
made a part of this offer. This offer is not subject to withdrawal unless upon mutual written agreement by the
Proposer/Bidder and City Purchasing Director.
City of Fayetteville, AR
RFP 24-15, CMAR for Maple Street Improvements
Page 1 of 23
City of Fayetteville
RFP 24-15, CMAR for Maple Street Improvements
Advertisement
City of Fayetteville, AR
Request for Proposal
RFP 24-15, CMAR for Maple Street Improvements
The City of Fayetteville is accepting proposals from construction managementfirms licensed to do business within
the State of Arkansas to provide, construction management / general contractor (CM/GC) services as a
construction management at risk (CMAR) / guaranteed maximum (GMP) project for the reconstruction of 2,500
linear feet of Maple Street from Gregg Avenue to Garland Avenue. The project includes storm drainage,
sidewalks, protected bike lane, enhanced crosswalks, turn lanes, new traffic signals, street lighting and
landscaping. Any questions regarding this RFP shall be directed to Amann Beilfuss qj:R pf Fayetteville Sr.
Purchasing Agent at abeilfuss@fayetteville-ar.gov or (479) 575-8220. [- ` _�f
Solicitation documents and addenda shall be obtaine at e Cit f 7eett`teville Png Division's electronic
bidding platform at www.fa etteville-ar. ov bids. II propos be recey Tuesday, January 7, 2025
before 2:00 PM, Local Time utilizing the elec c I ding f r or by i ing a sealed physical proposal
to the City of Fayetteville, Purchasing Divisirop I due be e time stated. No late proposals
shall be accepted. Submitting electron str ourag e Cit Fayetteville shall not be
ected responsible for lost or misdirpro , or for Llur)of propp r' techry2 uipment.
A non -mandatory Pre -proposal nice we{d Tues cem 24 at 10:00 AM in Room #326
of Fayetteville City Hall. Inf a r gart pre-bi s`avai le on the project page on the City's
electronic bidding platformt reSted�ariTes are e�p aged toeAend.
`` A v ` 111 ]]]►►►
All interested parties shall be qua[fi To do busi and licen /accordance with all applicable laws of the
state and local governmentRe
re e proje ated. Fyo ndred percent (100%) performance bond and
separate payment bond isd with t n ct aw roposers shall have a current, valid registration
with the Arkansas Secreate RFP d OR be able to provide proof of registration before
recommendation of rdlo Fayettevi ity Cou il�tration and good standing in the System for Award
Management (SAM) also b \relZed prio*t* act execution.
The City of Fayetteville res e right t e ct any or all Proposals and to waive irregularities therein, and all
parties agree that such nn hall be without liability on the part of the City of Fayetteville for any damage or
claim brought by an party because of such rejections, norshall any interested party seek any recourse
of any kind against th i y of Fayetteville because of such rejections. The filing, of any Statement in response to
this invitation shall constitute an agreement of the interested party to these conditions.
The City of Fayetteville hereby notifies all proposers that this contract is subject to applicable labor laws, non-
discrimination provisions, wage rate laws, and other federal laws including, but not limited to, the Uniform
Administrative Requirements, Cost Principles, Audit Requirements for Federal Awards (2 CFR part 200), National
Environmental Policy Act, and Build America, Buy America Act.
City of Fayetteville, AR
RFP 24-15, CMAR for Maple Street Improvements
Page 2 of 23
This project is a Federal -Aid contract. This project requires wage rates to be paid according to Davis -Bacon Federal
Wage Rates.
City of Fayetteville
By: Amanda Beilfuss, Sr. Purchasing Agent
P: 479.575.8220 abeilfuss@fayetteville-ar.gov
TDD (Telecommunications Device for the Deaf): (479) 521-1316
Date of advertisement: 12/08/24, 12/09/24, 12/10/24
This publication was paid for by the Purchasing Division of the City of Fayetteville, Arkansas.
Amount paid: $734.44
City of Fayetteville, AR
RFP 24-15, CMAR for Maple Street Improvements
Page 3 of 23
City of Fayetteville
RFP 24-15, CMAR for Maple Street Improvements
SECTION A: General Terms & Conditions
1. SUBMISSION OF A PROPOSAL SHALL INCLUDE:
Each proposal shall contain the following at a minimum. Proposer must also address detailed requirements
as specified in the Scope of Work.
a. A written narrative describing the method or manner in which the Proposer proposes to satisfy
requirements of this RFP in the most cost-effective manner. The term Proposer shall be in reference to a
firm or individual responding to this solicitation.
b. A description of the Proposer's experience in providing the same or similar services as outlined in the RFP.
This description should include the names of the person(s) wh will provid the services, their
qualifications, and the years of experience in performing this t Y&rk. AIZIF, de the reference
information requested in this RFP. Q � ,),N
c. The complete fee and cost to the City for al services o lip in his RF v
d. Statement should be no more than • 1►-fiv 2 es; sintandard, readable, print on
standard 8.5x11 documents. Pro all s it a thre2 g imum) executive summary.
The following items will not co and thE%JweJty-five-6 pendix, cover sheet, 3-page
IWANOF executive summary, resum es hall be no mor page�pe on), and forms provided by
the City for completion. �� � �
i. Submitting a responding
es Qn in o th��isJ FP osal`s s `e[`pre_pared simply and economically,
providing a str fight concise cription of ity to meet the requirements for the
project. Fancy bin n , olored di0s, and r onal material are not required. Emphasis
should be on plet ess a ity of co I documents physically submitted should be
typewritte andardd/// 8►►►►►► �wh'te and bound in one volume. Exceptions would be
schema xhi its, of resume City required forms. Limit proposal to twenty-five
(25) ess, exclud' resumes,
team resumes, references, and forms required by the City
for co etion. �Qll�jposals sr e aled upon delivery to the City of Fayetteville.
1. O ti —•Ellectr `Submittal (strongly eneoura e : Proposers can go to
e eville-ar.gov/bids and follow the prompts to submit a proposal within the
onic bidding platform. If a proposal is submitted electronically, a physical submission
not necessary. All Proposers must register in order to be able to submit. There is no fee
for registration.
2. Option 2 — Physical Submittal: All Proposers shall submit one (1) original copy of their
proposal as well as one (1) electronic copy on a properly labeled USB or other electronic
media device. The electronic copy submitted shall be contained into one single electronic
file and shall be identical to the hard copies provided. The use of Adobe PDF documents is
strongly recommended. Files contained on an USB or electronic media shall not be
restricted against saving or printing. Electronic copies shall not be submitted via e-mail to
Cityemployees bythe Proposer and shall be provided to the City in a sealed manner. Fed Ex,
City of Fayetteville, AR
RFP 24-15, CMAR for Maple Street Improvements
Page 4 of 23
UPS, US PS, or other packages should be clearly marked with the RFP number on the outside
ofthe mailing package.
e. Proposals will bereviewed following the stated deadline, as shown onthe cover sheet ofthis document.
Only the names of Proposer's will be available after the deadline until a contract has been awarded by the
Fayetteville City Council. All interested parties understand proposal documents will not be available until
after uvalid contract has been executed.
t Proposers shall submit a proposal based on documentation published by the Fayetteville Purchasing
Division.
g. Proposals must follow the format of the RFP. Proposers should structure their responses to follow the
sequence ofthe RFP.
h. Proposers shallhave experience in work of the
will satisfy the City of Fayetteville. Proposer a I urnish aLpfer ce is o n for whom they have
%91' t fT
performed similar services and must provide icl)ation R�estecl in , . ecu m e nt.
i Proposer is advised that exceptions
agreement must be identified in its o eto ailuretk o may lead the City to declare any
such term non-negotiable. Propo 's esire tal xceptio 21140 _n o able term will not disqualify
it from consideration for awkiar
]. Local time shall be od4Deadline.
Documents shall be d b the atomic clock located in the
Purchasing Division O��ceore ic d Y�c�n h ird'pa�ybidding softvvare.
No oral interpretations 4111je made toatlaVims as tot�ft—meaning of specifications or any other contract
documents. All que rtaini 11% term nditions or scope of work of this proposal must be
senzmwrmngv an
addendum if the se ou ro i e cil ion to the requirements of the proposal. All such addenda
shall become part nrthe c ocu City will not be responsible for any other explanation or
interpretation of the pro s FP ma eo i en prior to the award of the contract.
__
DESCRIPTION OF-S AND SERVICES:
Any rnanufarnes, trade name, brand narne, catalog number, etc. used in specifications are for the
purpose of describing and establishing general quality levels. Such references are NOT intended to be
restrictive. Proposals shall be considered for all brands that meet the quality of the specifications listed for
any items.
4. RIGHTS OF CITY OF FAYETTEVILLE IN REQUEST FOR PROPOSAL PROCESS.
In addition to all other rights of the City of Fayetteville, under state law, the City specifically reserves the right
tothe following:
City of PayetteviIle, Ali
RFP24'l5,[[NARfor Maple Street Improvements
The City of Fayetteville reserves the right to rank firms and negotiate with the highest-ranking firm.
Negotiation with an individual Proposer does not require negotiation with others.
b. The City of Fayetteville reserves the right to select the proposal it believes will serve the best interest of
the City.
c. The City of Fayetteville reserves the right to accept or reject any or all proposals.
d. The City of Fayetteville reserves the right to cancel the entire request for proposal.
e. The City of Fayetteville reserves the rightto remedy orwaive technical or immaterial errors in the request
for proposal or in proposals submitted.
f. The City of Fayetteville reserves the right to request any necessary ctrification ional information
or proposal data without changing the terms of the proposal. K"t,
g. The City of Fayetteville reserves the right to�j sele i the Pr e to perform the services
required on the basis of the original prod Is without o ' tion.
h. The City reserves the right to askfor e and fi rom on ore Proposers. The best and final
offer process is not guaranteed; r ore, P opo s shall s and r p nd to this RFP on the most
favorable terms available.
5. EVALUATION CRITERIA:
The evaluation criterion the fact hat will s by the Iec n committee to evaluate and score
responsive, responsible a d qualiNuate
oposals ro sers shall ' c de sufficient information to allow the
selection committee tothoro a propo ach proposal submitted shall be evaluated
and ranked by a selection Comm e. The t will b rded to the most qualified Proposer; per the
evaluation criteria listed ' t is R P. Pro are not Reed to be ranked.
6. COSTS INCURRED POSERS;
All expenses inv�Ai,
th the par Lion mission of proposals to the City, or any work performed in
connection tl- ehall o e so Proposer(s). No payment will be made for any responses
received, or for any other requir d of o made by, the Proposer(s) prior to contract commencement.
7. ORAL PRESENTA 10
An oral presenta nd/or interview may be requested of any firm, at the selection committee's discretion.
S. CONFLICT OF INTEREST:
a. The Proposer represents that it presently has no interest and shall acquire no interest, either direct or
indirect, which would conflict in any manner with the performance or services required hereunder, as
provided in City of Fayetteville Code Section 34.26 titled "Limited Authority of City Employee to Provide
Services to the City".
b. The Proposer shall promptly notify Amanda Beilfuss, City Sr. Purchasing Agent, in writing, of all potential
conflicts of interest for any prospective business association, interest, or other circumstance which may
City of Fayetteville, Ali
RFP 24-15, CIVIAR, for Maple Street Improvements
Page 6 of 23
influence or appear to influence the Proposer's judgment or quality of services being provided. Such
written notification shall identify the prospective business association, interest or circumstance, the
nature of which the Proposer may undertake and request an opinion to the City as to whether the
association, interest or circumstance ,would, in the opinion of the City, constitute a conflict of interest if
entered into bythe Proposer. The City agrees to communicate :with the Proposer its opinion via e-mail or
first-class mail within thirty days of receipt of notification.
9. WITHDRAWAL OF PROPOSAL:
A proposal may be withdrawn prior to the time set for the proposal submittal based on a written request
from an authorized representative of the firm; however, a proposal shall not be withdrawn after the time set
for the proposal.
a. Proposal and modifications received after the time setfor the propos submittal s of be considered.
Modifications in writing received prior to the deadline will be a t The Cit not be responsible
for misdirected bids. Proposers refer to theiGermceipt
ission statu e onlin bi ing portal or call the
Purchasing Division at (479) 575-8220 to ens it submitta ments prior to opening
time and date listed.
b. The time set for the deadline shall be c ime F eville, he date listed. All proposals shall
be received in the Purchasing Div' o FO e e dline s The ial clock to determine local
time shall be the atomic clock I in the P ch sing Div' i oom City Hall, 113 W.�,1auntain
Fayetteville, AR.
11. CONSTITUTIONAL STA EDERA, LIA IR NT .
The laws of the State of rl<ansas up to any urc made this request for proposal. Proposers
shall comply with all constituti I, e, and f directive ers and laws as applicable to this proposal
and subsequent contract(s) in u i but nolli d to Eq I oyment Opportunity (EEO), Disadvantaged
Business Enterprises (DB ^ OS A as arwwjle to thi ct.
N\0
12. PROVISION FOR 0TkJ GE CIES \CO
Unless otherwis ted b the apo e e Proposer agrees to make available to all Government
agencies, departm is m ies, a s the proposal prices submitted in accordance with said
proposal terms and condi ' erein, ho ny said governmental entity desire to buy underthis proposal.
Eligible users shall m state of nsas agencies, the legislative and judicial branches, political
subdivisions (count aI district school boards, community colleges, municipalities, counties, or other
public agencies rities), which may desire to purchase under the terms and conditions of the contract.
13. COLLUSION:
The Proposer, by affixing his or her signature to this proposal, agrees to the following: "Proposer certifies that
their proposal is made without previous understanding, agreement, or connection with any person, firm or
corporation making a proposal for the same item(s) and/or services and is in all respects fair, without outside
control, collusion, fraud, or otherwise illegal action."
City of Fayetteville, lilt
f,FP 24-15,. CMAFI, for Maple Street Improvements
Page 7 of 23
14. RIGHT TO AUDIT, F01A, AND JURISDICITON:
a. The City ofFayetteville reserves the privilege of auditing a Contractor's records as such records relate to
purchases between the City and said Contractor.
b. Freedom of Information Act: [hx contracts and documents prepared while performing City contractual
work are subject tothe Arkansas Freedom ofInformation Act. |faFreedom ofInformation Act request is
presented to the City of Fayetteville, the (contractor) will do everything possible to provide the documents
in a prompt and timely manner as prescribed in the Arkansas Freedom ofInformation Act (AI.A. §25-19-
10I et. seq.). Only legally authorized photocopying costs pursuant to the FO|A may be assessed for this
compliance.
c. Legal jurisdiction to resolve any disputes shall be Arkansas with Arkansas law applying to the case.
15. CITY INDEMNIFICATION:
The successful Proposer(s) agrees to indemnify the City and h Id it a Ss fro&nhgainst all claims,
10
liability, loss, damage or expense, including b t n mited to coun s, arisi fr or by reason of any
actual or claimed trademark, patentor copyrigh ig &inmen r i ation bas 3Ror., with respect to the
services or any part thereof covered by this ord r, and such@Qbli tionshall r i e acceptance of the services
and payment thereof by the City.
16.
All standard terms and condition ' Nd in
specifically stated in the subseq Wectigps
understood by Proposers I Vq b m Lt t Via
Persons with disabilities
Persons needing tra;nsIAN of is dc
immediately. N
18. PAYMENTS AND G:
The Proposer must pecify t4
as invoices submitted fo
responsible for irnrne
of this docu hich recedence, and should be fully
�pftposal re
the cle ater than seven days prior to the deadline.
'00""W
� shall c tie City of Fayetteville, Purchasing Division,
�^-~f
companyQ .004b
J1 prop e act name and address which must bethe same
of award of this RFP. Further, the successful Proposer is
iotifvingturohasing Division ofany company name change, which would
cause invoicing to c rom the name used atthe time ofthe original RFP. Payment will bemade within
thirty days of in The City of Fayetteville is very credit worthy and will not pay any interest or
penalty for untirnepayments. Payments can be processed through Proposer's acceptance of Visa at no
additional costs tothe City for expedited payment processing. The City will not agree 10allow any increase
in hourly rates by the contract without PRIOR Fayetteville City Council approval.
19.
a. The City reserves the right to cancel this contract without cause by giving thirty/]O\ days prior notice to
the Contractor in writing of the intention to cancel or with cause if at any time the Contractorfails tofulfill
or abide by any of the terms or conditions specified.
City of PayetteviIle, Ali
RFP24'l5,[[NARfor Maple Street Improvements
b. Failure of the contractor to onrnp|y with any of the provisions of the contract shall be considered a
material breach of contract and shall be causefor immediate termination ofthe contract at the discretion
of the City of Fayetteville.
In addition to all other legal remedies available tothe City of Fayetteville, the City reserves the right to
cancel and obtain from another source, any items and/or services which have not been delivered within
the period of time from the date of order as determined by the City of Fayetteville.
d. In the event sufficient budgeted funds are not available for a new fiscal period, the City shall notify the
Contractor of such occurrence and contract shall terminate of the last day of the current fiscal period
without penalty or expense to the City.
a. The Contractor shall perform this contract. No assignment of subc , tracting h allowed without
ortion ork, the Proposer
prior written consent of the City. If a Proposer intends to subco tt 4?7V
IQ
shall disclose such intent in the proposal sub s a resUlt o F P.
la V
b . In the event of a corporate acquisition erger, tractor I rovide written notice to the
tor's t o such or upon the occurrence of said
City within thirty (30) calendar days ,+,trcl
action, whichever occurs first.
21. NON-EXCLUSIVE CONTRACT:
Award of this RFP shall impos o "" ligatiOn on the City I , e h ractor for all work of this type.,
which may develop during Caa ct d. T clt
t I _ 0
the right to concurrentl i 4 ct withK com s r simil wo if it deems such an action to be in
the City's best interest. I�tVhecas*QfAultiple-R�ase ntracts is rovision shall apply separately to each
22.
Lobbying of selectio c . Ittee Cit e teville employees, or elected officials regarding
request for propo quest for I cations, bid r contracts, during the pendency of bid protest, bythe
bidder/proposer or or m mbe e bidder's/proposer's/protestor's staff, and agent of the
bidder/proposer/pr estor, per 4 o ed by any legal entity affiliated with or representing an
organization that is resp I o the qu t 0 r proposal, request for qualification, bid or contract ., or has a
pending bid protes is prohibite her upon advertisement or on a date established by the City of
Fayetteville and ha rohibited until either an award is final or the protest is finally resolved by the City
of Fayetteville; ed, however, nothing herein shall prohibit a pros pective/bid der/proposer from
contacting the Purc asing Division to address situations such as clarification and/or questions related to the
procurement process. For purposes of this provision lobbying activities shall include but not be limited to,
influencing or attempting to influence action or non -action in connection with any request for proposal,
request for qualification., bid or contract through direct or indirect oral or written communication or an
attempt to obtain goodwill of persons and/or entities specified in this provision. Such actions may cause any
request for proposal, request for qualification, bid or contract to berejected.
City of PayetteviIle, Ali
RFP24'l5,[[NARfor Maple Street Improvements
23. ADDITIONAL REQUIREMENTS:
The City reserves the right to request additional services relating to this RFP from the Proposer. When
approved by the City as an amendment to the contract and authorized in writing priorto work, the Contractor
shall provide such additional requirements as may become necessary.
A written agreement, in substantially the form attached, incorporating the RFP and the successful proposal
will be prepared by the City, signed by the successful Proposer and presented to the City of Fayetteville for
approval and signature of the Mayor.
25. INTEGRITY OF REQUEST FOR PROPOSAL (RFP) DOCUMENTS:
Proposers shall use the original RFP form(s) provided by the Purchasing Division and enter information only
in the spaces where a response is requested. Proposers may use an attachment as an addendum to the RFP
form(s) if sufficient space is not available on the original form for the Pro er to enter mplete response.
Any modifications or alterations to the original RFP documents a oposep�wtper intentional or
otherwise, will constitute grounds for rejection of uc RFP res nse. ny suc d 'cations or alterations
a Proposer wishes to propose shall be clearly state e Pro RFP res nd presented in the form
of an addendum to the original RFP documn
26. INSURANCE:
Any project selected under this RFP s I quire rof oval lia sura i the amount of $5 million
US dollars, at minimum. Such Cert ' e of Insur hall [is ty as itional insured and not be
required unless firm is awarde c ntrac ertificate of i u e sh rovided within 10 (ten)
calendar days after contract r Th Ci r eivest to pr i der's risk insurance in the
event it results in a cost to the E proj
i. Profess nal/Co hensive ner Liabili ance: Minimum $5 million
NO
ii. Builder's Ri k
iii. 1Nor ompens n. tutory nt
iv. al utomtivu
rance a ired by state law
27. OTHER GENERA7provid &DITI
a. Proposers sent ion t t eir firm currently has or has applied for a valid Arkansas
Contractor'srent istered and in good standing or has applied with the Arkansas
Secretary ofb. Proposers mty with their proposals signed by an employee having legal authority to
submit proposals on behalf of the Proposer. The entire cost of preparing and providing responses shall
be borne by the Proposer.
c. The City reserves the right to request any additional information it deems necessary from any or all
Proposers after the submission deadline.
d. This solicitation is not to be construed as an offer, a contract, or a commitment of any kind; nor does it
commit the City to pay for any costs incurred by Proposer in preparation. It shall be clearly understood
that any costs incurred by the Proposer in responding to this requestfor proposal is at the Proposer's own
City of Fayetteville, Alt
f1,F1124-15, CIVIAf, for Maple Street Improvements
Page 10 of 23
risk and expense as a cost of doing business. The City of Fayetteville shall not be liable for reimbursement
to the Proposer for any expense so incurred, regardless of whether or not the proposal is accepted.
e. If products, components, or services other than those described in this bid document are proposed, the
Proposer must include complete descriptive literature for each. All requests for additional information
must be received within five working days following the request.
f. Any uncertainties shall be brought to the attention to Amanda Beilfuss immediately via telephone
(479.575.8220) or e-mail (abeilfuss@favetteville-ar.gov). It is the intent and goal of the City of Fayetteville
Purchasing Division to provide documents providing a clear and accurate understanding of the scope of
work to be completed and/or goods to be provided. We encourage all interested parties to ask questions
to enable all Proposers to be on equal terms.
E
h.
k
Any inquiries or requests for explanation in regard to the City's requ ments shod e made promptly
to Amanda Beilfuss, City of Fayetteville, Sr. Purchasing Agent vitnva� abeilfu 7 tteville-ar. ov) or
telephone (479.575.8220). No oral interprets i tion i on r clarifbe gi 1 'No the meaning of any
part of this request for proposal. All questionsicati s reques t er with answers, if any,
will be provided to all firms via written a�c um. Na mssub 'n any questions, clarifications,
or requests will not be disclosed until contra 's pace.
At the discretion of the City, oneG)nc
re fir s m ➢doe aske 7T�ore a d information before final
ranking of the firms, which mayerview�
Any information provi d Rin i i �en evil to e Pro � the preparation of proposals
necessary to prope nd toFP. T is desi ed 1b provide qualified Proposers with
sufficient basic info ation I�ubmit ppoo plsmeeti inimum specifications and/or test
requirements but is not int�l�l�b limit ontentcQc)fexclude any relevant or essential data.
Proposers ii
manner rel
irrevocably
jurisdiction
;ainst it under, arising out of or in any
law. Proposer hereby expressly and
seeding based on any alleged lack of
The successful Propo r iWII not alLsign the whole or any part of this Contract or any monies due or to
become due hee thout wri consent of City of Fayetteville. In case the successful Proposer
assigns all o of any monies due or to become due under this Contract, the Instrument of
assignment sa clause substantially to the effect that it is agreed that the right of the assignee in
and to any moor to become due to the successful Proposer shall be subject to prior liens of all
persons, firms, and corporations for services rendered or materials supplied for the performance of the
services called for in this contract.
The successful Proposer's attention is directed to the fact that all applicable Federal and State laws,
municipal ordinances, and the rules and regulations of all authorities having jurisdiction over the services
shall apply to the contract throughout, and they will be deemed to be included in the contract as though
written out in full herein. The successful Proposer shall keep himself/herself fully informed of all laws,
ordinances and regulations of the Federal, State, and municipal governments or authorities in any manner
City of Fayetteville, AR
RFP 24-15, CMAR for Maple Street Improvements
Page 11 of 23
affecting those engaged or employed in providing these services or in any way affecting the conduct of the
services and of all orders and decrees of bodies or tribunals having anyjurisdiction or authority over same.
If any discrepancy or inconsistency should be discovered in these Contract Documents or in the
specifications herein referred to, in relation to any such law, ordinance, regulation, order or decree, s/he
shall herewith report the same in writing to the City of Fayetteville.
City of Fayetteville, Ali
RFf' 24-15, CIVIAR, for Maple Street Improvements
Page 12 of 23
City of Fayetteville
RFP 24-15, CMAR for Maple Street Improvements
SECTION B: Scope of Services and General Information
a. The City of Fayetteville is accepting statements of qualifications from licensed professionals to provide
construction management at risk (CMAR) services for the reconstruction of 2,500 linearfeet Maple Street
from Gregg Avenue to Garland Avenue for the City of Fayetteville. The project includes storm drainage,
sidewalks, protected bike lane, enhanced crosswalks, turn lanes, new traffic signals, street lighting and
landscaping.
b. Olsson, Inc. is serving as lead design professional for this project.
c. Phasing and Award: One (1) contract will be awarded with m It' aces. will include pre -
construction services as outlined below. PhaW will includ e Ord or the Guaranteed
Maximum price for construction of the projec
d. Project Funding: The total project fu cf 57c F d ough t e Streets for All Program and
, matching to be split by the Univ Ark ns the Ci a etteville.
PROJECT INFORMATION &RECkUIR T
Request for Proposal (RFP)s ses all be submitt one primary construction manager
firm with each addition c cte N
sty as ntrac r primary. The primary firm, in
addition to any can bird p llb ed Twit the P response and be considered the
project team for the o all co rr.ion sco of roject. hl equirement to provide sub -consultant
professionals does not incl ntract esforth al construction items (Electrical, Masonry
etc.) as those items will be i the C er cant c ward.
It is the intent of i licitati ter in ally beneficial agreement indicated by the draft
provided ti^,pith P.
The primary res ndin s all b x n ed in constructing a wide variety of streetscape elements
such as; street recon on, sh red- s paved trails, sidewalks, stormwater infrastructure, lighting,
signalization, land irrigation specific pavement materials. Respondents to this RFP shall
submit at least ) similar type projects within the past ten (10) years that demonstrates successful
street proje ojects listed shall have been completed by the employees/associates that will be
b.
C.
assigned to this"project.
Overview: Anticipated phases are identified below with associated scope of work. Scope of work is not
limited to any additional industry standard scope of work necessary to complete each phase. Selected
Primary firm shall coordinate with the design team composed of +Olsson Inc., the City of Fayetteville, and
the University of Arkansas in order to achieve best value for the overall success of the project, including
working to achieve maximurn cost savings. Coordination with design team is critical for all phases.
City of Fayetteville, Ali
f1,F1124-15, CMAFI, for Maple Street Improvements
Page 1' of 21
Ulm
1. CMAR shall develop a construction phasing plan
2. CIVIARshall develop aconstruction schedule
3. [IVIARshaU develop cost estimates for the most current design set and specifications
and evaluate cost reduction alternatives and control.
4. Provide industry standard construction manager services., including but not limited to
development of costs, identifying potential design changes which could result in cost
savings or construction efficiencies, interact with the design team for review of
documents, etc.
5Coordinate i1h Olsson on Final Design O Final Spulfications,d Cost
Estimates and Schedule to present to the Des' r,� (90% view).
& NIP
6. After receiving 90% design jaew comments, with a QiNb'le City of Fayetteville
ff
and University of Arkansas ff res mments.
Arkansas comment ns.
10. C t on Do m /Plans e i ti ns d Project Drawings shall be routed
th g e City f yettevil niver f Arkansas for required approvals.
11. Assist 0 the Ci the bid f and identify all separate trade packages.
tand co cost5#w ycle cost impacts and long-term maintenance
c t \160
0 dinate the d s n team to create plans for closure and detour of both
p e d ;,r , nd s re� e based on construction phasing.
1 0
14. Pr i edestri n a ess and ADA accessibility plan for construction duration.
Bi
Coordinate with City Purchasing Division to ensure all procedures followed for this
phase meet state laws and City of Fayetteville Purchasing Policies.
2. Provide services for reproduction and dissemination of bid sets (project manual and
stamped drawings) to the City Design Team [PM '1\, Purchasing /l' and interested
bidders]. Documents should be made available to any interested party electronically
a1nocost.
3. Provide distribution of plans to all interested parties:
City of PayetteviIle, Ali
RFP24'l5,[[NARfor Maple Street Improvements
Page l4of2J
a. Maintain open communication with the City of Fayetteville Purchasing Division
throughout the bidding process.
b. Distribution of all documents shall be done in a fair and unbiased manner while
keeping all interested parties on equal terms.
c. Document and keep an updated accurate record of plan holder's and provide
updated listings to all interested parties in a timely manner.
d. Answers to questions and inquiries shall be made in the form of an addendum
and shall be provided to all interested parties at the same time.
4. Coordinate with City Purchasing Division during pre -bid meeting, facilitate and attend
[.
7
the Bid Opening.
Maintain open communication with the City Purchasing Division during any process
involving Request for Information (RFI).
Any addenda shall be providad to the Purch ivision ew and approval in
advance of issuance. BiddErs., teres parts s, and olders shall receive all
information included in adde at the e dend d.
In the event the CIS e Tres to If r rm a p f the work or a trade package,
the CMAR shall su i id a the sa e and manner as other interested
parties.
Assist wit sign of all ropos
Revie n's Re eticlatio rd L e includes the following required
c n ass' i
Che oemath erWrs a recon mathematical discrepancies,
b. e e ifor unb kNF
id item
c. Coordinat the Cit haling Division in finalizing a Certified Bid
oilTabu FludinNis estimate
d. Revieo contrac nancial standing and references provided,
ancies between the Engineer's estimate and bids, and
to provide a formal written recommendation of award.
meeting( s) for the recommendation for award of Contract(s) for
Put forth diligent and fiscally responsible efforts to ensure the project will be
completed on time and within budget.
2. Attend pre -construction meeting and conduct regular update meetings as jointlN,,
determined by the design team and contracted construction companies.
City of Fayetteville, silt
RFf' 24-15, CMAFI, for Maple Street Improvements
Page 15 of 21
3. Coordinate with Obsnn and the Design Team on all Request for Change Proposals,
Change Orders, etc. including maintaining alog ofall such documents.
4. The [hv of Fayetteville and the University of Arkansas intends to provide regular
construction administration services. O|sson will provide field services, progress
meetings, and progress payment review and assistance on a bi-monthly basis.
5. Review site visit report from the Olsson., City of Fayetteville and University of Arkansas
staff team at least twice (2) per month.
G. Coordinate with the Design Team to conduct Substantial Completion Inspection.,
coordinate with architect to create punch list, substantiate that items noted are
completed, and issue Substantial Completion Certificate.
7. The Design Team shall be notified toattend all on -site meetings, review and approve
| pay requests, and change orderr'
8. Coordinate with the design team to creat an or clo,��ZrS�Fcd detour of both
ii. Project Close Out
1. Provide Warranty dur g tire W r eriod. Olsson to issue Warranty
Reports and re ms CM ha,4vr, ied City that these items are
4 a%�Q[5' al to 0 o comp en s before transmitting to the City
a. two r's red H and as-bu' s
P ro c roject r e that provides a comprehensive review of the
ro
constr Dn a cA
iv,�iesf r the project with a project narrative submitted for City
Any entity res
to this RFP shall be a current licensed contractor with the State of Arkansas
Contractor' Ing Board. Failure to hold a current contractor's license shall result in submittalsN
jeotion. Al| �ubcontnactors on the project shall be properly licensed by the State of Arkansas
Contractor's Licensing Board.
b. Any industry standard cost share or savings incentive practices desired for discussion during contract
negotiations should be disclosed with RFP response. Cost sharing practice shall be presented in the format
of general best practices approach and contract terms. Pricing and fees are part ofthe selection criteria
and shall beincluded with RFPsubmittal.
c. Estimating
City of PayetteviIle, Ali
RFP24'l5,[[NARfor Maple Street Improvements
d. After a contract has been awarded to the selected construction manager (CM) and within ten (10)
calendar days of the final construction contract being finalized, provide a 100% separate performance and
payment bond to the City of Fayetteville after being file marked at the Washington County Circuit Clerk's
Office.
Construction contracts for the project shall not be entered into between the CM and sub-
contractor without a 100% payment and performance bond in the amount of the contract and
any amendments thereto and shall provide for the manner in which the construction shall be
managed and supervised. Bonds shall be valid and exchanged between all parties prior to the
start of work.
e. After contract award, the awarded CM shall furnish a certificate of insurance showing that insurance
policies are carried in amounts acceptable to the City. Forms of insurance shall be, Comprehensive
General Liability, Builder's Risk, Property Damage Insurance, Worker' Compensat' n, and Automobile
coverage. Such insurance shall be kept in full force and in eff c all vvor een satisfactorily
completed and accepted. All certificates of in ance shall lis ty of F _�tilile as an additional
insured. The City of Fayetteville reserves the ight o bin 'Ider risk in e for this project in the
event it results in a cost savings to the City.
f. Ensure all funds spent are in accord ith Stat rkansas rement laws, including but not
limited to
i. Ensuring CMAR ma' a proper Vice with ansa C t ctors Licensing Board
ii. Ensuring all su ctor *project operl li d by the Arkansas Contractors
Licensing
iii. Compliance ith Ark state la incl ing bu iced to sections:
1. A.C.-58-1001
2 A A. 19-11Jz
A. A. 11
A.C.A 1 - 8-10
5. A. 17-3 �
.A. § 12-1
A.C.A. § 12-80-101
8. A.C.A. § 22-9-101
9. A.C.A. § 22-9-103
10. A.C.A. § 22-9-104
11. A.C.A. § 22-9-213
12. A.C.A. § 22-9-401
13. A.C.A. § 22-9-501
14. A.C.A. § 22-9-601
City of Fayetteville, Ali
RFf' 24-15, CMAFI, for Maple Street Improvements
Page 17 of 21
15.AI.4. § 22-9-701
16.AU competitive bidding statutes shall remain in full force and effect and not be
affected hereby
17. This project shall not authorize a design -build project contract or sub -contracts
g. Project and change order pricing
h. Schedule control
i. Cost reduction and control
5, SUBMITTAL REQUIREMENTS:
The Proposer shall provide adequate at 10 1 1 ren dq_r alifi and capable of effectively
accomplishing the scope of service ropo I w' e revie a S c n Committee which could
include ranking. Since there is n n e of the oser ha4 WYC 1%,
ability, the proposal response 11 egatel aViguity� i h ect roposer's ability and approach.
)m, Qgb
i. Title Page: w t e laarn of irm, ad teleph umber, name of contact person, date,
VNI &I (
ii. Table of Cor^ts: I lude a i entific the material by section and by page number.
iii. Letter— te est: 1: - N N61 ation regarding previous experience related to
elevant
cle imilar pro�JAII Pro sers shall submit a minimum of four (4) references within
the p five . In d vide in this section, your firm's primary business interest
iv. Proiec anization — Provide an organizational chart indicating the relationship between
th * n er's staff members who have responsibilities related to this project. Indicate on the
ch%art�e names of key personnel and their titles. Submit professional qualifications and
resumes ofstaff to be assigned to this project, showing where they have performed work on
similar projects including Construction MonagernentGMP projects.
v. Provide information regarding yourfirnfs past experience in
providing the services requested in this RFP including information pertaining to customer
satisfaction, timely completion, and meeting budgets onsimilar projects execu1ed under GK1P
contracting format.
City of PayetteviIle, Ali
RFP24'l5,[[NARfor Maple Street Improvements
Page l8of2J
vi. Schedule: Sulamitter shall provide a general schedule for the completion of the scope of the
specified project.
vii. Cost: Total listing of fee for pre -construction services, and any additional fees associated with
that pre -construction services only.
viii. Additional Background: All Proposers are invited to include a maximum of two (2) pages of
information not included above which may be useful and applicable to the project.
b. Proposals shall include the following in addition to the other requirements specified:
i. Prior experience construction streetscape and similar project types
ii. Statement regarding understanding of pre -construction sere' es and appro h to billing for pre -
construction services. Included as part of this statemen uId incl fear definition of
understanding for what a Guaranteed Maximum Price means
iii. Records of management teams o Qsar proJ th tim pletion, and high -quality
workmanship
iv. Records of previous similar with o verificati contact information. Please
provide contact informat' udin ce cont o he er and architect on at
least three (3) project e proje is s Id be w t e p (5j years.
v. Current and pro vorkl OVvi. Current ma ' o dinNcavacity an
6. CONTRACT FORMATION:
If the negotiation prod s mu t al agr t, a con Jill be considered for approval by the City of
Fayetteville City Cou egotia ' h the nking Proposer fail, negotiations may be initiated
with the next high - king Pro n it an a re nt is reached. The City reserves the right to reject all
offers and end the p ss with ut cutl c ntract.
7. CONTRACTADMINISTRAT
The Contract Admi 's r this Request for Proposal (RFP) shall be the City of Fayetteville's assigned
Project Manag V Abernathy, Bond Project and Construction Director. The City's selected Project
Manager will:
a. Provide the successful Proposer direction and monitor the results within the limits of the Contract's
terms and conditions.
b. Manage issues which may arise as to quality and acceptability of services performed.
Judge as to the accuracy of quantities submitted by the successful Proposer in payment requests and
the acceptability of the services which these quantities represent.
City of Fayetteville, Ali
f1,F1124-15, CMAFI, for Maple Street Improvements
Page 19 of 21
d. Serve as the point of contact for developing contract changes and amendments to be approved by the
City of Fayetteville.
e. Act as the City of Fayetteville's representative during the execution of any subsequent contract and
related amendments. All questions arising, subsequent to the contract award, shall be addressed to
the Purchasing Division.
The following criteria will be used by the City to evaluate and score responsive proposals. Proposers shall
include sufficient information to allow the City to thoroughly evaluate and score the proposal. Each proposal
submitted is not required to be ranked by the selection committee. The contract may be awarded to the
most qualified firm, per the evaluation criteria listed below, based on the evaluation of the selection
committee. Following the evaluation of the proposals, the Selection Coramittee may r quest that the top-
ranking firm(s) make an oral presentation or be interviewed. If pr se ns are��ry, they will take
place in Fayetteville Arkansas. Notices will be sen the Purchasi yi-ion.
1) 30'%_, Qualifications in Relation to Sp 1c Prol be Pe Information reflecting
qualifications of the fir d p ject ea icated s lized experience and technical
competence of the fir nection ' the type plexity of the service required.
Subcontractors, if u all b ith infor io on it organization.
2) 25% Experience, ence, and pacity or Information reflecting the
names, tit qua i os (inclu peri c a technical competence) of the
majo e e assiNLe this sp is ject.
3) 20% Propos d Meth Going k: propo rk plan (description of how the project
Would be n ted as s 11 other f oncerning approach to scope) indicating
methodownd edules ompli ope of work. Include with this the amount of
wor ently un y.
4) 15% t rformance• evious e alua ions shall be considered a significant factor. If previous
valuations the %t a of available, the professional firm's past performance
records y a th w I be used, including quality of work, timely performance,
dilige nd any e pertinent information. Firm will provide a list of similar jobs
and person whom the City can contact for information.
5) 10% - st/Fees: Complete costs and fees as described in this RFP and for delivery of the proposal
including fiscal feasibility and financial stability. All fees shall be clearly identified with RFP
response and be itemized as much as possible.
City of Fayetteville, Ali
RFf' 24-15, CMAFI, for Maple Street Improvements
Page 20 of 21
City of Fayetteville
RFP 24-15, CMAR for Maple Street lmlarovements
SECTION C: Signature Submittal
a. Proposer must disclose any possible conflict of interest with the City of Fayetteville, including, but not
limited to, any relationship with any City of Fayetteville employee. Proposer response must disclose if a
known relationship exists between any principal or employee of your firm and any City of Fayetteville
employee or elected City of Fayetteville official.
i. If, to your knowledge, no relationship exists, this should also be stated in your response. Failure
to disclose such a relationship may result in cancellation of a purchase and/or contract as a result
of your response. This form must be completed and returned in order foryour bid/proposal to be
eligible for consideration.
PLEASE CHECK ONE OF THE FOLLOWING TJO TI005, AS IT IATEL iS TO YOUR FIRM:
1) ISO KNOIr N RELATIONSHI E
2j RELATIONSHIP EK'IST see la
C)
b. I certify that; as an ficer o i organiz n, per t tt hed letter of authorization, am duly
authorized to certify the ' r on pro erein i c rate and true; and my organization shall
comply with all State and Fed Equal unity an -Discrimination requirements and conditions
of employment.
c. Proposer agr they sha av a curr t id registration with the Arkansas Secretary of State at
time of RFP e OR b ble to per roof of registration before recommendation of award to
Fayetteville City ouncil.
d. Pursuant Arkan a Annotate 5-1-503, the Contractor agrees and certifies that they do not
currently bo , o I and ,will not boycott Israel during any time in which they are entering into, orwhile
in contract, y° public entity as defined in §25-1-503. If at any time during contract the contractor
decides to boycott Israel, the contractor must notify the contracted public entity in writing.
Pursuant Arkansas Code Annotated §25-1-1002, the Contractor agrees and certifies that they do not
currently boycott Energy, Fossil Fuel, Firearms, and Ammunition Industries during anytime in which they
are entering into, orwhile in contract, with any public entity as defined in §25-1-1002. If at any time during
the contract the contractor decides to boycott Energy, Fossil Fuel, Firearms, and/or Ammunition
Industries, the contractor must notify the contracted public entity in writing.
City of Fayetteville, Ali
RFf' 24-15, CMAFI, for Maple Street Improvements
Page 21 of 21
k
At the discretion of the City, one or more firms may be asked for more detailed information before. final
ranking of the firms, which may also include oral interviews. MOTE. Each Proposer shall submit to the City a
primary contact name, e-mail address, and phone number (preferably a cell phone number) where the City
selection committee can call for clarification or interview via telephone.
Corporate Name of Firm:
Priman/ Contact:
Phone#1 (cell preferred):
E-Mail Address:
Title of Primary Contact:
ACKNOWLEDGEMENT OF ADDENDA
Acknowledge receipt of addenda for this invita ion o bid
by signing and dating below. All addendu s r eby
extent as though it were originally includ ein. o
in the appropriate blank listed herein t0 0
Phone#2:
e sfTor pro r request for qualification
art of t i r RFP documents to the same
s/Bidd uld indicate their receipt of same
subject tractor isqualification.
4. DEBARMENT CERTI O
a. As an intere ty on project, required to provide debarment/suspension certification
indicating comp ance halo I xecutive Order. Certification can be done by completing
and signing this form
b. Federal Exec ti r (E.O.) 12549 "Debarment and Suspension" requires that all contractors receiving
individual aw sing federal funds, and all sub -recipients certify that the organization and its principals
are not debarre , suspended, proposed for debarment, declared ineligible, or voluntarily excluded by any
Federal department or agency from doing business with the Federal Government.
c. Signature certifies that neither you nor your principal is presently debarred, suspended, proposed for
debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any
federal department or agency.
City of Fayetteville, Ali
RFP 24-15, CIVIAR, for Maple Street Improvements
Page 22 of 23
S. SIGNATURE SUBMITTAL:
NAME OF COMPANY:
PHYSICAL ADDRESS:
MAILING ADDRESS:
TAX ID #:
PHC)NE:
E-M AI L:
AR. SECRETARY OF STATE FILING #:
SAM UEI #:
SIGNATURE: ;7
PRINTED NAME:
City of Fayetteville, Ali
f1,F1124-15, CMAFI, for Maple Street Improvements
Page 23of 23
CITY OF
FAYETTEVILLE
ARKANSAS
Appendix A: Contract Provisions for Non -Federal Entity Contracts Under Federal Awards
CODE OF FEDERAL REGULATIONS
TITLE 2 — GRANTS AND AGREEMENTS
PART 200, APPENDIX II
Appendix II to Part 200, Title 2 — Contract Provisions for Non -Federal Entity Contracts Under Federal Awards
https://www.govinfo.gov/content/pkg/CFR-2021-title2-volt/pdf/CFR-2021-title2-volt-part200. pdf
Contractors and vendors shall comply with the following federal guidelines, in accordance with the most recent published version of
Appendix II to Part 200—Contract Provisions for Non -Federal Entity Contracts Under Federal Awards. The definition of a "non -Federal
entity" in this section shall mean the City of Fayetteville, AR. Language in this Appendi override rsede any language
contained in the bid documents. All parties shall understand the terms "vendor " ntractor" ply to a design firm,
construction contractor and/or sub -contractor. Language in th' app ndix shal ply It is appli t ederal law. Design firms
shall incorporate all applicable federal language into bid specifi io , quali ' a ' equirement contract documents prepared
for City of Fayetteville projects.
1. Simplified Acquisition Threshold: Contracts fo o� han the ed acquisit' shold, which is the inflation adjusted
amount determined by the Civilian Agenc c�ion Co he Defensisition Regulations Council (Councils) as
authorized by 41 U.S.C. 1908, must addr a inistr ive, ractual, ::5as emedi in stances where contractors
violate or breach contract terms, and e for such;�ns and as ap o e.
2. Termination for Cause and C ce �1
a. The Cityof Faye serves the ht to can I is ontract thou cause b giving thirty 30 days' notice to
Y � Yg g Y( ) Y
the vendor of th intent to c�or with C e i any time tl�v I►dor fails to fulfill or abide by any of the terms
or conditions specified i. W *ement s utomatical minated if funds under federal award, number are
discontinued by the a rd gency for a r son. Suc t tion shall take effect upon receipt of written notice.
If there is a need ettle an earl01tion
nation, pa ment up to the termination date would be determined
by incurrence I able cost, of percent of time completed up to the settlement, or some
other met ned by i on revi vendor's records.
a. Failur ndor to omp ith a y e provisions of this contract shall be considered a material breach of
contract d shall k�,�c or immeth er 'nation of the contract at the discretion of the City of Fayetteville.
`VV,
b. In addition to allA h legal rem ies vailable to the City of Fayetteville, the City reserves the right to cancel and
obtain fr n ource any services which have not been provided within the period of time stated in the
propo al, such time is stated, within a reasonable period of time from the date of order or request, as
deter y the City.
Equal Employment Opportunity— Vendor shall comply with 41 CFR 60-1.4(b)
a. During the performance of this contract, the vendor agrees as follows:
(1) The vendor will not discriminate against any employee or applicant for employment because of race,
color, religion, sex, sexual orientation, gender identity, or national origin. The vendorwill take affirmative
action to ensure that applicants are employed, and that employees are treated during employment
without regard to their race, color, religion, sex, sexual orientation, gender identity, or national origin.
Such action shall include, but not be limited to the following: Employment, upgrading, demotion, or
transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of
compensation; and selection for training, including apprenticeship. The vendor agrees to post in
City of Fayetteville, AR
Appendix A - Contract Provisions for Non -Federal Entity Contracts Under Federal Awards, CFR Part 200, Appendix II
Last Updated: 08/20/2024
Page 1 of 6
conspicuous places, available to employees and applicants for employment, notices to be provided
setting forth the provisions of this nondiscrimination clause.
(2) The vendor Will, in all solicitations Or advertisements for ernployees placed by or on behalf of the vendor,
state that all qualified applicants will receive consideration for ernployment Withor.it: regard to race,
color, religion, sex, sexual orientation, gender identity, or national origin.
(3) 1 he vendor will not discharge or in any other manner discriminate against any employee or applicant for
employment because such employee or applicant has inquired about, discussed, or disclosed the
compensation of the employee or applicant or another employee or applicant. This provision shall not apply
to instances in which an employee who has access to the compensation information of other employees or
applicants as a part of such employee's essential job functions discloses the compensation of Such other
ernployees or applicants to individuals who do not otherwise have access to such information, unless such
disclosure is in response to a formal complaint or charge, in furtherance of an investigation, proceeding;
3 7includinginvestigation 3 i! 3 1 3 C C'"1 1
"rE.ariraL„ or action, ara Ir1vE_StlL,ltlOn conducted r t."lE. E_rYap i)yE.r, or IS COrl.31.3tE_rat WIt1 the vendor's
legal duty to furnish information.
(4) The vendor will send to each labor union or representative ofaworkers with vvWch he has a collective
bargaining agreement or other contract or understanding; a r to be pr a wising the said labor
union or Workers' representatives of the vc_�rulor's c:orrunit. r dc_�r to"ris _ 'c <and shall post copies of
the notice in conspicuous places avai CI) t employ and licants f loyment.
(5) The vendor will comply with all provisExecu e 11246 0 `' e ber 24, 1965, and of the rules,
regulations, and relevant orders r the Secretar _a r.
(6) The vendor will furnish all .ic ion and =p S r .quired =cr -ive Order 1.:1246 of September 24,
1965; and by I ules, regula n ad or o ecretar} a or; or pursuant thereto, and will permit
access to his books; rafNZ, and a the adm ' ring ag and the Secretary of Labor for
CO purposes of Invest) r ) aScel"tal rY liance. WI ) 'L , rUIe_ r ? - )ns, and orders.
(7) In the event of or`s noncomp ce with on iscrim ra uses of this contract or with any
of the said r Ulatio rC rs, this co ac may b a e , terminated, or suspended in whole
or in p- rt a t : R _ ndoi a eclared ' Ali or furt 60 __rnment contracts or federally assisted
constri. atracts in Iac. rdance h o—dures a - oriz .d in Executive Order :11246 of September
24, 196 and sue hsanction S
yimposed n re edies invoked as provided in Executive Order
1.:1.246 of SeK} ._ }E. 1.965i, oe, reg=Lila i c order of the Secretary of L..at}or, or as otherwise
provided by la v.YJ
(8) 1 he ve o will it .lude the I of the se mediately preceding paragraph (1) and the provisions
of p a , hs (1) thro in every su t or purchase order unless exempted by rules, regulations,
or rS O the. Sc.. :I" 3 Labor ISSL. `Suant to section 204 of Executive Order .11.246 of Septerber
2 1 -, so that suc visions w be bi ding upon each sub -vendor or vendor. The vendor will take such
ction with re to any sL4) or purchase order as the administering agency may direct as a means
o enforcing roviSI i t . no sanctions for noncompliance:
ovided, )we .i, that in the event a vendor becomes involved in, or is threatened with;
litigation wit sub -vendor or vendor as a result of such direction by the administering agency,
the vendor may request the United States to enter into such litigation to protect the interests
of the United States.
b. The applicant further agrees that it will be bound by the above equal opportunity clause with
respect to its own employment practices when it participates in federally assisted construction
work: Provided, That: if the applicant so participating is a State or local governs"neat, the above
equal opportunity clause is not applicable to any agency, instrumentality or subdivision of such
government which does not participate in work on or under the contract.
c. The applicant agrees that itwill assist and cooperate actively with the administering agencyand
the Secretary of Labor in obtaining the compliance of vendors and sub vendors With the equal
opportunity clause and the rules; regulations; and relevant orders of the Secretary of Labor;
that itwill furnish the administering agency and the Secretary of Labor such information as they
may require for the strpervl Sion of suc-h Compliance, arid that It: will otherwise assist the
City of Fayetteville, AR
AppendixA- Contract Provisions for Non -Federal Entity Contracts Under Federal Awards, CFR Park-100, Appendix 11
Last Updated: 08J20J2024
Pape 2 of 6
administering agency in the discharge of the agency's primary responsibility for securing
compliance.
d. The applicant further agrees that it will refrain from entering into any contract or contract
modification subject to Executive Order 11246 of September 24, 1965, with a vendor debarred
from, or who has not demonstrated eligibility for, Government contracts and federally assisted
construction contracts pursuant to the Executive Order and will carry out such sanctions and
penalties for violation of the equal opportunity clause as may be imposed upon vendors and
sub -vendors by the administering agency or the Secretary of Labor pursuant to Part II, Subpart
D of the Executive Order. In addition, the applicant agrees that if it fails or refuses to comply
with these undertakings, the administering agency may take any or all of the following actions:
Cancel, terminate, or suspend in whole or in part this grant (contract, loan, insurance,
guarantee); refrain from extending any further assistance to the applicant under the program
with respect to which the failure or refund occurred until satisfactory assurance of future
compliance has been received from such applicant; and refer the case to the Department of
Justice for appropriate legal proceedings. ff
b. Subcontracts. Each nonexempt prime vendor or sub -vendor shall inclull�equal op� clause in each of its
nonexempt subcontracts. ((��//��
c. Inclusion of the equal opportunity clause by re ren .TheeRaying
oppo nity cla e included by reference in
all Government contracts and subcontracts, in Covell ills of lad sportation requests, contracts
for deposit of Government funds, and�co for issu U.S. n bonds and notes, and such other
contracts and subcontracts as the Di FCCP����y Sig ate.
d. Incorporation by operation of the o . y oper C order, t zI opportunity clause shall be considered
to be a partof every contmcta s y���trp y1Ru"���»'y the o the reons in this part to include such a
clause whether or not it is p�incor ted n such cac and wor not the contract between the
11
agency and the vendor is 11��
e. Adaptation of langua� necess es in Ian°�u e ay be In e equal opportunity clause as shall be
appropriate to entl�yp}p ly to r a d�eiddlrng�
4. Davis -Bacon Ad, as
by Department of Labor regulations
a. See also 2 C.F.R. Part 200 endix II
b. In accordance e sta ute, ve� st be req r pay wages to laborers and mechanics at a rate not less
than the pre li agesspecif wage d to n made by theSecretaryof Labor. In addition, vendor must
be require ay ages n once a
c. The n -F er entity must p a copy of rent prevailing wage determination issued by the Department of
Labor in ch solid ti e decisi4 �[a a contract or subcontract must be conditioned upon the acceptance
of the wage determnl The Fe�dl tity must report all suspected or reported violations to the Federal
awarding agency,
i. CQn7 4 on projects s reference the appendices containing Wage Determination Numbers and dates.
5. Copeland "Ant c-' Act (40 U.S.C. 3145), as supplemented by Department of Labor regulations (29 CFR Part 3,
"Contractors and SRbcontractors on Public Building or Public Work Financed in Whole or in Part by Loans or Grants from the
United States').
a. Each contractor or subrecipient shall be prohibited from inducing, by any means, any person employed in the
construction, completion, or repair of public work, to give up any part of the compensation to which he or she is
otherwise entitled. The non -Federal entity must report all suspected or reported violations to the Federal awarding
agency.
i. The contractor shall comply with 18 U.S.C. § 874, 40 U.S.C. § 3145, and the requirements of 29 C.F.R. pt. 3
as may be applicable, which are incorporated by reference into this contract.
ii. Subcontracts. The contractor or subcontractor shall insert in any subcontracts the clause above and such
other clauses as may by appropriate instructions require, and also a clause requiring the subcontractors to
City of Fayetteville, AR
Appendix A - Contract Provisions for Non -Federal Entity Contracts Under Federal Awards, CFR Part 200, Appendix II
Last Updated: 08/20/2024
Page 3 of 6
include these clauses in any lower tier subcontracts. The prime contractor shall be responsible for the
compliance by any subcontractor or lower tier subcontractor with all of these contract clauses.
iii. Breach. A breach of the contract clauses above may be grounds for termination of the contract, and for
debarment as a contractor and subcontractor as provided in 29 C.F.R. § 5.12.
6. Contract Work Hours and Safety Standards Act
a. Where applicable (see 40 U.S.C. § 3701), all contracts awarded by the non -Federal entity in excess of $100,000 that
involve the employment of mechanics or laborers must include a provision for compliance with 40 U.S.C. §§ 3702 and
3704, as supplemented by Department of Labor regulations at 29 C.F.R. Parts. See 2 C.F.R. Part 200, Appendix II, ¶ E.
b. Under40 U.S.C. § 3702, each contractor must be required to compute the wages of every mechanic and laborer based
on a standard work week of 40 hours. Work in excess of the standard work week is permissible provided that the
worker is compensated at a rate of not less than one and a half times the basic rate of pay for all hours worked in
excess of 40 hours in the work week.
c. The requirements of 40 U.S.C. § 3704 are applicable to construction work and provide that no laborer or mechanic
must be required to work in surroundings or under working conditionswhic areunsanitary zardousordangerous.
These requirements do not apply to the purchases of supplies or mater rticles or vailable on the open
market, or contracts for transportation or transmission of intelligen[9�
d. Compliance with the Contract Work Hours an afe Standar ct
ii. Overtime requirements. Nocontracto bcontrtacting f art of the contract work which
may require or involve the erVl entoflabo echanicss r Lure or permit any such laborer or
mechanic in any workweek i e ors is p yed on o k to work in excess of forty hours in
such workweek unless suc ab r or a eives co tion at rate not less than one and one-
half times the basic ra o or al ked it excL f forty^ in such workweek.
iii. Violation; liability f d wages; uid ed dama . In he eve y violation of the clause set forth
in paragraph (1 ection the con ctor an su contrates nsible therefor shall be liable for
the unpaid additi�hqontractor s bcontr s be liable to the United States (in the
case o wo d ne nd co t for th s f Colui o a territory, to such District or to such
territo . uidatecr dNages. S u ated da ges hall be computed with respect to each
individu laborerclieoianic, incl n chmen a an s, employed in violation of the clause set forth
in paragraph( ion, in of$10f r alendardayonwhich such individual was required
or permitted o o in excel standard o VVVeek of forty hours without payment of the overtime
wages ed b the cla rth in pa. 1) ofthis section.
iv. Wit for unpp/a►ii a s and I lid ages. The (write in the name of the Federal agency or the
logra t recip�nty�j upon its o�p on or upon written request of an authorized representative of
t D artment of L���j,,GGVV�r))withhold r can e to be withheld, from any moneys payable on account of work
erformed by®®��ontractc� s ntractor under any such contract or any other Federal contract with
the same����ntracQC17`11Nties
6t r federally -assisted contract subject to the Contract Work Hours and
Safety�UkSrs
Act, weld by the same prime contractor, such sums as may be determined to be
c s satisfy anof such contractor or subcontractor for unpaid wages and liquidated
as provided in the clause set forth in paragraph (2) of this section.
v. ontracts. The contractor or subcontractor shall insert in any subcontracts the clauses set forth in
ragraph (1) through (4) of this section and a clause requiring the subcontractors to include these clauses
in any lower tier subcontracts. The prime contractorshall be responsible for compliance by any subcontractor
or lower tier subcontractor with the clauses setforth in paragraphs (1) through (4) of this section."
7. Rights to Inventions Made Under a Contractor Agreement: If the Federal award meets the definition of "funding agreement"
under 37 CFR § 401.2 (a) and the recipient orsubrecipientwishes to enter into a contractwith a small business firm or nonprofit
organization regarding the substitution of parties, assignment or performance of experimental, developmental, or research
work under that "funding agreement," the recipient or subrecipient must comply with the requirements of 37 CFR Part 401,
"Rights to Inventions Made by Nonprofit Organizations and Small Business Firms Under Government Grants, Contracts and
Cooperative Agreements," and any implementing regulations issued by the awarding agency.
City of Fayetteville, AR
Appendix A - Contract Provisions for Non -Federal Entity Contracts Under Federal Awards, CFR Part 200, Appendix II
Last Updated: 08/20/2024
Page 4 of 6
8. Clean Air Act 42 U.S.C. 7401: Contracts in excess of $150,000 shall comply with the following related to the Clean Air Act
a. The vendor agrees to comply with all applicable standards, orders or regulations issued pursuant to the Clean Air Act,
as amended, 42 U.S.C.§ 7401 etseq.
b. The vendor agrees to report each violation to the City and understands and agrees that the City will, in turn, report
each violation as required to assure notification to the (name of recipient), Federal Emergency Management Agency,
and the appropriate Environmental Protection Agency Regional Office.
c. The vendor agrees to include these requirements in each subcontract exceeding $150,000 financed in whole or in
part with Federal assistance funding.
9. Federal Water Pollution Control Act: Contracts in excess of $150,000 shall comply with the following related to the Federal
Water Pollution Control Act
a. The vendoragrees to complywith all applicable standards, orders orregulations issued pursuantto the Federal Water
Pollution Control Act, as amended, 33 U.S.C. 1251 et sec.
b. The vendor agrees to report each violation to the (name of the state agency or local or Indian tribal government) and
understands and agrees that the (name of the state agency or local or Indj n tribal govern nt) will, in turn, report
each violation as required to assure notification to the (name of red iepi� deral Er anagement Agency,
and the appropriate Environmental Protection A ency Regional Off (`/�
c. The vendor agrees to include these requirem nts i each su trac xceedinjs,,�,No0 financed in whole or in
partwith Federal assistance.
10. Debarment and Suspension (Executive Orde k9nffcd, 126a. This contract is a covered transacti o F.R. pt. 1 �i 2 C.F.R. pt. 3000. As such the vendor is
required to verify that none of S/c a s princi fined .F.R. § 180.995), or its affiliates
(defined at 2 C.F.R. § 180.9�� exclude deft ed at 2 F�180.kni
squalified (defined at 2 C.F.R. §
180.935). VV/
b. A contract award (pFam
.22 �ot be mad oesA1111111111e governmen wide exclusions in the
System for ),i cordanc it OMBg ine at2 CFR 180 that implement Executive
Orders 12549 Co ., p. 18 2689 (3Rpa t 1989 Comp., E. 235), "Debarment and
Suspension." SA xclusionhpn�ins then s c roes de d uspended, or otherwise excluded by agencies,
aswell as parties declan►1Y'`-'le undPtims
ry or reg uthority other than Executive Order 12549.
c. The vendor must com ly h 2 C.F.0, subpan 2 C.F.R. pt. 3000, subpart C and must include a
requirement toRe
lywi these r n any rcovered transaction it enters into.
d. If it is later dthattth///h�����[n r id no co h2C.F.R.ptl8Qsubpart Cand 2C.F.R. Et. 300Qsubpart
C, in additi edies (v S to (name s agency serving as recipient and name of subrecipient), the
Feder er ent may pur vailable r edies, including but not limited to suspension and/or debarment.
e. The bid or prop sePes
es to cor�the requirements of 2 C.F.R. pt. 18Q subpart C and 2 C.F.R. pt. 300Q
subpartCwhilethisalid � ttheperiodofanycontractthatmayarisefromthisoffer.Thebidder
or proposer furt r a inc dea rovision requiring such compliance in its lower tier covered transactions.
11. Byrd Anti -Cobb ing ent 31 U.S.C. § 1352 (as amended)
a. Vendo apply or bid for an award of$10Q000 or more shall file the required certification. Each tier certifies to
the tier a ve that it will not and has not used Federal appropriated funds to pay any person or organization for
influencing or attempting to influence an officer or employee of any agency, a member of Congress, officer or
employee of Congress, or an employee of a member of Congress in connection with obtaining any Federal contract,
grant, or any other award covered by 31 U.S.C. § 1352. Each tier shall also disclose any lobbying with non -Federal
funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to
tier up to the recipient.
12. Procurement of recovered materials 200.323)
a. Anon -Fed era I entity that is a state agency or agency of a politica I subdivision of a state and its contractors and vendors
must comply with section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and
City of Fayetteville, AR
Appendix A - Contract Provisions for Non -Federal Entity Contracts Under Federal Awards, CFR Part 200, Appendix II
Last Updated: 08/20/2024
Page 5 of 6
Recovery Act. The requirements of Section 6002 include procuring only items designated in guidelines of the
Environmental Protection Agency (EPA) at40 CFR part 247 that contain the highest percentage of recovered materials
practicable, consistent with maintaining a satisfactory level of competition, where the purchase price of the item
exceeds $10,000 or the value of the quantity acquired during the preceding fiscal year exceeded $10,000; procuring
solid waste management services in a manner that maximizes energy and resource recovery; and establishing an
affirmative procurement program for procurement of recovered materials identified in the EPA guidelines.
13. Prohibition on certain telecommunications and video surveillance services or equipment 200.216)
a. Recipients and subrecipients are prohibited from obligating or expending loan or grant funds to:
i. Procure or obtain;
ii. Extend or renew a contract to procure or obtain; or
iii. Enter into a contract (or extend or renew a contract) to procure or obtain equipment, services, or systems
that uses covered telecommunications equipment or services as a substantial or essential component of any
system, or as critical technology as part of any system. As described in Public Law 115-232 section 889,
covered telecommunications equipment is telecommunicati s equipmenduced by Huawei
Technologies Company or ZTE Corporation (or any subsidiaty teofsu ).
(1) For the purpose of public safe security of Bove acilities, security surveillance of
critical infrastructure, an of er nati s rity pur video surveillance and
telecommunications equip roductera Co I tions Corporation, Hangzhou
Hikvision Digital TecY4no YCompany, a Technol o pany (or any subsidiary or affiliate
of such entities).
(2) Telecommunicati video r ce seryill vided by such entities or using such
equipment. VVVVVV
(.3) Telecomm nsorvid sur Ilancee m ntors reduced orprovided byanentity
that th ry of Defense, consul the [�,,[,or the National Intelligence or the
DiIro
the Feb Bseau of In tl non, r s believes to be an entity owned or
coy, o e tonne gover en f a covered foreign country.
b. In implementinibition un r Public 1 232 se nsubsection (f), paragraph (1), heads of
executive agenci adminis Ineloan, gra or s sidy pro s all prioritize available funding and technical
support to assist affe b y�sses, ins and or ans as is reasonably necessary for those affected
entities to transition fr m�red corr7� ions equi ��\aannd services, to procure replacement equipment and
services, and to s e th commu s service and customers is sustained.
a See Public L 1 32 section Ar additi n tion.
d. See also § 1. [ w
` ✓
14. Domestic prefer s or pr cu nts 20
a. As appropriate and t tent is i law, the non -Federal entity should, to the greatest extent practicable
under a Federal a rovide re rence for the purchase, acquisition, or use of goods, products, or materials
produced n d States (inc ng but not limited to iron, aluminum, steel, cement, and other manufactured
produ ts). uirements of this section must be included in all subawards including all contracts and purchase
orders r or products under this award.
I For purpo s of this section:
i. "Produced in the United States' means, for iron and steel products, that all manufacturing processes, from
the initial melting stage through the application of coatings, occurred in the United States.
ii. "Manufactured products" means items and construction materials composed in whole or in part of non-
ferrous metals such as aluminum; plastics and polymer -based products such as polyvinyl chloride pipe;
aggregates such as concrete; glass, including optical fiber; and lumber.
City of Fayetteville, AR
Appendix A - Contract Provisions for Non -Federal Entity Contracts Under Federal Awards, CFR Part 200, Appendix II
Last Updated: 08/20/2024
Page 6 of 6
RFP 24-15, Addendum 1 CITY OF
FAYETTEVILLE
Date: Monday, December 23, 2024 ' A R K A N S A S
To: All Prospective Vendors
From: Amanda Beilfuss-479.575.8220—abeilfuss@fayetteville-ar.gov
RE: RFP 24-15, CMAR for Maple Street Improvements
This addendum is hereby made a part of the contract documents to the same extent as though it were
originally included therein. Interested parties should indicate their receipt of same in the appropriate blank of
the RFP. PROPOSERS SHOULD ACKNOWLEDGE THIS ADDENDUM ON THEDMVeRQN ON THE BIG
PORTA11FORM_ i 1'1
1. A non -mandatory pre -proposal confe;en was held sday, De r 17, 2024 at 10:00 AM
in room #326 of Fayetteville City Hsting endees a tached to this addendum
for disclosure to all interested parti�t ach� `
a. Attendees: v n
i. City of Fayfneilf
nd Pro, resen
1. A ��,Procure men for2.VP c�sklgAg
t Mihal h��,.•//Activ T n ortatl Ma ger
Kriste njght, Univ sit Arkansa — sociate Director
ii. Vendors: D)
1. Antral,
lint o
Nabho uctio
2. DEADLINE EXSEN5l0l`%kQe dea�' + mit Proposals for this RFP has been extended. All
Proposals shall be s�11�li ed byZtaesct��7 January 21, 2025 no later than 2:00 PM.
Nftlof
3. CLARIFICAhe following is being provided as additional information and/or clarification:
a. The City of Fayetteville will hold and administer the CMAR contract.
b. Anticipated construction start time is May 2025.
c. Draft Contract — A draft contract for the CMAR for this project is attached to this
addendum (Attachment B). Final contract is subject to change.
�_iLV of Fayetteville, AR
RFP 2 4- 1 5, Addendum 1
Page 112
Telecommunications Device for the Deaf TDD(479)521-1316 113 West Mountain -Fayetteville, AR 72701
d. Draft Plans/Drawings —The draft plans (NOT completed) for this CMAR project are being
included in this addendum (see dropbox link below). Plans are subject to change.
i. Dropbox link for Plans/Drawings:
https://www.dropbox.com/scl/fi/ab9otzggeazcla m3mf82n/Maple-Street-Final-
Plans-reduced-size.pdf?rlkev=w6ln5s6cfmf6vewfws58zkva9&dl=O
4. Attachments:
a. Attachment A: Pre -Proposal Conference Sign -In Sheet
b. Attachment B: Draft Contract
_- of Fayetteville, AR
UP P 2 4- 1 5, Addendum 1
Page212
Telecommunications Device for the Deaf TDD(479)521-1316 113 West Mountain -Fayetteville, AR 72701
FAYETTEVILLE
ARKANSAS
Description:
City of Fayetteville, Arkansas
Attendance Sheet
• 91M.
Function (circle one) : Bid Opening, Selection Committee
i
+M 1�q
Name
�2.t�itf�5
3
1 tl
4
Wey;,n
LaA< -oi
5
Cal}on
HOFm
7
L'iMk 3'T
IFP%4 lso->J
8
Pfme On
Z;PSf61&f It
9
`,
% �[Lcr� Qn.
10
0US_ _ r..
11
kW5CEA1
�1U11oNT
12
Ka 1t�
PrM 1A
13
Mom- MIHA&tV(C44
14
15
16
17
18
19
20
Dater /--j *7 / N
"All Bid Openings are also streamed live on the City of Fayetteville's YouTube Channel.
Interview
/1 phut` ✓
City staff e-mail includes "@fayetteville-ar.gov"
Email
}mot . (3rrF�c��r (J v�xyJw�z ,vat
tL� Gw�OI PS f� �/,f nr a�Os� _ Ceirs
kris e vack•e&w
k
Aft CITE, OF City of Fayetteville
FAYETTEVILLE RFP24-15, CMARfor Maple Street Improvements
ARKANSAS Contract— Between City of Fayetteville, AR
and **Contractor**
THIS AGREEMENT ism adethis day of , 2025, by and between City of
FayiMeviIlia, Arkansas, acting by and through its Mayor (hereinafter called CITY OF FAYETTEVILLE or CITY) and
"Contractor" (construction manager at risk, hereinafter called CMAR, Construction Manager, **Contractor** OR
'ENDOR), and CITY OF FAYETTEVILLE from time to time requires professional CMAR services in connection with the
evaluation, design, and/or construction supervision of capital improvement projects. Therefore, CITY OF FAYETTEVILLE
and CM AR in consideration oftheir mutual covenants agree as follcrws:
-MAR shall serve as CITY OF FAYETTEVILLE'sprofessional CM AR consultant in thos ssignmentst ich this Agreement
appliesand shall give consultation and ad vice to CITY OF FAYETTEVILLE durin t ormanc ices defined in the
'.cope of work. All services shall be performed under th rection of a C gistered Kt
State of Arkansas and
licensed bythe Arkansas Contractor's Licensing Board. e)
1. Contracted parties and relationship:
a. This agreement shall be bin tween r es F e !ASOZIAR services shall be provided as
identified in appendices.
i ContractorS x tifica i n nu�m ber (TIN in ##
Cont Ct k sas n ac r Licen ####
Contra cr ary f ate Filin #####
b. Parties agree tin act t sis of rust, goo and fair dealing, and perform in a fiscally
responsible and tim y ner. P all eac n avor to promote cooperation among all Project
participants.
2. EntireAgEeem Exhibits Bement sets the entire agreement and understanding between the
parties on th matte f t Ag® Neither party shall be bound by any conditions, definitions,
representations warran re bject matter ofthis Agreement other than those as expressly
provided herein.
a. A1_peridic:.. I under this agreement include the following:
i. ndNA: Scope of Services
ii. AppondLx S: CM AR Fee Schedule
iii. Appendix C City issued solicitation for RFP 24-15, CM AR for Maple Street Improvements
iv. AppendixD Contractor's Respon se to R FP 24-15
v. AppendLx E Contractor's current Certificate of Insurance
b. This agreement may be modified only by a duly executed written instrument signed by the CITY and
Cf l'A,P
RFP24-15, ('110AP-11,-Arile Sf� Hpf ImF r- rn nt_
Page 1 of 26
Last Revised 12.19.24
c. ORDER OF PRECEDENCE: In case of any inconsistency, conflict, or ambiguity among the Contract
Documents, the documents shall govern in the following order: (a) Change Orders, affidavits, and written
amendments to this Agreement which are executed by all parties; (b) the Agreement; (c) CMAR's
response to RFP 24-15 (d) City's published RFP 24-15 and associated Addenda and attachments.
3. Notices: Any notice required under this Agreement shall be in writing, address to the appropriate party at the
following addresses:
a. City of Fayetteville: Attention: Mayor Molly Rawn, 113 W. Mountain, Fayetteville, AR 72701
b. "Contractor".: Attention: TBD, "Contractor Address"
4. General Provisions:
a. ETHICS: All parties shall perform with integrity. Each shall avoid conflicts of interest and promptly disclose
to any other part any conflicts that may arise. All parties warrant that it ha of and shall not pay or
receive any contingentfees or gratuities to o#from any other party, including an s, officer's employers,
Subcontractors, Subsubcontractors, Su tier " Volu e s, Elected Officials, or Others to secure
preferential treatment.
b. When the Construction Docume anteed um Price and other descriptive documents
defining the work are comp y s identifie waali ded this Agreement by mutually
agreed upon amendment greem nt.
c. Workmanship: The rk all be ecuted in actor a ith tract Documents in a workmanlike
manner. All mate Is s inPe o shall b ed in s t quantities to facilitate the proper
and expeditio tion of ork an II e new ept s otherwise provided in the Contract
Documents.
d. MATERIALS FURNIS E Y OWN OTHER I Work includes installation of materials or
equipment fur d b City or r , it shall esponsibility of Construction Manager to examine
the items pr ded an a on ha I e, and install the items, unless otherwise provided in
the Contra, ocuments, uch skill n re as to provide a satisfactory and proper installation. Loss
or damage fte to actj,.p r omissio nstruction Manager shall be the responsibility of Construction
Manager and ma duct y: amounts due or to become due Construction Manager. Any
defects discov zn such m teri or equipment shall be reported at once to the City and the City's
contract - rty Design rofessional. Following receipt of written notice from Construction
Man r ects, City and Design Professional shall promptly inform Construction Manager what
action, Construction Manager shall take with regard to the defects.
e. WORKSITE VISIT: Construction Manager acknowledges that it has visited, or has had the opportunity to
visit, the Worksite to visually inspect the general and local conditions which could affect the Work.
f. Construction Managershall perform cutting, fitting, and patching necessary to coordinate the various
parts of the Work and to prepare its Work for the work of City or Others.
i. Cutting, patching, or altering the work of City or Others shall be done with the prior written
approval of City and Design Professional. Such approval shall not be unreasonably withheld.
RFP 24-15, CMAR— Maple Street Improvements
Page 2 of 26
Last Revised 12.19.24
g. COMPLIANCE WITH LAWS: Construction Manager shall comply with all the Law at its own cost.
Construction Manager shall be liable to City for all loss, cost, or expense attributable to any acts or
omissions by Construction Manager, its employees, subcontractors, suppliers, and agents for failure to
comply with Laws, including fines, penalties, or corrective measures.
i. CHANGES IN THE LAW: The GMP, estimated Cost of the Work, Construction Manager's Fee, Date
of Substantial Completion or Date of Final Completion, and, if appropriate, the Compensation for
Preconstruction Services shall be equitably adjusted for additional costs or time needed resulting
from Laws enacted after the date of this Agreement, including taxes.
h. COST OF CORRECTING DAMAGED OR DESTROYED WORK: With regard to damage or loss attributable to
the acts or omissions of City or Others and not to Construction Manager, City may either (a) promptly
remedy the damage or loss and assume affected warranty responsibilities, (b) accept the damage or loss,
or (c) issue a Change Order to remedy the damage or loss. If Co truction Ma er incurs costs or is
delayed due to such loss or damage, Construction Manag k an eq a adjustment in the
GMP, estimated Cost of the Work, Constr n Manager's Fe of Sub n Completion or Date of
Final Completion, and, if appropriate, e omp a n for Preco ion Services under this
Agreement. Any equitable adjustment hall be ap a all parti
i. Taxes and Permits: Construction r sh II g blic auth i ' II notices required by law and shall
obtain and pay for all neces rmits and re Is pert Ing to the Work. Construction
Manager shall provide to pies of II n ices, per ts, icense renewals required under this
Agreement.
i. Construct age h I aye appli es an a it fees associated with the entire
project,
j. DISCOUNTS: All disc t tk! promp ent shall e to City. All trade discounts, rebates, and
refunds, and all returns r sale ofa s materi s equipment, shall be credited to the Cost of the
Work, or dire t the ity aft rf4aayment.
k. City ma y r use o d or part mpleted portions of the Work when (a) the portion of
the r signated in ertificate'illlI Su stantial Completion, (b) appropriate insurer(s) consent to
the occupancy or s d (c) puttlaslut
rities authorize the occupancy or use. Construction Manager
shall not unreas withh co to partial occupancy or use.
I. JOINT D FYI I Parties expressly agree that this Agreement was jointly drafted, and that both had
opp i negotiate its terms and to obtain the assistance of counsel in reviewing its terms before
executi herefore, this Agreement shall be construed neither against nor in favor of either Party but
shall be construed in a neutral manner.
m. EXTENT OF AGREEMENT: Except as expressly provided, this Agreement is for the exclusive benefit of all
Parties, and not the benefit of any third party. This Agreement represents the entire and integrated
agreement between the Parties, and supersedes all prior negotiations, representations, or agreements,
either written or oral. This Agreement and each and every provision is for the exclusive benefit of all
Parties and not for the benefit of any third party.
n. ASSIGNMENT: Except as to the assignment of proceeds, no Party shall assign their interest in this
Agreement without the written consent of the other Party. The terms and conditions of this Agreement
RFP 24-15, CMAR— Maple Street Improvements
Page 3 of 26
Last Revised 12.19.24
shall be binding upon all Parties, their partners, successors, assigns, and legal representatives. No Party
shall assign the Agreement without written consent of the other.
o. Where figures are given, they shall be preferred to scaled dimensions.
p. The drawings and specifications are complementary. If Work is shown only on one but not on the other,
Construction Manager shall perform the Work as though fully described on both. CMAR shall seek
clarification from Design Professional for any discrepancies.
q. In case of conflicts between the drawings and specifications, the specifications shall govern. In any case of
omissions or errors in figures, drawings, or specifications, Construction Manager shall immediately submit
the matter to City and Design Professional for clarification. Design Professional's clarifications are final
and binding.
DEBARMENT AND SUSPENSION. By execution of this agreement, CMAR certifies that to the best of its
knowledge and belief that the CMAR and its principals:
i. Are not presently debarred, s nded, pro ose debar t, declared ineligible, or
voluntarily excluded from covere ction Federalle ent or agency;
ii. Have not within a three year period p ec ding this pro al been convicted of or had a civil
judgment rendered agai ' for o lion of XIFede
criminal offense in connection with
obtaining, attempti tain, p ming ZdI
, tate, or local) transaction or
contract under a ransacti ; v lation of or 5 titrust statutes or commission
of embezzle eft, rgery, bribery, tion truction of records, making false
statemen eivi s le pperty;
iii. Are n r e tl indi to or or o se crimi or civilly charged by a government entity
(Federa , Stat o al) with c ission of a of the offenses enumerated in paragraph (2) of
this certifica o Ind
iv. Have t ithin a the eriod g this application/proposal had one or more public
tr s ti s (Fe , or to inated for cause or default.
V.. understands at aVal4atement on certification regarding debarment and suspension
may beg u s or rejf this proposal or termination of the award. In addition, under 18
USC Se , a fals stat ment may result in a fine. I further certify that I will obtain a similar
cprtjfWVfor each su ntract awarded in excess of $25,000.
v' cations for subcontracts executed under this agreement shall include all language in this
5. Definitions:
a. Unless otherwise specifically defined in this Agreement, any terms that have well-known technical or
trade meanings shall be interpreted in accordance with their well-known meanings.
b. "Business Day" means all Days, except weekends and official federal or state holidays where the Project is
located.
RFP 24-15, CMAR— Maple Street Improvements
Page 4 of 26
Last Revised 12.19.24
c. A "Change Order" is a written order signed by all Parties after execution of this Agreement, indicating
changes in the scope of the Work, the GMP and Date of Substantial Completion or Date of Final
Completion.
d. "Contract Time" is the period between the Date of Notice to Proceed and the total time authorized to
achieve Final Completion.
e. "Cost of the Work" means the total costs and discounts charged to the City.
f. The "Construction Manager at Risk" (CMAR or CM) is the person or entity identified in this contract and
includes Construction Manager's Representative.
g. "Day" means a calendar day unless otherwise specified.
h. "Defective Work" is any portion of the Work that that does not conform with the requirements of the
Contract Documents.
i. "Design Professional" means the licensed aritect retained b ity and i s �onsultants, to perform
design services for the Project.
i
j. "Final Completion" occurs on the date l%en C R tions u e is Agreement are complete and
accepted by City and final payrne W eco es and pay, is date shall be confirmed by a
Certificate of Final Completi 'hwed by a
k. "Hazardous Material" i0��bstance or rial iden i ow n h uture as hazardous under the
Law, or any other t ce or eri I that ma' b onsi zardous or otherwise subject to
statutory or r ul re uire en erning dispos or eanup.
I. "Interim Directi e" is a to order co aini hange to h ork directed by and in consultation with
City and Design PrQ#essi after e n of this ement and before Substantial Completion.
Interim Directives shall onsoI'd formaIi a change order to be signed by all parties.
m. "Law" mea al, state I aws, Q rd' codes, rules, and regulations applicable to the Work
with wh' nstruction must co at are enacted as of the Agreement date.
n. "Othe means City's- other: actors/constructors, (b) suppliers, (c) subcontractors, sub -
subcontractors, or fern o }, and others employed directly or indirectly by (a), (b), or (c) or
any by any of tporfor who a any of them may be liable.
o. "Overhe ns (a) payroll costs, burden, and other compensation of CMAR's employees in CMAR's
principal and branch offices for work associated with this project.
p. "Owner" is the City of Fayetteville, Arkansas (City).
q. The "Owner's Program" is an initial description of Owner's objectives, including budgetary and time
criteria, space requirements and relationships, flexibility and expandability requirements, special
equipment and systems, site requirements, and any requirements for phased occupancy.
r. The "Parties" are collectively City and CMAR.
s. The "Project," is the building, facility, or other improvements for which CMAR is to perform Work under
this Agreement. It may also include construction by Owner or Others.
RFP 24-15, CMAR— Maple Street Improvements
Page 5 of 26
Last Revised 12.19.24
t. The "Schedule of the Work" is the document prepared by CMAR that specifies the dates on which CMAR
plans to begin and complete various parts of the Work, including dates on which information and
approvals are required from City.
u. "Subcontractor" is a person or entity retained by CMAR as an independent contractor to provide the
labor, materials, equipment, or services necessary to complete a specific portion of the Work. The term
Subcontractor does not include Design Professional or Others.
v. "Substantial Completion" of the Work, or of a designated portion, occurs on the date when the Work is
sufficiently complete in accordance with the Contract Documents so that City may occupy or utilize the
Work, or a designated portion, for the use for which it is intended, without unapproved disruption. This
date shall be confirmed by a certificate of Substantial Completion signed by all Parties.
w. A "Sub -subcontractor" is a person or entity who has an agreement with a Subcontractor or another sub -
subcontractor or Supplier to perform a portion of the 5ubco ctor's W upply material or
equipment.
x. A "Supplier' is a person or entity retained UC AR to o e material o mentforthe Work.
y. "Terrorism" means a violent act that is a us to h life, property, or infrastructure,
that is committed by an individ ndivi ua that ap t be part of an effort to coerce a
civilian population or to in he affect th n uct ny government by coercion.
Terrorism includes, but is ited to, ny ct certifi b he U e ates government as an act of
terrorism pursuant to orisr Risk Insurance amende
z. "Work" mean thara
t cti a d_ ministr e mana a services necessary or incidental to
fulfill Constru kdV
'ob ations f e roject accordance with and reasonably inferable
from the Contr t DocThe Wo may efer to th ole Project or only a part of the Project if
work is also being p o Own ers.
aa. "Worksite" m ns he area of ctwhere ork is to be performed.
bb. "Bi-mon sis mean e urteen t n calendar days.
6. Contract Docu t Revie dministrqa
a. Before comme he Wo , C ruction Manager shall examine and compare the drawings and
specifica io t nformation ished by the City and Design Professional that are considered Contract
DocuTe vant field measurements made by Construction Manager, and any visible conditions at
the W affecting the Work.
b. Should Construction Manager discover any errors, omissions, or inconsistencies in the Contract
Documents, Construction Manager shall promptly report them to the City and Design Professional.
Following receipt of written notice from Construction Manager of defects, City shall promptly inform
Construction Manager what action, if any, Construction Manager shall take with regard to the defect.
c. Nothing in this section shall relieve CMAR of responsibility for its own errors, inconsistencies, or
omissions.
RFP 24-15, CMAR— Maple Street Improvements
Page 6 of 26
Last Revised 12.19.24
d. COST REPORTING: Construction Manager shall maintain complete, accurate, and current records that
comply with generally accepted accounting principles and calculate the proper financial management
under this Agreement. Construction Manager shall maintain a complete set of all books and records
prepared or used by Construction Manager with respect to the Project. City shall be afforded access to all
of Construction Manager's records, books, correspondence, instructions, drawings, receipts, vouchers,
memoranda, and similar data relating to this Agreement. Construction Manager shall preserve all such
records fora period of three years after the final payment or longer where required by Law.
7. Warranty
a. Construction Manager warrants all materials and equipment furnished under the Construction Phase of
this Agreement will be new unless otherwise specified, of good quality, in conformance with the Contract
Documents, and free from defective workmanship and materials. At City or Design Professional request,
Construction Manager shall furnish satisfactory evidence of th quality and pme of materials and
equipment furnished. Construction Manager further warrant al shall be e m material defects
not intrinsic in the design or materials 00qtired in the Cc Docum s. onstruction Manager's
warranty does not include remedies for f s or ges caused b mal wear and tear during
normal usage beyond the warranr iod, use f pose for c the Project was not intended,
improper or insufficient main
modif ti s performed key the City or others, or abuse.
Construction Manager's warrah I com the Date f anal Completion of the Project.
b. To the extent products, sys ms or mate ' i corpo e n the Work are specified and
purchased by the Ci all covere exclusi y the ty o the manufacturer. There are
no warranties wh' end be e des on t f any such warranty. For such
incorporated LOTH n AN S R S ED R I LIED INCLUDING THE WARRANTY OF
MERCHANTABI AND fJHF##WARRANJY FITNESS F R PARTICULAR PURPOSE ARE EXPRESSLY
DISCLAIMED.
4
c. Construction ger all Kb,(j�,,om its c ractors and Suppliers any special or extended
warranties r d by the C tume struction Manager's liability for such warranties shall
be limit he one-y a ction peVs
further defined in this Agreement. After that period
Cons anager sh rovide f and comprehensive assistance to the City in enforcing the
obligatio of Su tors ors? rsuch extended warranties.
d. Correction of rkvrthin
i. r
Substantial Completion or within two -years after the date of Final Completion of the
Defective Work is found, City shall promptly notify Construction Manager in writing.
ty provides written acceptance of the condition, Construction Manager shall promptly
correct the Defective Work at its own cost and time and bear the expense of additional services
required for correction of any Defective Work for which it is responsible. If within the two-year
correction period City discovers and does not promptly notify Construction Manager or give
Construction Manager an opportunity to test or correct Defective Work as reasonably requested
by Construction Manager, City waives Construction Manager's obligation to correct that
Defective Work as well as City's right to claim a breach of the warranty with respect to that
Defective Work.
RFP 24-15, CMAR— Maple Street Improvements
Page 7 of 26
Last Revised 12.19.24
ii. If Construction Manager fails to correct Defective Work within a reasonable time after receipt of
written notice from City before final payment, City may correct it in accordance with Owner's
right to carry out the Work. In such case, an appropriate Change Order shall be issued deducting
the cost of correcting the Defective Work from payments then or thereafter due Construction
Manager. If payments then or thereafter due Construction Manager are not sufficient to cover
such amounts, Construction Manager shall pay the difference to City.
iii. Construction Manager's obligations and liability, if any, with respect to any Defective Work
discovered after the two-year correction period shall be determined by the Law. If, after the two-
year correction period but before the applicable limitation period has expired, City discovers any
Work which City considers Defective Work, City shall, unless the Defective Work requires
emergency correction, promptly notify Construction Manager and allow Construction Manager
an opportunity to correct the Work if Construction Manager elects to do so. If Construction
Manager elects to correct the Work, it shall provide writ otice of s nt within fourteen
(14) Days of its receipt of notice from City and sha ete the ion of Work within a
mutually agreed timeframe. If Con truction Man r do not ele to correct the Work, City may
have the Work corrected by itself car Others, an ity inte eek recovery of those costs
from Construction Mana C
ity shall promtly pro v' e onstruction Manager with an
accounting of the actual costs
iv. If Construction Man R11111
corre on moval tive r auses damage to or destroys
other completed 16rtially com work ng b ' i , onstruction Manager shall be
responsible f th cost recting the d r or property.
v. The AP eriod f r tion f e t e k do not constitute a limitation period with
respec o the for ment of Con espNeco the Ma a 's other obligations under the Contract
Documents.
vi. Before I pa ent, at ion and i nstruction Manager's agreement, City may elect
to a c efective r er tha equi a its removal and correction. In such cases the GMP
sh e e uitabI a for anyNiminution in the value, as determined by City, of the Project
c by such ef4kc ve Work.
8. Safety of Persons and Pro
a. SAFETY P '" Constructi Manager holds overall responsibility for safety programs. However,
such bli does not relieve Subcontractors of their safety responsibilities and to comply with the
Law. C s ction Manager shall prevent against injury, loss, or damage to persons or property by taking
reasonable steps to protect: (a) its employees and other persons at the Worksite; (b) materials and
equipment stored at onsite or offsite locations for use in performing the Work; and (c) property located
at the Worksite and adjacent to work areas, whether or not the property is part of the Worksite.
b. CONSTRUCTION MANAGER'S SAFETY REPRESENTATIVE: Construction Manager shall designate an
individual at the Worksite in its employ as its safety representative. Unless otherwise identified by
Construction Manager in writing to City, Construction Manager's project superintendent shall serve as its
safety representative. Construction Manager shall report promptly in writing all recordable accidents and
RFP 24-15, CMAR— Maple Street Improvements
Page 8 of 26
Last Revised 12.19.24
injuries occurring at the Works ite. When Construction Manager is required to file an accident report with
a public authority, Construction Manager shall If a copy of the report to City.
c. Construction Manager shall provide City with copies of all notices required of Construction Manager by
the Law. Construction Manager's safety program shall comply with the requirements of governmental
and quasi -governmental authorities having jurisdiction.
i. Damage or loss not insured under property insurance that may arise from the Work, to the extent
caused by negligent or intentionally wrongful acts or omissions of Construction Manager, or
anyone for whose acts Construction Manager may be liable, shall be promptly remedied by
Construction Manager.
d. If City deems any part of the Work or Worksite unsafe, City, without assuming responsibility for
Construction Manager's safety program, may require Construction Manager to stop performance of the
Work, take corrective measures satisfactory to City. If Construc ' anager t adopt corrective
measures, City may perform them and deduct their cost fro P. Con;:&,n Manager agrees to
make no claim for damages, or an increas - in t GMP, or a ange in tes of Substantial or Final
Completion based on Construction Manage omplia City's r le request.
9. Su bcontracts: �+14,
a. BINDING OF SUBCONTRA AND S: Co ion ger agrees to bind every
Subcontractor and Suppli r require eve u bcontlp&r o so bORd subcontractors and significant
supplier, to the Cc a ocu nts as they a t the tractor's or Supplier's applicable
provisions to that o f th rk.
b. Construction age a ees of o subco constru manager at risk related services without
priorwritten co sent o City.
10. Fees, Expenses, and Payrr►ents: e maxi of -to -ex ount authorized for this agreement is included in
the breakdown shown below. Fees sh e id to t as described in Appendix B.
a. Phase 1: PreifonstructionSe ices
i. The maxi mu t-to-excgecl amount authorized for this phase is $######## USD. Fees shall be
paid to the fro e abed Lump Sum basis as described in Appendix B.
b. Phase 2: u eed Maximum a GMP
i, 4fNok Agreement is executed before establishment of the Guaranteed Maximum Price and its
ceptance by the City, then the GMP and its basis shall be setforth in a GMP Change Order.
ii. In the event all Parties agree the drawings and specifications are sufficiently complete after bids
are received, Construction Manager shall prepare and submit to the City in writing a GMP. The
GMP proposal shall include the cost of the Work, Construction Manager's Fee, the clarifications
upon which it is based, butshall not include compensation for Preconstruction Services (Phase 1).
iii. FAILURE TO ACCEPT THE GMP PROPOSAL: Unless the City accepts the GMP Proposal in writing
the GMP Proposal shall not be effective. If City fails to accept the GMP Proposal, or rejects the
GMP Proposal, City shall have the right to:
RFP 24-15, CMAR— Maple Street Improvements
Page 9 of 26
Last Revised 12.19.24
1. suggest modifications to the GMP Proposal
2. terminate the Agreement for convenience
iv. PRE-GMP WORK: Before City acceptance of the GMP Proposal, Construction Manager shall not
incur any cost to be reimbursed as part of the Cost of the Work, except as provided in this
Agreement or as City may specifically authorize in advanced writing.
v. GMP shall include an itemized cost items from the CMAR, including but not limited to:
1. Laborwages directly employed by Construction Manager in performing of the Work.
2. Salaries of Construction Manager's employees when stationed at the field office, in
whatever capacity employed, employees engaged on the road expediting the production
or transportation of material and equipment, and employees from the principal or
branch office as mutually agreed by the Parties in iting.
3. Cost of all employee b PW
fits and taxe i ing b �Zloimll
ited to, workers'
compensation, unemploy ent ompe n, s ial sec u alth, welfare, retirement,
and other fringe be efits s re ui law, I reements, or paid under
Construction M and d nel poli i ofar as such costs are paid to
employees of C s ion n ho are i in the Cost of the Work.
4. Transport t vet, h (te.1, an moving es of ruction Manager's personnel
incurr nection wonhe Work.
5. C ma)� , lies, a men ated in the Work, including costs
ection es ing if r i ed byVty, t nsportation, storage, and handling.
6. aym de by Con uction Man ubcontractors for work performed under
this g e ent.
7. C t, includi r ortatio aintenance of all materials, supplies, equipment,
pora ' s, an tools not owned by the workers that are used or
consume n e perfor and of the Work, less salvage value or residual value; and cost
less ge valuq items used, but not consumed that remain the property of
Co tion a
tal charges 11 necessary machinery and equipment, exclusive of hand tools owned
y workers, used at the Worksite, whether rented from Construction Manager or others,
including installation, repair, and replacement, dismantling, removal, maintenance,
transportation, and delivery costs at competitive market rates.
9. Cost of the premiums for all insurance and surety, performance or payment bonds which
Construction Manager is required to procure or deems necessary and approved by City
including any additional premium incurred as a result of any increase in the GMP at fixed
rates approved by the City.
10. Sales, use, gross receipts, or other taxes, tariffs, or duties related to the Work for which
Construction Manager is liable.
RFP 24-15, CMAR— Maple Street Improvements
Page 10 of 26
Last Revised 12.19.24
11. Permits, taxes, fees, licenses, tests, royalties.
12. Losses, expenses, or damages to the extent not compensated by insurance or otherwise,
and the cost of corrective work during the Construction Phase and for the warranty
period.
13. Costs associated with establishing, equipping, operating, maintaining, mobilizing and
demobilizing the field office.
14. Water, power, and fuel costs necessaryfor the Work.
15. Cost of removal of all nonhazardous substances, debris, and waste materials
16. Costs incurred due to an emergency affecting the safety of persons or property.
17. Costs directly incurred in the performance of the rk or in conneation with the Project,
and not included in Construction Manager's aNi are real in ly"inferable from the
Contract Documents. \%-J
r ec inten o c. Fees set for the construction of this pexecu agreement of all parties in
a not to exceed form via chang a e to th and fed a nding nature of this project, all
parties agree payment to the C be a Ilows.
i. The City shall be re si le for not xceed c .
ii. Final amounts sba ide tified wi a Cha r er, pu t t agreement of all parties of a
Guarantee um Pr
d. CMAR shall tr nd report xpenses ' t relate thi Agreement along with invoice which
shall include sc dule o es for pa ent foeach Invoices shall be itemized. Invoice and
payment requests s II exceed thO'S'ntagire fo completed as defined.
e. Payment Ter I invoices ar le upon oval and due within thirty (30) calendar days. If a
portion ofQn ice or t is di y CITY, the undisputed portion shall be paid. CITY OF
FAYETTI=i 1hall advis R in writ- g o e basis for any disputed portion of any invoice. CITY shall
make r d ble effQ#Uo pay inv®i hin 30 calendar days of date the invoice is approved.
f. STORED MATE ND UIP NT: Unless otherwise provided in the contract documents,
applications �ent may de materials and equipment not yet incorporated into the Work but
delivere suitably stored onsite or offsite including applicable insurance, storage, and costs
ncurr nsporting the materials to an offsite storage facility. Approval of payment applications for
stored materials and equipment stored offsite shall be conditioned on a submission by Construction
Manager of bills of sale and proof of required insurance, or such other documentation satisfactory to City
to establish the proper valuation of the stored materials and equipment, City's title to such materials and
equipment, and to otherwise protect City's interests therein, including transportation to the Worksite.
Materials and equipment stored offsite shall be in a bonded and insured secure facility.
g. Monthly invoices for each calendar month shall be submitted to City or such parties as City may designate
for professional services consistent with CMAR's normal billing schedule. Once established, the billing
schedule shall be maintained throughout the duration of the Project. Invoices shall be made in
RFP 24-15, CMAR— Maple Street Improvements
Page 11 of 26
Last Revised 12.19.24
accordance with a format to be developed by CMAR and approved by City. Applications for payment shall
be accompanied each month by the updated project schedule as the basis for determining the value
earned as the work is accomplished. Final payment for professional services shall be made upon CITY OF
FAYETTEVI LLE'S approval and acceptance with the satisfactory completion of professional services for the
P roj e ct.
i. Retainage in the amount of five percent (5%) will be withheld from each payment until project
final completion.
ii. Upon Substantial Completion, the City may release retainage on that portion of the Work a
Subcontractor has completed in whole or in part, and which City have accepted.
h. Final Payment: Upon satisfactory completion of the work performed under this Agreement, as a condition
before final payment under this Agreement, or as a termination settlement under this Agreement, CMAR
4
shall execute and deliver to CITY OF FAYETTEVILLE a release of all claims aga OF FAYETTEVILLE
arising under or by virtue of this Agreement except claims a specif' empted by CMAR to
be set forth therein.
i. Unless otherwise provided in tis Agreemef44r State la erwise expressly agreed to by
the parties to this Ag final a en unde greement or settlement upon
termination of this A m t sha t stitute a r of CITY OF FAYETTEVILLE's claims
against CMAR or sur es rider is A ment.
11. Project Banding: Performanc n paym onding. Aft ex c tion ontract by all parties, CMAR shall
provide 100%separate pe or a e a p bon fr bondi o any, licensed to do business in the
state of Arkansas, to C+W of Fayette le after He mar at a Washington County Circuit Clerk's
Office. Bonds shall be ovided n ten (10 alen r days P change order has been executed and
approved by all parties. NO
a. Construction cfntMcts or the shall no n ered into between the CMAR and sub -contractor
without 1 /o p ment rmanc b in the amount of the contract and any amendments
theret all provid r he man er i ich the construction shall be managed and supervised.
Bonds valid xc ang ® n all parties prior to the start of work.
b. A maintenance all be ovi forthe duration of the entire warranty period.
c. All bond ted with the S. Treasury Department listing of approved surety's (T-List) and shall
be rated imum by A. M. Best.
12. Time:
a. SUBSTANTIAL and FINAL COMPLETION: Date of Substantial Completion and the Date of Final Completion
shall be established in a GMP Change Order to this Agreement (GMP) as a hard not to exceed date. If
such dates are not established upon the execution of this Agreement, at such time as GMP is accepted a
Date of Substantial Completion and Date of Final Completion of the Work shall be established in a GMP
Change Order.
b. Time is of the essence with regards to the obligations of the Contract Documents.
RFP 24-15, CMAR— Maple Street Improvements
Page 12 of 26
Last Revised 12.19.24
c. Unless instructed by City in writing, Construction Manager shall not knowingly commence the Work
before the effective date of Construction Manager's required insurance and bonds.
d. Schedule of Work: Before submitting its first application for payment, Construction Managershall submit
to City and, if directed, Design Professional a Schedule of the Work showing the dates on which
Construction Manager plans to begin and complete various parts of the Work, including dates on which
information and approvals are required from City. Except as otherwise directed by City, Construction
Managershall complywith the approved Schedule of the Work or Construction Manager.
i. Unless otherwise agreed, the Schedule of the Work shall be formatted in a detailed precedence -
style critical path method that (a) provides a graphic representation of all activities and events,
including float values that will affect the critical path of the Work, and (b) identifies dates that are
critical to ensure timely and orderly completion of the Work.
ii. Construction Manager shall update the Schedule of ork on nthly basis or as
mutually agreed by all Parties.
iii. City may determine the sequenc 'n hich rk shall be ed, provided it does not
unreasonably interfere with e approv ct sche ty may require Construction
Afta-
Manager to make reason c anges i equence a i e during the performance of the
Work in order to facili a t perf f work or Others. If Construction Manager
consequently incurs s or is d aye , he GMP ates S bstantial or Final Completion,
or both, Constru anager m ek equit dust
e. NOTICE OF DELAY CLIf Con A Maria ests e le extension of the Contract Time
or an equitab ent in G` as r u o a de de ibed, Construction Manager shall give
City written no e of theWaigP If onst uctio nager c s delay in the completion of the Work, City
shall be entitled to r addition
f. MONITORING P 7RE AND C Ilowin ance by City of the GMP, Construction Manager
shall establi- rocess for it ing act c s against the GMP and actual progress against the
Schedule ork. Const anager s ovide written reports to City at intervals as agreed to by
all Pa ie e status of Work, s wing variances between actual costs and the GMP and actual
progres s co a o the S*c u f Work, including estimates of future costs and recovery
programs if act gress i ica hat the Dates of Substantial Completion or Final Completion may
not be met.
13. Determinatio Fra Time:
a. General:
i. The time allowed for the completion of the Work included in the Contract will be stated in the
Proposal and Contract and will be known as the "Contract Time". The contract time will be
specified as a fixed completion date or as calendar days.
ii. The CMAR shall take into consideration all normal conditions considered unfavorable to the
normal progress of the Work and place a sufficient work force and equipment on the project to
ensure completion of the Work within the contract time.
RFP 24-15, CMAR— Maple Street Improvements
Page 13 of 26
Last Revised 12.19.24
in. The Engineer/atV Engineer will determine the date upon which the Contract Is substantially
complete and time assessmentwm mazeIn the event cleanup Is necessary or items found at me
final Inspection arson be corrected the CHAR shall complete this work In a dimply manner, orthe
Engineer/atV Englneerwlu resume time charges.
b. u.mtl Completion Date When the contract time is specified as stoma date It will Came date onwhlch all
work on the project shall be substantially complete.
c Calentlaroay. Calendar clay contractnme includes tlelaysfor normal weather -related events, such as ram,
snow, and freezing temperatures than may affect the progress of the construction In the following
amounts on a parmonthbasis as hereinafter set out. Only weather heated delays in excess of these
amounts will be consltleretlfortlme extensions, If requested by the CMAR. Days included in the Contract
unreason Normal WeatherWishedEvents, on a monthly basis, include
ntaew n, ,
i. No on cons eTWlllb Canoga 'N without a request In writing from me
CINAR. is real tt slil lmelutl s� ormer u�j het with supporting documentation as proof
of wmeo tll s beyon MAR's [`t f 1VI coal rainfall amounts and soil conditions
will not etl asr e#ercl�o/Ai Run, nor will workload of me Contractor. The
reque t al, sub r to thhepe�� r/G[V Engineer within 5 clays of the and of the
m F, ony . compj ftn will be mad, for monetary damages clue to weather
it Workay 0 Ci+' f. the SO c 'me I5 scanned In working clays the provisions of Section
30908(tl]sball ��;
s/e
ssetl for each clay on which In the judgment of the Engineer/City Engineer and
m the limitations below, conditions allow the Contactor to effectively utilize 60% of
al 0rms and equipment to prosecute the work required at that time, for at least 60%of the
Contactors normal working hours, regardless Nwhemertbe CHAR actuallVworla.
u. The Engineer/City Engineer will not assess a working clay when conditions e-04 beyond the
control and without the fault of the CHAR that prevent the utilization of formsand equipment as
defined above Also, for the purpose of assessment ofworking clays, Inamesphall[V [o a portion of
the work clue to utility conflict or utility work, efiber of which prevents utilization of forties and
equipment as defined above, will be considered as an adverse working condition for the time
exceeding that specified In the Contract for the utility adjustment The ability of vendors,
suppliers, and subcontractors to prwltle materials and/or services is considered within the
RW 2415, CMAR—Maple Street Improvements
Gage 16 of 26
last Revised 1219.24
CMAR's control for the purpose of assessment of working days. Time from December 21 through
January 15, inclusive, will not be assessed against the contract time.
i. Saturdays and City recognized holidays, other than those designated above, which may be
declared by the City for certain special or unusual circumstances, will be optional to the CMAR as
working days, and time will not be assessed unless work is performed that requires inspection. If
work is performed, contract time assessment will be based upon the same conditions as a normal
working day.
ii. Contract time will not be assessed during a full suspension of the work as ordered by the
Engineer/City Engineer. During a partial suspension of the work as ordered by the Engineer/City
Engineer, the contract time will be assessed in direct proportion to the ratio of the money value
of the items not suspended to the total contract amount.
iii. Each pay estimate will state the each working day charg uring th ing period and the
total number of working days charged to date. If R disa ith the working days
charged by the Engineer/City En ineer�, then Con ctor s thin 10 calendar days of
signing the pay estimate, give the " ineer/ neer w ' tice of such disagreement
and the reasons, therefo I MAR d rovide i n notice within 10 calendar days
of signing the pay estim ubse ue uest for r ill be considered.
14. Substantial Completion:
a. Construction Manag sh noti ity and, if direc sign P ional when it considers Substantial
es na Completion of th r a portio a bee ed. City, with the assistance of its
Design Profes all pro p condu ' s ection dete ine whether the Work or designated
portion can be cupied d for its ' nd use by w out excessive interference in completing
any remaining unfi rk. If rmines ork or designated portion has not reached
Substantial Com tion,VY, with stance sign Professional, shall promptly compile a list of
items to be ted or c t o City o cupy or use the Work or designated portion for its
intended u Ill tructi rshall ly and accurately complete all items on the list.
b. When tial Completmeof t rk or a designated portion is achieved, Construction Manager
shall pre re a C of S ® mpletion establishing the date of Substantial Completion and
the respective s ibilitie of c Party for interim items such as security, maintenance, utilities,
insuranc age to the ork, and fixing the time for completion of all items on the list
acco a the Certificate. The Certificate of Substantial Completion shall be submitted by
Constr =V n Manager to City and, if directed, to Design Professional for written acceptance of
responsibilities assigned in the Certificate of Substantial Completion.
c. Unless otherwise provided in the Certificate of Substantial Completion, warranties required by the
Contract Documents shall commence on the date of Substantial Completion of the Work or a designated
portion.
d. Upon City's written acceptance of the Certificate of Substantial Completion, City shall pay to Construction
Manager the remaining retainage held by City for the Work described in the Certificate of Substantial
Completion less a sum equal to one hundred and fifty percent (150%) of the estimated cost of completing
RFP 24-15, CMAR— Maple Street Improvements
Page 15 of 26
Last Revised 12.19.24
or correcting remaining items on that part of the Work, as agreed to by the Parties as necessary to
achieve Final Completion, including all close outs. Uncompleted items shall be completed by Construction
Manager in a mutually agreed upon timeframe.
15. Final Completion:
a. Upon notification from Construction Manager that the Work is complete and ready for final inspection
and acceptance, City, with the assistance of its Design Professional shall promptly conduct an inspection
to determine if the Work has been completed and is acceptable under the Contract Documents.
b. When the Work is complete, Construction Manager shall prepare for City's written acceptance a final
application for payment stating that to the best of Construction Manager's knowledge, and based on
City's inspections, the Work has reached Final Completion in accordance with the Contract Documents.
c. Final payment of the balance of the GMP shall be made to Constr tion Mana e in thirty (30) Days
after Construction Manager has submitted an application fo i�qalejayment, i the application has
been approved by the City, including sub ssio s requir antifica Fi al Completion has been
executed by all Parties.
d. Final payment shall be due on Co ® c Ma e ' mission h ollowing to the City:
i. an affidavit declaring btedn cted zlitt7moOrA/ork to have been paid, satisfied, or
to be paid with th e dsof f alp ent, soo enc r City property;
ii. as -built draw' g , nual copies of warra nd al close-out documents required by
the Contr men s;
iii. releas lens, co di ned on ayment received;
iv. consent of a and
v. any o ndin know unrepor dents or injuries experienced by Construction
Majog r its Sub o r tors at e e.
vi a Substanti pletio of t Work, the Final Completion of a portion of the Work is
ateriall d d throui t of Construction Manager. If approved by City, they shall pay
the bala for p n of the Work fully completed and accepted. If the remaining
cont r ance for r not fully completed and accepted is less than the retained amount
ent, Construction Manager shall submit to City and, if directed, Design Professional
ritten consent of any surety to payment of the balance due for portions of the Work that
e fully completed and accepted. Such payment shall not constitute a waiver of claims, but
otherwise shall be governed by this section.
vii. ACCEPTANCE OF FINAL PAYMENT: Unless Construction Manager provides written identification of
unsettled claims with an application for final payment, its acceptance of final payment
constitutes a waiver of such claims.
e. CMAR shall ensure that the City of Fayetteville receives lien waivers from all material suppliers,
subcontractors and sub -subcontractors and before work begins on the project. The contractor shall give
RFP 24-15, CMAR— Maple Street Improvements
Page 16 of 26
Last Revised 12.19.24
written notice to the material suppliers, subcontractors and sub -subcontractors providing work on the
project that states the following:
i. `According to Arkansas law, it is understood that no liens can be filed against public property if
valid and enforceable payment and performance bond is in place. Regarding this Project and
Agreement, the valid and enforceable bonds are with ( name of surety ).'
ii. CMAR shall direct its subcontractors to obtain a written receipt evidencing acknowledgment of
this statement from sub -subcontractors.
16. Liquidated Damages: SUBSTANTIAL COMPLETION: Liquidated damages based on the Substantial Completion
date, to be determined in a GMP Change Order, shall apply.
a. City will suffer damages which are difficult to determine and accurately specify if the Substantial
Completion date, which may be amended by Change Order, is not attained. n tion Manager shall
pay City seven hundred fifty US dollars ($750.00 USD) per calm ar ay as liq damages and not as
a penalty for each Day that Substantial Co ple 'on exte be d the Su ti Completion date.
17. Notices: Any notice required to be givenn this Agre t either p t the other shall be sufficient if
addressed and mailed, certified mail, p paid, ivety, fax or ai (receipt confirmed), or overnight
cou rier.
18. Jurisdiction: Legal jurisdiction tZeanydisp all be a s wit r slaw applying to the case.
19. Venue: Venue for all legal is shoboh Mgton Arkan
20. Freedom of Informatio ct: Ci f F etteville cont and do m is prepared while performing contractual
work are subject to the Ar eedom rmation a Freedom of Information Act request is
presented to the City of Faye to the C II do ev t g possible to provide the documents in a prompt
and timely manner a r cribed in th sas Free Information Act (A.C.A. 25-19-101 et. Seq.). Only
legally authorized o ing c ant to e may be assessed for this compliance.
21. Changes in S ice: Chang odific ti s, or amendments in scope, price or fees to this contract shall
not be allowed ;ithout ormal mendment approved by the Mayor and the City Council in
k�& low
advance of the change i cost fee
22. Insurance:
a. Before ing the Work and as a condition precedent to payment, Construction Manager shall procure
and maintain in force Workers' Compensation Insurance, Employers' Liability Insurance, Business
Automobile Liability Insurance, and Commercial General Liability Insurance ("CGL"). The CGL policy shall
include coverage for liability arising from premises, operations, independent contractors, products -
completed operations, personal injury and advertising injury, contractual liability, pollution coverage, and
broad form property damage. Construction Manager shall maintain completed operations liability
insurance for one year after Substantial Completion, or as required by the Contract Documents,
whichever is longer. Construction Manager's Employers' Liability, Business Automobile Liability and CGL
policies shall be written with at least the limits of liability presented in Appendix E.
RFP 24-15, CMAR— Maple Street Improvements
Page 17 of 26
Last Revised 12.19.24
b. Employers' Liability, Business Automobile Liability, and CGL coverages required may be provided by a
single policy for the full limits required or by a combination of underlying policies with the balance
provided by excess or umbrella liability policies.
c. Construction Manager shall maintain in effect all insurance coverage required with insurance companies
lawfully authorized to do business in the jurisdiction in which the Project is located. If Construction
Manager fails to obtain or maintain any insurance coverage required under this Agreement, City may
purchase such coverage and charge the expense to Construction Manager or terminate this Agreement.
d. To the extent commercially available to Construction Manager from its current insurance company,
insurance policies required shall contain a provision that the insurance company or its designee shall give
City written notice transmitted in paper and electronic format: (a) 30 Days before coverage is
nonrenewed by the insurance company and (b) within 10 Business Days after cancelation of coverage by
the insurance company. Before commencing the Work and uatn renewal Qpwreplacement of the
insurance policies, Construction Manager shall furnish City it ificates o §I-S.Once until one year
after Substantial Completion or longer equired by th act Do m. In addition, if any
insurance policy required is not to be im edi ely r a d without la i coverage when it expires,
exhausts its limits, or is to be cancelled Constructi ager shall i e prompt written notice upon
actual or constructive knowledge c condit'
e. Certificates of Insurance shal City nal Insur ies.
f. PROPERTY INSURANCE:
i. At no time y poli covered b f- sura i self -insured format. All policies
shall c by a ved co e i in ura professional properly licensed to do
busine in r an5as.
ii. Unless othe r cted in t by City e starting the Work, CMAR shall obtain and
maintain —a Buil 's Risk pon th ti Project for the full cost of replacement at the
time ss, inclu a ng str This insurance shall also (a) name Construction
ubco u bs u A& ors, and Design Professional as named insureds; (b) be
it in such for cover atl ris of physical loss except those specifically excluded by the
olicy; an ( ure at leagar t and not exclude:
1. rils of 're, lightning, explosion, windstorm, hail, smoke, aircraft (except aircraft,
uding helico er, operated by or on behalf of Construction Manager) and vehicles,
riot and civil commotion, theft, vandalism, malicious mischief, debris removal, flood,
earthquake, earth movement, water damage, wind damage, testing if applicable,
collapse, however caused;
2. damage resultingfrom defective design, workmanship, or material;
3. coverage extension for damage to existing buildings, plant, or other structures at the
Worksite, when the Project is contained within or attached to such existing buildings,
plant or structures. Coverage shall be to the extent loss or damage arises out of
Constructor's activities or operations at the Project;
RFP 24-15, CMAR— Maple Street Improvements
Page 18 of 26
Last Revised 12.19.24
4. equipment breakdown, including mechanical breakdown, electrical injury to electrical
devices, explosion of steam equipment, and damage to steam equipment caused by a
condition within the equipment;
5. testing coverage for running newly installed machinery and equipment at or beyond the
specified limits of their capacity to determine whether they are fit for their intended use;
and
6. physical loss resulting from Terrorism.
iii. The Party that is the primary cause of a Builder's Risk Policy claim shall be responsible for any
deductible amounts or coinsurance payments. If no Party is the primary cause of a claim, then the
Party obtaining and maintaining the Builder's Risk Policy shall be responsible for the deductible
amounts or coinsurance payments. This policy shall provide for a waiver of subrogation. This
insurance shall remain in effect until final payment has It made o o person or entity
other than City has an insurable interest in the er to be by this insurance,
whichever is sooner. Partial occy, or use the ork sha commence until City has
secured the consent of the ins rantompan panies g the coverage required in
this subsection. Before c rt� g the shall p vi a copy of the property policy or
policies obtained.
iv. If City elects to purchase Ahe pr a urance wwl by s reement, including all of the
coverages and deciu titles for t me dur AvApeci ' d shall give written notice to
Construction er b the Work is m ced vide a copy of the property policy
or po 'tieRpa"aE i c ante w' greem may then provide insurance to
prote erests an the in t f the str ctor, Subcontractors, Suppliers, and
Su bsub ntracto tKintent
cost of s ins rance s aid by City in a Change Order. If City gives
written notiTntain
t se prop surance required by this Agreement and fails
to purc e s � urance, City.5 II be responsible for costs reasonably attributed
to s u re.
v. je arties eat ai all rig is a inst each other and their respective employees, agents,
n actors, ontract ® iers, sub -subcontractors, and design professionals for damages
c used by over p perty insurance, except such rights as they may have to the
o � the extent of the limits of Construction Manager's Commercial General Liability
Insurance, Construction Manager shall indemnify and hold harmless City against any and
all liability, claims, demands, damages, losses, and expenses, including attorneys' fees, in
connection with or arising out of any damage or alleged damage to any of City's existing
adjacent property, including personal property, that may arise from the performance of
the Work, to the extent caused by the negligent or intentionally wrongful acts or
omissions of Construction Manager, Subcontractor, Supplier, Sub -subcontractor, or
anyone employed directly or indirectly by any of them or by anyone for whose acts any of
them may be liable.
RFP 24-15, CMAR— Maple Street Improvements
Page 19 of 26
Last Revised 12.19.24
g. RISK OF LOSS: Except to the extent a loss is covered by applicable insurance, risk of loss from damage to
the Work shall be upon the Party obtaining and maintaining the Builder's Risk until the Date of Final
Completion.
h. ADDITIONAL GENERAL LIABILITY COVERAGE: City shall require Construction Manager to purchase and
maintain additional liability coverage. Construction Manager shall provide:
i. Additional Insured. City shall be named as an additional insured on Construction Manager's
Commercial General Liability (CGL) specified, for on -going operations and completed operations,
excess/umbrella liability, commercial automobile liability, and any required pollution liability, but
only with respect to liability for bodily injury, property damage, or personal and advertising injury
to the extent caused by the negligent acts or omissions of Construction Manager, or those acting
on Construction Manager's behalf, in the performance of Construction Manager's work for
Owner at the Worksite. The insurance of the ConstructionlOanager and i bcontractors (both
primary and excess) shall be primary to any insura e le to th A tonal Insureds. Any
insurance available to the Additio nsureds shall b and nor -contributory.
ii. OCP. Construction Manager ha )ovide ers' and C actors' Protective Liability
Insurance ("OCP") policy W s eq al imits on CGS specified, or limits as otherwise
required by Owner.
i. Any documented additional s in the or a surc e soci d with procuring the additional
liability coverage in acco e with thi section e paAR. Before commencing the
Work, Construction a ger s r vide eith a py OCP policy, or a certificate and
endorsement vi ci g at &tv een na d additi i red, as applicable.
i. ROYAL S, PATE TS ND COP RIG onstruc o anager shall pay all royalties and license
fees , unless eVu spec ifi e Contra cuments, which may be due on the inclusion
of any patent or cop materi ethods, or systems selected by Construction
Manag r d incorpora he Work. ruction Manager shall defend, indemnify, and hold
Ci r ess fro u ?or cl infringement of any patent rights or copyrights arising
t such sele n nless s ch ign, process or product of a particular manufacturer or
a facture ' require® Contract Documents, or where the copyright violations are
c ntaine04� men r y the Owner.
j. PROFESSIO BILITY INSU - E: To the extent Construction Manager is required to procure design
services, ction Manager shall require its design professionals to obtain a commercial professional
liabili rance for claims arising from the negligent performance of professional services under this
Agreement, with a company reasonably satisfactory to City, including coverage for all professional liability
caused by any consultants to Construction Manager's design professional, written for not less than one
million US dollars ($1,000,000) per claim and in the aggregate. Construction Manager's design
professional shall pay the deductible. The Professional Liability Insurance shall contain a retroactive date
providing prior acts coverage sufficient to cover all Services performed by the Constructor's design
professional for this Project. Coverage shall be continued in effectfor the entire warranty period.
23. Professional Responsibility: CMAR will exercise reasonable skill, care, and diligence in the performance of services
and will carry out its responsibilities in accordance with customarily accepted professional practices. CITY OF
RFP 24-15, CMAR— Maple Street Improvements
Page 20 of 26
Last Revised 12.19.24
FAYETTEVILLE will promptly report to CMAR any defects or suspected defects in services of which CITY OF
FAYETTEVILLE becomes aware, so CMAR can take measures to minimize the consequences of such a defect. CITY
OF FAYETTEVILLE retains all remedies to recover for its damages caused by any negligence of CMAR.
24. Responsibility of the City of Fayetteville: CITY OF FAYETTEVILLE shall, within a reasonable time, so as not to delay
the services of CMAR:
a. Provide full information as to the requirements forthe Project.
b. Assist CMAR by placing at CMAR's disposal all available information pertinent to the assignment including
previous reports and any other data relative thereto.
c. Assist CMAR in obtaining access to property reasonably necessary for CMAR to perform its services.
d. Examine all studies, reports, sketches, cost opinions, proposals, and -ther documerA4s presented by CMAR
and render in writing decisions pertaining thereto.
e. Review all documents and provide writteOM
ents to �Paimely m e
AR .
f. The City of Fayetteville Active Transportation Ma er, r their de ' is the project representatives
MW
with respect to the services to be performed u r is greem h Active Transportation Manager
shall have complete authority to transmit i receiv i ation, interpret and define policies
and decisions with respect to materials, uip nt, elem sys s o be used in the Project, and
other matters pertinent to th services c by this 4greehient.
25. Cost Opinions and Project' ins.
a. Cost opinions jection p pared b J$MAR 6ing to construction costs and schedules,
operation and aint na costs, eq en charaand performance, cost estimating, and
operating results ar a e on CMAR' erience, q tions, and judgment as a CMAR professional.
26. Period of Service: T 's eement co e effecikiIe upon the first written notice by CITY OF FAYETTEVILLE
authorizing service reu der.
a. The p isio s of th' reementt een agreed to in anticipation of the orderly progress of the
Project through co on of stated in the Agreement. CMAR shall proceed with providing
the authorized r ces imm iate upon receipt of written authorization from CITY OF FAYETTEVILLE.
Said aut ri hall include the scope of the services authorized and the time in which the services
are t pleted. The anticipated schedule for this project is included with Appendix B.
27. Termination:
a. This Agreement may be terminated in whole or in part in writing by either party in the event of
substantial failure by the other party to fulfill its obligations under this Agreement through no fault of the
terminating party, provided that no termination may be effected unless the other party is given:
i. Not less than ten (10) calendar days written notice (delivered by certified mail, return receipt
requested) of intent to terminate,
ii. An opportunity for consultation with the terminating party prior to termination.
RFP 24-15, CMAR— Maple Street Improvements
Page 21 of 26
Last Revised 12.19.24
b. This Agreement may be terminated in whole or in part in writing by CITY OF FAYETTEVILLE for its
convenience, provided that CMAR is given:
i. Not less than ten (10) calendar days written notice (delivered by certified mail, return receipt
requested) of intent to terminate,
ii. An opportunity for consultation with the terminating party prior to termination.
c. If termination for default is affected by CITY OF FAYETTEVILLE, an equitable adjustment in the price
provided for in this Agreement shall be made, but
i. No amount shall be allowed for anticipated profit on unperformed services or other work,
ii. Any payment due to CMAR at the time of termination may be adjusted to cover any additional
costs to CITY OF FAYETTEVILLE because of CMAR's default.
d. If termination for default is affected by CMAR, or if termin ioS&onvenie!!VrOffected by CITY OF
FAYETTEVILLE, the equitable adjustment II include a re le profi o ervices or other work
performed. The equitable adjustment for rmin II provide f ent to CMAR for services
rendered and expenses incurred priorto the ter t in addi ' termination settlement costs
reasonably incurred by CMAR relating to commi e w ich ha me firm prior to the termination.
e. Upon receipt of a termination a and a hs abov R sh
on
i. Promptly discontinue all affected (unless a ice d c erwise),
ii. Deliver or ise ma ?ailbble to FAYE EVI all data, drawings, specifications,
repo ates, s aan c t er i rmation and materials as may have been
accum ted by C AJ n perforiLing s Agreeme t, hether completed or in process.
f. Upon termination and sections ab I OF FA ILLE may take over the work and may award
another party aria reertn` nt to c to the wo r this Agreement.
g. If, after to i for f e MAR t ontractual obligations, it is determined that CMAR had
not f t fulfill cont ct I obliga ' ns, he termination shall be deemed to have been for the
conve nce of CITY AYETTE\V4 uch event, adjustments of the agreement price shall be made
as provided in this ent.
28, Delays
a. In the ev - e services of CMAR are suspended or delayed by CITY OF FAYETTEVILLE, or by other events
beyond AR's reasonable control, CMAR shall be entitled to additional compensation and time for
reasonable documented costs incurred by CMAR in temporarily closing down or delaying the Project.
b. In the event the services are suspended or delayed by CMAR, CITY shall be entitled to compensation and
time for reasonable costs incurred in temporarily closing down or delaying the Project.
29. Rights and Benefits: CMAR's services shall be performed solely for the benefit of CITY OF FAYETTEVILLE and not
for the benefit of any other persons or entities.
30. Dispute Resolution
RFP 24-15, CMAR— Maple Street Improvements
Page 22 of 26
Last Revised 12.19.24
31
32
a. Scope of Paragraph: The procedures of this Paragraph shall apply to any and all disputes between CITY
OF FAYETTEVILLE and CMAR which arise from, or in any way are related to, this Agreement, including, but
not limited to the interpretation of this Agreement, the enforcement of its terms, any acts, errors, or
omissions of CITY OF FAYETTEVILLE or CMAR in the performance of this Agreement, and disputes
concerning payment.
b. Exhaustion of Remedies Required: No action may be filed unless the parties first negotiate. If timely
Notice is given as described in this agreement, but an action is initiated prior to exhaustion of these
procedures, such action shall be stayed, upon application by either party to a court of proper jurisdiction,
until the procedures in this agreement have been complied with.
c. Notice of Dispute
i. For disputes arising prior to the making of final payment promptly after the occurrence of any
incident, action, or failure to act upon which a claim is based, the par g relief shall serve
the other party with a written Notice. 1(0 1 &41
ii. For disputes arising within one (arer th king of final t, CITY OF FAYETTEVILLE
shall give CMAR written Noticetat the add r s li d in this e nt within thirty (30) calendar
days after occurrence of n i ent, i rfirst o a ce of defector damage. In both
instances, the Notice s II ecify e and of relief sought, the reason relief
should be granted, a ap o ri portio is Ag nt that authorize the relief
requested.
iii. Negotiatio in sev Alenclar recei o th Notice, the Project Managers for
CITY EVILLE d AR s a e to resolve the dispute. If the dispute
cannot a resole d a ha level, th on writ n quest of either side, the matter shall be
referred to r 'dent of R, and th r of CITY OF FAYETTEVILLE or his or her
designee. T e fficers s t at th Site or such other location as is agreed upon
within len ar days p ritten r o resolve the dispute.
Sufficient Funds. CI repre o ave suffi unds or the means of obtaining funds to remit payment
to CMAR for se-rvi es rendere by R. II es agree if funding should become insufficient to complete the
project, CMAR shall be no*i i i a tim ® r
Publications: Reco he importa of professional services on the part of CMAR's employees and the
importance of CMAkB ublic relations, CMAR may prepare publications, such as technical papers, articles for
periodicals, p o ional materials, and press releases, in electronic or other format, pertaining to CMAR's
services for the roject. Such publications will be provided to CITY OF FAYETTEVILLE in draft form for CITY OF
FAYETTEVILLE's advance review. CITY OF FAYETTEVILLE shall review such drafts promptly and provide CITY OF
FAYETTEVILLE's comments to CMAR, CITY OF FAYETTEVILLE may require deletion of proprietary data or
confidential information from such publications, but otherwise CITY OF FAYETTEVILLE will not unreasonably
withhold approval. Approved materials may be used in a variety of situations and do not require additional
review or approval for each use. The cost of CMAR's activities pertaining to any such publication shall be for
CMAR's account.
RFP 24-15, CMAR— Maple Street Improvements
Page 23 of 26
Last Revised 12.19.24
33. Indemnification: To the fullest extent permitted by law, the CMAR shall indemnify and hold harmless the City
from and against claims, damages, losses and expenses, including but not limited to attorneys' fees, arising out of
or resulting from performance of the Work, provided that such claim, damage, loss or expense is attributable to
bodily injury, sickness, disease or death or injury to or destruction of tangible property (other than the Work
itself) but only to the extent caused by the negligent acts or omissions of the CMAR, a Subcontractor, anyone
directly or indirectly employed by them, or anyone for whose acts they may be liable, regardless of whether or
not such claim, damage, loss, or expense is caused in part by a party indemnified hereunder. Such obligation shall
not be construed to negate, abridge, or reduce other rights or obligations of indemnity that would otherwise exist
as to a party or person described in this Agreement.
34. Ownership of Documents:
a. All documents provided by CITY OF FAYETTEVILLE including original drawings, CAD drawings, estimates,
field notes, and project data are and remain the property of CITY OF FAYETTEV CMAR may retain
reproduced copies of drawings and copies of other documents.
3
b. Engineering and architectural documents, omputer m drawings, s i tions and other hard copy
or electronic media prepared by CIVIM as 'part of th ervices sh me the property of CITY OF
FAYETTEVILLE when CMAR has a pens to II Servi re dered, provided, however, that
CMAR shall have the unrestricte ri to th u MAR sh I o ever, retain its rights in its standard
drawings details, specificati base , er sof d oth oprietary property. Rights to
intellectual property dev o utilized, dified in rfor c f the Services shall remain the
property of CMAR.
c. Any files deliv c roni e may n n gst an software different than those with
which they we or i all pro uc . CMA s no waas to the compatibility of these files with
any other syste or f Because the potenti radation of electronic medium overtime, in
the event of a conf t tween the origin I ings/hard copies and the electronic files, the
sealed drawin rd c ies will
35. Additional Respo ies of CMAR'.
a. Reviewi p val, oraccepance ® drawings, specifications, reports and other services furnished
hereunde by CI of in y r ieve CMAR of responsibility for the technical adequacy of the
work. Review, p r vat or cep ance of, or payment for any of the services by CITY shall not be
construe a er of any rig is under this Agreement or of any cause of action arising out of the
perforgLakW4p7 this Agreement.
b. CMAR shall be and shall remain liable, in accordance with applicable law, for all damages to CITY OF
FAYETTEVILLE caused by CMAR's negligent performance, except beyond the CMAR's normal standard of
care, of any of the services furnished under this Agreement, and except for errors, omissions or other
deficiencies to the extent attributable to CITY OF FAYETTEVILLE or CITY OF FAYETTEVILLE-furnished data.
c. CMAR's obligations under this clause are in addition to CMAR's other express or implied assurances under
this Agreement or State law and in no way diminish any other rights that CITY OF FAYETTEVILLE may have
against CMAR for faulty materials, equipment, orwork.
RFP 24-15, CMAR— Maple Street Improvements
Page 24 of 26
Last Revised 12.19.24
36. Audit and Access to Records:
a. CMAR shall maintain books, records, documents and other evidence directly pertinent to performance on
work under this Agreement in accordance with generally accepted accounting principles and practices
consistently applied in effect on the date of execution of this Agreement.
b. CMAR shall also maintain the financial information and data used by CMAR in the preparation of support
of the cost submission required for any negotiated agreement or change order and send to CITY OF
FAYETTEVILLE a copy of the cost summary submitted. CITY OF FAYETTEVILLE, the State or any of their
authorized representatives shall have access to all such books, records, documents and other evidence
for the purpose of inspection, audit and copying during normal business hours. CMARwill provide proper
facilities for such access and inspection.
c. Records shall be maintained and made available during performance on assisted work under this
Agreement and until three years from the date of final payme for the pro In addition, those
records which relate to any controversy arising out of such m nce, or or items to which an
audit exception has been taken, shall be (intned an de ilable u ree years after the date of
resolution of such appeal, litigation, claimeptio .
d. This right of access clause (with r t o inan ' I o s) appli
i. Negotiated prime agr -e s
ii. Negotiated chan r ers or ent a nts c g the price of any formally
advertised, c p itively arded, fixed pre eme
iii. Agree- t r purc ders u a y ag em t other than a formally advertised,
compet ively aw de ,fixed pace a ent. H r, this right of access does not apply to a
prime agree er tier reement chase order awarded after effective price
competition, e t:
L th respec e d perta' ' ectly to sub agreement performance, excluding any
fi ncial e CMAR;
If themLis, any indi that fraud, collusion, gross abuse or corrupt practices may be
in
17 e sub afire t is terminated for default or for convenience. 9
37. Covenant Agar ontingent Fees, CMAR warrants that no person or selling agency has been employed or
retained to solia or secure this Agreement upon an agreement of understanding for a commission, percentage,
brokerage or continent fee, excepting bona fide employees or bona fide established commercial or selling
agencies maintained by CMAR for the purpose of securing business. For breach or violation of this warranty, CITY
OF FAYETTEVILLE shall have the right to annul this Agreement without liability or at its discretion, to deduct from
the contract price or consideration, or otherwise recover, the full amount of such commission, percentage,
brokerage, or contingent fee.
38. Gratuities:
RFP 24-15, CMAR— Maple Street Improvements
Page 25 of 26
Last Revised 12.19.24
a. If CITY OF FAYETTEVILLE finds after a notice and hearing that CMAR or any of CMAR agents or
representatives, offered or gave gratuities (in the form of entertainment, gifts or otherwise) to any
official, employee or agent of CITY OF FAYETTEVILLE or related third party contractor associated with this
project, in an attempt to secure an agreement or favorable treatment in awarding, amending or making
any determinations related to the performance of this Agreement, CITY OF FAYETTEVILLE may, by written
notice to CMAR terminate this Agreement. CITY OF FAYETTEVILLE may also pursue other rights and
remedies that the law or this Agreement provides. However, the existence of the facts on which CITY OF
FAYETTEVILLE bases such finding shall be in issue and may be reviewed in proceedings under the
Remedies clause of this Agreement.
Date Signed: Date Signed:
RFP 24-15, CMAR— Maple Street Improvements
Page 26 of 26
Last Revised 12.19.24
CITY OF
FAYETTEVILLE
W4W ARKANSAS
RFP 24-15 Addendum 1
Flintco
Supplier Response
Event Information
Number: RFP 24-15 Addendum 1
Title: CMAR for Maple Street Improvements
Type: Request for Proposal
Issue Date: 12/8/2024
Deadline: 1/21/202502:00 PM (CT)
Notes: The City of Fayetteville is accepting proposals from construction
management firms licensed to do business within the State of
Arkansas to provide, construction management / general contractor
(CM/GC) services as a construction management at risk (CMAR) /
guaranteed maximum (GMP) project for the reconstruction of 2,500
linear feet of Maple Street from Gregg Avenue to Garland Avenue. The
project includes storm drainage, sidewalks, protected bike lane,
enhanced crosswalks, turn lanes, new traffic signals, street lighting and
landscaping. Any questions regarding this RFP should be directed to
Amanda Beilfuss at abeilfuss0fayetteville-arar.gov.
Contact Information
Contact: Amanda Beilfuss
Address: Purchasing
Room 306
City Hall
113 West Mountain Street - Room 306
Fayetteville, AR 72701
Email: abeilfuss@fayetteville-ar.gov
Page 1 of 2 pages Vendor: Flintco RFP 24-15 Addendum 1
Flintco Information
Contact:
Klint Kimball
Address:
184 E Fantinel Blvd
Springdale, AR 72762
Phone:
(479) 750-4565
Email:
klint.kimball@flintco.com
Web Address:
www.flintco.com
By submitting your response, you certify that you are authorized to represent and bind your company.
Klint Kimball
Signature
Submitted at 112112025 10:42:36 AM (CT)
Supplier Note
Klint.kimball@flintco.com
Email
Was not sure if anything needed to be filled out in the activities section. We did participate in the pre -bid
conference.
Requested Attachments
RFP 24-16, Response Submittal Fayetteville Streets_Final.pdf
Please upload your RFP proposal, including the required signature forms from the RFP document.
Bid Attributes
1 Addendum Acknowledgement
By selecting " 1 agree", you acknowledge that you have read all addendum(s) that have been issued for this
solicitation, if applicable.
❑J 1 agree
Page 2 of 2 pages Vendor: Flintco RFP 24-15 Addendum 1
\\1
UNMRsf1Y OF ARKANS
AS
i9l I
-"Wood
x
RFP 24-15, CMAR for Maple Street Improvements
RFQ 24-15 1 January 21,2025
Submitted by Flintco, LLC
Brent Farmer, Vice President / Area Manager
184 Fantinel Dr., Springdale, AR 72762
(479) 306-6259 r L I N TC O
Executive Summary
Firm Overview
With over 70 years of construction experience in Northwest Arkansas, Flintco has a proven record of
delivering high -quality infrastructure and streetscape projects forth e City of Fayetteville and other public
clients. Our tailored approach integrates preconstruction expertise, long-standing partnerships with local
trade partners, and a commitment to community -focused results to deliver this project on schedule and
within budget.
Relevant Experience
Flintco's extensive portfolio includes several notable projects in Fayetteville that demonstrate ourability to
meet the city's expectations forquality, safety, and timeliness:
Razorback Road Improvements: This $1.68 million project involved roadway widening, landscaping
upgrades, and the integration of pedestrian -friendly features, all completed within budget and in
September 2022.
Deane Street and Porter Road Realignment: Delivered under CMAR/CMP format, this $4.07 million
project included roadway grading storm water improvements, parking, greenway pathways, crosswalk
installation, and enhanced pedestrian infrastructure, completed in December 2023.
University of Arkansas Senior Sidewalk Expansion: Spanning multiple years, this $4.05 million project
involved complex coordination in high -traffic areas, demonstrating our ability to work effectively in active
environments while ensuring quality and timeliness.
Fayetteville Police Headquarters: Ourteam delivered this $35 million facility with minimal disruptions,
employing creative scheduling and proactive problem -solving to meet quality and budget goals.
Fayetteville Fire Stations #2, #8, and #9: These essential facilities, with project values ranging from $2.37
million to $7.07 million, reflect our expertise in constructing critical municipal infrastructure.
Key Project Team
Our proposed team for the Maple Street Improvements project combines extensive streetscape expertise
and a proven track record of success with the City of Fayetteville:
Brent Farmer, Vice President/Area Manager: With over 33 years of industry experience, Brent has
overseen numerous Fayetteville projects, including Razorback Road Improvements and multiple fire
stations, ensuring seamless execution from concept to completion.
Chad Crouch, Project Director: A 24-year- industry veteran with 19 years at Flintco, Chad has provided
executive oversight on Fayetteville projects such as the Police Headquarters and the Deane Street and
Porter Road realignment. His focus on stakeholder collaboration ensures alignment with client objectives.
Klint Kimball, Preconstruction Director: Klint has delivered over $2 billion in preconstruction services in
Northwest Arkansas, including the Fayetteville Police Headquarters and Razorback Road Improvements.
His expertise in cost estimation, constructability, and value engineering has consistently driven project
success.
Tricia Shaw, Project Manager: With 28 years of industry experience, Tricia has managed Fayetteville
projects like Fire Stations #2, #8 and #9, ensuring timely delivery, quality control, and fiscal accuracy.
Kevin Langston, Senior Superintendent: KevinIs36 years of experience include managing complex
projects such as Razorback Road Improvements and the University of Arkansas Senior Walk, where he
ensured quality execution inactive campus environments.
Dustin Maupin, Superintendent: A seasoned professional with 24 years of industry experience, Dustin
played a key role in the Deane Street realignment, Fayetteville Fire Station #9, and Fayetteville Fire Station
#2, demonstrating exceptional leadership and attention to detail.
Preconstruction and Execution Strategy
Flintco's preconstruction process ensures value maximization and cost efficiency through:
Advanced Estimation Accuracy: Historical projects such as Tyson Park Renovations ($5.49 million) and
Rogers School District Athletic Facilities ($27 million) demonstrate ourabilityto maintain a variance below
2%.
Innovative Solutions: Cost -saving measures and flexible workflows have resulted in significant savings
on past Fayetteville projects, such as $2 million saved on the Fayetteville Police Headquarters through
material substitutions and design optimizations.
Safety and Quality
Flintco's commitment to safety and quality is foundational to our operations:
Industry -Leading Safety: Our Experience Modifier Rate (EMR) of 0.52 reflects our commitment to a safe
work environment.
Award -Winning Quality: Flintco's Fayetteville projects have consistently earned accolades for excellence,
including national safety and construction awards.
Conclusion
Flintco's experience with the City of Fayetteville, combined with our seasoned project team and proven
preconstruction strategies, ensures the successful delivery of the Maple Street Improvements project. Our
dedication to quality, collaboration, and community impact aligns seam lessly with the City's goals, and we
look forward to continuing our strong partnership.
v.
Table of Contents
TitlePage.....................................................................................................................................................................................i
ExecutiveSummary................................................................................................................................................................. ii
Tableof Contents.....................................................................................................................................................................iv
Letter of Interest
1
Project Team Organization
2
Specialized and Past Experience
9
Schedule
12
Cost
16
Additional Background
17
Prior Experience
19
Understanding of Preconstruction Services
23
Records of Management
25
Owner Verification & Contact Verification
28
Current and Projected Workload
29
Current Maximum Bonding Capacity and Rate
30
Signature Submittal
31
4ff1-31.— IL
CITY OF FAYETTEVILLE MAPLE STREET IMPROVEMENTS I RFP 24-15 ?LINTCO
Letter of Interest
January21, 2025
City of Fayetteville, Arkansas
Attention: Amanda Beilfuss, Sr. Purchasing Agent
Re: RFQ 24 -15 1 CMAR for Maple Street Improvements
Dear Ms. Beilfuss and Selection Committee:
Thank you for inviting us to propose on the Street Improvement project. Having worked in the Fayetteville community,
since 1951, Flintco will provide accurate estimating during preconstructi on, local trade partners with commitment to
quality work, and the guarantee it requires to successfully complete your project on budget and schedule.
Specialized Experience and Technical Competence: Flintco is the number one provider of CMAR services in
the state of Arkansas and more than 90% of our work is completed under the CM GMP delivery system. Out of our
Arkansas office, alone, Flintco has successfully completed more than $200 million in streetscaping and hardscaping
projects. Your Preconstruction Director Klint Kimball has delivered more than $2 billion in preconstruction services in
Northwest Arkansas and has developed meaningful relationships with trade
partners, which results in reliable trade partners who garner the best bids and
perform quality work for the duration of construction. We are also proposing
our same team of construction professionals, who successfully collaborated
with the City of Fayetteville to deliver your recent Fire Stations and Police
Headquarters. Our long-standing relationship will allow us to hit the ground
running, ensuring that project kick-off is on time.
Firm's Business Interest and Project Familiarity: Flintco's primary
business interest lies in providing a full range of construction services across
various sectors. Flintco is deeply committed to prioritizing local clients and
communities by placing their needs and aspirations at the forefront of every
project. Our unwavering dedication to excellence extends to fostering strong
relationships with local clients, understanding their unique requirements, and
delivering tailored solutions that positively impact the community. Over our 70
years in Northwest Arkansas, our team has completed seven projects for the
City of Fayetteville, including two streetscape projects: Fayetteville Razorback
Road Improvements and Deane Street and Porter Road.
Building Trust Through Repeat Clientele: Flintco takes immense pride in
fostering lasting relationships. With 80%of our projects earned from repeat
clients, we believe that the foundation of every successful project is a strong
partnership that endures well beyond its completion.
We know that you expect only the best from this project in terms of safety,
schedule, quality, and value. Ourteam is readyto make that happen, and we
appreciate your consideration.
Sincerely,
Brent Farmer
Vice President/Area Manager
As requested in this section, below
are references stemming from our
work performed in the last five years.
References that are specific to the
this project's scope are included in
Section B IV.
Gary Wilson, Billing & Collections
Manager
City of Bentonville
479.271.3100
gwilson@bentonvillear.com
Scott Eccleston, President of Campus
Planning and Facility Management
Art and Wellness Enterprises
479.418.5731
scott.eccieston@aweoffice.org
Dr. Jared Cleveland, Superintendent
Springdale Public Schools
479.750.8800
jcleveland@sdale.org
Shayan Dehbozorgi, Principal
Hight -Jackson Associates
479.464.4965
sdehbozorgi@hjarch.com
Greg Walker, Architect
Miller Boskus Lack Architects
479.443.7121
greg@mbi-arch.com
Project Team Organization
Our project team members were selected because of their experience working on streetscape projects. This
team is also uniquely familiar with the City of Fayetteville, as many have been instrumental in delivering
the recently completed first responder projects. All have extensive experience in the delivery construction
management GMP projects. They have the right blend of knowledge, skills, and experience to successfully
complete the Maple Street Improvements project.
Organizational Chart
Legend
Off -Site Support
r
Preconstruction Director
Klint Kimball
Project Director
Chad Crouch
On -Site Support
CITY OF FAYETTEVILLE MAPLE STREET IMPROVEMENTS I RFP 24-15
\FLINTCO 12
Industry Experience
33 Years
Years with Flintco
30 Years
Education
A.A. Construction
Management,
Oklahoma State
University
Licenses/Certifications
LEED Review Seminar,
Subguard, OSHA 30, FMI
Leadership, First Aid, CPR,
Bloodborne Pathogens
Brent Farmer
VP/ Area Manager
In the 25 years Brent has led the Arkansas Division, he has been instrumental
in leading the team to achieve more than 99 state awards from the
Associated Builders and Contractors from 1993-2023. As a direct result
from his leadership the Arkansas Division has been named #1 Contractor
in the State of Arkansas several years running, Best Contractor by Citiscape
Magazine, Commercial Contractor of the Year by Fayetteville Construction
and Developers Committee, 2018-2022 Very Best Commercial Contractor by
Celebrate Arkansas, and 2021 Best Places to Work by Arkansas Business.
As Brent prioritizes camaraderie within the team, the NWA office has been
named #1 Contractor in the State of Arkansas several years running, Best
Contractor by Citiscape Magazine, Commercial Contractor of the Year by
Fayetteville Construction and Developers Committee, 2018-2021 Very Best
Commercial Contractor by Celebrate Arkansas, and 2021 Best Places to Work
by Arkansas Business.
Key Experience
• Deane & Porter Road Realignment I Fayetteville, AR $ 4,074,000
• City of Fayetteville Razorback Road Improvements Fayetteville, AR
$1,680,000 CMAR/GMP
• Deane & Porter Road Realignment
• University of Arkansas Senior Walk 2020 - 2025 1 Fayetteville, AR
$4,051,000 CMAR/GMP
• University of Arkansas Razorback Road I Fayetteville, AR 1 $2,000,000
CMAR/GMP
• Fayetteville Fire Station #2 1 Fayetteville, AR 1 $7,078,000 CMAR/GMP
• Fayetteville Fire Station #8 1 Fayetteville, AR 1 $2,374,000
• Fayetteville Fire Station #9 1 Fayetteville, AR 1 $2,510, 000
• Fayetteville Police Headquarters Facility Project I Fayetteville, AR
$35,343,000 CMAR/GMP
• University of Arkansas Brough Commons Retail Shops I Fayetteville, AR
$4,392,000 CMAR/GMP
• University of Arkansas Frank O'Mara Track I Fayetteville, AR
$12,264,450 CMAR/GMP
• Crystal Bridges Museum of American Art Phase II Expansion
Bentonville, AR I Confidential CMAR/GMP
• Crystal Bridges Museum of American Art - The Momentary I
Bentonville, AR I Confidential CMAR/GMP
CITY OF FAYETTEVILLE MAPLE STREET IMPROVEMENTS I RFP 24-15 1PLI1MTC0 13
Industry Experience
24 Years
Years with Flintco
19 Years
Education
B.S., Construction
Management, Missouri State
University
A.S., Drafting and Design
Technology, Ozarks
Technical Community
College
Licenses/Certifications
OSHA 30, ACI Concrete
Flatwork Finisher and
Technical
Chad Crouch
Project Director
As the project director, Chad serves in a project executive oversight role. He
acts as the liaison between Flintco, the owner representatives, major trade
partners and architects/engineers to provided iversified input based on his
construction expertise. Chad is responsible for overall management direction
of al I areas required to successfu I ly deliver the project. Hem a nagesthe
appropriate resource allocation to assure completion of the project and he
serves as the senior point of contact regarding overall project contract and
delivery. His specific responsibilities will be over planning, staffing, defining
functions and responsibilities, and supervision of all project activities including
project schedule, personnel administration and performance review.
Chad was selected to complete Pillars, a premier 2-year leadership program
that trains and develops Flintco's future leaders and key contributors. He
was nominated by his co-workers and honored with a Chairman's Award for
Construction/Project Management Leadership, the highest recognition given
at Flintco.
Key Experience
• City of Fayetteville Razorback Road Improvements I Fayetteville, AR
$116801000
• Deane & Porter Road Realignment I Fayetteville, AR 1 $4,074,000
• University of Arkansas Senior Walk 2020 - 2025 1 Fayetteville, AR
$410511000
• Bentonville Creekside Park Bentonville, AR $13,000,000 CMAR/GMP
• Fayetteville Fire Station #2 Fayetteville, AR $7,078,000 CMAR/GMP
• Fayetteville Fire Station #81 Fayetteville, AR 1 $2,374,000
• Fayetteville Fire Station #91 Fayetteville, AR 1 $2,510, 000
• Fayetteville Police Headquarters Facility Project I Fayetteville, AR
$35,343,000 CMAR/GMP
• Universityof Arkansas Brough Commons Retail Shops I Fayetteville, AR
$4,392,000 CMAR/GMP
• Tyson Park Renovations I Springdale, AR 1 $5,000,000 CMAR/GMP
• Universityof Arkansas Frank O'Mara Track I Fayetteville, AR
$12,264,450 CMAR/GMP
CITY OF FAYETTEVILLE MAPLE STREET IMPROVEMENTS I RFP 24-15 ?LINTCo 14
Industry Experience
32 Years
Years with Flintco
8 Years
Licenses/Certifications
USGBC LEED Green
Associate, AGC-ASPE
Estimating Academy, AGC
Advanced Print Reading,
Planning the Estimate,
Advanced Contract Law,
AGC Conceptual and
Square Foot Cost, DBIA
Certified
Klint Kimball
Director of Preconstruction
Klint leads budgeting, estimating, value analysis and constructability review
services as well as the planning and coordination of preconstruction activities
with all team members. Klint is well versed at cost model development,
as well as scope definition and bid packaging. He is skilled in contract
negotiations and adds valuable insight in the preconstruction phase of
planning. Klint is thorough, systematic and efficient in the development of
the GMP. He also provides project development expertise during the design
phase to help define needs and determine scope based on his experience in
project management and field operations.
Klint is DBIA certified and volunteers with the Ozark Foundation. He was
nominated by his co-workers and honored with a Chairman's Award for
Employee Development, the highest recognition given at Flintco. Klint was
selected to complete Pillars, a premier 2-year leadership program that trains
and develops Flintco's future leaders and key contributors. Klint enjoys
traveling, pickleball and mountain biking.
Key Experience
• City of Fayetteville Razorback Road Improvements I Fayetteville, AR
$1,680,000
• Deane & Porter Road Realignment I Fayetteville, AR 1 $4,074,000
• University of Arkansas Senior Walk 2020 - 20251 Fayetteville, AR
$4,051,000
• Bentonville Creekside Park I Bentonville, AR $13,000,000 CMAR/GMP
• Fayetteville Fire Station #2 1 Fayetteville, AR $7,078,000 CMAR/GMP
• Fayetteville Fire Station #8 1 Fayetteville, AR 1 $2,374,000
• Fayetteville Fire Station #91 Fayetteville, AR 1 $2,510, 000
• Fayetteville Police Headquarters Facility Project I Fayetteville, AR
$35,343,000 CMAR/GMP
• Tyson Park Renovations I Springdale, AR 1 $5,000,000 CMAR/GMP
• Oaklawn Track Improvements & Tunnel Replacement I Hot Springs, AR
$2,407,000 CMAR/GMP
• University of Arkansas Frank O'Mara Track I Fayetteville, AR
$12,264,450 CMAR/GMP
• Crystal Bridges Museum of American Art Phase II Expansion I
Bentonville, AR I Confidential CMAR/GMP
• Crystal Bridges Museum of American Art -The Momentary I
Bentonville, AR I Confidential CMAR/GMP
CITY OF FAYETTEVILLE MAPLE STREET IMPROVEMENTS I RFP 24-15 1PLINTC0 15
Industry Experience
28 Years
Years with Flintco
10 Years
Licenses/Certifications
OSHA 30
Tricia Shaw
Project Manager
Tricia oversees the project team to assure quality workmanship is delivered
timely and with fiscal accuracy. She prepares the prelim inary schedule and
assists the preconstruction director with cost estimates, feasibility studies,
and value analysis. She is responsible for writing and reviewing subcontracts
and purchase orders to ensure the scope of work for each trade is accurate
and complete. She monitors all construction activities, quality control, and
the accounting process. She organizes and conducts progress meetings with
the owner and architect and ensures timely resolution of all project issues.
Tricia is a member of Women in Construction and chairs Flintco's annual
Top Golf tournament, raising significant funds forA Level Up. She attends
local Chamber of Commerce events. Tricia and her daughters share a jewelry
business, and she enjoys spending time at the beach.
Key Experience
• City of Fayetteville Razorback Road Improvements I Fayetteville, AR
$1,680,000
• University of Arkansas Senior Walk 2020 - 2025 1 Fayetteville, AR
$4,051,000
• Fayetteville Fire Station #2 1 Fayetteville, AR 1 $7,078,000 CMAR/GMP
• Fayetteville Fire Station #8 1 Fayetteville, AR 1 $2,374,000
• Fayetteville Fire Station #91 Fayetteville, AR 1 $2,510, 000
• University of Arkansas Seed Processing Facility I Stuttgart, AR
$8,000,000 CMAR/GMP
• Springdale Elementary School 2016 (Knapp Elementary) I Springdale,
AR 1 $16,900,000 CMAR/GMP
• University of Arkansas Brough Commons Retail Shops I Fayetteville, AR
$4,392,000 CMAR/GMP
• University of Arkansas Old Main Lawn Lighting I Fayetteville, AR
$730,000
• University of Arkansas - Arkansas Avenue Sidewalk Replacement
Fayetteville, AR 1 $550,000
• University of Arkansas Senior Walk Replace Sidewalk I Fayetteville, AR
$630,000
• University of Arkansas Old Main Lawn Stone Retaining Wall
Restoration I Fayetteville, AR 1 $525,000
CITY OF FAYETTEVILLE MAPLE STREET IMPROVEMENTS I RFP 24-15 ?LINTCO 16
e%5�
Industry Expedence
36 Years
Years with Flintco
13 Years
Licenses/Cenifications
CPR, Fi rst Aid, OS HA 10
Kevin Langston
Senior Superintendent
Kevin oversees and directs construction, ensuring trade partner workmanship
is incorporated timely and with the expected level of quality. He works
with the project manager and superintendent(s) to manage the on -site
operations and is the most famiI is r with the plans, specifications, contracts
and submittals. Kevin serves as the liaison between the owner's and trade
partners and governmental authorities. He enforces jobsite safety, ensuring
all field operations are in compliance with OSHA standards.
Key Experience
Fayetteville Razorback Road Improvements I Fayetteville, AR
$2,398,000
University of Arkansas Senior Walk 2021-20251 Fayetteville, AR
$1,383,000
University of Arkansas Brough Commons Retail Shops I Fayetteville, AR
$4,392,000 CMAR/GMP
University of Arkansas Old Main Lawn Lighting I Fayetteville, AR
$730,000
University of Arkansas - Arkansas Avenue Sidewalk Replacement
Fayetteville, AR I $550,000
University of Arkansas Senior Walk Replace Sidewalk I Fayetteville, AR
$630,000
University of Arkansas Old Main Lawn Stone Retaining Wall
Restoration I Fayetteville,AR 1 $525,000
University of Arkansas Alumni North Paver Patio I Fayetteville, AR
$43,000
University of Arkansas System Eastern Avenue Demolition I Fayetteville,
AR I $30,368
University of Arkansas System Maple & Reagan Gravel Parking Lots
Fayetteville, AR I $163,098
University of Arkansas System Multiple Demo; Greg, Maple, Reagan St
Fayetteville, AR 1 $95,800
University of Arkansas System Oliver Ave Demolition and Parking
Fayetteville, AR I $468,000
University of Arkansas Innovation Center IAR I $5,300,000
University of Arkansas Peabody Hall I AR I $8,400,000
CITY OF FAYETTEVILLE MAPLE STREET IMPROVEMENTS I RFP 24-15 �pJm 1
Industry Experience
24 Years
Years with Flintco
18 Years
Education
Master welding Degree
Licenses/Certifications
First Aid, CPR
Dustin Maupin
Superintendent
Dustin oversees and directs construction, ensuring trade partner
workmanship is incorporated on -time and with the expected level of quality.
He works with the project managerto oversee operations and is the most
familiarwith the plans, specifications, contracts and submittals. Dustin
enforces jobsite safety, prepares and manages the quality control program,
organizes and conducts weekly trade partner meetings and inspects the work
to verify construction conforms to the contract documents.
Key Experience
• City of Fayetteville Razorback Road Improvements I Fayetteville, AR
$1,680,000
• Deane & Porter Road Realignment I Fayetteville, AR 1 $ 4,074,000
• University of Arkansas Senior Walk 2020 - 2025 1 Fayetteville, AR
$4,051,000
• Fayetteville Fire Station #2 1 Fayetteville, AR 1 $7,078,000 CMAR/GMP
• Fayetteville Fire Station #8 1 Fayetteville, AR 1 $2,374,000
• Fayetteville Fire Station #9 1 Fayetteville, AR 1 $2,612,000
• Fayetteville Police Headquarters Facility Project I Fayetteville, AR
$35,343,000 CMAR/GMP
• University of Arkansas Maple & Reagan Gravel Parking Lots
Fayetteville, AR 1 $163,098
• University of Arkansas - Arkansas Avenue Sidewalk Replacement I
Fayetteville, AR 1 $550,000
• University of Arkansas Senior Walk Replace Sidewalk I Fayetteville, AR
$630,000
• University of Arkansas Fred W. Smith Football Center I Fayetteville, AR
$33,694,484 CMAR/GMP
• Northwest Arkansas Community College Shewmaker Center
for Global Business Development I Bentonville, AR 1 $8,000,000
CMAR/GM P
• Gentry Public Schools Multi -Purpose Athletics & Activities Facility I
Gentry, AR 1 $3,974,000 CMAR/GMP
• Springdale Elementary School 2016 (Knapp Elementary) I Springdale,
AR 1 $16,900,000 CMAR/GMP
CITY OF FAYETTEVILLE MAPLE STREET IMPROVEMENTS I RFP 24-15 ?LINTCO I a
SECTION A V
Specialized and Past Experience
According to Engineering News Record, the leading industry publication, Flintco is the
number one provider of Construction Management at Risk (CMAR) services in the
state of Arkansas.
Flintco is consistently ranked as atop provider of
CM in the nation, and ranks in the top 25 in multiple
sectors. In the last five years, the Arkansas office
alone has delivered or is delivering $1.93 billion
worth of CMAR work.
With more than 90% of our work completed
under the CM delivery system, our construction
management services focus on identification of team -
oriented, positive solutions to project challenges.
We provide the client with complete control and
City of Fayetteville
Experience
In addition to the Razorback Road
and the Dean Street and Porter Road
improvement projects on the following
pages, Flintco is proud to have
partnered with the City of Fayetteville
on four landmark projects. We deeply
value the relationships we've built
through these recent endeavors and
remain committed to exceeding your
expectations while strengthening our
partnership at every opportunity.
Project Director, Chad Crouch;
Preconstruction Director, Klint Kimball;
Project Manager, Tricia Shaw; and
Superintendent, Dustin Maupin have
been involved in each of these projects
and understand how to expertly
navigate the City of Fayetteville
processes and procedures.
............. .....
.��.
understanding of a project's status while placing the
day-to-day decisions and dealings with trade partners
in the experienced hands of Flintco's project team.
The strength of oursuccess comes from our individual
approach to each project: focusing on client goals,
collaborating with the project team, listening to
stakeholders, understanding the markets we serve
and maximizing our national resources - all while
providing unequaled service and attention to detail.
CITY OF FAYETTEVILLE MAPLE STREET IMPROVEMENTS I RFP 24-15
,?LINTCO 19
Fayetteville Police Headquarters
Maintaining Schedule Momentum Despite
Delays
This state-of-the-art $35 million project was
delivered without significant construction delays,
thanks to Flintco's proactive problem -solving and
adaptability. While the project team encountered
several material acquisition challenges due to
supply chain challenges that occurred during COVID,
they ensured the timeline remained on track. For
instance, the generator did not arrive until late
January 2023, necessitating its installation after
much of the project had been completed. Similarly,
delays in the arrival of mechanical equipment
required creative scheduling to prevent work
stoppages.
Sourcing essential materials like steel and roofing
proved especially difficult, but Flintco's team
successfully navigated these obstacles by securing
substitutions where possible —an approach that not
only kept the project moving but also yielded cost
savings. When materials could not be substituted,
the team strategically adjusted workflows to
minimize disruptions.
One of the most complex aspects of the project
involved the building's exterior, which featured
terracotta —a reddish limestone requiring
specialized machinery and highly skilled labor
for installation. Despite the fragility and logistical
challenges of mining, transporting, and installing
the massive terracotta pieces, the team's
expertise ensured steady progress and exceptional
craftsmanship.
Project Savings
In 2021, rising industry prices significantly increased
project costs. Flintco's team initially provided the
ownerwith a cost estimate, but delays in funding
led to substantial cost escalation by the time
construction began.
To keep the project within the original budget, the
team implemented over 30 cost -saving measures,
achieving over $2M in savings. Specific actions
included:
• Switching from concrete paving to HD asphalt
($94K saved).
• Changing door hardware to Falcon ($34K saved).
• Using a 40MIL roofing product instead of 60MlL
($50K saved).
• Opting for Powder Coat guardrails ($34K saved).
• Improved landscape design with local planting
and improved spacing ($29K saved).
• Custornizing pedestals instead of using
premanufactured ones ($40K saved).
• Selecting alternate mechanical manufacturers to
increase competition ($370K saved).
• Switching to a more economical metal panel
system ($260K saved).
The below chart is a sample of our recent government projects executed under a GM P format that represents
how Flintco has successfully delivered projects on -schedule, on -budget, while maintaining high customer
satisfaction.
Project
Contract
Amount
Final Cost
Scheduled ActualSatisfaction
Completion Completion
Cl
Fayetteville Police Headquarters
$35,343,000
$35,343,000
4/12/2023
4/12/2023
Yes
Fayetteville Fire Station #2
$7,078,682
$6,931,188
10/30/2024
10/30/2025
Yes
Bentonville Creekside Park & Road
$6,279,038
$8,265,475
5/2/2023
5/3/2023
Yes
Mickey Jackson Fire Training Center
$2,805,900
$2,797,908
2/26/21
1/29121
Yes
Fayetteville The New School
$9,114,009
$9,101,776
1/31/16
1/31/16
Yes
Bentonville Evening Star Elementary
School
$18,900,000 $18,108,379
8/1/19
8/1/19
Yes
CITY OF FAYETTEVILLE MAPLE STREET IMPROVEMENTS I RFP 24-15 111w'co I I
Additional savings were achieved by buying out metal panels for roof screens ($100K saved) and installing
them individually. The team also replaced ceramic tile with polished concrete in many areas, saving
$130K by using stainless steel wall protection instead of wall tile, $85K by resizing wall tiles, $80K with
alternate quartz countertops and window stools, and $60K by reducing and rearranging light fixtures. This
comprehensive approach allowed the project to remain on budget despite significant challenges.
This project was impacted by manufacturing delays created from the COVID-19 pandemic. One was the
overhead door forth e apparatus bay. The team found a temporary solution to keep the apparatus bay
closed so that interior finishes could be completed to keep the project moving forward. Even though the
overhead door arrived late, the team worked around that scope to avoid major schedule delays.
Ensuring Quality & Client
Satisfaction
Flintco's Arkansas project
team actively worked
with the owner to develop
the most cost-effective,
highest -quality facility for
the city's public servants.
The project team created
strong, lasting relationships
with the owner and looks
forward to future projects
with the City of Fayetteville.
CITY OF
FAYETTEVILLE
ARKANSAS
December 5, 2023
To whom it may concern,
It is my pleasure to provide this letter of recommendation for Flintco Construction,
highlighting their exceptional contributions to the successful completion of the City of
Fayetteville's new police headquarters campus.
Flintco Construction played a pivotal role in ensuring the project's success,
starting with their invaluable cost -saving strategies during pre -construction planning.
Their meticulous attention to detail aided in the selection of subcontractors, which
significantly contributed to the seamless execution of the project's scope of work.
During the challenges posed by the construction industry's volatility amid an
unprecedented pandemic, Flintco demonstrated resilience, adaptability, and a steadfast
commitment to overcoming obstacles. Their proactive measures and collaborative
approach helped mitigate unforeseen costs, allowing the City of Fayetteville to absorb
challenges during the design, planning, and construction phases.
Throughout the construction process, Flintco exhibited meticulous oversight and
attention to detail, ensuring the project's quality met and exceeded expectations. Their
responsiveness to the completion of punch list items showcased a dedication to
excellence and client satisfaction.
I wholeheartedly recommend Flintco Construction for future projects, as I and the
entire police force have been impressed with their professionalism, expertise, and
unwavering commitment to delivering exceptional results.
Sincerel ,
/&
0,6a_
Mike Reynolds
Chief of Police
MR:am
EXAMPLE: CUSTOMER SATISFACTION
CITY OF FAYETTEVILLE MAPLE STREET IMPROVEMENTS I RFP 24-15 �-FLINTCO 177
Schedule
Phase I Schedule
ID
(Task
Mode
Task Name
Duratlon
Start
Finish
efi2'5
xlul
x '25 A
xr
1
gis
i
•
i
•
ti
W
-
-
-
S
W
4
{a
ti
Maple Street Construction
Project Admin
Project Award
Owner Contract Negotiations
Develop Bid Packages
Bid Project
Bid Due
Bid Vetting Process
Present Pricing to Owner
Award Sub Contracts
Submittal Process
Finalize Phase Planning
Submit Road Closure Permits
One Call Locates
Phase 1 Construction
AREA1-Greggto Ark
Mobilization
Staking and Layout
Traffic Control & Signage Installation
SWEEP Installation
Demo Sidewalks and Curb Gregg to Ark
Excavation& Grading for Sidewalks and
Utility Relocates
Traffic Light Relocates
Form Sidewalks and Curbs
Inspect Forms and Compaction Test
Pour Sidewalks, Curbs and Mud slabs
Set Granite Curbs
Demo Remaining Street
Street Excavation and Grading
Final Inspections and Compaction Test
Asphalt Paving
Bike Trail Paver and Cobble Stone Install
Landscaping Install
Open Gregg to Ark
Curbs
124 days
62 days
1 day
7days
10 days
10 days
1 day
8 days
2tlays
5tlays
15 days
5tlays
5tlays
3tlays
60 days
40 days
1 day
3tlays
1 do,
2tlays
8days
8days
8 days
20 days
5 days
2 days
6 days
4 days
2tlays
5 days
Il day
3 days
11 days
3tlays
1 do,
Fee 2/11/25
Fee 2/11/25
Time 2/11/25
Wed 2/12/25
Wed 2/12/25
Wed 2/26/25
Wed 3/12/25
ALL 3/13/25
Toe 3/25/25
ALL 3/27/25
ALL 4/3/25
ALL 4/3/25
ALL 4/10/25
Mon 5/5/25
Mon 5/12/25
Mon 5/12/25
Mon 5/12/25
Mon 5/12725
Mon 5/12/25
Mon 5/12/25
Wed 5/14/25
ALL 5/15/25
ALL 5/15/25
ALL 5/15/25
Toe 5/27/25
Toe 6/3/25
ALL 6/5/25
Fri 6/13/25
ALL 6/19/25
Mon 6/23/25
Mon 6/30/25
Toe 7/1/25
ALL 6/19/25
Toe 7/1/25
Fri 7/4/25
Fri 8/1/25
Wed 5/7/25
Toe 2/11/25
Thu 2/20/25
Toe 2/25/25
Toe 3/11/25
Wed 3/12/25
Mon 3/24/25
Wed 3/26/25
Wed 4/2/25
Wed 4/23/25
Wed 4/9/25
Wed 4/16/25
1Wetl 5/7/25
Fri 8/1/25
Fri)/4/25
Mon 5/12/25
Wed 5/14/25
Mon 5/12/25
'Toe 5/13/25
Fri 5/23/25
Mon 5/26/25
Mon 5/26/25
Wed 6/11/25
Mon 6/2/25
Wed 6/4/25
Thu 6/12/25
Wed 6/18/25
'Fri 6/20/25
Fri 6/27/25
Mon 6/30/25
Thu 7/3/25
Thu 7/3/25
Thu 7/3/25
Fri 7/4/25
a
2
3
4
5
6
]
8
9
10
11
12
13
14
15
16
11
18
19
20
21
22
23
24
25
26
21
28
29
30
31
32
33
34
35
36
31
38
39
Project: Maple Street
Date: Fri 1/17/25
Schedule
Task
spuv ...............
Mllertone O
Summary
pr Jett Summary
In,seTask
Inaclve Milestone
Inaclve Summary
�1
0
Manual Task
DurationonlyFinish
Manual Summary Rollup
0 Manual Summary
startonlyC
only]
External Tasks
External Mllertone
Deadline 1
Progress
Manual Progress
40
•
.
y
•
a
y
y
a
R
ARE%2-Ark to GRAD
Mobilization
Traffic Control Signage Installation
SWEEP Installation
Demo Sidewalks and Curb Ark to GRAD
Excavation Grading for Sidewalks and Curbs
Utility Relocates
Form Sidewalks and Curbs
Inspect Forms and Compaction Test
Pour Sidewalks, Curbs and Mud slabs
Set Granite Curbs
Demo Remaining Street
Street Excavation and Grading
Final Inspections and Compaction Test
Asphalt Paving
Bike Trail Paver and Cobble Stone Install
Landscaping Install
Open Ark to Whitham
AREA 3- GRAD to Campus Drive
Mobilization
Traffic Control Signage Installation
SWEEP Installation
Demo Sidewalks and Curb GRAD to Campus Drive
Demo Street
Excavation Grading for Sidewalks and Curbs
Storm Drainage Installation
Utility Relocates
Traffic Light Relocates
Form Sidewalks and Curbs
Inspect Forms and Compaction Test
Pour Sidewalks, Curbs and Mud slabs
Set Granite Curbs
Street Excavation and Grading
Final Inspections and Compaction Test
Asphalt Paving
Bike Trail Paver and Cobble Stone Install
Landscaping Install
Open
60 days
1 day
lday
3tlays
7days
7days
J days
5 days
1 day
5 days
5 days
3tlays
6days
lday
2 days
12 days
3tlays
lday
60 days
lday
lday
2tlays
8tlays
3tlays
8tlays
20 days
8 days
20 days
5 days
2tlays
] days
4 days
7 days
lday
3tlays
10 days
3tlays
'1 day
Mon 5/12/25
Mon 5/12/25
Mon 5/12/25
Mon 5/12/25
Tue 5/27/25
Thu 6/5/25
Thu 6/5/25
Mon 6/16/25
Mon 6/23/25
Tue 6/24/25
Fri 7/4/25
Fri 7/11/25
Wed 7/16/25
Thu 7/24/25
Fri 7/25/25
Fri 7/11/25
Tue 7/29/25
Fri 8/1/25
Mon 5/12/25
Mon 5/12/25
Mon 5/12/25
Mon 5/12125
Wed 5/14/25
Mon 5/26/25
Mon 5/26/25
Mon 5/26/25
Mon 5/26/25
Mon 5/26/25
Mon 6/23/25
Mon 6/30/25
Wed 7/2/25
Fri 7/11/25
Thu 7/17/25
Mon 7/28/25
Tue 7/29/25
Thu?/17/25
'Tue 7/29/25
Fri 8/1/25
Fri 8/1/25
Mon 5/12/25
Mon 5/12/25
Wed 5/14/25
Wed 6/4/25
Fri 6/13/25
Fri 6/13/25
Fri 6/20/25
Mon 6/23/25
Mon 6/30/25
Thu 7/10/25
Tue 7/15/25
Wed 7/23/25
Thu 7/24/25
Mon 7/28/25
Mon 7/28/25
Thu 7/31/25
Fri 8/1/25
Fri 8/1/25
Mon 5/12/25
Mon 5/12/25
Tue 5/13/25
Fri 5/23/25
Wed 5/28/25
Wed 6/4/25
Fri 6/20/25
Wed 6/4/25
Fri 6/20/25
Fri 6/27/25
Tue 7/1/25
Thu 7/10/25
Wed 7/16/25
Fri 7/25/25
Mon 7/28/25
Thu 7/31/25
Wed 7/30/25
Thu 7/31/25
Fri 8/1/25
-'
q
I
41
42
43
44
45
46
41
48
49
So
51
52
53
54
55
56
51
58
59
60
61
62
63
64
65
66
61
68
69
10
11
12
13
14
]5
16
11
]8
Ta
Project: Maple Street Schedule split
Date: Fri 1/17/25 Milestone
Summary
Prolett Summary
............... Inattive Task
O Inactive Milestone
�1 Inactive Summary
Manual Task StartonlyE Deadline 1
DurationonlyFinishonly] Progress
ManualSummaryRollup External Tasks Manual Progress
0 Manual Summary riiiiiiiiiiiiiiiiiiiiiiiiiiiiii1 External Milestone
CITY OF FAYETTEVILLE MAPLE STREET IMPROVEMENTS I RFP 24-15 'Lnvrao 113
Phase II Schedule
ID
Task
Mode
Task Name
Duration
Start
Finish
Predecessors
IMay'26 �lun'26 �lul'26 JAug'26
26 3 16 17 24 39 7 14 21 28 5 12 19 26 2 9
1
��
�a
Ili
�.�
�a
Ili
�.�
�.�
�a
�a
�.�
W,
W.
Wi
Wa
W,
111111%
W,
III,
Wi
W,
111111i
III,
III,
M
Ili
Wi
III,
W,
Maple Street Construction 62 days
Phase 2 Construction 63 days
AREA 1- Campus Drive to Oakland 40 days
Mobilization 1 day
Staking and Layout 3 days
Traffic Control & Signage Installation 1 day
SWPPP Installation 2 days
Demo Sidewalks and Curb Campus Drive to Oakland 8 days
Excavation & Grading for Sidewalks and Curbs 8 days
Utility Relocates 8 days
Form Sidewalks and Curbs 5 days
Inspect Forms and Compaction Test 2 days
Pour Sidewalks, Curbs and Mud slabs 6 days
Set Granite Curbs 4 days
Demo Remaining Street 2 days
Street Excavation and Grading 5 days
Final Inspections and Compaction Test 1 day
Asphalt Paving 3 days
Bike Trail Paverand Cobble Stone Install 11 days
Landscaping Install 3 days
Open Campus Drive to Oakland 1 day
AREA 2 - Oakland to Lindell 63 days
Mobilization 1 day
Traffic Control & Signage Installation 1 day
SWPPP Installation 3 days
Demo Sidewalks and Curb Oakland to Lindell 7 days
Excavation & Grading for Sidewalks and Curbs 7 days
Utility Relocates 7 days
Form Sidewalks and Curbs 5 days
Inspect Forms and Compaction Test 1 day
Tue 2/11/25
Mon 5/11/26
Mon 5/11/26
Mon 5/11/26
Mon 5/11/26
Mon 5/11/26
Mon 5/11/26
Wed 5/13/26
Thu 5/14/26
Thu 5/14/26
Tue 5/26/26
Tue 5/2/26
Thu 5/4/26
Fri 6/12/26
Thu 6/18/26
Mon 6/22/26
Mon 6/29/26
Tue 6/30/26
Thu 6/18/26
Tue 6/30/26
Fri 7/3/26
Mon 5/11/26
Mon 5/11/26
Mon 5/11/26
Mon 5/11/26
Tue 5/26/26
Thu 5/4/26
Thu 5/4/26
Mon 6/15/26
Mon 6/22/26
'Wed 5/7/25
Wed 8/5/26
Fri 7/3/26
Mon 5/11/26
Wed 5/13/26
Mon 5/11/26
Tue 5/12/26
Fri 5/22/26
Mon 5/25/26
Mon 5/25/26
Mon 5/1/26
Wed 5/3/26
Thu 6/11/26
Wed 6/17/26
Fri 6/19/26
Fri 6/26/26
Mon 6/29/26
Thu 7/2/26
Thu 7/2/26
Thu 7/2/26
Fri 7/3/26
Wed 8/5/26
Mon 5/11/26
Mon 5/11/26
Wed 5/13/26
Wed 5/3/26
Fri 6/12/26
Fri 6/12/26
Fri 6/19/26
Mon 6/22/26
18SS
19SS
19SS
21
22SS+1 day
23SS
24
25
26
27
28
29
30
31
28
31
34
18SS
38SS
38SS
23
41
42SS
43
44
8/5
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
Project: PH 2 Maple Street Sche
Date: Sun 1/19/25
Task
Split ...................
Milestone O
Summary r ---------- I
Project Summary rT
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration -only
o
Manual Summary Rollup
Manual Summary
o Start -only C
Finish -only 7
FMernal Tasks
Fxtemal Milestone
Deadline 3
Progress
Manual Progress
ID
Task
Mode
Task Name
I
Duration
I
Start
1
Finish
1
Predecessors
May'26 Jun'26 1Jul'26 IAug '26
26 3 10 17 24 31 7 14 21 28 5 12 19 26 2 9
46
Wi
III,
Wi
W+
Wa
Wa
1
III,
W,
Wa
W,i
Ili
W4
W4
Wa
1
W,
W+
W+
Ill
Ili
W4
W+
Pour Sidewalks, Curbs and Mud slabs
Set Granite Curbs
Demo Remaining Street
Street Excavation and Grading
Final Inspections and Compaction Test
Asphalt Paving
Bike Trail Paver and Cobble Stone Install
Landscaping Install
Open Oakland to Lindell
AREA 3 - Lindell to Garland
Mobilization
Traffic Control & Signage Installation
SWPPP Installation
Demo Sidewalks and Curb Lindell to Garland
Demo Street
Excavation & Grading for Sidewalks and Curbs
Storm Drainage Installation
Utility Relocates
Traffic Light Relocates
Form Sidewalks and Curbs
Inspect Forms and Compaction Test
Pour Sidewalks, Curbs and Mud slabs
Set Granite Curbs
Street Excavation and Grading
Final Inspections and Compaction Test
Asphalt Paving
Bike Trail Paver and Cobble Stone Install
Landscaping Install
Open Lindell to Garland
5 days
5 days
3 days
6 days
1 day
2 days
12 days
3 days
1 day
60 days
1 day
1 day
2 days
8 days
3 days
8 days
20 days
8 days
20 days
5 days
2 days
7 days
4 days
7 days
1 day
3 days
10 days
3 days
1 day
Tue 6/23/26
Tue 6/30/26
Tue 7/7/26
Fri 7/10/26
Mon 7/20/26
Tue 7/21/26
Tue 7/7/26
Thu 7/23/26
Tue 7/28/26
Thu 5/14/26
Thu 5/14/26
Thu 5/14/26
Thu 5/14/26
Mon 5/18/26
Thu 5/28/26
Thu 5/28/26
Thu 5/28/26
Thu 5/28/26
Thu 5/28/26
Thu 6/25/26
Thu 7/2/26
Mon 7/6/26
Wed 7/15/26
Tue 7/21/26
Thu 7/30/26
Fri 7/31/26
Tue 7/21/26
Fri 7/31/26
Wed 8/5/26
Mon 6/29/26
Mon 7/6/26
Thu 7/9/26
Fri 7/17/26
Mon 7/20/26
Wed 7/22/26
Wed 7/22/26
Mon 7/27/26
Tue 7/28/26
Wed 8/5/26
Thu 5/14/26
Thu 5/14/26
Fri 5/15/26
Wed 5/27/26
Mon 6/1/26
Mon 6/8/26
Wed 6/24/26
Mon 6/8/26
Wed 6/24/26
Wed 7/1/26
Fri 7/3/26
Tue 7/14/26
Mon 7/20/26
Wed 7/29/26
Thu 7/30/26
Tue 8/4/26
Mon 8/3/26
Tue 8/4/26
Wed 8/5/26
45
46
47
48
49
50
47
52
53
19
57SS
57SS
59
60
60
62SS
62SS
62SS
63
66
67
68
69
70
71
'69
71
74
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
&6W+
69
70
71
72
73
74
75
Project: PH 2 Maple Street Sche
Date: Sun 1/19/25
Task
Split ...................
Milestone ♦
Summary r --------- I
Projeat Summary 9"
Inaetive Task
Ina Rive Milestone
InactivE Summary
Manual Task
Duration -only
o
Manual Summary Rollup
Manual Summary r1
o Start -only C
Finish -only 7
I'. External Tasks
Extemal Milestone
Deadline
Progress
Manual Progress
CITY OF FAYETTEVILLE MAPLE STREET IMPROVEMENTS I RFP 24-15 ?MIIYTCC3 115
SECTION A VII
Cost
Flintco greatly respects and appreciates our relationship with City of Fayetteville. We look forward to each
project as an opportunity to prove ourselves and showcase our team. For the City of Fayetteville Maple
Street Improvements project, Flintco's preconstruction fee is $1.00. There are no other fees solely
associated with preconstruction.
CITY OF FAYETTEVILLE MAPLE STREET IMPROVEMENTS I RFP 24-15 1fmAvrGD 116
SECTION A VIII
Additional Background
Self Perform
Flintco provides competitive self -performance
capabilities to our clients for those trades that have
significant impact on the quality and schedule of
construction. When Flintco self -performs work, we
have ourown people deeplyengaged in the safety,
schedule and quality control of your project everyday,
which addsvalue and certainty.
Our ability to self -perform work allows for
greater control of staff performance, cost,
flexibility of schedules and end -of -work quality.
This includes concrete, steel, rough carpentry,
industrial, dry -wall and installation of doors,
hardware and specialty items.
The self -performance bid process is the exact same
expected of other trade partners where we submit
our lowest price for the scope of work and all bids
are publicly opened. Flintco remains transparent
throughout the bidding process, including when we
self -perform. Final selection is always based on best
value foryour project.
Safety
Our safety program exceeds federal, state, and
local OSHA requirements and demands total
participation of our staff and trade partners. This
primary focus on safety results in quality buildings
and positive experiences for everyone involved. It
also controls costs and keeps projects on schedule.
Safety is our company -wide badge of honorthat
reflects ourcommitment to doing things right.
We recently have celebrated the following
milestones*:
Flintco's Experience Modifier Rate (EMR) of 0.52
remains well below the industry average of 1.0
Trade Partner incidents continue to trend down
yearafteryear
2021 - 2023 ABC National Safety of Excellence
Award Winner
2O23ABC Pinnacle Award
*2024 Safety Awards have not been issued to date
2018 - 2023 Designated
as Diamond Level by the
Associated Builders and
Contractors Safety and
Training Evaluation Process
(ABC STEP) - the highest level
a company can achieve
from the safety
r
L--JkL
benchmarking
system.
Our focus is
evident, not only •
through national prefer to '
recognition,
including by both
the Associated Builders and
Contractors (ABC) and Associated
General Contractors (AGC) trade
associations, but also in our
achievement of the prestigious
Diamond status in the ABC STEP
benchmarking process yearafter
year.
The single most important
element in the success of our
Safety program was the creation
of our Flintco 4 LIFE culture. Since
it was introduced in 2017, Flintco
+ LIFE has become synonymous with
-1intco'sSafety culture because it
vorks with leadership and employees
it all levels to create change in people,
)rocesses, culture, and organizations.
-Iintco 4 LIFE focuses on process,
)ractice, and individual behaviors
o improve safety by Living Incident
ree Everyday (LIFE). We explore how
eople think, feel and relate to Safety,
and look at the role of the organization in providing
a safe work environment. The 4 R's are prominent
in our approach: Reach out, do it Right, Raise your
voice and Recognize hazards.
Solid Trade Partner Relationships: As part of the
Arkansas fabric for more than 70 years, Flintco
enjoys an excellent reputation within local trade
partner communities as a contractor known as
financially stable and forsafe and clean jobsites.
We plan ourworkand involve trade partners in
scheduling the work. Because of this, trade partners
want to work with us.
Flintco has established itself not only in the region
but nationally as a well -respected contractor of
choice. Our reputation, excellent communication and
partnering programs enable us to attract and engage
the highest quality trade partners for our projects.
Trade partners want to work with Flintco and will
push aside other projects for an opportunity to bid a
Flintco job. This benefits you by ensuring high levels
of trade partner participation so that you know you
are getting competitive market pricing.
FAYETTEVILLE MAPLE STREET IMPROVEMENTS I RFP 24-15 ?LINTCO 118
TAB B I
Prior Experience Constructing
Streetscape and Similar Project Types
In the past five years, Flintco has completed more than $240 million in streetscape
and hardscaping projects in the last five years. Of this, more than $200 million has
been completed in Northwest Arkansas.
Fayetteville Razorback Road Improvements
Fayetteville, AR
These improvements included the widening of the existing road and landscaping
upgrades along the west side of Razorbackto enhance thevisual appeal.
Enhancements included the addition of trees, grassyareas, improved asphalt
pavers, cobblestones, and pavement markings for pedestrian traffic.
DELIVERY METHOD
General Contracting
FINAL COST
$1,696,000
YEAR OF COMPLETION
September 2022
CITY OF FAYETTEVILLE MAPLE STREET IMPROVEMENTS I RFP 24-15
'FLIT o 119
1 ^Il rA bMTT t.i�Il� i
C1IAND R1AUL-R(T'I
AI.L'XANI RLA M AA,R(l I
VANY _A APADIA f;(WI,7
University of Arkansas Senior Sidewalk
2021-2025
The University of Arkansas Senior Walk project includes engraving the names of
four years' worth of graduating seniors on over4,000 feet of sidewalk. The project
scope included curb and gutter, sidewalk, manholes, landscaping and electrical
work. From Cleveland Street and Razorback Road, the project spanned up Maple
Street, around Garland, and tied into the previous Senior Sidewalk project at the
northwest corner of Cleveland and Garland.
DELIVERY METHOD
General Contracting
FINAL COST
$4,051,000
YEAR OF COMPLETION
December 2023
CITY OF FAYETTEVILLE MAPLE STREET IMPROVEMENTS I RFP 24-15 ?LINTCO 120
Deane Street and Porter Road
Fayetteville, AR
DELIVERY METHOD
CM -At Risk / GMP
As an extension of the Fayetteville Police Department project, Flintco transformed
FINAL COST
Deane Street and Porter Road into a safer, more accessible, and aesthetically
$4,074,000
pleasing corridor. The project included widening and realigning the roadway,
adding parking spaces, and improving drive lanes. A roundabout was constructed
YEAR OF COMPLETION
to enhance traffic flow, while new curb and gutter systems and an upgraded
December2023
storm sewer system improved drainage. ADA-compliant crosswalks, a section of
greenway bike and walkingtrail, and street landscaping further enriched the area,
creating a functional and inviting space for pedestrians, cyclists, and drivers alike.
CITY OF FAYETTEVILLE MAPLE STREET IMPROVEMENTS I RFP 24-15 1?Ur rco 121
�
♦ 4 4 1 k�'�
� Cf'
_ � C -1, V'r
_ .
�i-�� _�
SECTION B II
Understanding of Preconstruction
Services
Ninety-five percent of project savings are
achieved during the preconstruction phase. We
can help you maximize every dollar.
As ideas are discussed, Flintco will work with
the City of Fayetteville and engineering team to
implement the most cost-effective solutions to the
City's programing needs. We will work with the team
to explore options and run "what -if" scenarios on
the fly so that no design or programing idea is left
unexplored.
The meaning of Guaranteed Maximum Price {GMP}
is more than just a contractual term that defines
our "not to exceed" project value. A Guaranteed
Maximum Price as prepared by Flintco shall include
all Cost of the Work as defined by the AIA A133,
Article 6. We prepare our GMP with full transparency
in mind, allowing the Owner and Flintco to discuss
both inclusions and exclusions. The GMP is only
amended as a result of allowable additions or
deletions as defined in the Contract.
We are responsible for the GMP. Flintco works to
exceed expectations while delivering the project
from original concept through completion. We
believe it is our responsibility to maximize your
construction dollar. By collaborating with the design
team and our trade partners, Flintco delivers the
maximum amount of building/programing within
the total GMP.
OUR EXPERTISE:
' Design Management
• AHJ Coordination
Site Utilization and Logistics Planning
• Schedule Development
• Cost Estimating & Modeling
• ConstructabilityAnalysis
• Value Analysis
• Phase Planning
• Bid Package Planning & Development
• Document Quality Analysis & Control
• Total Cost of Ownership Analysis
• Trade Partner Prequalification
• WMBE/HUB Outreach
OUR TOOLS:
• Building Information Modeling
• Proprietary Cost Data Base
• Primavera P6
• Assemble
• Laser Scanning
• ThermalIriaging
• Drone Imaging & Scanning
• Coordination Clash Detection
• Lean 2.0
CITY OF FAYETTEVILLE MAPLE STREET IMPROVEMENTS I RFP 24-15
\P INTCO 123
Mutual trust is the basis for any relationship. Flintco We work with the engineeringteam to prioritize the
has been fostering relationships in the Northwest items that have the greatest impact on the final GMP
Arkansas community for more than seven decades. foryourproject. Trend estimates, ourassumptions/
This has allowed us to create a deep pool of `tried clarifications and constructability reviews, help
and true'trade partners that have proven theirvalue confirm that the contract documents and the GMP
project after project. align with your- objectives.
Flintco will take a hands-on approach from the
initial phases of preconstruction. Our strong
industry relationships from seven decades in the
region allow Flintco to involve our trade partners in
the constructibility reviews and value analysis early
in the process. The Flintco team, in conjunction
with our local trade partners, will add value to
your project by making informed construction
recommendations that will have direct impacts on
schedule and budget.
Our preconstruction process unifies design,
engineering, and construction to ensure that
the project is thoroughly planned, budgeted and
built on paper priorto the start of construction.
We provide value analysis, insight and creative
recommendations that maintain your budget,
schedule, and design intent.
We develop trade partner interest in the project
and divide the trade work into as many separate
packages as is practical. The more the work is
divided, the more clearly the cost of the work is
defined. This also increases the opportunity to
include smaller, local trade partners as well as more
minority and small business. We tabulate the bids
and make comments and recommendations. The
low responsible bidder- is interviewed to ascertain
bid completeness, as well as understanding of the
scope of the work.
Billing Approach
Our approach to billing includes the use of the
A133- 2009 Standard Form of Agreement Between
Owner and Construction Manager as Constructor
where the basis of payment is the Cost of the Work
Plus a Fee with a Guaranteed Maximum Price. The
A133 will be coordinated for use with AIA Document
A201-2007, General Conditions of the Contract for
Construction.
Tyson Park Renovations - Cityof Springdale $5,493,500 $5,446,144 -0.86%
Rogers School District Athletic Facilities $27,001,421 $26,890,705 -0.41%
UniversityofArkansasFrankO'MaraTrackandFieldHigh $10,261,650 $10,143,112 -1.17%
Performance Center
Preconstruction will be led by Preconstruction Director, Klint Kimball, who has delivered more than $2
billion in preconstruction services in the Northwest Arkansas market and has a record of maintaining
a 2% variance when preparing estimates. He is supported by a dedicated team of experts who will be
involved in document review, project coordination, and quality exercises from the onset of Flintco's
involvement. Mint has forged trusting relationships with the Arkansas trade partner community,
ensuringproven trade partners will compete foryour project.
CITY OF FAYETTEVILLE MAPLE STREET IMPROVEMENTS I RFP 24-15 1?UNTC0 l 24
SECTION B III
Records on Similar Projects
Asa companyand specifically forthe project team we have proposed, Flintco has earned a reputation for
the timely completion of our projects with award -winning results for quality. On the previous pages, the
resumes of our staff reflect a full listing of projects with on -time completions. In addition, these personnel
have all earned ABC Excellence in Construction awards for projects they have built. Key members of this team
are designated to establish and document the project quality objectives. A constructabiIity and materials
performance report is prepared to address any concerns that surface during the evaluation of the design
development documents. Elements of the program include:
• A clearly understood and well communicated quality assurance program.
Concise procedures and timing forinspection of the final work to coordinate the initial inspection
responsibility of the project manager with the final acceptance responsibilities of the project architect.
• Involve members of review agencies early.
• Extract concerns relating to the trade partner's ability to perform to the objectives of the quality
assurance program and discuss these issues at the pre -award conference.
• Evaluation of alternates and "or equal" provisions prior to issuing the bidding documents.
Incorporate into the construction documents specific criteria for submittals, samples, mock-ups, etc.
and requirements to define the individual contractor's responsibility for quality assurance.
Require each trade partner to designate a representative to discuss quality assurance issues.
• Establish a
meeting schedule
prior to coming
on -site to discuss
quality awareness,
individual
commitment
and anticipated
problems with
materials,
equipment or
workmanship to
be incorporated
into the project.
PROJECTS
Fayetteville Razorback Rd. Improv,
✓
✓
✓
✓
✓
Deane & Porter Road Realignment
✓
✓
✓
U of A Senior Walk 2020 - 2025
✓
✓
✓
✓
✓
Fayetteville Police Headquarters
✓
✓
✓
Fayetteville Fire Station #2
✓
✓
✓
✓
Fayetteville Fire Station #8
✓
✓
✓
✓
Fayetteville Fire Station #9
✓
✓
✓
✓
CITY OF FAYETTEVILLE MAPLE STREET IMPROVEMENTS I RFP 24-15
1FL1r-rrC0 12 5
In addition to the extended project narrative shown below, please refer to Section B I for additional
examples of Flintco's relevant experience.
University of Arkansas Senior Walk 2021- 2025
Flintco was pleased to partner with the University of Arkansas on the expansion of their iconic Senior
Sidewalk tradition. To maintain consistency in the design, especially since the campus has many
historic areas, the University of Arkansas executives have established guidelines for the sidewalk size to
accommodate two rows of names on each panel. Flintco was hired to complete this project, which involved
redoing sidewalks and the curb, gutter, and manholes to accommodate the graduating classes from 2021
to 2025.
The scope of the project also included electrical workto replace several old light poles to match campus
standards. From the cornerof Cleveland and Razorback Road, the project spanned up Maple, around Garland,
and tied into the previous Senior Sidewalk project, completed bythe Flintco JOC team in 2022, at the
northwest cornerof Cleveland and Garland. The 2021- 2025 Senior Sidewalk project involved 4,240 linear
feet of curb, gutter, and sidewalk, and the landscaping was also replaced.
Safety and Successful Execution on
Operational Campus
An active corridor of campus, the project team took measures to control pedestrian and car traffic on roads
and sidewalks, including establishing a path of access and installing proper signage and fencing, where
necessary. Additional coordination efforts were exercised to accommodate drop-off and pick-up traffic, as the
construction site was adjacent to an elementary school. The Flintco team was proactive in the coordination of
these efforts, working closely with University staff and school administrators.
t eky. • "� a .�G. .
r
Landscaping, senior sidewalk and retaining wall that were all a part of this 2020 - 2025 Senior Sidewalk Project just south of a
residential area off Razorback and Cleveland Streets.
CITYOF FAYETTEVILLE MAPLE STREET IMPROVEMENTS I RFP 24-15 1PLINTC0 1 26
Additionally, a portion of the project on
Maple Street ran along the north end of
Donald W. Reynolds Razorback Stadium,
where 80,000+ fans converged on game
days. Flintco worked diligently to maintain
traffic flow in both directions, so this project
did not impact game day traffic.
Approximately 550 feet of the new
Senior Sidewalk is located directly above
a high -voltage tunnel that housed the
infrastructure for campus utilities. Special consideration was given to protect this area while safely
demolishing existing sidewalk, so as not to interrupt university operations and to ensure a safe
environment for trade partners working around the high -voltage area.
Though the start of this project was delayed, Flintco was able to finish on time by working in conjunction
with the owner. Per the owner's request, we developed a plan whereby we could maintain open driveways
and pathways which were necessary to maintain campus operations.
The project team began work in December of 2022 and completed avast majority of the project by mid -
September 2023, five weeks ahead of schedule.
Further demonstrating the collaborative effort between Flintco, the owner and the designer, Flintco was
asked to price the use of asphalt pavers compared to bluestone pavers for an area of the sidewalk. This
change in design resulted in substantial savings.
To effectively coordinate construction activities in this busy corridor of campus and maintain proper access
to drives and walkways, Flintco held bi-weekly owner meetings to ensure communication was thorough and
proactive. This working relationship laid the groundwork for a successful, injury -free project that finished
on schedule and in -budget.
Excavation at retaining wall preparing for new curb, gutter, and the Iconic U of A Senior Sidewalk.
CITY OF FAYETTEVILLE MAPLE STREET IMPROVEMENTS I RFP 24-15 `"duNr= 1 27
SECTION B IV
Owner Verification & Contact
Information
U of A Razorback
Road Improvements
OWNER REFERENCE
Todd Ferguson, Campus Planner
University of Arkansas
toddf@uark.edu
479.575.3371
ARCHITECT REFERENCE
Jay Young, President
DCI
jayy@dcius.pro
479-444-7880
Arkansas Ave. Senior
Sidewalk
OWNER REFERENCE
Todd Ferguson, Campus Planner
University of Arkansas
toddf@uark.edu
479.575.3371
ARCHITECT REFERENCE
Steven J. Head, PE, Principal and
Geo-technical Department Head
McClelland Consulting Engineers
shead@mce.us.com
479.443.2377
U of A Senior
Sidewalk
OWNER REFERENCE
Todd Ferguson, Campus Planner
University of Arkansas
toddf@uark.edu
479.575.3371
ARCHITECT REFERENCE
Matt Loos, Engineer of Record
Olsson, Inc.
mloos@olsson.com
479.443-3404
CITY OF FAYETTEVILLE MAPLE STREET IMPROVEMENTS I RFP 24-15
,PLINTCO 128
SECTION B V
Current and Projected Workload
We have the resources available to commence work immediately upon selection.
Your team - Project Director, Chad Crouch, Project Manager, Tricia Shaw, Senior Superintendent,
Kevin Langston, and Superintendent Dustin Maupin - have the capacity and resources available
to them to manage the construction of the City of Fayettevi I I e's Maple Street Improvements project.
Preconstruction Director Klint Kimball leads our preconstruction effort with the full support of our local
Preconstruction Department, which is structured to facilitate multiple projects simultaneously.
Our philosophy is that when preconstruction is interactive and performed at a high level, it sets the
foundation for success in the field. Our current workload allows our team to commence this effort for the
City of Fayetteville immediately.
Bus Depot Transportation Upgrades - February 2025
Springdale HS & Harbor HS Baseball & Softball Field
Improvements - February 2025
21C Museum Hotel Bentonville North Entry
Modifications - May 2025
Downtown Bentonville Utility Relocation - July 2025
200 East Central Hotel - August 2025
Lincoln Junior High School SPED & FACS Remodel -
August 2025
A Street Promenade - September 2025
Bentonville Adult Recreation Center - November 2025
Crystal Bridges Museum of American Art Phase 2
Expansion - December 2025
Saracen Casino Resort Hotel & Event Center Phase 2 -
December 2025
Quilt of Parks - December 2025
Mercy Rogers 7th Floor ICU - April 2025
Oakdale Middle School Renovation - August 2026
Alice Walton School of Medicine Campus Housing -
June2027
CITY OF FAYETTEVILLE MAPLE STREET IMPROVEMENTS I RFP 24-15 \P INT= 1 28
SECTION B VI
Current Maximum Bonding Capacity
and Rate
TRAVELERS
One Tower Square
Hartford, CT 06183
January 16, 2024
Re: Flintco, LLC, (a subsidiary of Alberici)
323 E. Reconciliation Way
Tulsa, OK 74120
To Whom This May Concern,
Richard W. DuPont
Managing Director, Construction Services
Bond & Specialty Insurance
(314) 579-8315
940 West Port Plaza, St. Louis, MO 63146
We are pleased to share with you our experience as surety for Flintco, LLC, a subsidiary of Alberici. We consider Alberici one of
our outstanding and most valued clients in whom we have the highest confidence. Throughout the past 104 years Alberici has, in
our opinon, remained properly financed, well equipped and capably managed. Based on a conservative internal credit system, we
rank Alberici's financial strength and condition in the top 5% of our portfolio. Very few clients achieve this status and it reflects
how well run the company is in several facets.
Travelers' current A.M. Best Co. rating is A++ XV. Travelers Casualty and Surety Company of America, a subsidiary of The
Travelers Companies, has a reinsurance agreement in place with other Travelers companies. Combined, these companies, which
are licensed by the Treasury, provide Travelers Casualty and Surety Company of America with approximately $2 billion in
capacity above and beyond its $211 million single risk limit
Travelers Casualty and Surety Company of America has participated in total work programs on behalf of Alberici in excess of
$300,000,000 on single contracts and $2,500,000,000 aggregate. This information is provided only for general evidence of
capabilities and bonding capacity on a normal operating basis and is not intended to represent the maximum bonding capacity
available for this firm.
This letter confirms that, in the event Flintco, LLC should be selected for proposed Project, Travelers Casualty and Surety
Company of America is prepared to provide the required Performance and Payment Bonds on behalf of Flintco, LLC covering
the Project up to 100% of the contract price, subject to our normal underwriting requirements at the time the request is made.
Alberici enjoys an excellent reputation of meeting all of their responsibilities and obligations in a professional manner and has a
number of repeat customers because of their fine results. Travelers places a high level of confidence in Alberici's financial
strength, technical expertise, integrity and ability to select projects. It is our privilege to recommend Flintco, LLC, as a subsidiary
of Alberici, to you.
Sincerely,
Travel asualty d S Company of America
By: ,? l
Richard W. DuPont, Managing Director, Construction Services
The undersigned declares under penalty of perjury that the above statement(s) submitted is true and correct and that this
declaration was executed in St. Louis County, Missouri.
Signed, sealed and dated this 16th day
of January, 2024
By: OJUA //. � (.��LL.�C.L7AC..
Cheryl L Mc leenan—Notary Public
o,pgY P(jIG,
CHERYL L MCALEENAN
�,
:
My Commission Expires
* ;NOTARY : *
;9 . SEAL .a' =
May 15, 2024
St. Louis County
�OF40'
Commission#12487106
CITY OF FAYETTEVILLE MAPLE STREET IMPROVEMENTS I RFP 24-15 ?Ur-JTCO 130
City of Fayetteville
RFP 24-15, CMAR for Maple Street Improvements
SECTION C: Signature Submittal
1. DISCLOSURE INFORMATION
a. Proposer must disclose any possible conflict of interest with the City of Fayetteville, including, but not
limited to, any relationship with any City of Fayetteville employee. Proposer response must disclose if a
known relationship exists between any principal or employee of your firm and any City of Fayetteville
employee or elected City of Fayetteville official.
L If, to your knowledge, no relationship exists, this should also be stated in your response. Failure
to disclose such a relationship may result in cancellation of a purchase and/or contract as a result
of your response. Thisform must be completed and returned in orderforyour bid/proposal to be
eligible for consideration.
PLEASE CHECK ONE OF THE FOLLOWING TWO OPTIONS, AS IT APPROPRIATELY APPLIES TO YOUR FIRM:
X 1) NO KNOWN RELATIONSHIP EXISTS
2) RELATIONSHIP EXISTS (Please explain):
b. I certify that; as an officer of this organization, or per the attached letter of authorization, am duly
authorized to certify the information provided herein is accurate and true; and my organization shall
comply with all State and Federal Equal Opportunity and Non -Discrimination requirements and conditions
of employment.
c. Proposer agrees that they shall have a current, valid registration with the Arkansas Secretary of State at
time of RFP deadline OR be able to provide proof of registration before recommendation of award to
Fayetteville City Council.
d. Pursuant Arkansas Code Annotated §25-1-503, the Contractor agrees and certifies that they do not
currently boycott Israel and will not boycott Israel during anytime in which they are entering into, orwhile
in contract, with any public entity as defined in §25-1-503. If at any time during contract the contractor
decides to boycott Israel, the contractor must notify the contracted public entity in writing.
e. Pursuant Arkansas Code Annotated §25-1-1002, the Contractor agrees and certifies that they do not
currently boycott Energy, Fossil Fuel, Firearms, and Ammunition Industries during anytime in which they
are entering into, orwhile in contract, with any public entity as defined in §25-1-1002. If at anytime during
the contract the contractor decides to boycott Energy, Fossil Fuel, Firearms, and/or Ammunition
Industries, the contractor must notify the contracted public entity in writing.
City of Fayetteville, AR
RFP 24-15, CMAR for Maple Street Improvements
Page 21 of 23
2. PRIMARY CONTACT INFORMATION
At the discretion of the City, one or more firms may be asked for more detailed information before final
ranking of the firms, which may also include oral interviews. NOTE: Each Proposer shall submit to the City a
primary contact name, e-mail address, and phone number (preferably a cell phone number) where the City
selection committee can call for clarification or interview via telephone.
Corporate Name of Firm: Flintco, LLC
Primary Contact: Brent Farmer
Phone#1 (cell preferred): 479.879.7313
E-Mail Address: bfarmer@flintco.com
3. ACKNOWLEDGEMENT OF ADDENDA
Title of Primary Contact: Vice President / Area
hone#2: 479.306.6259
Acknowledge receipt of addenda for this invitation to bid, request for proposal, or request for qualification
by signing and dating below. All addendums are hereby made a part of the bid or RFP documents to the same
extent as though it were originally included therein. Proposers/Bidders should indicate their receipt of same
in the appropriate blank listed herein. Failure to do so may subject Contractor to disqualification.
ADDENDUM NO.
SIGNATUR AND PRINTED NAME
DATE ACKNOWLEDGED
1 - Dec. 23, 2024
Brent Farmer `;
1/20/2025
4. DEBARMENT CERTIFICATION:
a. As an interested party on this project, you are required to provide debarment/suspension certification
indicating compliance with the below Federal Executive Order. Certification can be done by completing
and signing this form.
b. Federal Executive Order (E.O.) 12549 "Debarment and Suspension" requires that all contractors receiving
individual awards, using federal funds, and all sub -recipients certify that the organization and its principals
are not debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded by any
Federal department or agency from doing business with the Federal Government.
c. Signature certifies that neither you nor your principal is presently debarred, suspended, proposed for
debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any
federal department or agency.
City of Fayetteville, AR
RFP 24-15, CMAR for Maple Street Improvements
Page 22 of 23
5. SIGNATURE SUBMITTAL:
NAME OF COMPANY: Flintco, LLC
PHYSICAL ADDRESS: 184 E. Fantinel Blvd., Springdale, AR 72762
MAILING ADDRESS:
TAX I D #: 27-3321079
PHONE: 479.750-4565
E-MAIL: bfarmer@flintco.com
PRINTED NAME: Brent Farmer
TITLE: VP/Area Manager
AR. SECRETARY OF STATE FILING #: 800188970
SAM LEI #: U7BTDMB4CJ16
DATE: 1 /20/2025
END OF RFP DOCUMENT
City of Fayetteville, AR
RFP 24-15, CMAR for Maple Street Improvements
Page 23 of 23