Resolution: 235-24
File Number: 2024-430
STORMWATER FUNDING STUDY (CONTRACT AMENDMENT):
A RESOLUTION TO APPROVE AMENDMENT NO. 4 TO THE PROFESSIONAL SERVICES AGREEMENT
BETWEEN THE CITY OF FAYETTEVILLE, ARKANSAS AND JACOBS ENGINEERING GROUP, INC F/K/A
C112M HILL ENGINEERS, INC. IN AN AMOUNT NOT TO EXCEED $92,780.00
WHEREAS, on August 15, 2017, the City Council passed Resolution 175-17 expressing the City Council's intent to
fund a study to evaluate the feasibility of creating a stormwater utility program and authorizing City staff to move
forward with the selection of a professional consultant to complete the study; and
WHEREAS, on June 4, 2018, the City Council approved Resolution 131-18, authorizing a contract with CH2M Hill
Engineers, Inc., now known as Jacobs Engineering Group, Inc., to evaluate the feasibility of creating a stormwater
utility program; and
WHEREAS, on September 17, 2019, the City Council approved Resolution 209-19 approving Amendment No. 1 for
additional travel and labor expenses; and
WHEREAS, on November 5, 2019, the City Council approved Resolution 250-19, approving Amendment No. 2 for
additional serviced related to the development of final recommendations for the creation of a stormwater utility; and
WHEREAS, on July 5, 2022, the City Council approved Resolution 157-22 that expressed its intent to establish a
stormwater utility for the purposes of funding needed stormwater and flood management water quality projects through
a monthly stormwater fee to be paid by most property owners in Fayetteville; and
WHEREAS, on May 21, 2024, the City Council approved Resolution 143-24 again expressing its intent to enact a
stormwater utility ordinance and establish a stormwater management and water quality fund, and authorized additional
services related to implementation and public outreach; and
WHEREAS, additional funding is requested for assistance with the creation of the billing database and public parcel
lookup tool as well as the future recalculation of impervious area to create the baseline.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Amendment No. 4 to the
Professional Services Agreement with Jacobs Engineering, Inc., a copy of which is attached to this Resolution, in an
amount not to exceed $92,780.00.
Page 1
Resolution: 235-24
File Number: 2024-430
PASSED and APPROVED on September 17, 2024
Attest: 011111111n,/i
K•/• T RF
_U•
— • FAYETTEVlLL:
Kara Paxton, City el&k Treasurer
9
Page 2
CITY OF
FAYETTEVILLE
ARKANSAS
MEETING OF SEPTEMBER 17, 2024
CITY COUNCIL MEMO
2024-430
TO: Mayor Jordan and City Council
THRU: Chris Brown, Public Works Director
FROM: Alan Pugh, Staff Engineer
SUBJECT: Approval of Amendment 4 to the Stormwater Feasibility Study professional services
contract with Jacobs in an amount not to exceed $92,780 (total contract amount
$675,722)
RECOMMENDATION:
Staff recommends approval of Amendment 4 to the Stormwater Feasibility Study professional services contract
with Jacobs in an amount not to exceed $92,780 (total contract amount $675,722).
BACKGROUND:
Like many cities throughout the state and nation, the City of Fayetteville experiences issues with management
of its stormwater utility system. These issues stem from many sources including, but not limited to, compliance
with the mandated Municipal Separate Stormwater System (MS4) requirements, aging infrastructure,
maintenance of system capacity, personnel to perform systematic inspections and the lack of formal drainage
systems in many older areas of the City. To address these concerns, the City has historically funded the
stormwater program through the Sales Tax Capital Improvement Program (CIP) and the Street Fund for
capital and operational/maintenance functions, respectively. However, there are many needs within the City
that require funding from these sources and, at least in recent years, the funding for stormwater has been
inadequate to comprehensively address stormwater management within the City. To develop a
comprehensive solution, additional funding is required for personnel and equipment as well as multiple capital
projects, many of which will require more than $1 million dollars for each project. Given the current levels, it
would take many years to address just one of those projects.
In June 2018, the City Council recognized these needs and approved a consultant contract for a feasibility
study (Resolution 131-18) and amended that agreement on two occasions (Resolutions 209-19 and 250-19) to
provide additional investigation and details. That study was completed in August 2019 and updated in 2022
with more recent program costs, impervious area and associated fees. The Council also passed a resolution
of intent to establish a stormwater utility in July 2022 (Resolution 157-22) and another resolution of intent in
May 2024 (Resolution 143-24) which also approved an additional $150,000 in funding toward the project.
DISCUSSION:
As stated in May of this year, the additional $150,000 authorized development of the billing database and
billing tool that would allow property owners and residents to view their proposed fee as a portion of the
continued public outreach efforts. While that effort has begun, staff proposes to engage Jacobs with a contract
amendment to perform portions of this work as noted in the attached agreement. This includes aiding the City
with the creation of the billing database and public parcel lookup tool as well as the future recalculation of
impervious area to create the baseline in 2025 should the Council decide to move forward with creating the
Mailing address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
utility by adopting Chapter 52.
BUDGET/STAFF IMPACT:
Of the previously allocated $150,000, staff proposes an amendment with Jacobs in the amount of $92,780.
The additional funding will be used for staff time and future agreements if necessary.
ATTACHMENTS: SRF (#3), Stormwater Funding Study Contract Amendment 4 (#4), 131-18 Resolution (#5),
209-19 Resolution (#6), 250-19 Resolution (#7), 157-22 Resolution (#8), 143-24 Resolution (#9)
Mailing address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
== City of Fayetteville, Arkansas
y 113 West Mountain Street
Fayetteville, AR 72701
(479)575-8323
- Legislation Text
File #: 2024-430
Approval of Amendment 4 to the Stormwater Feasibility Study professional services contract with
Jacobs in an amount not to exceed $92,780 (total contract amount $675,722)
A RESOLUTION TO APPROVE AMENDMENT NO. 4 TO THE PROFESSIONAL SERVICES
AGREEMENT BETWEEN THE CITY OF FAYETTEVILLE, ARKANSAS AND JACOBS
ENGINEERING GROUP, INC F/K/A CH2M HILL ENGINEERS, INC. IN AN AMOUNT NOT TO
EXCEED $92,780.00
WHEREAS, on August 15, 2017, the City Council passed Resolution 175-17 expressing the City
Council's intent to fund a study to evaluate the feasibility of creating a stormwater utility program and
authorizing City staff to move forward with the selection of a professional consultant to complete the
study; and
WHEREAS, on June 4, 2018, the City Council approved Resolution 131-18, authorizing a contract with
CH2M Hill Engineers, Inc., now known as Jacobs Engineering Group, Inc., to evaluate the feasibility of
creating a stormwater utility program; and
WHEREAS, on September 17, 2019, the City Council approved Resolution 209-19 approving
Amendment No. 1 for additional travel and labor expenses; and
WHEREAS, on November 5, 2019, the City Council approved Resolution 250-19, approving
Amendment No. 2 for additional serviced related to the development of final recommendations for the
creation of a stormwater utility; and
WHEREAS, on July 5, 2022, the City Council approved Resolution 157-22 that expressed its intent to
establish a stormwater utility for the purposes of funding needed stormwater and flood management
water quality projects through a monthly stormwater fee to be paid by most property owners in
Fayetteville; and
WHEREAS, on May 21, 2024, the City Council approved Resolution 143-24 again expressing its intent
to enact a stormwater utility ordinance and establish a stormwater management and water quality fund,
and authorized additional services related to implementation and public outreach; and
WHEREAS, additional funding is requested for assistance with the creation of the billing database and
public parcel lookup tool as well as the future recalculation of impervious area to create the baseline.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Page 1
Resolution: 235-24
File Number: 2024-430
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Amendment No.
4 to the Professional Services Agreement with Jacobs Engineering, Inc., a copy of which is attached to
this Resolution, in an amount not to exceed $92,780.00.
Page 2
Chris Brown
Submitted By
City of Fayetteville Staff Review Form
2024-430
Item ID
9/3/2024
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
8/8/2024 ENGINEERING (621)
Submitted Date Division / Department
Action Recommendation:
Approval of Amendment 4 to the Stormwater Feasibility Study professional services contract with Jacobs in an
amount not to exceed $92,780 (total contract amount $675,722)
Budget Impact:
1010.090.6600-5314.00
General Fund
Account Number Fund
17008.1 Stormwater Utility Feasibility Study
Project Number
Budgeted Item? Yes
Does item have a direct cost? Yes
Is a Budget Adjustment attached? No
Total Amended Budget
Expenses (Actual+Encum)
Available Budget
Item Cost
Budget Adjustment
Remaining Budget
Project Title
$ 202, 685.00
$ 52,684.64
$ 150,000.36
$ 92,780.00
57,220.36
V20221130
Purchase Order Number: 2018-498 Previous Ordinance or Resolution # 131-18,209-19,250-19,
Change Order Number: 4 Approval Date:
Original Contract Number: 2018-23
Comments:
City of Fayetteville, Arkansas
Flood Management and Water Quality Funding Program
Implementation —Amendment
Client:
Project name:
Project number: D3320601
Description of change:
Change requested by
City of Fayetteville, Arkansas PCN no.: 001
Phase III of the Flood Management and Date: 7/15/2024
Water Quality Funding Program
Attention: Alan Pugh
Amendment to provide additional Customer Billing Database Support
City of Fayetteville, Arkansas
Date of request: 7/15/2024
Scope Definition
Additional Subtasks for Customer Billing Database
Task 1. Billing Database (August — October 2024)
In this task, CH21VI HILL Engineers Inc. (CH2M HILL) will work with the City's Information
Technology and Utility Departments to create a lookup tool application in ArcGIS Online (AGOL)
that will allow citizens to search by address, parcel owner name and/or parcel number and
provide their estimated stormwater fee and impervious area calculations for their parcel.
Task I Deliverables and Assumptions
• AGOL lookup tool
• TM Guide on creating AGOL Look Up Tool
Task 1 Assumptions
0 CH2M HILL will be given access to AGOL/Portal via a login
Task 2 Process Workflow for Updates (November- April 2025)
In this task, CH21VI HILL will work with City staff to 1) document the workflow process for incorporating
utility data changes to the GIS and vice versa for the customer billing database and 2) automate this
process to the extent possible. This task will consist of two in -person workflow meetings (Burhan, Tanya,
GIS/IT team). The first meeting will be a chartering meeting to determine existing workflows and
database configuration for the GIS and utilities department and to determine the path forward for
automating (where possible) sewer and parcel updates. The second meeting will be to test the
established workflow and provide training to appropriate staff for executing updates to the billing
database.
Under this task up to three scripts will be created, one for each of the following workflows:
• Customer Billing Database/GIS database integration (to the extent possible)
• Script for parcel updates
• Script for utility updates
Task 2 Deliverables
• SQL stored procedure or python script
• TM and documentation for scripts
Task 2 Assumptions
• There will be up to two in -person meetings in addition to bi-weekly status calls.
• During the task chartering meeting, The City will determine the frequency of the parcel and
utility database updates for script.
• This task will not exceed 300 hours (this includes time for meetings, scripting, testing, and
rescripting).
• CH2M HILL will provide up to 24 hours of ad hoc support within the first year of the scripts being
executed.
Task 3. Recalculate IA (May 2025- August 2025)
The objective of this task is to, where needed, re -relate the new impervious area (IA) imagery to the
parcel layer to updated utility database to capture changes since original database was created. From
this, the customer billing database will be refined with new IA calculations.
Task 3 Deliverables
• Geodata base of updated parcel layer with new IA calculations
• TM of IA recalculation process
Task 3 Assumptions
• The City will QA/QC and deliver new IA data
• The City will provide the IA data in vector format
Task 4 Overall Project & Quality Management (June 2024-August 2025)
The objective of this task is to recharter the project by defining the individual project roles, points of
contact and project controls for the next 24 months. This includes managing, coordinating and
proactively communicating the status of project resources, schedule, and budget.
Task 4 Deliverables and Assumptions
12 monthly invoices and progress reports.
Bi-weekly or monthly status calls, including an agenda, updated schedule, and action items.
Task 4 Assumptions
• Additional scope or tasks will be documented via a change order and/or amendment.
Attachment A: Cost Breakdown for Tasks
Task 1
Billin Database
$13,540
Task 2
Process Workflow Updates
$57,500
Task 3
Recalculate IA
$13,000
Task 4
Project Management
$5 940
Travel
Additional travel (currently have $8,200)
$1,800
General Expenses
$1000
Total
$928780
Attachment B: Timeline
Jun
July
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
July
Aug
24
24
24
24
24
24
24
25
25
25
25
25
25
25
25
Parcel
Linking
Customer
Billing
Database
Process
Workflow
Updates
Recalculate
IA
Project
Mgmt.
Article C. Authorization:
ccepte for CLIENT by
Accei#ed for Jacobs E gine ring Group Inc. by:
ame. Lioneld -dan
Name: Heather Smith, P. .
itte: Ma -
itte: Principal Project Manager
113 West Mountain Street
Fayetteville, AR 72701
(479)575-8323
Resolution: 131-18
File Number: 2018-0267
STORMWATER UTILITY STUDY CONTRACT:
A RESOLUTION TO AUTHORIZE A PROFESSIONAL SERVICES AGREEMENT WITH CH2M HILL
ENGINEERS, INC., PURSUANT TO RFQ 18-02, IN AN MOUNT NOT TO EXCEED $229,222.00 FOR A
STORMWATER UTILITY FEASIBILITY STUDY, AND TO APPROVE A BUDGET ADJUSTMENT
WHEREAS, on August 15, 2017, the City Council passed Resolution No. 175-17 expressing the City
Council's intent to fund a study to evaluate the feasibility of creating a stormwater utility program and
authorizing City staff to move forward with the selection of a professional consultant to complete the
study.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan
to sign a professional services agreement with CH2M Hill Engineers, Inc., pursuant to RFQ 18-02, in
an amount not to exceed $229,222.00 for a stormwater utility feasibility study.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget
adjustment, a copy of which is attached to this Resolution.
PASSED and APPROVED on 6/5/2018
Attest:
Sondra E. Smith, City Clerk TreasurerOCgS�,��
• ,A--
S
°"
Page 1 Printed on 615118
City of Fayetteville, Arkansas
113 West Mountain Street
f�i \ Fayetteville, AR 72701
(479) 575-8323
w _ ; Text File
�— File Number: 2018-0267
Agenda Date: 6/5/2018 Version: 1 Status: Passed
In Control: City Council Meeting File Type: Resolution
Agenda Number: C. 2
STORMWATER UTILITY STUDY CONTRACT:
A RESOLUTION TO AUTHORIZE A PROFESSIONAL SERVICES AGREEMENT WITH CH2M HILL
ENGINEERS, INC., PURSUANT TO RFQ 18-02, IN AN AMOUNT NOT TO EXCEED $229,222.00
FOR A STORMWATER UTILITY FEASIBILITY STUDY, AND TO APPROVE A BUDGET
ADJUSTMENT
WHEREAS, on August 15, 2017, the City Council passed Resolution No. 175-17 expressing the City
Council's intent to fund a study to evaluate the feasibility of creating a stormwater utility program and
authorizing City staff to move forward with the selection of a professional consultant to complete the study.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign a
professional services agreement with CH2M Hill Engineers, Inc., pursuant to RFQ 18-02, in an amount not to
exceed $229,222.00 for a stormwater utility feasibility study.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a
copy of which is attached to this Resolution.
City of Fayetteville, Arkansas Page 1 Printed on 61512018
City of Fayetteville Staff Review Form
2018-0267
Legistar File ID
6/5/2018
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
Chris Brown 5/15/2018 ENGINEERING (621)
Submitted By Submitted Date Division / Department
Action Recommendation:
Approval of the Stormwater Feasibility Study professional services contract with CH21VI Hill Engineers, Inc in an
amount not to exceed $229,222 and to approve a budget adjustment.
Budget Impact:
1010.090.6600-5314.00 General Fund
Account Number
17008.1
Project Number
Budgeted Item? Yes
Does item have a cost? Yes
Budget Adjustment Attached? Yes
Fund
Stormwater Utility Feasibility Study
Project Title
Current Budget
$
200,000.00
Funds Obligated
$
275.40
Current Balance
C_
199,724.60
Item Cost
$
229,222.00
Budget Adjustment
$
29,498.00
Remaining Budget
$
0.60
V20180321
Purchase Order Number: Previous Ordinance or Resolution # 175-17
Change Order Number:
Original Contract Number:
Comments:
Approval Date:
CITY OF
FAYETTEVILLE
ARKANSAS
MEETING OF JUNE 5, 2018
TO: Mayor and City Council
THRU: Don Marr, Chief of Staff
Garner Stoll, Development Services Director
Chris Brown, City Engineer
FROM: Alan Pugh, Staff Engineer
DATE: May 21, 2018
CITY COUNCIL MEMO
SUBJECT: Approval of the Stormwater Feasibility Study professional services contract with
CH2M Hill Engineers, Inc in an amount not to exceed $229,222 and to approve a
budget adjustment.
RECOMMENDATION:
Approval of the Stormwater Feasibility Study professional services contract with CH2M Hill
Engineers, Inc in an amount not to exceed $229,222 and to approve a budget adjustment.
BACKGROUND:
Like many cities throughout the state and nation, the City of Fayetteville experiences issues
with stormwater runoff. These issues stem from many sources including, but not limited to,
aging infrastructure, maintenance of system capacity, manpower to perform systematic
inspections and the lack of formal drainage systems in many older areas of the City. In order to
address these concerns, the City has historically funded maintenance and new projects directly
from the Sales Tax Capital Improvement Program (CIP). However, there are many needs
within the City that require funding from the CIP and, at least in recent years, the funding for
stormwater has been inadequate to comprehensively address stormwater issues. In order to
develop a comprehensive solution, funding is required for manpower and equipment as well as
multiple capital projects, some of which will require in excess of $1 million dollars for each
project. Given the current funding levels, it would take many years in order to address just one
of those projects.
The City Council recognized these needs and expressed the City's intent to move forward with
a stormwater feasibility study on August 15, 2017 as noted in resolution 175-17.
DISCUSSION:
Upon approval by the Council in August of last year, staff began working with the purchasing
division to draft an appropriate scope of work to go along with a request for professionals to
submit their qualifications for consideration. This scope was shared with the Water and Sewer
Committee and any comments from the committee were addressed. The RFQ was then
published on January 2, 2018 and qualifications were due on or before and February 8, 2018.
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
The City received statements of qualifications from 7 firms and from these the top 3 were
interviewed by the selection committee. Of the top three firms, CH21VI Hill was selected as the
most qualified and contract negotiations began. It should be noted that CH2M Hill was recently
acquired by Jacobs and accordingly some of the following materials reference both firms.
Although both are licensed in the state of Arkansas, the contract itself would be with CH2M Hill
Engineers Inc.
Subsequent to the selection of CH2M Hill as the most qualified firm, staff has worked to
develop a contract that meets the expectations of the Administration and the City Council. This
contact is attached for your consideration. Although it does slightly exceed the original
approved amount, staff feels that all aspects are necessary for a thorough and complete study.
This includes a robust public outreach program as well as the financial analysis and other
aspects required to complete the study. It will also provide the platform should Council decide
to move forward with implementation of the stormwater utility. It should be noted that there are
also stopping points built into the contract so that at various times throughout the study, staff
and CH21VI Hill would present the findings to council committee at which time the City would
have the option to discontinue the study should it be necessary.
BUDGET/STAFF IMPACT:
The overall cost proposed is $229,222 which does include the opportunity for some additional
services should they be required. The council originally set aside $200,000 from the general
fund in order to pay for the study. This request also includes a budget adjustment that would
provide the additional $29,222 from that same fund, and cover the cost of advertising the
request for qualifications, for a total budget adjustment of $29,498.
Attachments:
Resolution 175-17
Stormwater Utility Contract
STANDARD AGREEMENT FOR PROFESSIONAL SERVICES
This AGREEMENT is between CH2M HILL ENGINEERS, INC., ("CH2M HILL"), and
CITY OF FAYETTEVILLE, ARKANSAS ("CITY")
for a PROJECT generally described as: Stormwater Utility Feasibility Study
ARTICLE 1. SCOPE OF SERVICES AND FEE
CH2M HILL will perform the Scope of Services at the
Fee set forth in Attachment S.
ARTICLE 2. COMPENSATION
CITY will compensate CH2M HILL at rate schedule set
forth in Attachment A. Work performed under this
AGREEMENT may be performed using labor from
affiliated companies of CH2M HILL. Such labor will be
billed to CITY under the same billing terms applicable to
CH2M HILL's employees.
ARTICLE 3. TERMS OF PAYMENT
CITY will pay CH2M HILL as follows:
3.1 Invoices and Time of Payment
CH2M HILL will issue monthly invoices pursuant to
Attachment B. Invoices are due and payable within 30
days of receipt.
3.2 RESERVED
ARTICLE 4. OBLIGATIONS OF CH2M HILL
4.1 Standard of Care
The standard of care applicable to CH2M HILL's
Services will be the degree of skill and diligence
normally employed by professional engineers or
consultants performing the same or similar Services at
the time said services are performed.
4.2 Subsurface Investigations
In soils, foundation, groundwater, and other subsurface
investigations, the actual characteristics may vary
significantly between successive test points and sample
intervals and at locations other than where
observations, exploration, and investigations have been
made. Because of the inherent uncertainties in
subsurface evaluations, changed or unanticipated
underground conditions may occur that could affect total
PROJECT cost and/or execution. These conditions and
cost/execution effects are not the responsibility of CH2M
HILL.
FORM 390
REVISED 1106
4.3 CH2M HILL's Personnel at Construction Site
4.3.1 The presence or duties of CH2M HILL's
personnel at a construction site, whether as onsite
representatives or otherwise, do not make CH2M HILL
or CH2M HILL's personnel in any way responsible for
those duties that belong to CITY and/or the construction
contractors or other entities, and do not relieve the
construction contractors or any other entity of their
obligations, duties, and responsibilities, including, but
not limited to, all construction methods, means,
techniques, sequences, and procedures necessary for
coordinating and completing all portions of the
construction work in accordance with the construction
Contract Documents and any health or safety
precautions required by such construction work.
4.3.2 CH2M HILL and CH2M HILL's personnel have
no authority to exercise any control over any
construction contractor or other entity or their
employees in connection with their work or any health or
safety precautions and have no duty for inspecting,
noting, observing, correcting, or reporting on health or
safety deficiencies of the construction contractor(s) or
other entity or any other persons at the site except
CH2M HILL's own personnel.
4.3.3 The presence of CH2M HILL's personnel at a
construction site is for the purpose of providing to CITY
a greater degree of confidence that the completed
construction work will conform generally to the
construction documents and that the integrity of the
design concept as reflected in the construction
documents has been implemented and preserved by the
construction contractor(s). CH2M HILL neither
guarantees the performance of the construction
contractor(s) nor assumes responsibility for construction
contractor's failure to perform work in accordance with
the construction documents.
For this AGREEMENT only, construction sites include
places of manufacture for materials incorporated into
the construction work, and construction contractors
include manufacturers of materials incorporated into the
construction work.
4.4 Opinions of Cost, Financial Considerations, and
Schedules
In providing opinions of cost, financial analyses,
economic feasibility projections, and schedules for the
PROJECT, CH2M HILL has no control over cost or price
of labor and materials; unknown or latent conditions of
existing equipment or structures that may affect
operation or maintenance costs; competitive bidding
procedures and market conditions; time or quality of
performance by operating personnel or third parties; and
other economic and operational factors that may
materially affect the ultimate PROJECT cost or
schedule. Therefore, CH2M HILL makes no warranty
that CITY's actual PROJECT costs, financial aspects,
economic feasibility, or schedules will not vary from
CH2M HILL's opinions, analyses, projections, or
estimates.
4.5 RESERVED
4.6 Record Drawings
Record drawings, if required, will be prepared, in part,
on the basis of information compiled and furnished by
others, and may not always represent the exact
location, type of various components, or exact manner
in which the PROJECT was finally constructed. CH2M
HILL is not responsible for any errors or omissions in
the information from others that is incorporated into the
record drawings.
4.7 Access to CH2M HILL's Accounting Records
CH2M HILL will maintain accounting records, in
accordance with generally accepted accounting
principles. These records will be available to CITY
during CH2M HILL's normal business hours for a period
of 1 year after CH2M HILL's final invoice for examination
to the extent required to verify the direct costs
(excluding established or standard allowances and
rates) incurred hereunder.
4.8 CH2M HILL's Insurance
CH2M HILL will maintain throughout this AGREEMENT
the following insurance:
(a) Worker's compensation and employer's liability
insurance as required by the state where the work is
performed.
(b) Comprehensive automobile and vehicle liability
insurance covering claims for injuries to members of the
public and/or damages to property of others arising from
use of motor vehicles, including onsite and offsite
operations, and owned, nonowned, or hired vehicles,
with $1,000,000 combined single limits.
(c) Commercial general liability insurance covering
claims for injuries to members of the public or damage
to property of others arising out of any covered
negligent act or omission of CH2M HILL or of any of its
employees, agents, or subcontractors, with $1,000,000
per occurrence and in the aggregate.
(d) Professional liability insurance of $1,000,000
per occurrence and in the aggregate.
(e) CITY will be named as an additional insured
with respect to CH2M HILL's liabilities hereunder in
insurance coverages identified in items (b) and (c) and
CH2M HILL waives subrogation against CITY as to said
policies.
FORM 390
FAYETTEVILLE AR 512018
ARTICLE 5. OBLIGATIONS OF CITY
5.1 CITY -Furnished Data
CITY will provide to CH2M HILL all data obtained within
the last five years and currently in CITY's possession
relating to CH2M HILL's services on the PROJECT.
CH2M HILL may request additional relevant data if
necessary for the PROJECT. CH2M HILL will
reasonably rely upon the accuracy, timeliness, and
completeness of the information provided by CITY.
5.2 Access to Facilities and Property
CITY will make its facilities accessible to CH2M HILL as
required for CH2M HILL's performance of its services
and will provide labor and safety equipment as required
by CH2M HILL for such access. CITY will perform, at no
cost to CH2M HILL, such tests of equipment,
machinery, pipelines, and other components of CITY's
facilities as may be required in connection with CH2M
HILL's services.
5.3 Advertisements, Permits, and Access
Unless otherwise agreed to in the Scope of Services,
CITY will obtain, arrange, and pay for all advertisements
for bids; permits and licenses required by local, state, or
federal authorities; and land, easements, rights -of -way,
and access necessary for CH2M HILL's services or
PROJECT construction.
5.4 Timely Review
CITY will examine CH2M HILL's studies, reports,
sketches, drawings, specifications, proposals, and other
documents; obtain advice of an attorney, insurance
counselor, accountant, auditor, bond and financial
advisors, and other consultants as CITY deems
appropriate; and render in writing decisions required by
CITY in a timely manner.
5.5 Prompt Notice
CITY will give prompt written notice to CH2M HILL
whenever CITY observes or becomes aware of any
development that affects the scope or timing of CH2M
HILL's Services, or of any defect in the work of CH2M
HILL or construction contractors.
5.6 Asbestos or Hazardous Substances
5.6.1 If asbestos or hazardous substances in any
form are encountered or suspected, CH2M HILL will
stop its own work in the affected portions of the
PROJECT to permit testing and evaluation.
56.2 If asbestos is suspected, CH2M HILL will, if
requested, manage the asbestos remediation activities
using a qualified subcontractor at an additional fee and
contract terms to be negotiated.
5.6.3 It hazardous substances other than asbestos
are suspected, CH2M HILL will, if requested, conduct
tests to determine the extent of the problem and will
perform the necessary studies and recommend the
necessary remedial measures at an additional fee and
contract terms to be negotiated.
5.6.4 Client recognizes that CH2M HILL assumes no
risk and/or liability for a waste or hazardous waste site
originated by other than CH2M HILL.
5.7 Contractor Indemnification and Claims
5.7.1 CITY agrees to include in all construction
contracts the provisions of Article 4.3, CH2M HILL's
Personnel at Construction Site, and provisions providing
contractor indemnification of CITY and CH2M HILL for
contractor's negligence.
5.7.2 CITY shall require construction contractor(s) to
name CITY and CH2M HILL as additional insureds on
the contractor's general liability insurance policy.
5.7.3 CITY agrees to include the following clause in
all contracts with construction contractors, and
equipment or materials suppliers:
"Contractors, subcontractors, and equipment and
material suppliers on the PROJECT, or their sureties,
shall maintain no direct action against CH2M HILL,
CH2M HILL's officers, employees, affiliated
corporations, and subcontractors for any claim arising
out of, in connection with, or resulting from the CH2M
HILL's services performed. CITY will be the only
beneficiary of any undertaking by CH2M HILL."
5.8 Reserved
5.9 Litigation Assistance
The Scope of Services does not include costs of CH2M
HILL for required or requested assistance to support,
prepare, document, bring, defend, or assist in litigation
undertaken or defended by CITY. All such Services
required or requested of CH2M HILL by CITY, except
for suits or claims between the parties to this
AGREEMENT, will be reimbursed as mutually agreed.
5.10 Changes -see Supplemental Terms
ARTICLE 6. GENERAL LEGAL PROVISIONS
6.1 Authorization to Proceed
Execution of this AGREEMENT by CITY will be
authorization for CH2M HILL to proceed with the work,
unless otherwise provided for in this AGREEMENT.
6.2 Reuse of PROJECT Documents
All reports, drawings, specifications, documents, and
other deliverables of CH2M HILL, whether in hard copy
or in electronic form, are instruments of service for this
PROJECT, whether the PROJECT is completed or not.
6.3 Force Majeure
CH2M HILL is not responsible for damages or delay in
performance caused by acts of God, strikes, lockouts,
accidents, or other events beyond the control of CH2M
HILL
FORM 398
FAYETTEVILLE AR 5018
6.4 Limitation of Liability
6.4.1 To the maximum extent permitted by law,
CH2M HILL's liability for CITY's damages will not, in the
aggregate, exceed $1,000,000.
6,4.2 This article takes precedence over any
conflicting article of this AGREEMENT or any document
incorporated into it or referenced by it.
6.4.3 This limitation of liability will apply whether
CH2M HILL's liability arises under breach of contract or
warranty; tort; including negligence; strict liability;
statutory liability; or any other cause of action, and shall
include CH2M HILL's officers, affiliated corporations,
employees, and subcontractors.
6.5 Termination
6.5.1 This AGREEMENT may be terminated by the
City for convenience on 30 day's written notice by the
City, or for cause if either party fails substantially to
perform through no fault of the other and does not
commence correction of such nonperformance within 5
business days of written notice and diligently complete
the correction thereafter.
6.5.2 On termination, CH2M HILL will be paid for all
authorized and satisfactory services performed up to the
termination date.
6.6 Suspension, Delay, or Interruption of Work
CITY may suspend, delay, or interrupt the Services of
CH2M HILL for the convenience of CITY. In such event,
CH2M HILL's contract schedule shall be equitably
adjusted.
6.7 No Third -Party Beneficiaries
This AGREEMENT gives no rights or benefits to anyone
other than CITY and CH2M HILL and has no third -party
beneficiaries,
6.8 Indemnification- See Supplemental Terms
6.9 Assignment
This is a bilateral personal Services AGREEMENT.
Neither party shall have the power to or will assign any
of the duties or rights or any claim arising out of or
related to this AGREEMENT, whether arising in tort,
contract or otherwise, without the written consent of the
other party. Any unauthorized assignment is void and
unenforceable. These conditions and the entire
AGREEMENT are binding on the heirs, successors, and
assigns of the parties hereto.
6.10 Reserved
6.11 Reserved
6.12 Jurisdiction
The substantive law of, the state of ARKANSAS, shall
govern the validity of this AGREEMENT, its
interpretation and performance, and any other claims
related to it. See SUPPLIMENTAL TERMS for venue.
6.13 Severability and Survival
6.13.1 If any of the Provisions contained in this
AGREEMENT are held for any reason to be invalid,
illegal, or unenforceable, the enforceability of the
remaining provisions shall not be impaired thereby.
613.2 Limitations of liability, indemnities, and other
express representations shall survive termination of this
AGREEMENT for any cause.
6,14'Materials and Samples
Any iterps, substances, materials, or samples removed
from thq PROJECT site for testing, analysis, or other
evaluation will be returned to the PROJECT site within
60 days of. PROJECT close-out unless agreed to
otherwise. CITY recognizes and agrees that CH2M HILL
is acting as a bailee and at no time assumes title to said
items, substances, materials, or samples.
6.15 CH2M HILL's Deliverables
CH2M HILL's deliverables, including record drawings,
are limited to the sealed and signed hard copies.
Computer -generated drawing files furnished by CH2M
HILL are for CITY or others' convenience. Any
conclusions or information derived or obtained from
these files will be at users sole risk.
FORM 390
FAYETTEVILLE AR 5/2010
6.16 Dispute Resolution
The parties will use their best efforts to resolve amicably
any dispute, including the possible use of alternative
dispute resolution options.
6.17 Ownership of Work Product and Inventions
All of the work product of the CH2M HILL in executing
this PROJECT shall remain the property of C112M HILL.
CITY shall receive a perpetual, royalty -free, non-
transferable, non-exclusive license to use the
deliverables for the general purpose of stormwater
management and the feasibility of the stormwater utility.
Any inventions, patents, copyrights, computer software,
or other intellectual property developed during the
course of, or as a result of, the PROJECT shall remain
the property of the CH2M HILL subject to the City's free,
perpetual, non-exclusive license to use for its purposes.
ARTICLE 7. ATTACHMENTS, SCHEDULES, AND
SIGNATURES
This AGREEMENT, including its attachments and
schedules, constitutes the entire AGREEMENT,
supersedes all prior written or oral understandings, and
may only be changed by a written amendment executed
by both parties. The following attachments and
schedules are hereby made a part of this
AGREEMENT:
Attachment A —RATE SCHEDULE
Attachment B—SCOPE OF WORK AND FEE
Attachment C—SUPPLEMENTAL TERMS
IN WITNESS WHEREOF, the parties execute below:
For CITY, CITY OF FAYETTEVILLE, ARKANSAS
dated this -4e& j% day of -KW , tt _ 2018
4
Signature Attest:
Name (printed) Lioneld Jo r Name Sondra Smith
Title Mayor Title City Clerk
0%111111111J."
RK �•Tve
����
For CH2M HILL, CH2M HILL ENGINEERS, INC., = Vi,�G�ZY OF'•G���I
dated this 10th day of MAY 2018 •p
o, =
Q
Signature ��i�7'• �RKANS, •' J�.�
G TO
Name (printed) art Jeffcoat, PhD
Title VICE PRESIDENT
FORM 396
FAYETTEVILLE AR 5018
Attachment A
Labor Rate Schedule
Functional Labor Category
2018 Rates'
Principal Manager/ Consultant
$225
Senior Technologist/ Consultant
$190
Senior Project Manager / Project Technologist
$175
Project Manager / Consultant
$160
Associate Project Manager / Consultant
$140
Project Engineer
$125
Associate Engineer/Consultant
$115
Staff Engineer / Consultant
$100
Engineer Intern / Scientist
$85
Designer / Tech / RPR - 5
$130
Designer / Tech / RPR - 4
$110
Designer / Tech / RPR -3
$90
Designer / Tech / RPR- 2
$80
Designer / Tech / RPR - 1
$70
Designer / Tech / RPR - 0
$60
Admin Staff II
$85
Admin Staff 1
$60
Notes;
1. The indicated labor rates are subject to escalation annually, beginning on
January 1st of each calendar year.
2. Vehicle mileage will be charged at the prevailing IRS rate.
3. Expenses and outside services will be billed at cost.
FRIDAY, MAY 11, 2018 FAYETTEVILLE AR SW FEASIBILITY STUDY
Attachment B - Scope and Fee for RFQ 18-02
Stormwater Utility Feasibility Study for the
City of Fayetteville, Arkansas
May 11, 2018
BS
OLSSON e, i
ASSOCIATES Iu��eunq su�uuu
SCOPE AND FEE FOR RFQ!a-72, STORI OIATER FEASIBILITY STUDY
ProjectApproach .... :................................................................................................................................... 3
StudyPhases......................................................................................................................................................... 3
StudyTeam....................................................................................................................................................... 3
EstimatedFee by Task................................................................................................................................3
Milestones..................................................................................................................................................4
Phase I — Scope of Services for Stormwater Feasibility Study.....................................................................5
Task1. Project Chartering.................................................................................................................................... S
Task 2, Stormwater Program Costs......................................................................................................................6
Task 3. Financial Planning and Rate Analysis....................................................................................................... 9
Task 4. Policy and Ordinance Development.. —.— ........................ .................................. ....... I........................... 11
Task S, Public Outreach and Education.............................................................................................................. 13
Task 6. Stormwater Feasibility Report............................................................................................................... 17
Task7. Project Management............................................................................................................................. 17
Task8. Additional Services.................................................................................................................................18
21
SCOPE AND FEE FOR RM 18 02, STORMWATER FEASIBILITY ST OY
Project Approach
The CH2M — McGoodwin Williams and Yates Team (the Team) is proud to submit this scope and fee to support
the City of Fayetteville (the City) in meeting its evolving stormwater management and flood prevention needs.
Our Team's extensive local experience and presence paired with our nationally recognized experts in the
development of stormwater utilities will cost effectively support the City in developing a program that reflects
the needs of Fayetteville residents, as well as its own drivers for enhanced stormwater management.
Study Phases
This scope of work represents Phase I of two phases, Phase I — Stormwater Feasibility Study, and Phase II —
Implementation, that would carry the City of Fayetteville through adoption of an ordinance for a stormwater
enterprise fund and initial billing. Since the scope and estimated fee for Phase 11 is dependent on the findings
of Phase I, a planning -level estimate is provided separately for Phase II.
Study Tearn
The Study Team will closely reflect that presented to the City of Fayetteville in the Statement of Qualifications
and interview:
!an Ulmer. PE
Lan Oste+void. PE
Laurem van der Tak, O. WRE
Steve M,1*1 Michael Natbchich
Chr� Brackett. PE. CFM "dh 8ishtoo
Chars Hail, PE
Estimated Fee by Task
CITY OF
FAYETTEVILLE
ARKAN
ApKANSAS
Heather Dyke, AICP
Mahael Matxhrch
6:Policy and Ordinance Tas k S: Public Outr eaih and
Development Education
t.
s. [_
Table 1 summarizes the Study Team's estimated fee by task for the services described herein.
TABLE 1. ESTIMATED FEE BY TASK
Task#
Task
Phase I: Feasibility Study
Task 1
Chartering
$ 9,370
Task 2
Stormwater Program Costs
$ 43,618
Task 3
Financial Planning and Rate Analysis
$ 34,410
Task 4
Policy and Ordinance Development
$ 24,365
Task 5
Public / Stakeholder Education and Outreach
$ 57,939
Task 6
Stormwater Feasibility Report
$ 32,800
Task 7
Project Management
$ 10,920
Task 8
Additional Services
$ 15,800
Total Fee
$ 229,222
31
SCOPE AND FEE FOR RFQ 18-02, STORMWATER FEASIBILITY STUDY
Milestones
Table 2 outlines the key milestones for both phases, Phase I (a) — Stormwater Feasibility Study in 2018 and
2019, and Phase It (b) — Implementation in 2019 and 2020, that would carry the City of Fayetteville through
adoption of an ordinance for a stormwater enterprise fund and initial billing
Table 2. Key Milestones
Phase I Mllestone Anticipated Schedule (2018 - 2019)
Notice to Proceed (NTP)
June 2018
Chartering Workshop with STAC and Special Council Committee
June
• Prepare Stormwater Program Needs and Extent of Service Analysis
• Prepare Preliminary SW Billing Database Estimates (City GIS)
June to August
Special Committee Meeting #1- Stormwater Program Needs and Extent of Service
Analysis
August
Special Committee Meeting #2 - SW Program LOS / EOS and Credit Options
Early December 2018
Special Committee Meeting #3 - SW Billing and Financial Planning Options
January 2019
Special Committee Meeting #4 - Final Draft Stormwater Feasibility Study Report
February 2019
Final Stormwater Feasibility Study Report and Project Close-out
March 2019
4
SCOPE AN F—Eir MR €iFQ I8-02, SIORRAWA'ER FE°wSIFII I TV STUDY
Phase I — Scope of Services for Stormwater Feasibility Study
The following subsections describe the Team's technical approach for Phase I, which is organized into the seven
major tasks listed in Table 3. Table 3 provides a crosswalk between this scope and fee and the original scope of
services provide in the January 2018 RFP.
Table 3. Cross Walk to Original RFP
Task #
Task
January RFP Scope Items
Task 1
Chartering
a- and b.
Task 2
Stormwater Program Costs
c and d
Task 3
Financial Planning and Rate Analysis
e.
Task 4
Policy and Ordinance Development
f., g., and h.
Task 5
Public / Stakeholder Education and Outreach
b. and I.
Task 6
Stormwater Feasibility Report
j.
Task 7
Project Management
Task 8
Additional Services
I.
The deliverables and assumptions for Phase I are summarized in Table 4. It is the Team's understanding that the
City will self -perform the following services:
• Facilitate meetings with various departments to discuss funding needs and potential involvement in the
program (Task S).
• Provide information previously developed by City Staff regarding the creation of a utility (Task 1).
• Conduct public involvement meetings and public hearings as required (Task S).
• Aerial mapping of impervious surfaces in GIS format (Task 3).
Task 1. Project Chartering
The Team will meet with the City to fully develop the scope of services prior to the final notice to proceed
therefore Task 1, Project Chartering task will focus on:
• Establishing a Strategic Vision and Goals for Fayetteville's Stormwater Feasibility Study
• Study and Schedule Overview
• Review draft Public Engagement Plan
• Establish and charter Staff Technical Advisory Committee (STAC)
• Distribute Initial Request for Information for Feasibility Study
A key component of the draft Public Engagement Plan will be the development of an integrated implementation
schedule for staff review. As illustrated in the Proposed Project Approach, the goal and intent is to involve
internal (Mayor, Council, special Committee, STAC) and external stakeholders in each of the major decision
51�
FEE FOP RFQ1 '8-C1 , � . UPAVVVAT v __i:AS1>3[y{I Y 5 JIM
points:
• `There will Fayetteville provide stormwater services (extent of service) and what services will be provided,
where and at what frequency (level of service)?
• What mix of funding options does Fayetteville prefer for each of the services provided (i.e. operation and
maintenance, flood prevention and capital improvements)?
• If a stormwater fee is used to fund these services, what rate structure best suits Fayetteville?
• Will debt service be considered or is a pay -go model preferred?
• How can a Stormwater Credit System be structured to encourage proactive and progressive stormwater
management practices in Fayetteville?
To ensure maximum participation by stakeholders, the Team will work with the City to establish a schedule that is
cognizant of the University of Arkansas academics and sports as well as other major initiatives being coordinated
by Fayetteville such as the April 2019 bond vote to fund drainage capital improvements,
Deliverables
1. Prepare draft Chartering workshop agendas and presentations for staff review
2. Prepare draft integrated implementation schedule reflecting draft Engagement Plan.
3. Prepare Initial Request for Information for Feasibility Study
4. Facilitate Project Chartering workshop with STAC (day 1)
5. Facilitate Special Committee Meeting #1- Vision / Goals, Engagement Plan and Study Overview (day 2)
6. Meeting Summary of Project Chartering workshop
Assumptions
• Fayetteville staff will facilitate the selection of the STAC and ongoing scheduling logistics of STAC meetings.
• 2-3 representatives of the CFI2M — MWT team will be present for the Project Chartering workshop (day 1).
• 1 representatives of the Team will be present for Special Committee Meeting 41 - Vision / Goals, Engagement
Plan and Study Overview (day 2).
i All other fees related to the Team attending internal and external meetings can be found under Task S.
Task 2. Stormwater Program Costs
Task 2, Stormwater Program Costs includes services related working with STAC to perform a needs analysis, and
assisting with development of the following program components:
Assist in defining the appropriate level of service (LOS) and scope of the system to be maintained as public. A
range of service levels should be developed for consideration by the City Council
Aid in the development of a maintenance and capital improvement plan
Determine staffing requirements and organizational structure
61
MOH AN[I FEE N;IiiiFs_),15-0Z,S'rJRM,A)A'ERFrrAS, IF31i.1I'Y51U Y
As part of Task 2, the Team will work with the STAC (STAC meeting #1) to perform a stormwater needs analysis
that integrates regulatory drivers, such as the City's MS4 permit, recent flood study updates, flood or drainage
service calls, system renewal or replacement needs, and stakeholder feedback. This analysis will define additional
stormwater services expected of Fayetteville, such as those identified in a 2015 ADEQ MS4 audit that all outfalls
must be screened once every five years, sampling results should be included on annual reports, stormwater
pollution prevention plans (SWPPPs) must be completed, and staff training must be provided for all facilities
under City oversight. STAC (STAC meeting #1) will start to bracket the range of service options included in Task
2.1.
Task 2.1 Definition of Extent of Service and Level of Service.
This subtask includes determining what parts of the system the City maintains, or extent of service (EOS), and
what services the city provides within this area (LOS); these critical initial decisions will set the baseline for the
program. To date, the City has not had a dedicated funding source for stormwater services, and the LOS has been
limited to meeting basic regulatory requirements and responding only to emergency repairs. Activities performed
under the proposed LOS will address aging infrastructure, provide a proactive inspection and maintenance
program, and enable improved response to citizen calls.
A preliminary draft range of stormwater service levels will be developed for the City's consideration, such as a
basic (current), standard, and proactive LOS, for at least a 5-year planning cycle.
Baseline — Existing conditions
—ry,, .- t,. r
.iid�ivaiu—riuviuc lull ivies-+, �uiuNiia�i�c niiu �uiiciy ic�}.wiuc iu uiauiagc uauc� vviu:i iiiin�cu niUiicy iUi
innovative practices or sustainable stormwater / watershed improvement projects.
Proactive - Provide full MS4 compliance and timely response to drainage issues and active flood prevention
program with the potential for buyouts as well as a focus on innovative, sustainable stormwater / watershed
improvement projects.
Three preliminary draft EOS options will be developed for the City's consideration, such as:
• Baseline — Existing conditions, Fayetteville maintains the public MS4 (roads and right of ways) and the limited
private stormwater infrastructure with drainage easements.
• Standard — Baseline plus public maintenance to the upstream end of the first connected private structure.
• Proactive — Standard, plus those creeks / stormwater conveyances that drain areas greater than X acres.
Draft programmatic cost estimates for these LOS / EOS options will be tabulated (over 5 years) for up to 6
program areas, i.e. cost centers, such as, operations and maintenance, program administration / customer
service, compliance and inspections, stormwater planning and capital improvements program (CIP). As part of
Task 2.1, the Team will facilitate feedback from the STAC (STAC meeting #2) and the Special Committee
(committee meetings 41 and #2) on these preliminary Draft Stormwater LOS / EOS options.
7)
SCOPE. A;Pdn F,.E. ROR R.FQ 18-02, STQRMWATF.R FEASIBI1rrr STUDY
Task 2.2 Programmatic Stormwater 0 & M and Capital Improvement Plan.
Given available resources, the current program has focused on meeting regulatory requirements; any major
stormwater infrastructure projects have been budgeted as specific capital improvements. This task will
summarize the City's existing stormwater management, drainage improvement and capital improvement
planning efforts so the team can support the City in determining the optimal LOS, as well as funding sources for
these activities. The resulting draft Programmatic Stormwater 0 & M and Capital Improvement Plan will provide a
high-level path forward for the more detailed master planning and prioritization efforts that would be needed
should a fee be implemented.
As part of Task 2.2, City Council will be briefed on a final draft of the Stormwater LOS / EOS options and draft
Programmatic Stormwater 0 & M and Capital Improvement Plan. Feedback from Council will be used to generate
SW Policy Paper #1- SW Program Costs (EOS and LOS) as part of Task 4 that will be used throughout Task 5 to
communicate with internal and external stakeholders. Stakeholder preferences regarding these LOS / E05
options will be documented in Task 6 as part of the Stormwater Feasibility Study.
Task 2.3 Staffing requirements and organizational structure.
As part of Task 2.3, the Team will support Fayetteville and the consultant selected for RFP 18-03, Organizational
Development Consultant, in identifying staffing requirements and potential organizational structures. The Team
will solicit initial feedback from the STAC (STAG meetings 41-2) and the Special Committee (committee workshop
#2) on the range of organizational options to be vetted by Feasibility Study. STAC Meeting #4, Draft SW Credit
Program and Financial Planning, will summarize these staffing requirements. After completion of Task 2.2, the
Team will prepare a draft section of the Feasibility Study presenting an analysis of these organizational options,
which could range from a new stormwater organization to a matrixed organization that leverages existing
resources and sharing of expertise between City departments.
Deliverables —
1. Materials for STAC meeting 41— Stormwater Needs Analysis and SW 0 & M and Capital Improvement
Planning, based on Strategic Vision and Goals from Project Chartering Workshop
2. Preliminary Draft LOS / EOS options, including a basic (current), standard, and proactive LOS, for at least a 5-
year planning cycle. Draft programmatic cost estimates for these LOS / EOS options will be tabulated (over 5
years) for up to 6 program areas.
3. Materials for Special Committee workshop 41 on Stormwater Program Needs and Extent of Service Analysis
4. Draft Programmatic Stormwater 0 & M and Capital Improvement Plan with a description of the City's existing
stormwater management, drainage improvement and capital improvement planning efforts as well as a high-
level path forward for the more detailed master planning and prioritization efforts that would be needed
should a fee be implemented.
S. Materials for STAC meeting #2 and Special Committee workshop #2 on Preliminary Draft Stormwater LOS /
EOS options
6, Draft Stormwater Program Cost and Programmatic Stormwater 0 & M and Capital improvement Plan sections
for Feasibility Study.
a
SCOPEAMD C.E.F:^RFIF: ]0^07,STO^,P,1W,T:Et> ASIEIL€7Y5€t.�Jr
Assumptions —
• Meeting attendance and coordination is included in Task 5. Public Education and Outreach.
• Definition of the City of Fayetteville's current stormwater MS4, level of service and extent of service will be
based on readily available information provided by the City.
• Feedback from STAC Meeting #2 and Special Committee Meeting #2 will be used to generate SW Policy Paper
# 1- SW Program Costs (EOS and LOS) part of Task 4 that will be used throughout Task 5 to communicate with
internal and external stakeholders.
• All draft task documents will be finalized as part of Task 6, Stormwater Feasibility Study.
• To the extent practical, one set of consolidated and adjudicated comments from Fayetteville staff are
appreciated.
Task 3. Financial Planning and Rate Analysis
Task 3, Financial Planning and Rate Analysis includes services related to the funding components of the Study:
• Work with STAC to determine financial needs for which the funds from the storm water utility fee may be
used,
• Assist in determining a reasonable rate model for residential uses,
• Assist in determining a reasonable rate model for commercial uses,
• Ensure rate models selected will meet the financial needs of the program. This item should include a detailed
5-year cash flow analysis at minimum. A range of fees corresponding to various levels of service is expected.
• Consult with City's GIS division to develop compatible parcel -based stormwater utility layers for identification
of rates and to aid in the billing process,
• Identify alternative billing and collection options with pros and cons of each alternative,
• Financing Options should the City so choose to try and finance a portion up front.
Task 3 will provide financial planning, rate analysis, and billing support to the City of Fayetteville as it assesses the
feasibility of a stormwater utility. This task will use an iterative process to help the City identify the right balance
of stormwater services, given its financial capacity and stakeholder priorities.
Task 3.1 Financial Needs Analysis.
As part of Task 3.1, the Team will help the City and the STAC identify the revenue necessary to adequately fund
the stormwater program options using a pro forma financial spreadsheet model (financial / rate model)
developed in this task. STAC meeting #1—Stormwater Needs Analysis will also serve as a forum for defining the
overall structure of the model to ensure it reflects any financial inputs or assumptions unique to the City of
Fayetteville. The financial model will be used to evaluate the feasibility of achieving the desired EOS/LOS options
based on an assessment of willingness to pay determined through the public engagement outlined in Task S.
The LOS / EOS cost estimates developed in Task 2.1 and preliminary stormwater billing database estimates
generated by the City's GIS division, with support from the Team in Task 3.2, will be used as inputs to the model.
The model will provide a detailed S-year cash flow analysis and planning level projections over a longer timeframe
with financing options should the City be interested in exploring the use of stormwater debt financing to enable
faster implementation of capital needs or to leverage the fee program to accomplish affordability objectives. The
results of Task 3.1 will be presented as the Draft Financial Needs Analysis and Planning section for stakeholder
feedback as part of STAC Meeting #3 and Special Committee Meeting #3.
9�
SC( PE ANn FFF FOR i)A 22-W, STORfUAWER rEASIBIL T:.l' STi} )Y
Task 3.2 Stormwater Billing Approach and Database.
As part of Task 3.2, the Team will support the City GIS Division in developing a preliminary stormwater billing
database using Fayetteville's existing parcel and pending impervious data layers. Ideally, this preliminary
stormwater billing database will include:
• Parcel Identification Number
• Ownership
• Ownership type
• Utility Customer Code, Land Use Code or similar information to support a crosswalk to general billing classes
and potential residential tiers.
• Estimate of all impervious surfaces within parcel.
To do so, the Team will facilitate 3 conference calls in addition to interactions as part of the STAC, with GIS
division staff to identify the City's preliminary stormwater billing database approach. This subtask will also
identify the most cost-effective stormwater billing mechanism for Fayetteville. It will assess the most practical
approach for the City given relevant factors such as the capability of the software systems used to issue utility bills
and property tax bills to accommodate additional charges such as the stormwater fee program. Based on this
assessment, a draft Stormwater Billing Approach will outline alternative billing and collection options with pros
and cons of each mechanism. STAC Meeting #3 and Special Committee Meeting #3 will be used to present the
pros and cons of billing via annual property taxes, monthly utility bills or via a separate stand -along bill. Feedback
from these internal stakeholders will be used to generate SW Policy Paper #3 — Billing Options as part of Task 4
that will be used throughout Task 5 to communicate with internal and external stakeholders. Stakeholder
preferences regarding these stormwater billing options will be documented in Task 6 as part of the Stormwater
Feasibility Study,
Task 3.3 Stormwater Rate Analysis.
The stormwater rate analysis will use the financial model developed in Task 3.1 to help Fayetteville assess the
most suitable rate structure to meet its stormwater financial needs in an equitable manner and consistent with
the complexity of Fayetteville's customer base and stormwater system. As part of this task, the Team will help the
City and STAC weigh the benefits of a series of rate structure alternatives against the implementation costs of
developing and maintaining each alternative on an ongoing basis. The stormwater rate analysis will consider a
range of reasonable residential and commercial fees corresponding to the LOS / EOS options developed in Task 2.
For the purposes of this proposal, commercial properties are assumed to also include public and institutional
properties, such as the University of Arkansas and Fayetteville public schools.
The rate analysis will consider alternatives such as whether residential properties should be charged a flat rate or
a tiered rate. While a flat rate is easier to administer, a tiered rate tends to be more equitable, recognizing that
smaller, single-family properties contribute less stormwater and thus should pay less than larger single-family
properties, which place a greater burden on City's system. However, the more tiers there are, the higher the
administrative cost and the greater likelihood of categorizing properties into the wrong tier, resulting in a higher
number of appeals of bills. By studying the distribution of Fayetteville's single-family homes, the Team will help
the City develop a structure that is legally defensible, while minimizing administrative burdens.
101
Ci'L PdI} L -OR: QI8-011.,S-T0Re1WA1eR E SIBI ITYSTUN
STAC Meeting #4 and Special Committee Meeting #3 will be used to present the draft results of the Stormwater
Rate Analysis. Feedback from these internal stakeholders will be used to generate SW Policy Paper #2 - Rate
Structure and Credit Options as part of Task 4 that will be used throughout Task 5. Stakeholder preferences
regarding these stormwater rate structures will be documented in Task 6 as part of the Stormwater Feasibility
Study
Deliverables —
1. Stormwater pro forma financial spreadsheet model (financial / rate model) with a detailed 5-year cash flow
analysis and planning level projections over a longer timeframe.
2. 3 conference calls with GIS division staff (in addition to interactions as part of the STAC), to identify the City's
preliminary stormwater billing database approach.
3. Draft Stormwater Billing Approach section for STAC Meeting #3 and Special Committee Meeting #3
4. Draft Financial Needs Analysis and Planning section for STAC Meeting #4 and Special Committee Meeting #3
5. Draft Stormwater Rate Analysis section for STAC Meeting #5 and Special Committee Meeting #3
Assumptions
• The City GIS Division will be responsible for developing a preliminary Stormwater billing database as part of
Task 3.2 using Fayetteville's existing parcel and pending impervious data layers. This is a critical path item
with the potential to delay later tasks.
• Feedback from STAC Meeting #4 and Special Committee Meeting 43 will be used to generate SW Policy Paper
H L JVV (tale )LFULLUI e dnp VIIIIng Upuuns ds pJad L ui dds.k 4 LflaL wIii ue USeu udduugiIOU L i dsk SLu
communicate with internal and external stakeholders.
• Feedback from STAC Meeting #4 and Special Committee Meeting #3 will be used to generate SW Policy Paper
#S - SW Financial Planning
• Stakeholder feedback will be documented in Task 6 as part of the Stormwater Feasibility Study.
Task 4. Policy and Ordinance Development
Task 4, Policy and Ordinance Development, includes services related:
Assist with policy development- Aid in the identification the program mission and priorities and develop
policies consistent with those principles.
Assist with the development of policies for credits and appeals -
o Assist in determination applicable credits for commercial and residential uses and how the credits will
be applied,
o Assist in the determination of applicable credits for development projects and how the credits will be
applied,
o Assist with development of a Customer Appeals Process
Assist with Ordinance Development and Revision - Assist in determining legal requirements for creating the
program should the City decide to move forward
SCOFF AND FHE FOR R= Q 15-02; STOR r WA"E s HAS01111Y STUDY
Implementation of an enhanced stormwater management program would require developing and defining
specific policies and procedures to facilitate effective operations and to communicate to stakeholders exactly
what is covered in the program and where Fayetteville provides services. As part of Task 4, the Team will work
closely with the City's legal staff to develop a series of stormwater utility policy papers tailored to the City's
stormwater needs, while reflecting the foundational legal requirements for defensible fee outlines. If warranted,
the Team will augment the City's extensive experience with our national resources to develop a corresponding
ordinance establishing a stormwater enterprise fund.
Task 4.1 Policy Development
First the Team will work with the STAC to develop a list of key policy issues such as:
Cost of Stormwater Services: what mix of stormwater services is the City and its stakeholders willing to fund?
The cost of various LOSs can be identified and presented to support the feasibility process.
Stormwater Rate Structure: is there sufficient variation in the characteristics of single-family residential
properties to merit some distinction in rate structures (e.g., for townhouses, for large, medium and small
single-family homes)?
Credit and Appeal Policies: should credits and exemptions be limited to properties that install onsite
stormwater management facilities? Should credits be provided to customer groups in exchange for in -kind
services, such as environmental education that helps meet the City's MS4 permit requirements (e.g., schools,
churches)?
Based on this list of policy issues and initial public engagement efforts, the Team will develop brief policy papers
as part of Task 4. Up to five policy papers would be developed to describe the issue, alternatives, concerns and
benefits, and recommendations.
Task 4.2 Credit and Appeal Policies
As part of Task 4.2, the Team will support Fayetteville with determining the applicable range of credits available to
residential and non-residential customers and how these credits would be applied. STAC Meeting #4 and Special
Committee Meeting #2 will be used to review the "universe" of credit options encompassed by the City's
Drainage Manual and Ordinances as well as innovative credits to raise stakeholder awareness and encourage
innovative practices. Feedback from these stakeholders will be used to generate SW Policy Paper #3 - Credit
Options that will be used throughout Task 5. Stakeholder preferences regarding these stormwater rate structures
will be documented in Task 6 as part of the Stormwater Feasibility Study. The Team will also outline a draft
Customer Appeals Process that is easily understood and consistent with the appeals process used for the City's
other fees.
Deliverables —
Up to 5 Stormwater Policy Papers, each generally 2 pages, color with a graphic content meant for external
stakeholders.
a. SW Policy Paper #1 - SW Program Costs (EOS and LOS)
b. SW Policy Paper 42 - SW Rate Structure and Billing Options
c. SW Policy Paper #3 - SW Credit Options
d. SW Policy Paper #4 - SW Customer Service (Appeals and Exemptions)
e. SW Policy Paper #5 - SW Financial Planning
2. Draft Stormwater Policy section of the Stormwater Feasibility Study
12
SCOPE AN? FE.F F ,.R RrQ LR 7, S'€-`RF.AVA `LP FYASiS f rl'r 5 IOV
Task 5. Public Outreach and Education
The Team understands that Fayetteville's goal is to reach as many people as possible throughout the public
engagement process. The Team will work with Fayetteville's Communications and Marketing Department and the
Media Services Division to support the implementation of a robust and innovative public engagement process
that reflects the City's long history of reaching out to its citizens. To do so, the Team's role in Task S is to develop
a Public Engagement Plan, develop the technical content and materials appropriate to each stakeholder audience
and outreach method (presentations, media content, stormwater utility toolkit), and assist City staff with
implementation of the Plan. The Public Education Plan will articulate how the public and stakeholders will be
provided opportunities to vet the analyses and policy choices developed in Tasks 2, 3 and 4, at each step of the
way. For example, Task 4 Policy and Development, proposes a series of policy papers for use in Task 5. Further,
Fayetteville's 2017 Strategic Planning Report articulates City Council's focus on communications and community
engagement'. It identified the following means for implementation which integrate into development of the
Public Engagement Plan:
• Improvements to City's communications initiatives — expanding channels
• Newsletter
➢ Review of effectiveness and transforming format
• Digital and social media
• More mobile workshops
• Website
• User-friendly methods of obtaining information
• tmoracing tecnnology, pilot programs ana prototyping
■ Staff concierge
■ Communications between department heads to address issues of "siloed departments"
• Citizen committee reviews
This focus is consistent with the stakeholder approaches implemented by other similarly sized communities. A
recent survey of 13 communities identified the following key lessons:
• Proactively engage stakeholders on all sides of the issue, those that support developing a stormwater funding
program as well as those that oppose it.
• Foster deliberation and exchange of ideas among stakeholders with many points of view.
• Make a locally -compelling case that a stormwater funding program meets a critical need.
• Demonstrate the cost-effectiveness of the funding approach,
• Demonstrate that the proposed approach is the most equitable, i.e. those that generate the most
stormwater, pay the most.
• Use several forms of proactive outreach.
• Recognize that despite outreach efforts, the first bill arriving in the mail will be the first time many people
become aware of the new fee —be responsive and flexible through the first few billing cyclesz.
1 InVerltas. 2017. Strategic Planning Final Report 2017. March 2017.
2 US EPA. 2013. The Role of Public Outreach and Stakeholder Engagement in Storm water Funding Decisions in New England,
13 1
SCO?e. Arvo r;F Fo,i F.FQ STOF:hiL" A _ > = s I IL I.Y > LJUY
It is the Teams understanding that the City of Fayetteville plans to acquire one of many online public engagement
tools available to provide a new and innovative ways to involve stakeholders in the feasibility study process. The
Team will work with City staff to develop applications that utilize the software ultimately purchased.
Task 5.1 Public Engagement Plan
To assist Fayetteville with its public outreach and education efforts, the Team will first work with staff to develop
a draft public engagement plan for review during Task 1, Project Chartering. As part of an initial Project
Chartering Workshop, we will charter the Staff Technical Advisory Committee (STAG), facilitate a discussion of
Fayetteville's Stormwater Program Strategic Visions/Goals, and review the draft public engagement plan. With
feedback from Fayetteville's internal (elected and staff) stakeholders during chartering, the team will finalize the
Public Engagement Plan for use throughout the Study. The draft Public Engagement Plan will address each of the
components as described further below:
I.Stormwater Program Strategic Visions/Goals
II.ldentify and Charter Stakeholders
Ill.ldentify and Establish Outreach Methods
IV.Identify and develop technical content and materials appropriate to each stakeholder audience and
outreach method (presentations, media content, stormwater utility toolkit)
V.Provide a detailed implementation schedule
Stormwater Program Strategic Visions/Goals
As part of the Task 1, Chartering, the Team will facilitate a discussion of Fayetteville's Strategic Vision / Goals for
its Stormwater Program, in general, and the Stormwater Feasibility Study. The discussion will validate the Team's
understanding of City Councils' Fayetteville Vision 2050 (To keep Fayetteville a vibrant and welcoming city that
encourages diversity, creativity, and innovation while providing our citizens the opportunity to thrive) and its
eleven guiding principles. The Team will reference these principles while facilitating a discussion of Fayetteville's
Strategic Vision / Goals for its Stormwater Program.
Identify and Charter Stakeholders
It is the Team's understanding that the following audiences can be considered the primary internal and external
stakeholders:
• Stakeholders (Internal)
o Elected Officials (Mayor and Council)
o Staff
Stakeholders (External)
o General Public (neighborhood groups, homeowner's associations, civic groups)
o Key Stakeholders (Large and / or new Customers, such as the University of Arkansas, Lindsey &
Associates, Fayetteville Public Schools, etc.)
o Targeted Stakeholders (business community, faith community, nonprofits, low-income advocates,
environmental groups, etc.)
14 (
VWP :.AND VR. FOH? Rf G 1)8.07, SIQRMVVAY[:,'1 r.FAS >s )_IT'S`: ;i)'ti
As part of development of the draft Public Engagement Plan, the Team will work with the City to identify each of
the City's external stakeholders and link the appropriate outreach methods to each group. The Team intends to
ensure both stakeholder groups are chartered for involvement in the Feasibility Study and are adequately
educated on technical subjects in sufficient detail to enable meaningful input to the decisions on key issues such
as range of services addressed, level of service provided, and extent and nature of credits provided.
ldt ntify and cstobhsh outreach Methods
The stakeholders above will be reached using a variety of proven and innovative methods, such as the
EngagementHQ tools noted above. The Team will work with Fayetteville's Communications and Marketing
Department and the Media Services Division to develop the technical content and materials appropriate to each
stakeholder audience and outreach method.
Task 5.2 Meetings, Workshops and Briefings
The Team will engage internal and external stakeholders via a variety of in person meetings, workshops and
briefings of:
1) Council and TBD Committee
2) Staff Technical Advisory Committee (STAC)
3) Key Stormwater Stakeholders
4) Public Meetings
Elected officials will be briefed either through the newly appointed mayoral subcommittee presentations or full
Council presentations at key steps in the evaluation of policy options. In general, it is recommended that the
Council be briefed once before the start of the stakeholder engagement process and once at the end, before
launching the wider stakeholder engagement process.
Experience in successfully evaluating and implementing other stormwater utilities suggests that interactive and
transparent engagement with both internal and external stakeholders early on, as well as elected officials leads to
success. The Team will support the City with the development of the Staff Technical Advisory Committee (STAC)
as part of Task 1. The STAC should be composed of internal stakeholders representing a cross-section of the
City's departments, whose goal will be to help make staff recommendations on the important components of the
program, as analyzed in Tasks 2, 3 and 4. Up to 6 STAC workshops of 4 hours each are assumed to be included in
Task 5, The Team will work with City staff to develop a list of key groups for focused stormwater stakeholder
outreach and engagement. The Team will provide technical materials to support 3 rounds of focused outreach by
City staff during the Study, generally anticipated to address: Stormwater 101 / FAQ Funding Needs / Level(s) of
Service and Credit and Appeals.
Task 5.3 Develop Technical Content and Materials
The Team will work with Fayetteville's Communications and Marketing Department and the Media Services
Division to develop digital tools for use online and in meetings / workshops. The purpose of these tools will be to
educate stakeholders about stormwater funding alternatives, level of service and credit options while providing
them with a meaningful opportunity to log their preferences and willingness to pay for various levels of service.
FCGP;. AND F%` QR R.FQ 12 oi, STORNIV AT0r fUS[BIOY -STUDY
As needed, our stakeholder team stands ready to support City staff with additional technical analysis by providing
qualitative research from interviews with key leaders, targeted focus groups with community networks, media
analysis, formal or informal surveys, website feedback analysis, elected official interviews, and more, as needed.
We can review already -available data from community surveys or customer information, looking for sensitivities
(cultural, socio-economic, religious), community concerns (environmental, safety, economic, lifestyle), or rate
imbalances that could can provide baseline information on which amenable public policy is based.
As part of the Stormwater Utility Toolkit, the Team will utilize the technical content developed through the
technical analyses in Tasks 2, 3 and 4. This material will be tailored to each stakeholder audience and outreach
method (presentations, media content, stormwater utility toolkit). The Team suggests:
• Stormwater Utility Toolkit with technical content and materials. Provided online, as appropriate, and via
hardcopies depending on stakeholder demographics.
o External Toolkit - FAQs, Factsheets, Policy Papers
o Internal Toolkit — External materials plus talking points and City Council Ward -specific maps of
stormwater issues that build on those illustrated in the 2018 Drainage Improvement Plan.
• PowerPoint presentations to support 3 rounds of focused outreach by City staff during the Study, generally
anticipated to address: Stormwater 101 / FAQ, Funding Needs / Level(s) of Service and Credit and Appeals.
• Wikimaps Online Mapping Tool (see Task 8, Additional Services)
• Stormwater Needs and Priorities Survey of Stakeholders (see Task 8, Additional Services)
Passive Methods
• Fayetteville Website - Use the existing Stormwater feasibility study page on Fayetteville website,
http://www. iyttevilie-ar.gov_J3328/5rormwater•Utility-SW2 or establish a dedicated Stormwater Master
Planning page on http://www.favetteviile--,i.r,,gq�1.308G/Master-Plans 308G/Master-Plans or convert the Drainage Master Plan
page.
Social Media postings
NotifyMe Listsery e-mails
o Create a new NotifyMe ListSery group (ht[ s: fye.acwdle-ar.eov/list.aspx) for the Stormwater
Feasibility Study
o Use the NotifyMe Media Releases and Public Meetings list to engage the general public the SW
Feasibility Process.
Deliverables —
1. Draft Public Engagement Plan
2. Final Public Engagement Plan
3. Meetings, Workshops and Briefings.
a. City Leadership Briefings: Presentation materials and 1 team members for up to 3 Mayoral or Special
Committee Meetings.
b. Staff Technical Advisory Committee Meetings: Meeting materials and 1 team members for up to 6
STAC Meetings
c. Meeting materials and 1 team members for up to 3 SW Public Meetings
4. Technical Content and Materials.
a. 3 presentations for use in Stormwater Stakeholder Targeted Outreach Activities
161
K-OPE ANO FC_ OR €TQ ld•C i, STOR€ MATE-F FEASIB1_1": 11UDY
b_ Stormwater Utility Toolkit with technical content and materials. Provided online, as appropriate, and
via hardcopies depending on stakeholder demographics.
i. Branding Logo after completion of Task 1.
ii. External Toolkit - FAQs, Factsheets, Policy Papers
iii. Internal Toolkit— External materials plus talking points and City Council Ward -specific maps
of stormwater issues that build on those illustrated in the 2018 Drainage Improvement Plan.
Assumptions -
• The CH2M / Olsson Team will facilitate internal stakeholder meetings and workshops.
• Staff with Fayetteville's Communications and Marketing Department and the Media Services Division will
facilitate external meetings and support the internal implementation of the technical content provided by the
CH2M / Olsson Team.
Task 6. Stormwater Feasibility Report
Task 6, Stormwater Feasibility Report includes services related to preparation of a report summarizing the results
of the study, accompanied by a programmatic implementation plan. Together, these documents will provide the
City with the roadmap to implementation, if developing a stormwater utility fee is deemed to be beneficial to the
City, An initial draft of the feasibility report will be prepared and reviewed with City staff and the STAC while a
final draft will be the basis of a presentation of the completed study to the Mayor and City Council. The final
Feasibility Study report will integrate these subsequent final comments.
Deliverables —
1. Initial Draft Stormwater Feasibility Report
2. Draft Stormwater Feasibility Report
3. Final Draft Stormwater Feasibility Report
4. Final Stormwater Feasibility Report
S. Summary of Stakeholder Comments on Final Draft Stormwater Feasibility Report
Assumptions -
All draft task documents will be finalized as part this Task 6, Stormwater Feasibility Study.
To the extent practical, one set of consolidated and adjudicated comments from Fayetteville staff are
appreciated.
Task 7. Project Management
Task 7 includes the work related to the management, administration, and coordination of the Teams activities
during this scope. This includes managing and coordinating project resources and responsiveness consistent with
the schedule and budget. Specific activities conducted by the CH2M — MWY Team will Include:
• Project Work Plan. Prepare a project work plan within seven days after the Notice to Proceed. The plan will
identify project scope, individual work elements, budget for each element, responsible individuals for each
work element, staffing plan and schedule. The plan will include the communication plan for the project to be
17
SC::PE AND £ EE Po£i RFC! 18-u2, 57"OEsio WATER rVASIBI 1Ty STUDY
used between Team, Fayetteville and other stakeholders. The project work plan will be submitted to the City
for its use.
Project Conference Calls. CH2M — MWY Team will coordinate monthly project conference calls as needed
with City of Fayetteville staff. The purpose such calls is to coordinate project activities for continued
progression of assigned work.
Project Schedule. The Team will prepare a schedule within S days of Notice to Proceed and will provide it to
the City for tracking purposes. Schedule updates will be prepared on an as needed basis.
Project Cost Control/Progress Reporting: The CH2M — MWY Team will prepare monthly project status reports
that compare work accomplished with scheduled activities, provide support documentation for invoices,
compare expenditures with task budgets, and describe changes to the scope that have occurred.
Documentation will include details of expenditures on each task and will show the hours worked by pro iect
personnel and other direct expenses related to the task. The status report including tasks completed and any
changes to the scope of services will be presented at the end of each month. All monthly reports will then be
submitted to the City with the monthly invoices.
Deliverables -
1. Project Management Plan and internal CH2M — MWY Team kickoff meeting.
2. 12 monthly invoices and progress reports.
3. Monthly status meetings, including meeting preparation, updated schedule, and meeting summary.
Assumptions --
A period of performance not to exceed 18 months.
It is assumed that all deliverables will consist of no more than 2 drafts and 1 final.
Task 8. Additional Services
Task 8, Additional Services includes services that are not essential to developing the Feasibility Report itself.
Therefore, the Team will implement these additional services at the discretion of the City. Other services relate
to moderating STAC meetings, assisting with a Stormwater Organizational Analysis, additional report preparation,
or additional presentations to regional and local entities. Task 8 currently includes the development of a
Wikimapping.com Stormwater Mapping Tool to solicit stakeholder feedback regarding the extent and character of
stormwater and drainage challenges. Additionally, a Stormwater Needs and Priorities Survey of Stakeholders will
be developed for the City of Fayetteville to administer.
Deliverables -
1. Additional Technical Content and Materials.
a. Wikimapping.com Stormwater Mapping Tool
b. Stormwater Needs and Priorities Survey of Stakeholders
Assumptions -
• Staff with Fayetteville's Communications and Marketing Department and the Media Services Division will
support the internal implementation of the technical content provided by the CH2M / Olsson Team.
• City staff will administer the Wikimapping.com Stormwater Mapping Tool including the compilation and
analysis of stakeholder data points collected as part of their engagement.
18
`.,t:OPF AND r+:E FOR RPQ lE 02, STrlfi7bMA iER FEA-S[RILl7-V STUDY
TABLE 4. DELIVERABLES AND ASSUMPTIONS: PHASE I-STORMWATER FEASIBILITY STUDY
Task #
Task
Deliverables
Assumptions
1
Chartering
• Prepare draft Chartering workshop agendas and
a Fayetteville staff will facilitate the selection of the STAC
presentations for staff review
and ongoing scheduling logistics of STAC meetings.
• Prepare draft integrated implementation schedule
a 2-3 representatives of the CH2M — MWT team will be
reflecting draft Engagement Plan.
present for the Project Chartering workshop (day 1).
• Prepare Initial Request for Information for Feasibilit/
• 1 representatives of the Team will be present for Special
Study
Committee Meeting #1- Vision / Goals, Engagement
• Facilitate Project Chartering workshop with STAC (day 1)
Plan and Study Overview (day 2)
• Facilitate Special Committee Meeting #1 -Vision /Coals,
• All other fees related to the Team attending internal and
Engagement Plan and Study Overview (day 2)
external meetings can be found under Task S
• Meeting Summary of Project Chartering workshop
2
Stormwater Program
0 Materials for STAC meeting #1—Stormwater N 3eds
• Meeting attendance and coordination is included
Costs
Analysis and 5W 0 & M and Capital Improvement
in Task 5. Public Education and Outreach.
Planning, based on Strategic Vision and Goals f om
• Definition of the City of Fayetteville's current
Project Chartering Workshop
Stormwater M54, level of service and extent of
• Preliminary Draft LOS / EOS options, including i
service will be based on readily available
basic (current), standard, and proactive LOS, for at
information provided by the City.
least a 5-year planning cycle. Draft programmz tic
a Feedback from STAC Meeting #2 and Special
cost estimates for these LOS / EOS options will be
Committee Meeting #2 will be used to generate
tabulated (over 5 years) for up to 6 program ar=as.
SW Policy Paper # 1 - SW Program Costs (E05 and
• Materials for Special Committee workshop #1 (,n
LOS) part of Task 4 that will be used throughout
Stormwater Program Needs and Extent of Sery ce
Task 5 to communicate with internal and external
Analysis
stakeholders.
• Draft Programmatic Stormwater 0 & M and Ca )ital
All draft task documents will be finalized as part of
Improvement Plan with a description of the Citi's
Task 6, Stormwater Feasibility Study.
existing Stormwater management, drainage
To the extent practical, one set of consolidated and
improvement and capital improvement plannirg
adjudicated comments from Fayetteville staff are
efforts as well as a high-level path forward for the
19)
SCOPE AND FEE FOR RFQ 18-02, .STORM WATER FEASIBILITY STUDY
TABLE 4. DELIVERABLES AND ASSUMPTIONS: PHASE I-STORMWATER FEASIBILITY STUDY
Task #
Task
Deliverables
Assumptions
more detailed master planning and prioritization
appreciated.
efforts that would be needed should a fee be
implemented.
• Materials for STAC meeting #2 and Special
Committee workshop #2 on Preliminary Draft
Stormwater LOS / EOS options
• Draft Stormwater Program Cost and Programmatic
Stormwater O & M and Capital Improvement Plan
sections for Feasibility Study.
3
Financial Planning and
. Stormwater pro forma financial spreadsheet model
Rate Analysis
(financial / rate model) with a detailed 5-year cash
• The City GIS Division will be responsible for
flow analysis and planning level projections over a
developing a preliminary Stormwater billing
longer timeframe,
database as part of Task 3.2 using Fayetteville's
• 3 conference calls with GIS division staff (in addition
existing parcel and pending impervious data layers.
This is a critical path item with the potential to
to Interactions as part of the STAC), to identify the
delay later tasks.
City's preliminary Stormwater billing database
approach.
• Feedback from STAC Meeting #4 and Special
• Draft Stormwater Billing Approach section for STAC
Committee Meeting #3 will be used to generate
Meeting #3 and Special Committee Meeting #3
SW Policy Paper # 2 SW Rate Structure and Billing
• Draft Financial Needs Analysis and Planning section
Options as part of Task 4 that will be used
for STAG Meeting #4 and Special Committee
throughout Task 5 to communicate with internal
Meeting #3
and external stakeholders.
• Draft Stormwater Rate Analysis section for STAC
a Feedback from STAC Meeting #4 and Special
Meeting #5 and Special Committee Meeting #3
Committee Meeting #3 will be used to generate
SW Policy Paper #5 - SW Financial Planning
• Stakeholder feedback will be documented in Task 6
as part of the Stormwater Feasibility Study.
4
Policy and Ordinance
Development
• Up to 5 Stormwater Policy Papers, each generally 2
pages, color with a graphic content meant for external
stakeholders.
is
SCOPE AND FEE FOR RFQ 18-02, STORMWATER FEASIBILITY STUDY
TABLE 4. DELIVERABLES AND ASSUMPTIONS: PHASE I—STORMWATER FEASIBILITY STUDY
Task #
Task
Deliverables
Assumptions
• Draft Stormwater Policy section of the Stormwater
Feasibility Study
5
Public / Stakeholder
• Draft Public Engagement Plan
The CH2M / Olsson Team will facilitate internal
Education and
• Final Public Engagement Plan
stakeholder meetings and workshops.
Outreach
a Meetings, Workshops and Briefings.
a. City Leadership Briefings: Presentatior
• Staff with Fayettevilie's Communications and Marketing
materials and 1 team members for up '� 0 3
Department and the Media Services Division will
Mayoral or Special Committee Meetin€ s.
facilitate external meetings and support the internal
implementation of the technical content provided by
b. Staff Technical Advisory Committee
the CH2M / Olsson Team.
Meetings: Meeting materials and 1 tez m
members for up to 6 STAC Meetings
c. Meeting materials and 1 team members for
up to 3 SW Public Meetings
• Technical Content and Materials.
a. 3 presentations for use in Stormwater
Stakeholder Targeted Outreach Activiti=s
b. Stormwater Utility Toolkit with technic it
content and materials. Provided online as
appropriate, and via hardcopies depen Ping
on stakeholder demographics.
6
Stormwater Feasibility
• Initial Draft Stormwater Feasibility Report
All draft task documents will be Finalized as part this
Report
. Draft Stormwater Feasibility Report
Task 6, Stormwater Feasibility Study.
• Final Draft Stormwater Feasibility Report
• Final Stormwater Feasibility Report
• To the extent practical, one set of consolidated and
adjudicated comments from Fayetteville staff are
aft
• Summary of Stakeholder Comments on Final DI a
appreciated.
Stormwater Feasibility Report
7
Project Management
0 Project Management Plan and internal kickoff meet ng.
• A period of performance not to exceed 18 months.
• 12 monthly invoices and progress reports.
211
SCOPE AND FEE FOR RFQ 18-02, STORM WATER FEASIBILITY STUDY
TABLE 4. DELIVERABLES AND ASSUMPTIONS: PHASE I —STORMWATER FEASIBILITY STUDY
Task #
Task
Deliverables
Assumptions
• Quarterly status meetings, including meeting
0 It is assumed that all deliverables will consist of no more
preparation, updated schedule, and minutes.
than 2 drafts and 1 final.
8
Additional Services
• WikimaPPing.com Stormwater Mapping Tool
• Staff with Fa etteville's Communications and Marketing
• Stormwater Needs and Priorities Survey of Stakeholders
Department and the Media Services Division will internal
implementation of the technical content provided by
the CN21V / Olsson Team.
• City staff will administer the Wikimapping.com
Stormwater Mapping Tool including the compilation and
analysis of stakeholder data points collected as part of
their engagement.
?? I
ATTACHMENT C
Stormwater Utility Feasibility Study
CITY OF FAYETTEVILLE, AR
SUPPLEMENTAL TERMS
Version: May 9, 2018
Changes, modifications, or amendments in scope, price or fees to this contract shall not
be allowed without a prior formal contract amendment approved by the Mayor and the
City Council in advance of the change in scope, cost or fees.
2. RIGHT TO AUDIT, FOIA, AND JURISDICTION:
The City of Fayetteville reserves the privilege of auditing a vendor's records as such
records relate to purchases between the Citv and said vendor.
Freedom of Information Act: City contracts and documents prepared while
performing City contractual work are subject to the Arkansas Freedom of
Information Act. If a Freedom of Information Act request is presented to the City
of Fayetteville, the (contractor) will do everything possible to provide the
documents in a prompt and timely manner as prescribed in the Arkansas
Freedom of Information Act (A.C.A. §25-19-101 et. seq.). Only legally authorized
photocopying costs pursuant to the FOIA may be assessed for this compliance.
b. Legal jurisdiction to resolve any disputes shall be Arkansas with Arkansas law
applying -to the case.
c. Legal venue and jurisdiction to resolve any disputes shall be Washington County,
Arkansas with Arkansas law applying to the case.
3. CITY INDEMNIFICATION:
a. CH2M HILL agrees to indemnify the City and hold it harmless from and against all
claims, liability, loss, damage or expense, including but not limited to counsel
fees, to the proportionate extent arising from negligence or willful misconduct or
arising from or by reason of any actual or claimed trademark, patent or copyright
infringement or litigation based thereon, with respect to the services or any part
thereof covered by this order, and such obligation shall survive acceptance of the
services and payment thereof by the City.
113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Resolution: 175-17
File Number: 2017-0413
STORMWATER UTILITY STUDY INTENT:
A RESOLUTION TO EXPRESS THE CITY COUNCIL'S INTENT TO FUND A STUDY TO
EVALUATE THE FEASIBILITY OF CREATING A STORMWATER UTILITY PROGRAM IN AN
AMOUNT NOT TO EXCEED $200,000.00, AND TO APPROVE A BUDGET ADJUSTMENT
WHEREAS, following the major flooding experienced in the City of Fayetteville during April 2017,
the City Council expressed a desire to research the feasibility of creating a stormwater utility program
and WHEREAS, staff recommends that the City utilize the experience of a professional consultant well
versed in establishing stormwater utilities and anticipates the study can be completed for under
$200,000.00.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby expresses its intent to fund a
study to evaluate the feasibility of creating a stormwater utility program in an amount not to exceed
$200,000.00.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget
adjustment, a copy of which is attached to this Resolution.
PASSED and APPROVED on 8/15/2017
Attest:
.io eld Jordah, ayor Sondra E. Smith, City
Clerk Treasur, aantItrNp�
010
FAYI I I i vil I ;
Page 1
Prinfed on 8116117
113 West Mountain Street
City of Fayetteville Arkansas
Fayetteville, AR 72701
--:_Ij' (479) 575-8323
rnl
Text File
— ' File Number: 2017-0413
Agenda Date: 8/15/2017 Version: 1 Status: Passed
In Control: City Council Meeting File Type: Resolution
Agenda Number: D. 10
STORMWATER UTILITY STUDY INTENT:
A RESOLUTION TO EXPRESS THE CITY COUNCIL'S INTENT TO FUND A STUDY TO
EVALUATE THE FEASIBILITY OF CREATING A STORMWATER UTILITY PROGRAM IN AN
AMOUNT NOT TO EXCEED $200,000.00, AND TO APPROVE A BUDGET ADJUSTMENT
WHEREAS, following the major flooding experienced in the City of Fayetteville during April
2017, the City Council expressed a desire to research the feasibility of creating a stormwater
utility program; and
WHEREAS, staff recommends that the City utilize the experience of a professional consultant
well versed in establishing stormwater utilities and anticipates the study can be completed for
unaer 3/,uu,uuu.uu.
NOW, THEREFORE, RE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section I: That the City Council of the City of Fayetteville, Arkansas hereby expresses its intent to fund
a study to evaluate the feasibility of creating a stormwater utility program in an amount not to exceed
$200,000.00.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget
adjustment, a copy of which is attached to this Resolution.
City of Fayetteville, Arkansas Page 1 Printed on 811812017
City of Fayetteville Staff Review Form
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
/
Chris Brown 7/28/2017 Engineering
Development Services Department
Submitted By . Submitted Date Division / Department
Action Recommendation:
Express the City's intent to complete a study evaluating the feasibility of a stormwater utility to provide a means by
which to address stormwater needs throughout the City, to approve funding forthestudy and to approve a budget
adjustment
1010.09 0.6 600 -5 314.00
-Account Number
17008
Project Number
Budgeted Item? No
Budget Impact:
General Fund
Fund
5tormwater Utility Feasability Study
Project Title
Current Budget $
Funds Obligated $
Current Balance
Does item have a cost? Yes Item Cost $ 200,000.00 I
Budget Adjustment Attached? Yes Budget Adjustment $ 200,000.00
Remaining Budget
V20140710
Previous Ordinance or Resolution H
Original Contract Number: Approval Date:
Comments:
CITY OF
Fa y I C
ARKANSAS
MEETING OF AUGUST 15, 2017
TO: Mayor and City Council
THRU: Don Marr, Chief of Staff
Chris Brown, City Engineer
FROM: Alan Pugh, Staff Engineer
DATE: August 1, 2017
STAFF MEMO
SUBJECT: Express the City's intent to complete a study evaluating the feasibility of a
stormwater utility to provide a means by which to address stormwater needs throughout the
City, to approve funding for the study and to approve a budget adjustment
e7r/"rl�����A1flA TlVN:
+.�vv+nm�.+vvr. + +v+..
Approval of the City's expression of intent to complete a study evaluating the feasibility of a
stormwater utility to provide a means by which to address stormwater needs throughout the
City, to approve funding for the study and to approve a budget adjustment.
BACKGROUND:
Like many cities throughout the state and nation, the City of Fayetteville experiences issues
with stormwater runoff These issues stem from many sources including, but not limited to,
aging infrastructure, maintenance of system capacity, manpower to perform systematic
inspections and the lack of formal drainage systems in many older areas of the City. In order to
address these concerns, the -City has historically funded maintenance and new projects directly
from the Capital Improvement Plan (CIP). However, there are many needs within the City that
require funding from the CIP and, at least in recent years, the funding for stormwater has been
inadequate to comprehensively address stormwater issues In order to develop a
comprehensive solution, funding is required for manpower and equipment as well as multiple
capital projects, some of which will require in excess of $1 million dollars for each project.
Given the current funding levels, it would take many years in order to address just one of those
projects.
DISCUSSION:
As you are aware, the City of Fayetteville experienced a major flooding event in April of 2017.
As a follow up to that event, City staff presented the results of an investigation into the
stormwater drainage system to Council at agenda session in June of this year. This
investigation revealed funding needs in excess of $15 million dollars to address the drainage
issues that the City is aware of at this time. Also during this presentation, several funding
sources were identified in order to begin to address these issues. However, given the extent of
funding required, council expressed the desire to research a stormwater utility in order to
provide an adequate funding source to begin to address the issues related with the stormwater
system as well as maintain the system into the future.
Mailing Address
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
In order to accomplish this task, staff is recommending the City utilize the experience of a
professional consultant versed in establishing stormwater utilities. This will aid in developing
a system that will ensure that the current and future needs are met. The engineering division
would aid in the procurement of the professional service and organization of the appropriate
resources to identify the funding needs as well as the structure of a potential stormwater utility
program.
BUDGET/STAFF IMPACT:
The cost of the study will depend heavily on the defined scope, however, staff anticipates that
the investigation would not exceed $200,000. The funding source would need to be general
fund reserves as this was not a budgeted project in 2017 and no funding is available for this
project at this time.
Attachments:
April 29, 2017 Flood Event Summary
April 28-30,
2017 Flooding
Event
0,01-0awto LIE
ILLr:.
IWA
CY OF
FAYETTEVILLE
ARKANSAS
FAQ
• How much rain did we get?
• Was it a 100-year event?
• What area saw most flooding?
• What can the City do to help?
100-Year Event
• Total 24 hour precipitation
• intensity (inches per hour)
of precipitation
• Observed stream
levels/high water marks
` 1 Tontitown Spnngpale
Johnson
Iwo
^ I.
- .. - .� — - , ,�_.`•—'a� _ .- -ram - I" __ i
R� � ^ ��' .�,-��
GGS _ _ _ I Goshen
Farmington -- _ 2SD-
- Elkins
Pr irie
Grove
Greenland.,;
FayetteviUe Rain Gauges -
Elkins
100-Year 24 hour Rainfall: 7.91 Inches Total Precipitation April 28t"-April 30tn
City Rain Gauges
Legend
100% amuai chance 0 Yf)
0
50% annual chance (2 Yn
2M &-ual chance (5 yrl
ift annual chance 00 yr)
4% anrpjal cMnte (25 yr)
2% nnu.1 chance (so Y'l
1 % annual chance (100 yr)
a 5% Onrolal &aPCO (200 YI)
0 2% anwal ehann (IMI YfI
IPO, V
50
5
N
25
70,
0
r FI
t 4 'r, fju n�j F.; i
Provided by FTN Associates Fbtal Precipitation April 28th-April 30th
National Weather Service
Intensity
• Highest intensity between 4:45 PM and
8:45 PM on Saturday 29th
• Between 2.01 and 5.65 inches of rain
during that 4 hour time period
• Highest Intensity: 0.83 inches rain in 15
minute period (3.32 in/hr),
• Over 0.5 inches in, 15 minutes common
Observed H\V Marks
2663 W Megan Drive
• Observed HW Mark Elevation: 1230.9
• Anticipated 1 % Annual chance
event: 1230.7
(1 00-year)
-f:-_-q=sr>�ic� Dean •
Observed HW Marks
189 N West End
• Observed HVV Mark Elevation: 1233.6
• Anticipated 1 % Annual Chance (100-year)
event: 1234.0
Observed HEN Marks
191 E Rebecca St
• Observed HW Mark EIElvation: 1390.1
• Anticipated 1 °/ Annual Chance (100-year)
event: 1392.5
Stream Gauges
Mud Creek at Greg/Wilkerson:
• Peak Gauge Height 17.5 (Approximately
1181.5 Elevation),
• Anticipated 10% Annual Chance(Il 0-year)
event: 1180.5
• Anticipated 2% Annual Chance (50-Year)
event: 1182. 0
• Anticipated 1 % Annual Chance (100-year)
event: 1183. 0
Stream G(a,-,ges
Town Branch at Armstrong:
• Peak Gauge Height 17 (Approximately
1188.75 Elevation)
• Anticipated 1 % Annual Chance (100-year)
event: 1190.7
Niokaska at Township
• Peak Gauge Height 6.92
• Correlates with an estimated 4% Annual
Chance (25-year) Event
Street Flooding
S 151" Street
N College Ave @ Sunbridge
N Porter Road
W Poplar Street
Structure F ooding
Estimate 45-50 structures with various levels of flooding
that have been -eported
Property Damage/Yard Flooding
Fence Damage
Valley Drive
Structure/Yard
Flooding
Driveway
Flooding
P rn nPrty D
7r -
. ,�:=rt �-s"-sac' • �,`�•ss
�•.. ��"3 - '" ,r�� :=�•�.� .tea
t` , __ ~jam ��•�'� - :� --
Zq
Pro
e rt
Damaae/Yard Floodina
College and Rebecca �Parking
N Fowler Ave
West of Holly/Sang Intersection
N Lewis Ave
Service Requests
i
Categores
_ R..-r::, . I.� -��::,
$,�
— Maintenance
C
Ey F-
-
!
I -
R� Code
0'=-;I
A'��
Sub-.—
M4-
— Capital
Small Projects
Medium P roj e cts
�7-U,91�E.11320
707-52.E.N120
0--?
CVM.'Zr.?
Ow
01�:4J
I A Mnw dAu"VOO-LOW LPJ
, I ,, "1zP.-WIQ"0J RC
Large Projects
170751EN1220
I M 151 It 1311
17051 F.1132.0
U4320
0-.5I!20.7
01
CF41I8J17,
Omm"
CE45
Q1 11
69:)s
0
IC: 0
C A %aC4 E
0 A 3111 N
0 A I E�, 0 E
D A 242 E
Euix&
51114115
-;4OOSRC-"
ORW;k
DR
1, "
DP
17j"n C14320
OWMIT
1G.02
C A. 210.3W
WIReN
CIR
I—,Q3IS EIMU
0-10?207
1019
A. ;.10510
-=UnAw
WA e
17�R1 7 F.t.4=
0 : :VIIXI7
IC 21J
QA
17jsys El1"120
f, -tl -All
I I : 17
D A 2632 1.
frUWAY
wly
R49 D1320
(i V.w
!0�1 ";
%.I -A
R b
17C.T19 F412.0
0-i01 tam?
16:13
a A -17I5 11
fLaw-A
AVE
1-I685 F."17.0
9*;%m -1
118,0?
0 A 1951E E
fkPAZO;
?OW E11320
WIS
0 A 2125 W
C .9
EN320
W.LO-2M7
0851
A WO N
f-T< K041 EA
11
�?ri972
70695 DMG
C Wa23 V
i 5 .1 6
0 A 2371. N
WIN ACRES
RD
April 29th, 2017 Flooding Service Requests
`r
�.. —_ — J.J. .' " eM I ! •\ ! �• ,' •\.'� - _—
J .
1 -
April 29th, 2017 Flooding Service Requests_
.rcg��n v xc...a � S '�1MIW.IIIII�IE IfiIEf:� ^�' • � � �... '
.�• -_. • - .._ /• � -... 7/.... ��. • +• w .•_ �) � /{_yam
�.. + 1 _fir `
✓ .... a .:
Ma ntenance
• Projects include,
— Clearing debris from ditches', culverts, inlets,
channels
— Restoring ditch capacity
— Includes labor only,, no materials
— historically deferred due to 'other priorities
— Occurs throughout the City
Small Drainage Projects
• Projects include
—Anything under $500,000
— Culvert replacement/sizo increase
— Curb/inlet construction
— Increase inlet capacity
— Create ditches/swales to divert runoff
— occurs'throughout the City
Medium J
Drainage Projects
April 29th, 2017 Flooding Service Requests
C IN
a
Medium Drainage Projects
• Projects include
—Anything between '$500K and $1 Mil
— Similar to Small Projects; but larger scale
— Culvert replacement/size increase
— Increase inlet capacity
— Install culvert/inlets/curb where none existed
Medium Drainage Projects
ProspectSt
ecca St
3 0
Lafayette�t I'
Upper Scull Phase II
Eastern Ave
ndividual Request Location
AH7D 11)
C2piial (127)
Maintenance (75)
• O
O
Ln
- H i
1-Boxwood Ave/Ashbrook Dr
2-E Country Way/E Ferguson Ave
Stream Erosion Ranking System (later this year)
Sandpiper Dr WF White River
• N Ashbrook Rackv Branch
• Sweetbriar Park More Rural Areas
Large Drainag,!.D.Projects
April 29th, 2017 Flooding Service Requests
0
Large Drainage Projects
• Projects include
—Anything over $1 Mil
— Large scale projects implemented throughout
entire watersheds
— Have been considered previously but deferred
due to cost
Large DrainagIn Projects
$1 Million Plus
3
L^
O�
4 SSvuftIA!iL95f ftA
O H.,. d st
DO
4oryrn N.®O. Y!J
r
r
9b
Missouri Creek
Elmhurst/M :,Clinton
Individual Request Ucation
AHTD (1)
Capital (127)
.Maintenance ( "5 j
Sunbridge/College
0 0 0
.0 1 i
43
Uthi ` St
Sutibridge Qt-
Additional, Flood Study
April 29th, 2017 Flooding Service Requests -
Additional'Flood "..:)Atudy Needed
Large floodplains w/limited solutions
— Clabber Creek at Salem Drive
— Ellis Ave between S Hill and S 15tn
— Scull Creek College Ave Crossing
— Hamestring @ I-49
a
Ha
Individual Request Location
AHTD (1)
i Capital (127)
Maintenance (� S)
r
Mciaren far
�i
Where to Begin?
• Project size
— Complete large projects or greater number of
smaller projects
• Severity of property damage
— Structure damage, property damage,
nuisance drainage
• Length of time known
• Number of residents impacted
$ How Much $
• Overall cost estimated $15 to $20 million
• Maintenance: 83 Projects; $100K
• Small: 92 Projects; $2.F► Mil
• Medium: 6 Projects; $3 Mil
• Large: 3 Projects; $8 Mil
• Does not include
— labor costs for maintenance projects
— capital costs for those projects in need of
flood study
Funding Mechanisms
• Capital Improvement Program
• Future Bond Issue
• Stormwater Utility
Stormwater Utility
• Permanent Revenue Stream
— Maintenance/Operations
— Capital Improvements
— Water Quality Monitoring
— I'l/S4 and other permitting
— Stream Restoration
• Allows for more robust incentive use LID
• Provide flexibility for developer
— Cost of system versus on -site mitigation
Stormwater Utility
• Further investigation required:
— Determine funding needs
• Projects, ongoing maintenance, staff,
administration of program
— Potential structure: flat rate versus sliding
scale based on impervious area
— Determine appropriate rate
— Rebates for LID and other runoff reduction
measures
.tier.: -. ��
Disaster Declaration
Funding available for public infrastructure and
private individuals
—Apply directly to FEMA for approval
-only pays to repair, no upgrades, to public
infrastructure
—Some grants can pay to elevate, floodproof or
purchase/demolish structures
1-800-621-FEMA (3362)
0
City of Fayetteville, Arkansas - Budget Adjustment Form (Legistar)
Budget Year Division ENGINEERING (621) Adjustment Number
2017 /Org2
Requestor: Chris Brown
BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION:
Express the City's intent to complete a study evaluating the feasibility of a stormwater utility to provide a means by
which to address stormwater needs throughout the City, to approve funding for the study and to approve a budget
adjustment
RESOLUTION/ORDINANCE
COUNCIL DATE: 8/1 5/2017
LEGISTAR FILE ID#: 2017-0413
13 cwbta 'G1i Fe Ul
V1/2017 4.00 PM
Budget Director Date
TYPE:
DESCRIPTION;
GLDATE:
POSTED:
TOTAL 200,000 200,000 v.20170707
Increase / (Decrease) Projecl.Subg
Account Number Expense Revenue Project Sub AT Account Name
1010.090.6600-5314.00 200,000 - 17008 1 EX Professional Services - :
1010.001.0001-4999.99 - 200,000 RE Use Fund Balance - Current
C:\Users\losmith\AppData\Roaming\L5\Temp\ I a415466-d217-459a-b465-69a2598402c7 I of I
City of Fayetteville, Arkansas - Budget Adjustment Form (Legistar)
Budget Year Division Adjustment Number
/Org2 ENGINEERING (621)
2018
Requestor: Chris Brown
BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION:
Approval of the Stormwater Feasibility Study professional services contract with Jacobs, formerly CH2M Hill, in an
amount not to exceed $229,222 and to approve a budget adjustment.
COUNCIL DATE: 6/5/2018
LEGISTAR FILE ID#: 2018-0267
xe,vbvvspr
VW2018 9:55 AM
Budget Director
TYPE:
DESCRIPTION:
Date
i
GLDATE:
RESOLUTION/ORDINANCE POSTED:
TOTAL 29,498 29,498 v.20180417
Increase / (Decrease) Proiect.Sub#
Account Number Expense Revenue Project Sub
1010.090.6600-5314.00 29,498 17008 1
1010.001.0001-4999.99 - 29,498
AT Account Name
EX Professional Services - :
RE Use Fund Balance - Current
C:\Users\losmifh\AppData\Roaming\L5\Temp\e58ef771-624f-4e32-836e-b213c7cc28f0 1 of 1
113 West Mountain Street
Fayetteville, AR 72701
(479)575-8323
Resolution: 209-19
File Number: 2019-0510
JACOBS ENGINEERING GROUP, INC F/K/A C112M HILL ENGINEERS, INC.
AMENDMENT NO. 1:
A RESOLUTION TO APPROVE AMENDMENT NO. I TO THE PROFESSIONAL SERVICES
AGREEMENT BETWEEN THE CITY OF FAYETTEVILLE, ARKANSAS AND JACOBS
ENGINEERING GROUP, INC F/K/A C142M HILL ENGINEERS, INC. IN THE AMOUNT OF $3,860.00
FOR ADDITIONAL TRAVEL AND LABOR EXPENSES, AND TO APPROVE A BUDGET
ADJUSTMENT
WHEREAS, on June 4, 2018, the City Council approved a contract with CH2M Hill Engineers, Inc.,
now known as Jacobs Engineering Group, Inc., to evaluate the feasibility of creating a stormwater utility
program; and
WHEREAS, City staff is requesting additional funds for to allow the Jacobs Engineering Group, Inc.
project manager to attend the presentation to the City Council and answer any questions about the study.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves and authorizes `
Mayor Jordan to sign Amendment No. 1 to the Professional Services Agreement between the City of
Fayetteville, Arkansas and Jacobs Engineering Group, Inc. formerly CH2M Hill Engineers, Inc. in the
amount of $3,860.00 for additional travel and labor expenses for the Jacobs Engineering Group, Inc. project
manager to be present for the stormwater utility feasibility study presentation to the City Council
Page 1 Printed on 9119119
File Number: 2019-0510
Resolution 209-19
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget
adjustment, a copy of which is attached to this Resolution.
PASSED and APPROVED on 9/17/2019
�����`ER K'/
��
Attest: v;
FAYETT • � =
�. EVt<<E •7D=
��' •'
"OLXTb
Lisa Branson, Deputy City Clerk ��,,11uiii0u t����
Page 2 Printed on 9119119
City of Fayetteville, Arkansas 113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Text File
File Number: 2019-0510
Agenda Date: 9/17/2019 Version: 1 Status: Passed
In Control: City Council Meeting File Type: Resolution
Agenda Number: A. 6
JACOBS ENGINEERING GROUP, INC F/K/A CH2M HILL ENGINEERS, INC. AMENDMENT
NO. 1:
A RESOLUTION TO APPROVE AMENDMENT NO. 1 TO THE PROFESSIONAL SERVICES
AGREEMENT BETWEEN THE CITY OF FAYETTEVILLE, ARKANSAS AND JACOBS
ENGINEERING GROUP, INC F/K/A CH2M HILL ENGINEERS, INC. IN THE AMOUNT OF
$3,860.00 FOR ADDITIONAL TRAVEL AND LABOR EXPENSES, AND TO APPROVE A BUDGET
ADJUSTMENT
WHEREAS, on June 4, 2018, the City Council approved a contract with CH2M Hill Engineers, Inc., now
known as Jacobs Engineering Group, Inc., to evaluate the feasibility of creating a stormwater utility program;
and
WHEREAS, City staff is requesting additional funds for to allow the Jacobs Engineering Group, Inc. project
manager to attend the presentation to the City Council and answer any questions about the study.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves and authorizes Mayor
Jordan to sign Amendment No. 1 to the Professional Services Agreement between the City of Fayetteville,
Arkansas and Jacobs Engineering Group, Inc. formerly CH2M Hill Engineers, Inc. in the amount of $3,860.00
for additional travel and labor expenses for the Jacobs Engineering Group, Inc. project manager to be present
for the stormwater utility feasibility study presentation to the City Council
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a
copy of which is attached to this Resolution.
City of Fayetteville, Arkansas Page 1 Printed on 9/19/2019
Chris Brown
City of Fayetteville Staff Review Form
2019-0510
Legistar File ID
9/17/2019
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
ENGINEERING (621)
Submitted By Submitted Date Division / Department
Action Recommendation:
5/15/2018
Approval of Amendment 1 to the Stormwater Feasibility Study professional services contract with Jacobs, formerly
CH21VI Hill, in an amount not to exceed $3,860 (total contract amount $233,082) and to approve a budget
adjustment.
Budget Impact:
1010.090.6600-5314.00
General Fund
Account Number
Fund
17008.1
Stormwater
Utility Feasibility Study
Project Number
Project Title
Budgeted Item? Yes
Current Budget
$ 229,222.00
Funds Obligated
$ 229,222.00
Current Balance
Does item have a cost? Yes
Item Cost
$ 3,860.00
Budget Adjustment Attached? Yes
Budget Adjustment
$ 3,860.00
Remaining Budget
$
V20180321
Purchase Order Number:
Previous Ordinance
or Resolution # 13 1 13
Change Order Number:
Approval Date:
Original Contract Number:
Comments:
CITY OF
FAYETTEVILLE
ARKANSAS
MEETING OF SEPTEMBER 17, 2019
TO: Mayor and City Council
THRU: Don Marr, Chief of Staff
Garner Stoll, Development Services Director
Chris Brown, City Engineer
FROM: Alan Pugh, Staff Engineer
DATE: August 20, 2019
CITY COUNCIL MEMO
SUBJECT: Approval of Amendment 1 to the Stormwater Feasibility Study professional
services contract with Jacobs, formerly CH2M Hill, in an amount not to exceed
$3,860 (total contract amount $233,082) and to approve a budget adjustment.
RECOMMENDATION:
Approval of Amendment 1 to the Stormwater Feasibility Study professional services contract
with Jacobs, formerly CH2M Hill, in an amount not to exceed $3,860 (total contract amount
$233,082) and to approve a budget adjustment.
BACKGROUND:
Like many cities throughout the state and nation, the City of Fayetteville experiences issues with
stormwater runoff. These issues stem from many sources including, but not limited to, aging
infrastructure, maintenance of system capacity, manpower to perform systematic inspections
and the lack of formal drainage systems in many older areas of the City. In order to address
these concerns, the City has historically funded maintenance and new projects directly from the
Sales Tax Capital Improvement Program (CIP). However, there are many needs within the City
that require funding from the CIP and, at least in recent years, the funding for stormwater has
been inadequate to comprehensively address stormwater issues. To develop a comprehensive
solution, funding is required for manpower and equipment as well as multiple capital projects,
some of which will require more than $1 million dollars for each project. Given the current
funding levels, it would take many years to address just one of those projects.
The City Council recognized these needs and approved moving forward with a feasibility study
on June 5, 2018 via resolution 131-18.
DISCUSSION:
As the feasibility study nears completion, staff is requesting additional funds so that Jacobs may
be present for the presentation of the study to the City Council. We feel it is important for the
Council to hear the findings of the study and for the Council to be able to ask any questions of
Jacobs in person.
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
BUDGET/STAFF IMPACT:
The overall cost proposed is $3,860 which includes one additional trip not included in the
original contract. This would bring the total of all services to $233,082 and is proposed to be
set aside from the general fund as was the case with the original funding for the study.
Attachments:
Amendment 1 to Stormwater Feasibility Contract
Budget Adjustment
Resolution 131-18
SCOPE CHANGE AUTHORIZATION
Project: Amendment 1 to the Stormwater Date Prepared: August 21,
Feasibility Study Contract 2019
Jacobs Project No.: 705896CH
Date Revised:
Client: City of Fayetteville, AR Client Project No.:
Project Manager: Heather H. D
1. 7
Change No.: I
to following changes in the scope of the work are hereby authorized:
I additional Project Manager trip (labor and travel).
2. The effect of these changes in scope is as follows:
a. Fee (1) Change I Labor: $2,560 + Travel: $1,300 = $3,860
(2) New Total $233,082
b. Schedule Se tember / October 2019
c. Construction (1) Cost I N/A
(2) Schedule I N/A
d. Other N/A
3. The reason for these changes in the scope of the work are as follows:
PM presentation of the draft Feasibility Study report to City leadership and attend
stakeholder meeting, if needed.
4. Project Manager's comments:
Approved by Cli
Agreed to by JEG:
Distribution:
Client
Project Manager
Client Services Manaser
Director of Projects
Service Leader
File
Date: q-1r)-1
Date: 8/21 /2019
113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Resolution: 131-18
File Number: 2018-0267
STORNnVATER UTILITY STUDY CONTRACT:
A RESOLUTION TO AUTHORIZE A PROFESSIONAL SERVICES AGREEMENT WITH CH2M HILL
ENGINEERS, INC., PURSUANT TO RFQ 18-02, IN AN MOUNT NOT TO EXCEED $229,222.00 FOR A
STORMWATER UTILITY FEASIBILITY STUDY, AND TO APPROVE A BUDGET ADJUSTMENT
WHEREAS, on August 15, 2017, the City Council passed Resolution No. 175-17 expressing the City
Council's intent to fund a study to evaluate the feasibility of creating a stormwater utility program and
authorizing City staff to move forward with the selection of a professional consultant to complete the
study.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan
to sign a professional services agreement with CH2M Hill Engineers, Inc., pursuant to RFQ 18-02, in
an amount not to exceed $229,222.00 for a stormwater utility feasibility study.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget
adjustment, a copy of which is attached to this Resolution.
PASSED and APPROVED on 6/5/2018
Attest:
���t1111111q�
Sondra E. Smith, City Clerk Treasurer
�`�``�� G �Y.o sG A
�� • .�
A'YE
TI�VIILE:
P • -J
'.9 •IYKAN
i �aN ` %��
Page 1 Printed on 615116
-� City of Fayetteville, Arkansas 113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Text File
File Number: 2018-0267
Agenda Date: 6l5/2018 Version: 1 Status: Passed
In Control: City Council Meeting File Type: Resolution
Agenda Number: C. 2
STORMWATER UTILITY STUDY CONTRACT:
A RESOLUTION TO AUTHORIZE A PROFESSIONAL SERVICES AGREEMENT WITH CH2M HILL
ENGINEERS, INC., PURSUANT TO RFQ 18-02, IN AN AMOUNT NOT TO EXCEED $229,222.00
FOR A STORMWATER UTILITY FEASIBILITY STUDY, AND TO APPROVE A BUDGET
ADJUSTMENT
WHEREAS, on August 15, 2017, the City Council passed Resolution No. 175-17 expressing the City
Council's intent to fund a study to evaluate the feasibility of creating a stormwater utility program and
authorizing City staff to move forward with the selection of a professional consultant to complete the study.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign a
professional services agreement with CH2M Hill Engineers, Inc., pursuant to RFQ 18-02, in an amount not to
exceed $229,222.00 for a stormwater utility feasibility study.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a
copy of which is attached to this Resolution.
City or Fayettevolle, Arkansas Page 1 Printed on 6/5/2018
City of Fayetteville, Arkansas - Budget Adjustment Form (Legistar)
Budget Year Division Adjustment Number
/Org2 ENGINEERING (621)
2019
Requestor: Chris Brown
BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION:
Approval of Amendment 1 to the Stormwater Feasibility Study professional services contract with Jacobs, formerly
CH21VI Hill, in an amount not to exceed $3,860 and to approve a budget adjustment.
RESOLUTION/ORDINANCE
COUNCIL DATE
LEGISTAR FILE ID#
9/17/2019
2019-0510
L ik R u tcheww
8/26/2019 9:35 AM
Budget Director
TYPE:
JOURNAL #:
GLDATE:
CHKD/POSTED:
Date
D - (City Council)
TOTAL 3,860 3,860 v.20190816
Increase / (Decrease) Project.Sub#
Account Number Expense Revenue Project Sub.Detl AT Account Name
1010.090.6600-5314.00 3,860 - 17008 1 EX Professional Services
1010.001.0001-4999.99 3,860 RE Use Fund Balance - Current
H:\Budget Adjustments\2019-Budget\City Council\09-17-2019\2019-0510 BA Stormwater Utility Amendment 1 1 of 1
113 West Mountain Street
Fayetteville, AR 72701
(479)575-8323
Resolution: 250-19
File Number: 2019-0596
JACOBS ENGINEERING, INC. AMENDMENT NO. 2:
A RESOLUTION TO ACCEPT AND ADOPT THE STORMWATER STUDY FOR FLOOD
MANAGEMENT AND WATER QUALITY FUNDING, TO APPROVE AMENDMENT NO. 2 TO THE
PROFESSIONAL SERVICES AGREEMENT WITH JACOBS ENGINEERING, INC. IN AN AMOUNT
NOT TO EXCEED $150,200.00 FOR ADDITIONAL SERVICES RELATED TO THE DEVELOPMENT
OF FINAL RECOMMENDATIONS FOR THE CREATION OF A STORMWATER UTILITY, AND TO
APPROVE A BUDGET ADJUSTMENT
WHEREAS, on August 15, 2017, the City Council passed Resolution No. 175-17 expressing the City
Council's intent to fund a study to evaluate the feasibility of creating a stormwater utility program and
authorizing City staff to move forward with the selection of a professional consultant to complete the
study; and
WHEREAS, on June 5, 2018 the City Council passed Resolution 131-18 authorizing a contract with CH2M
Hill Engineers, Inc. for the feasibility study; and
WHEREAS, the feasibility study has been completed and is being presented to the City Council for
final acceptance and adoption of the findings and recommendations; and
WHEREAS, if the study is accepted and adopted, staff also recommends the approval of Amendment No.
2 to the contract for Jacobs Engineering, Inc., the parent company of and successor in interest to CH2M Hill
Engineers, Inc., to develop final recommendations for the creation of a stormwater utility in the City of
Fayetteville.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
Page 1 Printed on 1116119
File Number.' 2019-0596
Resolution 250-19
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby accepts and adopts the
Stormwater Study for Flood Management and Water Quality Funding, a copy of which is attached to
this Resolution.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves Amendment No. 2 to
the Professional Services Agreement with Jacobs Engineering, Inc., a copy of which is attached to this
Resolution, in the amount not to exceed $150,200.00 for additional services related to the development
of final recommendations for the creation of a stormwater utility.
Section 3: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget
adjustment, a copy of which is attached to this Resolution.
PASSED and APPROVED on 11/5/2019
``���tinrrtrn
Attest: CITyp.�J.�
F ;
=cn��
Lisa Branson, Deputy City ClAil;-y�
Page 2 Printed on 1116119
City of Fayetteville, Arkansas 113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Text File
File Number: 2019-0596
Agenda Date: 11/5/2019 Version: 1 Status: Passed
In Control: City Council Meeting File Type: Resolution
Agenda Number: C. 3
JACOBS ENGINEERING, INC. AMENDMENT NO. 2:
A RESOLUTION TO ACCEPT AND ADOPT THE STORMWATER STUDY FOR FLOOD
MANAGEMENT AND WATER QUALITY FUNDING, TO APPROVE AMENDMENT NO. 2 TO THE
PROFESSIONAL SERVICES AGREEMENT WITH JACOBS ENGINEERING, INC. IN AN AMOUNT
NOT TO EXCEED $150,200.00 FOR ADDITIONAL SERVICES RELATED TO THE DEVELOPMENT
OF FINAL RECOMMENDATIONS FOR THE CREATION OF A STORMWATER UTILITY, AND TO
APPROVE A BUDGET ADJUSTMENT
WHEREAS, on August 15, 2017, the City Council passed Resolution No. 175-17 expressing the City
Council's intent to fund a study to evaluate the feasibility of creating a stormwater utility program and
authorizing City staff to move forward with the selection of a professional consultant to complete the study; and
WHEREAS, on June 5, 2018 the City Council passed Resolution 131-18 authorizing a contract with CH2M
Hill Engineers, Inc. for the feasibility study; and
WHEREAS, the feasibility study has been completed and is being presented to the City Council for final
acceptance and adoption of the findings and recommendations; and
WHEREAS, if the study is accepted and adopted, staff also recommends the approval of Amendment No. 2
to the contract for Jacobs Engineering, Inc., the parent company of and successor in interest to CH2M Hill
Engineers, Inc., to develop final recommendations for the creation of a stormwater utility in the City of
Fayetteville.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby accepts and adopts the
Stormwater Study for Flood Management and Water Quality Funding, a copy of which is attached to this
Resolution.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves Amendment No. 2 to
the Professional Services Agreement with Jacobs Engineering, Inc., a copy of which is attached to this
City of Fayetteville, Arkansas Page 1 Printed on 111612019
File Number: 2019-0596
Resolution, in the amount not to exceed $150,200.00 for additional services related to the development of final
recommendations for the creation of a stormwater utility.
Section 3: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a
copy of which is attached to this Resolution.
City of Fayetteville, Arkansas Page 2 Printed on 111WO19
Chris Brown
City of Fayetteville Staff Review Form
2019-0596
Legistar File ID
11/5/2019
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
ENGINEERING (621)
Submitted By Submitted Date Division / Department
Action Recommendation:
10/17/2019
Approval of the Flood Management and Water Quality Funding Study recommendations as well as contract
amendment 2 with Jacobs, formerly CH2M Hill, in an amount not to exceed $150,200 (total contract amount
$383,282) for additional services and approval of a budget adjustment
4470.6 21.8 810- 5 817.00
Account Number
17008.1
Project Number
Budgeted Item? Yes
Budget Impact:
Sales Tax Capital Improvement
Fund
Stormwater Utility Feasibility Study
Project Title
Current Budget
Funds Obligated
Current Balance
Does item have a cost? Yes Item Cost
Budget Adjustment Attached? Yes Budget Adjustment
Remaining Budget
$ 233,082.00
$ 233,082.00
$
$ 150,200.00
$ 150,200.00
$ -
V20180321
Purchase Order Number: Previous Ordinance or Resolution # 131-18
Change Order Number:
Original Contract Number:
Comments:
Approval Date:
CITY OF
FAYETTEVILLE
V4W ARKANSAS
MEETING OF NOVEMBER 5, 2019
TO: Mayor and City Council
THRU: Don Marr, Chief of Staff
Garner Stoll, Development Services Director
Chris Brown, City Engineer
FROM: Alan Pugh, Staff Engineer
DATE: October 16, 2019
CITY COUNCIL MEMO
SUBJECT: Approval of the Flood Management and Water Quality Funding Study
recommendations as well as contract amendment 2 with Jacobs, formerly CH2M
Hill, in an amount not to exceed $150,200 (total contract amount $383,282) for
additional services and approval of a budget adjustment.
RECOMMENDATION:
Staff recommends approval of the Flood Management and Water Quality Funding Study
recommendations as well as contract amendment 2 with Jacobs, formerly CH2M Hill, in an
amount not to exceed $150,200 (total contract amount $383,282) for additional services and
approval of a budget adjustment.
The contract amendment would further refine the stormwater utility framework by developing
final recommendations for the extent and level of service with associated rates, investigating
and developing the credit program, investigating the necessary ordnance revisions associated
with the program and other services.
BACKGROUND:
Like many cities throughout the state and nation, the City of Fayetteville experiences issues with
stormwater runoff. These issues stem from many sources including, but not limited to, aging
infrastructure, maintenance of system capacity, manpower to perform systematic inspections
and the lack of formal drainage systems in many older areas of the City. In order to address
these concerns, the City has historically funded maintenance and new projects directly from the
Sales Tax Capital Improvement Program (CIP). However, there are many needs within the City
that require funding from the CIP and, at least in recent years, the funding for stormwater has
been inadequate to comprehensively address stormwater issues. To develop a comprehensive
solution, funding is required for manpower and equipment as well as multiple capital projects,
some of which will require more than $1 million dollars for each project. Given the current
funding levels, it would take many years to address just one of those projects.
The City Council recognized these needs and approved moving forward with a feasibility study
on June 5, 2018 via resolution 131-18
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
DISCUSSION:
The Flood Management and Water Quality Funding Study final draft is attached for review.
However, in general it finds that the most equitable way to fund the Stormwater needs into the
future is with a fee for service based on the customer's impact to the system. Impervious area
was selected as the basis for the fee as it is directly related to the customer's impact to the
system. Impervious area causes an increase in the amount of water entering the drainage
system which can then increase the chance of flooding, stream bank erosion and
sedimentation. Runoff from impervious area also carries pollutants that can impact water
quality. These include, among others, sediment, herbicides and pesticides, meals and bacteria
from things such as pet waste. For these reasons, impervious area is an equitable basis for the
fee because larger developments, businesses and homes generate a greater need for
Stormwater services because of the greater amount of runoff they generate.
Given the feedback from stakeholders, residents and the council committee, Option A/B was
selected as it provides an adequate level of service, extends services to areas of town not
currently served and provides additional services not currently in the stormwater program. It
includes a 20-year capital program schedule and routine maintenance. This maintenance would
include cleaning/inspecting approximately 20% of the overall drainage system annually
(approximately 400,000 LF), replacing 2.5% of the drainage system annually (approximately
8,500 LF), performing maintenance on residential detention basins (approximately 110 total)
and providing for approximately $1.1 million annually for capital projects.
Table ES-2. Tiered Rate Structure
A tiered system based on impervious area was
v
selected as the most equitable way to distribute the
Propnsed ,.
cost of the program based on the items noted
PV!6nthly FO-e
fir''
above. The proposed tiers can be found below, and
additional information can be found within the
Tier Range (SF of
Current
attached study.
Impervious Area)
� +urn %r 1-
Tier 1(0 and 2,000)
$2.31
CONTRACT AMENDMENT SUMMARY:
The contract amendment with Jacobs will include
Tier 2 (2,000 and 3,500)
$5.09
several of the recommended additional tasks based
on the outcome of the feasibility study and feedback
Tier 3 (3,500 and 5,000)
$7.86
received during the public outreach efforts. These
Tier 4 (5,000 and 6,500)
$10.64
tasks include additional stakeholder engagement
and education, final stormwater program definition
Tier 5 (6,500 and 8,000)
$13.41
and rate analysis, refinement of stormwater
customer billing database, development of a
Tier 6 (over 8,000)
$1.85/1,000 SF
sustainable credit system, fee -in -lieu -of program
a. tf there is on onsite storm water man ogemen t
assessment, review or ordinances and
facility, there could be areducedfeebosdona
intergovernmental agreements and overall project
sustainable credit program established by the City.
and quality management.
• Stakeholder Engagement and Education:
this item will include additional stakeholder
engagement through workshops, public meetings, etc... in order to further educate the
public and targeted stakeholders of the need for a sustainable stormwater program.
• Stormwater program definition and rate analysis: this item will include final definition of
the stormwater program extent and level of service as well as a final rate analysis. This
will include a review of an alternate rate structure using percentage of impervious area to
lot size rather than an absolute rate based on public feedback.
• Stormwater Customer Billing Database: while the majority of this task will be handled by
staff, Jacobs will provide support where necessary as guidance. The billing database
will not be finalized until such time that a final decision is made on the billing mechanism
and implementation.
• Sustainable Credit System: the next phase of the contract will begin to define further the
credit system and how it will apply to the various tiers shown in the current proposal
• Fee -in -lieu -of Program Assessment: assessment of the potential for a fee -in -lieu -of
improvement in instances where the project site may be limited and there is potential for
the City or other parties to make regional improvements.
• Ordinances and Intergovernmental Agreements: review ordinances to include all aspects
of water quality and water quantity. This will include an analysis of the current
exemptions of 1 and 2 family from the grading and drainage permit requirements as well
as development of agreements with certain entities that would be included in the
stormwater program.
• Overall project quality and management: this item will include the overall project and
quality management associated with the continuation of the project.
BUDGET/STAFF IMPACT:
The overall cost proposed amendment is $150,200 which includes additional tasks outlined
above as well as those listed in more detail on the attached contract amendment. This would
bring the total of all services to $383,282. A budget adjustment is proposed to move funding
from two existing drainage projects into the stormwater utility study project.
The overall cost of the additional services, if approved, would include additional staff and
consultant time as well as additional consultant expenses. If approved, it is anticipated that
these additional tasks could take up to one year, at which point an ordinance to establish the
utility could be presented to the Council. An additional period would then be required to finalize
the billing database and begin collecting the fee from users.
Attachments:
Final Draft Stormwater Study for Flood Management and Water Quality Funding
Contract Amendment 2 to the Stormwater Feasibility Contract
Stormwater S• for
Flood Management Water Quality
Funding
��rrAr�w �• •
Executive Summary
I Additional Funding is Needed:
• To further protect the public (safety), public roads, and private
property from flooding,
• For watershed improvements to continue protecting the
quality of the Beaver Lake, the City's drinking water source
• To proactively maintain current drainage systems while
starting to retrofit and replace, as needed, aging infrastructure
• To continue complying with increasing NPDES Phase II MS4
permit requirements
• To encourage the use of green infrastructure and other
sustainable development practices to help mitigate
stormwater runoff and flooding
The City of Fayetteville (the City) needs
additional funding for drainage, flood
management, and water quality
improvements. The City continues to attract
new residents, with corresponding new
development, while its existing stormwater
system continues to age. At the same time,
recent flooding demonstrated the need to
proactively plan for storms of increasing
intensity and frequency. A combination of
more high -intensity rainfall and growth of
hard surfaces has contributed to flooded
streets and properties, among other drainage
issues, which can ultimately impact the quality of the City's drinking water source, Beaver Lake. Other
stormwater-related funding needs are driven by the need for compliance with more stringent National
Pollutant Discharge Elimination System (NPDES) Municipal Separate Storm Sewer System (MS4)
regulations. In response, the City initiated this Flood Management and Water Quality Funding Study
(Funding Study) to identify the most equitable way to fund these needs going forward. The key findings
of the Funding Study are summarized in Table ES-1.
STAKEHOLDER ENGAGEMENT AND EDUCATION
Over a dozen workshops and meetings were held with City staff, Council, and Stakeholders between
June 2018 and August 2019 to educate Stakeholders about Fayetteville's drainage needs and secure
input on how to fund these needs. Stakeholders were further engaged via a dedicated website,
factsheets, and two Speak Up Fayetteville Surveys. Survey #1 found that a majority (82%) of the
166 surveyed individuals think that drainage issues are either a major or minor problem in their area.
Figure ES-1 notes what type of drainage issues Stakeholders are experiencing. Flooding in streets, roads,
or private drives; flooding on their property; and trash/debris in streams or drainage ditches each
received over 75 responses.
Figure ES-1. Survey #1 Results
ISO
Question options: * Pollution in streams, ponds, or lakes
Flooding in streets, roads, or private drives near your home or business Soil and/or stream bank erosion
Flooding anywhere on your property • Other
Flooding inside your home or business 0 1 have not experienced any drainage issues
Trash/debris in streams or drainage ditches
OCTOBER 2019 ES-1
EXECUTIVE SUMMARY
Table ES-1. Flood Management and Water Quality Funding Study —Key Findings
Topic
Findings
Stakeholder
82% of survey respondents think drainage is a major or minor problem in the City.
Engagement
• 39% of those surveyed were willing to pay a Flood Management and Water Quality fee based on
(Refer to Section 1 for
IA, 35% said they were not, and 26% were undecided.
more details.)
• Additional Stakeholder education and engagement efforts would be conducted if the City
proceeds with implementation.
Current Stormwater
0 The City currently spends approximately $1.5 million annually, of which $200,000 is on capital
Program Costs
projects.
(Refer to Section 3.2.)
. Drainage services are currently funded by the Street Fund, General Fund, Sales Tax Capital
Improvements Fund, and the intermittent issuance of revenue bonds.
Stormwater EOS
The recommended EOS was selected to make the City's current drainage services more
(Refer to
equitable for those older areas developed before public drainage easements were required.
Section 3.3.1.)
0 It would include public roads, public detention ponds, and ROWS, and drainage features within
existing dedicated public easements (excluding private commercial detention ponds).
• The City would establish procedures for accepting public drainage easements from existing
property owners and for assuming public maintenance responsibilities of private residential
detention ponds.
Stormwater LOS
0 The recommended LOS would address the backlog of drainage projects and meet Flood
(Refer to
Management and Water Quality goals in a 20-year time frame.
Section 3.3.2.)
a Examples of the services included in this LOS include:
- Cleaning/inspecting approximately 20% of the overall drainage system annually
(400,000 LF).
- Replacing 2.5% of drainage system annually (8,500 LF).
- Performing maintenance on residential detention basins (110 total).
Future Stormwater
. Depending on the LOS option selected, the City would need $3.5 to $4.6 million annually to fund
Program Costs
Operation and Maintenance, Engineering and Planning, Regulatory Compliance, and
(Refer to
Administration (CIP costs described separately in Section 3.4).
Section 3.3.3.)
Alternative funding sources such as additional taxes, special assessments, developer trust funds,
impact fees and grants would not be equitable, provide adequate funding or allow for use across
the City.
Programmatic Capital
. Depending on the option selected, total Future CIP needs range from $35 to $59 million over a
Improvement Project
15- to 20-year time period, respectively.
Costs
• Excluding the $15 million of early action plan CIP projects funded by 2019 drainage bond
(Refer to Section 3.4.)
program, the City would need approximately $1 to $3 million annually to fund its CIP needs.
• This would fund drainage improvements, floodplain buyouts/elevation projects, projects
identified by drainage studies and watershed improvement/stream restoration projects. The
higher level of CIP funding would also provide large-scale regional detention projects and some
detention pond retrofits.
CIP = Capital Improvements Program
EOS = extent of service
IA = impervious area
LF = linear foot (feet)
LOS = level of service
ROW = right of way
SF = square foot (feet)
ES-2 OCTOBER 2019
EXECUTIVE SUMMARY
Table ES-1. Flood Management and Water Quality Funding Study —Key Findings
Topic
Findings
Financial Planning and
. IA, using a billing unit of 1,000 SF, was selected as the basis of the fee in order to quantify the
Rate Analysis
approximate burden a property places on the City's drainage system.
(Refer to Section 4.)
• A six -tier, customer -neutral rate structure was selected as the most equitable and cost-effective
option given the distribution of the City's IA.
• The selected rate option would be phased in over a 5-year period.
• Future services would be funded from Tier Range (SF of IA) Year 5 Monthly Fee
a stand-alone enterprise fund sourced
from a new Flood Management and Tier 1 (0 and 2,000) $2.31
Water Quality Fee and the
intermittent issuance of revenue Tier 2 (2,000 and 3,S00) $5.09
bonds.
• The City plans to evaluate two Tier 3 (3,500 and 5,000) $7.86
methods for billing property owners
Tier 4 (5,000 and 6,500) $10.64
during implementation, either its
existing, monthly utility system or Tier 5 (6,500 and 8,000) $13.41
Washington County's annual property
tax system. Tier 6 (over 8,000) $1.85/1000 SF
Stormwater Credit
A sustainable credit system would be developed with additional Stakeholder input.
and Incentive
Programs
0Credits would be available to all customers and be based on the sizing criteria found in City's
(Refer to Section 5.)
drainage criteria manual with additional credits likely offered for green infrastructure practices,
rain barrels and public education.
• A stormwater rebate program and in lieu of fee program may also be considered as incentives
during implementation.
Policy and Legislative
. Selection of IA as the billing unit established a "rational nexus" between the drainage services
Considerations
provided by the City and how they are funded.
(Refer to Section 6.)
• The Funding Study was structured to reflect the following "fee for service" policy considerations:
- Unlike a tax, it is also important that all properties with impervious surfaces pay, there
should be no exemptions, only credits for reducing a property's burden on the stormwater
system. As a result, important City Stakeholders who have historically not paid impact fees
for police and fire, will still be expected to contribute to the Flood Protection and Water
Quality fee program.
- The overall cost of the program would be reasonably related to the services being provided,
- Revenue from the fee would be accounted for separately in an enterprise fund for use by
the stormwater program,
- The tiered rate structure would be proportional to a property's contribution to stormwater
runoff.
• At the State level, stormwater management, including the creation and operation of a
stormwater utility, is authorized by the definition of the term "works" in Arkansas
Code14-235-201.
• There are currently two communities in Arkansas with drainage fees: Bryant and Hot Springs.
CIP = Capital Improvements Program
EOS = extent of service
IA = impervious area
LF = linear foot (feet)
LOS = level of service
ROW = right of way
SF = square foot (feet)
OCTOBER 2019 ES-3
EXECUTIVE SUMMARY
CURRENT STORMWATER SYSTEM AND COSTS
The City currently provides stormwater services within the public rights of way (ROWS), on City -owned
property, and in those areas with public drainage easements. The City spends approximately $1.5 million
annually on these services, of which $200,000 is for capital projects. Although the City does try to
leverage grants and other funding sources, these activities are primarily supported by the Street Fund,
General Fund, and Sales Tax Capital Improvements Fund. As such, these activities are competing for
limited funds with the City's other transportation and operating needs on a year-to-year basis.
FUTURE STORMWATER SERVICES AND COSTS
A range of future service options was evaluated in the study. This included looking at different options
for the EOS (where the City will work) and LOS options (what stormwater services the City would
provide and at what frequency). Routine, proactive, and enhanced EOS/LOS options were studied to
enable a comparison of benefits versus costs and consideration of how they relate to the City's financial
capacity. Based on Stakeholder input, the City intends to pursue a future EOS option that makes the
City's current drainage services more equitable by extending maintenance to older parts of Fayetteville
while taking on public responsibility of select private infrastructure (residential detention ponds and
private infrastructure connected to Public ROW) (Figure ES-2).
ure is-2. r-uture txtent of 5tormwater Services
Future Extent of Stormwater Servi
pri" to CAN -,Am. f49—Wt#m. am nriYAfo
Ccmate a dmin ve easa meat to trio Cat
f V* RAY mpecw by cm(ats
Ket>ead PC to ensue so WiY oe d aa
W are specowtown d ace
cis'ttvia mxxx.Y,
t Public roads, public detention ponds and rights of way, and drainage teatufes within existing dedicated public
easements (excluding private commercial detention ponds).
2 City would assume public maintenance of those private drainage features found within what would now be designated
a public drainage easement but not for the age of the development
OLE 3 Public maintenance would extend to the downstream end of the first private infrastructure connected to the public
i system.
WJww
4 City would establish a process for accepting public mamtenan€e responsibilities of private residential detention ponds.
ES-4 OCTOBER 2019
EXECUTIVE SUMMARY
A 20-year capital program schedule and routine maintenance approach for the future LOS was selected
to address the backlog of drainage projects and meet Flood Management and Water Quality Goals. This
LOS option would provide for services such as:
• Cleaning/inspecting approximately 20% of the overall drainage system annually (approximately
400,000 LF)
• Replacing 2.5% of drainage system annually (approximately 8,500 LF)
• Performing maintenance on residential detention basins (110 total)
To do so, the City would spend $4.5 million annually in the future, of which $1.1 million would be on
capital projects.
FUTURE CAPITAL COSTS
The 2018 Drainage Plan estimated that more than $15 million is needed to address the most urgent
backlog of known capital projects (Figure ES-3). Because it can take several years for the City to save
enough to complete a single drainage project at the current funding level, the 2019 Drainage Bond was
passed as an Early Action Plan to start addressing these high priority capital projects.
However, additional funds are also needed to fully evaluate the City's watersheds and drainage system
to identify the full extent of issues and identify cost-effective, sustainable flood management and water
quality solutions. After removing the projects funded by the Drainage Bond, future CIP needs total $34.6
million over a 20-year period, or $1.1 million on an annual basis. This would fund drainage
improvements, floodplain buyouts/elevation projects, projects identified by drainage studies and
watershed improvement/stream restoration projects.
Figure ES-3. Comparison of Current Stormwater Budget with Identified Future Needs
COMPARISON OF CURRENT STORMWATER BUDGET WITH IDENTIFIED
FUTURE NEEDS
■ Operation and Maintenance 0 Engineering and Planning F5 Regulatory Compliance
Stormwater CEP Components a Administrative
CURRENT
FUTURE NEEDED
OCTOBER 2019 ES-5
EXECUTIVE SUMMARY
BASIS OF POTENTIAL FEE FOR FUTURE SERVICES
Impervious Area, or surfaces that do not absorb
stormwater such as rooftops, driveways, and
parking, would be the basis of the Flood
Protection and Water Quality Fee.
RECOMMENDED FLOOD MANAGEMENT AND
WATER QUALITY FEE STRUCTURE
A range of fee estimates was examined with
and without the continuation of current
funding from the Street and General Funds.
Ultimately, a stand-alone program for future
services was recommended that discontinues
reliance on these sources for the City's
drainage program. It would instead be
administered from an enterprise fund
sourced from the new Flood Management
and Water Quality fee and the intermittent
issuance of revenue bonds. The proposed
rate structure shaded yellow in Table ES-2
would be phased in over a 5-year period to
IA was selected as the basis of a potential Flood
Management and Water Quality fee. It is the most
common basis for stormwater-related fees nationwide
because using this metric ensures that customers pay
according to the demand their property places on the
City's stormwater system. IA causes an increase in the
amount of water entering the drainage system, which
can then increase the chance of flooding, stream bank
erosion, and sedimentation. Runoff from IA also carries
pollutants that can impact water quality, such as
sediment, herbicides and pesticides, metals, and
bacteria from pet waste. Therefore, IA is an equitable
basis for the fee because larger developments,
businesses, and homes, with corresponding parking lots
and driveways, generate a greater need for stormwater
services because of the greater amount of runoff that
they generate (Figure ES-4).
A preliminary customer billing database was developed
by the City's Geographic Information System (GIS)
department to assess the funding potential of the
236 million SF of IA identified within its 25,690 parcels.
A six -tier, customer -neutral rate structure based on IA
was selected as the most equitable and cost-effective
method of billing a Flood Management and Water
Quality fee (Table ES-2).
Table ES-2. Tiered Rate Structure
Tier Range (SF of
Impervious Area)
Proposed
Monthly Fee
Without
Current
Funding
$2.31
Monthly Fee
with Current
Funding'
Tier 1 (0 and 2,000)
$1.60
Tier 2 (2,000 and 3,S00)
$S.09
$3.52
Tier 3 (3,S00 and S,000)
$7.86
$S.44
Tier 4 (5,000 and 6,S00)
$10.64
$7.36
Tier 5 (6,500 and 8,000)
$13.41
$9.28
Tier 6 (over 8,000)
$1.85/1,000 SF
$1.28/1,000 SF
a. If there is an onsite stormwater management facility, there
achieve these monthly rates in Year 5. This could be a reduced fee based on a sustainable credit program
would result in an $5.09 monthly fee for a established by the City.
1,S00-SF home with a two -car garage, a
$67 monthly fee for a typical fast food restaurant, and a $250 monthly fee for a 75-unit apartment
complex.
ES-6 OCTOBER 2019
I WA =11119Al& 1JAIPG1:0
SUSTAINABLE CREDIT PROGRAM
A sustainable credit program would be developed with additional Stakeholder input if the City proceeds
with implementation. A stormwater credit is an ongoing, renewable reduction in the Flood Management
and Water Quality fee that is provided to property owners that implement practices onsite that reduce
the stormwater runoff from their properties; all properties subject to the fee are eligible to apply for a
fee credit. Credits would be offered to customers based on the sizing criteria found in City's drainage
criteria manual with additional credits likely offered to property owners that implement green
infrastructure practices on their properties or contribute substantially to public education related to the
City's stormwater programs. Other incentives such as a stormwater rebate program and in lieu of fee
program may also be considered during implementation.
POLICY BASIS OF A POTENTIAL FEE SERVICE PROGRAM
Development of this Funding Study was guided by establishing a "rational nexus" between the drainage
services provided by the City and how the services are funded. User fees are based on the "polluter
pays" principle; therefore, the size of the fee charged must be related to the burden a property places
on the City's stormwater system. The Funding Study was structured to reflect the following "fee for
service" policy considerations:
• All properties with impervious surfaces would pay; unlike a tax, there would be no exemptions only
appropriate appeals and credits would be allowed (NAFSMA, 2006).
• The overall cost of the program would be reasonably related to the services being provided.
• Revenue from the fee would be accounted for separately in an enterprise fund for use by the
stormwater program.
• The tiered rate structure would be proportional to a property's contribution to stormwater runoff.
Unlike a tax, it is also important that all properties with impervious surfaces pay, there should be no
exemptions, only credits for reducing a property's burden on the stormwater system. As a result,
important City Stakeholders who have historically not paid impact fees for police and fire, will still be
expected to contribute to the Flood Protection and Water Quality fee program.
OCTOBER 2019 ES-7
Contents
Section Page
ExecutiveSummary.........................................................................................................................ES-1
Acronymsand Abbreviations............................................................................................................... v
1 Introduction and Background......................................................................................................... 1-1
1.1
Strategic Vision and Goals...............................................................................................1-1
1.2
Background......................................................................................................................1-2
1.2.1 2010 Stormwater Utility Feasibility Study..........................................................1-3
1.2.2 2018 Drainage Improvement Plan......................................................................1-3
1.2.3 2019 Bond Program............................................................................................1-4
2 Stakeholder Engagement and Education........................................................................................
2-1
2.1
Stakeholders....................................................................................................................2-1
2.2
Funding Study Survey#1..................................................................................................
2-3
2.3
Funding Study Survey#2..................................................................................................
2-4
3 Stormwater Program Costs............................................................................................................
3-1
3.1
Current Stormwater System and Services.......................................................................3-1
3.1.1 Current Stormwater Services..............................................................................3-2
3.2
Current Stormwater Program Costs................................................................................3-4
3.3
Extent of Service and Level of Service Analysis...............................................................3-5
3.3.1 Extent of Service.................................................................................................3-6
3.3.2 Level of Service.................................................................................................3-10
3.3.3 EOS/LOS Program Cost Estimates.....................................................................3-13
3.4
Programmatic Stormwater Capital Improvement Plan.................................................3-15
3.5
Final Future Program Costs by Option...........................................................................3-17
3.6
Preliminary Organizational Structure............................................................................3-18
4 Financial Planning and Rate Analysis..............................................................................................
4-1
4.1
Alternative Funding Sources............................................................................................4-1
4.2
Basis of Proposed Fee Estimates.....................................................................................4-3
4.3
Financial Planning Assumptions.......................................................................................4-5
4.4
Recommended Fee Option..............................................................................................4-6
4.4.1 Flood Protection and Water Quality Fee Examples............................................4-7
5 Stormwater Credit and Incentive Programs....................................................................................
5-1
5.1
Stormwater Credits..........................................................................................................5-1
5.2
Other Incentive Programs................................................................................................5-2
6 Policy and Legislative Considerations.............................................................................................
6-1
6.1
Existing Stormwater Management Regulations..............................................................6-1
6.2
Policy Considerations.......................................................................................................6-2
6.3
Legislative Implementation Steps....................................................................................6-3
6.4
Arkansas Authorizing Legislation and Fee Programs.......................................................6-3
7 Next Steps Towards Implementation............................................................................................. 7-1
8 References..................................................................................................................................... 8-1
OCTOBER 2019 1
CONTENTS
Tables
ES-1
Flood Management and Water Quality Funding Study —Key Findings ......................................
ES-2
ES-2
Tiered Rate Structure..................................................................................................................
ES-6
1-1
Drivers for Flood Management and Water Quality Funding........................................................1-2
1-2
2018 Capital Budget Projects........................................................................................................1-4
1-3
2019 Drainage Bond Phase I Projects...........................................................................................1-5
2-1
Key Stakeholders and Methods of Engagement...........................................................................2-2
3-1
City of Fayetteville Stormwater System........................................................................................3-1
3-2
Overview of Current City Drainage Levels of Service...................................................................3-2
3-3
Current Stormwater Program Costs.............................................................................................3-4
3-4
Overview of Initial Extent of Service and Level of Service Options..............................................3-5
3-5
Extent of Service Options..............................................................................................................3-6
3-6
Level of Service Options..............................................................................................................3-11
3-7
Programmatic Costs by EOS/LOS Option....................................................................................3-14
3-8
Stormwater CIP Program Elements by Option...........................................................................3-15
3-9
Initial Capital Improvement Program Costs by Option...............................................................3-15
3-10
Final Capital Improvement Program Total Costs by Option.......................................................3-16
3-11
Final Future Program Costs by Option........................................................................................3-17
4-1
Summary of Alternative Funding Sources....................................................................................4-2
4-2
Parcel Count and Impervious Area by Customer Class.................................................................4-3
4-3
Comparison of Billing Unit Distribution by Customer Class..........................................................4-4
4-4
Proposed Tier Structure (Applies to All Properties)......................................................................4-5
4-5
Monthly Fee Estimates by Tier and Scenario................................................................................4-6
4-6
Staging of Recommended Fee Structure under Scenario 2 ($/1,000 SF/month).........................4-6
4-7
Monthly Residential Fee Examples by Tier in Year 5....................................................................4-7
4-8
Fee Examples for Other Property Types.......................................................................................4-8
6-1
Surveyed Status of Billing and Collecting Stormwater Fees from Government Entities ..............6-2
6-2
Stormwater Fee Rates for Hot Springs, Arkansas.........................................................................6-4
7-1
Next Steps Towards Implementation...........................................................................................7-1
Figures
ES-1
Survey #1 Results........................................................................................................................
ES-1
ES-2
Future Extent of Stormwater Services........................................................................................
ES-4
ES-3
Comparison of Current Stormwater Budget with Identified Future Needs ...............................
ES-5
ES-4
Impervious Area..........................................................................................................................
ES-6
1-1
Historical Stakeholder Education Example...................................................................................1-2
1-2
2017 Flooding Service Requests...................................................................................................1-3
1-3
2019 Drainage Bond Phase I Projects...........................................................................................1-6
2-1
Funding Study Business Card........................................................................................................2-1
2-2
Funding Study included in the Beaver Water District Speaker Series..........................................2-3
2-3
Drainage Issues Identified in Survey#1........................................................................................2-3
2-4
Survey#1 Results..........................................................................................................................2-4
2-5
Survey #1, Willing to pay a fee for additional services?...............................................................2-4
3-1
Current Extent of Service..............................................................................................................3-7
3-2
Standard Extent of Service (Option A)..........................................................................................3-8
3-3
Proactive Extent of Service (Option A/B and B)............................................................................3-9
3-4
Enhanced Extent of Service (Option C).......................................................................................3-10
3-5
Final Future Program Costs by Option........................................................................................3-17
3-6
Potential Future Organizational Integration...............................................................................3-19
OCTOBER2019
Section
4-1
4-2
4-3
5-1
Distribution of Parcel Count versus Impervious Area ...................
Recommended Monthly Flood Management and Water Quality Fee Structure in Year 5
Example of a Residence that falls within Tier 2.................................................................
2014 Drainage Criteria Manual Sizing Criteria...................................................................
OCTOBER 2019
CONTENTS
Page
4-4
4-7
4-8
5-1
Acronyms and Abbreviations
ADEQ
Arkansas Department of Environmental Quality
BMP
Best Management Practices
CIP
Capital Improvements Program
CWA
Clean Water Act
DCM
Drainage Criteria Manual
EOS
extent of service
ERU
equivalent residential unit
GIS
Geographic Information System
IA
impervious area
ID
Identification number
LF
linear foot (feet)
LID
low -impact development
LOS
level of service
MCM
Minimum Control Measures
MS4
Municipal Separate Storm Sewer System
NPDES
National Pollutant Discharge Elimination System
0 & M
operation and maintenance
ROW
right of way
SF
square foot (feet)
SWMP
Stormwater Management Plan
USGS
U.S. Geological Survey
WCRC
Watershed Conservation Resource Center
OCTOBER2019 v
SECTION 1
Introduction and Background
The City of Fayetteville (the City) needs additional funding for drainage, flood management, and water
quality improvements. The City continues to attract new residents and corresponding new
development, while its existing stormwater system continues to age. At the same time, recent flooding
demonstrated the need to proactively plan for storms of increasing intensity and frequency. A
combination of more high -intensity rainfall and growth of hard surfaces have contributed to flooded
streets and properties, among other drainage issues, which can ultimately impact the quality of its
drinking water source, Beaver Lake. Other stormwater-related funding needs are driven by the need for
compliance with evolving National Pollutant Discharge Elimination System (NPDES) Municipal Separate
Storm Sewer System (MS4) regulations and the inherent operation and maintenance (0 & M)
requirements of aging infrastructure. As a result, the City embarked on this Flood Management and
Water Quality Funding Study (Funding Study) to assess what services are currently provided by our
drainage program and to compare the cost of these services with the cost of a more proactive approach
to reduce flooding and pollutants that impact water quality.
1.1 Strategic Vision and Goals
The strategic vision for the Funding Study is taken from Fayetteville Vision 2050 (InVeritas, 2017), which
seeks "to support the City's guiding principles of well -maintained infrastructure and facilities, a
financially sustainable City government and ecosystem preservation to meet its future vision of a vibrant
and welcoming city that encourages diversity, creativity, and innovation while providing our citizens the
opportunity to thrive."
In addition to the goals found in the City's MS4 Stormwater Management Plan (SWMP) (based on the
City of Fayetteville 2015 Stormwater Management Program for Permit ARR 040010), the Council
provided feedback at the beginning of the Funding Study on the six primary drivers for additional Flood
Management and Water Quality Funding. The City Council clearly noted that its intent was to identify a
funding source that is fair and equitable, that helps prevent flooding, and that addresses erosion while
improving water quality (Table 1-1).
These goals and the guiding principles from Vision 2050, listed as follows, were used to define the extent
of service (EOS) and level of service (LOS) options:
1. A diverse growing local economy
2. A naturally beautiful city
3. Well -maintained city infrastructure
4. Greater ease of mobility — effective transportation system
5. Financially sustainable government
6. Quality public school system
7. Reputation as a safe community
8. A fun city in which to live
9. Pathways to prosperity
10. Education, research, and healthcare excellence
11. Ecosystem preservation
EOS goals are defined as "what infrastructure" and "where" the City is responsible for managing
stormwater. LOS goals are defined as "how well" and "how often" stormwater infrastructure is to be
managed.
OCTOUR 2019 1-1
SECTION 1- INTRODUCTION AND BACKGROUND
Table 1-1. Drivers for Flood
Management and Water Quality Funding
Drivers
MS4 SWMP Goals and Related Council Chartering Feedback
Education and Engagement
SWMP Goal: Educate citizens and businesses to understand the need to protect water quality
Equity and Fairness
• How to pay for it in a fair and legal way
• Cost
• Equitable to everyone
Flood Management
SWMP Goal: Protect citizens and property from flooding
• Address topography, clogged ditches, and inadequate existing drainage
• Prevent home flooding
• "Get the water out'
Proactive and Sustainable
Look to the future and plan for it
• Have clear long term, value-added solution
• Fund and implement CIP projects in a shorter time frame
Water Quality
SWMP Goal: Improve the quality of surface and sub -surface drainage
• Need to address erosion
• Water quality
Watershed Maintenance and
SWMP Goal: Preserve and maintain surface waters, wetlands and riparian areas
Preservation
0 Need to address erosion
• Water quality
CIP = Capital Improvements Program
1.2 Background
The City has a long history of educating and
engaging its Stakeholders on the importance of
sustainable drainage practices in creative ways
(Figure 1-1). On April 29, 2017, a large rain event
occurred in Fayetteville, Arkansas, causing flooding
in much of the City and surrounding areas. In
response to this event, many citizens contacted the
City to report damages to structures, roadways,
streams, and other damages. The City recorded the
customer service requests and has used this record
to identify over 100 drainage improvement and
maintenance projects ranging in size and
complexity (Figure 1-2). The 2018 Drainage
Improvement Plan (Fayetteville, 2018a), described
further in the following section, estimated that the
cost of drainage projects is between $1S to
$20 million, excluding O & M costs and projects that
require additional flood studies.
1 2 OCI0BER 2019
SECTION 1— INTRODUCTION AND BACKGROUND
Figure 1-2. 2017 Flooding Service Requests
April 29th, 2017 Flooding Service Requests �— p
1
vl
w.�.ww+uoa 7
)
Source: 2018 Drainage Improvement Plan (Fayetteville, 2018a)
1.2.1 2010 Stormwater Utility Feasibility Study
This Funding Study builds on the Stormwater Utility Feasibility Study completed by the City in 2010. It
was developed in response to the funding needs identified in the Nutrient Reduction Plan to reduce the
load of total phosphorus into Beaver Lake as part of a 2006 agreement between the City and the Beaver
Water District (Geosyntec, 2009). It found that a utility funded by a user fee would be beneficial as the
City continues to grow and develop.
1.2.2 2018 Drainage Improvement Plan
To prioritize the many drainage projects within the City, a numeric ranking system was developed by
City staff and approved by the City Council. The prioritization system ranks projects on a points system
with scoring based on the number of structures flooded, the number of structures with water against or
surrounding them, and other occurrences of property damage. The City prioritizes projects with flooding
structures by giving a score of 5 points to each residence or commercial building with water intrusion.
Water against or surrounding a structure is scored 2 points for each occurrence. Other property
damage, such as damage to an outbuilding or fence, scores 1 point for each occurrence. For example,
the ranking system would result in a score of 25 total points for a drainage project with two structures
flooded (10 points), five structures with water against or surrounding them (10 points), and five other
incidents of property damage (5 points). This sample drainage project would have a lower priority than
projects that scored above 25 and a higher priority than projects with fewer than 25 points.
OCTOBER 2019 1-3
SECTION 1 - INTRODUCTION AND BACKGROUND
To begin planning for a capital
improvement program, the City compiled
a list of all potential improvement
projects identified during the 2017
flooding incident. The cost of the projects,
maintenance, and floodplain buyouts
were combined with contingencies,
contractor overhead and profit, and
design fees to determine a total cost for
the existing project demand. Table 1-2
summarizes the projects implemented as
part of the 2018 capital budget of
$500,000; some projects were ultimately
delayed due to budget overruns.
1.2.3 2019 Bond Program
Table 1-2. 2018 Caoital BudEet Proiects
Project Location
Estimated
Cost
Status
Eastern Avenue Interim
$3,000
Complete
Park Avenue/Wilson Park
$33,000
Design Complete/
Transportation to Construct
Ramsey
$56,000
Design Complete/Bid 2020
Ferguson/Country Way
$ 427,624
Under Construction
Spyglass Hill
$172,621
Complete
Black Canyon
$500
Complete
South Emma Avenue
$7,000
Complete
The City proposed an "Early Action Plan" to address the most significant stormwater projects in early
2019 as part of a bond program for flood mitigation and drainage improvement projects identified from
the April 2017 flooding event. Funding for these Drainage Improvement Projects, approved at a level not
to exceed $15,840,000, was passed by voters on April 9, 2019. The 2019 Bond Program will be
implemented in two phases, Phase 1 (2019 to 2022) and Phase II (2022 to 2025). Eleven projects have
been identified for Phase I (Table 1-3 and Figure 1-3); Table 1-3 lists each of the Phase I projects'
location, estimated cost, and rank. The rank total is calculated using a point scoring system to prioritize
projects that will have the greatest impact. The scoring system used for the bond program projects is
the same scoring system described in Section 1.2.1. The estimated construction cost of each of the
11 projects is a planning -level estimate and does not include contingencies, contractor overhead and
profit, and design. Although the Drainage Bond projects are generally focused on improvements larger
than $200,000, smaller system upgrades such as North Palmer Avenue, and floodplain buyout efforts
(on Linda Jo Place, for example) are also,included.
The drainage projects outlined in this section were identified as top priorities to kickstart improvement
of the City's stormwater system. However, once these projects are completed, an ongoing and
sustainable effort will be required to maintain a quality stormwater management system over time. This
study for Flood Management and Water Quality Funding will evaluate the most equitable way to fund
the remaining needs going forward. The total estimated cost of these drainage projects during Phase I is
just under $9 million. With contingencies, contractors' overhead and profit, and the costs of design, the
total cost of these Phase I and II projects will be much closer to the $15 million in capital funding from
the proposed bond.
1-4 OCTOBER 2019
SECTION 1— INTRODUCTION AND BACKGROUND
Table 1-3. 2019 Drainage Bond Phase I Projects
Project
Estimated
Rank
ID
Project Location
Cost
Project Type
Total
1
Missouri Creek/Rolling Hills Phase 1
$3,726,000
Large Drainage Improvement. To alleviate street
22
flooding, property damage, and flooding in structures
throughout the drainage basin
2
Sunbridge Drive/North College
$1,400,000
Large Drainage Improvement. Additional storm
16
Avenue Area Phase I
drainage capacity in order to alleviate flooding the
intersection and structures near/at the intersection
3
Fairlane, Elmhurst, and McClinton
$247,S00
Large Drainage Improvement. To alleviate flooding in
17
Street Area Phase I
several structures in the area from drainage that flows
from the north
4
Upper Scull Creek, Part 2
$700,000
Large Drainage Improvement. Continuation of the
10
Upper Scull Creek project to address neighborhood
wide flooding of streets that is also causing damage to
private property
5
South River Meadows Drive /
$630,000
Drainage Improvements
8
Cherry Hills
6
Boxwood Addition Drainage
$632,500
Large Drainage Improvement. To alleviate the flooding
15
Improvements
of multiple structures and property damage by
installation of new storm drain along Ashbrook Drive
7
Eastern Avenue, Part 2
$490,000
Large Drainage Improvement
25
8
Niokaska Creek Stream
$350,000
Streambank Stabilization. Stream restoration project
4
Restoration
that would address major erosion currently damaging
private property
9
Scull Creek Stream Restoration
$350,000
Streambank Stabilization. Stream restoration project
4
that would address major erosion currently damaging
private property in the area
10
Homespun Drive
$210,000
Large Drainage Improvement. Upgrades of the existing
10
storm drainage system to alleviate structure flooding
11
North Palmer Avenue
$161,000
Drainage Improvement. Upgrades of the existing storm
5
drainage system to alleviate structure flooding near
Hotz Park
ID = identification number
OCTOBER 2019 1-5
SECTION 1 — INTRODUCTION AND BACKGROUND
IFiPure 1-3. 2019 Drainage Bond Phase I Proiects
Phase 1 (First Bond Issue)
Drainage Projects 'A
9/19 - 6/22
—Design
— Construction
c
f-
Project ID
a Project Name
1
Missourl creek
2
Sunhddge/College
3
Fairlane/Elmhurst/McClinton
d
Upper Scull Creek Phase 2
S
River Meadows or
6
Boxwood Addition
7
Emtem Avenue
R
Nlokmka Creek SLRest�tlon
9
Scull Creek Strea
SO
Homespun Drive
11
Palmer Avenue
After the $15,000,000 drainage bond is considered, the 2018 Drainage Plan identified a known
remaining CIP demand of just over $3,000,000, not counting the large-scale floodplain issues that
require further study. Section 3.4 further describes the City's programmatic stormwater CIP.
OCTOBER 2019
SECTION 2
Stakeholder Engagement and Education
2.1 Stakeholders
The City was cognizant that input from its
many Stakeholders, listed in Table 2-1,
would be vital to the City Council making an
informed decision of how to fund its Flood
Management and Water Quality needs. As a
result, the Funding Study, with extensive
support from the City's Communication
Department, used multiple methods of
engaging its Stakeholders. These included
developing a business card for City
leadership to use at community gatherings
to raise awareness and direct Stakeholders
to the project website (Figure 2-1).
The project website was populated with
meeting presentations and other materials
such as flyers and common acronyms
(Appendix A), to keep Stakeholders up to
date on the progress of the Funding Study.
Speak Up Fayetteville, the City's new
interactive engagement website, was also
used to administer the two surveys
described in this section as well as to allow
Stakeholders to identify drainage issues that
City staff might otherwise not be aware of.
Figure 2-1. Funding Study Business Card
City of Fayetteville
Study for
Flood Management
& Water Quality
Funding
The City of Fayetteville faces many challenges when
it comes to stormwater, both in quantity and quality,
which require a sustainable funding source. The City
is undertaking a study to discover the full cost of
stornwvater services that our citizens expect, and to
identify sources of funding to provide those services.
We encourage you to be a part of the process by
voicing your opinion.
Learn more at:
fayettevflle-ar.gov/flood-management-study
Due to the multiple studies and bond referendum activities that were ongoing concurrent with the
Funding Study, additional Stakeholder engagement and education efforts are planned, should the City
decide to proceed with implementation of the recommended option.
OCTOBER 2019 2 1
SECTION 2 - STAKEHOLDER ENGAGEMENT AND EDUCATION
Table 2-1. Key Stakeholders and Methods of Engagement
Key Stakeholders
Methods of Engagement
Mayor and Council Members
1. Direct coordination via in -person meetings, presenting the program, and answering
potential questions from their constituencies
2. Special Committee Meetings
3. Public Meetings and presence at Community Events
City Staff: Representatives of
1. Direct coordination via in -person meetings, presenting the program, and answering
Key Departments
potential questions from their constituencies
2. Staff Technical Advisory Committee (STAC)
General Public
1. Stormwater Public Meetings:
• September 20, 2018 (Ozark Natural Foods)
• September 22, 2018 (Fayetteville Farmers' Market)
• January 9, 2019 (Fayetteville Public Library)
• January 10, 2019 (Arkansas Research & Technology Park)
• January 17, 2019 (Boys & Girls Club)
2. Funding Study materials at other community events
3. Dedicated Funding Study website with presentations, acronyms and definitions, and
Factsheets #1 and #2
4. Speak Up Fayetteville with Survey #1 and Survey #2 as well as a mapping tool to identify
drainage needs
S. Direct mailing of outreach postcard to all residential utility account holders.
Stakeholders (Known Service
Citizens who contacted the City during the April 2017 storm event were provided direct
Calls)
notification of upcoming Funding Study events and opportunities to submit comments.
Key Stakeholders
Key Stakeholder such as the University of Arkansas, Residential Property Managers/Student
Housing Providers, Chamber of Commerce members, and those holding business licenses
were contacted using the following methods:
1. Direct notification of upcoming Funding Study events and opportunities to provide
comment.
2. Additional a -mails to key Stakeholder groups as well as traditional mailings to reach
those without e-mail/internet access.
3. Coordination via in -person meetings, presenting the program and answering potential
questions.
As outlined in Table A-1 in Appendix A and illustrated by the photograph on Figure 2-2, over a dozen
workshops and meetings were held with City staff, Council, and Stakeholders between June 2018 and
August 2019 to:
• Establish a strategic vision and goals for the Funding Study
• Review the City's current stormwater system and services
• Identify future stormwater needs and the additional cost of providing these services
• Present options related to where the City provides drainage services (EOS) and what services the
City provides and their frequency (LOS)
• Select impervious area (IA) by property as the basis for billing a six -tier, customer neutral rate
structure as the most equitable method of linking a property's impact on the drainage system with
the fee it is charged
• Review a range of Flood Management and Water Quality fee estimates by program options
• Review options for a sustainable credit program to reduce the fees of those owners willing to
proactively manage their property's stormwater runoff
2 2 OCTOBER 2019
SECTION 2 — STAKEHOLDER ENGAGEMENT AND EDUCATION
2.2 Funding Study Survey #1
Stakeholder Survey #1 was open from August 8, 2018
to April 7, 2019, during which 166 responses were
logged. Of these, 157 responses were from survey
takers that live in the City, with approximately 85% of
these owning their residence and 1S% renting.
During this time period, on average, there were:
• SS4 total visits to the website
• A maximum of 49 visits per day
• 64 engaged visitors, meaning they filled out a
survey or dropped pins on the map
• 196 informed visitors, meaning that they clicked
on something, either viewing a page or
downloading a document
Overall, the majority (82%) think drainage issues are either a major or minor problem in their area.
Figure 2-3 characterizes what type of drainage issues the Stakeholders are experiencing. Although
Stakeholders could select more than one issue, flooding in streets, roads, or private drives; flooding on
their property; and trash/debris in streams or drainage ditches each received over 75 responses.
2-3. Drainaee Issues Identified in Survev #1
150
Question options
Flooding in streets, roads, or private drives near your home or business 0 Flooding anywhere on your property
Flooding inside your home or business 0 irashidebris in streams or drainage ditches 0 Pollution in streams, ponds, or lakes
Soil andlor stream bank erosion * Other 0 1 have not experienced any drainage issues
(166 responses, 0 skipped)
To gauge the extent to which the City is aware of its overall drainage needs, Survey #1 asked how many
of those surveyed were affected by the April 2017 storm. Of the 166 respondents, 76 were affected;
however, only 18 (23%) logged a service request with City staff. To determine whether the City would
have legal access to fix drainage issues when a service request is filed, survey takers were asked whether
there was an existing public drainage easement on their property. Figure 2-4 illustrates that 30% do
have a drainage easement on their property while 39% did not know, indicating that additional
Stakeholder education is needed on public easements. Almost half of those responding noted that
drainage issues in their part of Fayetteville were a major issue while 33% thought they were a minor
issue (Figure 2-4).
OCTOBER 2019 2-3
SECTION 2 - STAKEHOLDER ENGAGEMENT AND EDUCATION
55 (33.1%)
"a k40-rW1
Question options Question options
Yes P No 0 ! don't know goes not apply r Major problem 0 Minor problem 0 Not a problem
Coxonar question (166 responses. 0 s*pped) (166 responses, 0 skipped)
Survey #1 also asked Stakeholders about their willingness to pay a Flood Management and Water
Quality fee based on the amount of impervious surface (Figure 2-5). Sixty-five (39%) responded that
they were willing to pay a fee while fifty-eight, 35%, said they were not, and 25% were undecided.
Survey #1 provided an open-ended question; a sample of these responses included the following:
• Comments encouraging credits for low impact/green infrastructure measures, such as preservation
of drainage onsite through bioswales, rain gardens, or rainwater collection for metered irrigation
• Comments regarding affordability and equity
• Willingness to pay for long-term, forward -
thinking, sustainable solutions, not more
ditches/culverts/higher curbs, and similar;
instead, solutions such as more permeable
surfaces, more native vegetation, and
education
2.3 Funding Study
Survey #2
Funding Study Survey #2 was posted on
July 11, 2019 and will be open through the end
of the September 2019. It solicits the City's
businesses' and residents' opinions on the
reasonableness of the proposed rates needed
to proactively fund the management of flooding
and water quality issues.
2-4 OCTOBER 2019
SECTION 3
Stormwater Program Costs
This section summarizes the cost of the City's current stormwater program and the potential
programmatic costs of future program options related to EOS, where the City will work, and LOS, what
stormwater services the City would provide and at what frequency. To do so, it first characterizes the
City's current stormwater system and then describes the range of EOS/LOS options developed to allow
the City to characterize potential tradeoffs between cost of these services and its financial capacity
(Section 4). Understanding the required costs associated with stormwater program implementation is
critical to identifying required revenue and the associated financial management strategy.
3.1 Current Stormwater System and Services
Currently, the City focuses its
limited stormwater
management funding on
complying with the City's
MS4 NPDES permit and
responding to emergency
repairs. The City is only
responsible for operating and
maintaining the public
portion of its municipal
stormwater system.
Maintenance of the City's
stormwater assets is
primarily done in response to
an emergency or to customer
calls complaining about a
stormwater management
issue (typically associated
Table 3-1. City of Fayetteville Stormwater System
Total
Responsibility
City
% of Total
Feature
Count
Miles
City
Private/
Other
Area of City of FayettevillE
55 square miles
Rivers and Creeks
draining > 100 acres
101
Highways
91
X
X
City Streets
386
X
Private Streets
110
X
Bridges
50
--
X
X
--
Detention Ponds
286
12
274
4%
Outfall
1,494
643
851
43%
with localized or nuisance flooding). The City relies on its Transportation Division to perform street
sweeping and the cleaning out of curb inlets to remove sediment and debris that could potentially clog
storm drains. They manage roadside ditches and continually clean and reshape the ditches to maintain
positive drainage. Table 3-1 summarizes the City's stormwater assets and provides information on some
relevant contributing aspects of the City, such as the rivers and creeks or streets. Various stormwater
assets are tabulated based on type, and the responsibility for both City features and Stormwater assets
is included. The quantity of various assets and the responsibility for them affects both the current and
future stormwater program costs (Sections 3.2 through 3.4).
The City's stormwater assets also include:
• 257 miles of conduit pipes, of which 167 miles are in drainage easements or ROWS
• 11 miles of box culvert, of which 7 miles are in drainage easements or ROWS
• 238 miles of channel, of which 114 miles are in drainage easements or ROWS
• 7,921 inlets and 794 junctions, also within easements or ROWS
OCTOBER 2019 3-1
SECTION 3 - STORMWATER PROGRAM COSTS
3.1.1 Current Stormwater Services
The City currently provides the stormwater services summarized by program area in Table 3-2 for the
public assets listed in Table 3-1. As noted previously, the City is not responsible for the 110 miles of
private streets and ROWS (which include drainage infrastructure), nor does it maintain the 274 private
detention ponds that are not part of the public drainage system.
Table 3-2. Overview of Current City Drainage Levels of Service
Program Area
Current City Services
Maintenance of Public Drainage System
The City is responsible for 43% of its outfalls (643 of 1,484 total), 48% of channels
(Public Roads, ROWs, and Infrastructure
(114 miles of 238 total) and 386 miles of streets/ROWS.
with Easements)
Maintenance of Private Drainage System
Not applicable. There are approximately 110 miles of private streets in Fayetteville.
(Private Roads and Infrastructure)
Maintenance of BMPs
Fayetteville is responsible for maintaining the 12 public (of 286 total) detention
(Detention Ponds)
ponds within the City.
Maintenance of City Streamside Corridor
There are currently no funding or corresponding public easements to allow the City
to maintain most of its City Streamside Corridor. The City is currently inventorying
and assessing the 100 miles of rivers and creeks draining more than 100 acres in
Fayetteville as part of a multi -year project, as funding allows.
Capital Improvement Program Projects
Approximately $200,000 is currently budgeted annually for CIP projects. The 2019
Drainage Bond approved by voters provides for an Early Action Plan to address
$15 million of the City's known $17.3 million backlog of projects.
Program Administration
Drainage/stormwater plan reviews and inspections are addressed by a mix of City
(Plan Reviews and Inspections)
staff located in multiple departments. These services are funded via multiple
sources (impact fees and tax revenue).
Stream Restoration and Stabilization
As funding allows, the City has started inventorying and assessing streams on a
Projects
watershed basis to prioritize restoration and stabilization activities.
NPDES MS4 Program Administration
Phase II Small Community responsible for dry weather screening of all of the City's
existing stormwater outfalls within a 5-year period, monthly construction site
stormwater runoff control (erosion and sediment control) inspections, post -
construction stormwater plan reviews (DCM and similar), post -construction
stormwater plan "as built" inspections, and municipal maintenance/good
housekeeping inspections.
Water Quality Monitoring
The City currently funds two USGS Stations.
BMP = Best Management Practice
DCM = Drainage Criteria Manual
USGS = U.S. Geological Society
The City's Engineering Department is responsible for the following flood management and water quality -
related functions and services:
• NPDES MS4 permit compliance
• Floodplain administration
• Streamside protection
• Stormwater quality and nutrient reduction
• Design, bid, and construction management of drainage improvement projects
3-2 OCTOBER 2019
SECTION 3-STORMWATER PROGRAM COSTS
As an operator under the NPDES ARR040000 MS4 general permit, the City must comply with all permit
conditions. Violation of any condition of the general permit constitutes a violation of the Arkansas
Water and Air Pollution Control Act and subjects the discharger to the penalties specified therein. The
Arkansas Department of Environmental Quality (ADEQ) issued a revised five-year permit, effective
August 1, 2019, in order to renew general permit coverage for Phase II MS4s like Fayetteville. The level
of effort and cost of ensuring compliance continues to increase with each subsequent permit renewal.
For example, ADEQ has implemented a two-phase permit in order to be compliant with the federal
general permit remand rule'. This makes the City's associated SWMP an integral and enforceable part of
its permit, requiring public notice in the event of major modifications. As part of the recent MS4 permit
renewal, ADEQ also made over 30 changes to the permit conditions that the City must integrate to
ensure compliance going forward2.
The City's NPDES MS4 permit conditions include six Minimum Control Measures (MCMs). The MCMs
provide a framework for operators to design their programs to meet the three goals of reducing
discharge of pollutants, protecting water quality, and satisfying the appropriate water quality
requirements of the Clean Water Act (CWA). The six MCMs, or program elements, are as follows:
• Public Education and Outreach on Stormwater Impacts
• Public Involvement/Participation
• Illicit Discharge Detection and Elimination
• Construction Site Stormwater Runoff Control
• Post -Construction Stormwater Management in New Development and Redevelopment
• Pollution Prevention/Good Housekeeping for Municipal Operations
Public education and outreach on stormwater impacts includes distributing educational materials and
performing outreach to inform citizens about the impacts of polluted stormwater runoff on water
quality. Public involvement/participation takes this a step farther by providing opportunities for citizens
to participate in program development and implementation. Illicit discharge detection and elimination
deals with both systematic and episodic discharges and includes public outreach as citizens should be
informed of the hazards associated with illegal and improper disposal of waste. Construction site runoff
control involves developing, implementing, and enforcing an erosion and sediment control program for
construction activities that disturb 1 or more acres of land. Post -construction runoff control continues
this process by implementing community -appropriate BMPs to reduce the impact of developments over
their lifespan. Pollution prevention from municipal operations includes staff training on pollution
prevention measures and it is the City's stated intention to "lead by example" and use this MCM to
model excellent pollution control practices for Fayetteville citizens and businesses.
The City is responsible for reviewing all new development plans for compliance with the City of
Fayetteville Code of Ordinances and other applicable regulations. These regulations include, but are not
limited to, the City of Fayetteville DCM and the flood damage prevention code. The City participates in
the National Flood Insurance Program and has adopted a flood prevention ordinance in order to help
protect residents and comply with the program.
1 For more information, see https://www.epa.gov/npdes/npdes-stormwater-final-ms4-general-permit-remand-rule for documents associated
with the final MS4 general permit remand rule.
2 See%Section 1.10 of https://www,adeo.state.ar.us/water/permits/npdes/stormwater/pdfs/ms4/arrO400i)0-final-fact-sheet-20190801.pdf.
OC10BLR 2019 3-3
SECTION 3—STORMWATER PROGRAM COSTS
Streamside protection, stormwater quality, and nutrient reduction are also handled by the City's
engineering department. A Streamside protection ordinance is in effect and the City published a
Streamside Protection BMP Manual to assist the public in complying with this ordinance. They also
partner with the Watershed Conservation Resource Center (WCRC) and perform stream restoration
projects.
3.2 Current Stormwater Program Costs
The City currently spends
approximately $1.3 million to $1.5 Table 3-3. Current Stormwater Program Costs
million annually on water quality and
flood management activities (Table 3-
3). Although the City does try to
leverage grants and other sources,
these activities are primarily funded by
the Street Fund, General Fund, and
Sales Tax Capital Improvements Fund.
The Street Fund is used to maintain and
repair City streets, ROWS, drainage,
traffic control and maintenance, and
City -owned sidewalks; portions are also
allocated for public transit to Razorback
and Ozark Transit systems. The Street
Fund is primarily financed by turnback
revenues received from the State of
Arkansas and turnback monies received
from the County Road Millage Tax, as
well as a temporary gasoline tax levied
by the State. The General Fund, the
City's major operating fund, is sourced
from over 10 different taxes, fees, and
services. Over 80% of the revenue
supporting the General Fund comes
Department and Cost Center
2017
Engineering
$460,000
Non -project -related labor (Floodplain Administration,
Streamside Protection, and similar)
$100,000
Stormwater Quality Management and Nutrient
Reduction
$160,000
Drainage Projects/Other
$200,000
Parks & Recreation
$25,000
Maintenance of public owned detention and
stormwater quality features
$25,000
Transportation Division
$959,682
Drainage
$697,101
Street Sweeping
$262,581
Water & Sewer
$13,759
Staffing - Inspections
$1,207
Dam Inspection and Maintenance
$12,552
Grand Total
$1,458,441
from the City's Share of county sales
Note: Drainage capital increased from $200,000 annually to $500,000
tax, the city sales tax, franchise fees, annually in 2018 for Engineering.
and the property tax millage
(Fayetteville, 2018b). The Sales Tax Capital Improvements Fund is sourced from the City's sales and use
taxes and is used for acquisition and improvement projects as well as equipment additions and
replacements that are included in the City's 5-year CIP. Contributions to the stormwater program come
from various departments including Engineering, Parks and Recreation, Transportation Division, and
Water and Sewer.
The current costs of the City's stormwater program, as of 2017, are summarized in Table 3-3. The City's
Engineering Department is also responsible for the design, bid, and construction management of
drainage improvement projects throughout the City. Projects are generally classified as small, medium,
or large based on their cost. Small drainage projects are defined as less than $500,000; some examples
include culvert replacement or size increase, curb or inlet construction, increasing inlet capacity, and
creation of ditches or swales to divert runoff. Medium drainage projects are similar project types but are
larger in scope and range from $500,000 to $1 million. Large drainage projects are those that would be
3-4 OCTOBER 2019
SECTION 3 — STORMWATER PROGRAM COSTS
over $1 million and be implemented throughout entire watersheds. Projects this size have been
considered previously but were deferred due to cost considerations.
Maintenance is a combined effort between the City and the property owners. The Parks and Recreation
Department maintains the 12 detention ponds as well as the parks in which many low -impact
development (LID) features have been installed. However, the bulk of maintenance efforts for
stormwater assets are addressed by the Transportation Services Department. The City maintains all
public facilities, including above and below ground storm drainage. When needed, the City will address
waterways located within the city limits by removing debris, sediments and other items that may inhibit
effective conveyance of stormwater runoff. However, in many instances this maintenance activity
dependent on the existence of a drainage easement surrounding the structures and waterways in
question. If no drainage easement exists or if the portion of the storm drainage system is private, it
becomes the responsibility of the property owner or owners to maintain that portion of the system. This
is also applicable for stormwater detention basins as the maintenance responsibility is placed on the
property owner or in some instances the Property Owner's Association. The Water and Sewer
Department is responsible for inspections including dam inspection and maintenance on the three major
lakes in Fayetteville (Lakes Fayetteville, Sequoyah, and Wilson).
3.3 Extent of Service and Level of Service Analysis
Future stormwater program costs are based on a range of options for both EOS and LOS (Table 3-4). The
EOS defines where the City will work or, in other words, what drainage infrastructure the City will be
responsible for. The LOS defines what stormwater services the City would provide and at what
frequency. These services generally fall into categories such as 0 & M, regulatory compliance,
engineering and planning, and capital improvement planning. Three initial options were provided for
both EOS and LOS—Routine, Proactive, and Enhanced —ranging from the least to the most involved.
Having a range of potential EOS and LOS options will allow the City to characterize potential tradeoffs
between the cost of these services and its financial capacity. Programmatic cost estimates are tabulated
for these options in later sections while a blended option of Standard/Proactive was added later in the
Funding Study.
Table 3-4. Overview of Initial Extent of Service and Level of Service Options
Likely
Time
Cost
Option
Frame'•
Purpose of Option
Current
Characterize existing conditions, that is, what drainage services the City provides and where
for the current program costs
$
Standard
20 years
Characterize the cost to address unintended inequities in the City's current drainage services
$$$
Proactive
10 years
Characterize the cost of additional public responsibility of private infrastructure and to
estimate the cost of additional unfunded regulatory compliance if the City continues to grow
in population
$$$$$
Enhanced
S years
Characterize the cost of additional public responsibility of private infrastructure. Estimate the
cost of additional unfunded regulatory compliance if the City continues to grow in population
' Time frame to address backlog of drainage projects and meet Flood Management and Water Quality goals
Financial planning and rate analysis, described in Section 4, follows an iterative process to help the City
identify the right balance of stormwater services, given its financial capacity and Stakeholder priorities.
ocro�i [z )oly 1-s
SECTION 3 — STORMWATER PROGRAM COSTS
3.3.1 Extent of Service
Although the current EOS has been implemented fairly consistently, some areas of the City do not have
drainage easements simply due to the age of the development, while others are adjacent to larger
waterways or drainage conveyances that are not realistic to maintain privately. Table 3-5 outlines the
City service areas and dictates which service areas would be addressed by each EOS.
Table 3-5. Extent of Service Options
Service Area
Current
Standard
(Option A)
Proactive
(Option A/B
and B)
Enhanced
(Option C)
Public Roads and ROW
X
X
X
X
Private infrastructure connected to Public ROW,
X
X
Drainage Easements
Existing
X
X
X
X
Assume Easements Equitably (City-wide)
X
X
X
Detention Pondsb
Public
X
X
X
X
Residential
X
X
Non -Residential
X
City Streamside Corridor'
X
a_ Public maintenance would extend to the downstream end of the first private infrastructure connected to the ROW.
b. Donated easement and a brief report certified by a licensed Arkansas Professional Engineer demonstrating that all private
drainage features are functioning according to the specifications of the City's DCM prior to being accepted by City.
A corridor representing a 10-foot buffer from the top of each waterway's banks downstream of the City's 100-acre
headwater for streamside protection areas.
3-6 OCTOBER 2019
SECTION 3—STORMWATER PROGRAM COSTS
3.3.1.1 Current Extent of Service
Figure 3-1 illustrates existing conditions in which the City maintains public roads and ROWS as well as
drainage features (excluding detention ponds) within dedicated easements. These dedicated public
easements are generally found in the more recently developed areas of the City.
Figure 3-1. Current Extent of Service
H -",q
r
17,19
orb+
5tvd� for i iaod A4anageawnr and NhrrerQL aky knWing
l
OCTOBER 2019 3-7
SECTION 3—STORMWATER PROGRAM COSTS
3.3.1.2 Standard Extent of Service (Option A)
Current EOS plus public maintenance of those private drainage features found within what would now
be designated a public drainage easement but not for the age of the development (Figure 3-2). Private
property owners would be expected to:
• Donate these new drainage easements to the City on an as needed basis
• Provide a brief report certified by a licensed Arkansas Professional Engineer demonstrating that all
private drainage features are functioning per the specifications of the City's drainage criteria manual
prior to being accepted. Alternately, should the City decide to proceed with implementation, the
City may assess the cost and legal implications of allowing City staff to perform these certifications
for private property owners.
Figure 3-2. Standard Extent of Service (Option A)
Pilot to city eccewm 1`060rm6ia W
fibx.2rr .st �s:!:
D"sao=3" 02senwil aoeva
P; a user repot ceMf*d W an
Ergrbr einn-Amliin
&—aw iaa — are hater orwv pe
ar V" COY$ "wtage otem "WnQ
t Public roads, publk detenbcan ponds and rights of way, and
2. Drainage features (excluding private detention ponds) within dedicated public easements
3. City would assume public maintenance of those private drainage features fouM within what would now be designated a
public drainage easement but not for the age of the development
3-8 OCTOBER 2019
SECTION 3-STORMWATER PROGRAM COSTS
3.3.1.3 Proactive Extent of Service (Option A/B and B)
The proactive EOS alternative, referred to later as "Option A/B and B," includes the standard EOS plus
the City would establish a process for accepting public maintenance responsibilities of private residential
detention ponds as needed (Figure 3-3). Private property owners would be held to the same
expectations as the standard EOS.
3-3. Proactive Extent of Service (Option A/B and
Prim to cov accRohm resms4bNitV. the DrNme
oroftoy ownsr Mot
• Dot: a "k+r eastrnart m ow chy, as —km,
• € lovee a bW repA eeTtrW by an Aft-kU se4 FIE
66ff4 VWV Oft A: M4* * M A90 are
hr+c9Ktsm pet VA S eaftawn3 a€ ste ceys &ar,.40
allefu r9LY "V411
i
Standard EOS, additionally public maintenance would extend to the downstream end of the first private infrastructure
connected to lire public system.
H2 Drainage features (excluding private commercial detention ponds) within dedicated public easements
RMIP i City +,mould estabhsh a process for accepting public maintenance responsibilities of private reside'nual detenuon ponds.
Steadylar Flood Manage nent and Waiter Quality Funding
OCTOBER 2019 3-9
SECTION 3—STORMWATER PROGRAM COSTS
3.3.1.4 Enhanced Extent of Service (Option C)
Includes the proactive EOS described previously, plus public maintenance of commercial detention
ponds and those waterways downstream of the City's 100-acre headwater for streamside protection
areas with public responsibility extending out approximately 10 feet from the top of the waterway's
banks (Figure 3-4). Private property owners would be held to the same expectations as proactive EOS.
Figure 3-4. Enhanced Extent of Service (Option C)
ur+ztlttx.2=rmtsc
Dons, a df WM ma to VW c vy as nceOW,
FIVv-eJd a U M,eV-t u-mkd Uf.V31R- taexd FE
ci9diK'/t VJIV t W.4 xa (:pima Qa{l,a8 ie rax ls" am
4,A CmM iw the speaT,kat*m al t o Otis d anaW
sa4W3 rmxr,,V.
cmw.t
I Proactive EOS, and
2 City would establish a process for accepting public maintenance responsibilities of private residential and commercial
Mdetention ponds, and
Public maintenance of the approximately 100 Was of waterways downstream of the City's 100-acre headwater for streamside
protection areas; public responsibility would d extend ml approximately 10 feet from the top of the waterway's banks
3.3.2 Level of Service
The LOS dictates what stormwater services would be provided by the City and at what frequency. These
services, listed by option in Table 3-6, are generally distributed among four categories: O & M,
regulatory compliance, engineering and planning, and stormwater CIP. After additional Stakeholder
feedback, Option A/B was added to characterize the financial impacts of the Option B EOS with the
Option A "standard" frequency of maintenance and time frame for CIP.
3.3.2.1 Current Level of Service
Table 3-6 outlines the stormwater services provided for a current LOS. These are the services that are
currently provided by the City. O & M services are primarily reactionary, drainage calls are responded to
and resolved, and public detention ponds are inspected and maintained at a minimum level. The current
LOS does not cover inspection and maintenance of private residential or commercial ponds. Regulatory
compliance actions include administration of the NPDES MS4 program as well as water quality
monitoring and inspections that meet regulatory minimums. Program elements related to engineering
and planning are limited for the current LOS (Table 3-6). Dam safety studies are performed, as are a
limited number of drainage studies, stream and watershed assessments, and floodplain studies. Low
impact development retrofits are not addressed at this LOS. Capital improvement projects are limited by
3-10 OCTOBER 2019
SECTION 3—STORMWATER PROGRAM COSTS
funding. At this LOS, a limited number of drainage improvements, watershed improvements, and dam
safety upgrades are performed but many larger stormwater improvement projects are not feasible.
Table 3-6. Level of Service Options
Standard
Proactive
Enhanced
Program Elements
Current
(Options A and A/B)
(Option B)
(Option C)
Operations and Maintenance'
Respond to Drainage Calls
Xb.
X
X
X
Provide Resolution to Drainage Call
Xb,
4S days
30 days
2 weeks
(No Action, Routine Fix, CIP Fix, or Drainage Study)
Inspection and Routine Maintenance of Public
V
Annually
Annually
Annually
Detention Ponds
Inspection and Routine Maintenance of Private
1S%Annually
2S%Annually
50%Annually
Residential Ponds
Inspection and Routine Maintenance of Private
25%Annually
Commercial Detention Ponds
Inspection and Routine Maintenance of Public
Reactive`
20% Annually
25%Annually
S0%Annually
Drainage System/MS4
Regulatory Compliance
NPDES MS4 Program Administration
Phase II
Phase II Small
Phase II Medium
Phase II Medium
Small
Water Quality Monitoring
Two USGS
Two USGS Stations
Four USGS
Four USGS
Stations
Stationed
Stationsd
Dry Weather screening of existing stormwater
20%
20% Annually
50% Annually
100% Annually
outfalls
Annually
(Compliance goal = Screen all outfalls every S years)
Construction Site Stormwater Runoff Control
Monthly
Monthly
Biweekly
Biweekly
(Erosion and Sedimentation Control) Inspections
Post Construction Stormwater Plan Reviews (DCM
X
X
X
X
and similar)
Post Construction Stormwater Plan "As Built"
X
X
X
X
Inspection
Dam Safety Inspections
Xc
X
X
X
Municipal Maintenance/Good Housekeeping
Annually`
Annually
Two per Year
Two per Year
Inspections
OCTOBER 2019 3-11
SECTION 3 — STORMWATER PROGRAM COSTS
Table 3-6. Level of Service Options
Standard
Proactive
Enhanced
Program Elements
Current
(Options A and A/B)
(Option B)
(Option C)
Engineering and Planning
Drainage Studies
Limited
Prioritize basins,
Prioritize basins,
City-wide
10% of City studied
25% of City
Drainage Study
annually
studied annually
Stream and Watershed Assessments
Limited
Prioritize basins,
Prioritize basins,
City-wide
10% of City studied
25% of City
Watershed
annually
studied annually
Assessment,
including Stream
Condition
Assessment
Floodplain Studies
Limited
As Needed
As Needed
As Needed
LID Retrofits
Limited
As
Prioritize and
Redevelopment
implement
Occurs
retrofits based on
Drainage Studies
Dam Safety Studies
X
X
X
X
Stormwater CIP Components
CIP Project Completion Rate
Limited
20 Year
10 Year e_
5 Year
Potential CIP Project Types:
Drainage Improvements/Retrofits
Limited
X
X
X
(Pipe Replacements, Neighborhood Systems)
Floodplain Buyouts or Improvement/Elevation
X
X
X
Projects
Large-scale regional detention projects
X
X
Watershed Improvement, that is, Stream
Limited
X
X
Restoration and Stabilization Projects
Dam Safety Upgrades
Limited
X
Detention Pond Retrofits
X
X
' O & M to address both the drainage and water quality criteria of the City DCM
b. Where public drainage easements exist to legally allow the City to work on private property
Meeting regulatory minimum, frequency limited by current City resources (funding and staff)
d. Additional monitoring points may be required under a Phase II Medium permit and/or due to Total Maximum Daily Load
monitoring of the Illinois River.
e. After additional analysis of potential costs and input from City Stakeholders, the CIP completion rate was later increased
modestly for Option B from 10 years to the 15 years
3-12 OCTOBER 2019
SECTION 3 - STORMWATER PROGRAM COSTS
3.3.2.2 Future Level of Service Options
Three future LOS options were considered including Options A and A/B (standard), Option B (proactive),
and Option C (enhanced). Each LOS alternative provides an increase to the baseline LOS currently
provided, see Table 3-6. The frequency of several program elements would remain constant for each
LOS. These include responding to drainage calls, post -construction plan reviews and "as built"
inspections, and dam safety inspections and studies. However, the LOS options provide a framework for
program elements to be transitioned from reactionary to scheduled. O & M activities could become
more preventive in nature and greater numbers of water quality control efforts could be implemented.
Table 3-6 illustrates that increases in LOS would allow the City's Engineering and Planning Departments
to play a much larger role in the stormwater management program. Currently, studies of drainage,
streams and watersheds, and floodplains are limited. The three new levels of service would allow for
portions of the City, or even the City as a whole, to be studied with the added benefit that the new
information facilitates appropriate use of future capital improvement funds.
3.3.3 EOS/LOS Program Cost Estimates
Feedback on these three EOS/LOS options was solicited from Stakeholders and Council members
through a series of meetings regarding what should be included in each option. The three alternatives
for EOS and LOS have different associated costs, which increase over time. Programmatic cost estimates
were generated and projected forward over a 5-year time frame and are provided in Tables 3-7 and 3-8
or, with respect to capital improvement components, in Section 3.4.
The programmatic costs for O & M are based on the services needed for the current stormwater system,
as quantified in Table 3-1. Costs for responding to drainage calls and resolving them as well as inspecting
and maintaining detention ponds are consistent for Option A, Option B, and Option C services. However,
the 0 & M costs for Option A/B were adjusted to reflect the City taking care of private, residential
detention ponds. 0 & M costs were estimated based on several factors including: quantity of various
assets, frequency of maintenance, and the required time and personnel to complete maintenance.
Salary schedules were used to obtain costs from the annual number of labor hours required for various
maintenance levels. O & M costs also include construction materials such as new conduit and annual
operating costs for equipment such as trucks, excavators, and trailers. Equipment operating costs were
based on unit prices provided by the Transportation Division.
Engineering and planning programmatic costs consist of staffing costs for inspection and engineering
services as well as the cost of contracted studies. Inspection costs span various aspects of the program
and include:
• Dry Weather Screening
• Construction Site Inspection
• Building Safety EC Inspections
• Inspection of MS4 Facilities
• Illicit Discharge Detection
• Inspection of Public and Private Detention Basins
• Dame Safety Inspections
• MS4 Reporting
Each EOS/LOS involves an increased number of facilities requiring inspection and increased frequencies
of inspection which are detailed in the previous sections. Engineering services include the costs for
engineering work on drainage studies, stream and watershed assessments, and LID retrofits, as well as
the cost of managing contracted studies in these areas. The cost of contracted studies varies between
OCTOBER 2019 3-13
SECTION 3 — STORMWATER PROGRAM COSTS
the LOS options depending on who is performing the work. The City would self -perform S% of the
prioritized studies for both a standard and proactive LOS. For a standard LOS, 5% of them would be
contracted annually, and 20% would be contracted annually for a proactive LOS. The enhanced LOS
involves City-wide studies, which would be 100% contracted. Approximate costs for contracted stream
and watershed assessments were determined based on previous WCRC projects.
The programmatic costs for Regulatory Compliance are based on the size of stormwater program.
Section 3. 2 describes how the program is considered to be Phase II Small for the baseline and standard
EOS/LOS. This is upgraded to Phase II Medium for the proactive and enhanced EOS/LOS to reflect the
possibility of continued population growth. The MS4 permit cost and cost per USGS station were held
constant for this cost estimate. The cost for the standard EOS/LOS was assumed to be the same as the
Baseline. For the remaining sources of Regulatory Compliance cost, the costs were scaled up for each
EOS/LOS. These sources include staff time charged to program administration, partnerships with the
University of Arkansas Cooperative Extension Service, the Illinois River Watershed Partnership, and the
Beaver Watershed Alliance for public outreach and education, and natural stream restoration
maintenance through the WCRC. Table 3-7 provide 5-year projections of cost of each EOS/LOS
alternative; these projections assumed a 3% annual rate of increase.
Table 3-7. Programmatic Costs by EOS/LOS Option
Option A (Standard EOS/LOS)
Year 1
Year 2
Year 3
Year 4
Year 5
Operation and Maintenance
$1,630,000
$1,678,900
$1,729,267
$1,781,145
$1,834,579
Engineering and Planning
$290,000
$298,700
$307,661
$316,891
$326,398
Regulatory Compliance
$193,000
$198,790
$204,75
$210,896
$217,223
Option B (Proactive)
Year 1
Year 2
Year 3
Year 4
Year 5
Operation and Maintenance
$2,190,000
$2,255,700
$2,323,371
$2,393,072
$2,464,864
Engineering and Planning
$799,000
$822,970
$847,659
$873,089
$899,282
Regulatory Compliance
$333,000
$342,990
$3S3,280
$363,878
$374,794
Option C (Enhanced)
Year 1
Year 2
Year 3
Year 4
Year 5
Operation and Maintenance
$3,860,000
$3,975,800
$4,095,074
$4,217,926
$4,344,464
Engineering and Planning
$2,250,000
$2,317,500
$2,387,025
$2,458,63
$2,532,395
Regulatory Compliance
$333,000
$342,990
$353,280
$363,878
$374,794
Note: Refer to Section 3.4 for stormwater CIP components.
3-14 OCTOBER 2019
SECTION 3 — STORMWATER PROGRAM COSTS
3.4 Programmatic Stormwater Capital Improvement Plan
Historically, the City has budgeted $200,000 per year to address design and construction of drainage
projects. As discussed in Section 1.2.2, the high demand for drainage projects revealed by the 2017
flooding prompted the City Council to approve an increase for the 2018 drainage improvement budget
to $500,000. For 2018, the City has used this increased budget to address seven drainage improvements
projects (listed in Table 3-8). These costs do not include labor costs for maintenance projects or the
capital costs for projects that need additional flood studies. Section 1.2.3 describes the 2019 Bond
Program, which funds a $15 million Early Action Plan of flood mitigation and drainage improvement
projects (larger than $200,000). However, the increase in 2018 funds to $500,000 along with the
$15 million bond are anticipated to be insufficient to address many of the stormwater improvements
identified, particularly with respect to large-scale, City-wide studies and improvements. Table 3-8
summarizes the current and future CIP program elements considered for the Funding Study.
Table 3-8. Stormwater CIP Program Elements by Option
Program Elements
Current
Option A
and A/B
Option B
Option C
CIP Project Completion Rate
Limited
20 Year
10 Year a
5 Year
Potential CIP Project Types:
Drainage Improvements/Retrofits
(pipe replacements, neighborhood systems)
Limited
X
X
X
Floodplain Buyouts or Improvement/Elevation Projects
X
X
X
Large-scale Regional Detention Projects
X
X
Watershed Improvement, that is, Stream Restoration &
Stabilization Projects
Limited
X
X
Dam Safety Upgrades
Limited
X
Detention Pond Retrofits
X
X
Note: a After additional analysis of potential costs and input from City Stakeholders, the CIP completion rate was later
increased modestly for Option B from 10 years to the 15 years
Table 3-8 was used to develop a budget for capital improvement projects for the EOS/LOS options. In
addition to these program elements, the capital cost of equipment used for 0 & M and the cost of
completion for projects identified by drainage studies were included in the budget for each option. Once
the budgets were compiled, the total cost was annualized by the project completion rates listed
previously to generate a yearly cost for each LOS (Table 3-9).
Table 3-9. Initial Capital Improvement Program Costs by Option
Option A and A/B
(Standard)
Option B
(Proactive)
Option C (Enhanced)
Total Programmatic Cost
$22,813,000
$46,046,000
$49,217,000
Annual Average Programmatic Cost
$1,141,000
$4,605,000
$9,844,000
OCTOBER 2019
3-15
SECTION 3—STORMWATER PROGRAM COSTS
After additional analysis of potential costs and input from City Stakeholders, these options were
narrowed to Options A/B and B. Concurrently, the CIP completion rate was increased modestly for
Option B from 10 years to the 15 years noted in Table 3-10. Table 3-10 provides these final CIP costs by
project type prior to excluding the $15 million budged for the Early Action Plan and funded by 2019
Drainage Bond. O & M costs are not eligible for Bond funding.
Table 3-10. Final Capital Improvement Program Total Costs by Option
Option A/B
(Standard)
Option B
(Proactive)
CIP Project Completion Rate (years)
20
15
CIP Project Types
Total Budget
% of Total
Total Budget
% of Total
Drainage Improvements
$26,693,450
77%
$26,693,4SO
4S%
Flood Plain Buyouts/Elevation Projects
$1,750,000
5%
$ 2,500,000
4%
Operation and Maintenance Equipment (startup)
$1,654,000
5%
$1,88S,S00
3%
Projects identified by drainage studies
$ 2,S00,000
7%
$5,000,000
8%
Large-scale Regional Detention
$15,000,000
25%
Watershed Improvement/Stream Restoration
$2,000,000
6%
$ 2,500,000
4%
Detention Pond Retrofits
$ 5,500,000
9%
Totals (rounded)
$ 34,598,000
$59,079,000
Minus FY2018 Funding
($500,000)
($500,000)
Minus 2019 Bond Funding
($15,000,000)
($15,000,000)
Net Total CIP Needs (rounded)
$19,100,000
$43,600,000
3-16 OCTOBER 2019
SECTION 3—STORMWATER PROGRAM COSTS
3.5 Final Future Program Costs by Option
As discussed previously, program costs were developed for each option and refined for Option A/B and
Option B. Table 3-11 and Figure 3-5 present these costs (in 2018 dollars) for each aspect of the program
along with a total programmatic cost for each both EOS/LOS options.
Table 3-11. Final Future Program Costs by Option
Current
% of Total
Option A/B
(Standard)
% of
Total
Option B
(Proactive)
% of Total
Operation and Maintenance
$998,441
68%
$2,623,000
58%
$2,982,000
38%
Engineering and Planning
$67,000
5%
$201,000
4%
$638,000
8%
Regulatory Compliance
$193,000
13%
$351,000
8%
$638,000
8%
Stormwater CIP Components
$200,000*
14%
$954,900
24%
$2,905,267
42%
Administrative
$286,000
6%
$315,000
4%
Total
$1,458,441
$4,415,900
$7,478,267
Figure 3-5. Final Future Program Costs by Option
$3,500,000
$3,000,000
$2,500,000
$2,000,000
S 1, so0,000
$1,000,000
$S00,000
$0
Operation and Maintenance Engineering and Planning Regulatory Compliance Stormwater CIP Components Administrative
■ Current M Option A(B v Option B
OCTOBER 2019 3-17
SECTION 3-STORMWATER PROGRAM COSTS
3.6 Preliminary Organizational Structure
There are many ways that the City could integrate a Flood Management and Water Quality fee program
into its current organization structure, ranging from a new stormwater organization to a matrixed
organization that leverages existing resources and sharing of expertise between City departments. The
City has indicated its preliminary interest in a matrixed approach (Figure 3-6), using existing
departments and divisions. The Engineering Department, housed under Development Services, would
lead the implementation of a Flood Management and Water Quality fee if the City decides to proceed.
Engineering staff provide technical review and support for all private development including the
technical review of compliance with the City's water, sanitary sewer, street design, grading, and
stormwater runoff standards and ordinances. It also supports of the Planning Department and Planning
Commission at the development review meetings. The Engineering Division is responsible for the
following:
• Providing design and project management for City infrastructure projects
• Reviewing development proposals for compliance with city criteria such as water, sewer, streets,
drainage, grading, and other technical requirements
• Managing the planning, design, and permitting of trails projects and oversees construction of trails
by the Transportation Division or private contractors.
• Assisting in the acquisition and sale of City property, ROWs, easements, and similar
• Managing miscellaneous stormwater and water quality initiatives
• Ensuring compliance with the City's NPDES Stormwater Permit issued through ADEQ and its
floodplain regulations
3-1F OCTOBER 2019
SECTION 3-STORMWATER PROGRAM COSTS
Figure 3-6. Potential Future Organizational Integration
Vti5ty Fin— at SendcM Geog aphic la(or EnK(nmr, g
err M
CTeryl Pattatn Chris Brown
Greg Rest
I
E
Transportation Servkas Flee Cpea[weu_
KeiM Sh i Sar C.�
i
D-elopntent A
Sfornnwcw En6rt E
1 Stmn - Engnaw
Iili
W .... 411'11 G6 Analyst (0.<FTEI
Commmon
i Lkm d
vrhl ep at �a
Lltens i
j
Eiy-
I los Fre7�
(0.5 Frn
r
fustomn Sbv3Ye
SCpllnsv W �n#Pfna'
.
5t, S weepins
kepresentatNe
il.s iTO
.w lr�dn 4'eir laatlr�
Ope Wns QFM
$Ni Fngneer I
( I
� jj}
Llnik¢nsei lG.S FfEi
(
New Employee Front tine Employee
OCTOBER 2019 3-19
SECTION 4
Financial Planning and Rate Analysis
The Financial Planning and Rate Analysis followed an iterative process to help the City identify the right
balance of stormwater services, given its financial capacity and Stakeholder priorities. Financial planning
for developing a stormwater utility is typically an iterative process that includes both a "top down" and
"bottom up" evaluation. The "top down" component focuses on what it would actually cost to deliver
the anticipated LOS, and the "bottom up" component typically focuses on what customers are willing
to pay.
A sound financial planning process that considers all relevant revenue sources is critical to rate setting,
because the level of revenues required from user fees should consider the projected revenues available
from other revenue sources. This financial planning must support the correlation between the cost of
service and the relative burden of an individual property on the stormwater system in order to develop
a defensible recommended fee. Therefore, the financial planning activities are usually conducted in
parallel with the development of the final LOS/EOS and rate structure evaluation to identify an overall
fee and financial plan that supports the goals for improving stormwater management and is acceptable
to key Stakeholders.
4.1 Alternative Funding Sources
There are several types of funding sources that can be used for drainage services, which may include
one or more ad valorem taxes, grants, loans, and/or user charges. Stormwater programs often depend
on mix of other funding sources beyond a potential drainage fee or general fund sourced from tax
revenue. For example, some capital projects may qualify for federal or State grant funding; as another
example, plan review and inspection fees or other special fees may be used to cover some program -
related activities. A number of utilities secure State revolving fund loans to pay for capital projects that
merit such long-term funding. For the 2019 Drainage Bond, the City is using a revenue bond, which
consist of municipal bonds secured by a specified revenue source. Use of these other funding sources
can increase the LOSS offered by a stormwater program because the stormwater user fees are employed
to pay the annual debt service rather than the upfront capital expenditure costs.
The City's current drainage program is primarily funded by the Street Fund, General Fund, Sales Tax
Capital Improvements Fund, and the intermittent issuance of revenue bonds. However, due to the
increasing and competing demands for these limited funds, the City recognizes the need to identify
other dedicated and equitable funding sources to sustainably support its future drainage needs. The
City's 2010 Feasibility Study reviewed a series of alternative funding sources and generally eliminated
additional funding from the following other long-term funding sources due to the reasons noted as
follows and summarized in Table 4-1:
• Millage from Property Taxes — Not equitable because tax exempt organizations do not pay for the
management of the stormwater they generate. Not a stable, dedicated funding source.
Sales Taxes — No direct relationship with the amount of stormwater management needed nor
dedicated specifically to drainage needs. Taxes can also be politically difficult to increase and can
vary from year to year.
OCTOBER 2019 4-1
SECTION 4 — FINANCIAL PLANNING AND RATE ANALYSIS
Similarly, the following supplemental funding sources were found to be inadequate for the City's future
needs:
• Special Assessments — Typically used to fund public works associated with specific properties and
for a specific purpose, as opposed to the long-term O & M of a system.
• Developer trust funds — Typically only successful when associated with a new development's desire
to be annexed into a community. Because these funds cannot be retroactively applied to existing
developments, these trust funds can raise the cost of new construction, while their revenue
potential is limited to new development.
• Impact Fees — Use of revenue from impact fees on new construction is limited to new facilities that
serve those paying the fee and cannot be used to retrofit existing infrastructure unless it is
redeveloped and must go through the City's permitting process. The amount of revenue from
impact fees is directly related to the rate of new development and thus vary from year to year.
• Low Interest Capital Funding — Sometimes offered by various agencies; however, these typically
fund short-term capital projects and not long-term O & M needs.
• Bond Financing of Capital Projects — Used for capital projects with the potential to generate new
revenue. However, the revenue stream must first be established and proven prior to bonds being
issued.
• Grants — Offered by various agencies such as the U.S. Environmental Protection Agency and the
U.S. Department of Agriculture. Although useful for specific projects, the grant amounts are typically
not sufficient to fund long-term O & M needs, and the administrative requirements can be
burdensome for local communities.
Table 4-1. Summary of Alternative Funding Sources
Equitable
Flexible
Can provide
adequate
funds?
Data/
Administrative
Complexity
Use of Funds
Stormwater User Fee
Yes
Yes
Yes
High
City-wide
Millage from Property Taxes
Yes
Low
City-wide
Sales Taxes
Yes
Low
City-wide
Special Assessments
Yes
Medium
Project -specific, not for 0 & M
Developer trust funds
Medium
Project -specific, not for O & M
Impact Fees
Yes
Medium
Project -specific, not for 0 & M
Low Interest Capital Funding
Yes
Project -specific, not for 0 & M
Bond Financing of Capital Projects
Yes
High
Project -specific, not for O & M
Grants
High
Project -specific, not for 0 & M
4-2 OCTOBER 2019
SECTION 4 - FINANCIAL PLANNING AND RATE ANALYSIS
4.2 Basis of Proposed Fee Estimates
IA was selected as the basis of the fee because it increases the amount of water entering the drainage
system and waterways, which can then increase the chance of flooding, stream bank erosion, and
sedimentation. Runoff from IA also carries pollutants that can impact water quality, such as sediment,
sand, fuel from spills and leaks of vehicles, herbicides and pesticides, detergents, metals, and bacteria
from pet waste. It is an equitable basis for a fee for services since larger, developed properties tend to
have larger amounts of IA which generates a greater volume of runoff. More runoff requires more
drainage infrastructure, which necessitates additional O & M as well as the long-term capital costs of
repair and replacement. Put simply, larger developments and homes with corresponding parking and
driveways create a greater need for stormwater services.
To determine the revenue potential of a user fee program, accurate spatial data is needed to calculate
individual user fees based on IA and property boundaries and to determine the number of billing units,
while other attributes such as ownership, billing, and service addresses (if different) are needed to
generate a customer billing database. The City's Geographic Information System (GIS) Department
performed a preliminary spatial analysis of:
• The number of properties within the City
• The amount of imperviousness (buildings, driveways, and similar) by parcel/property
• Their distribution by customer class
The Funding Study team then reviewed of distribution of IA by parcel boundary and customer type
(Table 4-2) to identify an equitable billing unit and whether a tiered rate structure would be
appropriate. Due to the historical expense of mapping all the IA within a local governments service area,
many entities adopted an "equivalent residential unit" (ERU) billing unit based on statistical sample of
the median impervious area of single-family residential properties. For the City, the ERU based on all
18,974 single family parcels would be approximately 3,500 square feet (SF) of IA.
Table 4-2. Parcel Count and Impervious Area by Customer Class
Customer Class
Parcel Count
Total IA
(SF)
Average IA
(SF)
Median IA
(SF)
Maximum IA
(SF)
All Properties
25,690
235,940,932
9,184
3,425
2,325,502
Single -Family
18,974
76,451,588
4,029
3,466a
90,954
Multi -Family
3,059
36,724,982
12,006
3,734
521,127
Non -Residential
2,943
98,178,891
33,360
12,819
2,325,502
Public School
68
5,002,386
73,565
14,188
530,925
Religious
206
4,589,749
22,280
8,353
428,155
University
440
14,993,336
34,076
7,26S
1,210,092
a Based on a preliminary GIS analysis by City staff; minimum mapping unit of data is 100 SF.
Figure 4-1 illustrates this comparison and why IA serves as an equitable representation of the cost of
providing these services. This avoids the multiple issues generated by using a flat rate based on
customer or meter type. For example, if the City adopted a program similar to the City of Bryant,
Arkansas (bills based a monthly flat fee of $3 for residential utility account holders and $6 for
OCTOBER 2019 4-3
SECTION 4 —FINANCIAL PLANNING AND RATE ANALYSIS
commercial and industrial accounts), which is closer to parcel count distribution on the left, there would
be an inequitable "disconnect" between the cost of services and fee/charge paid by the customer for
these services.
Figure 4-1. Distribution of Parcel Count versus Impervious Area
Number of Parcels
Impervious Area (sq. ft.)
Public School -., Religious University
University
0.3% �`, 1% �� 2/
Religious 6%
2%,
Public school_.___
2%
Customer billing equity was further assessed by comparing the percent distribution of billing units by
customer class using an ERU method versus a tiered method to illustrates the distribution of potential
costs (Table 4-3). It shows the potential for non-residential and multi -family residential properties
(shaded light gray) to subsidize the cost of providing single family residential stormwater services under
an ERU billing unit method.
A six -tier billing unit method, using
a rate expressed as cost per
1,000 SF of IA, was found to most
closely equate to the distribution of
actual IA and therefore could best
serve to avoid inter -customer class
subsidies. Therefore, a tiered rate
structure, shown in Table 4-4, with
no customer class distinction was
selected to balance equity with
ease of administration. Most
properties pay based on tier
assignments where the fee is based
on middle value of the range
divided by 1,000 SF. For example, a
property assigned to Tier 3 (more than 3,500 and less than or equal to 5,000 SF) pays based on
4.25 billing units (4,250/1,000). For those properties with imperviousness greater than 8,000 SF, the
owner would pay based on actual impervious area divided by 1,000 SF. For example, a property with
10,000 SF pays based on 10 billing units (10,000/1,000).
Table 4-3. Comparison of Billing Unit Distribution by Customer Class
Parcels
Total IA
ERU Method
(1 ERU =
+/-3,500 SF
of IA)
Tier Method
(1 Billing
Unit =
1,000)
Single -Family
74.6%
34.8%
30.4%
34.8%
Multi -Family
11.6%
15.6%
16.6°'
41.8%
15.6%
Non -Residential
11.2%
39.2%
39.2%
Public School
0.2%
2.1%
2.3%
2.1%
Religious
0.8%
1.9%
2.1%
1.9%
University
1.6%
6.4%
6.8%
6.4%
4-4 OCTOBER 2019
4.3 Financial Planning Assumptions
Using the tier structure presented in Table 4-4, the
Funding Study then assessed a series of financial
planning scenarios and narrowed them down to the
following two based on feedback from the City:
• Scenario 1 reflects rates with the continuation of
current funding ($1.5 million) from the City
budget.
Scenario 2 represents a stand-alone program
without the current funding from City budget.
Assumptions include:
• Staging over a 5-year period to allow adequate
time for the City to implement an enhanced
program
SECTION 4 — FINANCIAL PLANNING AND RATE ANALYSIS
Table 4-4. Proposed Tier Structure
(Applies to All Properties)
Tier
Tier Range (SF)
Property
Count
Billing
Units
1
5 2,000
2,196
2,74S
2
>2,000 and 5 3,500
9,602
26,406
3
>3,500 and 5 5,000
6,491
27,587
4
>5,000 and <- 6,500
2,644
15,203
S
>6,500 and <_ 8,000
1,093
7,924
6
>8,000
3,664
156,095
Total
25,690
235,960
• A reduction in CIP costs, reflecting an Early Action Plan of projects being funded by the 2019
Drainage Bond (http://www.fayetteville-ar.gov/3713/Drainage-Projects)
• A baseline credit/rebate program to encourage BMPs that will modestly reduce potential revenue
Assumptions do not yet include:
• Reductions in revenue due to the potential for bad debt
• Increases in revenue due to new/infill development
As noted previously, Option A/B was added to characterize the financial impacts of the Option B EOS
with the Option A "routine" frequency of maintenance and time frame for CIP. After additional
Stakeholder feedback, the City chose to narrow the EOS/LOS options to those that could be realistically
implemented by a reasonable rate structure (Options A/B and B). Table 4-5 presents the monthly Flood
Management and Water Quality fee estimates for these two options by tier and scenario based on the
assumptions stated previously.
OCTOBER 2019 4-5
SECTION 4 - FINANCIAL PLANNING AND RATE ANALYSIS
Table 4-S. Monthly Fee Estimates by Tier and Scenario
Scenario 1: With Current Funding from City Budget
Tier Range
A/B Monthly Fee
(Standard)
B Monthly Fee
(Proactive)
Tier 1 (0 and 2,000)
$1.60
$3.23
Tier 2 (2,000 and 3,500)
$3.S2
$7.10
Tier 3 (3,500 and S,000)
$5.44
$10.97
Tier 4 (5,000 and 6,500)
$7.36
$14.84
Tier 5 (6,500 and 8,000)
$9.28
$18.71
Tier 6 (over 8,000)
$1.28/1000 SF
$2.S8/1000 SF
Scenario 2: Without Current Funding from City Budget
Tier Range
A/B Monthly Fee
(Standard)
B Monthly Fee
(Proactive)
Tier 1 (0 and 2,000)
$2.31
$3.94
Tier 2 (2,000 and 3,500)
$5.09
$8.66
Tier 3 (3,500 and 5,000)
$7.86
$13.39
Tier 4 (5,000 and 6,500)
$10.64
$18.11
Tier 5 (6,500 and 8,000)
$13.41
$22.84
Tier 6 (over 8,000)
$1.85/1000 SF
$3.15/1000 SF
Note: If there is an onsite stormwater management facility, there could be a reduced fee based on a sustainable credit program
established by the City.
4.4 Recommended Fee Option
The City is considering proceeding
with the implementation of a stand-
alone Flood Management and Water
Quality Fee Program (that is,
Scenario 2) with the Option A/B rates.
A stand-alone program for future
services was selected that discontinues current funding and is instead administered from an enterprise
fund sourced from a Flood Management and Water Quality fee and the intermittent issuance of revenue
bonds. Option A/B was selected because it would provide the funding needed for an equitable,
sustainable drainage program while also addressing the ongoing challenges many homeowner
associations in the City have with operating and maintaining their detention ponds. Further, more than
half of those responding to Survey #2 as of August 2019 found the Option A/B rates to be reasonable.
The selected rate option would be staged/ramped up over a 5-year period (Table 4-6), to the monthly
rates in Year 5, illustrated on Figure 4-2.
Table 4-6. Staging of Recommended Fee Structure under Scenario 2
($/1,000 SF/month)
Year 1
Year 2
Year 3
Year 4
Year 5
Option A/B
$0.74
$0.93
$1.14
$1.35
$1.85
4 6 OCTOBER 2019
SECTION 4 — FINANCIAL PLANNING AND RATE ANALYSIS
Figure 4-2. Recommended Monthly Flood Management and Water Quality Fee Structure in Year 5
© Year 5
Fee (without Credits)
$35
$30
—
Tier 1(>0 and <= 2,000)
$2.31
$25
Tier 2 (>2,000 and <= 3,500)
$5.09
v
Tier 3 (>3,500 and <= 5,000)
$7.86
1A
� $20
Tier 4 (>5,000 and <= 6,500)
$10.64
p`etUa1
},
Tier 5 (>6,500 and <= 8,000)
$13.41
b:
o $15
Tier 5
Tier
4
$10
Tier 3
Tier 2
$5
Tier 1
4.
.
.
_ :,
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
o Ln o rn o Ln o rn o Ln o Ln o Lri o Ln o Ln o
r 4 i-4 tV N M M �' � Ln Ln tD LD n n 00 00 M Q1 0
r_1
Impervious Area (sq. ft.)
Note: Base rate of $1.8S/1,000 SF/month
4.4.1 Flood Protection and Water Quality Fee Examples
This would result in an $5.09 monthly fee for a 1,500-SF home (Table 4-7 and Figure 4-3) with a two -car
garage, a $67 monthly fee for a typical fast food restaurant and a $250 monthly fee for a 75-unit
apartment complex (Table 4-8).
Table 4-7. Monthly Residential Fee Examples by Tier in Year 5
Tier Range
Option A/B
Monthly Fee
Example Residential Property
Tier 1 (0 and 2,000)
$2.31
1,000 SF home, no garage or carport
Tier 2 (2,000 and 3,500)
$5.09
1500 SF home, attached two -car garage
Tier 3 (3,500 and 5,000)
$7.86
2,500 SF home, attached three -car garage
Tier 4 (5,000 and 6,500)
$10.64
3,S00 SF home, attached three -car garage
Tier S (6,500 and 8,000)
$13.41
4500 SF home, attached three -car garage
Tier 6 (over 8,000)
$1.85/1000 SF
Based on actual IA
Note: If there is an onsite stormwater management facility, there could be a reduced fee based on a
sustainable credit program established by the City.
OCIOBER 2019 4-7
SECTION 4 — FINANCIAL PLANNING AND RATE ANALYSIS
Table 4-8. Fee Examples for Other Property Types
Impervious Area (SF)
Option A/B: Monthly
Stand-alone Fast Fooda
36,000
$67
Big Box Retailer/Commercial Center
300,000-750,000
$555-$1,388
Apartment (76 units)
135,000
$2S0
Apartment with Clubhouse (306 units)
413,820
$766
Industrial/Manufacturing
780,000
$1,443
Industrial/Manufacturing
665,000 (floor area), 1,100,000 (total)
$2,035
Note: If there is an onsite stormwater management facility, there could be a reduced fee based on a sustainable credit program
established by the City.
a. The average IA for the more than 2,900 commercial properties in the City is 33,360 SF.
4-8 OCTOBER 2019
SECTION 5
Stormwater Credit and Incentive Programs
A stormwater credit is an ongoing, renewable reduction in the fee charged to a property for its
contribution (measured via its amount of IA) of runoff to the stormwater system; all properties subject
to the Flood Management and Water Quality fee would be eligible to apply. Credits would be offered for
existing practices or facilities that reduce the water quality and quantity burden imposed on the City
drainage system by runoff from a property. Other incentive programs such as a stormwater rebate
program (for private investments to mitigate drainage from existing developments) and in lieu of fee
program (for small development sites or areas where a regional solution is practical) would also be
considered during implementation.
5.1 Stormwater Credits
Basic credit programs typically mimic the
requirements of a community's DCM
(Figure 5-1), which helps support the City's
compliance with its MS4 permit. To the
extent that property owners mitigate the
effects of stormwater runoff before it is
discharged to the City of Fayetteville MS4
system (essentially pretreating their
stormwater runoff), the burden placed on
the City's system is somewhat less than if no
such mitigation were in place. Therefore,
the Flood Management and Water Quality
fees for properties having certain
stormwater management facilities or for
owners performing approved stormwater
educational activities will be reduced to
recognize the public benefits of privately
owned and managed facilities. It is
recommended that full credits not be
offered for undeveloped property or those
treating 100% of stormwater onsite because all property owners benefit from the following City
services:
• Maintaining the public ROWS including, but not limited to, storm drain cleaning and street
sweeping.
• Maintaining regional Stormwater infrastructure that serves multiple property owners
• Inspection of public and private stormwater facilities to ensure operating as designed
Additional credits can be offered for green infrastructure practices, public education, and other activities
important to a community. Credits are typically calculated based on the amount of IA and/or the volume
of water managed onsite. For example, a property could earn a 40% credit for demonstrating that it
meets all four sizing criteria illustrated in Figure 5-1, or a 10% credit for meeting each one individually.
OCTOBER2019
SECTION S - STORMWATER CREDIT AND INCENTIVE PROGRAMS
Key characteristics of a sustainable credit program would include:
• Customizing it to Fayetteville's unique mix of customers
• Providing the opportunity to meaningfully mitigate a customer's fees
• Keep it administratively simple
• Establishing a cap on the credit offered to ensure adequate revenue
A sustainable credit system will be developed with additional Stakeholder engagement on eligibility and
technical guidelines; application, inspection, and verification procedures; and duration between
renewals as part of implementation. It would be offered to customers based on the sizing criteria found
in the City's DCM, with additional credits possibly offered for green infrastructure practices and public
education.
5.2 Other Incentive Programs
The City is also considering other inventive programs to encourage long-term, sustainable solutions both
during and after construction, such as:
Stormwater rebates could be offered to eligible property owners that are willing to retrofit existing
or install new stormwater treatment facilities. Rebates would provide them with a mechanism to
recoup some of the costs of installing approved DCM facilities up to the amount of the actual fee for
a set period of time.
A stormwater "in lieu of fee program could be offered, wherein an owner or developer may
contribute via a fee to the construction of a regional or sub -regional detention site in lieu of
constructing onsite detention. For example, Hot Springs offers an in -lieu fee program where the fee
is calculated based on $10,000 per acre-foot of stormwater storage. However, no in -lieu
contributions are allowed when existing flooding occurs downstream from the development, or if
the development will cause downstream flooding.
5-2 OCTOBER 2019
SECTION 6
Policy and Legislative Considerations
This section provides an overview of the City's existing stormwater management regulations, key legal
considerations for development of a Flood Management and Water Quality fee program, Arkansas'
authorizing legislation for stormwater utilities, and potential legislative steps, should the City decide to
proceed with implementation.
6.1 Existing stormwater Management Regulations
Fayetteville is home to many streams and water bodies and is near the upstream end of two main
watersheds, the Beaver Lake Watershed and the Illinois River Watershed. As a result, the City has a long
history of implementing regulations that manage the volume and quality of stormwater. These efforts
have included the adoption of a LID ordinance in 2010, a streamside protection ordinance in 2011, and a
DCM in 2014 (Fayetteville, 2014). The DCM summarizes the regulations governing development and
stormwater management, which include:
• Chapter 161—Zoning Regulations
• Chapter 166 — Development
• Chapter 167—Tree
Preservation & Protection
• Chapter 168 —
Flood Damage Prevention Code
• Chapter 169 —
Physical Alteration of Land
• Chapter 170—Stormwater
Management, Drainage, & Erosion
• Chapter 171—Streets
and Sidewalks
• Chapter 172 —
Parking & Loading
• Chapter 173 —
Building Regulations
• Chapter 177 —
Landscape Regulations
• Chapter 179 —
Low Impact Development
• City Plan 2030
• City of Fayetteville Drainage Criteria Manual, Appendix H Exhibits
• City of Fayetteville Landscape Manual
• City of Fayetteville Streamside Protection BMP Manual City of Fayetteville Minimum Street
Standards
• City of Fayetteville Water and Sewer Specifications
OCTOBER 2019 6-1
SECTION 6 - POLICY AND LEGISLATIVE CONSIDERATIONS
6.2 Policy Considerations
To be equitable and legal, a fee for service program should be structured to reflect the following policy
and rate -setting considerations:
• The overall cost of the program must be reasonably related to the services being provided.
• The funds raised must be segregated for use by the stormwater program.
• The fee should be proportional to the property's contribution to stormwater runoff.
• Participation in the program should allow appropriate exemptions and credits (NAFSWA, 2006).
Development of this Funding Study was guided by establishing a "rational nexus" between the drainage
services provided by the City and how they are funded. Selection of IA as the basis for funding these
services was considered key to creating a legally defensible and equitable user fee program. These fees
are based on the "polluter pays" principle and therefore the size of the fee charged must be related to
the burden a property places on the City's stormwater system.
Unlike a tax, it is also important that all properties with impervious surfaces pay, there should be no
exemptions, only credits for reducing a
property's burden on the stormwater
system. As a result, important City
Stakeholders such as the University of
Arkansas, who have historically not paid
impact fees for police and fire, will still be
expected to contribute to the Flood
Protection and Water Quality fee program.
The question of whether sovereign immunity
is applicable when stormwater fees are billed
to federal and State properties typically
hinges on the question of whether the CWA
waives sovereign immunity about imposition
of fees on these properties (SESWA, 2017).
Although there are still challenges, an
amendment to the CWA passed in
January 2011, 33 United States Code
§ 1323(a), clarified that there is a federal
responsibility for municipal stormwater
charges. Additionally, many communities
around the country have successfully billed
and collected stormwater utility fees from
Table 6-1. Surveyed Status of Billing and Collecting
Stormwater Fees trom Government Entities
Government
Entity
Exempt
Bill and
Collect
Bill But Do
Not Collect
Not
Billed
Federal
4
63
8
2
• of Total
5%
82%
10%
3%
State
6
59
10
4
• of Total
8%
75%
13%
5%
County
2
74
4
2
• of Total
2%
90%
5%
2%
City
3
76
7
2
• of Total
3%
86%
8%
2%
School District
6
66
3
0
% of Total
8%
88%
4%
0%
Special District
1
45
0
3
% of Total
2%
92%
0%
6%
State, federal, and local government source: SESWA, 2017
properties, including school districts.
In practice, the 2017 SESWA survey found that 82% of 77 communities responding to this question on
the survey billed and collected from these public entities (Table 6-1). As a result, it is recommended that
that no exemptions be provided and that the City instead integrate these entities in to a credit program,
where possible. Similar to other utilities, it is important that revenue from stormwater fees be
accounted for separately via an enterprise fund, instead of being added to the existing Street or General
Funds. This helps ensure that these funds are only used for their intended purpose (that is, to provide
stormwater services).
6-2 OCTOBER 2019
SECTION 6 — POLICY AND LEGISLATIVE CONSIDERATIONS
6.3 Legislative Implementation Steps
Because each local and State government is unique, there are multiple legislative routes that can be
taken to establish a stormwater fee program once a community has assessed the feasibility of
developing a fee program and decided to move forward. Further, some utilities will develop a guidebook
or other document (that is, cross-referenced in the legislation) detailing the step -wise processes used
for administration of the fee program. This allows the enabling legislation to be more succinct while
allowing the local government to make minor program adjustments without revisiting the original
ordinance. As illustrated by the legislative examples provided in Appendix B, local governments have
successfully adopted fee programs without some of the following key legal requirements. However, it is
recommended that the City's ordinance(s) include these key elements at a minimum:
• Establish a separate Enterprise Fund
• Establish the City's Administrator for the Stormwater Program
• Identify the scope of stormwater services (what will be funded)
• Establish a Flood Protection and Water Quality fee
• Note exemptions (limited)
• Provide a mechanism for appeals
• Provide a Credit Program
6.4 Arkansas Authorizing Legislation and Fee Programs
At the State level, stormwater management, including the creation and operation of a stormwater
utility, is authorized by the definition of the term "works" in Arkansas Code § 14-235-201. This statute
provides for:
1. The structures and property as provided in Arkansas Code § 14-235-203
2. Stormwater management
3. The creation and operation of a stormwater utility
4. The creation and operation of a stormwater department
5. Other like organizational structures related to the disposal or treatment of stormwater by
municipalities 3
3 2017 Arkansas Code, Title 14 - Local Government, Subtitle 14 - Solid Waste Disposal, Waterworks, And Sewers Generally, Chapter 23S -
Municipal Sewage Systems, Subchapter 2 - Operation of Systems by Municipalities, § 14-235-201 - Definition.
OCTOBER 2019 6-3
SECTION 6 - POLICY AND LEGISLATIVE CONSIDERATIONS
To date, two Arkansas communities have adopted stormwater fees:
1. Hot Springs, Arkansas: Flat rate for residential and tiered rate for nonresidential based on the
square footage of impervious surface (Ord. No. 6153, '1, 6-7-2016), as described in Table 6-2:
Table 6-2. Stormwater Fee Rates for Hot Springs, Arkansas
Cost Per Month
Current
June 2016
Jan. 2017
Jan. 2018
Jan. 2019
Jan. 2020
Residential
$3.00
$4.00
$4.00
$4.00
$4.25
$4.2S
Commercial
0-9,999
$6.00
$8.00
$10.00
$12.00
$12.00
$12.00
10,000-49,999
$6.00
$10.00
$12.00
$21.60
$28.80
$36.00
50,000-99,999
$6.00
$12.00
$30.00
$54.00
$72.00
$90.00
100,000-249,999
$6.00
$28.00
$70.00
$126.00
$168.00
$210.00
250,000-Above
$6.00
$60.00
$150.00
$270.00
$360.00
$450.00
2. Bryant, Arkansas: Monthly flat fee of $3 for residential utility account holders and $6 for
commercial and industrial accounts (Ord. No. 2016-3, § 1, 2-23-2016).
b-4 OCTOBER 2019
SECTION 7
Next Steps Towards Implementation
This section summarizes the additional activities that need to occur prior to a Flood Management and
Water Quality fee being billed by the City. It is estimated that 1 to 2 years would be needed to complete
these activities, with the bulk of the level of effort associated with developing a customer billing
database that is compatible with the existing utility or the County property tax systems. The next steps
towards implementation are detailed in Table 7-1.
Table 7-1. Next Steps Towards Implementation
Program Element
Next Steps
Stakeholder Engagement and
0 Additional Stakeholder involvement and education with a particular focus on the
Education
owners of rental property and key Stakeholders.
• Educate Stakeholders on the findings of this Funding Study and the timeline for
implementation
• Engage Stakeholders on the development of a sustainable credit program.
• Establish Intergovernmental Agreements with key Stakeholders.
Stormwater Program Definition
. Refine future program costs based on selected LOS/EOS options using updated
stormwater system condition and needs.
• Finalize preferred EOS option and publish it via legislation or other mechanism to
ensure Stakeholders understand public versus private drainage responsibilities.
Customer Billing Database
Refine preliminary customer billing database to confirm impervious area by parcel,,
property identification number, ownership, mailing address and existing utility account
number, if applicable.
• Establish method of billing property owners either within the existing utility billing
system or on the County property tax bill.
• Establish procedures for billing rental and multi -family properties as well as properties
that do not have a utility account currently.
• Establish procedures for adding new customers and capturing new impervious area as
property is developed or redeveloped.
Policy and Ordinance
. Pass a resolution to accept the Funding Study, establish a new enterprise fund, the basis
Development
of fee and definition of the rate structure.
• Pass ordinance with the final rate structure and fees, credit and appeal programs and
other administrative requirements.
• Develop process and procedures for obtaining public drainage easements in an iterative
fashion for those portions of Fayetteville that developed prior to them being required.
Stormwater Credit and
Engage Stakeholders on the development of a sustainable credit program.
Incentive Programs
• Determine whether the City wants to pursue other incentives such as rebates and in
lieu of fee programs.
• Develop policies for eligibility and technical guidelines; application, inspection and
verification procedures; and duration between renewal.
Appeals and Administration
Develop a robust customer service program that addresses appeals and ongoing
administration of the fee program.
• Proactively establish a process that allows customers to request a review of their fee
should they think it was calculated incorrectly.
OCTOBER 2019 7-1
SECTION 8
References
InVeritas. 2017. Fayetteville Vision 2050: Strategic Planning Final Report. March.
City of Fayetteville, Arkansas (Fayetteville). 2010. Stormwater Utility Fee Feasibility Study.
City of Fayetteville, Arkansas (Fayetteville). 2014. Drainage Criteria Manual. July.
City of Fayetteville, Arkansas (Fayetteville). 2018a. 2018 Drainage Improvement Plan.
City of Fayetteville, Arkansas (Fayetteville). 2018b. 2019 Annual Budget and Work Program.
November 20. https://www.favetteville-ar.gov/ArchiveCenter/ViewFile/Item/1991.
Geosyntec. 2009. Nutrient Reduction Plan. April.
National Association of Flood and Stormwater Management Agencies (NAFSMA). 2006. Guidance for
Municipal Stormwater Funding. Prepared under a grant provided by the U.S. Environmental Protection
Agency. January.
Southeast Stormwater Water Association (SESWA). 2017. 2017Southeast Stormwater Utility Report.
Prepared by CDM Smith, Dewberry.
OCTOBER 2019 8-1
Appendix A
Stakeholder Information
APPENDIX A
Stakeholder Information
Table A.1. Funding Study Meetings and Topics
Date
Topics
Full Council
June 25, 2018
• Chartering
• Study and Schedule Overview
• Review Relevant Goals
• Constituent Concerns Roundtable
• Review Draft Stakeholder Engagement Strategy
Special Council Committee
July 31, 2018
• Chartering
• Study and Schedule Overview
• Review Relevant Goals
. Constituent Concerns Roundtable with Ward Map
• Review Draft Stakeholder Engagement Plan
August 28, 2018
. Review Current Stormwater System, Regulatory Requirements and Costs
• Stormwater Extent of Service Options
. Stormwater Level of Service Options
• Committee Feedback and Next Steps
April 9, 2019
. Speak Up Fayetteville Results to Date
• Program Costs and EOS/LOS Options Refresher
• Review Draft Fee Estimates by Program Option
. Policy Primer on Credit/Rebate Program Options
Next Steps
July 30, 2019
• Final Extent of Service and Level of Service Option Refresher
• Review Final Fee Estimates by Program Option and Scenario
• Speak Up Fayetteville Survey #2 Results to Date
• Staff Recommendations for Council Committee Consideration
• Next Steps
Staff Technical Advisory Committee (STAC)
June 25, 2018
Chartering
• Study and Schedule Overview
• Review Relevant Goals
• Review Draft Stakeholder Engagement Plan
• STAC Homework Assignment for Stormwater Needs Analysis Meeting,
OCTOBER 2019 A-1
APPENDIX A —STAKEHOLDER INFORMATION
Table A.1. Funding Study Meetings and Topics
Date
Topics
August 1, 2018
. Review Baseline Stormwater Program Elements and Costs
• Review Chartering Feedback and Completed Homework Assignments
• Review Preliminary Extent and Level of Service Options
• Stormwater Needs Prioritization Exercise
December 10, 2018
Study Update
• Review Final Extent and Level of Service Options
• Review Corresponding Future Program Costs
• Next Steps
Public
September 30, 2018
. Study Purpose
. What is the City's Role?
. What are the funding needs?
. What are the proposed solutions?
. Speak Up Fayetteville!
November 29, 2018
Study Background
Beaver Water District Speaker
. 2017 Flooding
Series
. Review Current Stormwater System, Regulatory Requirements and Costs
. Stormwater Extent of Service Options
. Stormwater Level of Service Options
. Proposed Solutions/Funding Options
December 12, 2018 . Study Background
AWWWEA NW District Meeting . 2017 Flooding
. Review Current Stormwater System, Regulatory Requirements and Costs
. Stormwater Extent of Service Options
. Stormwater Level of Service Options
. Proposed Solutions/Funding Options
January 17, 2019 Study Update
. Review Final Extent and Level of Service Options and Corresponding Future
Program Costs
. Review of National and Regional Average Stormwater Fees
AWWWEA NW = Arkansas Water Works and Water Environment Association, Northwest District
EOS = extent of service
LOS = level of service
A-2 OCTOBER 2019
APPENDIX A— STAKEHOLDER INFORMATION
Figure A-1. Speak Up Fayetteville Factsheet
City of Fayetteville Stormwater Study:
Wff
Flood Management & Water Quality Funding
Stormwater runoff is generated from rain and snowmelt events that
flow over land or impervious surfaces, such as paved streets, parking
lots, and rooftops, and does not soak into the ground. The runoff picks
up pollutants like trash, chemicals, oils, and dirt/sediment that can
harm our rivers, streams, and lakes. —US Environmental protection Agency
Why Is the City Concerned about Stormwater? Flood Service Requests, April 2017
Fayetteville faces a growing backlogof drainage and stormwater manage-
ment issues that can cause flooding of streets, structures, and the property
of those who live here. Although customers can tell us where the worst
issues are, the City does not currently have the financial resources or legal
access to fix them all. Recent storms have generated hundreds of service
requests for the City, on top of stormwater management activities and
water quality projects that are mandated, but not funded, by the Clean
Water Act.
The City is responsible for operating and maintaining the public portion of
Fayetteville's municipal storrnwater system. For example, approximately 65
percent of its roads and rights of way, 57 percent of the drainage pipes, and
43 percent of its outfalls are public.
I our city's growing population, we
gnize that there is an increasing need
entity sustainable options for funding
nwater management.
4 a
What are the Funding Needs?
The City currently spends approximately $1.3 million annually on Stormwater activities. This includes
compliance with the Arkansas Department of Environmental Quality Stormwater permit requirements,
maintenance and repair of the public drainage system, as well as water quality and flood management
activities. The City's 2018 Drainage improvement Plan estimates that more than $15 million is needed
to protect public safety by addressing our most urgent backlog of stormwater maintenance and capital
projects. More funds are needed to identify issues that have not yet been documented.
Under current policy, it will take several years for the City to accrue enough funds to
complete even one of these significant stormwater projects.
What Is the Proposed Solution?
The City is proposing to develop an
`Early Action Plan' to address the most
significant stormwater projects, to be
presented to voters in early 2019 as part
of a bond program.
To determine the best way to fund the
remaining needs going forward, the City
is conducting this Study for Flood
Management & Water Quality Funding
to evaluate a range of options.
What Will the Study Do?
The purpose of the study is to present options for sustainable funding for stormwater
management, to reduce flooding, and protect water quality. The study has three phases
1. Review the City's existing stormwater system and program.
2. Collect input from the City Council, staff, and City residents regarding the current state,
and the necessary/desired future state of the City's stormwater programs.
3. Assess the advantages and disadvantages of various means of funding the program.
including ongoing intermittent bond referendums, additional General Fund or Capital
Improvement Program resources, and/or a dedicated stormwater fee.
Up We Need Your Input!
SID'EAK Input collected from stakeholders on both the program and funding options will be vital to the
process in order for the City Council to make an informed decision early in 2019. To provide your
FAYETTEV I LLE input. visit Speak Up Fayetteville, the City's civic engagement portal, and complete our public
input survey: fayetteville-ar.gov/speakup.
_911111
OCTOBER2019 A-3
APPENDIX A -STAKEHOLDER INFORMATION
Table A-2. Common Acronyms and Terms
Acronym
Description
Definition
Arkansas Department of
Government agency responsible for protecting human health and the
ADEfl
Environmental Quality
natural environment in Arkansas. Permitting authority for stormwater
drainaget1tips 1twww adert state ar ust
Activates, practices, procedures,. and treatment processes utilities use to
reduce or prevent pollutants from being released into streams, lakes, rivers,
and oceans. Fayetteville -specific 8MPs can be found in:
BMP
Best Management Practices
1I /Av rE Draa
w.fa),sltevd6r_r-ar.00vlS o - .ritef a �r� t�i
htlDs'tlwww Batt.vile :-ar novt0 - rnn-nil nr-rNiewfl�+ it auras:
Ptat ion Best -Mari merit Praci c #1L is PGF
The CIP for the City of Fayetteville examines the infrastructure and capital
C IP
Capital lmpro ,emenl Plan
needs of the City for the next five years.
https Plan
Capital Improvement Plan
Projects and there cumulative component areas totaling $10,000 or more
CiP Projects
Protects
should be included in the CIP. Projects costing less than $5,000 are not
considered capital and are funded through program operating budgets.
Federal Clean Water Act, i.e.
Federal measure to regulate pollutant discharge into streams, rivers, lakes,
CWA
Federal Water Pollution Control
and oceans of the United States,
Act. 33 U.S.C. 1251
h: ten hwww epa.opvtlaws-terauiatrerrrsisummary-clean-water-act
Cry docvmert that provides guidance on procedures and design to control
DCM
City of Fayetteville 2014
stomnwater.
Drainage Criteria Manual
httV1.1lwwrsur-tavetievrile-ar.00vr69BlOramacpe Crgena Manual
EOS
Extent of Service
Defines where the City will work, i.e. drainage infrastructure for which the
City will be responsible.
FEMA
Federal Emergency Management
Federal entry that handles disaster response in case the event is too large
Agency
for state or local governments to effectively handle_ A= fema oov
Map created by the Federal government that shows areas that are at higher
FIRM
Flood Insurance Rate Map
risk of floodinq
httpsilfwww tan.=attevdle-ar govI4021Ffzodolain-Management
Study to evaluate sustainable funding options for the Crtys stormwater
Study for Flood Management and
program, including a review of the existing program and additions needed
FS
Water Quality Funding
to satisfy future regulatory and customer service needs,
hftps;Uw'ww fa'its-'tleyWe-ar.4oy+33i$iFlo d-ManaoeR\ent•Stuti
Monitoring stormwater outfafts to detect illegal discharges including trash,
IDDE
Illicit Discharges Detection and
yard waste, wastewater. oil, petroleum products, cleaning products, paint
Elimination
products, hazardous waste and sediment.
htWs iwww.far"heviile-ar.cov1s+j1fRetnon-S}ormwater-r ;Aiuliion
What stormwater services the City would provide and at what frequency,
LOS
Level of Service
i.e. regulatory compliance, operations and maintenance, and capital
improvement planning, etc.
A conveyance (e.g, storm drains, channels, pipes,) or system of
conveyances that is owned by the City of Fayetteville that discharges to
MS4
Municipal
ipa Separate Strum Sewer
waters of the U.S. and is designed or used to collect or convey stormwater
System
runoff
httm' IAi;*w eoi onoy pooes1st(Sm]w.lt..Cz€SLr' rrae5 ,mtrni[iL �t-': sf €.5
Phase I
There are no Phase 1 Large MS4 permit hoiden in Arkansas, the City of
Medium
Medium municipal separate
Little Rock and Arkansas DOT are the only Phase I Medium MS4 entities
M54
storm sewer systems
hkirrs:11v1•w^«v-ad?g slatear us.'water�txe�masrnpdeststormwater!
Study for Flood Management and Water Quality Funding
A-4 OCTOBER 2019
r_1aaanQM-1M1/_1a:11.1IQIQ4 9ki1130 iIJ_U[QLI
Table A-2. Common Acronyms and Terms
Acronym
Description
Definition
Phase 11
Small municipal separate storm
City of Fayetteville is a Phase 0 small MS4 community covered under
Small PASS
sewer systems
ADEQ's GeneralPermit, # ARRO40000.
A permit program that regulates water pollartion from distinct pipe, ditch,
channel, tunnel, conduit, well, container, animal feeding operation, landfill,
National Pollutant Discharge
or floating vessel that discharges pollutants- The Clean Water Act prohibits
"poll
NPDES
Elimination System
anybody from discharging itants'through a'point source into a'water
of the United States' unless they have an NPDES permit. The NPDES
permit program addresses water pollution by regulating pant sources that
discharge pollutants to waters of the United States.
Pollution from a combination of dispersed sources resulting from rainfall or
NPS
Non -point Source Pollut on
snowfall moving over and through the ground during which 4 picks up and
tames away natural and human -made pollutants, finally depositing them
into lakes, rivers, wetlands, coastal waters and ground waters.
Streams that drain at least 100 acres as identified on the Streamside
Protected Streams
Protection Map available on: https:flwww fayefteviile-
ar cov1121d; s re- ;msA,; Pro er tan
Distinct pipe, ditch, channel, tunnel, conduit, well, contavier, animal feeding
PS
Pont Source Pollution
operation, landfill, or floating vessel that discharges pollutants_ This term
does not include agricultural story water nmff.
Rain, once if lands on the ground, which can either evaporate, seep
underground, or flow downhill into streams, rivers, takes, and oceans_ In the
SW
Stormwater
natural environment, stormwater is soaked up by the sod and some plants,
however in developed places with more asphalt, concrete, and roofs where
the rainwater can't seep into the sal or be absorbed by plants, it can
accumulate on top of the ground and cause flooding 4 not managed.
The City of Fayetteville's plan to erasure compliance with their stormwater
SWR1P
City of Fayetteville 2015 Storm
permit.
Water Management Program
https'dtwww #avettexillt�ar,t7lovtDsacumetti nterNie�vlt66 Stormwater-
an-gemn t Plan POF>hidJrl=
Streamside Protection Areas should be measured from the stream's top of
bank as defined in:
Streamside Protection Areas
httDsxtwww favetteville-argoviDocumentCenteriyiew1155fii streamside-
Proteotion-Rest -ManaGernent-Prmuces-Manual-PDF
Document which Consolidates all development-retated activity including
zDnng requirements, subdivision regulates, design and development
UDC
Unified Development Code
standards, and review procedures within a local governments jurisdiction.
hngsatiibrarwlmumcode of ordinances7nod
eId=CD ORD TITKVUNDECO
USAGE
U S Army Corps of Engineers
Federal governing entity over waters of the United States.
WQ
Water Quality
Desired condition (chemical, physical, or biological) of a water body_
Standards of water quality are enacted to preserve environmental hearth.
References:
%vA rov �a." lema.gov, Fayetteville, AR DCM, 2014. university of Arkansas Extension. What is Water Qualify?
I-' ,,,,,, N uae, d st aMcat;ons1DditFSA 4F2:8 pdf
Bpi�1
Study for Flood Management and Water Quality Fundingal;
OCTOBER 2019 A
Legislative Examples
APPENDIX B
Legislative Examples
The following ordinances were provided to the City of Fayetteville as legislative examples:
1. City of Bryant, AR — Rates in ordinance. Exemption for seniors only. No appeals or credits offered in
ordinance.
2. City of Hot Springs, AR — Rates in ordinance. No appeals or credits offered in ordinance.
3. City of San Antonio, TX — Provided due to its central-U.S. location. This drainage utility example
covers all legal considerations and is an example of tiered rates in ordinance.
4. City of Charlotte, INC — Provided as an example because it: establishes rates by a separate
resolution, includes the precedence in which fees will be applied to a utility bill and establishes a
Stormwater Advisory Committee within the ordinance.
5. City of Brookhaven, GA —This municipal example covers all legal considerations and is an example
of rates established by Mayor and City Council outside of ordinance.
6. DeKalb County, GA —The ordinance for DeKalb County, Georgia is provided as an example of a single
ordinance that establishes the enterprise fund and rate structures in one step. Like Hot Springs, this
ordinance has withstood formal legal challenge since it was adopted in 2004.
7. Montgomery County, MD — Water Quality Protection charge with rates established by resolution.
The ordinances for the cities of Bryant (2016) and Hot Springs (2008) are provided to demonstrate the
legislation used for the two other stormwater fee programs in Arkansas. However, the consulting team
recommends the following modifications to these two ordinances for the City of Fayetteville's purposes:
Removal of the actual fee/rate schedule from the ordinance, see later examples from the City of
Brookhaven, GA and Montgomery County, MD for how this can be referenced outside of the
legislation.
Exemptions should only be specified for public right of ways, no discharge properties and select
other subsets.
• Add essential sections for appeals and a credit system.
OCTOBER 2019 B-1
JACOBS
October 17, 2019
Chris Brown, PE
City of Fayetteville, Arkansas
Subject: Flood Management and Water Quality Funding Program Implementation
Dear Mr. Brown:
Jacobs is pleased to submit this amendment to our existing agreement for the purposes of assisting the
City of Fayetteville, Arkansas with consistency revisions to its Unified Development Code (related to
storm drainage and tree preservation), assessing the use of a mitigation / fee -in -lieu of program for
small, infill developments, and furthering elements of the Flood Management and Water Quality
Funding Study (prepared under Resolution 131-18, File Number 2018-0267). The code revisions and
program assessment activities represented in this proposal reflect the City being responsive to
Stakeholder feedback on the Funding Study. While many of these activities will be completed internally
by City staff, the Jacobs Team would assist, as needed, over the next year.
The proposal attached provides the following information:
• Article A. Purpose and Scope of Services
• Article B. Schedule and Fee
• Article C. Terms and Conditions
We appreciate the opportunity to provide a proposal for these services and look forward to working
with you and your staff on this important project. If you have any questions, please do not hesitate to
contact us.
Sincerely,
Heather H. Dyke, AICP
Kaitlin Tymrak
Enclosure
10/17/2019
SCOPE CHANGE AUTHORIZATION
Project: Amendment 2 to the Stormwater Date Prepared
Feasibility Study Contract
October 21, 2019
Jacobs Project No.: 705896CH Date Revised:
Client: City of Fayetteville, AR Client Project No.:
Project Manager: Heather H. Dyke Change No.: 2
1. The attached proposal for changes in the scope of the work are hereby authorized:
2.
As an amendment to our existing agreement, Resolution 131-18, File Number 2018-0267.
3. The effect of these changes in scope is as follows:
a. Fee (1) Change Labor: $142,000 + Travel: $8,200 = $150,200
(2) New Total $383,282
b. Schedule December 2019 to December 2020, or 12 months from NTP.
c. Construction (1) Cost N/A
(2) Schedule N/A
d.Other N/A
4. The reason for these changes in the scope of the work are as follows:
For the purposes of assisting the City of Fayetteville, Arkansas with consistency revisions to its
Unified Development Code (related to storm drainage and tree preservation), assessing the use of
a mitigation / fee -in -lieu of program for small, infill developments, and furthering elements of the
Flood Management and Water Quality Funding Study.
4. Project Manager's comments:
N/A
Approved by Client:
Date:
Agreed to by JEG: / Date: 10/18/2019
J �i/j ix'AM'
Carlos Giron, PG
Jacobs
Vice President I BIAF
City of Fayettevi I le, Arkansas
Flood Management and Water Quality Funding Program
Implementation
Article A. Purpose and Scope of Services
This scope of work would provide the City of Fayetteville, Arkansas with additional analysis of the Flood
Management and Water Quality Funding Study findings (prepared under Resolution 131-18, File
Number 2018-0267). The Jacobs Team has a unique awareness of why additional future funding is
needed:
• To further protect the public (safety), public roads, and private property from flooding,
• For watershed improvements to continue protecting the quality of the Beaver Lake, the City's
drinking water source
• To proactively maintain current drainage systems while starting to retrofit and replace, as needed,
aging infrastructure
• To continue complying with increasing NPDES Phase II MS4 permit requirements
• To encourage the use of green infrastructure and other sustainable development practices to help
mitigate stormwater runoff and flooding.
This additional analysis will use the preliminary customer billing database and rate model from the
Funding Study to revisit the fee structure in response to Stakeholder feedback. It will also assist City
staff with consistency revisions to its Unified Development Code, related to storm drainage and tree
preservation, and assess the use of a mitigation / fee -in -lieu of program for small, infill developments.
The Project Team would continue to be led by Heather Dyke, AICP with support from Mike Matichich,
Rick Brownlow and other Jacobs staff already familiar with the Funding Study.
The following definitions will be used throughout this document.
Term
Description
JACOBS
Local and remote JACOBS staff.
CITY
City of Fayetteville's management and, or technical staff.
Funding Study
Flood Management and Water Quality Funding Study
10/17/2019 PAGE 2 OF 10
Scope of Services
Project Understanding
Table 7-1 of the Flood Management and Water Quality Funding Study summarized the additional
activities that need to occur prior to a fee being billed by the City. Further, the City has received
additional, valuable Stakeholder feedback and suggestions since the Funding Study was completed that
is driving additional analysis of the rate structure and policy options. While many of these activities will
be completed internally by City staff, the Jacobs Team would assist City staff with the following tasks
over the next year:
Support additional Stakeholder Engagement and Education activities (Task 1)
Finalize the Stormwater Program Definition (EOS / LOS), perform an alternative rate structure
analysis based on "intensity of development", i.e. percent of impervious cover / gross area of
property and then perform a final rate analysis (Task 2)
As needed support of City staff in their efforts to select a billing method and to finalize a Stormwater
Customer Billing Database (Task 3)
Develop a Sustainable Stormwater Credit and Incentive Program (Task 4)
Assess the Feasibility of a Mitigation / Fee In Lieu of (FILO) Program including a Framework, Fee
Structure and "Cookbook" of Water Quality, Flood, and Tree mitigation measures (Task 5)
Consistency revisions to the City's existing Unified Development Code and development of
Ordinances and Intergovernmental Agreements for potential Implementation (Task 6)
Cost effectively manage the Project over a 12-month time frame and document the results in a
Program Summary Technical Memorandum (Task 7).
Stakeholder Engagement and Education
The Jacobs Team understands that Fayetteville's goal is to reach as many people as practical throughout
the stakeholder engagement and education process. Our experience during the Funding Study gave us a
unique perspective on the additional stakeholder education needed to ensure that property owners are
aware the drivers for additional funding above and beyond the 2019 drainage bond. Task 1 will focus on
raising awareness of these drivers, why additional future funding is needed as well as the availability of a
sustainable credit program. Task 1 will support implementation of the Next Steps noted in the Funding
Engage Stakeholders on the development of a sustainable credit program.
Educate Stakeholders on the findings of this Funding Study and the timeline for implementation.
Task 1.1 Stakeholder Engagement and Education Strategy
The Jacobs Team will kick off this task by hosting a Stakeholder workshop with City staff, either in person
or via conference call, to:
Review lessons learned from the Funding Study Stakeholder activities, i.e. what worked well and
what could be improved, as well as from the City's many other stakeholder efforts.
Confirm internal and external stakeholder participants
o Stakeholders (Internal)
■ Elected Officials (Mayor and Council)
■ Staff
o Stakeholders (External)
■ General Public (neighborhood groups, homeowner's associations, civic groups)
■ Key Stakeholders (University of Arkansas, Fayetteville Public Schools, Top 20
Impervious Customers and Chamber of Commerce)
■ Targeted Stakeholders (Faith community, nonprofits, environmental groups,
etc.)
III. Confirm the City's preferred engagement and education methods, such as:
o Meetings:
■ Special City Council Committee
■ Staff Technical Advisory Committee
■ Public Briefings (General Public)
o SpeakUp Fayetteville tools:
■ One Stakeholder Survey
■ Frequently Asked Questions (Fee Basics and Credits and Incentives)
o Traditional mailers
IV. Identify appropriate technical content and materials
V. Confirm general timing / schedule for implementing the Strategy.
Based on the results of the Stakeholder workshop, Jacobs will develop a draft Stakeholder Engagement
and Education Strategy for City staff review. After addressing one round of comments, Jacobs will
finalize the Strategy for implementation.
Task 1.2 General Meetings, Workshops and Briefings
The Jacobs Team will support City staff in engaging internal and external stakeholders via a variety of in
person meetings, workshops and briefings. Elected officials will be briefed either through the Special
subcommittee established during the Funding Study or full Council presentations. This scope of work
would cover 4 meetings over 2 trips by the Project Manager plus 1 additional staff member, as needed.
Task 1.3 Stakeholder Materials
The Team will work closely with Fayetteville's Communications and Marketing Department and the
Media Services Division to support the implementation of a robust and innovative stakeholder
engagement and education strategy that reflects the City's long history of reaching out to its citizens.
Jacobs will develop the draft technical content of Stakeholder Materials while City staff will finalize the
materials for posting and distribution.
• Up to 4 PowerPoint presentations in support of Task 1.2
• SpeakUp Fayetteville materials: One Stakeholder Survey and one set of Frequently Asked Questions.
10/17/2019 PAGE 4 OF 10
Task 1 Deliverables —
• Stakeholder Engagement Workshop
• Draft and Final Stakeholder Engagement and Education Strategy
• Meeting materials and 1— 2 team members for up to 4 Meetings, Workshops or Briefings (2
individual trips).
• One Stakeholder Survey
• One set of Frequently Asked Questions (Fee Basics, Credits and Incentives)
Task 1 Assumptions —
• The Jacobs Team will facilitate internal stakeholder meetings and workshops.
• City staff will administer the SpeakUp Fayetteville website including the compilation and analysis of
stakeholder survey data.
• Staff with Fayetteville's Communications and Marketing Department and the Media Services
Division will facilitate external meetings and support the internal implementation of the technical
content provided by the Jacobs Team.
• This task will be documented in the Program Summary TM as part of Task 7.
Task 2. Final Stormwater Program Definition (EOS/LOS) and Rate Analysis
Task 2 would finalize the City of Fayetteville's definition of its future Stormwater Program including
Extent of Service (EOS) and Level of Service (LOS) as well as the associated costs based on additional
stakeholder feedback. This will include a high-level path forward for capital improvement planning
efforts that would serve as the basis for a more detailed master planning and prioritization effort of
future drainage studies that would be developed separately. It will support implementation of the Next
Steps noted in the Funding Study, including:
• Refine future program costs based on selected LOS/EOS option using updated stormwater system
condition and needs.
• Finalize preferred EOS option and publish it via legislation or other mechanism to ensure
Stakeholders understand public versus private drainage responsibilities.
In response to Stakeholder suggestions, Task 2 will also develop and analyze an alternative rate
structure based on a property's "intensity of development", as represented by percent of a parcel that is
impervious instead of on tiers of total impervious area (IA). While not as common, using "intensity of
development" as part of their rate calculations is not unprecedented. The cities of Bellevue and Seattle,
Washington use IA billing units of 1,000-2,000 feet with a rate structure that is tiered by percent
impervious. Starting with the preliminary stormwater customer billing database developed by the City's
Geographic Information System (GIs) Department, Jacobs will perform a distribution analysis of the
percent imperviousness (buildings, driveways, and similar) to assess its use as an equitable billing unit
and what a tiered rate structure would be with its use.
After the future Stormwater Program definition, costs and rate structure are agreed to, one additional
rate analysis will be performed to confirm the fee schedule needed to support these services. The
existing rate model developed as part of the Funding Study will be used to evaluate the rate and
financial impacts of funding the final cost of service components. The rate analysis will be summarized
as part of the Program Summary Technical Memorandum (TM) which would be developed as part of
Task 7.
10/17/2019 PAGE 5 OF 10
Task 2 Deliverables —
• Final Stormwater Program definition and cost of service estimate tabulated (over 5 years) for up to 6
program areas.
• Alternative rate structure analysis that assesses a rate schedule that is tiered based on "intensity of
development", i.e. percent of impervious cover / gross area of property.
Stormwater pro forma financial spreadsheet model (financial / rate model) with a detailed 5-year
cash flow analysis and planning level projections over a 20-year time frame.
Task 2 Assumptions —
EOS/LOS Option A/B, with minor modifications, will generally serve as the basis for the final
Stormwater Program definition and cost of service estimates.
The existing preliminary stormwater customer database will be used to generate an alternative rate
structure that also integrates intensity of development. The existing financial spreadsheet model,
with minor modifications, will serve as the starting point for the alternative rate structure analysis
and one additional rate analysis will be performed.
This task will be documented in the Program Summary TM as part of Task 7.
Task 3. Stormwater Customer Billing Database
Task 3 will provide support to the City of Fayetteville as it selects the most cost-effective stormwater
billing mechanism and finalizes the corresponding preliminary billing database developed during the
Funding Study. Should the City decide to proceed with a Fee Program, the City would self -perform the
majority of Task 3, including the extensive CA/QC and database processing efforts needed to ensure the
accuracy of the resulting bills and prevent excessive customer appeals. As part of Task 3, Jacobs will
support City staff as they implement the Next Steps noted in the Funding Study, including:
• Selection of a method of billing property owners (not tenants) either within the existing utility billing
system, on the Washington County property tax bill or as a standalone bill.
• Refine preliminary customer billing database to confirm impervious area by parcel, property
identification number, ownership, mailing address and existing utility account number, if applicable.
Task 3 Deliverables —
As needed support for the City as it assesses and selects its preference billing method.
Up to 3 conference calls with GIS Office staff to strategize and support development of a final
stormwater billing database.
Task 3 Assumptions
The City will be responsible for selecting its preferred billing method with limited support by Jacobs
staff.
• This task will be documented in the Program Summary TM as part of Task 7.
10/17/2019 PAGE 6 OF 10
Task 4. Sustainable Stormwater Credit Program
A stormwater credit is an ongoing, renewable reduction in the fee charged to a property for its
contribution (measured via its amount of impervious surface) of runoff to the stormwater system; all
properties subject to the stormwater fee are eligible to apply for a fee credit. As part of Task 4, Jacobs
will support Fayetteville with determining the applicable range of credits available to customers and
how they would be applied. A resulting credit and incentive framework will provide customers with the
opportunity to receive reductions on their stormwater bills for specific measures or actions that reduce
their stormwater runoff/contribution to Fayetteville's drainage system. A draft and final Sustainable
Stormwater Credit and Incentive Framework will be developed for the purposes of interacting with the
City's internal and external Stakeholders. Stakeholders will be engaged, as appropriate, to review the
draft framework which would provide the "universe" of credit options encompassed by the City's
Drainage Manual and Ordinances as well as innovative credits to raise stakeholder awareness and
encourage innovative practices.
The Jacobs team will also support the City as it decides whether it wants to pursue other incentives such
as rebates; Stormwater rebates would provide eligible applicants the opportunity to recoup some of the
costs of installing approved Stormwater Best Management Practices (BMPs) up to the amount of the
actual fee for a set period. The Team will identify procedures for implementing the selected credit and
rebate programs and application rules and processes for property owners to use in applying for credits
and rebates. The framework will also:
Assist in determination applicable credits for existing commercial and residential uses and how the
credits will be applied,
Assist in the determination of applicable credits for new development projects and how the credits
will be applied,
Identify how the City's credit and rebate programs will generally be administered, including the
application documentation needed, enforcement, renewal and a credit appeals process.
Task 4 Deliverables —
Draft and Final Sustainable Stormwater Credit and Incentive Framework.
Task S. Mitigation / Fee -In -lieu -of Program Assessment
Task 5 will support the City in assessing the value of a mitigation measure / fee in lieu of program for
small infill developments and how such a program would interact with implementation of a Flood
Management and Water Quality Fee Program. Fayetteville's 2014 Design Criteria Manual requires
mitigations measures such as (1) onsite storage, (2) offsite storage, or (3) offsite drainage system
improvements if hydrologic and hydraulic studies reveal that a proposed development would cause
increased frequency of flooding, increased depth of inundation of structures, or inundation of
unprotected structures not previously subject to inundation. While the DCM does allow for cost sharing
of offsite facilities with the City, it's limited budget typically makes it unable to contribute its share of
the offsite costs which shifts the burden of these costs back to the developer. Additionally, the City's
Unified Development Code (UDC) currently exempts non-SFR (single family residential) additions of
2,000 sf of impervious or less and individual SFR and duplexes (that are not part of a larger subdivision)
from these DCM requirements.
10/17/2019 PAGE 7 OF 10
For those infill developments and redevelopments where these DCM requirements are not feasible, the
City is interested in providing these with property owners with alternatives, either by selecting a
mitigation measure from the Cookbook or paying a FILO. To date, in lieu of fees have mainly been used
as part of the development process as an alternative to on -site detention. As such, they are typically a
one-time fee used to construct larger, regional stormwater infrastructure versus an ongoing fee used to
also fund operation and maintenance costs. For example, Hot Springs offers an in -lieu fee program
where the fee is calculated based on $10,000 per acre-foot of stormwater storage.
As part of Task 5, the Jacobs team will:
A. Benchmark and summarize the use of mitigation measures and FILO incentives in other
communities. Facilitate public input meetings.
B. Develop a standard "Cookbook" of alternative water quality, flood, and tree mitigation measures for
small infill developments to choose from, instead of requiring a site -specific drainage study. The
City's Drainage Criteria Manual and Streamside Protection Best Management Practices Manual will
serve as the basis for these Cookbook mitigation measures.
C. Develop a framework for accepting either mitigation measures or payments in lieu of construction
of onsite drainage BMPs. The framework would include policies on when mitigation measures /
FILO payments are applicable and a potential fee structure.
Task S Deliverables —
Draft and Final Mitigation / Fee -In -lieu -of Program Assessment TM, including a Framework, Fee
Structure and "Cookbook" of Water Quality, Flood, and Tree mitigation measures
Task 6. Ordinances and Intergovernmental Agreements
As part of Task 6, the Team will work closely with the City's legal staff to update select Chapters of the
City's Unified Development Code, to develop a new ordinance establishing a stormwater enterprise fund
and to develop Intergovernmental Agreements with key stakeholders.
Task 6.1 Unified Development Code Revisions
The City of Fayetteville's Unified Development Code exempts single family homes and duplexes from
most stormwater management and tree preservation criteria required for other types of. This
exemption has led to a development pattern that is inconsistent with the goals of City Plan 2040,
especially Goal 1 (Making appropriate infill and revitalization our highest priority) and Goal 6 (Creating
opportunities for attainable housing), by encouraging the development of relatively large (and
expensive) single family homes and duplexes on small lots in many redeveloping areas of town,
especially in and near downtown. These large structures with no associated storm drainage mitigation
or tree preservation create negative impacts to adjacent property owners and to the stormwater system
and larger neighborhood as a whole. In comparison, all other types of housing and non-residential
development are required to fully meet all water quality, flood mitigation and tree preservation
requirements in City code, regardless of the size or relative impact to the storm drainage system or tree
canopy.
10/17/2019 PAGE 8 OF 10
The overall purpose of Task 6.1 is to normalize the storm drainage and tree preservation requirements
for developments in Fayetteville and to establish consistent requirements based on the impact of each
development, rather than land use or development type. The City anticipates that the effects of these
changes will likely make requirements for single family homes and duplexes more stringent but may
relax requirements for certain other types of development. To do so, the Jacobs team will:
A. Review the following relevant UDC chapters:
1. Chapter 151 Definitions
2. Chapter 166 Development
3. Chapter 167 Tree Preservation and Protection
4. Chapter 168 Flood Damage Prevention Code
5. Chapter 169 Physical Alteration of Land
6. Chapter 170 Stormwater Management, Drainage, and Erosion Control
7. Chapter 172, Parking and Loading
8. Chapter 179, Low Impact Development
9. City Drainage Criteria Manual
B. Facilitate public input meetings. A minimum of two public input meetings with a focus group and
potentially affected stakeholders shall be conducted by the Jacob's team to identify issues and
incorporate feedback into the code revisions.
C. Redline the existing UDC chapters to refine development thresholds based on land disturbance and
impervious surface, instead of building / land use type, based on input from City staff and
stakeholder input.
D. Attend public hearings. Jacobs team members will attend and present the findings of Tasks 5 and
6.1, including the UDC revisions, "Cookbook" of alterative mitigation measures and framework at
one Planning Commission and one City Council meeting.
Task 6.2 Enterprise Fund Ordinance and Intergovernmental Agreements
Task 6.2 will provide for the development of a new enterprise fund ordinance will provide the basis of
fee as well as policies for credits and appeals and establish / adopt a separate Implementation
document by reference; the final rate structure and administrative details would be developed later in
this Implementation document. Implementation of an enhanced stormwater management program
would also require developing and defining specific policies and procedures to convey to key
stakeholders exactly what is covered in the program, where Fayetteville provides services and what
remains their responsibility. This will be particularly important with key Stakeholders such as the
University of Arkansas, Washington County and the Fayetteville School System. Jacobs will develop up
to 3 Intergovernmental Agreements, also known as Interlocal Agreementsl, that clearly delineate the
extent and level of stormwater services provided by the City, the rights and responsibilities of each party
as well as mutual obligations, compensation and miscellaneous terms.
1 Community and Economic Development, University of Arkansas Division of Agriculture. FSPPC110 on Interlocal Agreements. August 2015.
littps://www.uaex.edu/pubIications/PDF/FSPPC11O.Pdf.
10/17/2019
PAGE 9 OF 10
Task 6 Deliverables:
1. Draft and Final redlined UDC chapters
2. Meeting materials and attendance at 2 public input meetings and 2 public meetings of the Planning
Commission and City Council.
3. Draft Enterprise Fund Ordinance, if warranted.
4. Up to 3 Intergovernmental Agreements, if warranted.
Task 6 Assumptions:
City staff will provide guidance on the development thresholds, based on corresponding land
disturbance and impervious surface percentages, it would like to see integrated in the UDC.
Jacobs staff will review up to 10 existing chapters / sections of the UDC solely for the purposes of
identifying opportunities to improve consistency among storm drainage and tree preservation
requirements based on the impact of each development. Revisions for other purposes, such as
updating text or consolidating sections will be handled separately by the City.
Meeting materials and 1— 2 team members for up to 4 public meetings (requiring 2-3 individual
trips).
Task 7.Overall Project and Quality Management
The objective of this task is to charter the project by defining the design team, management team,
individual roles, personnel contact information, and project controls. This includes managing and
coordinating project resources and responsiveness consistent with the schedule and budget. Task 7 will
also develop a succinct Program Summary Technical Memorandum (TM) summarizing the status /
results of:
• Stakeholder Engagement and Education activities,
• Final Stormwater Program Definition (EOS/LOS) and Rate Analysis,
• Development of a Stormwater Customer Billing Database,
• Development of a Sustainable Stormwater Credit Program
If warranted, the Program Summary TM will also outline next steps towards Program Implementation
and final versions of the other deliverables as attachments.
Task Deliverables —
1. 12 monthly invoices and progress reports.
2. Monthly status calls, including an agenda, updated schedule, and action items.
3. Draft and Final Program Summary TM.
10/17/2019 PAGE 10 OF 10
Project Deliverables
Task q
Task Name
Deliverables
1. Stakeholder Engagement Workshop
2. Draft and Final Stakeholder Engagement and Education Strategy
Stakeholder Engagement and
3. Meeting materials and 1— 2 team members for up to 4 Meetings,
1
Education
Workshops or Briefings (2 individual trips).
4. 1 Stakeholder Survey
5. 1 set of Frequently Asked Questions (Fee Basics, Credits and Incentives)
6. Final Stormwater Program definition and cost of service estimate
tabulated (over 5 years) for up to 6 program areas.
Final Stormwater Program
7. Alternative rate structure analysis that assesses a rate schedule that is
2
Definition (EOS/LOS) and Rate
tiered based on "intensity of development", i.e. percent of impervious
Analysis
cover / gross area of property.
8. Stormwater pro forma financial spreadsheet model (financial / rate
model) with a detailed 5-year cash flow analysis and planning level
projections over a 20-year time frame.
9. As needed support for the City as it assesses and selects its preference
Stormwater Customer Billing
billing method.
3
Database
10. Up to 3 conference calls with GIS Office staff to strategize and support
development of a final stormwater billing database.
4
Sustainable Stormwater Credit
11. Sustainable Stormwater Credit and Incentive Framework.
Program
Mitigation / Fee -In -lieu -of
12. Mitigation / Fee -In -lieu -of Program Assessment TM (Attachment to
5
Program Assessment
Program Summary TM) including a Framework, Fee Structure and
"Cookbook" of Water Quality, Flood, and Tree mitigation measures
13. Redlined UDC chapters
14. Meeting materials and attendance at 2 public input meetings and 2
6
Ordinances and
public meetings of the Planning Commission and City Council (requiring
Intergovernmental Agreements
2-3 individual trips).
15. Enterprise Fund Ordinance and up to 3 Intergovernmental Agreements,
if warranted.
16. 12 monthly invoices and progress reports.
7
Overall Project and Quality
17. Monthly status calls, including an agenda, updated schedule, and action
Management
items.
18. Draft and Final Program Summary TM.
Project Assumptions
1. A period of performance not to exceed 12 months.
2. Travel expenses for up to 5 individual trips in support of up to 8 total meetings are included.
3. It is assumed that all deliverables will consist of no more than 2 drafts and 1 final.
4. Unless specified, all deliverables will be provided in electronic format.
5. Key managers and staff from both CITY and FAY shall provide written review comments for
deliverables via email within 10 working days. Otherwise, deliverables shall be considered
acceptable as submitted. Comments will be addressed, and a final document issued.
10/17/2019 PAGE 11 OF 10
6. EOS/LOS Option A/B, with minor modifications, will generally serve as the basis for the final
Stormwater Program definition and cost of service estimates.
7. The existing stormwater customer billing database and financial spreadsheet model, with minor
modifications, will serve as the starting points for the alternative rate structure. After the City's
preferred rate structure is selected, one additional rate analysis will be performed.
Article B. Schedule and Fee
JACOBS will commence work within 10 working days of receiving a written notice to proceed with the
project. The schedule will be developed in consultation with City staff with activities anticipated to be
complete within 12 months.
The fee for the Scope of Services is calculated based on the hourly rates, and the estimated Level of
Effort (LOE) for this Scope of Services is shown in Table 1. Compensation will be on a not -to -exceed
basis, and the project compensation will not exceed a value of $150,200 without written authorization
from the client.
CITY will be provided with a monthly breakdown of hours spent along with a summary of activities
performed.
10/17/2019 PAGE 12 OF 10
Table 1 - Estimated Level of Effort and Expenses
Role
Project
Director
Senior
Consultant
Consultant
Project
Mana er
Stall
Engineer
Project
Support
Project
Assistant
Rate
$ 225
S 175
$ 160
$ 140
$ 100
$ 90
$ 85
Hours by Employee
56
16
451
60
396
36
32
_
Cost by Employee
$ 12,600
$ 2800
$ 72,160
$ 8,400
$ 39,6D0
S 3240
$ 2720
Hours Cost
Task 1: Stakeholder Engagement and Education
178
S 23,580
16
0
80_
0
24
0 --
$--
Labor
128
$ 19.480
16
_
80
24
8
Expenses
$ 4,100
Task. 2: Final Stormwater Program Definition and Rate Analysis
128
$ - 19,560
8
0
96.
0
24
0
0
Labor Program Definition / Costs
40
$ 4,960
16
24
Labor Alternative Rate Structure and 1 Rate Analysis
88
$ 14,600
8
80
Task 3: Stormwater Customer Billing Database Support
24
S 3,940
0
0
24
0
0
0
Labor
24
$ 3,840
24
Task 4: Sustainable Stormwater Credit Program
120 '"
$ 14,740
4
0
40
0
is
0
Labor
120
S 14.740
4
40
K40
16
Task S: Mitigation fee-1n h--f Pro ram Feasibility Assessment
212
$ 27,780
20
16
48
0
0
0
labor - Senchmarking
76
56
S 10,260
$ 7,080
4
16
16
Labor- Cookbook of Mitigation Measures
8
8
40
Labor -FILO policy framework and fee structure
80
$ 10440
8
24
48
Task 6: Ordinance and Inter mernmental Agreements
226`
- $ 32,160
4
0 '
74
16
120
12
0
Labor - IGAs and Enterprise Fund Crdinance
68
s 8,740
4
24
Labor- UDC Review and Redlinin
158
$ 19,320
50
16
12
Expenses -- -
s 4100
�-
-
Task 7: Project Management and SummaryReport
209
$ 28 D60
4.
0
89
u
E40
8
24
PM (12 months)
92
S 12040
24
44
24
Report120
S 16,500
8
Total
1050 s 150
City of Fayetteville, Arkansas - Budget Adjustment Form (Legistar)
Budget Year Division Adjustment Number
/Org2 ENGINEERING (621)
2019
Requestor: Chris Brown
BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION:
Approval of Amendment 2 to the Stormwater Feasibility Study professional services contract with Jacobs, formerly
CH2M Hill, in an amount not to exceed $150,200 and to approve a budget adjustment.
$100,000 from Other Drainage Improvements (Cedarwood/Glennwood) & $50,200 from the Stormwater Quality
Management project.
COUNCIL DATE: 1 1 /5/201 9
LEGISTAR FILE ID#: 2019-0596
ff a y 3lack
1012112019 11:31 AM
Budget Director Date
TYPE:
JOURNAL #:
GLDATE:
RESOLUTION/ORDINANCE CHKD/POSTED:
TOTAL - -
v.20190816
Increase / (Decrease) Proiect.Sub#
Account Number Expense Revenue Project Sub.Detl AT Account Name
4470.621.8810-5314.00 150,200 17008 1 EX Professional Services
4470.621.8810-5817.00 (100,000) 02108 1807.40 EX Improvements - Bridge & Drainage
4470.621.8810-5817.00 (50,200) 02097 1 EX Improvements - Bridge & Drainage
H:\Budget Adjustments\2019_Budget\City Council\ 1 1-05-2019\2019-0596 Jacobs contract amend 1 of 1
113 West Mountain Street
Fayetteville, AR 72701
(479)575-8323
Resolution: 157-22
File Number: 2022-0549
STORMWATER AND FLOOD MANAGEMENT WATER QUALITY PROJECTS:
A RESOLUTION OF INTENT TO ESTABLISH A STORMWATER UTILITY FOR THE
PURPOSES OF FUNDING NEEDED STORMWATER AND FLOOD MANAGEMENT
WATER QUALITY PROJECTS THROUGH A MONTHLY STORMWATER FEE TO BE PAID
BY MOST PROPERTY OWNERS IN FAYETTEVILLE, TO REQUEST CITY
STAFF TO CONTINUE WITH ANALYSIS AND SUPPORTING ACTIVITIES, AND TO
APPROVE THE ATTACHED $199,660.00 BUDGET ADJUSTMENT
WHEREAS, the City of Fayetteville experienced major floods in 2008, 2011, 2015 and 2017, each
of increasing frequency and magnitude; and
WHEREAS, additional funds are needed for measures to protect the long -teen resiliency of the City's
infrastructure and its ability to protect public safety and access to public roads, as well as
increase flood mitigation measures for the protection of private property; and
WHEREAS, the City became a regulated small Municipal Separate Storm Sewer System (MS4)
community under the State of Arkansas' General Permit (ARR040000) in 2003 with no
corresponding federal or state funding for its mandated MS4 Stormwater Management Program; and
WHEREAS, the Minimum Control Measures that the City is required to implement, track and report
as part of its MS4 Stormwater Management Program have increased with each 5-year
permit renewal cycle since 2003 and will likely increase again soon to reflect our substantially
increasing population; and
WHEREAS, the City's MS4 assets and responsibilities continue to increase with new development
built in Fayetteville while additional routine maintenance, repair and replacement
Page 1 Printed on 716122
Resolution: 157-22
File Number- 2022-0549
of the City's existing MS4 required infrastructure becomes necessary as these assets age; and
WHEREAS, the City will likely meet the population threshold of 100,000 by the 2030 Decennial
Census for Arkansas to become a medium MS4 community, triggering additional
mandated activities and infrastructure; and
WHEREAS, the City's current funding sources, including Street Fund, General Fund, Sales Tax
Capital Improvements Fund, and the intermittent issuance of revenue bonds, are no longer
adequate to provide and sustain these stormwater, flood management and water quality services; and
WHEREAS, the 2019 Flood Management and Water Quality Funding Study identified a
Stormwater Utility Fee to help pay for these services based upon the impervious area of houses,
buildings, driveways, etc. as the most equitable mechanism for funding these increasing needs when
paired with the Sustainable Credit Program available to all customers.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby expresses its intention to
adopt a Stormwater Utility and Stormwater Utility Fee upon satisfactory completion
of the following tasks which are necessary for a complete Stormwater Utility Ordinance:
a. Development of an accurate billing database with the attributes needed to facilitate billing.
b. Completion of a final validation of the original financial model using updated program costs and the
Customer Billing Database and develop final billing rates to complete.
c. Development, Expansion and Finalization of the Sustainable Credit Framework, to include eligibility,
application requirements, inspection and verification procedures and duration between
renewal.
d. Negotiate, if possible, Interlocal Cooperation Agreements with other public property owners in the
City, such as the University of Arkansas and Washington County.
e. Develop and implement stakeholder engagement and education materials and strategies including an
interactive map that will allow property owners to see information specific to their
property, including impervious areas and potential rates and monthly billing amounts.
f. Review and consider municipal exemptions for rights of way, parking lots and other City properties.
g. Development of a robust customer service program with processes allowing customers to request an
audit/map supporting their fee amount, to answer questions, and to facilitate appeals of fee amounts
and credits.
Page 2 Printed on 716122
Resolution: 157-22
File Number: 2022-0549
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves Contract
Amendment No. 3 with Jacobs in the amount of $199,660.00 for additional services necessary to
complete the tasks in section 1.
Section 3. That the City Council of the City of Fayetteville, Arkansas hereby approves the attached
budget adjustment.
PASSED and APPROVED on 7/5/2022
Attest: %011iit1tfyl
G~EDIT Y
•FAY ".
�F-Vft
Kara Paxton, City Clerk Treasurerw
I.If/ 44 N l�s`
va
Page 3 Printed on 716122
City of Fayetteville, Arkansas 113 West Mountain Street
Fayetteville, AR 72701
(479)575-8323
Text File
File Number: 2022-0549
Agenda Date: 7/5/2022 Version: 1 Status: Passed
In Control: City Council Meetinq File Type: Resolution
Agenda Number: D.1
STORMWATER AND FLOOD MANAGEMENT WATER QUALITY PROJECTS:
A RESOLUTION OF INTENT TO ESTABLISH A STORMWATER UTILITY FOR THE PURPOSES
OF FUNDING NEEDED STORMWATER AND FLOOD MANAGEMENT
WATER QUALITY PROJECTS THROUGH A MONTHLY STORMWATER FEE TO BE PAID BY
MOST PROPERTY OWNERS IN FAYETTEVILLE, TO REQUEST CITY
STAFF TO CONTINUE WITH ANALYSIS AND SUPPORTING ACTIVITIES, AND TO APPROVE
THE ATTACHED $199,660.00 BUDGET ADJUSTMENT
WHEREAS, the City of Fayetteville experienced major floods in 2008, 2011, 2015 and 2017, each of
increasing frequency and magnitude; and
WHEREAS, additional funds are needed for measures to protect the long-term resiliency of the City's
infrastructure and its ability to protect public safety and access to public roads, as well as
increase flood mitigation measures for the protection of private property; and
WHEREAS, the City became a regulated small Municipal Separate Storm Sewer System (MS4) community
under the State of Arkansas' General Permit (ARR040000) in 2003 with no
corresponding federal or state funding for its mandated MS4 Stormwater Management Program; and
WHEREAS, the Minimum Control Measures that the City is required to implement, track and report as part
of its MS4 Stormwater Management Program have increased with each 5-year
permit renewal cycle since 2003 and will likely increase again soon to reflect our substantially increasing
population; and
WHEREAS, the City's MS4 assets and responsibilities continue to increase with new development built in
Fayetteville while additional routine maintenance, repair and replacement
of the City's existing MS4 required infrastructure becomes necessary as these assets age; and
WHEREAS, the City will likely meet the population threshold of 100,000 by the 2030 Decennial Census for
Arkansas to become a medium MS4 community, triggering additional
mandated activities and infrastructure; and
WHEREAS, the City's current funding sources, including Street Fund, General Fund, Sales Tax Capital
City of Fayetteville, Arkansas Page 1 Printed on 71612022
File Number: 2022-0549
Improvements Fund, and the intermittent issuance of revenue bonds, are no longer
adequate to provide and sustain these stormwater, flood management and water quality services; and
WHEREAS, the 2019 Flood Management and Water Quality Funding Study identified a Stormwater
Utility Fee to help pay for these services based upon the impervious area of houses,
buildings, driveways, etc. as the most equitable mechanism for funding these increasing needs when paired with
the Sustainable Credit Program available to all customers.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby expresses its intention to adopt a
Stormwater Utility and Stormwater Utility Fee upon satisfactory completion
of the following tasks which are necessary for a complete Stormwater Utility Ordinance:
a. Development of an accurate billing database with the attributes needed to facilitate billing.
b. Completion of a final validation of the original financial model using updated program costs and the Customer
Billing Database and develop final billing rates to complete.
c. Development, Expansion and Finalization of the Sustainable Credit Framework, to include eligibility,
application requirements, inspection and verification procedures and duration between
renewal.
d. Negotiate, if possible, Interlocal Cooperation Agreements with other public property owners in the City,
such as the University of Arkansas and Washington County.
e. Develop and implement stakeholder engagement and education materials and strategies including an
interactive map that will allow property owners to see information specific to their
property, including impervious areas and potential rates and monthly billing amounts.
f. Review and consider municipal exemptions for rights of way, parking lots and other City properties.
g. Development of a robust customer service program with processes allowing customers to request an
audit/map supporting their fee amount, to answer questions, and to facilitate appeals of fee amounts and credits.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves Contract Amendment
No. 3 with Jacobs in the amount of $199,660.00 for additional services necessary to complete the tasks in
section 1.
Section 3. That the City Council of the City of Fayetteville, Arkansas hereby approves the attached budget
adjustment.
City of Fayetteville, Arkansas Page 2 Printed on 71612022
Chris Brown
Submitted By
City of Fayetteville Staff Review Form
2022-0549
Legistar File ID
7/5/2022
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
6/14/2022 ENGINEERING (621)
Submitted Date Division / Department
Action Recommendation:
Approval of a resolution of intent to establish a stormwater utility for the purposes of funding needed stormwater
and flood management water quality projects through a monthly stormwater fee to be paid by most property
owners in Fayetteville; and to request city staff to continue with analysis and supporting activities; and approval of
Amendment 3 to the Stormwater Feasibility Study professional services contract with Jacobs in an amount not to
exceed $199,660 (total contract amount $582,942) are complete and to approve a budget adjustment.
Budget Impact:
1010.090.6600-5314.00
General Fund
Account Number Fund
17008.1 Stormwater Utility Feasiblity Study
Project Number
Budgeted Item? Yes
Does item have a cost? Yes
Budget Adjustment Attached? Yes
Purchase Order Number: 2018-498
Change Order Number:
Original Contract Number:
Comments:
2
2018-23
Current Budget
Funds Obligated
Current Balance
Item Cost
Budget Adjustment
Remaining Budget
Project Title
$ 2,890.00
$ 2,889.92
0.08
$ 199,660.00
$ 199,660.00
V20210527
Previous Ordinance or Resolution # 131-18, 209-19, 250-1S
Approval Date:
CITY OF
FAYETTEVILLE
ARKANSAS
MEETING OF JULY 5, 2022
TO: Mayor and City Council
THRU: Susan Norton, Chief of Staff
Chris Brown, Public Works Director
FROM: Alan Pugh, Staff Engineer
DATE: June 14, 2022
CITY COUNCIL MEMO
SUBJECT: Approval of a resolution of intent to establish a stormwater utility for the purposes
of funding needed stormwater and flood management water quality projects
through a monthly stormwater fee to be paid by most property owners in
Fayetteville; and to request city staff to continue with analysis and supporting
activities; and approval of Amendment 3 to the Stormwater Feasibility Study
professional services contract with Jacobs in an amount not to exceed $199,660
(total contract amount $582,942) are complete and to approve a budget
adjustment.
RECOMMENDATION:
Staff recommends approval of a resolution of intent to establish a stormwater utility for the
purposes of funding needed stormwater and flood management water quality projects through a
monthly stormwater fee to be paid by most property owners in Fayetteville; and to request city
staff to continue with analysis and supporting activities; and approval of Amendment 3 to the
Stormwater Feasibility Study professional services contract with Jacobs in an amount not to
exceed $199,660 (total contract amount $582,942) are complete and to approve a budget
adjustment.
BACKGROUND:
Like many cities throughout the state and nation, the City of Fayetteville experiences issues with
stormwater runoff. These issues stem from many sources including, but not limited to, aging
infrastructure, maintenance of system capacity, manpower to perform systematic inspections
and the lack of formal drainage systems in many older areas of the City. In order to address
these concerns, the City has historically funded maintenance and new projects directly from the
Sales Tax Capital Improvement Program (CIP). However, there are many needs within the City
that require funding from the CIP and, at least in recent years, the funding for stormwater has
been inadequate to comprehensively address stormwater issues. To develop a comprehensive
solution, funding is required for manpower and equipment as well as multiple capital projects,
some of which will require more than $1 million dollars for each project. Given the current
funding levels, it would take many years to address just one of those projects.
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
The City Council recognized these needs and approved moving forward with a feasibility study
on June 5, 2018 via resolution 131-18 and amended that agreement on two occasions;
resolution 209-19 and 250-19 to provide additional investigation.
DISCUSSION:
With the feasibility portion of the project complete and accepted by the City Council, the next
phase will include preparation for the actual implementation should Council ultimately decide to
move forward. In the immediate future the proposed work would include developing a billing
database and procedure, finalizing the credit system, analyzing the latest impervious area and
finalizing the proposed rate structure. The proposed project will also, with the help of the City's
Communications Division, include a robust outreach program to educate the public about the
program once the analysis is complete. While there will be checkpoints along the way, the
contact also includes a full 24 months of support which will take the project all the way through
the implementation process.
With the amount of work remaining, the stormwater committee would like City Council to
consider the attached resolution of intent along with the amendment to the contract. This
resolution would only state Council's intent to move forward with the program and would not
establish the program at this time. Once the applicable items in contract Amendment #3 are
complete, staff would bring forth an ordinance for Council consideration to establish the
stormwater utility and move forward with the implementation.
BUDGET/STAFF IMPACT:
The overall cost proposed is $199,660 which would bring the total of all services to $582,942
and is proposed to be set aside from the general fund as was the case with the original funding
for the study.
Attachments:
Draft Resolution of Intent
Amendment 2 to Stormwater Feasibility Contract
Budget Adjustment
Resolution 131-18
Resolution 209-19
Resolution 250-19
RESOLUTION NO.
A RESOLUTION OF INTENT TO ESTABLISH A STORMWATER UTILITY FOR THE
PURPOSES OF FUNDING NEEDED STORMWATER AND FLOOD MANAGEMENT
WATER QUALITY PROJECTS THROUGH A MONTHLY STORMWATER FEE TO BE
PAID BY MOST PROPERTY OWNERS IN FAYETTEVILLE, AND TO REQUEST CITY
STAFF TO CONTINUE WITH ANALYSIS AND SUPPORTING ACTIVITIES.
WHEREAS, the City of Fayetteville experienced major floods in 2008, 2011, 2015 and 2017,
each of increasing frequency and magnitude; and
WHEREAS, additional funds are needed for measures to protect the long-term resiliency of the
City's infrastructure and its ability to protect public safety and access to public roads, as well as
increase flood mitigation measures for the protection of private property; and
WHEREAS, the City became a regulated small Municipal Separate Storm Sewer System (MS4)
community under the State of Arkansas' General Permit (ARR040000) in 2003 with no
corresponding federal or state funding for its mandated MS4 Stormwater Management Program;
and
WHEREAS, the Minimum Control Measures that the City is required to implement, track and
report as part of its MS4 Stormwater Management Program have increased with each 5-year
permit renewal cycle since 2003 and will likely increase again soon to reflect our substantially
increasing population; and
WHEREAS, the City's MS4 assets and responsibilities continue to increase with new
development built in Fayetteville while additional routine maintenance, repair and replacement
of the City's existing MS4 required infrastructure becomes necessary as these assets age; and
WHEREAS, the City will likely meet the population threshold of 100,000 by the 2030
Decennial Census for Arkansas to become a medium MS4 community, triggering additional
mandated activities and infrastructure; and
WHEREAS, the City's current funding sources, including Street Fund, General Fund, Sales Tax
Capital Improvements Fund, and the intermittent issuance of revenue bonds, are no longer
adequate to provide and sustain these stormwater, flood management and water quality services;
and
WHEREAS, the 2019 Flood Management and Water Quality Funding Study identified a
Stormwater Utility Fee to help pay for these services based upon the impervious area of houses,
buildings, driveways, etc. as the most equitable mechanism for funding these increasing needs
when paired with the Sustainable Credit Program available to all customers.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby expresses its
intention to adopt a Stormwater Utility and Stormwater Utility Fee upon satisfactory completion
of the following tasks which are necessary for a complete Stormwater Utility Ordinance:
a. Development of an accurate billing database with the attributes needed to facilitate billing.
b. Completion of a final validation of the original financial model using updated program costs and
the Customer Billing Database and develop final billing rates to complete.
c. Development, Expansion and Finalization of the Sustainable Credit Framework, to include
eligibility, application requirements, inspection and verification procedures and duration between
renewal.
d. Negotiate, if possible, Interlocal Cooperation Agreements with other public property owners in
the City, such as the University of Arkansas and Washington County.
e. Develop and implement stakeholder engagement and education materials and strategies
including an interactive map that will allow property owners to see information specific to their
property, including impervious areas and potential rates and monthly billing amounts.
f. Review and consider municipal exemptions for rights of way, parking lots and other City
properties.
g. Development of a robust customer service program with processes
allowing customers to request an audit/map supporting their fee amount, to answer questions,
and to facilitate appeals of fee amounts and credits.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves Contract
Amendment No. xx with Jacobs in the amount of $xxx,xxx for additional services necessary to
complete the tasks in section 1.
PASSED and APPROVED this 1 st day of March, 2022.
APPROVE]
ATTEST:
LIONELD JORDAN, Mayor KARA PAXTON, City Clerk/Treasurer
Project:
Jacobs Project No.
Client:
Project Manager:
SCOPE CHANGE AUTHORIZATION
Amendment 3 to the Stormwater Date Prepared:
Feasibility Study Contract
705896CH Date Revised:
City of Fayetteville, AR
Heather H. Dvke
June 15, 2022
Client Project No.:
Change No.: 3
1. The attached proposal for changes in the scope of the work are hereby authorized:
As an amendment to our existing agreement, Resolution 131-18, File Number 2018-0267.
2. The effect of these changes in scope is as follows:
a. Fee (1) Change Labor: $191,460 + Travel: $8,200 = $199,660
(2) New Total $582,942
b. Schedule August 2022 to July 2024, or 24 months from NTP.
c. Construction (1) Cost N/A
(2) Schedule N/A
d. Other N/A
3. The reason for these changes in the scope of the work are as follows:
The purpose of Phase III is for Jacobs to provide an additional 24 months of support to prepare the City of
Fayetteville for the initial billing of a customer -neutral fee based on impervious area (IA) as recommended
by the 2019 Funding Study and subsequent analysis by the City Council Special Stormwater Subcommittee.
4. Project Manager's comments:
On behalf of Jacobs, I greats ppreciate portunito support the City with potential implementation
of its Flood Managem nt Water ality F ding Pa gram.
Approved by Client:
Agreed to by J EG: /
Heather Laryisson, PE
Jacobs
Manager of Projects I BIAF
Date: '�� e = 2'L
Date: 6 15 2022
JACOBS`
June 10, 2022
Chris Brown, PE
Public Works Director
City of Fayetteville
125 W. Mountain Street
Fayetteville, AR 72701
Subject: Flood Management and Water Quality Funding Program Implementation, Phase III
Dear Mr. Brown:
Jacobs is pleased to submit this proposal for an amendment to our existing agreement for the purposes of assisting
the City of Fayetteville (the "City") with the implementation of the findings of the Flood Management and Water
Quality Funding Study (prepared under Resolution 131-18, File Number 2018-0267) and subsequent analysis for
Funding Program Implementation (Resolution 250-19, File Number 2019-0596). As a result of these efforts, our
Team uniquely understands the many drivers for the City establishing an equitable and sustainable long-term
funding source for its MS4 stormwater, flood management and water quality needs. Similarly, we recognize the
importance of the remaining work for the City's leadership, staff and citizens.
The overall purpose of Phase III of the Flood Management and Water Quality Funding Program Implementation
("Phase III") is for Jacobs to provide 24 months of support as described in the attached documents to facilitate the
initial billing of a customer -neutral fee based on impervious area (IA). As part of Phase III, Jacobs will support the
City as it develops its internal billing policies to support its diverse range of customers, a current customer billing
database, and a Sustainable Stormwater Credit Manual with Application and Instructions. Similarly, Jacobs will
provide technical content for the City's Communication Department to utilize with stakeholders and facilitate a
Customer Billing Preview & Notification Study paired with a public -facing Billing Preview tool for customers to view
the draft billing data (parcel boundaries and impervious area). The proposal attached provides the following
information:
• Article A. Purpose and Scope of Services
• Article B. Schedule and Fee
We greatly appreciate the opportunity to provide this proposal for the City's consideration. If you have any
questions, please do not hesitate to contact us.
Sincerely,
AIA�171__
Heather Layrisson/BTR
Heather H. Dyke, AICP
6/10/2022 PAGE 1 OF 12
Enclosure
Flood Management and Water Quality Funding Program
Implementation for the City of Fayetteville, Arkansas
Article A. Purpose and Scope of Services
This scope of work would provide the City of Fayetteville, Arkansas with support in implementing the
findings of the 2019 Flood Management and Water Quality Funding Study (prepared under Resolution
131-18, File Number 2018-0267) and subsequent analysis for Funding Program Implementation
(Resolution 250-19, File Number 2019-0596). The purpose of Phase III is to provide 24 months of
support to the City of Fayetteville to facilitate the initial billing of a Stormwater, Flood Management and
Water Quality fee. This customer -neutral fee, based on impervious area (IA), was identified as the most
equitable method of funding its drainage and federally mandated, albeit unfunded, Municipal Separate
Storm Sewer System (MS4) permit compliance needs by the 2019 Funding Study.
Under Phase III, Jacobs would first provide as needed services to City staff to navigate final policy
decisions and implement robust stakeholder engagement and education and develop credit and
customer service programs. Secondly, Jacobs would facilitate the creation of an updated Customer
Billing Database by the City and perform a final validation of the original financial model using updated
program costs and the updated Billing Database. Lastly, Jacobs will work with City staff to conduct a
Customer Billing Preview & Notification Study at least 6 months in advance of the first billings using the
draft Customer Billing database. This study will notify customers of their anticipated fee amount
without credits, provide them with the Draft Sustainable Stormwater Credit Manual, including a Credit
Program Application and Instructions as an attachment, and allow them to view the underlying parcel
boundaries and impervious area via a City -developed and hosted map tool. If the customer finds a
discrepancy in this source data an online link or form will be provided to request an appeal.
The Jacobs Project Team would continue to be led by Heather Dyke, AICP with support from Mike
Matichich and other Jacobs staff already familiar with the Funding Study and subsequent Program
Implementation Findings.
Scope of Services
Project Understanding
Phase III of the Flood Management and Water Quality Funding Program includes the interim activities
necessary to establish a fee program. After consideration and passing of a Resolution by City Council,
the Jacobs team would work closely with City staff to forward these activities in a cost-effective,
stepwise and collaborative fashion. The following table summarizes the Project Team's understanding
of City -led activities versus Jacobs -led deliverables by task, which are described further in the next
section. For example, it is assumed that the City will lead Stakeholder Education and Outreach activities
with technical support and content provided by Jacobs. Similarly, Task 5 is now dedicated to the
development of robust, sustainable customer service program in which Jacobs would support the City as
it develops a responsive program, including processes for customers to request a brief audit / map
supporting their fee amount, to answer questions, and facilitate appeals of fee amounts and credits.
6/10/2022 PAGE 2 OF 12
Task #
Task Name
City -led Activities
Jacobs Deliverables
• Overall Flood Management and Water
• Technical content for SpeakUp
Quality Stakeholder Engagement and
Fayetteville, the Customer Billing
Education Program
Preview & Notification Study,
Stakeholder
• Strategy and Action Plan including
Example Fee Calculations and
1
Engagement and
methods, milestones and schedule for
Frequently Asked Questions.
Education
necessary technical content from
• Meeting materials and
Jacobs.
attendance for up to 8 Meetings,
Workshops or Briefings (4
individual trips).
Development of underlying billing database
• Updated stormwater cost of
source data in Task 3, which will also be an
services, 2024 to 2034.
Final Stormwater
input for the financial /rate model.
• Updated stormwater financial /
rate model, with detailed 5-year
2
Program Costs and
cash flow analysis and planning
Rate Analysis
level projections over a 20-year
time frame.
• Obtain and process underlying billing
• Billing Policy Paper
database source data
• Workshops with City GIS and
• Develop public -facing Billing Preview
Utility Billing staff
tool for customers to view the draft
. Customer Billing Database
Stormwater
2024 Customer Billing Data (parcel
Work Ian
p
boundaries and impervious area) and
3
Customer Billing
submit a request for City staff review
• Draft 2024 Customer Billing
Database
as part of Notification
Database
• Distribute Customer Billing Preview &
• Customer Billing Preview &
Notification
Notification Study
• Final 2024 Customer Billing
Database
• City staff will take the lead soliciting
input from City stakeholders on the
. Revisit Phase II Credit Framework
range of credit opportunities that
and assess the cost /benefits of
Sustainable
should be offered, see Task 1, with
providing additional credits.
4
Stormwater Credit
technical support from Jacobs.
Program
• City staff will negotiate Interlocal
• Draft and Final Sustainable
Cooperation Agreements with other
Stormwater Credit Manual with
public governments relating to their
Application and Instructions
credits
• Sustainable Customer Service Program
• Draft and Final Customer Service
• Drainage Easement Equity Plan
Fee and Credit Appeal processes
Customer Service
and procedures
5
and
• Plan for Private Residential Detention
Administration
Pond Program (inventory, contact,
• Draft and Final CS processes and
procedures and a schedule)
procedures for administering the
Credit Program and Billing
Database.
• Confirm Section 52.03—Applicability.
• Up to 3 draft Interlocal
6
Ordinances and
Intergovernmental
• Negotiate Interlocal Cooperation
Cooperation Agreements
Agreements
Agreements
• Revise Ordinance Section 52.07,
if needed.
6/10/2022 PAGE 3 OF 12
Project Tasks
Task 1. Stakeholder Engagement and Education
The Jacobs Team understands that the City's goal is to continue to reach as many people as practical
throughout the stakeholder engagement and education process. Further, that additional involvement
and education of the owners of rental property, large industries, non -profits and other traditionally
exempt property may be needed to ensure they understand how equitable the fee is, the services it
provides and that the City is providing a robust, Sustainable Credit Program to recognize existing,
functional stormwater practices. Task 1 will provide the technical content for the City's Communication
Department to use to raise awareness among citizens and businesses of the need for additional funding
and the equity / fairness of Funding Program selected. Other technical content would support
Stakeholder awareness of the Customer Billing Preview & Notification Study planned for at least 6
months in advance of initial billing.
Task 1.1 General Meetings, Workshops and Briefings
The Jacobs Team will support City staff in engaging internal and external stakeholders via a variety of in
person meetings, workshops and briefings. Elected officials will be briefed either through the Special
Stormwater Subcommittee established during the Funding Study or through full City Council
presentation(s). This scope of work would cover 4 meetings over 2 trips by the Jacobs Project Manager
plus 1 additional staff member, as needed.
Task 1.2 Stakeholder Materials
The Team will work closely with the City's Communications and Marketing Department and the Media
Services Division to support the implementation of a robust and innovative stakeholder engagement
and education strategy that reflects the City's long history of reaching out to its citizens. Jacobs will
develop the draft technical content of Stakeholder Materials while City staff will finalize the materials
for posting and distribution.
Task 1 Deliverables and Assumptions —
o Meeting materials and 1— 2 team members for up to 8 Meetings, Workshops or Briefings (4
individual trips).
o Up to 4 PowerPoint presentations
o Technical content for SpeakUp Fayetteville, the Customer Billing Preview & Notification Study,
Example Fee Calculations and Frequently Asked Questions.
o Staff with the City's Communications and Marketing Department and the Media Services Division
will now lead this Task with technical support from the Jacobs Team.
Task 2. Final Stormwater Program Costs and Rate Analysis
Task 2 would update the costs associated with the City providing the Extent of Service (EOS) and Level of
Service (LOS) planned for its Stormwater Program based on inflation and additional stakeholder
feedback. Similarly, the financial planning and rate analysis activities performed in Phases I and II will be
updated and validated using these updated costs, the draft Stormwater Customer Billing Database from
6/10/2022 PAGE 4 OF 12
Task 3, and other potential changes to the underlying assumptions to confirm the fee schedule needed
to support its desired EOS / LOS.
Task 2 Deliverables and Assumptions —
• Final projected stormwater cost of services tabulated from 2024 to 2034.
• Final stormwater pro forma financial spreadsheet model (financial / rate model) with a detailed 5-
year cash flow analysis and planning level projections over a 20-year time frame.
• The EOS/LOS assumptions used for generating the final stormwater program costs will not vary
substantially from those in Phase II.
Task 3. Stormwater Customer Billing Database
Jacobs will work in collaboration with City staff in Task 3 to develop a current Stormwater Customer
Billing database. The resulting draft and final databases will serve multiple purposes for
implementation, including accurately identifying the top 20 Stakeholders for engagement (Task 1),
estimating fee amounts for the purposes of negotiating interlocal agreements (Tasks 4 and 6) as well as
determining efficient methods for billing non -fee simple properties and properties administered as
rentals by management companies. Jacobs anticipates the City needing to follow the steps below to
identify and develop a customer billing database that meets its needs:
1) A Billing Policy Paper to identify and evaluate the full range of policy questions in advance of
designing the Customer Billing Database of a parcel -based fee as a new module within the City's
monthly utility billing system. Examples of topics to be addressed during a Task Kickoff with City
staff include but are not limited to:
a) Will most undeveloped properties inherently not have a utility account?
b) What are cost-effective (long term) methods for?
i) Linking parcel ownership to the existing utility billing system?
ii) Calculating and administering fees for non -fee simple properties and properties
administered as rentals by management companies?
iii) Calculating and administering credit amounts?
2) Develop a Customer Billing Database Workplan based on findings of the Policy Paper and a series of
workshops with City GIS and Utility Billing staff. The workshops will:
a) Identify a wide range of attributes needed for billing, the structure of this data and cost-
effective processing steps to generating it.
b) Establish procedures for billing rental and multi -family properties.
c) Establish procedures for resolving database exceptions and customer appeals.
3) Generating a draft 2024 Customer Billing Database, as described in the Workplan.
4) Perform a Customer Billing Preview & Notification Study with the draft 2024 Customer Billing
database at least 6 months in advance of the initial billing to notify owners of their anticipated fee
amount without credits and to provide the Sustainable Credit Program Manual, including an
Application and Instructions, with a proposed period for owner submittals of appeal and credit
applications and subsequent City processing (see Task 5) before billing.
5) Generate fina12024 Customer Billing Database with credit amounts to date and adjustments
resulting from the Customer Billing Preview & Notification Study.
6/10/2022 PAGE 5 OF 12
Jacobs will provide support to the City while it generates a draft and final Customer Billing database.
Should the City decide to proceed with Phase III, it is assumed that the City would self -perform the
majority of Task 3, including the extensive QA/QC and database processing efforts needed to test for
accuracy of the resulting bills and reduce the likelihood of excessive customer appeals. Examples of self -
performed efforts include generating:
• Current Impervious Area (IA) data that reflects the City's definition of IA and growth that has
occurred since 2018.
• Parcel / Property Boundary Verification (attributed with PIN [parcel identification number], physical
address and owner)
o Purpose: Parcel boundaries are needed for calculating a fee, no matter the billing method
selected. The PIN or physical address will serve as the method of joining the customer
billing database to the City's utility billing system.
o Existing data: Substantial database processing could be needed to examine the extent that
parcel boundaries are reasonably correct. Moderate database processing will be needed for
all parcels to be attributed with PINs and Ownership. Lastly, while the fee is customer -
neutral, there are multiple benefits to retaining, or adding, attributes to indicate customer
type / class.
Task 3 Deliverables and Assumptions —
1. Deliverables:
a. Up to 8 virtual, or in -person, if possible, workshops with City staff from corresponding
Departments to develop the Billing Policy Paper, Customer Billing Database Workplan and
Customer Billing Preview & Notification Study.
b. Draft and Final Billing Policy Paper
c. Draft and Final Customer Billing Database Workplan
d. Draft and Final 2024 Customer Billing Database
e. Technical Support of Customer Billing Preview & Notification Study.
2. Other as needed support includes:
a. Technical input as City GIS staff leads (and hosts) the development of a simple, public -facing
tool for customers to view the draft 2024 Customer Billing Database, i.e., quick map of the
property boundaries and IA, for verification. The tool will also allow customers to request
an audit if something looks amiss in advance of billing.
3. Assumptions:
a. The City will be responsible for providing Jacobs with an updated ArcGIS geodatabase of an
"intersect" or "identity" between the following data sources as an input to the Draft 2024
Customer Billing Database:
Its version of the Washington County Tax Parcels with the attributes, highlighted
below:
Parcel: 765-13492-COO Washington County Report ID: 46604
Prev Parcel. 14 5J-0QC-l_0
Property Owner Property Information
Name: Physical Address: 1772 N COLLEGE AVE
Mailing Address: PO BOX 6536 Subdivision: 3-16-30 FAYETTEVILLE OUTLOTS
FORT SMITH, AR 72906-6538 Block I Lot: NIA I NIA
Type: (CI) Comm. Impr. S-T-R: 03-16-30
Tax Dist: (011) FAYETfEVILLE SCH, FAY Size (Acres): 0.336
Millage Rate: 57 95
6/10/2022 PAGE 6 OF 12
Building 1
AgeNC Condition Effective Age Stories Grade
1972 Average 14 1 C2
Avg. Floor Area: 1978 Common Wall:
Avg. Perimeter: 196 Total Floor Area: 1978
No. Floors: 1 Total Height: 10
Avg. Floor Hgl: 10 Unit Multiplier. 1
Occupancy HeatinglCooling Sprinkler
Primary Restaurarl - Fast Food (100%) WmnCI Air (100%) NIA
Secondary NIA NIA NIA
Outbuildings and Yard Improvements
Item
Type
Size/Dim Unit Multi. Quality Age
Cooler (35 F)
7x12
Fence, Metal
WIRON4
300
Freezer(0 F)
10x7
Lighting
PAVAPFX
7
Lighting
LGTP
34 3
Paving
ASPH
5000
Sign Pasts or Poles
6x2
Flagpole
NCV
Lighting
LGTP
20 1
Paving
CONC
4500
Walls, Masonry
CONC134
180
ii. Current impervious area (IA) data of all hard surfaces in the City, including
compacted gravel.
iii. Its best available data source for accurately determining legal ownership type
between the following buckets:
1. Private — Fee Simple
2. Private - Condominium
3. Public — City owned within the public rights of way,
4. Public —City owned, Drake Field,
5. Public — Other City owned lands such as parks and trails,
6. Public — Fayetteville Public Schools,
7. Public —Washington County,
8. Public —State of Arkansas,
9. Public — University of Arkansas (main campus and annexes),
10. Public —Federal
11. Other —Traditionally tax-exempt properties.
iv. Use of the City's Utility Billing System will also necessitate the need for a
corresponding linkage via meter location address or other method.
Task 4. Sustainable Stormwater Credit Program
As described further in the 2019 Funding Study and 2021 Sustainable Credit Framework memo, a
stormwater credit is an ongoing, renewable reduction in the fee charged to a property for mitigating its
impact on the City's stormwater system. The Framework provides all customers with an opportunity to
meaningfully reduce their fees by demonstrating activities or stormwater practices that reduce the
water quality and quantity burden imposed on the City's drainage system. As part of Task 4, Jacobs will
finalize the Sustainable Credit Program by:
• Revisiting the range of credit opportunities listed in draft Subsection 52.12 — Sustainable Credit
Framework, with input from City stakeholders.
• Assessing the administrative costs versus direct and indirect benefits of providing additional credits,
or a rebate program, for smaller residential stormwater practices such as rain barrels.
6/10/2022 PAGE 7 OF 12
• Producing a draft and final Sustainable Stormwater Credit Manual, including sections addressing
applicability and eligibility, application documentation, and processes for enforcement, renewal and
appeals. Application instructions and forms would be provided as appendices to the Manual.
Task 4 Deliverables and Assumptions —
1. Draft and Final Sustainable Stormwater Credit Manual, including a Credit Program Application
and Instructions as an attachment.
2. It is assumed that City staff will take the lead soliciting input from City stakeholders on the range
of credit opportunities that should be offered, see Task 1, with technical support from Jacobs.
3. It is assumed that corresponding internal administrative procedures for the Sustainable
Stormwater Credit are in Task 5.
Task 5. Customer Service and Administration Support
For Task 5, Jacobs will provide as needed support to the City in developing the internal Customer
Services processes and procedures to administer the Fee Program. This includes providing technical
support to a City -led Drainage Easement Equity Plan and Plan for Private Residential Detention Ponds.
Implementation of an enhanced stormwater management program would also require developing and
defining specific policies and procedures to convey to key stakeholders identified in Task 1, what is
covered in the program, where the City will provide services and what will remain the responsibility of
private property owners. As part of Task 5, the Jacobs team will:
• Work with the City to develop the processes and procedures for reviewing appeals to customers fee
amounts as well as appeals of the credits granted if the owner does not concur.
• Work with the City to develop the processes and procedures for administering the Sustainable
Credit Program including the review credit applications, determining the credit amount is warranted
and then integrating into the Customer Billing database.
• After granted, a long-term process for tracking credits, validation and renewal would be developed
for City staff. Similarly, Jacobs will work with City staff to identify a cost-effective method for
administering and tracking of credits for education and involvement activities as well as individual
residential practices, if needed.
Task 5 Deliverables and Assumptions —
• Up to 4 virtual, or in -person, if possible, workshops with City staff from corresponding Departments
to develop the City -specific process and procedures.
• Draft and Final Customer Service Fee and Credit Appeal processes and procedures
• Draft and Final Customer Service processes and procedures for administering the Sustainable
Stormwater Credit Program and the Customer Billing Database.
Task 6.Ordinances and Interlocal Cooperation Agreements
As part of Task 6, the Jacobs Team will work closely with the City's legal staff to update draft Chapter 52,
Stormwater Utility further, if needed, based on the findings of Tasks 1— 5. They will support the City as
it negotiates Interlocal Cooperation Agreements, under § 25-20-104 and § 14-54-704, with other public
property owners such as the University of Arkansas, Washington County and Fayetteville Public Schools
in recognition of their own MS4 permits or efforts to reduce stormwater runoff. Jacobs will develop up
6/10/2022 PAGE 8 OF 12
to 3 draft Intergovernmental Agreements for City staff that clearly delineate the extent and level of
stormwater services to be provided by the City, the rights and responsibilities of each party as well as
mutual obligations, compensation and miscellaneous terms.
Task 6 Deliverables and Assumptions:
1. Draft and Final revisions to Chapter 52. Stormwater Utility.
2. Up to 3 Interlocal Cooperation Agreements.
Task 7.Overall Project and Quality Management
The objective of this task is to recharter the project by defining the individual project roles, points of
contact and project controls for the next 24 months. This includes managing, coordinating and
proactively communicating the status of project resources, schedule and budget.
Task 7 Deliverables and Assumptions —
1. 24 monthly invoices and progress reports.
2. Monthly or quarterly status calls, including an agenda, updated schedule, and action items.
6/10/2022 PAGE 9 OF 12
Project Deliverables
Task #
Task Name
Deliverables
1. Technical content for SpeakUp Fayetteville, the Customer Billing
Preview & Notification Study, Example Fee Calculations and Frequently
1
Stakeholder Engagement
Asked Questions.
and Education
2. Meeting materials and 1— 2 team members for up to 8 Meetings,
Workshops or Briefings (4 individual trips).
3. Final stormwater cost of services tabulated from 2024 to 2034.
Final Stormwater
2
Program Costs and Rate
4. Final stormwater pro forma financial spreadsheet model (financial /
Analysis
rate model) with a detailed 5-year cash flow analysis and planning level
projections over a 20-year time frame.
5. Up to 8 virtual, or in -person, if possible, workshops with City staff from
corresponding Departments to develop the Billing Policy Paper,
Customer Billing Database Workplan and Customer Billing Preview &
Notification Study.
3
Stormwater Customer
Billing Database
6. Draft and Final Billing Policy Paper
7. Draft and Final Customer Billing Database Workplan
8. Draft and Final 2024 Customer Billing Database
9. Technical Support of Customer Billing Preview & Notification Study.
10. Revisit Phase II Sustainable Credit Framework, including the range of
credit opportunities and assessing the administrative costs versus
direct and indirect benefits.
Sustainable Stormwater
11. Draft and Final Sustainable Stormwater Credit Manual with sections
4
Credit Program
addressing applicability and eligibility, application documentation, and
processes for enforcement, renewal and appeals. Application
instructions and forms would be provided as appendices to the Manual
12. It is assumed that corresponding internal administrative procedures for
the Sustainable Stormwater Credit are in Task 5.
13. Up to 4 virtual, or in -person, if possible, workshops with City staff from
corresponding Departments to develop City -specific process and
procedures (2 individual trips).
Customer Service and
14. Draft and Final Customer Service Fee and Credit Appeal processes and
5
Administration
procedures
15. Draft and Final Customer Service processes and procedures for
administering the Sustainable Stormwater Credit Program and the
Customer Billing Database.
Ordinances and Interlocal
16. Draft and Final revisions to Chapter 52. Stormwater Utility.
6
Cooperation Agreements p g
17. Up to 3 Interlocal Cooperation Agreements
18. 24 monthly invoices and progress reports.
Overall Project and
7
Quality Management
19. Monthly or quarterly status calls, including an agenda, updated
schedule, and action items.
Project Conditions and Assumptions
• A period of performance not to exceed 24 months.
6/10/2022 PAGE 12 OF 12
• Travel expenses for up to 4 individual trips in support of up to 8 total meetings are included.
• It is assumed that all deliverables will consist of no more than 2 drafts and 1 final.
• Unless specified, all deliverables will be provided in electronic format.
• Staff with the City's Communications and Marketing Department and the Media Services Division
will now lead Task 1. Stakeholder Engagement and Education, with technical support from the
Jacobs Team.
• The EOS/LOS assumptions used for generating the final stormwater program costs in Task 2 will not
vary substantially from those in Phase II.
• For Task 3, the City will be responsible for providing Jacobs with an updated ArcGIS geodatabase of
an "intersect" or "identity" between its version of the Washington County Tax Parcels, current
impervious area (IA) data, and its best available data source for accurately determining legal
ownership type. If the City's Utility Billing System is selected, the geodatabase will also need to have
a corresponding linkage via meter location address or other method.
• For Task 4, it is assumed that City staff will take the lead soliciting input from City stakeholders on
the range of credit opportunities that should be offered, see Task 1, with technical support from
Jacobs.
Article B. Schedule and Fee
JACOBS will commence work within 10 working days of receiving the City's order for the project
services. The schedule will be developed in consultation with City staff with activities anticipated to be
complete within 24 months.
The fee for the Scope of Services is calculated based on the hourly rates, and the estimated Level of
Effort (LOE) for this Scope of Services is shown in Table 1. Compensation will be on a not -to -exceed
basis, and the project compensation will not exceed a value of $199,660 without written authorization
from the City.
The City will be provided with a monthly breakdown of hours spent along with a summary of activities
performed.
6/10/2022 PAGE 2 OF 12
4.1
C
m
O N
co O
O
a`Q
m
U
C
U
QO) O
66,
m
m
m
r
m
N C_
O_ Ci
(� C
M -
W
c
O N
O
N
0°0
m
m
V
m
N
0
U
a
Cm
�_
m O C
cl)
N
O
O
N
I-
m
N
O
V
d'
N
O
of
(O
m
M
V
N
V
N
V
N
V
N
m
m
M
V
m
N
cR
O O
O
=°'N
c
v
a
m
N
o)
r
and
n
C C
n O
N O
m
m
N
m
m
V
0
m
V
7
V
V
7
m
_ m
o
o
o
o
o
o
0
o
o
o
0
po
o
o
o
o
o
o
0
0
0
0
0
0
0
oo
to
m
N
o
V
of
Oo
O
O
N
V
w
O
V'
Q
m
(D
w
7
O
V
_
w
u)
O
O
O
(o
O
pp
O
(O
V
o
V
M
m
o
m
N
N
Vf
(R
H3
N
fA
N
49
V
fR
V3
6%
N
(A
(A
N
i4
(R
fA
YJ
fA
(H
V)
(R
fA
(A
N
fR
V3
fA
of
Oo
�
m
a
U
m
N �
O
m o
K
0'2
0
o
^
O
N
O
(O
m
m
N
p
N
N�
m
So
t
N
J
o
d°.
�y
m
co
0N
Oo
m
M
�
7
,y
o1
V
M
4
a
(o
N
7
S
N
O
r
(D
-
u
?
N
c
m
L
N
m
c
L
,
o
a
T
e
m$
m
'n'Fa
o
C
E=
c
h
N
in
E
m
J
a
N
m
u
c
m°
o
o
m
-Jo
oo
v
m
m
Y
't
W
°
N
V
O
bC0
'O
Y
L
N
vYi
N
m
n
L
po
C
J
n
V
C-•CbD
O
U
O
m
E
'^
o
_
N
m
V
E
w
a
O
a
o°
2
•m
v
Y°
¢
N
m
m
E
u
o
L
m
O
y
m
m
E>
O
m
e
y
v
o
v
w
m
o
Y
a
u
E
m
`1
3
m
v
u
m
v
o
m
c
a
u
m
L
v°
E
E
c
a
`w
'm
'm
w
LL
In
.L
a
o
o
m
a
u
m
m
p
o
m
E
m
n
m
v
-
L
O
YI
o
o
L
U
m
C
{A
VI
ii
3
a
E
rca
E
•Ip
_
'�
Y
m
.E
eco
o=
v
i
E
u
O
�+
O
$
a°+
.0
.o
C
a
v�
a+
N
•�
N..
r
°
m
N
c
Y
O
O
Y
O
O
Y
O
O
O
O
Y
O
O
Y
O
O
O
Y
O
O
Y
O
v
m
n
a
s
n
a
n
a
r
H
3
H
w
113 West Mountain Street
Fayetteville, AR 72701
(479)575-8323
Resolution: 131-18
File Number: 2018-0267
STORMWATER UTILITY STUDY CONTRACT:
A RESOLUTION TO AUTHORIZE A PROFESSIONAL SERVICES AGREEMENT WITH CH2M HILL
ENGINEERS, INC., PURSUANT TO RFQ 18-02, IN AN MOUNT NOT TO EXCEED $229,222.00 FOR A
STORMWATER UTILITY FEASIBILITY STUDY, AND TO APPROVE A BUDGET ADJUSTMENT
WHEREAS, on August 15, 2017, the City Council passed Resolution No. 175-17 expressing the City
Council's intent to fund a study to evaluate the feasibility of creating a stormwater utility program and
authorizing City staff to move forward with the selection of a professional consultant to complete the
study.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan
to sign a professional services agreement with CH2M Hill Engineers, Inc., pursuant to RFQ 18-02, in
an amount not to exceed $229,222.00 for a stormwater utility feasibility study.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget
adjustment, a copy of which is attached to this Resolution.
PASSED and APPROVED on 6/5/2018
Attest:
-, d-wl
Sondra E. Smith, City Clerk Treasurer �+�'o1���ir�
.p
�. • FA�'E� •,..
�f;ti� `G `ON �����
Page 1 Printed on 6/5118
City of Fayetteville, Arkansas 113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
.; Text File
File Number: 2018-0267
Agenda Date: 6/5/2018 Version: 1 Status: Passed
In Control: City Council Meeting File Type: Resolution
Agenda Number: C. 2
STORMWATER UTILITY STUDY CONTRACT:
A RESOLUTION TO AUTHORIZE A PROFESSIONAL SERVICES AGREEMENT WITH CH2M HILL
ENGINEERS, INC., PURSUANT TO RFQ 18-02, IN AN AMOUNT NOT TO EXCEED $229,222.00
FOR A STORMWATER UTILITY FEASIBILITY STUDY, AND TO APPROVE A BUDGET
ADJUSTMENT
WHEREAS, on August 15, 2017, the City Council passed Resolution No. 175-17 expressing the City
Council's intent to fund a study to evaluate the feasibility of creating a stormwater utility program and
authorizing City staff to move forward with the selection of a professional consultant to complete the study.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Sections 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign a
professional services agreement with CH2M Hill Engineers, Inc., pursuant to RFQ 18-02, in an amount not to
exceed $229,222.00 for a stormwater utility feasibility study.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a
copy of which is attached to this Resolution.
City of Fayetteville, Arkansas Page 1 Printed on 61512018
Chris Brown
Submitted By
City of Fayetteville Staff Review Form
2018-0267
Legistar File ID
6/5/2018
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
5/15/2018 ENGINEERING (621)
Submitted Date Division / Department
Action Recommendation:
Approval of the Stormwater Feasibility Study professional services contract with CH21VI Hill Engineers, Inc in an
amount not to exceed $229,222 and to approve a budget adjustment.
Budget Impact:
1010.090.6600-5314.00
General Fund
Account Number Fund
17008.1 Stormwater Utility Feasibility Study
Project Number
Budgeted Item? Yes Current Budget
Funds Obligated
Current Balance
Does item have a cost? Yes Item Cost
Budget Adjustment Attached? Yes Budget Adjustment
Purchase Order Number:
Change Order Number:
Original Contract Number:
Comments:
Project Title
$
200,000.00
$
275.40
$
999,724.60
$
229,222.00
$
29,498.00
Remaining Budget $
0.60
V20180321
Previous Ordinance or Resolution # 175-17
Approval Date:
CITY OF
FAYETTEVILLE
ARKANSAS
MEETING OF JUNE 5, 2018
TO: Mayor and City Council
THRU: Don Marr, Chief of Staff
Garner Stoll, Development Services Director
Chris Brown, City Engineer
FROM: Alan Pugh, Staff Engineer
DATE: May 21, 2018
CITY COUNCIL MEMO
SUBJECT: Approval of the Stormwater Feasibility Study professional services contract with
CH2M Hill Engineers, Inc in an amount not to exceed $229,222 and to approve a
budget adjustment.
RECOMMENDATION:
Approval of the Stormwater Feasibility Study professional services contract with CH2M Hill
Engineers, Inc in an amount not to exceed $229,222 and to approve a budget adjustment.
BACKGROUND:
Like many cities throughout the state and nation, the City of Fayetteville experiences issues
with stormwater runoff. These issues stem from many sources including, but not limited to,
aging infrastructure, maintenance of system capacity, manpower to perform systematic
inspections and the lack of formal drainage systems in many older areas of the City. In order to
address these concerns, the City has historically funded maintenance and new projects directly
from the Sales Tax Capital Improvement Program (CIP). However, there are many needs
within the City that require funding from the CIP and, at least in recent years, the funding for
stormwater has been inadequate to comprehensively address stormwater issues. In order to
develop a comprehensive solution, funding is required for manpower and equipment as well as
multiple capital projects, some of which will require in excess of $1 million dollars for each
project. Given the current funding levels, it would take many years in order to address just one
of those projects.
The City Council recognized these needs and expressed the City's intent to move forward with
a stormwater feasibility study on August 15, 2017 as noted in resolution 175-17.
DISCUSSION:
Upon approval by the Council in August of last year, staff began working with the purchasing
division to draft an appropriate scope of work to go along with a request for professionals to
submit their qualifications for consideration. This scope was shared with the Water and Sewer
Committee and any comments from the committee were addressed. The RFQ was then
published on January 2, 2018 and qualifications were due on or before and February 8, 2018.
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
The City received statements of qualifications from 7 firms and from these the top 3 were
interviewed by the selection committee. Of the top three firms, CH21VI Hill was selected as the
most qualified and contract negotiations began. It should be noted that CH2M Hill was recently
acquired by Jacobs and accordingly some of the following materials reference both firms.
Although both are licensed in the state of Arkansas, the contract itself would be with CH2M Hill
Engineers Inc.
Subsequent to the selection of CH2M Hill as the most qualified firm, staff has worked to
develop a contract that meets the expectations of the Administration and the City Council. This
contact is attached for your consideration. Although it does slightly exceed the original
approved amount, staff feels that all aspects are necessary for a thorough and complete study.
This includes a robust public outreach program as well as the financial analysis and other
aspects required to complete the study. It will also provide the platform should Council decide
to move forward with implementation of the stormwater utility. It should be noted that there are
also stopping points built into the contract so that at various times throughout the study, staff
and CH21VI Hill would present the findings to council committee at which time the City would
have the option to discontinue the study should it be necessary.
BUDGET/STAFF IMPACT:
The overall cost proposed is $229,222 which does include the opportunity for some additional
services should they be required. The council originally set aside $200,000 from the general
fund in order to pay for the study. This request also includes a budget adjustment that would
provide the additional $29,222 from that same fund, and cover the cost of advertising the
request for qualifications, for a total budget adjustment of $29,498.
Attachments:
Resolution 175-17
Stormwater Utility Contract
113 West Mountain Street
Fayetteville, AR 72701
(479)575-8323
Resolution: 209-19
File Number: 2019-0510
JACOBS ENGINEERING GROUP, INC F/K/A CH2M HILL ENGINEERS, INC.
AMENDMENT NO. 1:
A RESOLUTION TO APPROVE AMENDMENT NO. I TO THE PROFESSIONAL SERVICES
AGREEMENT BETWEEN THE CITY OF FAYETTEVILLE, ARKANSAS AND JACOBS
ENGINEERING GROUP, INC F/K/A CH2M HILL ENGINEERS, INC. IN THE AMOUNT OF $3,860.00
FOR ADDITIONAL TRAVEL AND LABOR EXPENSES, AND TO APPROVE A BUDGET
ADJUSTMENT
WHEREAS, on June 4, 2018, the City Council approved a contract with CH2M Hill Engineers, Inc.,
now known as Jacobs Engineering Group, Inc., to evaluate the feasibility of creating a stormwater utility
program; and
WHEREAS, City staff is requesting additional funds for to allow the Jacobs Engineering Group, Inc.
project manager to attend the presentation to the City Council and answer any questions about the study.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves and authorizes `
Mayor Jordan to sign Amendment No. 1 to the Professional Services Agreement between the City of
Fayetteville, Arkansas and Jacobs Engineering Group, Inc. formerly CH2M Hill Engineers, Inc. in the
amount of $3,860.00 for additional travel and labor expenses for the Jacobs Engineering Group, Inc. project
manager to be present for the stormwater utility feasibility study presentation to the City Council
Page 1 Printed on 9/19/19
File Number: 2019-0510
Resolution 209-19
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget
adjustment, a copy of which is attached to this Resolution.
PASSED and APPROVED on 9/17/2019
�V����►►��►
IRK
/T
Attest: O'�•••`sG�:
�U•
' FAYETTEVI(LE;X-
O
�L•
ice• 9 •�
Lisa Branson, Deputy City Clerk �„'►'Nt►i►`or
Page 2 Printed on 9119119
City of Fayetteville, Arkansas 113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
A; Text File
�`- - File Number: 2019-0510
Agenda Date: 9/17/2019 Version: 1 Status: Passed
In Control: City Council Meetinq File Type: Resolution
Agenda Number: A. 6
JACOBS ENGINEERING GROUP, INC F/WA CH2M HILL ENGINEERS, INC. AMENDMENT
NO. 1:
A RESOLUTION TO APPROVE AMENDMENT NO. 1 TO THE PROFESSIONAL SERVICES
AGREEMENT BETWEEN THE CITY OF FAYETTEVILLE, ARKANSAS AND JACOBS
ENGINEERING GROUP, INC F/K/A CH2M HILL ENGINEERS, INC. IN THE AMOUNT OF
$3,860.00 FOR ADDITIONAL TRAVEL AND LABOR EXPENSES, AND TO APPROVE A BUDGET
ADJUSTMENT
WHEREAS, on June 4, 2018, the City Council approved a contract with CH2M Hill Engineers, Inc., now
known as Jacobs Engineering Group, Inc., to evaluate the feasibility of creating a stormwater utility program;
and
WHEREAS, City staff is requesting additional funds for to allow the Jacobs Engineering Group, Inc. project
manager to attend the presentation to the City Council and answer any questions about the study.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves and authorizes Mayor
Jordan to sign Amendment No. 1 to the Professional Services Agreement between the City of Fayetteville,
Arkansas and Jacobs Engineering Group, Inc. formerly CH2M Hill Engineers, Inc. in the amount of $3,860.00
for additional travel and labor expenses for the Jacobs Engineering Group, Inc. project manager to be present
for the stormwater utility feasibility study presentation to the City Council
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a
copy of which is attached to this Resolution.
City of Fayetteville, Arkansas Page 1 Printed on 9/19/2019
Chris Brown
Submitted By
City of Fayetteville Staff Review Form
2019-0510
Legistar File ID
9/17/2019
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
5/15/2018 ENGINEERING (621)
Submitted Date Division / Department
Action Recommendation:
Approval of Amendment 1 to the Stormwater Feasibility Study professional services contract with Jacobs, formerly
CH21VI Hill, in an amount not to exceed $3,860 (total contract amount $233,082) and to approve a budget
adjustment.
1010.090.6600-5314.00
Account Number
17008.1
Project Number
Budgeted Item? Yes
Does item have a cost? Yes
Budget Adjustment Attached? Yes
Purchase Order Number:
Change Order Number:
Original Contract Number:
Comments:
Budget Impact:
General Fund
Fund
Stormwater Utility Feasibility Study
Current Budget
Funds Obligated
Current Balance
Item Cost
Budget Adjustment
Remaining Budget
Project Title
$ 229,222.00
$ 229,222.00
!$
$ 3,860.00
$ 3,860.00
$ -
V20180321
Previous Ordinance or Resolution # 131-18
Approval Date:
CITY OF
FAYETTEVILLE
ARKANSAS
MEETING OF SEPTEMBER 17, 2019
TO: Mayor and City Council
THRU: Don Marr, Chief of Staff
Garner Stoll, Development Services Director
Chris Brown, City Engineer
FROM: Alan Pugh, Staff Engineer
DATE: August 20, 2019
CITY COUNCIL MEMO
SUBJECT: Approval of Amendment 1 to the Stormwater Feasibility Study professional
services contract with Jacobs, formerly CH2M Hill, in an amount not to exceed
$3,860 (total contract amount $233,082) and to approve a budget adjustment.
RECOMMENDATION:
Approval of Amendment 1 to the Stormwater Feasibility Study professional services contract
with Jacobs, formerly CH2M Hill, in an amount not to exceed $3,860 (total contract amount
$233,082) and to approve a budget adjustment.
BACKGROUND:
Like many cities throughout the state and nation, the City of Fayetteville experiences issues with
stormwater runoff. These issues stem from many sources including, but not limited to, aging
infrastructure, maintenance of system capacity, manpower to perform systematic inspections
and the lack of formal drainage systems in many older areas of the City. In order to address
these concerns, the City has historically funded maintenance and new projects directly from the
Sales Tax Capital Improvement Program (CIP). However, there are many needs within the City
that require funding from the CIP and, at least in recent years, the funding for stormwater has
been inadequate to comprehensively address stormwater issues. To develop a comprehensive
solution, funding is required for manpower and equipment as well as multiple capital projects,
some of which will require more than $1 million dollars for each project. Given the current
funding levels, it would take many years to address just one of those projects.
The City Council recognized these needs and approved moving forward with a feasibility study
on June 5, 2018 via resolution 131-18.
DISCUSSION:
As the feasibility study nears completion, staff is requesting additional funds so that Jacobs may
be present for the presentation of the study to the City Council. We feel it is important for the
Council to hear the findings of the study and for the Council to be able to ask any questions of
Jacobs in person.
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
BUDGET/STAFF IMPACT:
The overall cost proposed is $3,860 which includes one additional trip not included in the
original contract. This would bring the total of all services to $233,082 and is proposed to be
set aside from the general fund as was the case with the original funding for the study.
Attachments:
Amendment 1 to Stormwater Feasibility Contract
Budget Adjustment
Resolution 131-18
113 West Mountain Street
Fayetteville, AR 72701
(479)575-8323
Resolution: 250-19
File Number: 2019-0596
JACOBS ENGINEERING, INC. AMENDMENT NO. 2:
A RESOLUTION TO ACCEPT AND ADOPT THE STORMWATER STUDY FOR FLOOD
MANAGEMENT AND WATER QUALITY FUNDING, TO APPROVE AMENDMENT NO. 2 TO THE
PROFESSIONAL SERVICES AGREEMENT WITH JACOBS ENGINEERING, INC. IN AN AMOUNT
NOT TO EXCEED $150,200.00 FOR ADDITIONAL SERVICES RELATED TO THE DEVELOPMENT
OF FINAL RECOMMENDATIONS FOR THE CREATION OF A STORMWATER UTILITY, AND TO
APPROVE A BUDGET ADJUSTMENT
WHEREAS, on August 15, 2017, the City Council passed Resolution No. 175-17 expressing the City
Council's intent to fund a study to evaluate the feasibility of creating a stormwater utility program and
authorizing City staff to move forward with the selection of a professional consultant to complete the
study; and
WHEREAS, on June 5, 2018 the City Council passed Resolution 131-18 authorizing a contract with CH2M
Hill Engineers, Inc. for the feasibility study; and
WHEREAS, the feasibility study has been completed and is being presented to the City Council for
final acceptance and adoption of the findings and recommendations; and
WHEREAS, if the study is accepted and adopted, staff also recommends the approval of Amendment No.
2 to the contract for Jacobs Engineering, Inc., the parent company of and successor in interest to CH2M Hill
Engineers, Inc., to develop final recommendations for the creation of a stormwater utility in the City of
Fayetteville.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
Page 1 Printed on 1116119
File Number. 2019-0596
Resolution 250-19
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby accepts and adopts the
Stormwater Study for Flood Management and Water Quality Funding, a copy of which is attached to
this Resolution.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves Amendment No. 2 to
the Professional Services Agreement with Jacobs Engineering, Inc., a copy of which is attached to this
Resolution, in the amount not to exceed $150,200.00 for additional services related to the development
of final recommendations for the creation of a stormwater utility.
Section 3: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget
adjustment, a copy of which is attached to this Resolution.
PASSED and APPROVED on 11/5/2019
``���ttnrrrrh
♦``��� CLE.R K
♦ '�y. T .'�cl�i
Attest: CITyo.�`9J.i
Lisa Branson, Deputy City Cleat••�
;'-"'v r CU\�
Page 2 Printed on 1116119
City of Fayetteville, Arkansas 113 West Mountain Street
- Fayetteville, AR 72701
(479) 575-8323
Text File
File Number: 2019-0596
Agenda Date: 11/5/2019 Version: 1 Status: Passed
In Control: City Council Meeting File Type: Resolution
Agenda Number: C. 3
JACOBS ENGINEERING, INC. AMENDMENT NO. 2:
A RESOLUTION TO ACCEPT AND ADOPT THE STORMWATER STUDY FOR FLOOD
MANAGEMENT AND WATER QUALITY FUNDING, TO APPROVE AMENDMENT NO. 2 TO THE
PROFESSIONAL SERVICES AGREEMENT WITH JACOBS ENGINEERING, INC. IN AN AMOUNT
NOT TO EXCEED $150,200.00 FOR ADDITIONAL SERVICES RELATED TO THE DEVELOPMENT
OF FINAL RECOMMENDATIONS FOR THE CREATION OF A STORMWATER UTILITY, AND TO
APPROVE A BUDGET ADJUSTMENT
WHEREAS, on August 15, 2017, the City Council passed Resolution No. 175-17 expressing the City
Council's intent to fund a study to evaluate the feasibility of creating a stormwater utility program and
authorizing City staff to move forward with the selection of a professional consultant to complete the study; and
WHEREAS, on June 5, 2018 the City Council passed Resolution 131-18 authorizing a contract with CH2M
Hill Engineers, Inc. for the feasibility study; and
WHEREAS, the feasibility study has been completed and is being presented to the City Council for final
acceptance and adoption of the findings and recommendations; and
WHEREAS, if the study is accepted and adopted, staff also recommends the approval of Amendment No. 2
to the contract for Jacobs Engineering, Inc., the parent company of and successor in interest to CH2M Hill
Engineers, Inc., to develop final recommendations for the creation of a stormwater utility in the City of
Fayetteville.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby accepts and adopts the
Stormwater Study for Flood Management and Water Quality Funding, a copy of which is attached to this
Resolution.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves Amendment No. 2 to
the Professional Services Agreement with Jacobs Engineering, Inc., a copy of which is attached to this
City of Fayetteville, Arkansas Page 1 Printed on 111612019
File Number: 2019-0596
Resolution, in the amount not to exceed $150,200.00 for additional services related to the development of final
recommendations for the creation of a stormwater utility.
Section 3: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a
copy of which is attached to this Resolution.
City of Fayetteville, Arkansas Page 2 Printed on 111WO19
Chris Brown
City of Fayetteville Staff Review Form
2019-0596
Legistar File ID
11/5/2019
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
ENGINEERING (621)
Submitted By Submitted Date Division / Department
Action Recommendation:
10/17/2019
Approval of the Flood Management and Water Quality Funding Study recommendations as well as contract
amendment 2 with Jacobs, formerly CH2M Hill, in an amount not to exceed $150,200 (total contract amount
$383,282) for additional services and approval of a budget adjustment
4470.621.8810-5 817.00
Account Number
17008.1
Project Number
Budgeted Item? Yes
Budget Impact:
Sales Tax Capital Improvement
Fund
Stormwater Utility Feasibility Study
Project Title
Current Budget
Funds Obligated
Current Balance
Does item have a cost? Yes Item Cost
Budget Adjustment Attached? Yes Budget Adjustment
Remaining Budget
$ 233,082.00
$ 233,082.00
$
$ 150,200.00
$ 150,200.00
$ -
V20180321
Purchase Order Number: Previous Ordinance or Resolution # 131-18
Change Order Number:
Original Contract Number:
Comments:
Approval Date:
CITY OF
FAYETTEVILLE
V4W ARKANSAS
MEETING OF NOVEMBER 5, 2019
TO: Mayor and City Council
THRU: Don Marr, Chief of Staff
Garner Stoll, Development Services Director
Chris Brown, City Engineer
FROM: Alan Pugh, Staff Engineer
DATE: October 16, 2019
CITY COUNCIL MEMO
SUBJECT: Approval of the Flood Management and Water Quality Funding Study
recommendations as well as contract amendment 2 with Jacobs, formerly CH2M
Hill, in an amount not to exceed $150,200 (total contract amount $383,282) for
additional services and approval of a budget adjustment.
RECOMMENDATION:
Staff recommends approval of the Flood Management and Water Quality Funding Study
recommendations as well as contract amendment 2 with Jacobs, formerly CH2M Hill, in an
amount not to exceed $150,200 (total contract amount $383,282) for additional services and
approval of a budget adjustment.
The contract amendment would further refine the stormwater utility framework by developing
final recommendations for the extent and level of service with associated rates, investigating
and developing the credit program, investigating the necessary ordnance revisions associated
with the program and other services.
BACKGROUND:
Like many cities throughout the state and nation, the City of Fayetteville experiences issues with
stormwater runoff. These issues stem from many sources including, but not limited to, aging
infrastructure, maintenance of system capacity, manpower to perform systematic inspections
and the lack of formal drainage systems in many older areas of the City. In order to address
these concerns, the City has historically funded maintenance and new projects directly from the
Sales Tax Capital Improvement Program (CIP). However, there are many needs within the City
that require funding from the CIP and, at least in recent years, the funding for stormwater has
been inadequate to comprehensively address stormwater issues. To develop a comprehensive
solution, funding is required for manpower and equipment as well as multiple capital projects,
some of which will require more than $1 million dollars for each project. Given the current
funding levels, it would take many years to address just one of those projects.
The City Council recognized these needs and approved moving forward with a feasibility study
on June 5, 2018 via resolution 131-18
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
DISCUSSION:
The Flood Management and Water Quality Funding Study final draft is attached for review.
However, in general it finds that the most equitable way to fund the Stormwater needs into the
future is with a fee for service based on the customer's impact to the system. Impervious area
was selected as the basis for the fee as it is directly related to the customer's impact to the
system. Impervious area causes an increase in the amount of water entering the drainage
system which can then increase the chance of flooding, stream bank erosion and
sedimentation. Runoff from impervious area also carries pollutants that can impact water
quality. These include, among others, sediment, herbicides and pesticides, meals and bacteria
from things such as pet waste. For these reasons, impervious area is an equitable basis for the
fee because larger developments, businesses and homes generate a greater need for
Stormwater services because of the greater amount of runoff they generate.
Given the feedback from stakeholders, residents and the council committee, Option A/B was
selected as it provides an adequate level of service, extends services to areas of town not
currently served and provides additional services not currently in the stormwater program. It
includes a 20-year capital program schedule and routine maintenance. This maintenance would
include cleaning/inspecting approximately 20% of the overall drainage system annually
(approximately 400,000 LF), replacing 2.5% of the drainage system annually (approximately
8,500 LF), performing maintenance on residential detention basins (approximately 110 total)
and providing for approximately $1.1 million annually for capital projects.
Table ES-2. Tiered Rate Structure
A tiered system based on impervious area was
. - .
selected as the most equitable way to distribute the
''°e
cost of the program based on the items noted
Monthly Fee
R
�Qut
above. The proposed tiers can be found below, and
additional information can be found within the
Tier Range (SF of�,,
.n
attached study.
Impervious Area)
_'Funding'
Tier 1(0 and 2,000)
$2.31
CONTRACT AMENDMENT SUMMARY:
The contract amendment with Jacobs will include
Tier 2 (2,000 and 3,500)
$5.09
several of the recommended additional tasks based
on the outcome of the feasibility study and feedback
Tier 3 (3,500 and 5,000)
$7.86
received during the public outreach efforts. These
Tier 4 (5,000 and 6,500)
$10.64
tasks include additional stakeholder engagement
and education, final stormwater program definition
Tier 5 (6,500 and 8,000)
$13.41
and rate analysis, refinement of stormwater
customer billing database, development of a
Tier 6 (over 8,000)
$1.85/1,000 SF
sustainable credit system, fee -in -lieu -of program
a. tf there is on onsitestorm water man ogement
assessment, review or ordinances and
facility, there could be areducedfeebosdona
intergovernmental agreements and overall project
sustainable credit program established by the City.
and quality management.
• Stakeholder Engagement and Education:
this item will include additional stakeholder
engagement through workshops, public meetings, etc... in order to further educate the
public and targeted stakeholders of the need for a sustainable stormwater program.
• Stormwater program definition and rate analysis: this item will include final definition of
the stormwater program extent and level of service as well as a final rate analysis. This
will include a review of an alternate rate structure using percentage of impervious area to
lot size rather than an absolute rate based on public feedback.
• Stormwater Customer Billing Database: while the majority of this task will be handled by
staff, Jacobs will provide support where necessary as guidance. The billing database
will not be finalized until such time that a final decision is made on the billing mechanism
and implementation.
• Sustainable Credit System: the next phase of the contract will begin to define further the
credit system and how it will apply to the various tiers shown in the current proposal
• Fee -in -lieu -of Program Assessment: assessment of the potential for a fee -in -lieu -of
improvement in instances where the project site may be limited and there is potential for
the City or other parties to make regional improvements.
• Ordinances and Intergovernmental Agreements: review ordinances to include all aspects
of water quality and water quantity. This will include an analysis of the current
exemptions of 1 and 2 family from the grading and drainage permit requirements as well
as development of agreements with certain entities that would be included in the
stormwater program.
• Overall project quality and management: this item will include the overall project and
quality management associated with the continuation of the project.
BUDGET/STAFF IMPACT:
The overall cost proposed amendment is $150,200 which includes additional tasks outlined
above as well as those listed in more detail on the attached contract amendment. This would
bring the total of all services to $383,282. A budget adjustment is proposed to move funding
from two existing drainage projects into the stormwater utility study project.
The overall cost of the additional services, if approved, would include additional staff and
consultant time as well as additional consultant expenses. If approved, it is anticipated that
these additional tasks could take up to one year, at which point an ordinance to establish the
utility could be presented to the Council. An additional period would then be required to finalize
the billing database and begin collecting the fee from users.
Attachments:
Final Draft Stormwater Study for Flood Management and Water Quality Funding
Contract Amendment 2 to the Stormwater Feasibility Contract
City of Fayetteville, Arkansas - Budget Adjustment Form (Legistar)
Budget Year Division Adjustment Number
/Org2 ENGINEERING (621)
2022
Requestor: Chris Brown
BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION:
Approval of Amendment 3 to the Stormwater Feasibility Study professional services contract with Jacobs, formerly
CH21VI Hill, in an amount not to exceed $199,660 (total contract amount $582,942) and to approve a budget adjustment.
RESOLUTION/ORDINANCE
COUNCIL DATE:
LEGISTAR FILE ID#:
7/5/2022
2022-0549
Ro-Uy Black
611512022 10:56 AM
Budget Director Date
TYPE: D - (City Council)
JOURNAL #:
GLDATE: 7/5/2022
CHKD/POSTED:
TOTAL 199,660 199,660 v.20220516
Increase / (Decrease) Proiect.Sub#
Account Number Expense Revenue Project Sub.Detl AT Account Name
1010.090.6600-5314.00 199,660 - 17008 1 EX Professional Services
1010.001.0001-4999.99 - 199,660 RE Use Fund Balance - Current
H:\Budget Adjustments\2022_Budget\CITY COUNCIL\07-05-22\2022-0549 BA Stormwater Feasability Study - Jacobs 1 of 1
113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Resolution: 143-24
File Number: 2024-1836
INTENT TO ENACT STORMWATER UTILITY FEE (RESOLUTION OF INTENT):
A RESOLUTION OF INTENT TO ENACT A STORMWATER UTILITY ORDINANCE AND ESTABLISH A
STORMWATER MANAGEMENT AND WATER QUALITY FUND, AUTHORIZE ADDITIONAL SERVICES
RELATED TO IMPLEMENTATION AND PUBLIC OUTREACH, AND TO APPROVE A BUDGET
ADJUSTMENT
WHEREAS, the Engineering Division, the City Council Stormwater Committee, and the City Council Water & Sewer
Committee have studied our community's growing need to improve our stormwater management services; and
WHEREAS, with the help of a professional consultant with extensive experience in creating Stormwater Utilities
supported by appropriate and fair utility fees, these City Council committees and Engineering staff have devised the
fairest Stormwater Management Utility Fee possible and recommend this ordinance to the full City Council for
passage; and
WHEREAS, the City Council has determined that the Stormwater Utility Fee is necessary to equitably and efficiently
fund stormwater management services in order to provide for the safety, preserve the health, and promote the
prosperity of Fayetteville residents, businesses, and institutions; and
WHEREAS, the City Council also agrees with and adopts all the purposes explained in § 52.01 —Purpose of the
proposed new code section; and
WHEREAS, additional services authorized with this resolution of intent include development of the billing database
and billing tool that would allow property owners and residents to view their proposed fee as a portion of the continued
public outreach efforts, which could include engaging a consultant or additional temporary staff.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby expresses its intent to enact Chapter 52
Stormwater Management Utility Fee as shown in Exhibit A attached hereto and made a part hereof.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of
which is attached to this Resolution, to appropriate funds for additional services including development of the billing
database and a billing tool to allow property owners and residents to view their proposed fees.
Page 1
Resolution: 143-24
File Number: 2024-1836
PASSED and APPROVED on May 21, 2024
Page 2
Attest: g�RK1/'TRE�9
Y
'G
FAY ETTEVILLE
Kara Paxton City rk Treasurer •'
• O �.
' '/yl TO `` .
CITY OF
FAYETTEVILLE
r4W ARKANSAS
MEETING OF MAY 21, 2024
CITY COUNCIL MEMO
2024-1836
TO: Mayor Jordan and City Council
THRU: Chris Brown, Public Works Director
FROM: Alan Pugh, Staff Engineer
SUBJECT: Approval of a resolution of intent to adopt Chapter 52, Stormwater Management and
Water Quality Utility, of the City of Fayetteville Code or Ordinances establishing a
Stormwater Management and Water Quality Fund, authorization to perform additional
services and approval of a budget adjustment
RECOMMENDATION:
Staff recommends approval of a resolution of intent to adopt Chapter 52, Stormwater Management and Water
Quality Utility, of the City of Fayetteville Code or Ordinances establishing a Stormwater Management and
Water Quality Fund, authorization to perform additional services and approval of a budget adjustment.
BACKGROUND:
Like many cities throughout the state and nation, the City of Fayetteville experiences issues with management
of its stormwater utility system. These issues stem from many sources including, but not limited to, compliance
with the mandated Municipal Separate Stormwater System (MS4) requirements, aging infrastructure,
maintenance of system capacity, personnel to perform systematic inspections and the lack of formal drainage
systems in many older areas of the City. To address these concerns, the City has historically funded the
stormwater program through the Sales Tax Capital Improvement Program (CIP) and the Street Fund for
capital and operational/maintenance functions, respectively. However, there are many needs within the City
that require funding from these sources and, at least in recent years, the funding for stormwater has been
inadequate to comprehensively address stormwater management within the City. To develop a
comprehensive solution, additional funding is required for personnel and equipment as well as multiple capital
projects, many of which will require more than $1 million dollars for each project. Given the current levels, it
would take many years to address just one of those projects.
In June, 2018, the City Council recognized these needs and approved with a consultant contract for a
feasibility study (Resolution 131-18) and amended that agreement on two occasions (Resolutions 209-19 and
250-19) to provide additional investigation and details. That study was completed in August of 2019 and
updated in 2022 with more recent program costs, impervious area and associated fees. The Council also
passed a resolution of intent to establish a stormwater utility in July of 2022 (Resolution 157-22)
DISCUSSION:
The study recognized several areas that are currently underfunded, with the gap between the funding and
actual costs to provide the services increasing every year. These needs include categories such as:
Operation and Maintenance
Engineering and Planning
Mailing address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
Regulatory Compliance
Capital Improvement Projects
The costs associated with these categories were based on a level and extent of service agreed upon by
council early in the program discussions as well as estimates of future regulatory compliance costs and
expansion of the stormwater system as Fayetteville continues to grow. The costs associated with the
recommended stormwater utility program can be found below.
Program Costs
Current Budget
Additional Needs
Total Program
Operation and
Maintenance
$998,441
$1,508,000
$2,506,441
Engineering and
Planning
$67,000
$122,000
$189,000
Regulatory
Compliance
$193,000
$274,000
$467,000
Stormwater CIP
$200,000
$913,400
$1,113,400
Administrative
$0
$324,000
$324,000
Total
$1,458,441
$3,141,400
$4,599,841
In response to the completed study and the need to find a sustainable funding source for the stormwater
management program, City staff has drafted Chapter 52, Stormwater Management and Water Quality
Utility, for consideration by City Council. The proposed ordinance would establish an equitable funding
source based on impervious areas, which can be directly correlated to the impact of any given property to
the stormwater system. The fee is proposed to be billed to sewer users with the City limits in a tiered
system. Properties with greater impervious areas would have a higher fee than smaller properties due to
the increased impact to the system. If there are multiple sewer customers on a single property, the total
impervious area would be allocated between those customers and the appropriate portion of the total fee
billed to each customer.
Staff have worked closely with the City Attorney's office throughout the process and has modified the
program to address the concerns that have been raised. The City Attorney has expressed concern over
the legality of billing federal, state and county governments, and recommended that they be exempted.
Staff has included a revised monthly fee that reflects this recommendation. The monthly fee is estimated
to go to $1.35 per billing unit with those exemptions, which is a slight increase from the $1.30 per billing
unit discussed previously. That change is reflected in the table below and in the attached draft of Chapter
52.
The proposed fee would provide funding, in addition to that already being allocated from existing sources,
to operate and maintain as well as improve and expand the stormwater system. The fee tiers are as
shown below.
Tier Range (by square footage Billing Units Initial Monthly Fee
of impervious area on a $1.35 per unit)
Tier property)
1 1052,000 11.25 I $1.69
Mailing address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
2
>2,000 to <_ 3,500
2.75
$3.71
3
>3,500 to <_ 5,000
4.25
$5.73
4
>5,000 to <_ 6,500
5.75
$7.76
5
>6,500 to <_ 8,000
7.25
$9.79
6
>8,000
Per Calc
Billing Unit x Rate
This fee will close the existing funding gap and will fully fund a program to adequately manage stormwater
within the City of Fayetteville. The proposed program presents a sustainable and equitable method of
funding.
The additional services authorized with this proposal would include development of the billing database
and billing tool that would allow property owners and residents to view their proposed fee as a portion of
the continued public outreach efforts. This could include engaging a consultant and/or additional
temporary staff. If a consultant is engaged, the contract for the services will be brought back to the
council. However, council would be authorizing and to authorize the addition of up to 3.0 temporary full-
time equivalent positions for the GIS and utility financial services to backfill existing employees related
with the implementation of a Stormwater Utility with this resolution.
This would bring the City one step closer to implementing the program. The anticipated schedule moving
forward would be for the billing tool to be available to the public by October of this year and for the council
to consider the ordinance adopting the program prior to the end of the year with the goal of the fee being
included on sanitary sewer bills by August of 2025. Additional funding is anticipated to be necessary at the
time of adoption of Chapter 52 for aerial imagery and impervious data in order to establish the baseline of
impervious area for the program.
BUDGET/STAFF IMPACT:
The proposal would initially generate approximately $3 million in additional funding to be allocated to the
Stormwater Management and Water Quality program.
ATTACHMENTS: SRF (#3), BA (#4), Exhibit A - Stormwater Management and Water Quality - Final Draft (#5),
2024-4 Letter of Support_Stormwater Utility_BWA (#6)
Mailing address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
City of Fayetteville, Arkansas 113 West Mountain Street
Fayetteville, AR 72701
(479)575-8323
Legislation Text
File #: 2024-1836
Approval of a resolution of intent to adopt Chapter 52, Stormwater Management and Water
Quality Utility, of the City of Fayetteville Code or Ordinances establishing a Stormwater
Management and Water Quality Fund, authorization to perform additional services and approval
of a budget adjustment
A RESOLUTION OF INTENT TO ENACT A STORMWATER UTILITY ORDINANCE AND
ESTABLISH A STORMWATER MANAGEMENT AND WATER QUALITY FUND, AUTHORIZE
ADDITIONAL SERVICES RELATED TO IMPLEMENTATION AND PUBLIC OUTREACH, AND
TO APPROVE A BUDGET ADJUSTMENT
WHEREAS, the Engineering Division, the City Council Stormwater Committee, and the City Council
Water & Sewer Committee have studied our community's growing need to improve our stormwater
management services; and
WHEREAS, with the help of a professional consultant with extensive experience in creating
Stormwater Utilities supported by appropriate and fair utility fees, these City Council committees and
Engineering staff have devised the fairest Stormwater Management Utility Fee possible and recommend
this ordinance to the full City Council for passage; and
WHEREAS, the City Council has determined that the Stormwater Utility Fee is necessary to equitably
and efficiently fund stormwater management services in order to provide for the safety, preserve the
health, and promote the prosperity of Fayetteville residents, businesses, and institutions; and
WHEREAS, the City Council also agrees with and adopts all the purposes explained in § 52.01 —
Purpose of the proposed new code section; and
WHEREAS, additional services authorized with this resolution of intent include development of the
billing database and billing tool that would allow property owners and residents to view their proposed
fee as a portion of the continued public outreach efforts, which could include engaging a consultant or
additional temporary staff.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby expresses its intent to
enact Chapter 52 Stormwater Management Utility Fee as shown in Exhibit A attached hereto and
made a part hereof.
Page 1
Resolution: 143-24
File Number. 2024-1836
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget
adjustment, a copy of which is attached to this Resolution, to appropriate funds for additional services
including development of the billing database and a billing tool to allow property owners and residents
to view their proposed fees.
Page 2
City of Fayetteville Staff Review Form
2024-1836
Item ID
5/21/2024
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
Chris Brown 5/2/2024 ENGINEERING (621)
Submitted By Submitted Date Division / Department
Action Recommendation:
Approval of a resolution of intent to adopt Chapter 52, Stormwater Management and Water Quality Utility, of the
City of Fayetteville Code or Ordinances establishing a Stormwater Management and Water Quality Fund,
authorization to perform additional services and approval of a budget adjustment
1010.090.6600-5314.00
Account Number
17008.1
Project Number
Budgeted Item? Yes
Does item have a direct cost? No
Is a Budget Adjustment attached? Yes
Budget Impact:
General Fund
Fund
Stormwater Feasability Study
Project Title
Total Amended Budget
Expenses (Actual+Encum)
Available Budget
Item Cost
Budget Adjustment
Remaining Budget
$
52,685.00
$
52,684.64
0.36
$
150,000.00
$ 150,000.36
V20221130
131-18, 209-19,
Purchase Order Number: Previous Ordinance or Resolution # 250-19, 157-22
Change Order Number:
Original Contract Number:
Comments:
Approval Date:
City of Fayetteville, Arkansas - Budget Adjustment (Agenda)
Budget Year Division Adjustment Number
ENGINEERING (621)
/Org2
2024
Requestor: Chris Brown
BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION:
Approval of a resolution of intent to adopt of Chapter 52, Stormwater Management and Water Quality Utility, of the City of
Fayetteville Code or Ordinances establishing a Stormwater Management and Water Quality Fund, authorization to perform
additional services and approval of a budget adjustment
COUNCIL DATE: 5/21/2024
ITEM ID#: 2024-1836
Nolly Black
51312024 77:77 RIn
RESOLUTION/ORDINANCE
Budget Division Date
TYPE: D - (City Council)
JOURNAL #:
GLDATE:
CHKD/POSTED:
TOTAL
Account Number
150,000 150,000
Increase / (Decrease)
Expense Revenue
Project.Sub#
Project Sub.Detl AT
v.2024422
Account Name
1010.090.6600-5314.00
150,000 -
17008 1 EX
Professional Services
1010.001.0001-4999.99
- 150,000
RE
Use Fund Balance - Current
I of 1
EXH I BIT A
CHAPTER 52: STORMWATER MANAGEMENT UTILITY FEE
ARTICLE I — GENERAL PROVISIONS
52.01 - Purpose
The Stormwater Management Utility Fee is hereby established to create an equitable, efficient, and
dedicated funding source for stormwater management services in the City of Fayetteville and provide
for the safety, preserve the health and promote the prosperity of Fayetteville residents, businesses and
institutions. The purposes for the Stormwater Management Fee further include:
(A) To establish an equitable, fair, efficient and dedicated funding source for stormwater management
services in the City of Fayetteville, Arkansas in addition to other taxpayer funds so that better long-
range planning can be achieved.
(B) To lessen or deter hazards to persons, property and the environment caused by increased runoff,
obstructions to drainage and introduction of excessive silts, debris and pollutants into the drainage
system, lakes, ponds, streams, rivers and other water bodies in the City of Fayetteville, and to
otherwise promote the public health, safety and welfare of the public.
(C) To fund the City's MS4 Stormwater Management Program for which it is expected to require a series
of minimum control measures and report on their progress annually. In addition to new measures with
each 5-year permit renewal, the City is projected to meet the population threshold of 100,000 by no
later than 2030 and would be designated a medium MS4 community, triggering additional mandated
activities.
(D) To administer the National Flood Insurance Program and its Community Rating System which
provides property owners with credits to reduce their flood insurance premiums,
(E) To equitably and legally address drainage needs, also known as stormwater management, to protect
public health, safety, and welfare and to reduce flooding on city streets thereby ensuring access of
emergency vehicles to all properties within the City during flood events, by providing resources for
construction, maintenance, and operation of stormwater facilities.
(F) To implement additional watershed improvements of the City's waters in general, and specifically,
that of Beaver Lake, the City's drinking water source, and the Illinois River.
52.02 - Definitions
The following definitions shall apply to this chapter:
Billing Unit shall mean the unit by which stormwater utility bills are calculated. A single billing unit shall be
equal to 1,000 square feet of impervious area.
Customer shall mean all persons or entities to whom the Stormwater Management Utility Fee is properly
billed. A customer is further defined as a person or an entity billed for sanitary sewer services within the
City limits.
Credit shall mean a conditional, renewable reduction in the amount of the fee owed by a customer in
accordance with the Sustainable Credit Framework.
CHAPTER 52. STORMWATER, FLOOD MANAGEMENT UTILITY
EXH I BIT A
Public customer shall mean a local public agency including property of a school district within the City of
Fayetteville.
Public Stormwater System shall mean all stormwater conveyance systems located within the City of
Fayetteville right-of-way or public drainage easements. All other stormwater conveyance systems shall be
considered Private Stormwater Systems.
Stormwater Management Utility Fee is the utility fee authorized by state law to provide necessary funds
for a city to adequately address stormwater problems and needs through an equitable and fair utility fee
derived from an expert analysis of the amount of impervious surface of each property which causes
increased stormwater runoff that needs to be managed by the city to reduce or prevent flooding problems
for our citizens and businesses.
52.03 - Applicability
(A) The stormwater utility fee shall apply to all real property within the territorial jurisdiction of the City of
Fayetteville for which sanitary sewer is provided by the City and upon which the City may
constitutionally and legally assess such stormwater utility fee.
(B) City -owned real property constituting the municipal drainage system, including public streets, public
rights -of -way, drainage facilities, and related infrastructure is not served by a sanitary sewer and thus
is not subject to a stormwater utility fee.
(C) The requirements of this chapter do not relieve landowners, developers, other individuals, and entities
from their responsibility for complying with the obligations of other portions of the Unified
Development Code.
52.04-52.05 - Reserved
ARTICLE II — STORMWATER MANAGEMENT UTILITY FUND
52.06 - Establishment of a Stormwater Management Utility Fund
Pursuant to A.C.A. § 14-235-201 and other state law, the City of Fayetteville hereby creates a fund
entitled the "Stormwater Management Utility Fund" for the purpose of segregating, identifying, and
controlling revenues and expenses for operation of the City of Fayetteville Stormwater Management
Program and other storm -related equipment, construction, materials, supplies or services attributable to
these functions. The following revenue sources shall be deposited in said fund:
(A) All revenue collected by or on behalf of the Stormwater Management Utility Fee.
(B) Revenue from contributions in -lieu of onsite detention or from developers as contributions for required
off -site drainage improvements, which may include bridge assessments.
(C) Any interest earned on monies held in the Stormwater Management Utility Fund.
(D) Any other revenue as may be determined appropriate by the City Council, including but not limited to
general revenue, bond and grant proceeds.
These revenues shall be used exclusively for the purposes listed in Article I — General Provisions.
CHAPTER 52. STORMWATER, FLOOD MANAGEMENT UTILITY
-2-
EXH I BIT A
52.07 — Authorization of a Stormwater Management Utility Fee
The Stormwater Management Utility Fee is a utility fee that is hereby authorized to be charged on most
real property within the City of Fayetteville, Arkansas. The fee shall be billable to the City's Sewer Utility
customers. The rate structure for the utility fee shall:
(A) Be based on the square footage of impervious area on a property,
(B) Be owner / customer type (residential, commercial, etc..) -neutral,
(C) Use a billing unit of 1,000 square feet of impervious area,
(D) Slot property within the following six -tier billing unit structure:
Tier
Tier Range (by square footage of
impervious area on a property)
Billing Units
Initial Monthly Fee (Billing Unit
times Billing Rate)
1
Less than 2,000
1.25
$1.69
2
2,001 to 3,500
2.75
$3.71
3
3,501 to 5,000
4.25
$5.73
4
5,001 to 6,500
5.75
$7.76
5
6,501 to 8,000
7.25
$9.79
6
More than 8,000
See (F)
See (F)
(E) For Tiers 1 through 5, the billing unit in the chart shall be multiplied by the billing rate per unit
rounded down to the nearest cent.
(F) For Tier 6, properties with impervious area greater than 8,000 square feet, the actual impervious area
is divided by 1,000 and multiplied by the monthly rate per billing unit.
(G) The initial rate per billing unit shall be $1.35. This rate shall be increased by 3% per year beginning in
the January 2026 billing period. No rates shall increase after 2031 without a further rate study.
(H) Fees for sewer customers on properties with multiple sewer accounts shall be based on the individual
sewer customer's percentage of total impervious area of the property or properties that may be
attributed to the customer's account, included any areas of parking, common use areas, or other
impervious area on the attributable properties.
(1) Sewer customers or property owners may apply to have the fee for their property mitigated or
reduced by the Sustainable Credit Framework.
52.08 — Initial Charge for the Stormwater Management Utility Fee
The initial assessment of the Stormwater Management Utility Fee established shall be charged beginning
one year after the effective date of the ordinance.
52.09 — Level and Extent of Service Policies
The level of services funded by the Stormwater Management Utility Fees are dependent upon the amount
of revenue generated by this Utility Fee, as well as possible general fund, sales tax bond, grants and
other sources. These revenues shall fund the operation and maintenance, engineering and planning,
regulatory compliance, stormwater capital improvements and administration of the City of Fayetteville's
MS4 Program. The most recently adopted version of the City of Fayetteville Drainage Criteria Manual
and Green Stormwater Practices will serve as the basis for the extent of stormwater service related to:
(A) Public roads, public rights of way and public detention ponds(detention pond maintenance limited to
activities necessary for proper functionality),
CHAPTER 52. STORMWATER, FLOOD MANAGEMENT UTILITY
-3-
EXH I BIT A
(B) Drainage features within existing dedicated public easements (excluding private commercial
detention ponds).
(C) These services extend to the downstream end of the first private infrastructure connected to the City
of Fayetteville's drainage system.
(D) Prior to City accepting responsibility for any private stormwater system, its owner must dedicate a
drainage easement to the City of sufficient size as determined by the City to allow access to and work
on the drainage facilities with appropriate equipment. The City Engineer shall determine the
sufficiency of the width and extent of easements.
52.10 - Reserved
ARTICLE III -ADMINISTRATION
52.11- Administration and Appeals
(A) The City Engineer is responsible for the interpretation and administration of this chapter.
(B) Owners may appeal the initial amount of the Stormwater Management Utility Fee credit allowed
denial of exemption or other dispute to the City Engineer, who shall determine the validity of any such
appeal. The City Engineer shall set forth the requirements of any such appeal in the Drainage Criteria
Manual. The City Engineer shall report the amount of any requested credit to be allowed in writing to
the appellant and maintain such record by the Engineering Department for at least one year.
(C) After exhausting administrative means with the City Engineer, customers desiring to further appeal of
an impervious area estimate, fee or credit can be heard by The City Water and Sewer Committee
pursuant to Chapter 155: Appeals."
52.12 —Sustainable Credit Framework
(A) A Sustainable Credit Framework will be established by the City Council that provides all Stormwater
Management Utility customers with an opportunity to reduce their normal fees. Customers may
qualify for renewable fee reductions by demonstrating activities or stormwater practices that increase
the water quality and thereby reduce the water quality and quantity burden imposed on the City of
Fayetteville's drainage system. Activities eligible for credit include the following:
(1) Compliance with an industrial stormwater permit
(2) Public customers that establish contracts, or Interlocal Cooperation Agreements, with the City
under § 25-20-104 will receive a credit recognizing the value of their public efforts to reduce
stormwater runoff, in accordance with the terms of the interlocal agreement.
(3) Using shared parking lots to minimize the creation of new impervious area
(4) Property retrofits using Water Quality, Flood, and Tree Mitigation Measures from the Drainage
Criteria Manual.
(5) Attendance at approved Stormwater Education Program and Stormwater Stewardship Activities.
(6) Demonstration of no direct discharge of stormwater.
CHAPTER 52. STORMWATER, FLOOD MANAGEMENT UTILITY
QB
EXH I BIT A
(B) The final Sustainable Credit Framework, including appropriate application forms and instructions, will
be developed and available to customers a minimum of 6 months in advance of the effective date of
the initial collection of the Stormwater Management Utility Fee.
52.13 - Billing and collection
The Stormwater Management and Fee shall be administered and collected in the same manner as the
City's sewer utility.
52.14-52.15 - Reserved
CHAPTER 52. STORMWATER, FLOOD MANAGEMENT UTILITY
I&I
Received By: Alan Pugh 05/14/2024 3:05
P.M.
BEAVER WATERSiHED�ALLIANCE
Becky Roark
Executive Director, Beaver Watershed Alliance
PO Box 762
Elkins, AR 72727
Becky@ beaverwatershedalliance.org
479-305-9701
April 10, 2024
City of Fayetteville Council Members
113 West Mountain St.
Fayetteville, AR 72701
RE: Support for Stormwater Utility
Dear City of Fayetteville Council Members,
I am writing to express strong support for the implementation of a stormwater utility in Fayetteville and its positive
impact on the Beaver Lake watershed. Beaver Watershed Alliance is a 501c3 nonprofit watershed group, formed in
2011, working to protect, enhance and sustain Beaver Lake and the integrity of its watershed. We work closely with
the City of Fayetteville and residents to engage the public in conservation stewardship, work alongside city staff to
install green infrastructure and have celebrated many success stories in water quality achievements over the past
decade. However, with the growth outpacing the resources for water quality protection and restoration needs, we
believe that this initiative is crucial for the future of water quality in the Town Branch watershed and West Fork
watershed, which are major tributaries to Beaver Lake, and an additional safeguard to keep high -quality drinking
water rates low for residents.
Increased urbanization and land development have led to a rise in stormwater runoff, which poses significant
threats to water quality and ecosystem health. Pollution from sediment, nutrients, and contaminants can degrade
water quality, harm aquatic life, and jeopardize public health. Sediments are costly to the drinking water utilities to
remove and dispose.
By implementing a stormwater utility, Fayetteville can take proactive measures to mitigate the adverse effects of
stormwater runoff and protect the integrity of the Beaver Lake watershed. The revenue generated from a
stormwater utility fee could be invested in critical infrastructure projects, including green infrastructure, detention
pond management, and erosion control measures, which help to reduce runoff volume and pollutant loads.
Additionally, funding can support educational programs and outreach efforts to raise awareness about the
importance of watershed stewardship and encourage sustainable practices among residents and businesses.
We urge you, as members of the City of Fayetteville Council, to consider the positive outcomes from the
implementation of a stormwater utility as a critical step towards safeguarding the Beaver Lake watershed and
ensuring a sustainable future for generations to come. Your leadership and commitment to environmental
stewardship will not only benefit our community and watersheds today but leave a legacy of conservation and
responsible resource management in our region.
Thank you for your attention to this matter, and we look forward to seeing the City of Fayetteville continue as a
leader in stormwater management and water quality protection.
Sincerely,
Becky ark
Executive Director
Beaver Watershed Alliance
becky@beaverwatershedalliance.org