Loading...
HomeMy WebLinkAbout205-24 RESOLUTION113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 205-24 File Number: 2024-371 BENCHMARK CONSTRUCTION COMPANY OF NWA, INC. (CHANGE ORDER 1): A RESOLUTION TO APPROVE CHANGE ORDER NO. 1 TO THE CONTRACT WITH BENCHMARK CONSTRUCTION COMPANY OF NWA, INC. IN THE AMOUNT OF $246,287.88 FOR THE NORTH STREET CORRIDOR IMPROVEMENTS PROJECT PHASE 1, AND TO APPROVE A BUDGET ADJUSTMENT — 2022 STREET IMPROVEMENT BOND PROJECT WHEREAS, on March 5, 2024, City Council passed Resolution 87-24 to approve a contract with Benchmark Construction of NWA, Inc. for the North Street Corridor Improvements Project; and WHEREAS, during the construction, it became apparent that the existing roadway structure is failing and staff recommends that the existing asphalt, base and soil beneath be removed and replaced with stable materials. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign Change Order No. 1 to the contract with Benchmark Construction Company of NWA, Inc. in the amount of $246,287.88 for the North Street Corridor Improvements Project Phase 1. A copy of Change Order No. 1 is attached to this Resolution and made a part hereof. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. PASSED and APPROVED on August 6, 2024 Appro%e�i:� Attest: `�.��K'j'TRF�i�,i Y IA- FAYETTEV11-L7 tz oneld Jordan, Mayor Kara Paxton, City Jerk Treasurer Z� �• r •` 1.0118111111, J� Page 1 CITY OF FAYETTEVILLE ARKANSAS MEETING OF AUGUST 6, 2024 CITY COUNCIL MEMO 2024-371 TO: Mayor Jordan and City Council THRU: Chris Brown, Public Works Director Susan Norton, Chief of Staff FROM: Matt Casey, Engineering Design Manager SUBJECT: Approval of Change Order 1 with Benchmark Construction Company of NWA, INC. for the North Street Corridor Improvements Project RECOMMENDATION: Staff recommends approval of Change Order 1 with Benchmark Construction for the North Street Corridor Improvements Project Phase 1 which will increase the contract amount by $246,287.88 and the contract time by 60 days and approval of a budget adjustment. BACKGROUND: On March 5, 2024, the City Council approved a contract with Benchmark Construction of NWA, Inc. for the construction of this project. Construction began in April of 2024 and is scheduled for completion in September of 2024. DISCUSSION: The design for this project includes the widening of North Street on the east side of College Avenue. For the widening, the existing roadway was planned to be left in place to make use of the existing pavement structure. Unfortunately, during the construction, it has become apparent that the existing roadway structure is failing. With the steep grade of this roadway and the volume of traffic that it experiences, the poor structure will continue to fail despite the proposed asphalt overlay. Staff recommends that the existing asphalt, base and soil beneath be removed and replaced with stable materials. BUDGET/STAFF IMPACT: The roadway improvements are funded by the 2022 Transportation Bond Program Funds. ,CCOUNT PROJECT AMOUNT 702.860.7223-5809.0046020.7223 $ 246,287.88 ATTACHMENTS: SRF (#3), BA (#4), Change Order #1 - North Street (#5) Mailing address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 == City of Fayetteville, Arkansas y 113 West Mountain Street Fayetteville, AR 72701 (479)575-8323 - Legislation Text File #: 2024-371 Approval of Change Order 1 with Benchmark Construction Company of NWA, INC. for the North Street Corridor Improvements Project A RESOLUTION TO APPROVE CHANGE ORDER NO. 1 TO THE CONTRACT WITH BENCHMARK CONSTRUCTION COMPANY OF NWA, INC. IN THE AMOUNT OF $246,287.88 FOR THE NORTH STREET CORRIDOR IMPROVEMENTS PROJECT PHASE 1, AND TO APPROVE A BUDGET ADJUSTMENT — 2022 STREET IMPROVEMENT BOND PROJECT WHEREAS, on March 5, 2024, City Council passed Resolution 87-24 to approve a contract with Benchmark Construction of NWA, Inc. for the North Street Corridor Improvements Project; and WHEREAS, during the construction, it became apparent that the existing roadway structure is failing and staff recommends that the existing asphalt, base and soil beneath be removed and replaced with stable materials. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign Change Order No. 1 to the contract with Benchmark Construction Company of NWA, Inc. in the amount of $246,287.88 for the North Street Corridor Improvements Project Phase 1. A copy of Change Order No. 1 is attached to this Resolution and made a part hereof. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. Page 1 Matt Casey Submitted By City of Fayetteville Staff Review Form 2024-371 Item ID 8/6/2024 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 7/17/2024 ENGINEERING (621) Submitted Date Division / Department Action Recommendation: Staff recommends approval of Change Order 1 with Benchmark Construction for the North Street Corridor Improvements Project Phase 1 which will increase the contract amount by $246,287.88 and the contract time by 60 days and approval of a budget adjustment. Budget Impact: 4702.860.7223-5809.00 Street Project 2022 Bonds Account Number Fund 46020.7223 North St Garland to Mission Project Number Project Title Budgeted Item? Yes Total Amended Budget $ 1,024,293.00 Expenses (Actual+Encum) $ 841,710.84 Available Budget $ 182,582.16 Does item have a direct cost? Yes Item Cost $ 246,287.88 Is a Budget Adjustment attached? Yes Budget Adjustment $ 246,288.00 Remaining Budget 182,582.28 V20221130 Purchase Order Number: 2024-00000416 Previous Ordinance or Resolution # 87-24 Change Order Number: 1 Approval Date: Original Contract Number: 2024-00000020 Comments: City of Fayetteville, Arkansas - Budget Adjustment (Agenda) Budget Year Division ENGINEERING (621) Adjustment Number 2024 /Org2 Requestor: Matt Casey BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION: Staff recommends approval of Change Order 1 with Benchmark Construction for the North Street Corridor Improvements Project Phase 1 which will increase the contract amount by $246,287.88 and the contract time by 60 days and approval of a budget adjustment. RESOLUTION/ORDINANCE COUNCIL DATE ITEM ID# 8/6/2024 2024-371 Noll y Black 711612024 72: 79 PM Budget Division Date TYPE: D - (City Council) JOURNAL#: GLDATE: CHKD/POSTED: TOTAL - - v.2024624 Increase / (Decrease) Prolect.Sub# Account Number Expense Revenue Project Sub.Detl AT Account Name 4702.860.7223-5809.00 246,288 - 46020 7223 EX Improvements - Street 4702.860.7999-5899.00 (246,288) - 46020 7999 EX Unallocated - Budget G:\Divs\Engineering\Engineering Design Services\Projects\BOND PROGRAM\2019 Bond Program\North Street Corridor\Council and Committee Actions\Change Order 1 \2024-371 BA Benchmark CO 1 1 of 1 Ad CITY OF ��FAYETTEVILLE ARKANS ARKANSAS CHANGE ORDER Contract Title: North Street Improvements - Phase I Change Order No. 1 Date of Issuance July 16, 2024 To Contractor: Benchmark Construction Company of NWA, Inc. ORDINANCE/RESOLUTION:87-24 The Contract is changed as follows: Effective March 5, 2024 Bid Bid Previous Unit Contract Revised Revised Original Revised Contract Item Item Estimated of Unit Estimated Unit Estimated Estimated Changes No Description Quantity Measure Price Quantity Price Cost Cost 8 Undercut and Backfill 150 CY $59.27 894 $59.27 $ 8,890.50 $52,987.38 10 Unclassified Excavation 700 CY $25.59 905 $25.59 $ 17,913.00 $23,158.95 13 Subgrade Preparation 434 SY $6.66 1356 $6.66 $ 2,890.44 $9,030.96 4" Thick Concrete Sidewalk (Width 22 Varies, Includes Concrete Infill Area 13 SY $151 00 433 $151 00 $ 1,963.00 $6,538.30 Between Curb and Sidewalk 26 8" Thick Concrete Pavement (For 177 SY $96.41 1155.5 $96.41 $ 17,064.57 $111,401.76 Street Widening, etail ST5) 27 Concrete Driveway Aprons 1 39 SY $103.92 1 49.1 $103.92 $ 4,052.88 $5,102.47 72 Pavement Repair Demolition - Change 0 LS $0.00 1 $1,992.00 - $1,992 00 Order # 1 73 Pavement Repair Subgrade Prep - 0 LS $0.00 1 $134.67 $134.67 Change Order#1 74 Inlet Lid and Extension 0 EA $0.00 1 $8,500.00 $8,500.00 75 Traffic Control and Maintenance for 0 LS $0.00 1 $20,000 00 $20,000.00 Pavement Repair 76 Existing Asphalt Removal for 0 LS $0.00 1 $40,760.00 $40,760,00 Pavement Repair 77 Bonds, Insurance, etc. for Pavement 0 LS $0.00 1 $7,405.78 $7,405 78 Repair 78 Install Owner Supplied Traffic Signal 0 LS $0.00 1 $4,709.00 $4,709 00 Control Cabinet 79 Change Pole Base from Octagonal to 0 LS $0 00 1 $2,341.00 $2,341 00 Square 80 Erosion Control - Change Order #1 0 LS $0.00 1 $1,500.00 $1,500.00 81 Roadway Construction Control - 0 LS $0.00 1 $3,500.00 $3,500.00 Chanize Order # 1 Summation of Cost 52,774.39 $299,062.27 Net Cost for this Change Order S246,2N-.88 Not valid until signed by the Owner The original Contract Price was S 789,747.50 Net change by previously authorized change orders S The Contract Price prior to this Change Order was The Contract Price will be adjusted by $246,287.88 The new Contract Price including this Change Order will be $ 1,036,035.38 The Contract Time(s) will be increased by 60 calendar days Required dates of Completion as of the date of this Change Order therefore are: Substantial Completion 11-Nov-24 Final Completion 11-Dec-24 NOTE: This summary does not reflect changes in the Contract Price or Time(s) which have been authorized by Work or previous Change Orders. BENCHMARK CONSTRUCTION COMPANY OF NWA, INC. �2� Smzi5� July 16, 2024 BY DATE Directives not m6korated in this rAY August 6, 2024 DATE