Loading...
HomeMy WebLinkAbout203-24 RESOLUTION113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 203-24 File Number: 2024-353 GARVER, LLC. (CONTRACT AMENDMENT 2): A RESOLUTION TO APPROVE AMENDMENT NO. 2 TO THE CONTRACT WITH GARVER, LLC. IN THE AMOUNT OF $74,875.00 FOR DESIGN OF THE SCHOOL/COLLEGE AVENUE CORRIDOR IMPROVEMENTS, AND TO APPROVE A BUDGET ADJUSTMENT — 2022 STREET IMPROVEMENT BOND PROJECT WHEREAS, on July 7, 2020, the City Council approved Resolution 180-20 authorizing a contract with Garver, LLC for the programming phase of the School/College Avenue Corridor Improvements Project; and WHEREAS, on December 7, 2021, the City Council approved Amendment No. 1 for the detailed design for College Avenue between North Street and Township Street and School Avenue between 15t' Street and MLK Jr. Boulevard; and WHEREAS, Amendment No. 2 will remove the previously approved scope of services for the School Avenue portion of the project and reallocate those associated funds for additional services for the portion of College Avenue between North Street and Sycamore Street. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign Amendment No. 2 to the contract with Garver, LLC. in the amount of $74,875.00 for design of the School/College Avenue Corridor Improvements. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. PASSED and APPROVED on August 6, 2024 `ti�ltilIIIIIf eve Attest: .`FF;� I T Rf .FAY'TiFVII� c. _ d Jordan Nia ara Paxton, City C erk Treasurer �� RK N1 l p �� . 9 f' J ' �iyS ••...•• C �� y/�� T 0`���.�`• Page 1 CITY OF FAYETTEVILLE ARKANSAS MEETING OF AUGUST 6, 2024 CITY COUNCIL MEMO 2024-353 TO: Mayor Jordan and City Council THRU: Chris Brown, Public Works Director Susan Norton, Chief of Staff FROM: Matt Casey, Engineering Design Manager SUBJECT: Approval of Contract Amendment #2 in the amount of $74,875.00 with Garver, LLC for design of the School/College Avenue Corridor Improvements, per RFQ 20-01, selection #3 and approval of a budget adjustment. RECOMMENDATION: Staff recommends approval of Contract Amendment #2 in the amount of $74,875.00 with Garver, LLC. to provide professional services for the design of the School/College Avenue Corridor Improvements Project and approval of a budget adjustment. BACKGROUND: The School Avenue and College Avenue Corridors serve as the major north -south route through the central part of the City and are major commercial and retail destination. Maintaining and improving the corridors will allow them to continue to serve mobility needs, and to continue to develop/redevelop as commercial corridors. Improvements to these corridors will include striping, widening and/or narrowing of the roadway, utility relocation, sidewalk/trail installation, accommodations for transit systems, elimination or reconfiguration of driveways, modification to traffic signals, medians, and other corridor improvements identified in the design process. The starting point for corridor designs was the 71 B Corridor Plan completed by RDG Planning. Goals and aspirations of the Plan will be implemented to the greatest extent possible through the limits of the project segments selected for design and construction, which include College Ave. between North Street and Township Street, and School Ave. between Martin Luther King Jr. Blvd. and Cato Springs Road. On July 7, 2020, the City Council approved a contract with Garver, LLC for the programming phase of this project. The programming phase included meetings with stakeholders and city staff to review the plan goals and make decisions about how and where to include project elements identified in the 71 B Plan. On December 7, 2021, the City Council approved contract amendment #1 with Garver, LLC for the detailed design for College Avenue between North Street and Township Street and School Avenue between 15th Street and MLK Jr. Boulevard. On June 27, 2024, the City opened construction bids for this project. DISCUSSION: Mailing address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 The approved contract with Garver, LLC does not include bidding services, construction phase services and materials testing. Staff has worked with MCE to develop a scope that will include support for the contractor and city staff as needed throughout the construction of this project. This contract amendment also removes design work for the School Avenue portion of the project. The intent is to approach this as a totally separate project with a new contract. Garver, LLC has provided a fee in the amount of $74,875.00 for this additional work. The contract will be paid based on hourly rates for work completed, up to the total contract amount. BUDGET/STAFF IMPACT: This work will be paid for with the funds from the 2022 Transportation Bond Fund. With this contract amendment, the new design contract will be $1,275,460.00 ATTACHMENTS: SRF (#3), BA (#4), College Ave Amendment 2 (#5) Mailing address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 == City of Fayetteville, Arkansas y 113 West Mountain Street Fayetteville, AR 72701 (479)575-8323 - Legislation Text File #: 2024-353 Approval of Contract Amendment #2 in the amount of $74,875.00 with Garver, LLC for design of the School/College Avenue Corridor Improvements, per RFQ 20-01, selection #3 and approval of a budget adjustment. A RESOLUTION TO APPROVE AMENDMENT NO. 2 TO THE CONTRACT WITH GARVER, LLC. IN THE AMOUNT OF $74,875.00 FOR DESIGN OF THE SCHOOL/COLLEGE AVENUE CORRIDOR IMPROVEMENTS, AND TO APPROVE A BUDGET ADJUSTMENT — 2022 STREET IMPROVEMENT BOND PROJECT WHEREAS, on July 7, 2020, the City Council approved Resolution 180-20 authorizing a contract with Garver, LLC for the programming phase of the School/College Avenue Corridor Improvements Project; and WHEREAS, on December 7, 2021, the City Council approved Amendment No. 1 for the detailed design for College Avenue between North Street and Township Street and School Avenue between 15th Street and MLK Jr. Boulevard; and WHEREAS, Amendment No. 2 will remove the previously approved scope of services for the School Avenue portion of the project and reallocate those associated funds for additional services for the portion of College Avenue between North Street and Sycamore Street. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign Amendment No. 2 to the contract with Garver, LLC. in the amount of $74,875.00 for design of the School/College Avenue Corridor Improvements. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. Page 1 Matt Casey Submitted By City of Fayetteville Staff Review Form 2024-353 Item ID 8/6/2024 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 7/11/2024 ENGINEERING (621) Submitted Date Division / Department Action Recommendation: Staff recommends approval of Contract Amendment #2 in the amount of $74,875.00 with Garver, LLC. to provide professional services for the design of the School/College Avenue Corridor Improvements Project and approval of a budget adjustment. 4702.860.7221-5860.02 Account Number 46020.7221-1020 Project Number Budgeted Item? Yes Budget Impact: Street Projects 2022 Bonds Fund Hwy 71B Corridor North to Township Total Amended Budget Expenses (Actual+Encum) Available Budget Does item have a direct cost? Yes Item Cost Is a Budget Adjustment attached? Yes Budget Adjustment Remaining Budget Project Title $ 232,335.00 $ 187,904.71 $ 44,430.29 $ 74,875.00 $ 74,875.00 44,430.29 V20221130 Purchase Order Number: 2020-00000607 Previous Ordinance or Resolution # 180-20, 291-21 Change Order Number: Original Contract Number: Comments: 2 2020-00000053 Approval Date: City of Fayetteville, Arkansas - Budget Adjustment (Agenda) Budget Year Division ENGINEERING (621) Adjustment Number 2024 /Org2 Requestor: Matt Casey BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION: Staff recommends approval of Contract Amendment #2 in the amount of $74,875.00 with Garver, LLC. to provide professional services for the design of the School/College Avenue Corridor Improvements Project and approval of a budget adjustment. COUNCIL DATE ITEM ID# 8/6/2024 2024-353 Nolly Black 717712024 70:33 AM Budget Division Date TYPE: D - (City Council) JOURNAL#: RESOLUTION/ORDINANCE I GLDATE: CHKD/POSTED: TOTAL Account Number - - Increase / (Decrease) Expense Revenue Prolect.Sub# Project Sub.Detl AT v.2024624 Account Name 4702.860.7221-5860.02 74,875 - 46020 7221.1020 EX Capital Prof Svcs - Engineering/Architectu 4702.860.7999-5899.00 (74,875) - 46020 7999 EX Unallocated - Budget G:\Divs\Engineering\Engineering Design Services\Projects\BOND PROGRAM\2019 Bond Program\Hwy 71 B Corridor 040887\Council and Committee Items\Garver Design Contract Amendment 2\2024-353 BA Garver CA2 1 of 1 AMENDMENT TO AGREEMENT FOR PROFESSIONAL SERVICES CITY OF FAYETTEVILLE Fayetteville, Arkansas Project No. 20T21060 CONTRACT AMENDMENT NO. 2 This Contract Amendment No. 2 ("Amendment'), effective on the date last written below, shall amend the original contract between the City of Fayetteville (Owner) and Garver, LLC (Garver), dated July 7, 2020 and Amendment No. 1 dated December 7, 2021 referred to in the following paragraphs as the "Agreement." This Contract Amendment No. 2 modifies professional services for the Improvements to School Avenue from MILK Jr. Boulevard to 1 Wh Street and College Avenue from North Street to Township Street. In General Amendment No. 2 modifies the agreement by removing previously approved scope of services and associated fees from certain portions of the project and reallocating those associated fees for additional services for the portion of College Avenue between North Street and Sycamore Street. More specifically, the agreement is hereby modified as follows: APPENDIX A — SCOPE OF SERVICES The attached Appendix A — Scope of Services for Amendment No. 2 shall replace the previously approved scope of services in its entirety. APPENDIX B — PROJECT FEE SPREADSHEETS The attached Appendix B — Project Fee Spreadsheet that contains the hourly rates, revised summary sheet, and revised fee spreadsheets shall replace the previously approved Appendix B in its entirety. Amendment No. 2 shall increase the maximum -not -to -exceed amount a sum of $74,875 from $1,200,585 to $1,275,460. Terms and conditions of the Agreement not modified herein remain unchanged and in full force and effect. Contract Amendment No. 2 1 of 2 School/College Avenue Corridor Improvements Garver Project No. 20T21050 GARVER This Amendment may be executed in two (2) or more counterparts each of which shall be deemed an original, but all of which together shall constitute one and the same instrument. IN WITNESS WHEREOF, OWNER and Garver have executed this Amendment effective as of the date last written below. Title: V1 Date: GARVER, LLC' By: Signature Name: Ronald S. Petrie Printed Name Title: Vice President Date: 5/31 /2024 Attest: = �: Attest_ Karp► aXn GI�rK �re�sU�rer--`� •• �RK�NS? Contract Amendment No. 2 2 of 2 School/College Avenue Corridor Improvements Garver Project No. 20T21050 AMENDMENT NO. 2 APPENDIX A — SCOPE OF SERVICES The following Appendix A - Scope of Services for Amendment No. 2 shall replace the entire previously approved Appendix A — Scope of Services. 1. General The scope of services for this project previously included surveying, environmental (NEPA documentation), design, and bidding services for improvements to School Avenue between MLK, Jr. Boulevard and 15th Street and College Avenue between North Street and Township Street. Improvements were planned to consist primarily of enhancements to pedestrian & bicycle infrastructure, landscaping, signalization, drainage improvements as necessary, watershed BMPs, utility relocations, and access control improvements for 1.82 miles of the School/College Avenue corridor and the portion of Poplar Street from College Avenue to Green Acres Road. Improvements to the corridor will be consistent with the items identified in the 2021 School & College Avenues Programming document. Generally, Amendment No. 2 reallocates the previously approved scope of services and associated fees of certain project phases to services that were previously excluded as further described below: • For the School Avenue segment between MLK, Jr. Boulevard and 15th Street, the amended scope of services includes surveying and design of the geometric improvements to the School Avenue and 151h Street intersection improvements in sufficient detail to allow ARDOT to use for improvements associated with a separate project. All previously approved scope of services for this corridor segment are hereby removed from the project. • For the College Avenue segment starting just to the north of the Sycamore Street intersection and extending to Township Street, the amended scope of services includes surveying and the preparation of conceptual (30%) construction plans of the planned improvements. All previously approved scope of services for this corridor segment are hereby removed from the project. • For the College Avenue segment from North Street to Sycamore Street, the amended scope of services includes all previously approved scope of services plus the following additional items: o Preparation of Right -of -Way and easement acquisition documents for up to 22 parcels. o Preparation of separate construction drawings for the portion of improvements adjacent to the VA Hospital property. o Preparation of a Maintenance of Traffic Plan for the Water/Sewer improvements designed by others including temporary traffic signal phasing plans. o Additional time to meet with adjacent property owners. o Additional time for intersection grading and layout plans. o Additional time for Utility relocation coordination including water/sewer. o Construction rebid for project segment with revised plans. o Construction Phase Services. Appendix A - Scope of Services 1 of 10 20T21050 School/College Ave. Corridor Improvements — Amendment 2 1. Surveys (No Amendment No. 2 changes to the previous scope of work) 1.1. Desian Survevs Garver will utilize the previously performed LIDAR survey for designing the project. The LIDAR survey included sufficient topography for modeling the existing ground, buildings & other structures, streets, trees, visible utilities, and parking lots. Garver will conduct additional field surveys along the project site as appropriate for locating underground utilities marked by their owners and/or representatives and any other pertinent drainage infrastructure that may be present at and/or along the project site. For the portion of the project between North Street and Township Street, Garver will utilize a survey provided by the City for the field location of utilities. Garver will establish control points for use during construction. 1.2. Property Surveys Garver will locate existing monumentation representing right of way and/or easements based on record data which will be provided by an abstractor under a subconsultant agreement with Garver for the portion of the project between North Street and Sycamore Street. For the remaining portion of the project, Garver will utilize City data and as -built plans to establish the existing right-of-way. 2. Geotechnical Services (No Amendment No. 2 changes to the previous scope of work) Geotechnical is not anticipated for the completion of the project and not included in this scope of services. 3. Coordination (No Amendment No. 2 changes to the previous scope of work) Garver will furnish plans to all known utility owners potentially affected by the project at preliminary & final stages of development. Garver will conduct individual coordination meetings as necessary among all known affected utility owners to enable them to coordinate efforts for any necessary utility relocations including the possibility of placing overhead utilities underground. Garver will include the surveyed locations of the observable and marked utilities in the construction plans. Garver will also include proposed and/or relocated utility information in the construction plans as provided by the utility companies. Garver will furnish both preliminary and final plans to the following agencies depending on the specific project regulatory requirements: ARDOT, ADEQ, COE, USFWS, and Department of Arkansas Heritage for their review and comment. In addition to the coordination meetings with the City and other regulatory agencies, the following public meetings will be prepared for and attended: • Two (2) public involvement meetings • Two (2) Transportation Committee meetings • One (1) Active Transportation Committee meeting • One (1) Arts Council meeting • Individual Stakeholder meetings as necessary Appendix A - Scope of Services 2 of 10 20T21050 School/College Ave. Corridor Improvements — Amendment 2 4. Environmental Services (No Amendment No. 2 changes to the previous scope of work) 4.1. Environmental Services Garver will prepare a small site construction Stormwater Pollution Prevention Plan (SWPPP) in accordance with DEQ standards for each of the three projects defined in this scope of services. Construction site notices of coverage for the three projects will be obtained. Preparation of the SWPPP includes reviews, addressing comments, and refinement of the SWPPP design sheets produced by the engineer to meet DEQ standard requirements for site plans. A Short -Term Activity Authorization (STAA) is required by DEQ for any project that might cause a violation of Arkansas water quality standards. Garver will complete the STAA request, which includes crossing location(s), point of contact, acreage of disturbance, schedule, and work to be performed. Garver will coordinate the issuance of a STAA with DEQ for one stream crossing. Garver will pay the required fee, which is $150 per stream crossing and seek reimbursement from the Client. Garver will perform wetland delineations for the portion of the project between North Street and Green Acres Road and also the area for the Nationwide Permit. Garver will work with the US Army Corps of Engineers to obtain a Section 404 Nationwide permit(s) for projects defined in this scope of services that require such permitting. An Individual permit and mitigation planning are not anticipated. 4.2. Environmental Services (Federal/State Funded Project Only) Preliminary environmental data associated with the proposed project area will be collected to assess impacts to the social, economic, and natural environments. Data related to the following impact areas should be included: 1. Air Quality 2. Cultural Resources 3. Economic 4. Endangered Species 5. Environmental Justice/Title VI 6. Fish and Wildlife 7. Floodplains 8. Forest Service Property 9. Hazardous Materials/Landfills 10. Land Use 11. Migratory Birds 12. Navigation/Coast Guard 13. Noise Levels 14. Prime Farmland 15. Protected Waters 16. Public Recreation Lands 17. Public Water Supply/WHPA 18. Relocatees 19. Section 4(f)/6(f) 20. Social 21. Underground Storage Tanks 22. Visual 23. Streams 24. Water Quality 25. Wetlands 26. Wildlife Refuges Appendix A - Scope of Services 3 of 10 20T21050 School/College Ave. Corridor Improvements — Amendment 2 Preliminary environmental data collection is part of the initial scope of work's justification of costs and fees. 4.2.1. Environmental Constraints Map 1. All environmental data collected will be transferred to appropriately scaled aerial photographs and/or overlaid on the design plans to produce a map that indicates all known environmentally sensitive areas and other constraints prior to submittal of 30% plans. The approved map will be the basis for avoidance and minimization of environmental impacts during the design process and notations on the plans for restraining conditions on the Contractor, in accordance with Section 107.10 of the Standard Specifications for Highway Construction. Contract Special Provisions will be developed as necessary to provide protection for environmentally sensitive areas or features and to provide guidance to the Contractor. 2. Constraints Mapping shall include an on -site survey level of site reconnaissance to verify desktop -collected data. A Constraints Memo shall be developed that summarizes the results of mapping and data collection, and shall include avoidance recommendations. 4.2.2. Special Studies and Agency Coordination 1. Conduct a wetland delineation including GPS mapping of potentially jurisdictional aquatic features within the study area. 2. Conduct a Phase I Cultural Resources Survey including archaeological and historic resources. If any additional analyses or data collection are needed beyond a Phase I Cultural Resources survey, this service will be added through a supplemental agreement. 3. A Request for Technical Assistance (RTA) regarding buildings and structures 45 years or older that need to be included in the Constraints Mapping will be submitted to the Arkansas Department of Parks, Heritage, and Tourism (ADPHT) with the results of the Phase I Cultural Resources Survey. Any buildings or structures listed in the National Register of Historic Places (NRHP) or determined eligible for listing through SHPO review of the RTA will be displayed on the constraints maps. 4. Agency coordination shall include the US Army Corps of Engineers (USAGE), US Fish and Wildlife Service (USFWS), Arkansas Division of Environmental Quality (DEQ), ADPHT, Arkansas Department of Health (ADH), and City of Fayetteville staff. 5. Prepare and submit Tribal consultation letters to ARDOT and FHWA for consultation with the appropriate Tribes. 6. Hazardous materials database review. 4.2.3. Location and/or Design Alternatives 1. Review conceptual design of all location and/or design alternatives, which will include but not be limited to major drainage structures and construction techniques. Development of the alternatives shall include early and continuous coordination with the design team, Client, and appropriate resource agencies, if necessary. Electronic copies of the design shall be furnished to the Client in Bentley MicroStation "DGN" format. One alternative will be described in the Categorical Exclusion. 2. The Consultant shall work to avoid and/or minimize environmental impacts, as appropriate. If impacts cannot be avoided, then the impacts shall be minimized. Mitigation for impacts should occur as a last option. 3. Reasonable and feasible alternatives shall be submitted for review by the Client and a determination will be made as it pertains to impacts consistent with a Categorical Exclusion. Appendix A - Scope of Services 4 of 10 20T21050 School/College Ave. Corridor Improvements — Amendment 2 4.2.4. Environmental Public Involvement 1. Coordinate with the Client and ARDOT on timing of the virtual meeting or in -person meeting. 2. Prepare public involvement virtual displays and website creation for review by the Client and ARDOT. 3. All coordination necessary for a virtual public meeting including: a. Publishing the virtual public meeting website and meeting materials. b. Publish and pay for public notices and including newspaper display adds. c. Provide Spanish translation for the virtual public meeting website and outreach materials. 4. Prepare a synopsis of the public meeting; review and respond to public comments as needed; and submit Title VI report. 4.2.5. Environmental Document 1. Prepare a Tier 3 Categorical Exclusion (CE) that will meet ARDOT and Federal Highway Administration (FHWA) standards in accordance with the National Environmental Policy Act (NEPA). 2. Submit draft environmental documents in electronic format, submitting the document in Word and pdf forms for review by the Client and ARDOT. 3. Perform alterations necessary to respond to comments made in the Client and ARDOT reviews. 4. Submit final drafts to the Client, then ARDOT for FHWA review/approval. 5. An electronic copy of the approved environmental document in pdf form will be provided to the Client. 4.2.6. Construction Plan Review, Special Provisions, and Permitting 1. Coordinate and obtain appropriate federal and state permits and clearances (Section 106, Section 404, Section 401, STAA, Section 7, etc.) necessary for environmental clearance and to construct the proposed project in compliance design procedures. 2. Prepare special provisions related to environmental commitments and protection. 3. If an Individual Section 404 permit and mitigation planning is required, these services can be performed under a supplemental agreement. 4. Prepare and complete coordination with DEQ regarding approval of a construction stormwater pollution prevention plan. (NOTE: Close coordination should be maintained with the Environmental Division to ensure that all aspects of the environmental process meet the Department approval. This includes approval of deliverables and dates of delivery for each task). 5. Landscape Architecture and Lighting Amendment No. 2 removes Landscape Architecture and Lighting from the scope of services of all sections of School Avenue and all sections of College Avenue except the portion between North Street to Sycamore Street. The following is to replace the previously approved Preliminary Design scope of services: Garver will subcontract with RDG Planning & Design for Landscape Architecture and Lighting design for the segment of College Avenue between North Street and Sycamore Street. The specific scope for these services is included in the attached scope of services provided by RDG Planning & Design. These items shall be made a part of these Scope of Services. Appendix A - Scope of Services 5 of 10 20T21050 School/College Ave. Corridor Improvements — Amendment 2 6. Conceptual Design Amendment No. 2 removes Conceptual Design from the scope of services of the School Avenue segment except as noted below. The following is to replace the previously approved Conceptual Design scope of services: The conceptual design phase submittal will include separate construction plan sets for the segment of College Avenue between North Street to Sycamore Street, the segment of College Avenue between Sycamore Street and Green Acres Road, the segment of College Avenue between Green Acres Road to Township Street, and a conceptual drawing of the 15t" Street and School Avenue intersection. Plan sets will include typical sections, street plan & profiles, sidewalk/trail layouts, adjacent parking lot adjustments, drainage improvements, pavement markings, signal pole layouts, overhead utility relocation route alternative exhibit and an opinion of probable construction cost. This conceptual submittal will be for the purpose of coordinating the proposed improvements with the City and the utility companies and developing an order of magnitude cost estimate for the project. Garver will incorporate comments from the Owner in the Preliminary Design. Garver will proceed with Preliminary Design after the Conceptual Design is approved by the Owner in writing. 7. Preliminary Design Amendment No. 2 removes Preliminary Design from the scope of services of all sections of School Avenue and all sections of College Avenue except the portion between North Street to Sycamore Street. The following is to replace the previously approved Preliminary Design scope of services: Upon receiving written approval from City on Conceptual Design, Garver will begin Preliminary Design. In addition to the specific items listed in the Conceptual Design, the Preliminary Design phase submittal will include the layout for any necessary retaining walls. In addition, an opinion of probable construction cost will be submitted with the Preliminary Phase submittal. The preliminary design phase will represent approximately 60 percent of final construction contract plans. This submittal will not include technical specifications or "front end" contract documents. Garver will incorporate comments from the Owner on the Preliminary Design in the Final Design. Garver will proceed with Final Design after the Preliminary Design is approved by the Owner in writing. 7.1. School Avenue Traffic Signal Improvements Preliminary Design excluded from the scope of services for this project segment. 7.2. College Avenue North of Sycamore Street Traffic Signal Improvements Preliminary Design excluded from the scope of services for this project segment. 7.3. College Avenue North Street to Sycamore Street Traffic Signal Improvements Signalization and wheelchair ramp improvements as needed at the existing College Avenue signalized intersections at Evelyn Hills entrance (Memorial) and Sycamore Street. 8. Final Design Amendment No. 2 removes Final Design from the scope of services of all sections of School Avenue and all sections of College Avenue except the portion between North Street to Sycamore Street and Appendix A - Scope of Services 6 of 10 20T21050 School/College Ave. Corridor Improvements — Amendment 2 adds scope of services for this specific section as listed below. The following is to replace the previously approved Final Design scope of services: Once Garver receives written approval from Owner on Preliminary Design, Garver will begin Final Design only on the segment of College Avenue between North Street to Sycamore Street. During the final design phase of the project, Garver will conduct final designs to prepare construction plans and specifications, for one construction contract, including final construction details and quantities, special provisions, and opinion of probable construction cost. Garver will also make any needed plan changes as a result of special easement acquisition considerations and prepare the construction documents as required to advertise for bids. In addition, the following items will be included in the final design phase: A. Garver will prepare separate plans for the portion of College Avenue within this segment adjacent to the Veteran's Administration facility property. It is anticipated that this portion will be completed at a future date utilizing in-house City construction crews. B. Garver will coordinate with the City water/sewer relocation design consultant including plan review for the identification of potential conflicts with the roadway improvements. C. Garver will prepare & modify the existing Maintenance of Traffic (MOT) Plan that includes the construction of the water/sewer improvements. The MOT plan will include temporary signal phasing plans. D. Garver will modify property acquisition documents to include the water/sewer improvements designed by others. E. Garver will include the following additional plan sheets in the construction drawings: a. Demolition Sheets b. General Site Layout and Survey Control Sheets c. MOT Plans for Water & Sewer relocations including temporary signal phasing d. Intersection Grading and Layout Sheets F. Garver designers will meet with property owner(s) as directed by the City during property acquisition. Garver will also prepare, submit, and coordinate approval of one Stormwater Pollution Prevention Plan (SWPPP) with ADEQ. 9. Property Acquisition Documents Amendment No. 2 adds property acquisition document preparation that was previously excluded for the College Avenue section between North Street and Sycamore Street, as follows: Garver will provide mapping as required for preparing Right of Way/Easement acquisition documents for the Owner's use in acquiring the property. Documentation will include individual tract maps with description of temporary and permanent acquisition for each property. The Owner will provide a standard easement acquisition document or "go-by" example for use by Garver. The fee for providing property acquisition documentation is based on permanent right of way and temporary construction easements for no more than 22 properties. Property acquisition document preparation will begin after receiving the Owner's comments from the Preliminary Design review. 10. Bidding Services Amendment No. 2 reduces the number of project bids from three (3) to two (2) and adds in scope of services to make plan & specification revisions determined by the City to rebid the College Avenue portion between North Street to Sycamore Street. The following is to replace the previously approved Bidding scope of services: During the bidding phase of the project, Garver will perform the following for a maximum of two (2) bids under this agreement: Appendix A - Scope of Services 7 of 10 20T21050 School/College Ave. Corridor Improvements — Amendment 2 A. Prepare and submit Advertisement for Bids for publication as directed by the Owner. Owner will pay advertising costs outside of this contract. B. Plan & Specification revisions as determined by the City for one (1) project rebid. C. Support the contract documents by preparing addenda as appropriate. D. Participate in two (2) pre -bid meetings if necessary. E. Attend the bid openings. F. Prepare bid tabulations. G. Evaluate bids and recommend award. H. Prepare construction contracts. 11. Construction Phase Services Amendment No. 2 adds Construction Phase Services for the segment of College Avenue between North Street and Sycamore Street, as follows: During the construction phase of work, Garver will accomplish the following in accordance with ARDOT Standard Specifications for Highway Construction (latest edition), Manual of Field Sampling and Testing Procedures, Resident Engineer's Manual, and the plans, specifications, and other applicable FHWA and ARDOT procedures for the College Avenue segment from North Street to Sycamore Street (excludes water/sewer improvements designed by others): A. Issue a Notice to Proceed letter to the Contractor and attend preconstruction meeting. B. Attend progress/coordination meetings with the Owner/Contractor. C. Evaluate and respond to construction material submittals and shop drawings. Corrections or comments made by Garver on the shop drawings during this review will not relieve Contractor from compliance with requirements of the drawings and specifications. The check will only be for review of general conformance with the design concept of the project and general compliance with the information given in the contract documents. The Contractor will be responsible for confirming and correlating all quantities and dimensions, selecting fabrication processes and techniques of construction, coordinating his work with that of all other trades, and performing his work in a safe and satisfactory manner. Garver's review shall not constitute approval of safety precautions or constitute approval of construction means, methods, techniques, sequences, procedures, or assembly of various components. When certification of performance characteristics of materials, systems or equipment is required by the Contract Documents, either directly or implied for a complete and workable system, Garver shall be entitled to rely upon such submittal or implied certification to establish that the materials, systems or equipment will meet the performance criteria required by the Contract Documents. D. Issue instructions to the Contractor on behalf of the Owner and issue necessary clarifications (respond to RFIs) regarding the construction contract documents. E. Review the Contractor's progress payment requests based on contractor provided quantities of contract items accepted and Garver will make a recommendation to the Owner regarding payment. Pay Applications and Documentation to meet ARDOT requirements. Garver's recommendation for payment shall not be a representation that Garver has made exhaustive or continuous inspections to (1) check the quality or exact quantities of the Work; (2) to review billings from Subcontractors and material suppliers to substantiate the Contractor's right to payment; or (3) to ascertain how the Contractor has used money previously paid to the Contractor. F. Prepare and furnish a record survey and record drawings. G. Provide part-time resident construction observation services for the 300-calendar-day construction contract performance time. The proposed fee is based on approximately 4 hours per day, 5 days per week, during the 300-calendar-day construction contract performance time. If the construction time extends beyond the time established in this agreement or if the Owner wishes to increase the time or frequency of the observation, the Owner will pay Garver an additional fee agreed to by the Owner and Garver. H. When authorized by the Owner, prepare change orders for changes in the work from that Appendix A - Scope of Services 8 of 10 20T21050 School/College Ave. Corridor Improvements — Amendment 2 originally provided for in the construction contract documents. If redesign or substantial engineering or surveying is required in the preparation of these change order documents, the Owner will pay Garver an additional fee to be agreed upon by the Owner and Garver. I. Participate in final project inspection, prepare punch list, review final project closing documents, and submit final pay request.' Construction observation services will be provided by Garver's Resident Project Representative, who will provide or accomplish the following: A. Consult with and advise the Owner during the construction period. B. Coordinate with the firm providing construction materials quality assurance testing under separate contract with the Owner. C. Maintain a file of quantities incorporated into the work, test reports, certifications, shop drawings and submittals, and other appropriate information. D. Maintain a project diary which will contain information pertinent to each site visit. In performing construction observation services, Garver will endeavor to protect the Owner against defects and deficiencies in the work of the Contractor(s); but Garver cannot guarantee the performance of the Contractor(s), nor be responsible for the actual supervision of construction operations or for the safety measures that the Contractor(s) takes or should take. However, if at any time during construction Garver observes that the Contractor's work does not comply with the construction contract documents, Garver will notify the Contractor of such non-compliance and instruct him to correct the deficiency and/or stop work, as appropriate for the situation. Garver will also record the observance, the discussion, and the actions taken. If the Contractor continues without satisfactory corrective action, Garver will notify the Owner immediately, so that appropriate action under the Owner's contract with the Contractor can be taken. 12. Project Deliverables (No Amendment No. 2 changes to the previous scope of work) The following will be submitted to the Owner, or others as indicated, by Garver: A. Digital copy of the Environmental NEPA Document. B. Public Involvement Exhibits. C. Digital copy of the Conceptual Designs with opinion of probable construction cost. D. Digital copy of the Preliminary Designs with opinion of probable construction cost. E. Digital copy of the Preliminary Plans to each potentially affected utility company. F. Digital copy of the Final Design with opinion of probable construction cost. G. Three hard copies of the revised Final Design with opinion of probable construction cost. H. Digital copy of the revised Final Plans to each potentially affected utility company. I. Three hard copies of the Final Plans and Specifications to the Contractor. J. Digital copies of the right-of-way and/or easement acquisition documents. K. Electronic files as requested. 13. Extra Work (No Amendment No. 2 changes to the previous scope of work) The following items are not included under this agreement but will be considered as extra work: A. Redesign for the Owner's convenience or due to changed conditions after previous alternate direction and/or approval. B. Submittals or deliverables in addition to those listed herein. C. Geotechnical Services including pavement design. D. ARDOT Survey/Drawings. E. Design of any utilities relocation other than for minor water and sewer adjustments. F. Design of a new Sublett Creek Crossing of College Avenue. G. Construction phase services. H. Environmental Handling and Documentation beyond what is specified in the scope of services. Appendix A - Scope of Services 9 of 10 20T21050 School/College Ave. Corridor Improvements — Amendment 2 I. Development of a HEC-RAS and HEC-HMS models for Sublett Creek. Coordination with FEMA and preparation/submittal of a CLOMR and/or LOMR. Extra Work will be as directed by the Owner in writing for an addition fee as agreed upon by the Owner and Garver. 14. Schedule (No Amendment No. 2 changes to the previous scope of work) Garver shall begin work under this Agreement within ten (10) days of a Notice to Proceed and shall complete the work in accordance with the schedule below: Phase Description Surveys — Utilities and Property NEPA Documentation (Project portion with State/Federal Funds only) Conceptual Design Preliminary Design Final Design Property Acquisition Documents Calendar Days 75 days from Notice to Proceed 150 days from Notice to Proceed 120 days from Notice to Proceed 90 days from approval of Conceptual Design 60 days from approval of Preliminary Design 60 days from approval of Final Design Appendix A - Scope of Services 10 of 10 20T21050 School/College Ave. Corridor Improvements — Amendment 2 Appendix B - Amendment No. 2 City of Fayetteville School/College Avenue Corridor Improvements TOTAL FEE SUMMARY Title I Service Original Estimated Fees Amendment No.1 Estimated Fees Amendment No.2 Fee Adjustments Total Estimated Fees Programming $ 224,350.00 $ (19,200.00) $ - $ 205,150.00 School Avenue (MILK Jr. Blvd. to 15th Street) $ - $ 306,660.00 $ (292,020.00) $ 14,640.00 College Avenue (North St. to Sycamore St.) $ $ 457,965.00 $ 286,685.00 $ 744,650.00 College Avenue (Sycamore St. to Township St.) $ $ 230,810.00 $ (134,040.00) $ 96,770.00 Subtotal for Title I Service $ 224,350.00 $ 976,235.00 1 $ (139,375.00) $ 1,061,210.00 Title II Service Original Estimated Fees Amendment No.1 Estimated Fees Amendment No.2 Fee Adjustments Total Estimated Fees CE&I College Avenue (North St. to Sycamore St.) $ $ $ 244,250.00 $ 244,250.00 Subtotal for Title 11 Service $ - $ - $ 244,250.00 $ 244,250.00 GARVER CREDIT - PROJECT MANAGER CHANGE $ (30,000.00) $ (30,000.00) PROJECT FEE TOTALS $ 224,350.00 $ 976,235.00 $ 74,875.00 $ 1,275,460.00 L \2020\20T21050 - Fayetteville College Avenue Improvements\Contracts\Client\DraftWmendment No. 2\Exhibit B - Garver Fee Spreadsheet - Amendment 2 Appendix B - Amendment No. 2 City of Fayetteville School/College Avenue Corridor Improvements FEE SUMMARY - SCHOOL AVENUE (MLK JR. BLVD. TO 15TH ST.) Title I Service Amendment No. 1 Amendment No. 2 TOTAL Estimated Fees Adjusted Fees ADJUSTMENTS Utility Locates (ARKUPS) $ 7,520.00 $ 190.00 $ (7,330.00) Property Title (WACO) $ - $ - $ Surveying $ 25,800.00 $ 6,160.00 $ (19,640.00) Environmental $ 2,850.00 $ 180.00 $ (2,670.00) Design Meetings $ 26,670.00 $ 2,150.00 $ (24,520.00) Garver $ 13,300.00 $ 2,150.00 RDG $ 13 370.00 $ Conceptual Design $ 57,720.00 $ 5,100.00 $ (52,620.00) Civil Engineering (Garver) $ 32,970.00 $ 5,100.00 Landscape Architecture, Lighting, Planning RDG' $ 24,750.00 $ - Si nalization Design $ 44 330.00 $ 860.00 $ 43,470.00 Preliminary Design $ 78,610.00 $ - $ (78,610.00) Civil Engineering (Garver) $ 48,230.00 $ Landscape Architecture, Lighting, Plannin RDG' $ 30,380.00 $ Final Design $ 55,170.00 $ $ (55,170.00) Civil Engineering (Garver) $ 43,210.00 $ Landscape Architecture RDG $ 11 960.00 $ Property Acquisition - (EXCLUDED) $ - $ $ Bidding $ 7,990.00 $ $ (7,990.00) Garver $ 3,250.00 $ RDG $ 4,740.00 $ Subtotal for School Avenue (MLK Jr. Blvd. to 15th Street) $ 306,660.00 1 $ 14,640.00 $ (292,020.00) L:\2020\20T21050 - Fayetteville College Avenue Improvements\Contracts\Client\Draft\Amendment No. 2\Exhibit B - Garver Fee Spreadsheet - Amendment 2 Appendix B - Amendment No. 2 City of Fayetteville School/College Avenue Corridor Improvements SURVEYS - SCHOOL AVENUE (MLK JR. BLVD. TO 15TH STREET) WORK TASK DESCRIPTION E-3 S-5 S-4 S-3 2-Man Crew (Survey) 2-Man Crew GPS Survey) T 2 $160.00 $172.00 $130.00 $91.00 $208.00 $228.00 $105.00 hr hr hr hr hr hr hr 1. Project Management Administration and Coordination 2 Quality Control Review 2 Submittals to Client Subtotal - Project Management 0 4 0 0 0 0 0 2. Topographic Survey Establish Horizontal and Vertical Control Points 2 8 Utility Locates 6 8 7 Topographic Surveys Data Processing/Preparation 2 Subtotal - Topographic Survey 0 0 2 6 10 8 7 3. Property Survey Survey Layout Map Property Surveys Establish Existing Right of way Data Processing/Preparation ubfotal-Property Survey 0 0 0 0 0 0 0 Hours 10 Salary Costs $0.00 $688.00 $260.00 $546.00 $2,080.00 $1,824.00 $735.00 SUBTOTAL - SALARIES: $6,133.00 DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $7.00 Survey Supplies $0.00 Travel Costs $20.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $27.00 TOTAL FEE: $6,160.00 Appendix B - Amendment No. 2 City of Fayetteville School/College Avenue Corridor Improvements ENVIRONMENTAL - SCHOOL AVENUE (MLK JR. BLVD. TO 15TH ST.) WORK TASK DESCRIPTION E-6 E-5 P-4 P-3 P-2 P-1 T-1 X-3 X-2 $280.00 $228.00 $239.00 $209.00 $172.00 $137.00 $83.00 $123.00 $89.00 hr hr hr hr hr hr hr hr hr 1. Project Management Administration and Coordination Quality Control Review Submittals to Client Subtotal - Project Management 0 0 0 0 0 0 0 0 0 2. Environmental SWPPP 1 Subtotal - Environmental 0 0 0 0 1 0 0 0 0 Hours 0 0 0 0 1 0 0 0 0 Salary Costs $0.00 $0.00 $0.00 $0.00 $172.00 $0.00 $0.00 $0.00 $0.00 SUBTOTAL - SALARIES: $172.00 DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $8.00 Postage/Freight/Courier $0.00 Permitting Fees (SWPPP) $0.00 Travel Costs $0.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $8.00 TOTAL FEE: $180.00 Appendix B - Amendment No. 2 City of Fayetteville School/College Avenue Corridor Improvements DESIGN MEETINGS - SCHOOL AVENUE (MLK JR. BLVD. TO 15TH ST.) WORK TASK DESCRIPTION E-6 E-4 E-3 E-1 T-1 P-1 P-2 $280.00 $187.00 $160.00 $114.00 $83.00 $137.00 $172.00 hr hr hr hr hr hr hr 1. Public Involvement Kick -Off Meeting 1 1 Progress Meetings Stakeholder Meetings (S. School- 11 property owner contacts) Review Meetings 2 3 5 Transportation Committee Meetings (2 each) Arts Council Meetings (1 each) Public Involvement Meetings (2 each) Active Transportation Committee Meeting (1 each) Subtotal - Public Involvement 2 4 0 0 0 6 0 Hours 2 4 0 0 0 6 0 Salary Costs $560.00 $748.00 $0.00 $0.00 $0.00 $822.00 $0.00 SUBTOTAL - SALARIES: DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $15.00 Postage/Freight/Courier $0.00 Travel Costs $5.00 $2,130.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $20.00 SUBTOTAL: $2,150.00 SUBCONSULTANTS FEE: (RDG Planning & Design) $0.00 TOTAL FEE: $2,150.00 Appendix B - Amendment No. 2 City of Fayetteville School/College Avenue Corridor Improvements CONCEPTUAL DESIGN - SCHOOL AVENUE (MLK JR. BLVD. TO 15TH ST.) WORK TASK DESCRIPTION E-6 E-5 E-4 E-3 E-2 E-1 T-1 $280.00 $228.00 $187.00 $160.00 $132.00 $114.00 $83.00 hr hr hr hr hr hr hr 1. Project Management Administration and Coordination 1 Quality Control Review Subtotal - Project Management 1 0 0 0 0 0 0 2. Civil Engineering Conceptual Plans Review ARDOT Intersection Plans 1 5 15th Street Intersection Layout 1 6 7 3 Sidewalk/Parking Lot Layout Review Street Improvements - Plan & Profiles Driveways School Avenue Drainage Modifications Conceptual Pavement Markings Utility Relocation Route Alternatives Utility Companies Coordination Coordination with ARDOT 1 Coordination with City 2 2 Quantities Opinion of Probable Construction Cost Subtotal - Civil Engineering 4 0 14 0 0 7 3 Hours 5 0 14 0 0 7 3 Salary Costs $1,400.00 $0.00 $2,618.00 $0.00 $0.00 $798.00 $249.00 SUBTOTAL - SALARIES: $5,065.00 DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $30.00 Postage/Freight/Courier $0.00 Travel Costs $5.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $35.00 SUBTOTAL: RDG SUBCONSULTANTS FEE: $5,100.00 $0.00 TOTAL FEE: $5,100.00 Appendix B - Amendment No. 2 City of Fayetteville School/College Avenue Corridor Improvements SIGNALIZATION DESIGN - SCHOOL AVE (MLK JR. BLVD. TO 15TH ST.) WORK TASK DESCRIPTION E-6 E-5 E-4 E-3 E-2 E-1 T-1 $280.00 $228.00 $187.00 $160.00 $132.00 $114.00 $83.00 hr hr hr hr hr hr hr 1. Project Management Administration and Coordination Quality Control Review Submittals to Client Subtotal - Project Management 0 0 1 0 0 0 1 0 0 2. Preliminary (1 Signal Mod, 1 HAWK Mod, 1 RRFB) Review of ARDOT 15th Street Signalization Plans 1 3 Traffic Signal Notes Street Name Signs Signal Layout (Reference File) (Includes HAWK) 60 Scale Sheets 40 Scale Sheets Wiring Diagrams Charts Sheets Wheelchair Ramp Layout and Details RRFB Standard Details and Plan Sheet Summary of Quantities Conduit Capacity Calculations Plan Check Plan Submittal and Corrections Subtotal - Preliminary (1 Signal Mod, 1 HAWK Mod, 1 RRFB) 1 0 3 0 0 0 0 3. Final (1 Signal Mod, 1 HAWK Mod, 1 RRFB) Signal Plan Updates RRFBs Update Quantity Updates Special Provisions Construction Cost Estimate Plan Check Plan Submittal and Corrections Subtotal - Final (1 Signal Mod, 1 HAWK Mod, 1 RRFB) 0 0 1 0 0 1 0 1 0 0 Hours Costs SUBTOTAL -SALARIES DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly Postage/Freight/Courier Travel Costs SUBTOTAL - DIRECT NON -LABOR EXPENSES: 1 0 3 0 0 0 0 $280.00 $0.00 $561.00 $0.00 $0.00 $0.00 $0.00 $841.00 $19.00 $0.00 $0.00 $19.00 TOTAL FEE: $860.00 Appendix B - Amendment No. 2 City of Fayetteville School/College Avenue Corridor Improvements FEE SUMMARY - COLLEGE AVENUE (NORTH ST. TO SYCAMORE ST.) Title I Service Amendment No. 1 Amendment No. 2 TOTAL Estimated Fees Adjusted Fees ADJUSTMENTS Utility Locates (ARKUPS) $ 2,000.00 $ - $ (2,000.00) Property Title (WACO) $ 15,750.00 $ 7,500.00 $ (8,250.00) Surveying $ 85,550.00 $ 69,210.00 $ (16,340.00) Environmental $ 38,350.00 $ 28,300.00 $ (10,050.00) Design Meetings $ 33,060.00 $ 56,120.00 $ 23,060.00 Garver $ 18,800.00 $ 34,900.00 RDG $ 14,260.00 $ 21,220.00 Conceptual Design $ 68,020.00 $ 53,600.00 $ (14,420.00) Civil Engineering (Garver) $ 41,600.00 $ 41,600.00 Landscape Architecture, Lighting, Planning RDG $ 26,420.00 $ 12,000.00 Si nalization Design $ 44,330.00 $ 84,590.00 $ 40,260.00 Preliminary Design $ 90,660.00 $ 118,810.00 $ 28,150.00 Civil Engineering (Garver) $ 58,200.00 $ 109,530.00 Landscape Architecture, Lighting, Plannin RDG $ 32,460.00 $ 9,280.00 Final Design $ 70,900.00 $ 308,520.00 $ 237,620.00 Civil Engineering (Garver) $ 58,150.00 $ 256,520.00 Landscape Architecture, Lighting, Planning RDG $ 12,750.00 $ 52,000.00 Bidding $ 9,345.00 $ 18,000.00 $ 8,655.00 Garver $ 4,340.00 $ 15,000.00 RDG $ 5,005.00 $ 3,000.00 Subtotal for College Avenue (North St. to Sycamore St.) $ 457,965.00 $ 744,650.00 $ 286,685.00 L:\2020\20T21050 - Fayetteville College Avenue Improvements\Contracts\Client\Dmft\Amendment No. 2\Exhibit B - Garver Fee Spreadsheet- Amendment 2 Appendix B - Amendment No. 2 City of Fayetteville School/College Avenue Corridor Improvements SURVEYS - COLLEGE AVENUE (NORTH ST. TO SYCAMORE ST.) WORK TASK DESCRIPTION E-3 S-5 S-4 S-3 2-Man Crew (Survey)GPS 2-Man Crew Surve T 2 $160.00 $172.00 $130.00 $91.00 $208.00 $228.00 $105.00 hr hr hr hr hr hr hr 1. Project Management Administration and Coordination 2 Quality Control Review 2 Submittals to Client 1 1 Subtotal - Project Management 0 5 1 0 j 0 0 0 2. Topographic Survey Establish Horizontal and Vertical Control Points 2 2 2 8 Utility Locates (New Utilities not in McClelland Survey) 2 2 4 4 16 Topographic Surveys 1 1 2 8 Data Processing/Preparation 2 20 20 Subtotal - Topographic Survey 0 7 25 4 8 32 20 3. Property Survey Survey Layout Map 4 Property Surveys 10 10 20 105 Establish Existing Right of way 4 8 12 Data Processing/Preparation 30 80 Subtotal - Property Survey 0 48 98 0 32 105 0 Hours 0 60 124 4 40 137 20 Salary Costs $0.00 $10,320.00 $16,120.00 $364.00 $8,320.00 $31,236.00 $2,100.00 SUBTOTAL - SALARIES: DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $80.00 Survey Supplies $25.00 Travel Costs $645.00 $68,460.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $750.00 TOTAL FEE: $69,210.00 Appendix B - Amendment No. 2 City of Fayetteville School/College Avenue Corridor Improvements ENVIRONMENTAL - COLLEGE AVENUE (NORTH ST. TO SYCAMORE ST.) WORK TASK DESCRIPTION E-6 E-5 P-4 P-3 P-2 P-1 T-1 X-3 X-2 $280.00 $228.00 $239.00 $209.00 $172.00 $137.00 $83.00 $123.00 $89.00 hr hr hr hr hr hr hr hr hr 1. Project Management Administration and Coordination 1 Quality Control Review 1 1 Submittals to Client 1 Subtotal - Project Management 0 0 1 0 3 0 0 0 0 2. Environmental Environmental Data Collection 2 6 Constraints mapping 12 6 Wetland delineation and report 2 8 Noise study (NA) Agency and Tribal Coordination/letters 2 8 Design Alternatives Coordination 2 2 2 4(f) De minimis evaluation & coordination (NA) Tier 3 CE Environmental Document Draft CE preparation and submittal 1 6 10 Revisions to CE draft 1 8 Final CE preparation and submittal 1 2 8 Construction Plan Review and Special Provisions 2 2 2 SWPPP 2 8 2 Subtotal - Environmental 0 0 2 0 33 66 6 0 0 3. Public Involvement Virtual public meeting preparation, websites (incl. Spanish), flyers, radio & newspaper ads 1 6 2 10 15 Coordination with Client and ARDOT 1 1 1 2 PI synopsis 1 1 8 2 4 Subtotal - Public Involvement 0 0 3 0 8 11 0 14 19 Hours 0 0 6 0 44 77 6 14 19 Salary Costs $0.00 $0.00 $1,434.00 $0.00 $7,568.00 $10,549.00 $498.00 $1,722.00 $1,691.00 SUBTOTAL - SALARIES: $23,462.00 DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $60.00 Postage/Freight/Courier $18.00 Legal Advertisements - Public Meeting Newspaper Ad $500.00 Permitting Fees (SWPPP) $200.00 Travel Costs $60.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: SUBTOTAL: SUBCONSULTANTSFEE: $838.00 $24,300.00 $4,000.00 Flat Earth - Cultural & Historic Resources TOTAL FEE: $28,300.00 Appendix B - Amendment No. 2 City of Fayetteville School/College Avenue Corridor Improvements DESIGN MEETINGS - COLLEGE AVENUE (NORTH ST. TO SYCAMORE ST.) WORK TASK DESCRIPTION E-6 E-4 E-3 E-1 T-1 P-1 P-2 $280.00 $187.00 $160.00 $114.00 $83.00 $137.00 $172.00 hr hr hr hr hr hr hr 1. Public Involvement Kick -Off Meeting 1 2 2 Progress Meetings 3 4 4 Stakeholder Meetings (N College 24 property owner contacts) 1 2 42 Review Meetings 2 2 2 Transportation Committee Meetings (2 each) 2 2 3 2 2 Arts Council Meetings (1 each) 1 1 1 Public Involvement Meetings (2 each) 3 6 6 3 15 Active Transportation Committee Meeting (1 each) 1 1 Subtotal - Public Involvement 14 19 0 9 5 69 0 Hours Salary Costs SUBTOTAL - SALARIES: 14 19 0 9 5 69 0 $3,920.00 $3,553.00 $0.00 $1,026.00 $415.00 $9,453.00 $0.00 DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $400.00 Postage/Freight/Courier $0.00 Travel Costs $33.00 $18,367.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $433.00 TOTAL FEE: $18,800.00 Appendix B - Amendment No. 2 City of Fayetteville School/College Avenue Corridor Improvements CONCEPTUAL DESIGN - COLLEGE AVENUE (NORTH ST. TO SYCAMORE ST.) WORK TASK DESCRIPTION E-6 E-5 E-4 E-3 E-2 E-1 T-1 $280.00 $228.00 $187.00 $160.00 $132.00 $114.00 $83.00 hr hr hr hr hr hr hr 1. Project Management Administration and Coordination 8 8 Quality Control Review 6 4 Subtotal - Project Management 14 0 12 0 0 0 0 2. Civil Engineering Conceptual Plans Base Plan Setup 4 3 Typical Sections 1 2 6 3 Sidewalk/Parking Lot Layout Review 2 6 3 Street Improvements - Plan & Profiles 3 16 40 60 Driveways 1 3 3 1 2 College Avenue Drainage Modifications 1 4 12 4 Conceptual Pavement Markings 1 4 6 3 Utility Relocation Route Alternatives 2 8 3 Utility Companies Coordination 1 8 Coordination with ARDOT 4 12 Coordination with City 2 4 Quantities 3 8 Opinion of Probable Construction Cost 1 2 4 Subtotal - Civil Engineering 19 0 76 0 0 82 78 Hours 33 0 88 0 0 82 78 Salary Costs $9,240.00 $0.00 $16,456.00 $0.00 $0.00 $9,348.00 $6,474.00 SUBTOTAL - SALARIES: DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $62.00 Postage/Freight/Courier $0.00 Travel Costs $20.00 $41,518.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $82.00 TOTAL FEE: $41,600.00 Appendix B - Amendment No. 2 City of Fayetteville School/College Avenue Corridor Improvements SIGNALIZATION DESIGN - COLLEGE AVENUE (NORTH ST. TO SYCAMORE ST.) WORK TASK DESCRIPTION E-6 E-5 E-4 E-3 E-2 E-1 T-1 $303.00 $247.00 $203.00 $174.00 $143.00 $124.00 $90.00 hr hr hr hr hr hr hr 1. Project Management Administration and Coordination 4 Quality Control Review 8 10 Submittals to Client 2 Subtotal - Project Management 8 0 16 0 0 0 0 2. Preliminary (2 Signal Mod) Site Visit 4 Traffic Signal Notes 2 Street Name Signs 2 2 Signal Layout (Reference File) 12 32 24 60 Scale Sheets 4 14 16 40 Scale Sheets 4 16 12 Wiring Diagrams 2 8 10 Charts Sheets 2 6 10 Wheelchair Ramp Layout and Details 2 8 16 12 Summary of Quantities 2 2 6 12 Conduit Capacity Calculations 2 2 Plan Check 10 10 8 Plan Submittal and Corrections 1 2 12 12 Subtotal - PreliminarySignal o 15 0 48 0 120 118 0 3. Final (2 Signal Mod) Signal Plan Updates 18 40 52 Quantity Updates 4 8 12 Special Provisions 4 8 Construction Cost Estimate 4 4 Plan Check 4 12 Plan Submittal and Corrections 4 4 8 12 Subtotal - Final (2 Signalo 16 0 50 0 68 64 0 Hours 39 0 114 0 188 182 Salary Costs $11,817.00 $0.00 $23,142.00 $0.00 $26,884.00 $22,568.00 $0.00 SUBTOTAL - SALARIES: $84,411.00 DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $60.00 Postage/Freight/Courier $0.00 Travel Costs $119.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $179.00 TOTAL FEE: $84,590.00 Appendix B - Amendment No. 2 City of Fayetteville School/College Avenue Corridor Improvements PRELIMINARY DESIGN - COLLEGE AVENUE (NORTH ST. TO SYCAMORE ST.) WORK TASK DESCRIPTION E-6 E-5 E-4 E-3 E-2 E-1 T-1 $303.00 $247.00 $203.00 $174.00 $143.00 $124.00 $90.00 hr hr hr hr hr hr hr 1. Project Management Administration and Coordination 8 8 Quality Control Review 6 8 Subtotal - Project Management 14 0 16 0 0 0 0 2. Civil Engineering Preliminary Plans Typical Sections 2 3 2 Sidewalk/Parking Lot Layout & Grading 2 40 80 100 Street Plan & Profile Sheets 2 30 84 90 Driveways 1 20 36 40 Parking Lot Drainage Improvements 12 24 12 Pavement Marking/Street Signage Plans 2 6 8 12 Address City/ARDOT Review Comments 2 8 16 16 Coordination with Utility Companies 2 20 Coordination with City 4 12 Coordination with ARDOT 3 12 Quantities 4 12 Opinion of Probable Construction Cost 1 2 3 Subtotal - Civil Engineering 19 0 168 0 0 266 272 3. Structural Engineering Retaining Wall Layout 5 20 12 Subtotal - Structural Engineering 0 0 5 0 0 20 12 Hours 33 0 189 0 0 286 284 Salary Costs $9,999.00 $0.00 $38,367.00 $0.00 $0.00 $35,464.00 $25,560.00 SUBTOTAL - SALARIES: $109,390.00 DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $100.00 Postage/Freight/Courier $0.00 Travel Costs $40.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $140.00 TOTAL FEE: $109,530.00 Appendix B - Amendment No. 2 City of Fayetteville School/College Avenue Corridor Improvements FINAL DESIGN - COLLEGE AVENUE ( NORTH ST. TO SYCAMORE ST.) WORK TASK DESCRIPTION E-6 E-5 E-4 E-3 E-2 E-1 T-1 $303.00 $247.00 $203.00 $174.00 $143.00 $124.00 $90.00 hr hr hr hr hr hr hr 1. Project Management Administration and Coordination 16 8 Quality Control Review 8 10 Subtotal - Project Management 24 0 18 0 0 0 0 2. Civil Engineering Final Plans Typical Sections 4 6 8 General Sity Layout and Survey Control 8 1 12 20 Roadway Drainage Plan & Profile 4 20 28 20 Intersection Grading & Layout 4 14 28 20 Sidewalks/Parking Lot Layout & Grading 6 32 70 50 Street Plan & Profile Sheets 8 22 40 40 Driveways 6 24 36 20 Parking Lot Drainage 6 16 30 34 Pavement Markings & Signage Plans 4 8 16 12 Water & Sewer Coordination 10 24 20 8 MOT Plan for Street & Water/Sewer 10 22 30 40 VA Property Plans 6 16 36 50 Typical Details 4 6 8 Special Details 3 6 12 16 Erosion Control Plans 6 10 12 Address City/ARDOT Review Comments 4 12 20 12 Coordination with Utility Companies 12 36 22 Coordination and Meetings with City 12 20 10 Coordination with adjacent Property Owners 12 24 20 Coordination with ARDOT 6 16 6 Specifications/Contract Documents 2 18 10 Quantities 4 10 16 Opinion of Probable Construction Cost 2 6 8 Plan Revisions after 1st Bid 6 20 30 26 Subtotal - Civil Engineering 127 0 388 0 1 0 522 396 3. Structural Engineering Retaining Wall Layout/Elevations 8 28 36 24 Retaining Wall Details 4 10 12 16 Retaining Wall Specifications 2 8 6 Quantities 2 8 12 Subtotal - Structural Engineering 16 0 54 0 0 66 40 Hours 167 0 460 0 0 588 436 Salary Costs $50,601.00 $0.00 $93,380.00 $0.00 $0.00 $72,912.00 $39,240.00 SUBTOTAL - SALARIES: $256,133.00 DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $155.00 Travel Costs $232.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $387.00 TOTAL FEE: $256,520.00 Appendix B - Amendment No. 2 City of Fayetteville School/College Avenue Corridor Improvements BIDDING SERVICES - COLLEGE AVENUE (NORTH ST. TO SYCAMORE ST.) WORK TASK DESCRIPTION E-6 E-4 E-3 E-1 T-1 $315.00 $211.00 $180.00 $129.00 $94.00 hr hr hr hr hr 1. Civil Engineering Coordination with City Purchasing Division 12 Addendums/Inquiries 2 24 Coordination with ARDOT 8 Pre -Bid Meeting 2 8 Bid Opening 1 3 Prepare bid tabulation - Not Applicable Evaluate bids and recommend award 3 Prepare construction contracts 4 Notice to Proceed 1 Subtotal - Civil Engineering 5 63 0 0 0 Hours Salary Costs SUBTOTAL - SALARIES: 5 63 0 0 0 $1,575.00 $13,293.00 $0.00 $0.00 $0.00 DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $50.00 Postage/Freight/Courier $0.00 Travel Costs $82.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $14,868.00 $132.00 TOTAL FEE: $15,000.00 Appendix B -Amendment No. 2 City of Fayetteville School/College Avenue Corridor Improvements FEE SUMMARY - COLLEGE AVENUE (SYCAMORE ST. TO TOWNSHIP ST.) Title I Service Amendment No. 1 Amendment No. 2 TOTAL Estimated Fees Adjusted Fees ADJUSTMENTS Utility Locates (ARKUPS) $ 2,000.00 $ $ (2,000.00) Property Title (WACO) $ - $ $ Surveying $ 21,510.00 $ 13,020.00 $ (8,490.00) Environmental $ 6,250.00 $ 150.00 $ (6,100.00) Design Meetings $ 22,180.00 $ 4,400.00 $ (17,780.00) Garver $ 15,500.00 $ 4,400.00 RDG $ 6,680.00 $ Conceptual Design $ 45,640.00 $ 59,540.00 $ 13,900.00 Civil Engineering (Garver) $ 33,260.00 $ 44,250.00 Landscape Architecture, Lighting, Planning RDG $ 12,380.00 $ 15,290.00 Si nalization Design $ 22,990.00 $ 1,200.00 $ (21,790.00) Preliminary Design $ 59,380.00 $ 18,460.00 $ (40,920.00) Civil Engineering (Garver) $ 44,150.00 $ 18,460.00 Landscape Architecture, Lighting, Planning RDG $ 15,230.00 $ Final Design $ 45,275.00 $ - $ (45,275.00) Civil Engineering (Garver) $ 39,300.00 $ Landscape Architecture, Lighting, Planning RDG $ 5,975.00 $ Property Acquisition - (EXCLUDED) $ - $ $ Bidding $ 5,585.00 $ $ (5,585.00) Garver $ 3,250.00 $ RDG $ 2,335.00 $ Subtotal for College Avenue (Sycamore St. to Township St.) $ 230,810.00 $ 96,770.00 $ (134,040.00) L:\2020\20T21050 - Fayetteville College Avenue Improvements\Contracts\Client\Draft\Amendment No. 2\Exhibit B - Garver Fee Spreadsheet - Amendment 2 Appendix B - Amendment No. 2 City of Fayetteville School/College Avenue Corridor Improvements SURVEYS - COLLEGE AVENUE (SYCAMORE ST. TO TOWNSHIP ST.) WORK TASK DESCRIPTION E-3 S-5 S-4 S-3 2-Man Crew (Survey) 2-Man Crew GPS Survey) T 2 $160.00 $172.00 $130.00 $91.00 $208.00 $228.00 $105.00 hr hr hr hr hr hr hr 1. Project Management Administration and Coordination 2 Quality Control Review 2 Submittals to Client 1 1 Subtotal - Project Management 0 5 1 0 0 0 0 2. Topographic Survey Establish Horizontal and Vertical Control Points 2 2 2 8 Utility Locates (New Utilities not in McClelland Survey) Topographic Surveys 1 1 2 7 Data Processing/Preparation 2 10 9 Subtotal - Topographic Survey 0 5 13 0 4 15 9 3. Property Survey Survey Layout Map Property Surveys Establish Existing Right of way 4 8 12 Data Processing/Preparation Subtotal - Property Survey 0 4 8 0 12 0 0 Hours 0 14 22 0 16 15 9 Salary Costs $0.00 $2,408.00 $2,860.00 $0.00 $3,328.00 $3,420.00 $945.00 SUBTOTAL - SALARIES: DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $10.00 Survey Supplies $5.00 Travel Costs $44.00 $12,961.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $59.00 TOTAL FEE: $13,020.00 Appendix B - Amendment No. 2 City of Fayetteville School/College Avenue Corridor Improvements ENVIRONMENTAL - COLLEGE AVENUE (SYCAMORE ST. TO TOWNSHIP ST.) WORK TASK DESCRIPTION E-6 E-5 P-4 P-3 P-2 P-1 T-1 X-3 X-2 $280.00 $228.00 $239.00 $209.00 $172.00 $137.00 $83.00 $123.00 $89.00 hr hr hr hr hr hr hr hr hr 1. Project Management Administration and Coordination Quality Control Review Submittals to Client Subtotal - Project Management 0 0 0 0 0 0 0 0 0 2. Environmental Wetland delineation and report Environmental Permit Applications (404 NWP, STAR, SWPPP) 1 Subtotal - Environmental 0 0 0 0 0 1 0 0 0 Hours 0 0 0 0 0 1 0 0 0 Salary Costs $0.00 $0.00 $0.00 $0.00 $0.00 $137.00 $0.00 $0.00 $0.00 SUBTOTAL - SALARIES: $137.00 DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $13.00 Postage/Freight/Courier $0.00 Legal Advertisements - Public Meeting Newspaper Ad $0.00 Permitting Fees (NWP, SWPPP, STAR) $0.00 Travel Costs $0.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $13.00 TOTAL FEE: $150.00 Appendix B - Amendment No. 2 City of Fayetteville School/College Avenue Corridor Improvements DESIGN MEETINGS - COLLEGE AVENUE (SYCAMORE ST. TO TOWNSHIP ST.) WORK TASK DESCRIPTION E-6 E-4 E-3 E-1 T-1 P-1 P-2 $280.00 $187.00 $160.00 $114.00 $83.00 $137.00 $172.00 hr hr hr hr hr hr hr 1. Public Involvement Kick -Off Meeting 1 1 1 Progress Meetings 1 0.5 2 Stakeholder Meetings (S. School- 11 property owner contacts, N College 41 property owner contacts) 2 20 Review Meetings Transportation Committee Meetings (2 each) Arts Council Meetings (1 each) Public Involvement Meetings (2 each) Active Transportation Committee Meeting (1 each) Subtotal - Public Involvement 2 3.5 0 0 0 23 0 Hours 2 3.5 0 0 0 23 0 Salary Costs $560.00 $654.50 $0.00 $0.00 $0.00 $3,151.00 $0.00 SUBTOTAL - SALARIES: $4,365.50 DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $24.00 Postage/Freight/Courier $0.00 Travel Costs $10.50 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $34.50 SUBTOTAL: $4,400.00 SUBCONSULTANTS FEE: (RDG Planning & Design) $0.00 TOTAL FEE: $4,400.00 Appendix B - Amendment No. 2 City of Fayetteville School/College Avenue Corridor Improvements CONCEPTUAL DESIGN - COLLEGE AVENUE (SYCAMORE ST. TO TOWNSHIP ST.) WORK TASK DESCRIPTION E-6 E-5 E-4 E-3 E-2 E-1 T-1 $280.00 $228.00 $187.00 $160.00 $132.00 $114.00 $83.00 hr hr hr hr hr hr hr 1. Project Management Administration and Coordination 6 8 Quality Control Review 5 4 Subtotal - Project Management 11 0 12 0 0 0 0 2. Civil Engineering Conceptual Plans Base Plan Setup 4 2 Typical Sections 2 6 2 Sidewalk/Parking Lot Layout Review 2 5 3 Street Improvements - Plan & Profiles 2 24 80 60 Driveways 1 8 20 7 College Avenue Drainage Modifications 1 3 12 4 Conceptual Pavement Markings 1 4 5 3 Utility Relocation Route Alternatives 1 6 3 Utility Companies Coordination 1 6 Coordination with City 2 4 Quantities 3 6 Opinion of Probable Construction Cost 1 2 4 Subtotal - Civil Engineering 12 0 71 0 0 136 81 Hours 23 0 83 0 0 136 81 Salary Costs $6,440.00 $0.00 $15,521.00 $0.00 $0.00 $15,504.00 $6,723.00 SUBTOTAL - SALARIES: $44,188.00 DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $49.00 Postage/Freight/Courier $0.00 Travel Costs $13.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $62.00 TOTAL FEE: $44,250.00 Appendix B - Amendment No. 2 City of Fayetteville School/College Avenue Corridor Improvements SIGNALIZATION DESIGN - COLLEGE AVENUE (SYCAMORE ST. TO TOWNSHIP ST.) WORK TASK DESCRIPTION E-6 E-5 E-4 E-3 E-2 E-1 T-1 $280.00 $228.00 $187.00 $160.00 $132.00 $114.00 $83.00 hr hr hr hr hr hr hr 1. Project Management Administration and Coordination 1 Quality Control Review Submittals to Client Subtotal - Project Management 0 0 1 0 0 0 0 2. Preliminary (1 New Signals, 1 RRFB) Site Visit 2 Traffic Signal Notes Street Name Signs Signal Layout (Reference File) 60 Scale Sheets 40 Scale Sheets Wiring Diagrams Charts Sheets Wheelchair Ramp Layout and Details 0.5 1 3 RRFBs Summary of Quantities Conduit Capacity Calculations Plan Check Plan Submittal and Corrections Subtotal - PreliminaryNew Signals, 1 RRFB)0.5 0 1 0 0 5 0 3. Final (1 New Signals, 1 RRFB) Signal Plan Updates RRFBs Update Quantity Updates Special Provisions Construction Cost Estimate Plan Check Plan Submittal and Corrections Subtotal - Final (11 New Signals, 0 0 0 0 0 0 0 Hours Salary Costs SUBTOTAL - SALARIES: DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly Postage/Freight/Courier Travel Costs SUBTOTAL - DIRECT NON -LABOR EXPENSES: 0.5 0 2 0 $140.00 $0.00 $374.00 $0.00 $1,084.00 $9.00 $0.00 $107.00 $116.00 TOTAL FEE: $1,200.00 0 5 0 $0.00 $570.00 $0.00 Appendix B - Amendment No. 2 City of Fayetteville School/College Avenue Corridor Improvements PRELIMINARY DESIGN - COLLEGE AVENUE (SYCAMORE ST. TO TOWNSHIP ST.) WORK TASK DESCRIPTION E-6 E-5 E-4 E-3 E-2 E-1 T-1 $280.00 $228.00 $187.00 $160.00 $132.00 $114.00 $83.00 hr hr hr hr hr hr hr 1. Project Management Administration and Coordination 2 2 Quality Control Review 2 6 Subtotal - Project Management 4 0 8 0 0 0 0 2. Civil Engineering Preliminary Plans Typical Sections 1 2 2 Sidewalk/Parking Lot Layout & Grading 1 10 24 18 Street Plan & Profile Sheets 1 10 24 18 Driveways Parking Lot Drainage Improvements College Ave. Drainage Modifications Pavement Marking/Street Signage Plans Address City/ARDOT Review Comments Coordination with Utility Companies 6 Coordination with City 2 4 Coordination with ARDOT Quantities Opinion of Probable Construction Cost Subtotal - Civil Engineering 4 0 31 0 0 50 38 Hours 39 0 0 50 38 Salary Costs $2,240.00 $0.00 $7,293.00 $0.00 $0.00 $5,700.00 $3,154.00 SUBTOTAL - SALARIES: $18,387.00 DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $50.00 Postage/Freight/Courier $0.00 Travel Costs $23.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $73.00 TOTAL FEE: $18,460.00 Appendix B - Amendment No. 2 City of Fayetteville School/College Avenue Corridor Improvements CONSTRUCTION PHASE SERVICES - COLLEGE AVENUE (NORTH ST. TO SYCAMORE ST.) WORK TASK DESCRIPTION E-6 E-4 E-2 E-1 C-3 C-2 C-1 $315.00 $211.00 $149.00 $129.00 $178.00 $146.00 $113.00 hr hr hr hr hr hr hr 1. Construction Engineering Preconstruction Meeting 2 2 3 2 Utility Coordination 16 8 Progress Meetings with Contractor/City (Monthly) 2 20 8 10 Shop Drawings/Material Submittals - Roadway 30 30 10 Coordination with Contractor/RFI Respones 24 Review and Process Monthly Pay Requests per ARDOT procedures (12 months) 4 34 12 34 Prepare and surbmit monthly progress reports per ARDOT procedures (12 months) 24 On -Site Meetings 4 16 12 Resident Construction Observation (10 month construction contract; 215 work days; avg. 4 hr/work day) 810 50 Prepare Change Orders 12 8 Final Project Inspection and Punchlist 4 4 6 Record Drawings 4 8 Construction Administration 12 16 u tota - Construction ngineenng 22 202 0 92 873 52 0 Hours 22 202 0 92 873 52 0 Salary Costs $6,930.00 $42,622.00 $0.00 $11,868.00 $155,394.00 $7,592.00 $0.00 SUBTOTAL - SALARIES: DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $220.00 SWPPP Permit Fees $500.00 Postage/Freight/Courier $20.00 Travel Costs $3,854.00 $224,406.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $4,594.00 SUBTOTAL: $229,000.00 RDG SUBCONSULTANTS FEE: $15,250.00 TOTAL FEE: $244,250.00