A RESOLUTION TO APPROVE AMENDMENT NO. 2 TO THE ENGINEERING SERVICES CONTRACT WITH
HAWKINS-WEIR ENGINEERS, INC. IN AN AMOUNT NOT TO EXCEED $226,140.00 FOR ADDITIONAL
SERVICES ASSOCIATED WITH UTILITY RELOCATIONS ALONG HIGHWAY 112, AND TO APPROVE A
BUDGET ADJUSTMENT
WHEREAS, on June 1, 2021, the City Council passed Resolution No. 164-21 approving a Professional Engineering
Services Agreement with Hawkins -Weir Engineers, Inc. for engineering services associated with the utility relocations
along Highway 112 from Truckers Drive to Howard Nickell Road associated with Arkansas Department of
Transportation Project 040746; and
WHEREAS, Amendment No. 2 is necessary to cover costs associated with re -designs where ARDOT plans have
changed to add another roundabout to the roadway design.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign
Amendment No. 2 to the engineering services contract with Hawkins -Weir Engineers, Inc. in an amount not to exceed
$226,140.00 for professional services associated with the utility relocations along Highway 112.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of
which is attached to this Resolution.
PASSED and APPROVED on July 2, 2024
Page 1
Attest: �� T EoJill �i
—v:
Kara Paxton, City C14rk Treasurer �� • ~�
�'�.,9• gRKAN' .oJ�••
"44�N i TO
CITY OF
FAYETTEVILLE
ARKANSAS
MEETING OF JULY 2, 2024
TO: Mayor Jordan and City Council
CITY COUNCIL MEMO
2024-234
THRU: Susan Norton, Chief of Staff
FROM: Tim Nyander, Utilities Director
SUBJECT: Hawkins -Weir Engineers, Inc. - Amendment No. 2 for Highway 112 Water/Sewer
Relocations (Truckers Drive to Howard Nickell Road)
RECOMMENDATION:
Staff recommends approval of Amendment No. 2 to the engineering services agreement with Hawkins -Weir
Engineers, Inc. for professional services associated with ARDOT Project 040746 Utility Relocations along
Highway 112 in an amount not to exceed $226,140.00, and approval of a budget adjustment.
BACKGROUND:
The Arkansas Department of Transportation has requested utility relocations to prepare for the widening of
Highway 112 from Truckers Drive to Howard Nickell Road. Amendment No. 1 was previously approved to
cover costs associated with significant additional effort encountered during the final design phases. This effort
included an additional 3,200-feet of pipeline design, assistance with nearby rezoning coordination that was
time -sensitive, four additional meetings with City and ARDOT for final coordination items, and additional 3-D
modeling to avoid conflicts with the final ARDOT detailing of underground pedestrian facilities.
DISCUSSION:
Amendment No. 2 is necessary to cover costs associated with re -design effort where ARDOT plans have
changed to add another round -about to the roadway design. Furthermore, due to the schedule delays
associated with the large utility relocation scope, ARDOT is willing to incorporate the City's utility relocations
into the overall ARDOT project which will allow one contractor to control schedules and work -trades onsite,
thereby expediting overall project schedules. For this to occur Hawkins -Weir must adjust all plans and specs to
match ARDOT formatting standards to be incorporated in the overall roadway drawings.
An existing agreement (Res. 218-19) between the City of Fayetteville and ARDOT is currently undergoing
revisions to incorporate the aforementioned project inclusion strategy. These amendments will be brought
forward to the City Council at a future meeting. This agreement will allow the City to pay its smaller portion of
the project at time of project bidding/award instead of fronting the entire project cost and seeking subsequent
reimbursements. Since the project is approximately 90% ARDOT and 10% City, this is a favorable
arrangement.
BUDGET/STAFF IMPACT:
Project savings from the Benson Mountain Pressure Plane Upgrade account will be moved to the Water &
Sewer Relocations account to cover the cost of this engineering amendment.
Mailing address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
ATTACHMENTS: SRF (#3), BA (#4), Amendment No. 2 (#5)
Mailing address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
== City of Fayetteville, Arkansas
Y 113 West Mountain Street
Fayetteville, AR 72701
(479)575-8323
- Legislation Text
File #: 2024-234
Hawkins -Weir Engineers, Inc. - Amendment No. 2 for Highway 112 Water/Sewer Relocations
(Truckers Drive to Howard Nickell Road)
A RESOLUTION TO APPROVE AMENDMENT NO. 2 TO THE ENGINEERING SERVICES
CONTRACT WITH HAWKINS-WEIR ENGINEERS, INC. IN AN AMOUNT NOT TO EXCEED
$226,140.00 FOR ADDITIONAL SERVICES ASSOCIATED WITH UTILITY RELOCATIONS
ALONG HIGHWAY 112, AND TO APPROVE A BUDGET ADJUSTMENT
WHEREAS, on June 1, 2021, the City Council passed Resolution No. 164-21 approving a Professional
Engineering Services Agreement with Hawkins -Weir Engineers, Inc. for engineering services associated
with the utility relocations along Highway 112 from Truckers Drive to Howard Nickell Road associated
with Arkansas Department of Transportation Project 040746; and
WHEREAS, Amendment No. 2 is necessary to cover costs associated with re -designs where ARDOT
plans have changed to add another roundabout to the roadway design.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to
sign Amendment No. 2 to the engineering services contract with Hawkins -Weir Engineers, Inc. in an
amount not to exceed $226,140.00 for professional services associated with the utility relocations along
Highway 112.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget
adjustment, a copy of which is attached to this Resolution.
Page 1
Tim Nyander
Submitted By
City of Fayetteville Staff Review Form
2024-234
Item ID
7/2/2024
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
6/13/2024 WATER SEWER (720)
Submitted Date Division / Department
Action Recommendation:
Staff recommends approval of Amendment No. 2 to the engineering services agreement with Hawkins -Weir
Engineers, Inc. for professional services associated with ARDOT Project 040746 Utility Relocations along Highway
112 in an amount not to exceed $226,140.00, and approval of a budget adjustment.
Budget Impact:
5400.720.5600-5314.00 5400.720.5700-
5314.00
Account Number
11011.2101
Project Number
Budgeted Item? Yes
Does item have a direct cost? Yes
Is a Budget Adjustment attached? Yes
Purchase Order Number:
Change Order Number:
Original Contract Number:
Comments:
Water and Sewer
Fund
Water & Sewer Relocations
Total Amended Budget
Expenses (Actual+Encum)
Available Budget
Item Cost
Budget Adjustment
Remaining Budget
Project Title
$ 11,659,260.00
$ 9,423,923.85
5 2,235,336.15
$ 226,140.00
$ 226,140.00
2,235,336.15
V20221130
2021-418 Previous Ordinance or Resolution # 218-19
2 Approval Date:
2021-00000039
City of Fayetteville, Arkansas - Budget Adjustment (Agenda)
Budget Year Division Adjustment Number
WATER SEWER (720)
/Org2
2024
Requestor: Shea Fankhouser
BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION:
A budget adjustment is needed in the Water & Sewer fund to move funds from the Benson Mountain Pressure Plane
Upgrade account to the Water & Sewer Relocations account to cover the cost of Amendment No. 2 with Hawkins -Weir
Engineers. The funds being moved are project savings from the Benson Mountain upgrade.
COUNCIL DATE: 7/2/2024
ITEM ID#: 2024-234
Holly Black
617g1202q 7:37 Pln
RESOLUTION/ORDINANCE
Budget Division Date
TYPE: D - (City Council)
JOURNAL #:
GLDATE:
CHKD/POSTED:
TOTAL
Account Number
- -
Increase / (Decrease)
Expense Revenue
Project.Sub#
Project Sub.Detl AT
v.2024522
Account Name
5400.720.5600-5808.00
(226,140) -
10006
1 EX
Improvements - Water Line
5400.720.5600-5314.00
5400.720.5700-5314.00
169,605
56,535
11011
11011
2101 EX
2101 EX
Professional Services
Professional Services
I of 1
AMENDMENT NO.2
TO THE
AGREEMENT For PROFESSIONAL ENGINEERING SERVICES
BETWEEN
CITY OF FAYETTEVILLE, ARKANSAS
AND
HAWKINS-WEIR ENGINEERS, INC.
In accordance with the AGREEMENT For PROFESSIONAL ENGINEERING SERVICES for the
Highway 112 Utility Relocation (HW Project No. 2021048), dated June 1, 2021, between the City of
Fayetteville, Arkansas (hereinafter called Owner) and Hawkins -Weir Engineers, Inc. (hereinafter called
Engineer), Owner hereby authorizes Engineer to proceed with engineering services as modified by this
Amendment No. 2.
SECTION 1— SCOPE OF SERVICES
1.1 Amendment No. 2 is for the partial redesign of the Highway 112 Utility Relocation project to
address new additions to the proposed roadway improvements by the Arkansas Department of
Transportation and reformatting of the construction drawings and specifications to allow the improvements
to be incorporated into ArDOT's roadway bidding documents. Additional services are detailed in the
Engineer's attached Scope of Services (Exhibit A) dated June 4, 2024.
SECTION 2 — TIME OF SERVICE
2.1 Engineer will proceed with providing the services set forth herein immediately upon execution of
this Authorization by all parties.
SECTION 3 — COMPENSATION
3.1 Owner shall compensate Engineer for providing the services set forth herein in accordance with the
terms of the Agreement. Total payment for Scope of Services described herein shall not exceed Two
Hundred Twenty -Six Thousand One Hundred Forty and 00/100 Dollars ($226,140.00) without written
2021048 Amendment 2.docx Page 1 of 2 June 4, 2024
approval of Owner. These additional services adjust the Agreement's total not to exceed fee to $790,750.00,
including proposed reimbursable expenses.
Attachments: Exhibit A — Scope of Services dated June 4, 2024
Exhibit B — Fee Proposal dated June 4, 2024
Exhibit C — Standard Hourly Billing Rate Structure, effective 2024
AUTHORIZATION BY:
CITY OF FAYE"1'TLV1LLL, ARKANSAS
dam/
lonorable V9held Jordan, Mayor
Date: July 2, 2024
ACCEPTED BY:
HAWKINS-WEIR ENGINEERS, INC.
By: ' U �) • C dJJL'6
Brett D. Peters, P.E.
President and CEO
Date: June 4, 2024
2021048 Amcndmcnt 2.docx Pagc 2 of 2 Junc 4, 2024
Exhibit A
Scope of Services — Amendment 2 ��
Highway 112 Utility Relocations
Fayetteville, Arkansas CITY OF
Project No. 2021048, ARDOT Job 040746 FAARKANSAS YETTEVILLE
June 4, 2024
Further Description of Basic Engineering Services and Related Matters:
Scope
The Highway 112 Utility Relocation project includes the relocation of publicly owned utilities to
precede the widening of Arkansas State Highway 112 by the Arkansas Department of
Transportation (ARDOT). The project limits are from Truckers Drive, north and west, to Howard
Nickell Road, approximately 1.4 miles. Amendment 2 to the Preliminary Engineering Agreement
includes redesign of utility relocations to accommodate the inclusion of a new traffic circle at
approximately STA 112+45 in the recently revised ARDOT roadway plans. Proposed plan
revisions also include waterline realignments due to changes in ownership on some property
tracts and coordination with the Owner's consultant on the proposed 48-in. transmission line.
A. Task 1 — Preliminary Engineering Services — Completed
B. Task 2 — Final Design Phase (ArDOT PE Agreement) — Completed
C. Reimbursable Expenses — Original Contract
D. Task 3 — Final Design Phase (ARDOT PE Agreement — Amendment 1) — Completed
E. Task 4 — Redesign Phase (ARDOT PE Agreement — Contract Amendment 2)
1. Project Management and Administration:
a. Prepare correspondence and consultation with the Owner;
b. Develop a project schedule outlining tasks and major milestones dates;
Coordinate with ARDOT on formatting utility relocation plans and specifications for
inclusion in the roadway plan set for bidding;
Provide general contract administration including the preparation of monthly status
reports for submission with each invoice.
2. Utility Coordination
a. Obtain proposed relocation plans and update locations and sizes of proposed
underground utilities from franchised utility companies;
b. Attend meetings and coordinate with franchised utility companies (specifically Black
Hills Energy and Lumen) to discuss necessary adjustments and placement of utility
lines within proposed shared utility easements.
3. Preliminary Redesign Phase (50% Design Documents)
a. Reformat utility relocation sheets and construction details to conform with ARDOT
roadway plans and submit to ARDOT for preliminary review;
2021048\Exhibit A Scope of Services Amendment 2 2024-06-04
Exhibit A
Scope of Services — Amendment 2 ��
Highway 112 Utility Relocations
Fayetteville, Arkansas CITY OF
Project No. 2021048, ARDOT Job 040746 FAARKANSAS YETTEVILLE
June 4, 2024
b. Realign water and sewer utilities and revise plans to incorporate new traffic circle in
accordance with revised ARDOT plans;
c. Coordinate with ARDOT on possible water main alignment changes across Tract 1X
(McGuire) and Tract 2X (Wheeler);
d. Coordinate with developer on transmission line and water main alignment changes
across Tract 11 (GRL 112 LLC);
e. Coordinate with developer on water main and sewer line alignment changes across
Tract 6 (112 Drive-In/The Aronson);
f. Coordinate with ARDOT on use of roadway drawings for Erosion Control and Traffic
Control;
g. Coordinate with Owner's consultant, McClelland Consulting Engineers on details for
connection to a proposed 48-in. water transmission line;
h. Prepare or update exhibits showing anticipated easement acquisitions, including
property descriptions, and submit to the Owner's right-of-way acquisition agent for
review;
Prepare 50% Redesign Opinion of Probable Utility Relocation Costs, including a
breakdown of reimbursable, non -reimbursable, and betterment expenses;
Submit one (1) half-size copy and one (1) PDF copy of the 50% Redesign Plans and
Opinion of Probable Cost for review by Owner and ARDOT;
k. Participate in 50% Redesign review meeting within thirty (30) days following submittal
of the 50% Redesign Documents.
4. Pre -Final Redesign Phase (90% Design Documents)
a. Prepare final redesign calculations, plans, profiles, details, cross sections, street
crossings, traffic detours and other items, incorporating comments from the 50%
Redesign Review Meeting;
b. Prepare or update utility construction details;
c. Update erosion and traffic control plans, incorporating ARDOT comments from
preliminary plan review;
d. Revise or prepare additional utility construction specifications in ARDOT format for
Special Conditions;
e. Identify anticipated material to be used under the Build America, Buy America
requirements;
2021048\Exhibit A Scope of Services Amendment 2 2024-06-04 2
Exhibit A
Scope of Services — Amendment 2
Highway 112 Utility Relocations
Fayetteville, Arkansas CITY OF
Project No. 2021048, ARDOT Job 040746 FA ETTE I LE
June 4, 2024
f. Provide construction bid proposal items to ARDOT to incorporate into Bid Form;
g. Prepare Final Opinion of Probable Utility Relocation Costs, including updates of
reimbursable, non -reimbursable, and betterment expenses;
h. Perform internal QA/QC Review of Final Plans;
Prepare permits (City of Fayetteville, ADEQ STAA, ARDOT Utility Permit, USACE
Section 404);
Update easement documents based on review comments and assist the City's right-
of-way acquisition agent in initial coordination meetings with property owners as
necessary, including staking of proposed easements;
k. Submit one (1) half-size copy and one (1) PDF copy of the 90% Redesign Plans and
Opinion of Probable Cost for review by Owner and ArDOT;
Participate in 90% Design review meeting with Owner and ArDOT within thirty (30)
days following submittal of the 90% Design Documents.
5. Final Redesign Phase (100% Design Documents)
a. Incorporate 90% Design review comments and QA/QC plan review comments;
b. Submit three (3) half-size copies and one (1) PDF copy of the Final Design
Documents and the Final Opinion of Probable Utility Relocation Costs;
c. Submit the Final Plans, Technical Specifications, and a Utility Relocation Cost
Estimate to the Arkansas Department of Health for review and respond to any
questions or comments;
d. Assist the Owner in transmitting easement documents or an affidavit to ARDOT to
substantiate the final reimbursement eligibility ratio.
Bidding and Construction Phase (ARDOT CE Agreement)
1. Consulting Services during the Bidding Phase are not included in this Scope of Services.
2. Construction Phase Services are not included in this Scope of Services.
General
1. The Engineer should anticipate a 30-calendar day review period by the City staff between
the completion of one phase and the beginning of the following phase. Additional time
may be required for review by ARDOT and regulatory agencies.
2021048\Exhibit A Scope of Services Amendment 2 2024-06-04 3
Exhibit A
Scope of Services — Amendment 2 ��
Highway 112 Utility Relocations
Fayetteville, Arkansas CITY OF
Project No. 2021048, ARDOT Job 040746 FAARKANSAS YETTEVILLE
June 4, 2024
2. The Plans, Specifications and Bid Documents authorized by this Amendment shall be
prepared to allow bids to be received and construction to be performed under one (1)
Roadway Construction Contract by ARDOT.
3. Subcontracting of services by the Engineer shall have prior approval of the Owner.
4. All surveys and related easement acquisition documents shall conform to the Arkansas
Minimum Standards for Property Boundary Surveys and Plats, Latest Edition. Property
descriptions and exhibits shall be in a format approved by the Purchasing Department for
the Owner's acquisition of utility easements and/or temporary construction easements.
Exclusions to the Scope of Services
As noted above, Bidding Services and Construction Observation and Administration
Services are not included in this Scope of Services. Excluded services include preparation
of bidding addenda, evaluation of bids, recommendation of contract award, material
submittal review, review or preparation of payment requests, assessment of
substantial/final completion, review of Contractor's conformance to construction
documents, and preparation of Record Drawings. Any Scope of Services for Bidding
Services and Construction Phase Services will be considered under a separate
Construction Engineering (CE) Agreement or Amendment.
2. The following additional services are also excluded:
a. Environmental assessment or evaluation of the project site(s);
b. Field location of utilities by spot digging or potholing;
Easement acquisition.
End of Scope of Services
2021048\Exhibit A Scope of Services Amendment 2 2024-06-04
Exhibit B - Fee Proposal Summary
Redesign Phase - Contract Amendment 2
Highway 112 Utility Relocation
Fayetteville, Arkansas
Project No. 2021048, ARDOT Job 040746
June 4, 2024
CITY OF
FAYETTEVILLE
ARKANSAS
Highway 112 Utility Relocations, Fayetteville, Arkansas
E. Task 4 - Final Redesign Phase - Amendment 2
Engr
VII
Engr
VI
Engr
III
GPS
Survey
Sury
Tech
Surveyor
Designer
II
CAD Tech
III
Doc
Processor
Total
Hours
$250
$225
$150
$175
$50
$150
$135
$120
$75
1. Project Management and Administration
a. Prepare correspondence and consultation with the Owner;
16
4
20
b. Develop a project schedule outlining tasks and major milestones dates;
8
2
10
c. Coordinate with ArDOT on utility plan sheet formatting
8
8
d. Provide general contract administration, prepare monthly status reports
32
8
8
48
2. Utility Coordination
a. Update plans with proposed (buried) franchised utility relocations
8
16
8
32
b. Coordinate with franchised utilities (Black Hills & Lumen) on locations
48
8
8
64
3. Preliminary Redesign Phase (50% Design Documents)
a. Reformat plans and construction details to ArDOT sheet format
8
8
24
40
b. Realign water and sewer lines and incorporate new traffic circle
8
24
2
80
114
c. Coordinate with ArDOT on alignment change across Tracts 1X and 2X
4
16
2
2
2
40
66
d. Coordinate with developer on alignment changes on GRL 112 property
16
16
2
2
2
40
78
e. Coordinate with developer on alignment changes on 112 Drive -In
48
8
2
8
66
f. Coordinate with ArDOT on Erosion and Traffic Control plans
8
8
8
24
g. Coordinate with McClelland on 48-in. transmission line connection
16
16
8
40
h. Prepare or update easement acquisition documents
20
4
4
48
20
8
104
i. Prepare 50% Opinion of Probable Utility Relocation Costs
32
16
8
56
j. Submit 50% Plans and Probable Cost to Owner and ArDOT for review
2
2
4
k. Participate in 50% Redesign review meeting with Owner and ArDOT
8
8
8
24
4. Pre -Final Redesign Phase (90% Design Documents)
a. Prepare final design calculations, incorporate 50% Review comments
8
16
24
b. Prepare or update utility construction details
2
4
8
14
c. Update Erosion and Traffic Control plans, incorporate ArDOT comments
2
4
4
10
d. Revise or prepare utility construction specifications in ArDOT format
40
16
24
80
e. Identify materials under Build America, Buy America requirements
4
4
4
12
f. Provide construction bid proposal items to ArDOT for Bid Form
8
4
4
16
g. Prepare 90% Opinion of Probable Utility Relocation Costs
8
16
4
28
h. Perform internal CA/QC Review of Final Plans
16
24
8
4
2
54
i. Prepare permits (COF, ADEQ, ArDOT, USACE)
24
16
8
4
52
j. Update easement documents, assist acquisition agent, and stake easements
16
8
16
16
8
8
8
80
k. Submit 90% Plans and Probable Cost to Owner and ArDOT for review
2
2
4
8
I. Participate in 90% Redesign review meeting with Owner and ArDOT
8
8
8
4
28
2021048 Exhibit B Fee Proposal 2024-06-04Wmend2 Redesign Fee 64-24 1 of 2
Exhibit B - Fee Proposal Summary
Redesign Phase - Contract Amendment 2
Highway 112 Utility Relocation
Fayetteville, Arkansas
Project No. 2021048, ARDOT Job 040746
June 4, 2024
CITY OF
FAYETTEVILLE
ARKANSAS
E. Task 4 - Final Redesign Phase - Amendment 2
Engr
VII
Engr
VI
Engr
III
GPS
Survey
Sury
Tech
Surveyor
Designer
II
CAD Tech
III
Doc
Processor
Total
Hours
$250
$225
$150
$175
$50
$150
$135
$120
$75
5. Final Redesign Phase (100% Design Documents)
a. Incorporate 90% Design review and QA/QC plan review comments
8
4
16
8
4
40
b. Submit 100% Plans and Probable Cost to Owner and ArDOT for review
2
2
2
6
c. Submit Final Plans and Specifications to the Arkansas Dept. of Health
8
8
4
4
24
d. Assist in transmitting easement documentation to ArDOT
2
4
6
TOTAL HOURS = 424 80 272 24 24 64 32 256 104
Task 4 - Final Redesign Phase - Amendment 2
1,280
$222,640
Reimbursable Expenses
Highway 112 Utility Relocations, Fayetteville, Arkansas
1. Stormwater and STAA Permit Fees
$500
2. Arkansas Department of Health Review Fee
$500
3. ArkUps Utility Locations
$500
4. Printing
$2,000
Total Estimated Reimbursable Expenses
$3,500
Engineering Services Summary
Total Engineering Fee (NTE)
2021048 Exhibit B Fee Proposal 2024-06-MArrend2 Redesign Fee 64-24 2 of 2
EXHIBIT C
HN
Hawkins -Weir Engineers, Inc.
Hourly Rate Schedule: 2024
Description
Billing Rate/Hour
Engineer VI
$250
Engineer VI
$225
Engineer V
$200
Engineer IV
$175
Engineer 111
$150
Engineer II
$125
Engineer 1
$75
Environmental Specialist 11
$130
Environmental Specialist 1
$110
Designer II
$135
Designer 1
$100
CAD/BIM Modeler II
$135
CAD/BIM Modeler 1
$100
CAD/GIS Technician 111
$120
CAD/GIS Technician 11
$95
CAD/GIS Technician I
$75
Construction Manager II
$140
Construction Manager 1
$125
Construction Observer IV
$135
Construction Observer III
$115
Construction Observer II
$95
Construction Observer 1
$75
Surveyor
$150
GPS Survey
$175
Survey Technician
$50
Business Manager
$100
Graphic Designer
$100
Document Processor
$75
Reimbursable Expenses
Mileage
$0.72/mile
Printing
@ Cost
Travel
@ Cost
Expert Witness
Rate x 2.0
Other Direct Costs
@ Cost
Notes:
1. Hourly rates may be equitably adjusted annually
2. Adjustment to rate schedule will not change contract lump sum or NTE amounts
3. If a conflict exists, hourly rates & reimbursable expenses will be invoiced per terms of Agreement.