HomeMy WebLinkAbout173-24 RESOLUTIONFile Number: 2024-226
113 West Mountain Street
Fayetteville , AR 72701
(479) 575-8323
Resolution: 173-24
SPATCO ENERGY SOLUTIONS, LLC. (CHANGE ORDER #1):
A RESOLUTION TO APPROVE CHANGE ORDER NO . I TO THE CONTRACT WITH SPATCO ENERGY
SOLUTIONS , LLC IN THE AMOUNT OF $37 ,297 .30 FOR THE FUEL FARM REHABILITATION PROJECT AT
DRAKE FIELD, AND TO APPROVE A BUDGET ADJUSTMENT
WHEREAS, on September 5, 2023 , the City Council approved Resolution 188-23 authorizing a contract with Spatco
Energy Solutions, LLC for the Fuel Farm Rehabilitation Project at Drake Field ; and
WHEREAS, Change Order No. I will authorize replacement of the AvGas filter coalesce system which was not
included in the as-bid project scope and will also replace faulty refueling quick disconnect fittings .
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section I: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign Change
Order No. I to the contract with SPATCO Energy Solutions in the amount of $37 ,297 .30 for the Fuel Farm
Rehabilitation project at Fayetteville-Drake Field Airport. A copy of Change Order No. 1 is attached to this Resolution
and made a part hereof.
Section 2: That the City Council of the City of Fayetteville , Arkansas hereby approves a budget adjustment, a copy of
which is attached to this Resolution.
PASSED and APPROVED on July 2 , 2024
Attest:
Page 1
Mailing address:
113 W. Mountain Street
Fayetteville, AR 72701
www.fayetteville-ar.gov
CITY COUNCIL MEMO
2024-226
MEETING OF JULY 2, 2024
TO: Mayor Jordan and City Council
THRU: Susan Norton, Chief of Staff
FROM: Jared Rabren, Airport Director
SUBJECT: Fuel Farm Rehab Change Order 01
RECOMMENDATION:
Staff requests authorization for the Mayor to execute construction Change Order 01 in the amount of
$37,297.30 with SPATCO Energy Solutions for the Fuel Farm Rehabilitation project at Fayetteville – Drake
Field Airport and approval of a budget adjustment. This change order will authorize replacement of the AvGas
filter coalescer system which was not included in the as-bid project scope. Filters required to operate the
existing equipment are being phased out and the equipment will soon become obsolete. This change order
also authorizes replacing faulty refueling quick disconnect fittings. The cost of this change order exceeds
previously approved project contingency.
BACKGROUND:
The fuel farm for the airport has historically had multiple failures that have hindered the ability for the airport to
extract fuel, which in turn causes availability issues for the flying community. The age of the equipment
presents an issue when attempting to purchase replacement parts, limiting the opportunity of service providers
to perform maintenance. In addition, new NFPA 407 updates mandated additional over-fill protection devices
be installed, which are also planned with the recommended improvements.
The Airport entered into an agreement with Garver, LLC to provide design and bidding services for the project
(Task Order 04). This project was initially bid in March 2022; however, the sole bid exceeded the engineers
estimate and was not awarded. The project was rebid in October 2022, but the sole bid received was deemed
non-responsive. The project was rebid a second time and construction bids were received on August 1, 2023.
DISCUSSION:
The Aviation Division is requesting permission to execute a change order with SPATCO Energy Solutions to
replace the AvGas filter coalescer and faulty quick disconnect fittings. The cost of this change order exceeds
the previously approved project contingency amount of $31,939.90 and will require a budget adjustment.
Change order costs will be paid using City funds.
A complete breakdown of the expected project funding is included below.
Engineering Services*: $45,000.00
Construction Contract (SPATCO Energy Solutions): $274,398.97 ADA: $250,000.00
Change Order 01 (SPATCO Energy Solutions): $37,297.30 City: $106,696.27
TOTAL: $356,696.27 TOTAL: $356,696.27
BUDGET/STAFF IMPACT:
Mailing address:
113 W. Mountain Street
Fayetteville, AR 72701
www.fayetteville-ar.gov
BUDGET/STAFF IMPACT:
The Aviation Division may expend up to $356,696.27 of its fund balance reserve. This amount includes
$106,696.27 to match the ADA grant received and $250,000.00 for cash-flow to cover the ADA grant until
reimbursement at the end of the project.
ATTACHMENTS: SRF (#3), BA (#4), Signed Change Order (#5)
Page 1
City of Fayetteville, Arkansas
Legislation Text
113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
File #: 2024-226
Fuel Farm Rehab Change Order 01
A RESOLUTION TO APPROVE CHANGE ORDER NO. 1 TO THE CONTRACT WITH SPATCO
ENERGY SOLUTIONS, LLC IN THE AMOUNT OF $37,297.30 FOR THE FUEL FARM
REHABILITATION PROJECT AT DRAKE FIELD, AND TO APPROVE A BUDGET
ADJUSTMENT
WHEREAS, on September 5, 2023, the City Council approved Resolution 188-23 authorizing a
contract with Spatco Energy Solutions, LLC for the Fuel Farm Rehabilitation Project at Drake Field; and
WHEREAS, Change Order No. 1 will authorize replacement of the AvGas filter coalesce system which
was not included in the as-bid project scope and will also replace faulty refueling quick disconnect
fittings.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan
to sign Change Order No. 1 to the contract with SPATCO Energy Solutions in the amount of $37,297.30
for the Fuel Farm Rehabilitation project at Fayetteville-Drake Field Airport. A copy of Change Order
No. 1 is attached to this Resolution and made a part hereof.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget
adjustment, a copy of which is attached to this Resolution.
6/12/2024
Submitted Date
Yes
31,940.53$
37,297.30$
V20221130
Budgeted Item?
Does item have a direct cost?
Is a Budget Adjustment attached?
Total Amended Budget
Expenses (Actual+Encum)
Available Budget
Item Cost
Budget Adjustment
Remaining Budget
320,888.00$
288,947.47$
Yes
Yes 5,358.00$
1.23$
21009.1
Project Number
Budget Impact:
Airport Fuel Farm Rehab
Fund
Airport Fuel Farm Rehab5550.760.3960-5804.00
Account Number
Project Title
City of Fayetteville Staff Review Form
2024-226
Item ID
7/2/2024
City Council Meeting Date - Agenda Item Only
Staff requests approval for the Aviation Division to execute construction Change Order 01 in the amount of
$37,297.30 with SPATCO Energy Solutions for the Fuel Farm Rehabilitation project at Fayetteville – Drake Field
Airport and process a budget adjustment. This change order will authorize replacement of the AvGas filter
coalescer system which was not included in the as-bid project scope. This change order also authorizes replacing
faulty refueling quick disconnect fittings. The cost of this change order exceeds previously approved project
contingency.
N/A for Non-Agenda Item
Action Recommendation:
Submitted By
Jared Rabren AIRPORT SERVICES (760)
Division / Department
Comments:
Purchase Order Number:
Change Order Number:
Previous Ordinance or Resolution #
Approval Date:
Original Contract Number:
City of Fayetteville, Arkansas - Budget Adjustment (Agenda)
Budget Year Division
/Org2 AIRPORT SERVICES (760)
Adjustment Number
2024 Requestor:Jared Rabren
BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION:
The Aviation Division is requesting permission to execute a change order with SPATCO Energy Solutions to replace the AvGas
filter coalescer and faulty quick disconnect fittings. The cost of this change order exceeds the previously approved project
contingency amount of $31,939.90 and will require a budget adjustment up to $37,297.30.
COUNCIL DATE:7/2/2024
ITEM ID#:2024-226
Holly Black
6/12/2024 3:26 PM
Budget Division Date
TYPE:D - (City Council)
JOURNAL #:
GLDATE:
RESOLUTION/ORDINANCE CHKD/POSTED:/
v.2024522TOTAL--
Increase / (Decrease)Project.Sub#
Account Number Expense Revenue Project Sub.Detl AT Account NameGLACCOUNTEXPENSEREVENUEPROJECTSUBATDESCRIPTION X
5550.760.3960-5804.00 37,298 -21009 1 EX Building Costs
5550.760.3960-5802.00 (5,358)-18019 1 EX Vehicles & Equipment - base
5550.760.3960-5911.99 (31,940)-21009 1 EX Contingency - Capital Project
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
1 of 1
Construction Contract Change Order
Project: Change Order No. 1
FYV Fuel Farm Rehabilitation
Fayetteville -Drake Field Date Prepared: June 11 ,2024
Garver Job No . 21A13212 Prepared by: Kyle Bennett, Garver
Owner: Contractor:
Drake Field Airport SPTATCO Energy Solutions
4500 S . School Ave . 1201 Cypress St
Fayetteville , AR 72701 North Little Rock, Arkansas 72114
Description of Work Included in Contract
The project includes , but is not limited to, modifciation to and addition of various components associated with the existing fuel farm facility including refueling rack shutoff system,
online inventory management system , Jet-A offload check valve, overfill prevention valves , relaxation chambers , pumps and motors , refueling ra ck hose, sump pumps ,
emeraencv fuel shutoff svstem imrcvements and tank suction line imorovements.
Changes and Reasons Ordered (List Individual Changes as: A, B, C, D, etc.)
A. Owner req uested scope addition : Filters required for the existing AvGas coalescer filter are being phased out and will be obsolete in the near future . This change order
adds a lump sum pay item to replace the existing AvGas coalescer filter ncluding all associated equipment, parts , and labor.
B. Existing quick disconnedt fitting discovered to be leaking during refueling . This change adds a new lump sum pay item to replace the faulty fittings with a new fitting
including all associated parts and labor. Installation of the new fittings will be performed in conjunction with Change A to reduce contractor installation cost.
Bid Bid Unit Original Contract Revised Revised Original Revised
Contract Item Item of Contract Unit Estimated Unit Estimated Estimated
Chances No. Descriotion Measure Quantity Price Quantity Price Cost Cost
A. SS-130-4 .11 AvGas Filter Coalescer, Installed Lump Sum 0 $0 .00 1.0 $36 ,498 .15 $0 .00 $36,498.15
B. SS-130-4.12 Gammon Quick Disconnect, Installed Lump Sum 0 $0 .00 1.0 $799.15 $0 .00 $799 .15
Summation of Cost $0.00 $37,297.30
Net Cost for this Change Order $37,297.30
Estimated Project Cost Time Change
Estimated Project Cost Original Contract Start Date TBD
Original Contract Amount $274 ,398.97 Original Contract Time (calendar days) 40
This Change Order $37 ,297 .30 Additional Calendar Days granted by th is Change Order 5
New Contract Amount $311 ,696 .27 New Contract Time (calendar days) 45
Suspended Time 0
New Construction Completion Date TBD
THIS AGREEMENT IS SUBJECT TO ALL ORIGINAL CONTRACT PROVISIONS AND PREVIOUS CHANGE ORDERS
ISSUED FOR REASONS 'i/J~., INDICATED ABOVE
Engineer: Garver Project Manager 06/11 /24
EnQil ~er's SiQn ature T itle Date
ACCEPTED BY
I~ f .,.,.,,-~ ... ~"-CONTRACTOR D tl·n humle15'"~0
··-·""'"'-.. --.t"""-''"''"" ............ ••o ..-,.,,.IJ\ Branch Mgr. 06/11/24 o.,l!OZ ◄Olld l 1)!•.JI 0!>00
Con tracto ift s,anature/ I D Title Date
APPROVED BY M;~ wJA OWNER -Mayor 07/02/24
0wner'~ Signaturi:/ I Title Date
(/