Resolution: 82-24
File Number: 2024-1753
MCCLELLAND CONSULTING ENGINEERS, INC. (AMENDMENT NO. 1):
A RESOLUTION TO APPROVE AMENDMENT NO. 1 TO THE PROFESSIONAL ENGINEERING SERVICES
AGREEMENT WITH MCCLELLAND CONSULTING ENGINEERS, INC. IN AN AMOUNT NOT TO EXCEED
$218,974.41 FOR ADDITIONAL SERVICES ASSOCIATED WITH UTILITY RELOCATIONS ALONG
HIGHWAY 16, AND TO APPROVE A BUDGET ADJUSTMENT
WHEREAS, on March 30, 2021, the City Council approved Resolution 165-21 authorizing a contract with McClelland
Consulting Engineers, Inc. to begin detailed survey and design work which is now completed; and
WHEREAS, Amendment No. 1 will provide for additional easement acquisition services and franchise utility
coordination necessary as well as provide funding for construction phase services such as project inspection, assistance
with contractor questions in -field, change orders, testing, progress meetings, as -built plan preparation, and project
closeout.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign
Amendment No. 1 to the Professional Engineering Services Agreement with McClelland Consulting Engineers, Inc. in
an amount not to exceed $218,974.41 for additional services associated with utility relocations along Highway 16.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of
which is attached to this Resolution.
PASSED and APPROVED on March 5, 2024
Page 1
CITY OF
FAYETTEVILLE
ARKANSAS
MEETING OF MARCH 5, 2024
TO: Mayor Jordan and City Council
CITY COUNCIL MEMO
2024-1753
THRU: Susan Norton, Chief of Staff
FROM: Tim Nyander, Utilities Director
SUBJECT: McClelland Consulting Engineers, Inc. - Amendment No. 1 for Highway 16 Utility
Relocations
RECOMMENDATION:
Staff recommends approval of Amendment No. 1 to the engineering services agreement with McClelland
Consulting Engineers, Inc. for professional services associated with ArDOT Project 040785 Utility Relocations
along Highway 16 from Stone Bridge Rd. to E. Roberts Rd., and approval of a budget adjustment.
BACKGROUND:
ArDOT has notified the City of Fayetteville to relocate water and sewer infrastructure along Highway 16 where
they will be widening the roadway to 4-lanes. After receiving this notification, a formal selection committee was
held on March 30, 2021 at which McClelland was selected for contract negotiations (RFQ 21-01, Selection #5).
Resolution 165-21 authorized McClelland to begin detailed survey and design work which is now completed.
Affected utilities include approximately 4,100 linear feet of 8-inch diameter cast iron waterline that will need to
be replaced and upgraded to 12-inch diameter PVC pipe. Additionally, there is approximately 1,700 linear feet
of small diameter sanitary sewer relocation necessary.
DISCUSSION:
Amendment No. 1 will provide funds to cover additional easement acquisition services and franchise utility
coordination necessary as well as provide funding for construction phase services such as project inspection,
assistance with contractor questions in -field, change orders, testing, progress meetings, as -built plan
preparation, and project closeout. The additional fees are hourly not -to -exceed in the amount of $218,974.41.
BUDGET/STAFF IMPACT:
The proposed contract is hourly in the maximum not -to -exceed amount of $218,974.41. Funds will be moved
from the Sanitary Sewer Rehabilitation account to the Water & Sewer Relocations account to cover the cost of
the engineering amendment.
ATTACHMENTS: SRF (#3), BA (#4), Amendment No. 1 - Hwy 16 Utility Relocations - Final (#5)
Mailing address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
== City of Fayetteville, Arkansas
y 113 West Mountain Street
Fayetteville, AR 72701
(479)575-8323
- Legislation Text
File #: 2024-1753
McClelland Consulting Engineers, Inc. - Amendment No. 1 for Highway 16 Utility Relocations
A RESOLUTION TO APPROVE AMENDMENT NO. 1 TO THE PROFESSIONAL ENGINEERING
SERVICES AGREEMENT WITH MCCLELLAND CONSULTING ENGINEERS, INC. IN AN
AMOUNT NOT TO EXCEED $218,974.41 FOR ADDITIONAL SERVICES ASSOCIATED WITH
UTILITY RELOCATIONS ALONG HIGHWAY 16, AND TO APPROVE A BUDGET
ADJUSTMENT
WHEREAS, on March 30, 2021, the City Council approved Resolution 165-21 authorizing a contract
with McClelland Consulting Engineers, Inc. to begin detailed survey and design work which is now
completed; and
WHEREAS, Amendment No. 1 will provide for additional easement acquisition services and franchise
utility coordination necessary as well as provide funding for construction phase services such as project
inspection, assistance with contractor questions in -field, change orders, testing, progress meetings, as -
built plan preparation, and project closeout.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan
to sign Amendment No. 1 to the Professional Engineering Services Agreement with McClelland
Consulting Engineers, Inc. in an amount not to exceed $218,974.41 for additional services associated
with utility relocations along Highway 16.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget
adjustment, a copy of which is attached to this Resolution.
Page 1
Tim Nyander
Submitted By
City of Fayetteville Staff Review Form
2024-1753
Item ID
3/5/2024
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
2/15/2024 WATER SEWER (720)
Submitted Date Division / Department
Action Recommendation:
Staff recommends approval of Amendment No. 1 to the engineering services agreement with McClelland
Consulting Engineers, Inc. in an amount not to exceed $218,974.41 for professional services associated with ArDOT
Project 040785 Utility Relocations along Highway 16 from Stone Bridge Rd. to E. Roberts Rd., and approval of a
budget adjustment.
Budget Impact:
5400.720.5600-5314.00/5400.720.5700-
5314.00
Account Number
11011.2102
Project Number
Budgeted Item? Yes
Does item have a direct cost? Yes
Is a Budget Adjustment attached? Yes
Purchase Order Number:
Change Order Number:
Original Contract Number:
Comments:
Water and Sewer
Fund
Water and Sewer Relocations
Total Amended Budget
Expenses (Actual+Encum)
Available Budget
Item Cost
Budget Adjustment
Remaining Budget
Project Title
$ 9,684,408.00
$ 9,609,512.46
74,895,54
$ 218,974.41
$ 218,975.00
74,896.13
V20221130
Previous Ordinance or Resolution # 165-21
Approval Date:
City of Fayetteville, Arkansas - Budget Adjustment (Agenda)
Budget Year Division Adjustment Number
WATER SEWER (720)
/org2
2024
Requestor: Cheryl Partain
BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION:
A budget adustment is needed in the Water Sewer Relocations project for the cost of the engineering services contract with
McClelland Consulting Engineers, Inc. Contract is for engineering services for the water and sewer utility relocations
associated with ArDOT Project# 040785 for Highwasy 16 East Utility Relocations from Stonebridge Rd to E Roberts Rd.
Moving budgeted funds from the Sewer Rehabilitation project.
RESOLUTION/ORDINANCE
COUNCIL DATE: 3/5/2024
ITEM ID#: 2024-1753
April Melton
217612024 9:40 AM
Budget Division Date
TYPE: D - (City Council)
JOURNAL #:
GLDATE:
CHKD/POSTED:
TOTAL
Account Number
- -
Increase / (Decrease)
Expense Revenue
Project.Sub#
Project Sub.Detl AT
v.2024116
Account Name
5400.720.5600-5314.00
164,231 -
11011
2102 EX
Professional Services
5400.720.5700-5314.00
5400.720.5700-5815.00
54,744 -
(218,975) -
11011
02017
2102 EX
1 EX
Professional Services
Improvements - Sewer
I of 1
Amendment No. 1 to the Engineering Services Agreement for
Highway 16 Utility Relocations, Stonebridge Drive to East Roberts Road
ARDOT Job No. 040785
Date: 03/05/2024
WHEREAS, the CITY OF FAYETTEVILLE and McClelland Consulting Engineers, Inc.
(ENGINEER) entered into an Agreement for Professional Engineering Services
(AGREEMENT) on June 1, 2021; and,
WHEREAS, the CITY OF FAYETTEVILLE has requested that ENGINEER perform additional
services outside of the scope of the AGREEMENT.
NOW THEREFORE, the following modifications will be made to the AGREEMENT to
include the additional services requested:
MODIFICATIONS:
1. Section 2.2.1 — the additional scope of services is included in the attached
Appendix "A-1 ".
2. Section 5.1.1 —the maximum not -to -exceed amount is increased from $273,388.00 to
$492,362.41. Modifications to compensation are included in the attached
Appendices "A-1", "13-355, "13-45', "B-5" and "B-6".
IN WITNESS WHEREOF, the parties execute this Amendment No. 1, to be effective on the
date set out above.
McClelland Consulting Engineers, Inc.
City of Fayetteville, Arkansas
BY: l e? W
Nicholas R. Batker, P.E.
Senior Associate
APPENDIX A-1 — SCOPE OF ADDITIONAL SERVICES
AMENDMENT NO. 1 TO THE ENGINEERING SERVICES AGREEMENT FOR
HIGHWAY 16 UTILITY RELOCATIONS, STONEBRIDGE DRIVE TO EAST ROBERTS
ROAD
1.0 General
1.1 Additional Services — Bid Phase and Easement Acquisition
During the course of final design on this project in 2023, the ENGINEER had final
plans prepared and approved by the Arkansas Department of Health. The ENGINEER
met with Black Hills Energy to coordinate any final potential conflicts with natural gas
facilities and discovered that the proposed water main relocations were in direct
conflict with the BHE proposed gas mains in several areas. As a result, the ENGINEER
was required to perform additional coordination with BHE to avoid these conflicts,
redesign the proposed water main relocations, and perform additional coordination
with affected property owners on the proposed easements. This additional effort
resulted in project expenditures that exhausted the original contract budget at the end
of 2023. The scope of additional services includes efforts associated with remaining
design and property acquisition tasks to get this project into the construction phase.
1.2 Additional Services — Services During Construction
The scope of additional services also includes construction administration and
construction observation service for the referenced project, which includes
approximately 4,300 linear feet of 18-inch water main; 130 linear feet of 12-inch water
main, 1,700 linear feet of 8-inch water main; 1,900 linear feet of 8-inch sewer main;
and related appurtenances and interconnections along Highway 16 between
Stonebridge Drive and East Roberts Road. Construction is anticipated to commence
in Spring 2024. The construction contract allows 300 calendar days to Substantial
Completion and 330 calendar days to Final Completion.
2.0 Scope of Additional Services — Bid Phase and Easement Acquisition
2.1 Bid Phase Services
2.1.1 Assist CITY OF FAYETTEVILLE with Bid Advertisement.
2.1.2 Respond to Bidders' questions and issue addenda as authorized by the CITY
OF FAYETTEVILLE.
2.1.3 Attend the pre -bid conference and bid opening.
2.1.4 Evaluate bid tabulation and bidders' qualifications.
2.1.5 Prepare and submit an updated summary of project costs and estimated
ARDOT reimbursement value based on the actual bid price.
2.1.6 Prepare Issued for Construction Documents, which shall incorporate all
changes during the Bid Phase through issued Addenda.
2.2 Additional Property Owner Coordination and Easement Acquisition
2.2.1 Finalize and complete easement acquisition for 19 remaining easements.
Negotiation and acquisition services to be provided by Visionary Milestones,
Appendix A-1 — Scope of Additional Services — Highway 16 Utility Relocations — Amendment No. 1
Page 1 of 3 1/30/2024
LLC as a subconsultant to the ENGINEER. ENGINEER to provide support as
required.
3.0 Scope of Additional Services — Services During Construction
3.1 Construction Administration
3.1.1 Assist CITY OF FAYETTEVILLE with issuing the Notice to Proceed and
obtaining executed Contract Document from the selected Contractor; if
requested by the CITY OF FAYETTEVILLE.
3.1.2 Conduct the pre -construction meeting with the Contractor and issue meeting
minutes.
3.1.3 Review and respond to Contractor submittals for conformance to the Contract
Documents. Up to ten (10 submittals are anticipated on this project. The initial
review and one (1) re -submittal review are included in this scope of services.
Additional re -submittal review will be considered Additional Services.
3.1.4 Review Contractor's Requests for Information and issue clarifications as
required. Up to ten (10) RFIs are anticipated on this project.
3.1.5 Assist the CITY OF FAYETTEVILLE with the evaluation, negotiation and
processing of Contractor change order requests, as required.
3.1.6 Review monthly Pay Estimates from the Contractor and provide
recommendation for payment. A total of ten (10) pay estimates are assumed.
3.1.7 Engineer of Record shall conduct monthly site visits and attend monthly
progress meetings as required to observe the progress and quality of the
completed work to determine compliance with the Contract Documents. A total
of twenty (20) site visits/progress meetings are estimated over the course of the
330 calendar day construction contract.
3.1.8 Assist the CITY OF FAYETTEVILLE with the final inspection walk-through.
Develop a punch list of outstanding items and review project closeout
documents.
3.1.9 Prepare Record Drawings based upon information furnished by the Contractor
and field representatives.
3.2 Construction Observation
3.2.1 Provide a field representative to perform comprehensive construction
observation services. Field representative shall keep Engineer of Record and
CITY OF FAYETTEVILLE informed on construction progress and any issues
that may arise.
3.2.2 It is estimated that the level of observation required by the ENGINEER to
provide comprehensive construction observation services will equate to an
average of 35 hours per week for the duration of the 330 calendar day
construction contract. Partial observation will be conducted on non -critical items
such as, but not limited to general site cleanup, seeding, sodding, etc.
3.3 Surveying Services
At the request of the CITY OF FAYETTEVILLE, provide up to 48 hours of field surveying
to assist in reviewing the Contractor's work and/or to address property owner questions.
Appendix A-1 — Scope of Additional Services — Highway 16 Utility Relocations — Amendment No. 1
Page 2 of 3 1/30/2024
4.0 Project Deliverables
4.1 PDF copy of the approved shop drawings and submittals from the Contractor.
4.2 PDF copy of all daily construction observation reports.
4.3 One (1) full-size hard copy, a PDF copy and AutoCAD file of the Record Drawings.
4.4 Other electronic files as requested by the CITY OF FAYETTEVILLE.
5.0 Compensation
In consideration of the performance of the foregoing services by the ENGINEER, the CITY OF
FAYETTEVILLE shall by to the ENGINEER compensation as shown below. A task hour
breakdown of the services is provided as Appendix B-3.
5.1 Compensation for Task 2.1 shall be as provided in Appendix B-4. The
not -to -exceed amount for Task 2.1 is $7,953.69.
5.2 Compensation for Task 2.2 shall be as provided in Appendix B-5. The
not -to -exceed amount for Task 2.2 is $36,889.64.
5.3 Compensation for Task 3.0 (Services During Construction) shall be as provided in
Appendix B-6. The not -to -exceed amount for Task 3.0 is $174,131.08.
5.4 The total maximum not -to -exceed for Amendment No. 1 therefore shall be
$218,974.41.
Appendix A-1 — Scope of Additional Services — Highway 16 Utility Relocations — Amendment No. 1
Page 3 of 3 1/30/2024
City of Fayetteville - Hwy 16 Water/Sewer Relocations (Stone Bridge Rd to E Roberts Rd) MCCLELLAND
Amendment No. 1 NECONSULTINGE
Appendix B-3 - Personnel Hour Estimate ENGINEERS, INC.
1 /30/2024
Task Description
Sr. Project
Manager
Project
Manager
Project
Engineer
CAD
Technician
Const.
Observer
Reg. Land
Surveyor
Survey
Technician
Field
Survey
Crew
2.0 ADDITIONAL SERVICES - BID PHASE AND EASEMENT ACQUISITION
Task 2.1 Bid Phase Services
Assist with Bid Advertisement
2.00
Respond to questions during bidding
4.00
8.00
Prepare/issue addenda
6.00
16.00
Pre -bid meeting
2.00
4.00
Bid open in /evaluate bids
2.00
2.00
Update summary of project costs
2.00
Prepare Issued for Construction Documents
2.00
16.00
Subtotal Task 2.1 (See Appendix B-4)1
16.00
1 0.00
1 48.00
1 0.00
1 0.00
1 0.00
1 0.00
1 0.00
Task 2.2 Add'I Property Owner Coord & Easement Acquisition
Assist Visionary Milestones with Remaining Property Owners
8.00 40.00
Subtotal Task 2.2 (See Appendix B-5)1
8.00 1 0.00 40.00 0.00 0.00 0.00 0.00 0.00
3.0 ADDITIONAL SERVICES - SERVICES DURING CONSTRUCTION
Task 3.1 Construction Administration
Pre -construction Meeting
2.00
2.00
2.00
Review Submittals
2.00
8.00
40.00
Respond to RFIs
2.00
8.00
20.00
4.00
Evaluate Change Order Requests
4.00
10.00
48.00
8.00
Pay Request Review/Preparation
10.00
32.00
Periodic Site Visits 20 estimated
20.00
40.00
60.00
Final Inspection/Punch List
2.00
2.00
16.00
Record Drawings
10.00
20.00
24.00
Project Closeout
4.00
8.00
4.00
Subtotal Task 3.1 (See Appendix B-6)1
32.00
1 94.00
1 246.00
1 40.00
0.00
1 0.00
1 0.00
1 0.00
Task 3.2 Construction Observation
Comprehensive Field Observation Services
1570.00
Pre -construction Meeting
2.00
Pay Request Review/Preparation
32.00
Final Inspection
16.00
Record Drawings
16.00
Project Closeout
8.00
Subtotal Task 3.2 (See Appendix B-6)1
0.00
1 0.00
1 0.00
1 0.00
1 1644.00
1 0.00
1 0.00
1 0.00
Task 3.3 Surveying Services
Review Contractor's Work & Address Prop Owner Questions, as
Req'd
8.00
16.00
48.00
Subtotal Task 3.3 (See Appendix B-6)1
0.00
1 0.00
1 0.00
1 0.00
1 0.00
1 8.00
1 16.00
1 48.00
Appendix B-4 Fee Proposal
Appendix B-4
Additional Services
Bidding Phase Services in Conjunction with the
Highway 16 Water and Sewer Relocations (Stone Bridge Rd to E Roberts Rd)
ARDOT Job No. 040785
Fayetteville, Arkansas
Personnel Hours
Labor Classification
Hours
Labor Rate
Extended
Sr. Project Manager
16.00
$68.00
$1,088.00
Project Manager
0.00
$53.00
$0.00
Project Engineer
48.00
$36.00
$1,728.00
CAD Technician
0.00
$30.00
$0.00
Const. Observer
0.00
$25.00
$0.00
Reg. Land Surveyor
0.00
$35.00
$0.00
Survey Technician
0.00
$25.00
$0.00
Field Survey Crew
0.00
$25.00
$0.00
Direct Labor Subtotal
$2,816.00
Overhead 151.55%
$4,267.65
Subtotal
$7,083.65
Fixed Fee 12%
$850.04
Subtotal Labor Costs
$7,933.69
EXPENSES
Item
Amount
Mileage ($0.52/mile)
$20.00
Total Estimated Reimbursable Expenses
$20.00
Total Costs - Additional Services - Bidding Phase Services
(Task Item 2.1) $7,953.69
Appendix B-5 Fee Proposal
Appendix B-5
Additional Services
Easement Acquisition Services in Conjunction with the
Highway 16 Water and Sewer Relocations (Stone Bridge Rd to E Roberts Rd)
ARDOT Job No. 040785
Fayetteville, Arkansas
Personnel Hours
Labor Classification
Hours
Labor Rate
Extended
Sr. Project Manager
8.00
$68.00
$544.00
Project Manager
0.00
$53.00
$0.00
Project Engineer
40.00
$36.00
$1,440.00
CAD Technician
0.00
$30.00
$0.00
Const. Observer
0.00
$25.00
$0.00
Reg. Land Surveyor
0.00
$35.00
$0.00
Survey Technician
0.00
$25.00
$0.00
Field Survey Crew
0.00
$25.00
$0.00
Direct Labor Subtotal
$1,984.00
Overhead 151.55%
$3,006.75
Subtotal
$4,990.75
Fixed Fee 12%
$598.89
Subtotal Labor Costs
$5,589.64
EXPENSES
Item
Amount
Mileage ($0.52/mile)
$50.00
Total Estimated Reimbursable Expenses
$50.00
SUBCONSULTANTS
Item
I Amount
Visionary Milestones - Acquisition Services ($1,600/parcel, 19 parcels)
$307400.00
Visionary Milestones - Filing Fees
$850.00
Total Estimated Subconsultant Cost
$31,250.00
Total Costs - Additional Services - Easement Acquisition Services
(Task Item 2.2) $36,889.64
Appendix B-6 Fee Proposal
Appendix B-6
Services During Construction in Conjunction with the
Highway 16 Water and Sewer Relocations (Stone Bridge Rd to E Roberts Rd)
ARDOT Job No. 040785
Fayetteville, Arkansas
Personnel Hours
Labor Classification
Hours
Labor Rate
Extended
Sr. Project Manager
32.00
$68.00
$2,176.00
Project Manager
94.00
$53.00
$4,982.00
Project Engineer
246.00
$36.00
$8,856.00
CAD Technician
40.00
$30.00
$1,200.00
Const. Observer
1644.00
$25.00
$41,100.00
Reg. Land Surveyor
8.00
$35.00
$280.00
Survey Technician
16.00
$25.00
$400.00
Field Survey Crew
48.00
$50.00
$2,400.00
Direct Labor Subtotal $61,394.00
Title II Labor Multiplier 2.82
Subtotal Labor Costs $173,131.08
EXPENSES
Item Amount
Mileage ($0.52/mile)
$1,000.00
Total Estimated Reimbursable Expenses
$1,000.00
Total Costs - Services During Construction
(Task Items 2.3, 2.4, 2.5)
$174,131.08
Notes:
1. Title II Multiplier based upon MCE FY22 Indirect Cost Rate (151.55%) for ARDOT projects,
plus fixed fee of 12%.