Loading...
HomeMy WebLinkAbout7-24 RESOLUTION113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 7-24 File Number: 2023-1540 CITY OF GREENLAND, ARKANSAS (SEWER COST SHARE AGREEMENT): A RESOLUTION TO APPROVE A COST SHARE AGREEMENT WITH THE CITY OF GREENLAND IN AN AMOUNT NOT TO EXCEED $954,000.00 FOR UPSIZING A PORTION OF 12-INCH SANITARY SEWER LINE TO 18-INCH, TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $100,000.00, AND TO APPROVE A BUDGET ADJUSTMENT WHEREAS, the City of Greenland owns its sewer collection system, including a lift station and force main within its corporate city limits; and WHEREAS, due to past and anticipated growth, upsizing of these facilities is necessary, all at Greenland's cost; and WHEREAS, the system connects to the City of Fayetteville's sewer system just north of Drake Field at which point is conveyed through gravity sewers, lift stations, and force mains on its way to the Noland Water Resource Recovery Facility; and WHEREAS, in anticipation of these upgrades, the City of Fayetteville needs to upgrade our own facilities to accommodate this additional flow; and WHEREAS, the City of Fayetteville and the City of Greenland have cooperated to incorporate Fayetteville's scope of improvements into the project bid package for the Greenland project; and WHEREAS, the cost share agreement consists of Fayetteville paying 100% of costs for upgrades to Fayetteville's infrastructure, and likewise Greenland paying 100% of costs for Greenland's infrastructure. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign a cost share agreement with the City of Greenland with the City of Fayetteville's portion of the cost not to exceed $954,000.00 and further approves a project contingency in the amount of $100,000.00. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. PASSED and APPROVED on January 2, 2024 Page 1 Resolution: 7-24 File Number: 2023-1540 Page 2 �,��pliillf//� Attest: /f `�� � � r,G i1� 'b\ Y O,c'�S. I AYETI EVIL_!- ' Kara Paxton, City C ®c reasurer u' •��'h 11 C7`'-.P . ° l .�� III/ ;�%�G T • IN 11%�` �lllfllll 1ON CITY OF FAYETTEVILLE ARKANSAS MEETING OF JANUARY 2, 2024 CITY COUNCIL MEMO 2023-1540 TO: Mayor Jordan and City Council THRU: Susan Norton, Chief of Staff FROM: Tim Nyander, Utilities Director DATE: SUBJECT: Cost Share Agreement with The City of Greenland for Upsizing a Portion of the Sewer Line Coming from Greenland to the City of Fayetteville RECOMMENDATION: Staff recommends the approval of a cost share agreement with the City of Greenland, Arkansas in an amount not to exceed $954,000.00 for upsizing a portion of 12-inch sanitary sewer line to 18-inch, to approve a project contingency in the amount of $100,000.00, and to approve a budget adjustment. BACKGROUND: The City of Greenland owns its sewer collection system, including a lift station and force main within their corporate city limits. Due to past and anticipated growth, upsizing of these facilities is necessary, all at Greenland's cost. This system connects to the City of Fayetteville's sewer system just north of Drake Field at which point it is conveyed through gravity sewers, lift stations, and force mains on its way to the Noland Water Resource Recovery Facility. In anticipation of these upgrades, the City of Fayetteville also needs to upsize facilities to accommodate this additional flow. These upgrades include approximately 1,860-feet of gravity sewer upsizing from 12" to 18" diameter leading to sewer Lift Station #16 on Ernest Lancaster Road. This lift station is also being modified to accommodate an additional pump. The downstream sewer force main is already adequate for these increased flows. DISCUSSION: The City of Fayetteville and City of Greenland have cooperated to incorporate Fayetteville's scope of improvements into the project bid package for the Greenland project. This is an advantage to Fayetteville in that economies of scale should keep costs competitive. It also reduces the project management burden on City of Fayetteville staff. This cost share agreement consists of Fayetteville paying 100% of costs for upsizing Fayetteville's infrastructure, and likewise Greenland paying 100% of costs for Greenland's infrastructure. The low bid cost of the Fayetteville scope of work was $954,000.00. BUDGET/STAFF IMPACT: A budget adjustment is attached to move funds from the Wastewater Impact Fee Improvements account to the Water/Sewer Impact Fee Cost Sharing account within the Water & Sewer fund. Mailing address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 ATTACHMENTS: SRF (#3), BA (#4), Greenland Cost Share Agreement (#5) Mailing address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 == City of Fayetteville, Arkansas Y 113 West Mountain Street Fayetteville, AR 72701 (479)575-8323 - Legislation Text File #: 2023-1540 Cost Share Agreement with The City of Greenland for Upsizing a Portion of the Sewer Line Coming from Greenland to the City of Fayetteville A RESOLUTION TO APPROVE A COST SHARE AGREEMENT WITH THE CITY OF GREENLAND IN AN AMOUNT NOT TO EXCEED $954,000.00 FOR UPSIZING A PORTION OF 12-INCH SANITARY SEWER LINE TO 18-INCH, TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $100,000.00, AND TO APPROVE A BUDGET ADJUSTMENT WHEREAS, the City of Greenland owns its sewer collection system, including a lift station and force main within its corporate city limits; and WHEREAS, due to past and anticipated growth, upsizing of these facilities is necessary, all at Greenland's cost; and WHEREAS, the system connects to the City of Fayetteville's sewer system just north of Drake Field at which point is conveyed through gravity sewers, lift stations, and force mains on its way to the Noland Water Resource Recovery Facility; and WHEREAS, in anticipation of these upgrades, the City of Fayetteville needs to upgrade our own facilities to accommodate this additional flow; and WHEREAS, the City of Fayetteville and the City of Greenland have cooperated to incorporate Fayetteville's scope of improvements into the project bid package for the Greenland project; and WHEREAS, the cost share agreement consists of Fayetteville paying 100% of costs for upgrades to Fayetteville's infrastructure, and likewise Greenland paying 100% of costs for Greenland's infrastructure. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign a cost share agreement with the City of Greenland with the City of Fayetteville's portion of the cost not to exceed $954,000.00 and further approves a project contingency in the amount of $100,000.00. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. Page 1 Tim Nyander Submitted By City of Fayetteville Staff Review Form 2023-1540 Item ID 1/2/2024 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 12/12/2023 WATER SEWER (720) Submitted Date Division / Department Action Recommendation: Staff recommends the approval of a cost share agreement with the City of Greenland in an amount not to exceed $954,000.00 for upsizing a portion of 12-inch sanitary sewer line to 18-inch, to approve a project contingency in the amount of $100,000.00, and to approve a budget adjustment. 5400.720.5700-5815.00 Account Number 04039.2301 Project Number Budgeted Item? Yes Does item have a direct cost? Yes Is a Budget Adjustment attached? Yes Purchase Order Number: Change Order Number: Original Contract Number: Comments: Budget Impact: Water & Sewer Fund Water & Sewer Impact Fee Cost Sharing Total Amended Budget Expenses (Actual+Encum) Available Budget Item Cost Budget Adjustment Remaining Budget Project Title $ 1,261,190.00 $ 467,458.41 �93,731.59 $ 1,054,000.00 $ 1,054,000.00 793,731.59 Previous Ordinance or Resolution # Approval Date: V20221130 City of Fayetteville, Arkansas - Budget Adjustment (Agenda) Budget Year Division Adjustment Number WATER SEWER (720) /Org2 2024 (BY) Requestor: Cheryl Partain BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION: A budget adjustment is needed in the Water & Sewer Impact Fee Cost Sharing project for the City of Greenland cost share project. The cost share project with the City of Greenland is for upsizing a portion of the City of Greenland's 12-inch sanitary sewer line that connects to the City of Fayetteville's sewer system to an 18-inch sanitary sewer line. Budgeted impact fee funds need to be transferred and utilized for this project. COUNCIL DATE: ITEM ID#: 1/2/2024 2023-1540 Holly Black 7217412023 77:25 ql;l RESOLUTION/ORDINANCE Budget Division Date TYPE: D - (City Council) JOURNAL#: GLDATE: CHKD/POSTED: TOTAL Account Number 1,208,000 1,208,000 Increase / (Decrease) Expense Revenue Project.Sub# Project Sub.Detl AT v.20231213 Account Name 5400.720.5700-5815.00 1,054,000 - 04039 2301 EX Improvements - Sewer 5400.720.5700-6602.30 2300.730.9300-7602.40 - 1,054,000 1,054,000 - 04039 07004 2301 RE 4039.2301 EX Transfer from Fund - Impact Fee Transfers To Funds - Water & Sewer Fund 2300.730.9300-5815.00 2300.730.9300-4999.99 (900,000) - - 154,000 07004 2 EX RE Improvements - Sewer Use Fund Balance - Current I of 1 CONTRACTUAL AGREEMENT FOR COST SHARE OF SEWER MAIN INSTALLATION COSTS This Agreement, made and entered into on this _2_day of January 2024, by and between the City of Fayetteville, Arkansas ("Fayetteville") and the City of Greenland, Arkansas ("Greenland"), witnesseth: WHEREAS, on Tuesday, June 6, 2023 Greenland opened sealed bids on the Lift Station and Sewer System to Fayetteville Project; and WHEREAS, Orr Construction, Inc. of Davenport, Oklahoma is the low bidder in the amount of $7,799,100.00; and WHEREAS, McClelland Consulting Engineers, Inc., representing Greenland as the Engineer of Record on this sewer main project, has reviewed the bid and recommends awarding the bid to Orr Construction, Inc. in the amount of $7,799,100.00; and WHEREAS,upsizing a 1,900 ft. segment of 12-inch sewer main to 18-inch will provide for ample future capacity which Fayetteville recognizes will be necessary for the area that is served by this sewer main, and is described in Fayetteville's 2014 Sewer Master Plan Update; and WHEREAS, § 51.113 of the Fayetteville City Code provides that "the City shall pay the excess material cost of facilities of a size larger than required to service subdivisions when such excess size is specified and required by the water and wastewater director for the general benefit of the sewerage system." NOW, THEREFORE, the City of Fayetteville, Arkansas and the City of Greenland, Arkansas agree as follows: 1. The City of Fayetteville, Arkansas agrees to: A. Reimburse Greenland for the cost to upsize approximately 1,900 linear feet of 12- inch sewer main to 18-inch sewer main in the area identified in Exhibit "A" up to a maximum -not -to -exceed amount of $954,000.00, as was bid by Orr Construction, Inc. and shown on Exhibit `B", attached. B. Payments due to Greenland shall be remitted within sixty (60) days after receipt of valid invoices and/or pay applications, verified by the Engineer of Record during the progress of the project. 2. The City of Greenland, Arkansas agrees to: A. Provide the necessary and normal project management, inspection, and testing as necessary for a complete and acceptable sewer main upsizing. B. Provide a copy of the invoices and/or pay applications from the Contractor and Greenland for Fayetteville approval of payments for the sewer main upsizing. C. Pay the costs for the Lift Station and Sewer System to Fayetteville Project in the amount of $7,799,100.00 (with reimbursement of $954,000.00 of the cost by Fayetteville). 3. It is further understood that the contract for construction is between Greenland and its contractor and that Fayetteville has no contractual obligation with either the contractor or any agent for the contractor. Fayetteville's only obligation shall be to participate in this cost share agreement with a not -to -exceed amount of $954,000.00 for the sewer main upsizing. IN AGREEMENT WITH ALL THE TERMS AND CONDITIONS ABOVE, WE SIGN BELOW: CITY OF GREENLAND, ARKANSAS By: JIM RENFRO` , Mayor ATTEST: By: MISTY Mc ARD, Recorder/Treasurer CITY OF FAYETTEVILLE, ARKANSV LIONEJ�1),0RDAN, Mayor ATTEST By: KA A PAXTON, 'ity Clerk Trea��ter FAYEJ i _'ViL: i •• 9 ' ' ~ z EXHIBIT A mcECONSULT/NGD mrimmmmm ENGINEERS, INC. Signature: Nicholas Batker, RE # 16753 Date: DENOTES MATHEMATICAL ERROR EXHIBIT B Certified Bid Tabulation City of Greenland Lift Station and Sewer System to Fayetteville Greenland, AR NICE Project # 21-2120 Bid Opening Date/Time: June 6, 2023, 10:00 A.M. SCHEDULE 1 - GREENLAND LIFT STATION Orr Construction Brothers Construction Tri-Star Contractors UNIT PRICE BID SCHEDULE ITEM NO. DESCRIPTION UNIT CITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL 1.01 Mobilization Max. 5 % total Schedule 1 LS 1 $65,000.00 $ 65,000.00 $125,000.00 $ 125,000.00 $130,250.00 $ 130,250.00 1.02 Bonds &Insurance LS 1 $50,000.00 $ 50,000.00 $37,000.00 $ 37,000.00 $78,150.00 $ 78,150.00 1.03 Act 291,1993 Trench & Excavation Safety System LS 1 $200,000.00 $ 200,000.00 $220,000.00 $ 220,000.00 $125,000.00 $ 125,000.00 1.04 Pre -Construction Video LS 1 $5,000.00 $ 5,000.00 $10,000.00 $ 10,000.00 $10,000.00 $ 10,000.00 1.05 Traffic Control LS 1 $5,000.00 $ 5,000.00 $16,000.00 $ 16,000.00 $20,000.00 $ 20,000.00 1.06 Environmental Compliance & Erosion & Sediment Control LS 1 $25,000.00 $ 25,000.00 $29,000.00 $ 29,000.00 $35,000.00 $ 35,000.00 1.07 Site Work LS 1 $265,000.00 $ 265,000.00 $290,000.00 $ 290,000.00 $200,000.00 $ 200,000.00 1.08 ISite Utilities LS 1 $140,000.00 $ 140,000.00 $235,000.00 $ 235,000.00 $150,000.00 1 $ 150,000.00 1.09 Lift Station Structure LS 1 $690,000.00 $ 690,000.00 $930,000.00 $ 930,000.00 $615,000.00 $ 615,000.00 1.1 Electrical Building LS 1 $75,000.00 $ 75,000.00 $95,000.00 $ 95,000.00 $125,000.00 $ 125,000.00 1.11 Pumps, Controls, Electrical and VFD's I LS 1 $1,475,000.00 $ 1,475,000.00 $1,415,000.00 $ 1,415,000.00 $1,300,000.00 $ 1,300,000.00 1.12 Piping, Valves, Accessories and Appurtenances LS 1 $275,000.00 $ 275,000.00 $305,000.00 $ 365,000.00 $293,500.00 $ 293,500.00 SUBTOTAL SCHEDULE 1 - GREENLAND LIFT STATION $ 3,270,000.00 $ 3,707,000.00 $ 3,081,900.00 SCHEDULE 2 - GREENLAND FORCE MAIN Orr Construction Brothers Construction Tri-Star Contractors UNIT PRICE BID SCHEDULE ITEM NO. DESCRIPTION UNIT QTY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL 2.01 Mobilization (Max. 5 % Total Schedule 2) LS 1 $70,000.00 $ 70,000.00 $73,000.00 $ 73,000.00 $89,939.29 $ 89,939.29 2.02 Bonds &Insurance LS 1 $50,000.00 $ 50,000.00 $19,000.00 $ 19,000.00 $53,963.57 $ 53,963.57 2.03 Act 291, 1993 Trench & Excavation Safety System LS 1 $30,000.00 $ 30,000.00 $23,500.00 $ 23,500.00 $50,000.00 $ 50,000.00 2.04 Pre -Construction Video LS 1 $7,500.00 $ 7,500.00 $10,000.00 $ 10,000.00 $10,000.00 $ 10,000.00 2.05 Traffic Control LS 1 $7,500.00 $ 7,500.00 $16,000.00 $ 16,000.00 $60,000.00 $ 60,000.00 2.06 Environmental Compliance & Erosion & Sediment Control LS 1 $65,000.00 $ 65,000.00 $81,000.00 $ 81,000.00 $65,000.00 $ 65,000.00 2.07 10-inch PVC C900 DR-18 Force Main LF 6,200 $95.00 $ 589,000.00 $127.00 $ 787,400.00 $95.00 $ 589,000.00 2.08 Ductile Iron Fittings LB 2,500 $20.00 $ 50,000.00 $33.00 $ 82,500.00 $40.00 $ 100,000.00 2.09 Underground Combination Air Valve EA 4 $24,000.00 $ 96,000.00 $36,500.00 $ 146,000.00 $33,337.19 $ 133,348.76 2.10 20-Inch Minimum Diameter Steel Casing by Open Cut LF 40 $350.00 $ 14,000.00 $340.00 $ 13,600.00 $462.60 $ 18,504.00 2.11 20-Inch Minimum Diameter Steel Casing by Bore LF 210 $1,100.00 $ 231,000.00 $1,275.00 $ 267,750.00 $1,500.00 $ 315,000.00 2.12 Fence Repair EA 3 $2,000.00 $ 6,000.00 $1,375.00 $ 4,125.00 $1,500.00 $ 4,500.00 2.13 Vinyl Fence by Modem Fence LS 1 $35,000.00 $ 35,000.00 $15,150.00 $ 15,150.00 $25,000.00 $ 25,000.00 2.14 10' Farm Gate EA 2 $1,500.00 $ 3,000.00 $1,150.00 $ 2,300.00 $2,000.00 $ 4,000.00 2.15 River Pea Stone Drive Repair LF 25 $125.00 $ 3,125.00 $33.00 $ 825.00 $250.00 $ 6,250.00 2.16 Gravel Drive Repair LF 130 $50.00 $ 6,500.00 $10.00 $ 1,300.00 $80.00 $ 10,400.00 2.17 Asphalt Drive Repair LF 30 $120.00 $ 3,600.00 $122.00 $ 3,660.00 $120.00 $ 3,600.00 2.18 Concrete Drive Repair LF 90 $120.00 $ 10,800.00 $112.00 $ 10,080.00 $175.00 $ 15,750.00 2.19 Asphalt Pavement Repair SY 300 $225.00 $ 67,500.00 $122.00 $ 36,600.00 $90.00 $ 27,000.00 2.20 Full Depth Class 7 Backfill TON 1,390 $40.00 $ 55,600.00 $29.00 $ 40,310.00 $50.00 $ 69,500.00 2.21 Trench Dam EA 6 $1,000.00 $ 6,000.00 $190.00 $ 1,140.00 $5,000.00 $ 30,000.00 2.22 Rock Excavation CY 100 $250.00 $ 25,000.00 $300.00 $ 30,000.00 $220.00 $ 22,000.00 2.23 Flowable Fill, as Directed by the Engineer CY 100 $250.00 $ 25,000.00 $270.00 $ 27,000.00 $250.00 $ 25,000.00 2.24 Trench and Bank Stabilization Material, as Directed by the Engineer TON 150 $65.00 $ 9,750.00 $115.00 $ 17,250.00 $50.00 $ 7,500.00 2.25 Temporary Construction 6' Tall Chain Link Fence LF 1,300 $20.00 $ 26,000.00 $20.00 $ 26,000.00 $13.41 $ 17,433.00 2.26 Relocate Existing Water Meter I EA 5 $2,000.00 $ 10,000.00 $3,000.00 $ 15,000.00 $35,000.00 $ 175,000.00 2.27 10-inch Plug Valve EA 1 $10,000.00 $ 10,000.00 $7,700.00 $ 7,700.00 $15,000.00 $ 15,000.00 SUBTOTAL SCHEDULE 2 - GREENLAND FORCE MAIN $ 1,512,875.00 $ 1,758,190.00 $ 1,942,688.62 W:Q021121-2120- Greenland Wastewater System Rehabililation\Construction DocumenWCertifed Bid TaM21-2120 CertlTed Bid Tab Page 1 of 3 10/25/2023 SCHEDULE 3 - GREENLAND GRAVITY MAIN Orr Construction Brothers Construction Tri-Star Contractors UNIT PRICE BID SCHEDULE ITEM NO. DESCRIPTION UNIT OTY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL 3.01 Mobilization Max. 5% Total Schedule 3 LS 1 $70,000.00 $ 70,000.00 $73,000.00 $ 73,000.00 $121,286.66 $ 121,286.66 3.02 Bonds &Insurance LS 1 $60,000.00 $ 60,000.00 $12,000.00 $ 12,000.00 $72,771.99 $ 72,771.99 3.03 Act 291,1993 Trench & Excavation Safety System LS 1 $70,000.00 $ 70,000.00 $23,500.00 $ 23,500.00 $100,000.00 $ 100,000.00 3.04 Pre -Construction Video LS 1 $7,500.00 $ 7,500.00 $10,000.00 $ 10,000.00 $10,000.00 $ 10,000.00 3.05 Traffic Control LS 1 $10,000.00 $ 10,000.00 $16,000.00 $ 16,000.00 $62,500.00 $ 62,500.00 3.06 Environmental Compliance & Erosion & Sediment Control LS 1 $65,000.00 $ 65,000.00 $90,000.00 $ 90,000.00 $7,000.00 $ 7,000.00 3.07 15-inch PVC SDR-26 Sewer Main LF 3,400 $120.00 $ 408,000.00 $85.00 $ 289,000.00 $200.00 $ 680,000.00 3.08 12-Inch PVC SDR-26 Sewer Main LF 160 $100.00 1 $ 16,000.00 $62.00 1 $ 9,920.00 $195.00 1 $ 31,200.00 3.09 Gravity Sewer Main Trenching & Backfill, 0'-10' Depth LF 1,330 $35.00 $ 46,550.00 $65.00 $ 86,450.00 $50.00 $ 66,500.00 3.1 Gravity Sewer Main Trenching & Backfill, 10'-14' Depth LF 1,900 $50.00 $ 95,000.00 $82.00 $ 155,800.00 $100.00 $ 190,000.00 3.11 Gravity Sewer Main Trenching & Backfill, 14'-18' Depth LF 110 $150.00 $ 16,500.00 $109.00 $ 11,990.00 $150.00 $ 16,500.00 3.12 4' Diameter Manhole, Ulp to 6' Depth EA 14 $6,500.00 $ 91,000.00 $5,800.00 $ 81,200.00 $6,500.00 $ 91,000.00 3.13 4' Diameter Drop Manhole, Up to 6' Depth EA 3 $7,500.00 $ 22,500.00 $5,800.00 $ 17,400.00 $8,500.00 $ 25,500.00 3.14 4' Diameter Manhole, Extra Depth Over 6' VF 70 $300.00 $ 21,000.00 $265.00 $ 18,550.00 $185.00 $ 12,950.00 3.15 4' Diameter Drop Manhole, Extra Depth Over 6' VF 30 $300.00 $ 9,000.00 $265.00 $ 7,950.00 $250.00 $ 7,500.00 3.16 4' Diameter Manhole Epoxy Coating VF 191 $525.00 $ 100,275.00 $485.00 $ 92,635.00 $650.00 1 $ 124,150.00 3.17 Standard Manhole Frame and Cover EA 12 $600.00 1 $ 7,200.00 $608.00 1 $ 7,296.00 $987.50 $ 11,850.00 3.18 Watertight Frame and Gasketed Cover EA 5 $1,150.00 $ 5,750.00 $915.00 $ 4,575.00 $1,372.40 $ 6,862.00 3.19 30-inch Minimum Diameter Steel Casing by Bore LF 225 $1,800.00 $ 405,000.00 $2,125.00 $ 478,125.00 $1,800.00 $ 405,000.00 3.2 30-inch Minimum Diameter Steel Casing by Open Cut LF 135 $620.00 $ 83,700.00 $735.00 $ 99,225.00 $734.60 $ 99,171.00 3.21 Remove Existing Manhole EA 1 $3,000.00 $ 3,000.00 $3,450.00 $ 3,450.00 $5,500.00 $ 5,500.00 3.22 Abandon Existing Manhole EA 14 $2,500.00 $ 35,000.00 $3,250.00 $ 45,500.00 $3,500.00 $ 49,000.00 3.23 Cut and Plug Existing Sanitary Sewer EA 7 $2,500.00 $ 17,500.00 $3,200.00 $ 22,400.00 $4,500.00 $ 31,500.00 3.24 Split Steel Encasement LF 1 10 $700.00 $ 7,000.00 $1,300.00 $ 13,000.00 $900.00 $ 9,000.00 3.25 Reconnect Existing Sewer Service EA 12 $2,000.00 $ 24,000.00 $1,750.00 $ 21,000.00 $4,750.00 $ 57,000.00 3.26 4-Inch PVC Sanitary Sewer Service Pie LF 200 $45.00 1 $ 9,000.00 $60.00 $ 12,000.00 $55.00 $ 11,000.00 3.27 6-Inch PVC Sanitary Sewer Service Pipe LF 100 $65.00 $ 6,500.00 $55.00 $ 5,500.00 $65.00 $ 6,500.00 3.28 Post -Construction CCTV Inspection of Sewer Main LF 3,540 $5.00 $ 17,700.00 $2.50 $ 8,850.00 $5.63 $ 19,930.20 3.29 Fence Repair EA 2 $2,500.00 $ 5,000.00 $1,375.00 $ 2,750.00 $1,500.00 $ 3,000.00 3.3 Asphalt Drive Repair LF 20 $120.00 $ 2,400.00 $122.00 $ 2,440.00 $120.00 $ 2,400.00 3.31 Concrete Curb and Gutter Repair LF 60 $300.00 $ 18,000.00 $60.00 $ 3,600.00 $32.00 $ 1,920.00 3.32 Concrete Drive Repair LF 20 $120.00 $ 2,400.00 $112.00 $ 2,240.00 $175.00 $ 3,500.00 3.33 lAsphalt Pavement Repair I SY 370 $225.00 $ 83,250.00 $122.00 $ 45,140.00 $90.00 $ 33,300.00 3.34 Full Depth Class 7 Backfill TON 1,550 $40.00 $ 62,000.00 $29.00 $ 44,950.00 $50.00 $ 77,500.00 3.35 Trench Dam EA 3 $1,000.00 $ 3,000.00 $190.00 $ 570.00 $5,000.00 $ 15,000.00 3.36 Rock Excavation CY 100 $250.00 $ 25,000.00 $300.00 $ 30,000.00 $220.00 $ 22,000.00 3.37 Flowable Fill, as Directed by the Engineer CY 500 $250.00 $ 125,000.00 $270.00 $ 135,000.00 $250.00 $ 125,000.00 3.38 Bank Stabilization Material, as Directed b the Engineer TON 100 $65.00 $ 6,500.00 $115.00 $ 11,500.06 $50.00 $ 5,000.00 SUBTOTAL SCHEDULE 3 - GREENLAND GRAVITY MAIN $ 2,062,225.00 $ 1,994,506.00 $ 2,619,791.85 W:Q021121-2120- Greenland Wastewater System Rehabilitation\Construction DocumenWCertlfeC Bid Tab\21-2120 certified Bid Tab Page 2 of 3 10/25/2023 SCHEDULE 4 - FAYETTEVILLE SEWER UPSIZE Orr Construction Brothers Construction Tri-Star Contractors UNIT PRICE BID SCHEDULE ITEM NO. DESCRIPTION UNIT CITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL 4.01 Mobilization Max. 5 % Total Schedule 4 LS 1 $40,000.00 $ 40,000.00 $40,000.00 $ 40,000.00 $77,078.18 $ 77,078.18 4.02 Bonds &Insurance LS 1 $50,000.00 $ 50,000.00 $7,500.00 $ 7,500.00 $46,246.91 $ 46,246.91 4.03 Act 291,1993 Trench & Excavation Safety System LS 1 $50,000.00 $ 50,000.00 $53,000.00 $ 53,000.00 $100,000.00 $ 100,000.00 4.04 Pre -Construction Video LS 1 $5,000.00 $ 5,000.00 $10,000.00 $ 10,000.00 $10,000.00 $ 10,000.00 4.05 Traffic Control LS 1 $5,000.00 $ 5,000.00 $16,000.00 $ 16,000.00 $85,000.00 $ 85,000.00 4.06 Environmental Compliance & Erosion & Sediment Control LS 1 $40,000.00 $ 40,000.00 $35,000.00 $ 35,000.00 $75,000.00 $ 75,000.00 4.07 18-Inch PVC PS-115 Sewer Main LF 1,860 $140.00 $ 260,400.00 $108.00 $ 200,880.00 $300.00 $ 558,000.00 4.08 8-Inch PVC SDR-26 Sewer Main LF 20 $100.00 1 $ 2,000.00 $43.00 $ 860.00 $85.00 1 $ 1,700.00 4.09 Gravity Sewer Main Trenching & Backfill, 0'-10' Depth LF 240 $40.00 $ 9,600.00 $65.00 $ 15,600.00 $50.00 $ 12,000.00 4.10 Gravity Sewer Main Trenching & Backfill, 10'-14' Depth LF 1,580 $50.00 $ 79,000.00 $82.00 $ 129,560.00 $100.00 $ 158,000.00 4.11 Gravity Sewer Main Trenching & Backfill, 14'-18' Depth LF 100 $150.00 $ 15,000.00 $109.00 $ 10,900.00 $150.00 $ 15,000.00 4.12 5' Diameter Manhole, Up to 6' Depth EA 6 $8,500.00 $ 51,000.00 $9,600.00 $ 57,600.00 $8,100.00 $ 48,600.00 4.13 5' Diameter Drop Manhole, Up to 6' Depth EA 1 $9,000.00 $ 9,000.00 $9,600.00 $ 9,600.00 $10,000.00 $ 10,000.00 4.14 5' Diameter Flat Top Manhole with Vent, Up to 6' Depth EA 2 $12,000.00 $ 24,000.00 $11,900.00 $ 23,800.00 $15,500.00 $ 31,000.00 4.15 5' Diameter Flat Top Drop Manhole with Vent, Up to 6' Depth EA 1 $13,500.00 $ 13,500.00 $11,900.00 $ 11,900.00 $15,500.00 $ 15,500.00 4.16 5' Diameter Manhole, Extra Depth Over 6' VF 36 $350.00 $ 12,600.00 $380.00 $ 13,680.00 $800.00 $ 28,800.00 4.17 5' Diameter Drop Manhole, Extra Depth Over 6' VF 20 $400.00 1 $ 8,000.00 $380.00 $ 7,600.00 $800.00 $ 16,000.00 4.18 5' Diameter Manhole Epoxy Coating VF 110 $650.00 $ 71,500.00 $600.00 $ 66,000.00 $750.00 $ 82,500.00 4.19 4' Diameter Manhole, Up to 6' Depth EA 1 $6,500.00 $ 6,500.00 $5,800.00 $ 5,800.00 $6,500.00 $ 6,500.00 4.20 4' Diameter Manhole, Extra Depth Over 6' VF 2 $300.00 $ 600.00 $265.00 $ 530.00 $185.00 $ 370.00 4.21 4' Diameter Manhole Epoxy Coating VF 8 $525.00 $ 4,200.00 $485.00 $ 3,880.00 $650.00 $ 5,200.00 4.22 Watertight Frame and Gasketed Cover EA 11 $1,150.00 $ 12,650.00 $915.00 $ 10,065.00 $1,372.40 $ 15,096.40 4.23 36-inch Minimum Diameter Steel Casing by Open Cut LF 75 $650.00 $ 48,750.00 $1,190.00 $ 89,250.00 $1,174.51 $ 88,088.25 4.24 Remove Existing Manhole EA 1 $2,500.00 $ 2,500.00 $3,450.00 $ 3,450.00 $5,500.00 $ 5,500.00 4.25 lAbandon Existing Manhole EA 2 $2,500.00 $ 5,000.00 $3,250.00 $ 6,500.00 $3,500.00 $ 7,000.00 4.26 Cut and Plug Existing Sanitary Sewer EA 6 $2,500.00 1 $ 15,000.00 $3,200.00 $ 19,200.00 $4,500.00 $ 27,000.00 4.27 Install lnserta Valve EA 1 $25,000.00 $ 25,000.00 $50,000.00 $ 50,000.00 $35,555.56 $ 35,555.56 4.28 Post -Construction CCTV Inspection of Sewer Main LF 1,910 $5.00 $ 9,550.00 $3.00 $ 5,730.00 $5.63 $ 10,753.30 4.29 Fence Repair EA 1 $2,500.00 $ 2,500.00 $1,375.00 $ 1,375.00 $1,500.00 $ 1,500.00 4.3 Gravel Drive Repair LF 40 $50.00 $ 2,000.00 $10.00 $ 400.00 $80.00 $ 3,200.00 4.31 Asphalt Pavement Repair SY 30 $225.00 $ 6,750.00 $122.00 $ 3,660.00 $90.00 $ 2,700.00 4.32 Full Depth Class 7 Backfill TON 1 210 $40.00 $ 8,400.00 $29.00 $ 6,090.00 $50.00 $ 10,500.00 4.33 Trench Dam EA 3 $1,000.00 $ 3,000.00 $190.00 $ 570.00 $5,000.00 $ 15,000.00 4.34 1 Rock Excavation CY 100 $250.00 $ 25,000.00 $300.00 $ 30,000.00 $220.00 $ 22,000.00 4.35 Flowable Fill, as Directed by the Engineer CY 50 $250.00 $ 12,500.00 $270.00 $ 13,500.00 $250.00 $ 12,500.00 4.36 ITrench and Bank Stabilization Material, as Directed by the Engineer TON 100 $65.00 $ 6,500.00 $170.00 $ 17,000.00 $50.00 $ 5,000.00 4.37 18-Inch DIP Sewer Main LF 40 $300.00 $ 12,000.00 $290.00 $ 11,600.00 $400.00 $ 16,000.00 SUBTOTAL SCHEDULE 4 - FAYETTEVILLE SEWER UPSIZE $ 954,000.00 $ 988,080.00 $ 1,659,888.60 TOTAL AMOUNT BID (SCHEDULES 1 + 2 + 3 + 4) $ 7,799,100.00 $ 8,447,776.00 $ 9,304,269.07 W:Q021121-2120- Greenland Wastewater System Rehabilitation\Construction Documente\Certified Bid TaM21-2120 CertlTed Bid Tab Page 3 of 3 10/25/2023 Comments: 2024-250Purchase Order Number: Change Order Number:1 Previous Ordinance or Resolution #7-24 Approval Date: Original Contract Number:2024-7 04039.2301 Budget Impact: Water & Sewer Cost Sharing Water and Sewer5400.720.5700-5815.00 City of Fayetteville Staff Review Form 2025-0950 N/A Staff recommends approval to utilize contingency funds in the amount of $99,925.94 for the City of Greenland sewer cost share project. N/A for Non-Agenda Item Action Recommendation: Tim Nyander WATER SEWER (720) Division / Department 12/4/2025 Submitted Date Yes 1,054,201.04$ 99,925.94$ V20221130 Budgeted Item? Does item have a direct cost? Is a Budget Adjustment attached? Total Amended Budget Expenses (Actual+Encum) Item Cost Budget Adjustment Remaining Budget 3,062,335.00$ 2,008,133.96$ Yes No -$ 954,275.10$ TO: Mayor Molly Rawn THRU: Keith Macedo, Chief of Staff FROM: Tim Nyander, Utilities Director DATE: December 4, 2025 SUBJECT: City of Greenland – Contingency Funds for Sewer Cost Share RECOMMENDATION: Staff recommends approval to utilize contingency funds in the amount of $99,925.94 for the City of Greenland sewer cost share project. BACKGROUND: Resolution 7-24 passed City Council approval on January 2, 2024, which authorized a cost share agreement with the City of Greenland in an amount not to exceed $954,000.00 and a contingency in the amount of $100,000.00. The City’s portion of the cost share is for the upsizing of a sanitary sewer line from 12-inch to 18-inch. DISCUSSION: The construction project for the sewer line is complete, and McClelland Consulting Engineers and City Staff have reconciled the final project quantities and determined the total amount that the City of Fayetteville owes the City of Greenland. It was determined that two additional sewer manholes and a gravity sewer realignment were needed during construction. Also, material price increases and rock excavation contributed to the increased overall project cost. Contingency funds are needed in the amount of $99,925.94, for a total City cost share amount of $1,053,925.94. Staff recommends approval of the use of available contingency funds in the amount of $99,925.94. BUDGET/STAFF IMPACT: Funds are available in the Water & Sewer Impact Fee Cost Sharing account, and the project contingency in the amount of $100,000.00 was previously approved by Resolution 7-24. Attachments: McClelland Reconciliation Documents Resolution 7-24 City of Fayetteville 22-2119 03/14/2022 22-2119 954,000.00 954,000.00 45,743.94 999,743.94 Only reflect costs associated with Fayetteville's portion of the project. No signatures, but can be revised and made official as necessary. EJCDC C-941 Change Order Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute. Page 1 of 2 Section 00 68 00-1 Change Order No. 2 Date of Issuance: Effective Date: Project: Lift Station and Sanitary Sewer to Fayetteville Owner: City of Fayetteville Owner's Contract No.: 22-2119 Contract: Date of Contract: 03/14/2022 Contractor: Orr Construction, Inc. Engineer's Project No.: 22-2119 The Contract Documents are modified as follows upon execution of this Change Order: Description: 1) Additional Manholes and Realignment During construction, the existing Fayetteville Sewer Force Main was incorrectly marked and was damaged by the Contractor. To maintain proper slope and drops, two (2) additional manholes were added to realign the new gravity sewer around the existing force main. This revision was addressed under RFI No. 12, with no new bid items created. However, quantity overruns resulting from the realignment are included in this Change Order No. 2. 2) Supporting Documentation • Attachment A – RFI 12 Fayetteville Gravity Sewer Realignment • Table 1 – Quantity Overruns: Item No. Item Description Additional Cost 4.12 5' Diameter Manhole, Up to 6' Depth $ 17,000.00 4.16 5' Diameter Manhole, Extra Depth Over 6' $ 4,900.00 4.18 5' Diameter Manhole Epoxy Coating $ 16,900.00 4.22 Watertight Frame and Gasketed Cover $ 2,672.00 TOTAL COST OVERRUN $ 41,472.00 954,000.00 954,000.00 45,743.94 999,743.94 Only reflect costs associated with Fayetteville's portion of the project. No signatures, but can be revised and made official as necessary. $ 954,000.00 Increase from previously approved Change Orders No. 1 to No. 2: $ 45,743.94 Contract Price prior to this Change Order: $ 999,743.94 Increase of this Change Order: $ 41,472.00 Contract Price incorporating this Change Order: $ 1,041,215.94 ATTACHMENT A RFI 12 - Gravity Sewer Realignment & Additional MHs RFI Response Greenland, AR Lift Station and Sewer System MCE Project No. 21-2120 Submittals included in this review: Comments: Engineer Review PERMITTED AS SUBMITTED BY DATE SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITY AND GENERAL CONFORMANCE TO CONTRACT DOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLE FOR CONFIRMING AND CORRELATING DIMENSIONS AT JOBSITE FOR TOLERANCE, CLEARANCE, QUANTITIES, FABRICATION, PROCESSES AND TECHNIQUES OF CONSTRUCTION, COORDINATION OF THEIR WORK WITH OTHER TRADES AND FULL COMPLIANCE WITH CONTRACT DOCUMENTS. PERMITTED AS NOTED REJECTED REVISE AND RESUBMIT FOR INFORMATION ONLY 4 B.R. Knutson 5/9/2025 SHOP DRAWING / SUBMITTAL REVIEW (22-2119 Fayetteville 18" Gravity Sewer) RFI 12 - 18" Gravity Sewer Realignment and Additional MHs Add two additional epoxy coated 5' manholes w/ watertight & gasketed frame and cover Approximately 480LF for realign from STA 118+30 to MH 8 Survey of new proposed alignment must be conducted prior to construction All slope of revised alignment shall be between 0.22% and 0.26% Minimum of 0.1' drop across MH inverts Cast in place MHs shall be prioritized over repair couplings on gravity sewer Add two additional epoxy coated 5' manholes w/ watertight & gasketed frame and cover Approximately 480LF for realign from STA 118+30 to MH 8 Survey of new proposed alignment must be conducted prior to construction All slope of revised alignment shall be between 0.22% and 0.26% Minimum of 0.1' drop across MH inverts Cast in place MHs shall be prioritized over repair couplings on gravity sewer Add two epoxy coated 5' manholes w/ watertight & gasketed frame/cover. Approx. 206 LF for realignment from STA 118+30 to MH 9, any further proposed adjustments shall be submitted separately. Min. 0.1' drop on additional manholes. Slope of revised alignment shall be uniform and enter MH-9 at designed invert in elevation. Modifications to the existing centerline layout shall be surveyed This alignment adjustment is the solution provided in the field by Danny with the City of Fayetteville and Jobany with Orr Construction to resolve the conflict with the existing 12" force main. The result will be 2 additional Manholes and a slight increase in the 18" gravity sewer. Please let us know how to proceed. N PLEASE SEND ADDITIONAL INFORMATION IF THIS MH IS PROPOSED TO BE SHIFTED. ITEM NO. DESCRIPTION UNIT QTY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL 4.01 Mobilization (Max. 5% Total Schedule 4)LS 1 $40,000.00 40,000.00$ $40,000.00 40,000.00$ $77,078.18 77,078.18$ 4.02 Bonds & Insurance LS 1 $50,000.00 50,000.00$ $7,500.00 7,500.00$ $46,246.91 46,246.91$ 4.03 Act 291, 1993 Trench & Excavation Safety System LS 1 $50,000.00 50,000.00$ $53,000.00 53,000.00$ $100,000.00 100,000.00$ 4.04 Pre-Construction Video LS 1 $5,000.00 5,000.00$ $10,000.00 10,000.00$ $10,000.00 10,000.00$ 4.05 Traffic Control LS 1 $5,000.00 5,000.00$ $16,000.00 16,000.00$ $85,000.00 85,000.00$ 4.06 Environmental Compliance & Erosion & Sediment Control LS 1 $40,000.00 40,000.00$ $35,000.00 35,000.00$ $75,000.00 75,000.00$ 4.07 18-Inch PVC PS-115 Sewer Main LF 1,860 $140.00 260,400.00$ $108.00 200,880.00$ $300.00 558,000.00$ 4.08 8-Inch PVC SDR-26 Sewer Main LF 20 $100.00 2,000.00$ $43.00 860.00$ $85.00 1,700.00$ 4.09 Gravity Sewer Main Trenching & Backfill, 0'-10' Depth LF 240 $40.00 9,600.00$ $65.00 15,600.00$ $50.00 12,000.00$ 4.10 Gravity Sewer Main Trenching & Backfill, 10'-14' Depth LF 1,580 $50.00 79,000.00$ $82.00 129,560.00$ $100.00 158,000.00$ 4.11 Gravity Sewer Main Trenching & Backfill, 14'-18' Depth LF 100 $150.00 15,000.00$ $109.00 10,900.00$ $150.00 15,000.00$ 4.12 5' Diameter Manhole, Up to 6' Depth EA 6 $8,500.00 51,000.00$ $9,600.00 57,600.00$ $8,100.00 48,600.00$ 4.13 5' Diameter Drop Manhole, Up to 6' Depth EA 1 $9,000.00 9,000.00$ $9,600.00 9,600.00$ $10,000.00 10,000.00$ 4.14 5' Diameter Flat Top Manhole with Vent, Up to 6' Depth EA 2 $12,000.00 24,000.00$ $11,900.00 23,800.00$ $15,500.00 31,000.00$ 4.15 5' Diameter Flat Top Drop Manhole with Vent, Up to 6' Depth EA 1 $13,500.00 13,500.00$ $11,900.00 11,900.00$ $15,500.00 15,500.00$ 4.16 5' Diameter Manhole, Extra Depth Over 6'VF 36 $350.00 12,600.00$ $380.00 13,680.00$ $800.00 28,800.00$ 4.17 5' Diameter Drop Manhole, Extra Depth Over 6'VF 20 $400.00 8,000.00$ $380.00 7,600.00$ $800.00 16,000.00$ 4.18 5' Diameter Manhole Epoxy Coating VF 110 $650.00 71,500.00$ $600.00 66,000.00$ $750.00 82,500.00$ 4.19 4' Diameter Manhole, Up to 6' Depth EA 1 $6,500.00 6,500.00$ $5,800.00 5,800.00$ $6,500.00 6,500.00$ 4.20 4' Diameter Manhole, Extra Depth Over 6'VF 2 $300.00 600.00$ $265.00 530.00$ $185.00 370.00$ 4.21 4' Diameter Manhole Epoxy Coating VF 8 $525.00 4,200.00$ $485.00 3,880.00$ $650.00 5,200.00$ 4.22 Watertight Frame and Gasketed Cover EA 11 $1,150.00 12,650.00$ $915.00 10,065.00$ $1,372.40 15,096.40$ 4.23 36-inch Minimum Diameter Steel Casing by Open Cut LF 75 $650.00 48,750.00$ $1,190.00 89,250.00$ $1,174.51 88,088.25$ 4.24 Remove Existing Manhole EA 1 $2,500.00 2,500.00$ $3,450.00 3,450.00$ $5,500.00 5,500.00$ 4.25 Abandon Existing Manhole EA 2 $2,500.00 5,000.00$ $3,250.00 6,500.00$ $3,500.00 7,000.00$ 4.26 Cut and Plug Existing Sanitary Sewer EA 6 $2,500.00 15,000.00$ $3,200.00 19,200.00$ $4,500.00 27,000.00$ 4.27 Install Inserta Valve EA 1 $25,000.00 25,000.00$ $50,000.00 50,000.00$ $35,555.56 35,555.56$ 4.28 Post-Construction CCTV Inspection of Sewer Main LF 1,910 $5.00 9,550.00$ $3.00 5,730.00$ $5.63 10,753.30$ 4.29 Fence Repair EA 1 $2,500.00 2,500.00$ $1,375.00 1,375.00$ $1,500.00 1,500.00$ 4.3 Gravel Drive Repair LF 40 $50.00 2,000.00$ $10.00 400.00$ $80.00 3,200.00$ 4.31 Asphalt Pavement Repair SY 30 $225.00 6,750.00$ $122.00 3,660.00$ $90.00 2,700.00$ 4.32 Full Depth Class 7 Backfill TON 210 $40.00 8,400.00$ $29.00 6,090.00$ $50.00 10,500.00$ 4.33 Trench Dam EA 3 $1,000.00 3,000.00$ $190.00 570.00$ $5,000.00 15,000.00$ 4.34 Rock Excavation CY 100 $250.00 25,000.00$ $300.00 30,000.00$ $220.00 22,000.00$ 4.35 Flowable Fill, as Directed by the Engineer CY 50 $250.00 12,500.00$ $270.00 13,500.00$ $250.00 12,500.00$ 4.36 Trench and Bank Stabilization Material, as Directed by the Engineer TON 100 $65.00 6,500.00$ $170.00 17,000.00$ $50.00 5,000.00$ 4.37 18-Inch DIP Sewer Main LF 40 $300.00 12,000.00$ $290.00 11,600.00$ $400.00 16,000.00$ 954,000.00$ 988,080.00$ 1,659,888.60$ 7,799,100.00$ 8,447,776.00$ 9,304,269.07$ SCHEDULE 4 - FAYETTEVILLE SEWER UPSIZE UNIT PRICE BID SCHEDULE SUBTOTAL SCHEDULE 4 - FAYETTEVILLE SEWER UPSIZE Tri-Star Contractors TOTAL AMOUNT BID (SCHEDULES 1 + 2 + 3 + 4) Brothers ConstructionOrr Construction X2 +$17,000 X13 +$4,550 X13 +$16,250 X2 +$2,300 TOTAL REALIGNMENT + MHs $ 40,100.00 *Minor QTY variances may be required (each) 1220 1225 1230 1235 1240 1245 1250 1255 1260 1220 1225 1230 1235 1240 1245 1250 1255 1260 115+00 116+00 117+00 118+00 119+00 120+00 STA 119+44, MH-11 RIM= 1245.91 INV 15" IN (S)= 1233.71 INV 15" OUT (NE)= 1233.61 STA 118+87, MH-10 RIM= 1244.86 INV 15" IN (SW)= 1233.32 INV 8" IN (NW) = 1237.3 +/- (MATCH INVERT)(OUTSIDE DROP) INV 18" OUT (E)= 1233.12 STA 116+24, MH-9 RIM= 1243.20 INV 18" IN (W)= 1232.33 INV 8" IN (S) = 1234.0 +/- (MATCH INVERT) INV 18" OUT (E)= 1232.23 EXISTING GRADE 2 1 3' M I N I M U M CO V E R ( T Y P ) 3' M I N I M U M CO V E R ( T Y P ) 58 LF - 15" PVC SDR-26 @ 0.50% 106 LF - 15" PVC SDR-26 @ 0.50% 263 LF - 18" PVC PS-115 @ 0.30% STA 119+56 EXISTING 12" FORCE MAIN INV 1242.0 +/- STA 116+79 EXISTING 6" WATER LINE UNKNOWN DEPTH STA 118+16 EXISTING 24" STORM SEWER INV 1238.6 +/- STA 119+61 UNDERGROUND ELECTRIC UNKNOWN DEPTH 1 STA 118+67 EXISTING UNDERGROUND ELECTRIC UNKNOWN DEPTH 1240 1239 1241 12421243 1244 1240 1245 1241 1242 1243 124 4 12 4 5 12 4 5 12 4 6 12 4 6 12 4 7 12 4 7 12 4 5 12 4 1 12 4 1 12 4 2 12 4 2 12 4 3 12 4 3 12 4 4 12 4 6 12 4 3 1243 GA S SWEPCO N RIM ELEV. 1244.75 10" CLAY OUT E 1235.83 10" CLAY IN SE 1236.4 8" PVC IN NW 1236.68 SS SS SS SS SSSSSSSSSSSSSSSS SS SS SS FM FM FM N RIM ELEV. 1243.27 12" ? OUT E 1233.31 12" ? IN W 1233.45 8" ? IN N 1233.36 N RIM ELEV. 1246.89 TOP OF 8"? PVC 1242.30 SS SS SS SS SS PER GIS (NOT FIELD LOCATED) SS SS SS SS SS SS UGE SS SS UGE UGE UGEUG E UGE UGE UGE UGEUG E FMFMFMFMFMFMFMFMFM FM FM FM FM FM W W W W RO W RO W RO W RO W RO W RO W CITY OF FAYETTEVILLE PN: 765-15531-001 DEED 2009-35547 29 TRACT SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS 115+00 116+00 117+00 118+00 11 9 + 0 0 12 0 + 0 0 S S S UG E TCE TC E TC E TC E TC E STA 119+56 EXISTING 12" FORCE MAIN STA 116+79 EXISTING 6" WATER LINE 18" PVC PS-115 15" PVC SDR 26 25' P E ABANDON EXISTING MANHOLE AFTER NEW SANITARY SEWER IS PLACED IN SERVICE CUT AND PLUG 8" SANITARY SEWER (S) ABANDON EXISTING MANHOLE AFTER NEW SANITARY SEWER IS PLACED IN SERVICE CUT AND PLUG 8" SANITARY SEWER (S) STA 118+16 EXISTING STORM STA 119+61 UNDERGROUND ELECTRIC WORKING LIMITS 20' T C E 35 LF OF GRAVEL DRIVE REPAIR STA 116+60 TRENCH DAM SEE DETAIL WOTUS CROSSING (DR26) SEE SHEET C33. INSTALL CHECK DAMS AND LIMIT DISTURBANCE TO EXISTING PERENNIAL STREAM (DR25). DO NOT DISTURB OUTSIDE OF PERMANENT EASEMENT. STA 116+24, MH-9 CONSTRUCT 5' DIAMETER MANHOLE WITH WATERTIGHT FRAME AND GASKETED COVER OVER EXISTING 8" SANITARY SEWER STA 118+87, MH-10 CONSTRUCT 5' DIAMETER FLAT TOP DROP MANHOLE WITH WATERTIGHT FRAME AND GASKETED COVER OVER EXISTING 8" SANITARY SEWER 6" SCREEN VENT = 1247.50 STA 119+44, MH-11 CONSTRUCT 4' DIAMETER MANHOLE WITH WATERTIGHT FRAME AND GASKETED COVER INSTALL SEWER MARKER POST 50 ' 0 10 20 4020 1 inch = 20ft. ( IN FEET ) PLAN SCALE GRAVITY MAIN ALIGNMENT PROFILE HORIZONTAL SCALE: 1" = 20' VERTICAL SCALE: 1" = 5' SCALE: DATE: DRAWN BY:DESIGNED BY: JOB NUMBER: ORIGINAL SIGNATURE ON FILE REVISION: RE V I S I O N S RE V DA T E DE S C R I P T I O N HT T P : / / W W W . M C E . U S . C O M PRELIMINARY NOT FOR CONSTRUCTION 1 BASED ON CONSTANT SLOPE BETWEEN EXISTING MANHOLES. 2 BASED ON HYDRO EXCAVATION IN THE VICINITY. 3 CONTRACTOR SHALL VERIFY ELEVATION PRIOR TO INSTALLING SANITARY SEWER. UTILITY KEYNOTES 15 8 0 E S T E A R N S S T FA Y E T T E V I L L E , A R K A N S A S 7 2 7 0 3 (4 7 9 ) 4 4 3 - 2 3 7 7 C 20 2 4 SE W E R S Y S T E M T O F A Y E T T E V I L L E LI F T S T A T I O N A N D GR E E N L A N D , A R K A N S A S GRAVITY MAIN STA 115+00 TO STA 120+00 TLW JCW MAY 2024 IFC AS NOTED 21-2120 C-21W: \ 2 0 2 1 \ 2 1 - 2 1 2 0 - G r e e n l a n d W a s t e w a t e r S y s t e m R e h a b i l i t a t i o n \ D e s i g n D r a w i n g s \ S h e e t s \ G M S h e e t s . d w g , P R I N T E D O N : Ma y 1 0 , 2 0 2 4 @ 10 : 1 1 A M MA T C H L I N E ST A 1 1 5 + 0 0 SH E E T C- 2 0 MA T C H L I N E ST A 1 1 5 + 0 0 SH E E T C- 2 0 MA T C H L I N E ST A 1 2 0 + 0 0 SH E E T C- 2 2 MATCHLINE STA 120+00 SHEET C-22 BID S C H E D U L E 3 GREE N L A N D GRAV I T Y M A I N BID S C H E D U L E 4 FAYE T T E V I L L E SEWE R U P S I Z E BID SCHEDULE 3 GREENLAND GRAVITY MAIN BID SCHEDULE 4 FAYETTEVILLE SEWER UPSIZE 1.ALL MANHOLE COVERS WITHIN BID SCHEDULE 4 TO INCLUDE WORDS "FAYETTEVILLE ARKANSAS" 2.THE EXACT LOCATION OF NUMBER OF SEWER SERVICES IS NOT KNOWN. THE CONTRACTOR SHALL LOCATE, PROTECT, AND MAINTAIN ALL SEWER SERVICES. ANY DAMAGE WILL BE THE CONTRACTOR'S RESPONSIBILITY TO REPAIR. CONTRACTOR SHALL TRANSFER SERVICES TO NEW MAIN. PLAN NOTES 05-14-2024 124 3 1243 SSSSSSSSSS SS SS SS 113+ 0 0 114+00 115 S STA 1 1 3 + 4 6 , M H - 8 CON S T R U C T 5 ' D I A M E T E R M A N H O L E W I T H WATE R T I G H T F R A M E A N D G A S K E T E D C O V E R INS T A L L S E W E R M A R K E R P O S T MA T C H L I N E ST A 1 1 5 + 0 0 SH E E T C- 2 0 1220 1225 1230 1235 1240 1245 1250 1255 1260 MA T C H L I N E 1220 1225 1230 1235 1240 1245 1250 1255 1260 114+00 115+00 STA 113+46, MH-8 RIM= 1242.91 INV 18" IN (W)= 1231.40 INV 18" OUT (SE)= 1231.30 278 LF - 18" PVC PS-115 @ 0.30% MA T C H L I N E ST A 1 1 5 + 0 0 SH E E T C- 2 1 115+00 PLAN 5' - 1 / 4 " 7' - 6 " STA 118+30 NEW MH 10B SET PRE-CAST MH NEW STA 118+00 NEW MH 10A NEW CAST IN PLACE MH N S EW SW SE NENW 30'-1 0 3 / 4 " ~30 LF (SWbW) 18" PVC PS-115 10'-0" 177'-11 3/4" ~175 LF (W) 18" PVC PS-115 NEW STA 116+25 NEW MH 10A NEW PRE-CAST MH SHIFT MH-9 ~5LF DUE NORTH PER FIELD DISCUSSION AND COORDINATION 5' - 1 0 1 / 4 " 10 ' - 0 " 1232.92 0' - 2 1 / 2 " STA 118+00, NEW MH 10A 26 ' - 5 " 24 ' - 8 3 / 4 " ~113+ 5 0 TIE INTO MH-8 ON EXISTING GRADE & ALIGNMENT 271'-7 1/2" SET DESIGN MH 9 ~5 DUE NORTH OF DESIGN LOCATION CONTRACTOR SHALL RESUME CONSTRUCTION IN ACCORDANCE WITH IFC DESIGN AT MH-8. STA 118+30 NEW MH 9B SET NEW MH STA 118+00 NEW MH 9A SET NEW MH 6' - 3 " STA 118+30 NEW MH 9B STA 118+00 NEW MH 9A (day) (width) (depth) (length) 8 3 4 58 696 25.78 3 4 42 504 18.67 8 8 2 128 4.74 8 8 2 128 4.74 12 4 2 98 784 29.04 13 4 2 66 528 19.56 3.5 1.5 160 840 31.11 3.5 1.5 168 882 32.67 8 8 1.5 96 3.56 8 8 1.5 96 3.56 3.5 1.5 98 514.5 19.06 4 2 62 496 18.37 4 2 84 672 24.89 31 4 2 28 224 8.30 3 4 1 84 336 12.44 4 4 1 50 200 7.41 5 4 1 70 280 10.37 10 4 1 150 600 22.22 13 4 1 150 600 22.22 16 4 1 150 600 22.22 SCHEDULE 4 - ROCK EXCAVATION TOTAL (yd3) TOTAL ROCK (CY) 340.91 May June 30 Date (month) 1) Daily rock excavation numbers from MCE observer's daily reports 2) Rock excavation quantities recorded are less than total billed by Orr 3) Relevant observation reports - Attachment A 9 15 16 Dimensions (ft)TOTAL (ft3) 1580 East Stearns Street Fayetteville, AR 72703 (479) 443.2377 P | (479) 443.9241 F mce.us.com (day) (width) (depth) (length) 8 3 4 58 696 25.78 3 4 42 504 18.67 8 8 2 128 4.74 8 8 2 128 4.74 12 4 2 98 784 29.04 13 4 2 66 528 19.56 3.5 1.5 160 840 31.11 3.5 1.5 168 882 32.67 8 8 1.5 96 3.56 8 8 1.5 96 3.56 3.5 1.5 98 514.5 19.06 4 2 62 496 18.37 4 2 84 672 24.89 31 4 2 28 224 8.30 3 4 1 84 336 12.44 4 4 1 50 200 7.41 5 4 1 70 280 10.37 10 4 1 150 600 22.22 13 4 1 150 600 22.22 16 4 1 150 600 22.22 SCHEDULE 4 - ROCK EXCAVATION TOTAL (yd3) TOTAL ROCK (CY) 340.91 May June 30 Date (month) 1) Daily rock excavation numbers from MCE observer's daily reports 2) Rock excavation quantities recorded are less than total billed by Orr 3) Relevant observation reports - Attachment A 9 15 16 Dimensions (ft)TOTAL (ft3) ATTACHMENT A RFI 12 - Gravity Sewer Realignment & Additional MHs Construction Reports for Rock Excavation Review Observer  Project  Date  Job #  Report #  Contractor  Sunny  Partly Cloudy  Temperature Min (F)  Cloudy  Rain Temperature Max (F)  Rained Out Rainfall Amount (In.)  HOURS WORKED SITE CONDITIONS  EQUIPMENT WORKING  TRACKHOE  BACKHOE  TRENCHER SCRAPER DOZER  AM Acceptable  GRADER  COMPACTOR PAVER  PUMPS  PM  Partly Useable    Not Workable  CONC. VIBRATOR  DUMP TRUCKS SKIDDER SKYTRACK  PERSONNEL WORKING  Superintendent  Foreman Operators Laborers  DESCRIPTION & LOCATION OF WORK IN PROGRESS (Also photos, tests, results, deficiencies, delays,  etc.)  Date  Report #  Observer  Project  Date  Job #  Report #  Contractor  Sunny  Partly Cloudy  Temperature Min (F)  Cloudy  Rain Temperature Max (F)  Rained Out Rainfall Amount (In.)  HOURS WORKED SITE CONDITIONS  EQUIPMENT WORKING  TRACKHOE  BACKHOE  TRENCHER SCRAPER DOZER  AM Acceptable  GRADER  COMPACTOR PAVER  PUMPS  PM  Partly Useable    Not Workable  CONC. VIBRATOR  DUMP TRUCKS SKIDDER SKYTRACK  PERSONNEL WORKING  Superintendent  Foreman Operators Laborers  DESCRIPTION & LOCATION OF WORK IN PROGRESS (Also photos, tests, results, deficiencies, delays,  etc.)  Observer  Project  Date  Job #  Report #  Contractor  Sunny  Partly Cloudy  Temperature Min (F)  Cloudy  Rain Temperature Max (F)  Rained Out Rainfall Amount (In.)  HOURS WORKED SITE CONDITIONS  EQUIPMENT WORKING  TRACKHOE  BACKHOE  TRENCHER SCRAPER DOZER  AM Acceptable  GRADER  COMPACTOR PAVER  PUMPS  PM  Partly Useable    Not Workable  CONC. VIBRATOR  DUMP TRUCKS SKIDDER SKYTRACK  PERSONNEL WORKING  Superintendent  Foreman Operators Laborers  DESCRIPTION & LOCATION OF WORK IN PROGRESS (Also photos, tests, results, deficiencies, delays,  etc.)  Observer  Project  Date  Job #  Report #  Contractor  Sunny  Partly Cloudy  Temperature Min (F)  Cloudy  Rain Temperature Max (F)  Rained Out Rainfall Amount (In.)  HOURS WORKED SITE CONDITIONS  EQUIPMENT WORKING  TRACKHOE  BACKHOE  TRENCHER SCRAPER DOZER  AM Acceptable  GRADER  COMPACTOR PAVER  PUMPS  PM  Partly Useable    Not Workable  CONC. VIBRATOR  DUMP TRUCKS SKIDDER SKYTRACK  PERSONNEL WORKING  Superintendent  Foreman Operators Laborers  DESCRIPTION & LOCATION OF WORK IN PROGRESS (Also photos, tests, results, deficiencies, delays,  etc.)  Observer  Project  Date  Job #  Report #  Contractor  Sunny  Partly Cloudy  Temperature Min (F)  Cloudy  Rain Temperature Max (F)  Rained Out Rainfall Amount (In.)  HOURS WORKED SITE CONDITIONS  EQUIPMENT WORKING  TRACKHOE  BACKHOE  TRENCHER SCRAPER DOZER  AM Acceptable  GRADER  COMPACTOR PAVER  PUMPS  PM  Partly Useable    Not Workable  CONC. VIBRATOR  DUMP TRUCKS SKIDDER SKYTRACK  PERSONNEL WORKING  Superintendent  Foreman Operators Laborers  DESCRIPTION & LOCATION OF WORK IN PROGRESS (Also photos, tests, results, deficiencies, delays,  etc.)  Observer  Project  Date  Job #  Report #  Contractor  Sunny  Partly Cloudy  Temperature Min (F)  Cloudy  Rain Temperature Max (F)  Rained Out Rainfall Amount (In.)  HOURS WORKED SITE CONDITIONS  EQUIPMENT WORKING  TRACKHOE  BACKHOE  TRENCHER SCRAPER DOZER  AM Acceptable  GRADER  COMPACTOR PAVER  PUMPS  PM  Partly Useable    Not Workable  CONC. VIBRATOR  DUMP TRUCKS SKIDDER SKYTRACK  PERSONNEL WORKING  Superintendent  Foreman Operators Laborers  DESCRIPTION & LOCATION OF WORK IN PROGRESS (Also photos, tests, results, deficiencies, delays,  etc.)  Observer  Project  Date  Job #  Report #  Contractor  Sunny  Partly Cloudy  Temperature Min (F)  Cloudy  Rain Temperature Max (F)  Rained Out Rainfall Amount (In.)  HOURS WORKED SITE CONDITIONS  EQUIPMENT WORKING  TRACKHOE  BACKHOE  TRENCHER SCRAPER DOZER  AM Acceptable  GRADER  COMPACTOR PAVER  PUMPS  PM  Partly Useable    Not Workable  CONC. VIBRATOR  DUMP TRUCKS SKIDDER SKYTRACK  PERSONNEL WORKING  Superintendent  Foreman Operators Laborers  DESCRIPTION & LOCATION OF WORK IN PROGRESS (Also photos, tests, results, deficiencies, delays,  etc.)  Date  Report #  Observer  Project  Date  Job #  Report #  Contractor  Sunny  Partly Cloudy  Temperature Min (F)  Cloudy  Rain Temperature Max (F)  Rained Out Rainfall Amount (In.)  HOURS WORKED SITE CONDITIONS  EQUIPMENT WORKING  TRACKHOE  BACKHOE  TRENCHER SCRAPER DOZER  AM Acceptable  GRADER  COMPACTOR PAVER  PUMPS  PM  Partly Useable    Not Workable  CONC. VIBRATOR  DUMP TRUCKS SKIDDER SKYTRACK  PERSONNEL WORKING  Superintendent  Foreman Operators Laborers  DESCRIPTION & LOCATION OF WORK IN PROGRESS (Also photos, tests, results, deficiencies, delays,  etc.)  Observer: Luis Martinez Project: Greenland QC: Signed: DATE 06/03/2025 WORK DAY Working SITE CONDITIONS Acceptable JOB # 212120 CONTRACTOR ORR Construction HOURS WORKED Start: 07:00 End: 19:00 WEATHER CONDITIONS Sunny EQUIPMENT WORKING Trackhoes Skidders QTY 2 1 PERSONNEL WORKING Laborers Foreman Operators QTY 8 1 2 DESCRIPTION & LOCATION OF WORK IN PROGRESS The crew began excavation for a 36-inch casing using open cut 45. During trenching, they encountered significant rock formations, which slowed progress and required additional effort to remove. Due to high groundwater levels within the trench, three pumps were operated simultaneously to control water accumulation and maintain workable conditions. Despite the challenges, the crew successfully installed 84 feet of 18-inch sewer pipe by the end of the workday. you can find this on section 105 on the blueprints . 18” sewer pipe.84’ Trenching 10’-14’= 84’ Rock excavation 84’x4’x1’-6” =18.66 36” steel casing by open cut. 45’ CORRISPONDENCE MATERIALS Item Qty Unit Location Description Pipe 84 Feet Casing 30 Feet LOCATION 22-2119: Fayetteville's Schedule Date: 06/03/2025 IMAGES Observer: Luis Martinez Project: Greenland QC: Signed: DATE 06/04/2025 WORK DAY Working SITE CONDITIONS Acceptable JOB # 212120 CONTRACTOR ORR Construction HOURS WORKED Start: 07:00 End: 19:00 WEATHER CONDITIONS Sunny EQUIPMENT WORKING Trackhoes Skidders QTY 2 1 PERSONNEL WORKING Laborers Foreman Operators QTY 8 1 2 DESCRIPTION & LOCATION OF WORK IN PROGRESS ORR In the morning, the crew spent approximately two hours pumping out groundwater from the trench to prepare the site for pipe i nstallation. Once dewatering was complete, they proceeded to install 140 feet of 18 -inch sewer pipe. After the lunch break, the crew installed Manhole #6. Progress was slower than usual due to ongoing challenges with rock excavation throughout the day. You can find this on se ction 108 on the blueprints. 6/4/25. 18” sewer pipe. 140’ Trenching 10’-14’= 140’ Rock excavation 50’x1’x4’ =14.81 cy 5’ dia manhole = 1 5’ dia extra depth manhole = 4. VF CORRISPONDENCE MATERIALS Item Qty Unit Location Description Pipe 140 Feet LOCATION 22-2119: Fayetteville's Schedule Date: 06/04/2025 IMAGES Observer: Luis Martinez Project: Greenland QC: Signed: DATE 06/05/2025 WORK DAY Working SITE CONDITIONS Acceptable JOB # 212120 CONTRACTOR ORR Construction HOURS WORKED Start: 07:00 End: 20:00 WEATHER CONDITIONS Sunny EQUIPMENT WORKING Trackhoes Skidders QTY 2 1 PERSONNEL WORKING Laborers Foreman Operators QTY 8 1 2 DESCRIPTION & LOCATION OF WORK IN PROGRESS ORR It was a productive day on site. The crew began by installing Manhole #5 and constructing a drop structure for it. Following that, they proceeded with the installation of a casing open cut 30. In addition to these tasks, the crew successfully installed 196 feet of 18-inch sewer pipe, you can find this on section 106 on the blueprints. 18” sewer pipe. 196’ Trenching 10’-14’= 196’ Rock excavation 70’x1’x4’ =10.37cy 5’ dia manhole = 1 5’ dia extra depth manhole = 3.5 VF 36” casing by open cut = 30’ CORRISPONDENCE MATERIALS Item Qty Unit Location Description Pipe 196 Feet LOCATION 22-2119: Fayetteville's Schedule Date: 06/05/2025 IMAGES Observer: Luis Martinez Project: Greenland QC: Signed: DATE 06/10/2025 WORK DAY Working SITE CONDITIONS Acceptable JOB # 212120 CONTRACTOR ORR Construction HOURS WORKED Start: 07:00 End: 19:00 WEATHER CONDITIONS Sunny EQUIPMENT WORKING Trackhoes Skidders QTY 2 1 PERSONNEL WORKING Laborers Foreman Operators QTY 6 1 2 DESCRIPTION & LOCATION OF WORK IN PROGRESS ORR Today, the crew installed 350 feet of 18-inch sewer main. They also installed manhole number 3 and completed the framing and pouring of the drop structure for the manhole. Significant rock excavation was performed throughout the day. To conclude the day’s work, a trench dam was constructed as detailed in Section 104 of the blueprints. 18” sewer pipe. 350’ Trenching 10’-14’= 350’ Rock excavation 150’x1’x4’ =22.22 cy 5’ dia extra depth manhole = 9.5VF 5’ día drop manhole 1 Trench dam 2 CORRISPONDENCE MATERIALS Item Qty Unit Location Description Pipe 25 LOCATION 22-2119: Fayetteville's Schedule Date: 06/10/2025 IMAGES Observer: Luis Martinez Project: Greenland QC: Signed: DATE 06/13/2025 WORK DAY Non-Working (Weather) SITE CONDITIONS Not Workable JOB # 212120 CONTRACTOR ORR Construction HOURS WORKED Start: 07:00 End: 19:00 WEATHER CONDITIONS Rain EQUIPMENT WORKING Trackhoes Skidders QTY 2 1 PERSONNEL WORKING Laborers Foreman Operators QTY 6 1 2 DESCRIPTION & LOCATION OF WORK IN PROGRESS Work was not possible today due to persistent rain. The crew returned to Oklahoma. Rain is also forecasted for Thursday and F riday, so no work is expected until the weather clears. 18” sewer pipe. 350’ Trenching 10’-14’= 350’ Rock excavation 150’x1’x4’ =22.22 cy 5’ dia extra depth manhole = 9.5VF 5’ día drop manhole 1 Trench dam 2 CORRISPONDENCE MATERIALS Item Qty Unit Location Description Pipe 25 LOCATION 22-2119: Fayetteville's Schedule Observer: Luis Martinez Project: Greenland QC: Signed: DATE 06/16/2025 WORK DAY Non-Working SITE CONDITIONS Not Workable JOB # 212120 CONTRACTOR ORR Construction HOURS WORKED Start: 07:00 End: 19:00 WEATHER CONDITIONS Partly Cloudy EQUIPMENT WORKING Trackhoes Skidders QTY 2 1 PERSONNEL WORKING Laborers Foreman Operators QTY 6 1 2 DESCRIPTION & LOCATION OF WORK IN PROGRESS The crew did not perform any pipe installation today due to poor site conditions. Most of the day was spent pumping groundwat er, which continues to flow into the trench area. The site remains extremely muddy and not workable for excavation. Crews focused o n general cleanup. 18” sewer pipe. 350’ Trenching 10’-14’= 350’ Rock excavation 150’x1’x4’ =22.22 cy 5’ dia extra depth manhole = 9.5VF 5’ día drop manhole 1 Trench dam 2 CORRISPONDENCE MATERIALS Item Qty Unit Location Description Pipe 25 LOCATION 22-2119: Fayetteville's Schedule 22-2119 OC24020 12 From 09/21/25 to 10/25/25 10/31/25 A C D E F G H I J K L Item Quantity Units Unit Price ($) Value of Bid Item (C X E) ($) Estimated Quantity Incorporated in the Work Value of Work Completed to Date (E X G) ($) 4.01 1.00 LS 40,000.00 40,000.00 1.00 40,000.00 40,000.00 100% - 4.02 1.00 LS 50,000.00 50,000.00 1.00 50,000.00 50,000.00 100% - 4.03 1.00 LS 50,000.00 50,000.00 1.00 50,000.00 50,000.00 100% - 4.04 1.00 LS 5,000.00 5,000.00 1.00 5,000.00 5,000.00 100% - 4.05 1.00 LS 5,000.00 5,000.00 1.00 5,000.00 5,000.00 100% - 4.06 1.00 LS 40,459.14 40,459.14 1.00 40,459.14 40,459.14 100% - 4.07 1,860.00 LF 129.31 240,517.53 1,860.00 240,517.53 240,517.53 100% - 1,860.00 LF 7.61 14,148.09 1,860.00 14,148.09 14,148.09 100% - 1,860.00 LF 12.17 22,636.94 1,860.00 22,636.94 22,636.94 100% - 1,860.00 LF 3.04 5,659.24 1,860.00 5,659.24 5,659.24 100% - 4.08 20.00 LF 87.55 1,751.00 20.00 1,751.00 1,751.00 100% - 20.00 LF 5.15 103.00 20.00 103.00 103.00 100% - 20.00 LF 8.24 164.80 20.00 164.80 164.80 100% - 20.00 LF 2.06 41.20 20.00 41.20 41.20 100% - 4.09 240.00 LF 40.00 9,600.00 240.00 9,600.00 9,600.00 100% - 4.10 1,580.00 LF 50.00 79,000.00 1,580.00 79,000.00 79,000.00 100% - 4.11 100.00 LF 150.00 15,000.00 100.00 15,000.00 15,000.00 100% - 4.12 6.00 EA 8,500.00 51,000.00 6.00 51,000.00 51,000.00 100% - 4.13 1.00 EA 9,000.00 9,000.00 1.00 9,000.00 9,000.00 100% - 4.14 2.00 EA 12,000.00 24,000.00 2.00 24,000.00 24,000.00 100% - 4.15 1.00 EA 13,500.00 13,500.00 1.00 13,500.00 13,500.00 100% - 4.16 36.00 VF 350.00 12,600.00 36.00 12,600.00 12,600.00 100% - 4.17 20.00 VF 400.00 8,000.00 20.00 8,000.00 8,000.00 100% - 4.18 110.00 VF 650.00 71,500.00 110.00 71,500.00 71,500.00 100% - 4.19 1.00 EA 6,500.00 6,500.00 1.00 6,500.00 6,500.00 100% - 4.20 2.00 VF 300.00 600.00 2.00 600.00 600.00 100% - 4.21 8.00 VF 525.00 4,200.00 8.00 4,200.00 4,200.00 100% - 4.22 11.00 EA 1,336.00 14,696.00 11.00 14,696.00 14,696.00 100% - 4.23 75.00 LF 836.20 62,715.00 75.00 62,715.00 62,715.00 100% - 4.24 1.00 EA 2,500.00 2,500.00 1.00 2,500.00 2,500.00 100% - 4.25 2.00 EA 2,500.00 5,000.00 2.00 5,000.00 5,000.00 100% - 4.26 6.00 EA 2,715.50 16,293.00 6.00 16,293.00 16,293.00 100% - 4.27 1.00 EA 28,983.00 28,983.00 1.00 28,983.00 28,983.00 100% - 4.28 1,910.00 LF 5.00 9,550.00 1,910.00 9,550.00 9,550.00 100% - 4.29 1.00 EA 2,500.00 2,500.00 1.00 2,500.00 2,500.00 100% - 4.30 40.00 LF 50.00 2,000.00 40.00 2,000.00 2,000.00 100% - 4.31 30.00 SY 225.00 6,750.00 30.00 6,750.00 6,750.00 100% - 4.32 210.00 TONS 40.00 8,400.00 210.00 8,400.00 8,400.00 100% - 4.33 3.00 EA 1,000.00 3,000.00 3.00 3,000.00 3,000.00 100% - 4.34 100.00 CY 250.00 25,000.00 100.00 25,000.00 25,000.00 100% - 4.35 50.00 CY 250.00 12,500.00 50.00 12,500.00 12,500.00 100% - 4.36 100.00 TONS 65.00 6,500.00 100.00 6,500.00 6,500.00 100% - 4.37 40.00 LF 334.40 13,376.00 40.00 13,376.00 13,376.00 100% - - - - - - - - - - - - - - - - - - - - - - - - - 999,743.94$ 999,743.94$ -$ 999,743.94$ 100% -$ - - - - 4.09 94.00 LF (40.00) (3,760.00) 94.00 (3,760.00) (3,760.00) 100% - 4.10 90.00 LF 50.00 4,500.00 90.00 4,500.00 4,500.00 100% - 4.11 36.00 LF (150.00) (5,400.00) 36.00 (5,400.00) (5,400.00) 100% - 4.12 2.00 EA 8,500.00 17,000.00 2.00 17,000.00 17,000.00 100% - 4.16 14.00 VF 350.00 4,900.00 14.00 4,900.00 4,900.00 100% - 4.18 26.00 VF 650.00 16,900.00 26.00 16,900.00 16,900.00 100% - 4.21 4.00 VF (525.00) (2,100.00) 4.00 (2,100.00) (2,100.00) 100% - 4.22 2.00 EA 1,336.00 2,672.00 2.00 2,672.00 2,672.00 100% - 4.31 18.00 CY (225.00) 4,050.00 18.00 (4,050.00) (4,050.00) -100% 8,100.00 4.32 2.50 TONS 40.00 100.00 2.50 100.00 100.00 100% - 4.34 169.68 CY 250.00 42,420.00 169.68 42,420.00 42,420.00 100% - 4.35 50.00 CY (250.00) (12,500.00) 50.00 (12,500.00) (12,500.00) 100% - 4.36 100.00 TONS (65.00) (6,500.00) 100.00 (6,500.00) (6,500.00) 100% - - - - - - - - - 62,282.00$ 54,182.00$ -$ 54,182.00$ 87% 8,100.00$ 54,106.08$ 1,062,025.94$ 1,053,925.94$ -$ 1,053,925.94$ 99% 8,100.00$ CO 1 45743.94 CO 2 41472 B Original Contract % of Value of Item (J / F) (%) Balance to Finish (F - J) ($)Description Work Completed Final Project Reconciliation Owner's Project No.: Engineer's Project No.: Contractor's Project No.: City of Fayetteville, AR McClelland Consulting Engineers, Inc. Orr Construction, Inc. Lift Station and Sewer System to Fayetteville Owner: Engineer: Contractor: Project: Contract: Application Date:Application Period:Application No.: Materials Currently Stored (not in G) ($) Work Completed and Materials Stored to Date (H + I) ($) Contract Information Bid Item No. Project Totals Change Order 2 Fayetteville Sch 4 Final Reconciliation Rock Excavation Flowable Fill, as directed by the Engineer Trench and Bank Stabilization material, as directed by the Change Order Totals Original Contract and Change Orders 5' Diameter Manhole, Up to 6' Depth 5' Diameter Manhole, Extra Depth Over 6' 5' Diameter Manhole, Epoxy Coating Watertight Frame and Gasketed Cover Full Depth Class 7 Backfill Gravity Sewer main Trenching & Backfill 10'-14' Depth Gravity Sewer main Trenching & Backfill 0'-10' Depth Gravity Sewer main trenching & backfill 14'-18' Depth 4' Dia Manhole epoxy coating Asphalt Pavement Repair Mobilization Bonds & Insurance Schedule 4 Fayetteville Sewer Upsize Act 291, 1993 Trench & Excavation Safety System Pre-Construction Video Traffic Control Environmental Compliance & Erosion & Sediment Control 18" PVC PS-115 Sewer main 18" PVC PS-115 Sewer main 18" PVC PS-115 Sewer main 18" PVC PS-115 Sewer main 8" PVC SDR-26 Sewer Main 5' dia drop manhole up to 6' depth 5' dia flat top manhole with vent, up to 6' depth 5' dia flat top drop manhole with vent up to 6' depth 5' dia manhole extra depth over 6' 5' dia drop manhole extra depth over 6' 8" PVC SDR-26 Sewer Main Gravity Sewer main Trenching & Backfill 0'-10' Depth Gravity Sewer main Trenching & Backfill 10'-14' Depth Gravity Sewer main trenching & backfill 14'-18' Depth 5' dia manhole up to 6' depth 8" PVC SDR-26 Sewer Main 8" PVC SDR-26 Sewer Main 36" Min. Dia. Steel Casing by Open Cut Remove Existing MH Abandon Existing MH Cut & Plug Existing Sewer Service Install Inserta Valve 5' dia manhole epoxy coating 4' Dia Manhole, up to 6' depth 4' Dia Manhole, extra depth over 6' 4' Dia Manhole epoxy coating Watertight Frame and Gasketed Cover Trench Dam Rock Excavation Flowable Fill, as directed by the Engineer Trench and Bank Stabilization material, as directed by the 18" DIP Sewer Main Post-Construction CCTV Inspection of Sewer Main Fence Repair Gravel Drive Repair Asphalt Pavement Repair Full Depth Class 7 Backfill Original Contract Totals Change Orders Unit Price EJCDC C-620 Contractor's Application for Payment (c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved.1 of 1 1580 East Stearns Street Fayetteville, AR 72703 (479) 443.2377 P | (479) 443.9241 F mce.us.com Comments: 2024-250Purchase Order Number: Change Order Number:1 Previous Ordinance or Resolution #7-24 Approval Date: Original Contract Number:2024-7 04039.2301 Budget Impact: Water & Sewer Cost Sharing Water and Sewer5400.720.5700-5815.00 City of Fayetteville Staff Review Form 2025-0950 N/A Staff recommends approval to utilize contingency funds in the amount of $99,925.94 for the City of Greenland sewer cost share project. N/A for Non-Agenda Item Action Recommendation: Tim Nyander WATER SEWER (720) Division / Department 12/4/2025 Submitted Date Yes 1,054,201.04$ 99,925.94$ V20221130 Budgeted Item? Does item have a direct cost? Is a Budget Adjustment attached? Total Amended Budget Expenses (Actual+Encum) Item Cost Budget Adjustment Remaining Budget 3,062,335.00$ 2,008,133.96$ Yes No -$ 954,275.10$ 12-12-2025 TO: Mayor Molly Rawn THRU: Keith Macedo, Chief of Staff FROM: Tim Nyander, Utilities Director DATE: December 4, 2025 SUBJECT: City of Greenland – Contingency Funds for Sewer Cost Share RECOMMENDATION: Staff recommends approval to utilize contingency funds in the amount of $99,925.94 for the City of Greenland sewer cost share project. BACKGROUND: Resolution 7-24 passed City Council approval on January 2, 2024, which authorized a cost share agreement with the City of Greenland in an amount not to exceed $954,000.00 and a contingency in the amount of $100,000.00. The City’s portion of the cost share is for the upsizing of a sanitary sewer line from 12-inch to 18-inch. DISCUSSION: The construction project for the sewer line is complete, and McClelland Consulting Engineers and City Staff have reconciled the final project quantities and determined the total amount that the City of Fayetteville owes the City of Greenland. It was determined that two additional sewer manholes and a gravity sewer realignment were needed during construction. Also, material price increases and rock excavation contributed to the increased overall project cost. Contingency funds are needed in the amount of $99,925.94, for a total City cost share amount of $1,053,925.94. Staff recommends approval of the use of available contingency funds in the amount of $99,925.94. BUDGET/STAFF IMPACT: Funds are available in the Water & Sewer Impact Fee Cost Sharing account, and the project contingency in the amount of $100,000.00 was previously approved by Resolution 7-24. Attachments: McClelland Reconciliation Documents Resolution 7-24 City of Fayetteville 22-2119 03/14/2022 22-2119 954,000.00 954,000.00 45,743.94 999,743.94 Only reflect costs associated with Fayetteville's portion of the project. No signatures, but can be revised and made official as necessary. EJCDC C-941 Change Order Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute. Page 1 of 2 Section 00 68 00-1 Change Order No. 2 Date of Issuance: Effective Date: Project: Lift Station and Sanitary Sewer to Fayetteville Owner: City of Fayetteville Owner's Contract No.: 22-2119 Contract: Date of Contract: 03/14/2022 Contractor: Orr Construction, Inc. Engineer's Project No.: 22-2119 The Contract Documents are modified as follows upon execution of this Change Order: Description: 1) Additional Manholes and Realignment During construction, the existing Fayetteville Sewer Force Main was incorrectly marked and was damaged by the Contractor. To maintain proper slope and drops, two (2) additional manholes were added to realign the new gravity sewer around the existing force main. This revision was addressed under RFI No. 12, with no new bid items created. However, quantity overruns resulting from the realignment are included in this Change Order No. 2. 2) Supporting Documentation • Attachment A – RFI 12 Fayetteville Gravity Sewer Realignment • Table 1 – Quantity Overruns: Item No. Item Description Additional Cost 4.12 5' Diameter Manhole, Up to 6' Depth $ 17,000.00 4.16 5' Diameter Manhole, Extra Depth Over 6' $ 4,900.00 4.18 5' Diameter Manhole Epoxy Coating $ 16,900.00 4.22 Watertight Frame and Gasketed Cover $ 2,672.00 TOTAL COST OVERRUN $ 41,472.00 954,000.00 954,000.00 45,743.94 999,743.94 Only reflect costs associated with Fayetteville's portion of the project. No signatures, but can be revised and made official as necessary. $ 954,000.00 Increase from previously approved Change Orders No. 1 to No. 2: $ 45,743.94 Contract Price prior to this Change Order: $ 999,743.94 Increase of this Change Order: $ 41,472.00 Contract Price incorporating this Change Order: $ 1,041,215.94 ATTACHMENT A RFI 12 - Gravity Sewer Realignment & Additional MHs RFI Response Greenland, AR Lift Station and Sewer System MCE Project No. 21-2120 Submittals included in this review: Comments: Engineer Review PERMITTED AS SUBMITTED BY DATE SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITY AND GENERAL CONFORMANCE TO CONTRACT DOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLE FOR CONFIRMING AND CORRELATING DIMENSIONS AT JOBSITE FOR TOLERANCE, CLEARANCE, QUANTITIES, FABRICATION, PROCESSES AND TECHNIQUES OF CONSTRUCTION, COORDINATION OF THEIR WORK WITH OTHER TRADES AND FULL COMPLIANCE WITH CONTRACT DOCUMENTS. PERMITTED AS NOTED REJECTED REVISE AND RESUBMIT FOR INFORMATION ONLY 4 B.R. Knutson 5/9/2025 SHOP DRAWING / SUBMITTAL REVIEW (22-2119 Fayetteville 18" Gravity Sewer) RFI 12 - 18" Gravity Sewer Realignment and Additional MHs Add two additional epoxy coated 5' manholes w/ watertight & gasketed frame and cover Approximately 480LF for realign from STA 118+30 to MH 8 Survey of new proposed alignment must be conducted prior to construction All slope of revised alignment shall be between 0.22% and 0.26% Minimum of 0.1' drop across MH inverts Cast in place MHs shall be prioritized over repair couplings on gravity sewer Add two additional epoxy coated 5' manholes w/ watertight & gasketed frame and cover Approximately 480LF for realign from STA 118+30 to MH 8 Survey of new proposed alignment must be conducted prior to construction All slope of revised alignment shall be between 0.22% and 0.26% Minimum of 0.1' drop across MH inverts Cast in place MHs shall be prioritized over repair couplings on gravity sewer Add two epoxy coated 5' manholes w/ watertight & gasketed frame/cover. Approx. 206 LF for realignment from STA 118+30 to MH 9, any further proposed adjustments shall be submitted separately. Min. 0.1' drop on additional manholes. Slope of revised alignment shall be uniform and enter MH-9 at designed invert in elevation. Modifications to the existing centerline layout shall be surveyed This alignment adjustment is the solution provided in the field by Danny with the City of Fayetteville and Jobany with Orr Construction to resolve the conflict with the existing 12" force main. The result will be 2 additional Manholes and a slight increase in the 18" gravity sewer. Please let us know how to proceed. N PLEASE SEND ADDITIONAL INFORMATION IF THIS MH IS PROPOSED TO BE SHIFTED. ITEM NO. DESCRIPTION UNIT QTY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL 4.01 Mobilization (Max. 5% Total Schedule 4)LS 1 $40,000.00 40,000.00$ $40,000.00 40,000.00$ $77,078.18 77,078.18$ 4.02 Bonds & Insurance LS 1 $50,000.00 50,000.00$ $7,500.00 7,500.00$ $46,246.91 46,246.91$ 4.03 Act 291, 1993 Trench & Excavation Safety System LS 1 $50,000.00 50,000.00$ $53,000.00 53,000.00$ $100,000.00 100,000.00$ 4.04 Pre-Construction Video LS 1 $5,000.00 5,000.00$ $10,000.00 10,000.00$ $10,000.00 10,000.00$ 4.05 Traffic Control LS 1 $5,000.00 5,000.00$ $16,000.00 16,000.00$ $85,000.00 85,000.00$ 4.06 Environmental Compliance & Erosion & Sediment Control LS 1 $40,000.00 40,000.00$ $35,000.00 35,000.00$ $75,000.00 75,000.00$ 4.07 18-Inch PVC PS-115 Sewer Main LF 1,860 $140.00 260,400.00$ $108.00 200,880.00$ $300.00 558,000.00$ 4.08 8-Inch PVC SDR-26 Sewer Main LF 20 $100.00 2,000.00$ $43.00 860.00$ $85.00 1,700.00$ 4.09 Gravity Sewer Main Trenching & Backfill, 0'-10' Depth LF 240 $40.00 9,600.00$ $65.00 15,600.00$ $50.00 12,000.00$ 4.10 Gravity Sewer Main Trenching & Backfill, 10'-14' Depth LF 1,580 $50.00 79,000.00$ $82.00 129,560.00$ $100.00 158,000.00$ 4.11 Gravity Sewer Main Trenching & Backfill, 14'-18' Depth LF 100 $150.00 15,000.00$ $109.00 10,900.00$ $150.00 15,000.00$ 4.12 5' Diameter Manhole, Up to 6' Depth EA 6 $8,500.00 51,000.00$ $9,600.00 57,600.00$ $8,100.00 48,600.00$ 4.13 5' Diameter Drop Manhole, Up to 6' Depth EA 1 $9,000.00 9,000.00$ $9,600.00 9,600.00$ $10,000.00 10,000.00$ 4.14 5' Diameter Flat Top Manhole with Vent, Up to 6' Depth EA 2 $12,000.00 24,000.00$ $11,900.00 23,800.00$ $15,500.00 31,000.00$ 4.15 5' Diameter Flat Top Drop Manhole with Vent, Up to 6' Depth EA 1 $13,500.00 13,500.00$ $11,900.00 11,900.00$ $15,500.00 15,500.00$ 4.16 5' Diameter Manhole, Extra Depth Over 6'VF 36 $350.00 12,600.00$ $380.00 13,680.00$ $800.00 28,800.00$ 4.17 5' Diameter Drop Manhole, Extra Depth Over 6'VF 20 $400.00 8,000.00$ $380.00 7,600.00$ $800.00 16,000.00$ 4.18 5' Diameter Manhole Epoxy Coating VF 110 $650.00 71,500.00$ $600.00 66,000.00$ $750.00 82,500.00$ 4.19 4' Diameter Manhole, Up to 6' Depth EA 1 $6,500.00 6,500.00$ $5,800.00 5,800.00$ $6,500.00 6,500.00$ 4.20 4' Diameter Manhole, Extra Depth Over 6'VF 2 $300.00 600.00$ $265.00 530.00$ $185.00 370.00$ 4.21 4' Diameter Manhole Epoxy Coating VF 8 $525.00 4,200.00$ $485.00 3,880.00$ $650.00 5,200.00$ 4.22 Watertight Frame and Gasketed Cover EA 11 $1,150.00 12,650.00$ $915.00 10,065.00$ $1,372.40 15,096.40$ 4.23 36-inch Minimum Diameter Steel Casing by Open Cut LF 75 $650.00 48,750.00$ $1,190.00 89,250.00$ $1,174.51 88,088.25$ 4.24 Remove Existing Manhole EA 1 $2,500.00 2,500.00$ $3,450.00 3,450.00$ $5,500.00 5,500.00$ 4.25 Abandon Existing Manhole EA 2 $2,500.00 5,000.00$ $3,250.00 6,500.00$ $3,500.00 7,000.00$ 4.26 Cut and Plug Existing Sanitary Sewer EA 6 $2,500.00 15,000.00$ $3,200.00 19,200.00$ $4,500.00 27,000.00$ 4.27 Install Inserta Valve EA 1 $25,000.00 25,000.00$ $50,000.00 50,000.00$ $35,555.56 35,555.56$ 4.28 Post-Construction CCTV Inspection of Sewer Main LF 1,910 $5.00 9,550.00$ $3.00 5,730.00$ $5.63 10,753.30$ 4.29 Fence Repair EA 1 $2,500.00 2,500.00$ $1,375.00 1,375.00$ $1,500.00 1,500.00$ 4.3 Gravel Drive Repair LF 40 $50.00 2,000.00$ $10.00 400.00$ $80.00 3,200.00$ 4.31 Asphalt Pavement Repair SY 30 $225.00 6,750.00$ $122.00 3,660.00$ $90.00 2,700.00$ 4.32 Full Depth Class 7 Backfill TON 210 $40.00 8,400.00$ $29.00 6,090.00$ $50.00 10,500.00$ 4.33 Trench Dam EA 3 $1,000.00 3,000.00$ $190.00 570.00$ $5,000.00 15,000.00$ 4.34 Rock Excavation CY 100 $250.00 25,000.00$ $300.00 30,000.00$ $220.00 22,000.00$ 4.35 Flowable Fill, as Directed by the Engineer CY 50 $250.00 12,500.00$ $270.00 13,500.00$ $250.00 12,500.00$ 4.36 Trench and Bank Stabilization Material, as Directed by the Engineer TON 100 $65.00 6,500.00$ $170.00 17,000.00$ $50.00 5,000.00$ 4.37 18-Inch DIP Sewer Main LF 40 $300.00 12,000.00$ $290.00 11,600.00$ $400.00 16,000.00$ 954,000.00$ 988,080.00$ 1,659,888.60$ 7,799,100.00$ 8,447,776.00$ 9,304,269.07$ SCHEDULE 4 - FAYETTEVILLE SEWER UPSIZE UNIT PRICE BID SCHEDULE SUBTOTAL SCHEDULE 4 - FAYETTEVILLE SEWER UPSIZE Tri-Star Contractors TOTAL AMOUNT BID (SCHEDULES 1 + 2 + 3 + 4) Brothers ConstructionOrr Construction X2 +$17,000 X13 +$4,550 X13 +$16,250 X2 +$2,300 TOTAL REALIGNMENT + MHs $ 40,100.00 *Minor QTY variances may be required (each) 1220 1225 1230 1235 1240 1245 1250 1255 1260 1220 1225 1230 1235 1240 1245 1250 1255 1260 115+00 116+00 117+00 118+00 119+00 120+00 STA 119+44, MH-11 RIM= 1245.91 INV 15" IN (S)= 1233.71 INV 15" OUT (NE)= 1233.61 STA 118+87, MH-10 RIM= 1244.86 INV 15" IN (SW)= 1233.32 INV 8" IN (NW) = 1237.3 +/- (MATCH INVERT)(OUTSIDE DROP) INV 18" OUT (E)= 1233.12 STA 116+24, MH-9 RIM= 1243.20 INV 18" IN (W)= 1232.33 INV 8" IN (S) = 1234.0 +/- (MATCH INVERT) INV 18" OUT (E)= 1232.23 EXISTING GRADE 2 1 3' M I N I M U M CO V E R ( T Y P ) 3' M I N I M U M CO V E R ( T Y P ) 58 LF - 15" PVC SDR-26 @ 0.50% 106 LF - 15" PVC SDR-26 @ 0.50% 263 LF - 18" PVC PS-115 @ 0.30% STA 119+56 EXISTING 12" FORCE MAIN INV 1242.0 +/- STA 116+79 EXISTING 6" WATER LINE UNKNOWN DEPTH STA 118+16 EXISTING 24" STORM SEWER INV 1238.6 +/- STA 119+61 UNDERGROUND ELECTRIC UNKNOWN DEPTH 1 STA 118+67 EXISTING UNDERGROUND ELECTRIC UNKNOWN DEPTH 1240 1239 1241 12421243 1244 1240 1245 1241 1242 1243 124 4 12 4 5 12 4 5 12 4 6 12 4 6 12 4 7 12 4 7 12 4 5 12 4 1 12 4 1 12 4 2 12 4 2 12 4 3 12 4 3 12 4 4 12 4 6 12 4 3 1243 GA S SWEPCO N RIM ELEV. 1244.75 10" CLAY OUT E 1235.83 10" CLAY IN SE 1236.4 8" PVC IN NW 1236.68 SS SS SS SS SSSSSSSSSSSSSSSS SS SS SS FM FM FM N RIM ELEV. 1243.27 12" ? OUT E 1233.31 12" ? IN W 1233.45 8" ? IN N 1233.36 N RIM ELEV. 1246.89 TOP OF 8"? PVC 1242.30 SS SS SS SS SS PER GIS (NOT FIELD LOCATED) SS SS SS SS SS SS UGE SS SS UGE UGE UGEUG E UGE UGE UGE UGEUG E FMFMFMFMFMFMFMFMFM FM FM FM FM FM W W W W RO W RO W RO W RO W RO W RO W CITY OF FAYETTEVILLE PN: 765-15531-001 DEED 2009-35547 29 TRACT SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS 115+00 116+00 117+00 118+00 11 9 + 0 0 12 0 + 0 0 S S S UG E TCE TC E TC E TC E TC E STA 119+56 EXISTING 12" FORCE MAIN STA 116+79 EXISTING 6" WATER LINE 18" PVC PS-115 15" PVC SDR 26 25' P E ABANDON EXISTING MANHOLE AFTER NEW SANITARY SEWER IS PLACED IN SERVICE CUT AND PLUG 8" SANITARY SEWER (S) ABANDON EXISTING MANHOLE AFTER NEW SANITARY SEWER IS PLACED IN SERVICE CUT AND PLUG 8" SANITARY SEWER (S) STA 118+16 EXISTING STORM STA 119+61 UNDERGROUND ELECTRIC WORKING LIMITS 20' T C E 35 LF OF GRAVEL DRIVE REPAIR STA 116+60 TRENCH DAM SEE DETAIL WOTUS CROSSING (DR26) SEE SHEET C33. INSTALL CHECK DAMS AND LIMIT DISTURBANCE TO EXISTING PERENNIAL STREAM (DR25). DO NOT DISTURB OUTSIDE OF PERMANENT EASEMENT. STA 116+24, MH-9 CONSTRUCT 5' DIAMETER MANHOLE WITH WATERTIGHT FRAME AND GASKETED COVER OVER EXISTING 8" SANITARY SEWER STA 118+87, MH-10 CONSTRUCT 5' DIAMETER FLAT TOP DROP MANHOLE WITH WATERTIGHT FRAME AND GASKETED COVER OVER EXISTING 8" SANITARY SEWER 6" SCREEN VENT = 1247.50 STA 119+44, MH-11 CONSTRUCT 4' DIAMETER MANHOLE WITH WATERTIGHT FRAME AND GASKETED COVER INSTALL SEWER MARKER POST 50 ' 0 10 20 4020 1 inch = 20ft. ( IN FEET ) PLAN SCALE GRAVITY MAIN ALIGNMENT PROFILE HORIZONTAL SCALE: 1" = 20' VERTICAL SCALE: 1" = 5' SCALE: DATE: DRAWN BY:DESIGNED BY: JOB NUMBER: ORIGINAL SIGNATURE ON FILE REVISION: RE V I S I O N S RE V DA T E DE S C R I P T I O N HT T P : / / W W W . M C E . U S . C O M PRELIMINARY NOT FOR CONSTRUCTION 1 BASED ON CONSTANT SLOPE BETWEEN EXISTING MANHOLES. 2 BASED ON HYDRO EXCAVATION IN THE VICINITY. 3 CONTRACTOR SHALL VERIFY ELEVATION PRIOR TO INSTALLING SANITARY SEWER. UTILITY KEYNOTES 15 8 0 E S T E A R N S S T FA Y E T T E V I L L E , A R K A N S A S 7 2 7 0 3 (4 7 9 ) 4 4 3 - 2 3 7 7 C 20 2 4 SE W E R S Y S T E M T O F A Y E T T E V I L L E LI F T S T A T I O N A N D GR E E N L A N D , A R K A N S A S GRAVITY MAIN STA 115+00 TO STA 120+00 TLW JCW MAY 2024 IFC AS NOTED 21-2120 C-21W: \ 2 0 2 1 \ 2 1 - 2 1 2 0 - G r e e n l a n d W a s t e w a t e r S y s t e m R e h a b i l i t a t i o n \ D e s i g n D r a w i n g s \ S h e e t s \ G M S h e e t s . d w g , P R I N T E D O N : Ma y 1 0 , 2 0 2 4 @ 10 : 1 1 A M MA T C H L I N E ST A 1 1 5 + 0 0 SH E E T C- 2 0 MA T C H L I N E ST A 1 1 5 + 0 0 SH E E T C- 2 0 MA T C H L I N E ST A 1 2 0 + 0 0 SH E E T C- 2 2 MATCHLINE STA 120+00 SHEET C-22 BID S C H E D U L E 3 GREE N L A N D GRAV I T Y M A I N BID S C H E D U L E 4 FAYE T T E V I L L E SEWE R U P S I Z E BID SCHEDULE 3 GREENLAND GRAVITY MAIN BID SCHEDULE 4 FAYETTEVILLE SEWER UPSIZE 1.ALL MANHOLE COVERS WITHIN BID SCHEDULE 4 TO INCLUDE WORDS "FAYETTEVILLE ARKANSAS" 2.THE EXACT LOCATION OF NUMBER OF SEWER SERVICES IS NOT KNOWN. THE CONTRACTOR SHALL LOCATE, PROTECT, AND MAINTAIN ALL SEWER SERVICES. ANY DAMAGE WILL BE THE CONTRACTOR'S RESPONSIBILITY TO REPAIR. CONTRACTOR SHALL TRANSFER SERVICES TO NEW MAIN. PLAN NOTES 05-14-2024 124 3 1243 SSSSSSSSSS SS SS SS 113+ 0 0 114+00 115 S STA 1 1 3 + 4 6 , M H - 8 CON S T R U C T 5 ' D I A M E T E R M A N H O L E W I T H WATE R T I G H T F R A M E A N D G A S K E T E D C O V E R INS T A L L S E W E R M A R K E R P O S T MA T C H L I N E ST A 1 1 5 + 0 0 SH E E T C- 2 0 1220 1225 1230 1235 1240 1245 1250 1255 1260 MA T C H L I N E 1220 1225 1230 1235 1240 1245 1250 1255 1260 114+00 115+00 STA 113+46, MH-8 RIM= 1242.91 INV 18" IN (W)= 1231.40 INV 18" OUT (SE)= 1231.30 278 LF - 18" PVC PS-115 @ 0.30% MA T C H L I N E ST A 1 1 5 + 0 0 SH E E T C- 2 1 115+00 PLAN 5' - 1 / 4 " 7' - 6 " STA 118+30 NEW MH 10B SET PRE-CAST MH NEW STA 118+00 NEW MH 10A NEW CAST IN PLACE MH N S EW SW SE NENW 30'-1 0 3 / 4 " ~30 LF (SWbW) 18" PVC PS-115 10'-0" 177'-11 3/4" ~175 LF (W) 18" PVC PS-115 NEW STA 116+25 NEW MH 10A NEW PRE-CAST MH SHIFT MH-9 ~5LF DUE NORTH PER FIELD DISCUSSION AND COORDINATION 5' - 1 0 1 / 4 " 10 ' - 0 " 1232.92 0' - 2 1 / 2 " STA 118+00, NEW MH 10A 26 ' - 5 " 24 ' - 8 3 / 4 " ~113+ 5 0 TIE INTO MH-8 ON EXISTING GRADE & ALIGNMENT 271'-7 1/2" SET DESIGN MH 9 ~5 DUE NORTH OF DESIGN LOCATION CONTRACTOR SHALL RESUME CONSTRUCTION IN ACCORDANCE WITH IFC DESIGN AT MH-8. STA 118+30 NEW MH 9B SET NEW MH STA 118+00 NEW MH 9A SET NEW MH 6' - 3 " STA 118+30 NEW MH 9B STA 118+00 NEW MH 9A (day) (width) (depth) (length) 8 3 4 58 696 25.78 3 4 42 504 18.67 8 8 2 128 4.74 8 8 2 128 4.74 12 4 2 98 784 29.04 13 4 2 66 528 19.56 3.5 1.5 160 840 31.11 3.5 1.5 168 882 32.67 8 8 1.5 96 3.56 8 8 1.5 96 3.56 3.5 1.5 98 514.5 19.06 4 2 62 496 18.37 4 2 84 672 24.89 31 4 2 28 224 8.30 3 4 1 84 336 12.44 4 4 1 50 200 7.41 5 4 1 70 280 10.37 10 4 1 150 600 22.22 13 4 1 150 600 22.22 16 4 1 150 600 22.22 SCHEDULE 4 - ROCK EXCAVATION TOTAL (yd3) TOTAL ROCK (CY) 340.91 May June 30 Date (month) 1) Daily rock excavation numbers from MCE observer's daily reports 2) Rock excavation quantities recorded are less than total billed by Orr 3) Relevant observation reports - Attachment A 9 15 16 Dimensions (ft)TOTAL (ft3) 1580 East Stearns Street Fayetteville, AR 72703 (479) 443.2377 P | (479) 443.9241 F mce.us.com (day) (width) (depth) (length) 8 3 4 58 696 25.78 3 4 42 504 18.67 8 8 2 128 4.74 8 8 2 128 4.74 12 4 2 98 784 29.04 13 4 2 66 528 19.56 3.5 1.5 160 840 31.11 3.5 1.5 168 882 32.67 8 8 1.5 96 3.56 8 8 1.5 96 3.56 3.5 1.5 98 514.5 19.06 4 2 62 496 18.37 4 2 84 672 24.89 31 4 2 28 224 8.30 3 4 1 84 336 12.44 4 4 1 50 200 7.41 5 4 1 70 280 10.37 10 4 1 150 600 22.22 13 4 1 150 600 22.22 16 4 1 150 600 22.22 SCHEDULE 4 - ROCK EXCAVATION TOTAL (yd3) TOTAL ROCK (CY) 340.91 May June 30 Date (month) 1) Daily rock excavation numbers from MCE observer's daily reports 2) Rock excavation quantities recorded are less than total billed by Orr 3) Relevant observation reports - Attachment A 9 15 16 Dimensions (ft)TOTAL (ft3) ATTACHMENT A RFI 12 - Gravity Sewer Realignment & Additional MHs Construction Reports for Rock Excavation Review Observer  Project  Date  Job #  Report #  Contractor  Sunny  Partly Cloudy  Temperature Min (F)  Cloudy  Rain Temperature Max (F)  Rained Out Rainfall Amount (In.)  HOURS WORKED SITE CONDITIONS  EQUIPMENT WORKING  TRACKHOE  BACKHOE  TRENCHER SCRAPER DOZER  AM Acceptable  GRADER  COMPACTOR PAVER  PUMPS  PM  Partly Useable    Not Workable  CONC. VIBRATOR  DUMP TRUCKS SKIDDER SKYTRACK  PERSONNEL WORKING  Superintendent  Foreman Operators Laborers  DESCRIPTION & LOCATION OF WORK IN PROGRESS (Also photos, tests, results, deficiencies, delays,  etc.)  Date  Report #  Observer  Project  Date  Job #  Report #  Contractor  Sunny  Partly Cloudy  Temperature Min (F)  Cloudy  Rain Temperature Max (F)  Rained Out Rainfall Amount (In.)  HOURS WORKED SITE CONDITIONS  EQUIPMENT WORKING  TRACKHOE  BACKHOE  TRENCHER SCRAPER DOZER  AM Acceptable  GRADER  COMPACTOR PAVER  PUMPS  PM  Partly Useable    Not Workable  CONC. VIBRATOR  DUMP TRUCKS SKIDDER SKYTRACK  PERSONNEL WORKING  Superintendent  Foreman Operators Laborers  DESCRIPTION & LOCATION OF WORK IN PROGRESS (Also photos, tests, results, deficiencies, delays,  etc.)  Observer  Project  Date  Job #  Report #  Contractor  Sunny  Partly Cloudy  Temperature Min (F)  Cloudy  Rain Temperature Max (F)  Rained Out Rainfall Amount (In.)  HOURS WORKED SITE CONDITIONS  EQUIPMENT WORKING  TRACKHOE  BACKHOE  TRENCHER SCRAPER DOZER  AM Acceptable  GRADER  COMPACTOR PAVER  PUMPS  PM  Partly Useable    Not Workable  CONC. VIBRATOR  DUMP TRUCKS SKIDDER SKYTRACK  PERSONNEL WORKING  Superintendent  Foreman Operators Laborers  DESCRIPTION & LOCATION OF WORK IN PROGRESS (Also photos, tests, results, deficiencies, delays,  etc.)  Observer  Project  Date  Job #  Report #  Contractor  Sunny  Partly Cloudy  Temperature Min (F)  Cloudy  Rain Temperature Max (F)  Rained Out Rainfall Amount (In.)  HOURS WORKED SITE CONDITIONS  EQUIPMENT WORKING  TRACKHOE  BACKHOE  TRENCHER SCRAPER DOZER  AM Acceptable  GRADER  COMPACTOR PAVER  PUMPS  PM  Partly Useable    Not Workable  CONC. VIBRATOR  DUMP TRUCKS SKIDDER SKYTRACK  PERSONNEL WORKING  Superintendent  Foreman Operators Laborers  DESCRIPTION & LOCATION OF WORK IN PROGRESS (Also photos, tests, results, deficiencies, delays,  etc.)  Observer  Project  Date  Job #  Report #  Contractor  Sunny  Partly Cloudy  Temperature Min (F)  Cloudy  Rain Temperature Max (F)  Rained Out Rainfall Amount (In.)  HOURS WORKED SITE CONDITIONS  EQUIPMENT WORKING  TRACKHOE  BACKHOE  TRENCHER SCRAPER DOZER  AM Acceptable  GRADER  COMPACTOR PAVER  PUMPS  PM  Partly Useable    Not Workable  CONC. VIBRATOR  DUMP TRUCKS SKIDDER SKYTRACK  PERSONNEL WORKING  Superintendent  Foreman Operators Laborers  DESCRIPTION & LOCATION OF WORK IN PROGRESS (Also photos, tests, results, deficiencies, delays,  etc.)  Observer  Project  Date  Job #  Report #  Contractor  Sunny  Partly Cloudy  Temperature Min (F)  Cloudy  Rain Temperature Max (F)  Rained Out Rainfall Amount (In.)  HOURS WORKED SITE CONDITIONS  EQUIPMENT WORKING  TRACKHOE  BACKHOE  TRENCHER SCRAPER DOZER  AM Acceptable  GRADER  COMPACTOR PAVER  PUMPS  PM  Partly Useable    Not Workable  CONC. VIBRATOR  DUMP TRUCKS SKIDDER SKYTRACK  PERSONNEL WORKING  Superintendent  Foreman Operators Laborers  DESCRIPTION & LOCATION OF WORK IN PROGRESS (Also photos, tests, results, deficiencies, delays,  etc.)  Observer  Project  Date  Job #  Report #  Contractor  Sunny  Partly Cloudy  Temperature Min (F)  Cloudy  Rain Temperature Max (F)  Rained Out Rainfall Amount (In.)  HOURS WORKED SITE CONDITIONS  EQUIPMENT WORKING  TRACKHOE  BACKHOE  TRENCHER SCRAPER DOZER  AM Acceptable  GRADER  COMPACTOR PAVER  PUMPS  PM  Partly Useable    Not Workable  CONC. VIBRATOR  DUMP TRUCKS SKIDDER SKYTRACK  PERSONNEL WORKING  Superintendent  Foreman Operators Laborers  DESCRIPTION & LOCATION OF WORK IN PROGRESS (Also photos, tests, results, deficiencies, delays,  etc.)  Date  Report #  Observer  Project  Date  Job #  Report #  Contractor  Sunny  Partly Cloudy  Temperature Min (F)  Cloudy  Rain Temperature Max (F)  Rained Out Rainfall Amount (In.)  HOURS WORKED SITE CONDITIONS  EQUIPMENT WORKING  TRACKHOE  BACKHOE  TRENCHER SCRAPER DOZER  AM Acceptable  GRADER  COMPACTOR PAVER  PUMPS  PM  Partly Useable    Not Workable  CONC. VIBRATOR  DUMP TRUCKS SKIDDER SKYTRACK  PERSONNEL WORKING  Superintendent  Foreman Operators Laborers  DESCRIPTION & LOCATION OF WORK IN PROGRESS (Also photos, tests, results, deficiencies, delays,  etc.)  Observer: Luis Martinez Project: Greenland QC: Signed: DATE 06/03/2025 WORK DAY Working SITE CONDITIONS Acceptable JOB # 212120 CONTRACTOR ORR Construction HOURS WORKED Start: 07:00 End: 19:00 WEATHER CONDITIONS Sunny EQUIPMENT WORKING Trackhoes Skidders QTY 2 1 PERSONNEL WORKING Laborers Foreman Operators QTY 8 1 2 DESCRIPTION & LOCATION OF WORK IN PROGRESS The crew began excavation for a 36-inch casing using open cut 45. During trenching, they encountered significant rock formations, which slowed progress and required additional effort to remove. Due to high groundwater levels within the trench, three pumps were operated simultaneously to control water accumulation and maintain workable conditions. Despite the challenges, the crew successfully installed 84 feet of 18-inch sewer pipe by the end of the workday. you can find this on section 105 on the blueprints . 18” sewer pipe.84’ Trenching 10’-14’= 84’ Rock excavation 84’x4’x1’-6” =18.66 36” steel casing by open cut. 45’ CORRISPONDENCE MATERIALS Item Qty Unit Location Description Pipe 84 Feet Casing 30 Feet LOCATION 22-2119: Fayetteville's Schedule Date: 06/03/2025 IMAGES Observer: Luis Martinez Project: Greenland QC: Signed: DATE 06/04/2025 WORK DAY Working SITE CONDITIONS Acceptable JOB # 212120 CONTRACTOR ORR Construction HOURS WORKED Start: 07:00 End: 19:00 WEATHER CONDITIONS Sunny EQUIPMENT WORKING Trackhoes Skidders QTY 2 1 PERSONNEL WORKING Laborers Foreman Operators QTY 8 1 2 DESCRIPTION & LOCATION OF WORK IN PROGRESS ORR In the morning, the crew spent approximately two hours pumping out groundwater from the trench to prepare the site for pipe i nstallation. Once dewatering was complete, they proceeded to install 140 feet of 18 -inch sewer pipe. After the lunch break, the crew installed Manhole #6. Progress was slower than usual due to ongoing challenges with rock excavation throughout the day. You can find this on se ction 108 on the blueprints. 6/4/25. 18” sewer pipe. 140’ Trenching 10’-14’= 140’ Rock excavation 50’x1’x4’ =14.81 cy 5’ dia manhole = 1 5’ dia extra depth manhole = 4. VF CORRISPONDENCE MATERIALS Item Qty Unit Location Description Pipe 140 Feet LOCATION 22-2119: Fayetteville's Schedule Date: 06/04/2025 IMAGES Observer: Luis Martinez Project: Greenland QC: Signed: DATE 06/05/2025 WORK DAY Working SITE CONDITIONS Acceptable JOB # 212120 CONTRACTOR ORR Construction HOURS WORKED Start: 07:00 End: 20:00 WEATHER CONDITIONS Sunny EQUIPMENT WORKING Trackhoes Skidders QTY 2 1 PERSONNEL WORKING Laborers Foreman Operators QTY 8 1 2 DESCRIPTION & LOCATION OF WORK IN PROGRESS ORR It was a productive day on site. The crew began by installing Manhole #5 and constructing a drop structure for it. Following that, they proceeded with the installation of a casing open cut 30. In addition to these tasks, the crew successfully installed 196 feet of 18-inch sewer pipe, you can find this on section 106 on the blueprints. 18” sewer pipe. 196’ Trenching 10’-14’= 196’ Rock excavation 70’x1’x4’ =10.37cy 5’ dia manhole = 1 5’ dia extra depth manhole = 3.5 VF 36” casing by open cut = 30’ CORRISPONDENCE MATERIALS Item Qty Unit Location Description Pipe 196 Feet LOCATION 22-2119: Fayetteville's Schedule Date: 06/05/2025 IMAGES Observer: Luis Martinez Project: Greenland QC: Signed: DATE 06/10/2025 WORK DAY Working SITE CONDITIONS Acceptable JOB # 212120 CONTRACTOR ORR Construction HOURS WORKED Start: 07:00 End: 19:00 WEATHER CONDITIONS Sunny EQUIPMENT WORKING Trackhoes Skidders QTY 2 1 PERSONNEL WORKING Laborers Foreman Operators QTY 6 1 2 DESCRIPTION & LOCATION OF WORK IN PROGRESS ORR Today, the crew installed 350 feet of 18-inch sewer main. They also installed manhole number 3 and completed the framing and pouring of the drop structure for the manhole. Significant rock excavation was performed throughout the day. To conclude the day’s work, a trench dam was constructed as detailed in Section 104 of the blueprints. 18” sewer pipe. 350’ Trenching 10’-14’= 350’ Rock excavation 150’x1’x4’ =22.22 cy 5’ dia extra depth manhole = 9.5VF 5’ día drop manhole 1 Trench dam 2 CORRISPONDENCE MATERIALS Item Qty Unit Location Description Pipe 25 LOCATION 22-2119: Fayetteville's Schedule Date: 06/10/2025 IMAGES Observer: Luis Martinez Project: Greenland QC: Signed: DATE 06/13/2025 WORK DAY Non-Working (Weather) SITE CONDITIONS Not Workable JOB # 212120 CONTRACTOR ORR Construction HOURS WORKED Start: 07:00 End: 19:00 WEATHER CONDITIONS Rain EQUIPMENT WORKING Trackhoes Skidders QTY 2 1 PERSONNEL WORKING Laborers Foreman Operators QTY 6 1 2 DESCRIPTION & LOCATION OF WORK IN PROGRESS Work was not possible today due to persistent rain. The crew returned to Oklahoma. Rain is also forecasted for Thursday and F riday, so no work is expected until the weather clears. 18” sewer pipe. 350’ Trenching 10’-14’= 350’ Rock excavation 150’x1’x4’ =22.22 cy 5’ dia extra depth manhole = 9.5VF 5’ día drop manhole 1 Trench dam 2 CORRISPONDENCE MATERIALS Item Qty Unit Location Description Pipe 25 LOCATION 22-2119: Fayetteville's Schedule Observer: Luis Martinez Project: Greenland QC: Signed: DATE 06/16/2025 WORK DAY Non-Working SITE CONDITIONS Not Workable JOB # 212120 CONTRACTOR ORR Construction HOURS WORKED Start: 07:00 End: 19:00 WEATHER CONDITIONS Partly Cloudy EQUIPMENT WORKING Trackhoes Skidders QTY 2 1 PERSONNEL WORKING Laborers Foreman Operators QTY 6 1 2 DESCRIPTION & LOCATION OF WORK IN PROGRESS The crew did not perform any pipe installation today due to poor site conditions. Most of the day was spent pumping groundwat er, which continues to flow into the trench area. The site remains extremely muddy and not workable for excavation. Crews focused o n general cleanup. 18” sewer pipe. 350’ Trenching 10’-14’= 350’ Rock excavation 150’x1’x4’ =22.22 cy 5’ dia extra depth manhole = 9.5VF 5’ día drop manhole 1 Trench dam 2 CORRISPONDENCE MATERIALS Item Qty Unit Location Description Pipe 25 LOCATION 22-2119: Fayetteville's Schedule 22-2119 OC24020 12 From 09/21/25 to 10/25/25 10/31/25 A C D E F G H I J K L Item Quantity Units Unit Price ($) Value of Bid Item (C X E) ($) Estimated Quantity Incorporated in the Work Value of Work Completed to Date (E X G) ($) 4.01 1.00 LS 40,000.00 40,000.00 1.00 40,000.00 40,000.00 100% - 4.02 1.00 LS 50,000.00 50,000.00 1.00 50,000.00 50,000.00 100% - 4.03 1.00 LS 50,000.00 50,000.00 1.00 50,000.00 50,000.00 100% - 4.04 1.00 LS 5,000.00 5,000.00 1.00 5,000.00 5,000.00 100% - 4.05 1.00 LS 5,000.00 5,000.00 1.00 5,000.00 5,000.00 100% - 4.06 1.00 LS 40,459.14 40,459.14 1.00 40,459.14 40,459.14 100% - 4.07 1,860.00 LF 129.31 240,517.53 1,860.00 240,517.53 240,517.53 100% - 1,860.00 LF 7.61 14,148.09 1,860.00 14,148.09 14,148.09 100% - 1,860.00 LF 12.17 22,636.94 1,860.00 22,636.94 22,636.94 100% - 1,860.00 LF 3.04 5,659.24 1,860.00 5,659.24 5,659.24 100% - 4.08 20.00 LF 87.55 1,751.00 20.00 1,751.00 1,751.00 100% - 20.00 LF 5.15 103.00 20.00 103.00 103.00 100% - 20.00 LF 8.24 164.80 20.00 164.80 164.80 100% - 20.00 LF 2.06 41.20 20.00 41.20 41.20 100% - 4.09 240.00 LF 40.00 9,600.00 240.00 9,600.00 9,600.00 100% - 4.10 1,580.00 LF 50.00 79,000.00 1,580.00 79,000.00 79,000.00 100% - 4.11 100.00 LF 150.00 15,000.00 100.00 15,000.00 15,000.00 100% - 4.12 6.00 EA 8,500.00 51,000.00 6.00 51,000.00 51,000.00 100% - 4.13 1.00 EA 9,000.00 9,000.00 1.00 9,000.00 9,000.00 100% - 4.14 2.00 EA 12,000.00 24,000.00 2.00 24,000.00 24,000.00 100% - 4.15 1.00 EA 13,500.00 13,500.00 1.00 13,500.00 13,500.00 100% - 4.16 36.00 VF 350.00 12,600.00 36.00 12,600.00 12,600.00 100% - 4.17 20.00 VF 400.00 8,000.00 20.00 8,000.00 8,000.00 100% - 4.18 110.00 VF 650.00 71,500.00 110.00 71,500.00 71,500.00 100% - 4.19 1.00 EA 6,500.00 6,500.00 1.00 6,500.00 6,500.00 100% - 4.20 2.00 VF 300.00 600.00 2.00 600.00 600.00 100% - 4.21 8.00 VF 525.00 4,200.00 8.00 4,200.00 4,200.00 100% - 4.22 11.00 EA 1,336.00 14,696.00 11.00 14,696.00 14,696.00 100% - 4.23 75.00 LF 836.20 62,715.00 75.00 62,715.00 62,715.00 100% - 4.24 1.00 EA 2,500.00 2,500.00 1.00 2,500.00 2,500.00 100% - 4.25 2.00 EA 2,500.00 5,000.00 2.00 5,000.00 5,000.00 100% - 4.26 6.00 EA 2,715.50 16,293.00 6.00 16,293.00 16,293.00 100% - 4.27 1.00 EA 28,983.00 28,983.00 1.00 28,983.00 28,983.00 100% - 4.28 1,910.00 LF 5.00 9,550.00 1,910.00 9,550.00 9,550.00 100% - 4.29 1.00 EA 2,500.00 2,500.00 1.00 2,500.00 2,500.00 100% - 4.30 40.00 LF 50.00 2,000.00 40.00 2,000.00 2,000.00 100% - 4.31 30.00 SY 225.00 6,750.00 30.00 6,750.00 6,750.00 100% - 4.32 210.00 TONS 40.00 8,400.00 210.00 8,400.00 8,400.00 100% - 4.33 3.00 EA 1,000.00 3,000.00 3.00 3,000.00 3,000.00 100% - 4.34 100.00 CY 250.00 25,000.00 100.00 25,000.00 25,000.00 100% - 4.35 50.00 CY 250.00 12,500.00 50.00 12,500.00 12,500.00 100% - 4.36 100.00 TONS 65.00 6,500.00 100.00 6,500.00 6,500.00 100% - 4.37 40.00 LF 334.40 13,376.00 40.00 13,376.00 13,376.00 100% - - - - - - - - - - - - - - - - - - - - - - - - - 999,743.94$ 999,743.94$ -$ 999,743.94$ 100% -$ - - - - 4.09 94.00 LF (40.00) (3,760.00) 94.00 (3,760.00) (3,760.00) 100% - 4.10 90.00 LF 50.00 4,500.00 90.00 4,500.00 4,500.00 100% - 4.11 36.00 LF (150.00) (5,400.00) 36.00 (5,400.00) (5,400.00) 100% - 4.12 2.00 EA 8,500.00 17,000.00 2.00 17,000.00 17,000.00 100% - 4.16 14.00 VF 350.00 4,900.00 14.00 4,900.00 4,900.00 100% - 4.18 26.00 VF 650.00 16,900.00 26.00 16,900.00 16,900.00 100% - 4.21 4.00 VF (525.00) (2,100.00) 4.00 (2,100.00) (2,100.00) 100% - 4.22 2.00 EA 1,336.00 2,672.00 2.00 2,672.00 2,672.00 100% - 4.31 18.00 CY (225.00) 4,050.00 18.00 (4,050.00) (4,050.00) -100% 8,100.00 4.32 2.50 TONS 40.00 100.00 2.50 100.00 100.00 100% - 4.34 169.68 CY 250.00 42,420.00 169.68 42,420.00 42,420.00 100% - 4.35 50.00 CY (250.00) (12,500.00) 50.00 (12,500.00) (12,500.00) 100% - 4.36 100.00 TONS (65.00) (6,500.00) 100.00 (6,500.00) (6,500.00) 100% - - - - - - - - - 62,282.00$ 54,182.00$ -$ 54,182.00$ 87% 8,100.00$ 54,106.08$ 1,062,025.94$ 1,053,925.94$ -$ 1,053,925.94$ 99% 8,100.00$ CO 1 45743.94 CO 2 41472 B Original Contract % of Value of Item (J / F) (%) Balance to Finish (F - J) ($)Description Work Completed Final Project Reconciliation Owner's Project No.: Engineer's Project No.: Contractor's Project No.: City of Fayetteville, AR McClelland Consulting Engineers, Inc. Orr Construction, Inc. Lift Station and Sewer System to Fayetteville Owner: Engineer: Contractor: Project: Contract: Application Date:Application Period:Application No.: Materials Currently Stored (not in G) ($) Work Completed and Materials Stored to Date (H + I) ($) Contract Information Bid Item No. Project Totals Change Order 2 Fayetteville Sch 4 Final Reconciliation Rock Excavation Flowable Fill, as directed by the Engineer Trench and Bank Stabilization material, as directed by the Change Order Totals Original Contract and Change Orders 5' Diameter Manhole, Up to 6' Depth 5' Diameter Manhole, Extra Depth Over 6' 5' Diameter Manhole, Epoxy Coating Watertight Frame and Gasketed Cover Full Depth Class 7 Backfill Gravity Sewer main Trenching & Backfill 10'-14' Depth Gravity Sewer main Trenching & Backfill 0'-10' Depth Gravity Sewer main trenching & backfill 14'-18' Depth 4' Dia Manhole epoxy coating Asphalt Pavement Repair Mobilization Bonds & Insurance Schedule 4 Fayetteville Sewer Upsize Act 291, 1993 Trench & Excavation Safety System Pre-Construction Video Traffic Control Environmental Compliance & Erosion & Sediment Control 18" PVC PS-115 Sewer main 18" PVC PS-115 Sewer main 18" PVC PS-115 Sewer main 18" PVC PS-115 Sewer main 8" PVC SDR-26 Sewer Main 5' dia drop manhole up to 6' depth 5' dia flat top manhole with vent, up to 6' depth 5' dia flat top drop manhole with vent up to 6' depth 5' dia manhole extra depth over 6' 5' dia drop manhole extra depth over 6' 8" PVC SDR-26 Sewer Main Gravity Sewer main Trenching & Backfill 0'-10' Depth Gravity Sewer main Trenching & Backfill 10'-14' Depth Gravity Sewer main trenching & backfill 14'-18' Depth 5' dia manhole up to 6' depth 8" PVC SDR-26 Sewer Main 8" PVC SDR-26 Sewer Main 36" Min. Dia. Steel Casing by Open Cut Remove Existing MH Abandon Existing MH Cut & Plug Existing Sewer Service Install Inserta Valve 5' dia manhole epoxy coating 4' Dia Manhole, up to 6' depth 4' Dia Manhole, extra depth over 6' 4' Dia Manhole epoxy coating Watertight Frame and Gasketed Cover Trench Dam Rock Excavation Flowable Fill, as directed by the Engineer Trench and Bank Stabilization material, as directed by the 18" DIP Sewer Main Post-Construction CCTV Inspection of Sewer Main Fence Repair Gravel Drive Repair Asphalt Pavement Repair Full Depth Class 7 Backfill Original Contract Totals Change Orders Unit Price EJCDC C-620 Contractor's Application for Payment (c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved.1 of 1 1580 East Stearns Street Fayetteville, AR 72703 (479) 443.2377 P | (479) 443.9241 F mce.us.com