Loading...
HomeMy WebLinkAbout7-24 RESOLUTION113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 7-24 File Number: 2023-1540 CITY OF GREENLAND, ARKANSAS (SEWER COST SHARE AGREEMENT): A RESOLUTION TO APPROVE A COST SHARE AGREEMENT WITH THE CITY OF GREENLAND IN AN AMOUNT NOT TO EXCEED $954,000.00 FOR UPSIZING A PORTION OF 12-INCH SANITARY SEWER LINE TO 18-INCH, TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $100,000.00, AND TO APPROVE A BUDGET ADJUSTMENT WHEREAS, the City of Greenland owns its sewer collection system, including a lift station and force main within its corporate city limits; and WHEREAS, due to past and anticipated growth, upsizing of these facilities is necessary, all at Greenland's cost; and WHEREAS, the system connects to the City of Fayetteville's sewer system just north of Drake Field at which point is conveyed through gravity sewers, lift stations, and force mains on its way to the Noland Water Resource Recovery Facility; and WHEREAS, in anticipation of these upgrades, the City of Fayetteville needs to upgrade our own facilities to accommodate this additional flow; and WHEREAS, the City of Fayetteville and the City of Greenland have cooperated to incorporate Fayetteville's scope of improvements into the project bid package for the Greenland project; and WHEREAS, the cost share agreement consists of Fayetteville paying 100% of costs for upgrades to Fayetteville's infrastructure, and likewise Greenland paying 100% of costs for Greenland's infrastructure. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign a cost share agreement with the City of Greenland with the City of Fayetteville's portion of the cost not to exceed $954,000.00 and further approves a project contingency in the amount of $100,000.00. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. PASSED and APPROVED on January 2, 2024 Page 1 Resolution: 7-24 File Number: 2023-1540 Page 2 �,��pliillf//� Attest: /f `�� � � r,G i1� 'b\ Y O,c'�S. I AYETI EVIL_!- ' Kara Paxton, City C ®c reasurer u' •��'h 11 C7`'-.P . ° l .�� III/ ;�%�G T • IN 11%�` �lllfllll 1ON CITY OF FAYETTEVILLE ARKANSAS MEETING OF JANUARY 2, 2024 CITY COUNCIL MEMO 2023-1540 TO: Mayor Jordan and City Council THRU: Susan Norton, Chief of Staff FROM: Tim Nyander, Utilities Director DATE: SUBJECT: Cost Share Agreement with The City of Greenland for Upsizing a Portion of the Sewer Line Coming from Greenland to the City of Fayetteville RECOMMENDATION: Staff recommends the approval of a cost share agreement with the City of Greenland, Arkansas in an amount not to exceed $954,000.00 for upsizing a portion of 12-inch sanitary sewer line to 18-inch, to approve a project contingency in the amount of $100,000.00, and to approve a budget adjustment. BACKGROUND: The City of Greenland owns its sewer collection system, including a lift station and force main within their corporate city limits. Due to past and anticipated growth, upsizing of these facilities is necessary, all at Greenland's cost. This system connects to the City of Fayetteville's sewer system just north of Drake Field at which point it is conveyed through gravity sewers, lift stations, and force mains on its way to the Noland Water Resource Recovery Facility. In anticipation of these upgrades, the City of Fayetteville also needs to upsize facilities to accommodate this additional flow. These upgrades include approximately 1,860-feet of gravity sewer upsizing from 12" to 18" diameter leading to sewer Lift Station #16 on Ernest Lancaster Road. This lift station is also being modified to accommodate an additional pump. The downstream sewer force main is already adequate for these increased flows. DISCUSSION: The City of Fayetteville and City of Greenland have cooperated to incorporate Fayetteville's scope of improvements into the project bid package for the Greenland project. This is an advantage to Fayetteville in that economies of scale should keep costs competitive. It also reduces the project management burden on City of Fayetteville staff. This cost share agreement consists of Fayetteville paying 100% of costs for upsizing Fayetteville's infrastructure, and likewise Greenland paying 100% of costs for Greenland's infrastructure. The low bid cost of the Fayetteville scope of work was $954,000.00. BUDGET/STAFF IMPACT: A budget adjustment is attached to move funds from the Wastewater Impact Fee Improvements account to the Water/Sewer Impact Fee Cost Sharing account within the Water & Sewer fund. Mailing address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 ATTACHMENTS: SRF (#3), BA (#4), Greenland Cost Share Agreement (#5) Mailing address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 == City of Fayetteville, Arkansas Y 113 West Mountain Street Fayetteville, AR 72701 (479)575-8323 - Legislation Text File #: 2023-1540 Cost Share Agreement with The City of Greenland for Upsizing a Portion of the Sewer Line Coming from Greenland to the City of Fayetteville A RESOLUTION TO APPROVE A COST SHARE AGREEMENT WITH THE CITY OF GREENLAND IN AN AMOUNT NOT TO EXCEED $954,000.00 FOR UPSIZING A PORTION OF 12-INCH SANITARY SEWER LINE TO 18-INCH, TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $100,000.00, AND TO APPROVE A BUDGET ADJUSTMENT WHEREAS, the City of Greenland owns its sewer collection system, including a lift station and force main within its corporate city limits; and WHEREAS, due to past and anticipated growth, upsizing of these facilities is necessary, all at Greenland's cost; and WHEREAS, the system connects to the City of Fayetteville's sewer system just north of Drake Field at which point is conveyed through gravity sewers, lift stations, and force mains on its way to the Noland Water Resource Recovery Facility; and WHEREAS, in anticipation of these upgrades, the City of Fayetteville needs to upgrade our own facilities to accommodate this additional flow; and WHEREAS, the City of Fayetteville and the City of Greenland have cooperated to incorporate Fayetteville's scope of improvements into the project bid package for the Greenland project; and WHEREAS, the cost share agreement consists of Fayetteville paying 100% of costs for upgrades to Fayetteville's infrastructure, and likewise Greenland paying 100% of costs for Greenland's infrastructure. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign a cost share agreement with the City of Greenland with the City of Fayetteville's portion of the cost not to exceed $954,000.00 and further approves a project contingency in the amount of $100,000.00. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. Page 1 Tim Nyander Submitted By City of Fayetteville Staff Review Form 2023-1540 Item ID 1/2/2024 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 12/12/2023 WATER SEWER (720) Submitted Date Division / Department Action Recommendation: Staff recommends the approval of a cost share agreement with the City of Greenland in an amount not to exceed $954,000.00 for upsizing a portion of 12-inch sanitary sewer line to 18-inch, to approve a project contingency in the amount of $100,000.00, and to approve a budget adjustment. 5400.720.5700-5815.00 Account Number 04039.2301 Project Number Budgeted Item? Yes Does item have a direct cost? Yes Is a Budget Adjustment attached? Yes Purchase Order Number: Change Order Number: Original Contract Number: Comments: Budget Impact: Water & Sewer Fund Water & Sewer Impact Fee Cost Sharing Total Amended Budget Expenses (Actual+Encum) Available Budget Item Cost Budget Adjustment Remaining Budget Project Title $ 1,261,190.00 $ 467,458.41 �93,731.59 $ 1,054,000.00 $ 1,054,000.00 793,731.59 Previous Ordinance or Resolution # Approval Date: V20221130 City of Fayetteville, Arkansas - Budget Adjustment (Agenda) Budget Year Division Adjustment Number WATER SEWER (720) /Org2 2024 (BY) Requestor: Cheryl Partain BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION: A budget adjustment is needed in the Water & Sewer Impact Fee Cost Sharing project for the City of Greenland cost share project. The cost share project with the City of Greenland is for upsizing a portion of the City of Greenland's 12-inch sanitary sewer line that connects to the City of Fayetteville's sewer system to an 18-inch sanitary sewer line. Budgeted impact fee funds need to be transferred and utilized for this project. COUNCIL DATE: ITEM ID#: 1/2/2024 2023-1540 Holly Black 7217412023 77:25 ql;l RESOLUTION/ORDINANCE Budget Division Date TYPE: D - (City Council) JOURNAL#: GLDATE: CHKD/POSTED: TOTAL Account Number 1,208,000 1,208,000 Increase / (Decrease) Expense Revenue Project.Sub# Project Sub.Detl AT v.20231213 Account Name 5400.720.5700-5815.00 1,054,000 - 04039 2301 EX Improvements - Sewer 5400.720.5700-6602.30 2300.730.9300-7602.40 - 1,054,000 1,054,000 - 04039 07004 2301 RE 4039.2301 EX Transfer from Fund - Impact Fee Transfers To Funds - Water & Sewer Fund 2300.730.9300-5815.00 2300.730.9300-4999.99 (900,000) - - 154,000 07004 2 EX RE Improvements - Sewer Use Fund Balance - Current I of 1 CONTRACTUAL AGREEMENT FOR COST SHARE OF SEWER MAIN INSTALLATION COSTS This Agreement, made and entered into on this _2_day of January 2024, by and between the City of Fayetteville, Arkansas ("Fayetteville") and the City of Greenland, Arkansas ("Greenland"), witnesseth: WHEREAS, on Tuesday, June 6, 2023 Greenland opened sealed bids on the Lift Station and Sewer System to Fayetteville Project; and WHEREAS, Orr Construction, Inc. of Davenport, Oklahoma is the low bidder in the amount of $7,799,100.00; and WHEREAS, McClelland Consulting Engineers, Inc., representing Greenland as the Engineer of Record on this sewer main project, has reviewed the bid and recommends awarding the bid to Orr Construction, Inc. in the amount of $7,799,100.00; and WHEREAS,upsizing a 1,900 ft. segment of 12-inch sewer main to 18-inch will provide for ample future capacity which Fayetteville recognizes will be necessary for the area that is served by this sewer main, and is described in Fayetteville's 2014 Sewer Master Plan Update; and WHEREAS, § 51.113 of the Fayetteville City Code provides that "the City shall pay the excess material cost of facilities of a size larger than required to service subdivisions when such excess size is specified and required by the water and wastewater director for the general benefit of the sewerage system." NOW, THEREFORE, the City of Fayetteville, Arkansas and the City of Greenland, Arkansas agree as follows: 1. The City of Fayetteville, Arkansas agrees to: A. Reimburse Greenland for the cost to upsize approximately 1,900 linear feet of 12- inch sewer main to 18-inch sewer main in the area identified in Exhibit "A" up to a maximum -not -to -exceed amount of $954,000.00, as was bid by Orr Construction, Inc. and shown on Exhibit `B", attached. B. Payments due to Greenland shall be remitted within sixty (60) days after receipt of valid invoices and/or pay applications, verified by the Engineer of Record during the progress of the project. 2. The City of Greenland, Arkansas agrees to: A. Provide the necessary and normal project management, inspection, and testing as necessary for a complete and acceptable sewer main upsizing. B. Provide a copy of the invoices and/or pay applications from the Contractor and Greenland for Fayetteville approval of payments for the sewer main upsizing. C. Pay the costs for the Lift Station and Sewer System to Fayetteville Project in the amount of $7,799,100.00 (with reimbursement of $954,000.00 of the cost by Fayetteville). 3. It is further understood that the contract for construction is between Greenland and its contractor and that Fayetteville has no contractual obligation with either the contractor or any agent for the contractor. Fayetteville's only obligation shall be to participate in this cost share agreement with a not -to -exceed amount of $954,000.00 for the sewer main upsizing. IN AGREEMENT WITH ALL THE TERMS AND CONDITIONS ABOVE, WE SIGN BELOW: CITY OF GREENLAND, ARKANSAS By: JIM RENFRO` , Mayor ATTEST: By: MISTY Mc ARD, Recorder/Treasurer CITY OF FAYETTEVILLE, ARKANSV LIONEJ�1),0RDAN, Mayor ATTEST By: KA A PAXTON, 'ity Clerk Trea��ter FAYEJ i _'ViL: i •• 9 ' ' ~ z EXHIBIT A mcECONSULT/NGD mrimmmmm ENGINEERS, INC. Signature: Nicholas Batker, RE # 16753 Date: DENOTES MATHEMATICAL ERROR EXHIBIT B Certified Bid Tabulation City of Greenland Lift Station and Sewer System to Fayetteville Greenland, AR NICE Project # 21-2120 Bid Opening Date/Time: June 6, 2023, 10:00 A.M. SCHEDULE 1 - GREENLAND LIFT STATION Orr Construction Brothers Construction Tri-Star Contractors UNIT PRICE BID SCHEDULE ITEM NO. DESCRIPTION UNIT CITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL 1.01 Mobilization Max. 5 % total Schedule 1 LS 1 $65,000.00 $ 65,000.00 $125,000.00 $ 125,000.00 $130,250.00 $ 130,250.00 1.02 Bonds &Insurance LS 1 $50,000.00 $ 50,000.00 $37,000.00 $ 37,000.00 $78,150.00 $ 78,150.00 1.03 Act 291,1993 Trench & Excavation Safety System LS 1 $200,000.00 $ 200,000.00 $220,000.00 $ 220,000.00 $125,000.00 $ 125,000.00 1.04 Pre -Construction Video LS 1 $5,000.00 $ 5,000.00 $10,000.00 $ 10,000.00 $10,000.00 $ 10,000.00 1.05 Traffic Control LS 1 $5,000.00 $ 5,000.00 $16,000.00 $ 16,000.00 $20,000.00 $ 20,000.00 1.06 Environmental Compliance & Erosion & Sediment Control LS 1 $25,000.00 $ 25,000.00 $29,000.00 $ 29,000.00 $35,000.00 $ 35,000.00 1.07 Site Work LS 1 $265,000.00 $ 265,000.00 $290,000.00 $ 290,000.00 $200,000.00 $ 200,000.00 1.08 ISite Utilities LS 1 $140,000.00 $ 140,000.00 $235,000.00 $ 235,000.00 $150,000.00 1 $ 150,000.00 1.09 Lift Station Structure LS 1 $690,000.00 $ 690,000.00 $930,000.00 $ 930,000.00 $615,000.00 $ 615,000.00 1.1 Electrical Building LS 1 $75,000.00 $ 75,000.00 $95,000.00 $ 95,000.00 $125,000.00 $ 125,000.00 1.11 Pumps, Controls, Electrical and VFD's I LS 1 $1,475,000.00 $ 1,475,000.00 $1,415,000.00 $ 1,415,000.00 $1,300,000.00 $ 1,300,000.00 1.12 Piping, Valves, Accessories and Appurtenances LS 1 $275,000.00 $ 275,000.00 $305,000.00 $ 365,000.00 $293,500.00 $ 293,500.00 SUBTOTAL SCHEDULE 1 - GREENLAND LIFT STATION $ 3,270,000.00 $ 3,707,000.00 $ 3,081,900.00 SCHEDULE 2 - GREENLAND FORCE MAIN Orr Construction Brothers Construction Tri-Star Contractors UNIT PRICE BID SCHEDULE ITEM NO. DESCRIPTION UNIT QTY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL 2.01 Mobilization (Max. 5 % Total Schedule 2) LS 1 $70,000.00 $ 70,000.00 $73,000.00 $ 73,000.00 $89,939.29 $ 89,939.29 2.02 Bonds &Insurance LS 1 $50,000.00 $ 50,000.00 $19,000.00 $ 19,000.00 $53,963.57 $ 53,963.57 2.03 Act 291, 1993 Trench & Excavation Safety System LS 1 $30,000.00 $ 30,000.00 $23,500.00 $ 23,500.00 $50,000.00 $ 50,000.00 2.04 Pre -Construction Video LS 1 $7,500.00 $ 7,500.00 $10,000.00 $ 10,000.00 $10,000.00 $ 10,000.00 2.05 Traffic Control LS 1 $7,500.00 $ 7,500.00 $16,000.00 $ 16,000.00 $60,000.00 $ 60,000.00 2.06 Environmental Compliance & Erosion & Sediment Control LS 1 $65,000.00 $ 65,000.00 $81,000.00 $ 81,000.00 $65,000.00 $ 65,000.00 2.07 10-inch PVC C900 DR-18 Force Main LF 6,200 $95.00 $ 589,000.00 $127.00 $ 787,400.00 $95.00 $ 589,000.00 2.08 Ductile Iron Fittings LB 2,500 $20.00 $ 50,000.00 $33.00 $ 82,500.00 $40.00 $ 100,000.00 2.09 Underground Combination Air Valve EA 4 $24,000.00 $ 96,000.00 $36,500.00 $ 146,000.00 $33,337.19 $ 133,348.76 2.10 20-Inch Minimum Diameter Steel Casing by Open Cut LF 40 $350.00 $ 14,000.00 $340.00 $ 13,600.00 $462.60 $ 18,504.00 2.11 20-Inch Minimum Diameter Steel Casing by Bore LF 210 $1,100.00 $ 231,000.00 $1,275.00 $ 267,750.00 $1,500.00 $ 315,000.00 2.12 Fence Repair EA 3 $2,000.00 $ 6,000.00 $1,375.00 $ 4,125.00 $1,500.00 $ 4,500.00 2.13 Vinyl Fence by Modem Fence LS 1 $35,000.00 $ 35,000.00 $15,150.00 $ 15,150.00 $25,000.00 $ 25,000.00 2.14 10' Farm Gate EA 2 $1,500.00 $ 3,000.00 $1,150.00 $ 2,300.00 $2,000.00 $ 4,000.00 2.15 River Pea Stone Drive Repair LF 25 $125.00 $ 3,125.00 $33.00 $ 825.00 $250.00 $ 6,250.00 2.16 Gravel Drive Repair LF 130 $50.00 $ 6,500.00 $10.00 $ 1,300.00 $80.00 $ 10,400.00 2.17 Asphalt Drive Repair LF 30 $120.00 $ 3,600.00 $122.00 $ 3,660.00 $120.00 $ 3,600.00 2.18 Concrete Drive Repair LF 90 $120.00 $ 10,800.00 $112.00 $ 10,080.00 $175.00 $ 15,750.00 2.19 Asphalt Pavement Repair SY 300 $225.00 $ 67,500.00 $122.00 $ 36,600.00 $90.00 $ 27,000.00 2.20 Full Depth Class 7 Backfill TON 1,390 $40.00 $ 55,600.00 $29.00 $ 40,310.00 $50.00 $ 69,500.00 2.21 Trench Dam EA 6 $1,000.00 $ 6,000.00 $190.00 $ 1,140.00 $5,000.00 $ 30,000.00 2.22 Rock Excavation CY 100 $250.00 $ 25,000.00 $300.00 $ 30,000.00 $220.00 $ 22,000.00 2.23 Flowable Fill, as Directed by the Engineer CY 100 $250.00 $ 25,000.00 $270.00 $ 27,000.00 $250.00 $ 25,000.00 2.24 Trench and Bank Stabilization Material, as Directed by the Engineer TON 150 $65.00 $ 9,750.00 $115.00 $ 17,250.00 $50.00 $ 7,500.00 2.25 Temporary Construction 6' Tall Chain Link Fence LF 1,300 $20.00 $ 26,000.00 $20.00 $ 26,000.00 $13.41 $ 17,433.00 2.26 Relocate Existing Water Meter I EA 5 $2,000.00 $ 10,000.00 $3,000.00 $ 15,000.00 $35,000.00 $ 175,000.00 2.27 10-inch Plug Valve EA 1 $10,000.00 $ 10,000.00 $7,700.00 $ 7,700.00 $15,000.00 $ 15,000.00 SUBTOTAL SCHEDULE 2 - GREENLAND FORCE MAIN $ 1,512,875.00 $ 1,758,190.00 $ 1,942,688.62 W:Q021121-2120- Greenland Wastewater System Rehabililation\Construction DocumenWCertifed Bid TaM21-2120 CertlTed Bid Tab Page 1 of 3 10/25/2023 SCHEDULE 3 - GREENLAND GRAVITY MAIN Orr Construction Brothers Construction Tri-Star Contractors UNIT PRICE BID SCHEDULE ITEM NO. DESCRIPTION UNIT OTY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL 3.01 Mobilization Max. 5% Total Schedule 3 LS 1 $70,000.00 $ 70,000.00 $73,000.00 $ 73,000.00 $121,286.66 $ 121,286.66 3.02 Bonds &Insurance LS 1 $60,000.00 $ 60,000.00 $12,000.00 $ 12,000.00 $72,771.99 $ 72,771.99 3.03 Act 291,1993 Trench & Excavation Safety System LS 1 $70,000.00 $ 70,000.00 $23,500.00 $ 23,500.00 $100,000.00 $ 100,000.00 3.04 Pre -Construction Video LS 1 $7,500.00 $ 7,500.00 $10,000.00 $ 10,000.00 $10,000.00 $ 10,000.00 3.05 Traffic Control LS 1 $10,000.00 $ 10,000.00 $16,000.00 $ 16,000.00 $62,500.00 $ 62,500.00 3.06 Environmental Compliance & Erosion & Sediment Control LS 1 $65,000.00 $ 65,000.00 $90,000.00 $ 90,000.00 $7,000.00 $ 7,000.00 3.07 15-inch PVC SDR-26 Sewer Main LF 3,400 $120.00 $ 408,000.00 $85.00 $ 289,000.00 $200.00 $ 680,000.00 3.08 12-Inch PVC SDR-26 Sewer Main LF 160 $100.00 1 $ 16,000.00 $62.00 1 $ 9,920.00 $195.00 1 $ 31,200.00 3.09 Gravity Sewer Main Trenching & Backfill, 0'-10' Depth LF 1,330 $35.00 $ 46,550.00 $65.00 $ 86,450.00 $50.00 $ 66,500.00 3.1 Gravity Sewer Main Trenching & Backfill, 10'-14' Depth LF 1,900 $50.00 $ 95,000.00 $82.00 $ 155,800.00 $100.00 $ 190,000.00 3.11 Gravity Sewer Main Trenching & Backfill, 14'-18' Depth LF 110 $150.00 $ 16,500.00 $109.00 $ 11,990.00 $150.00 $ 16,500.00 3.12 4' Diameter Manhole, Ulp to 6' Depth EA 14 $6,500.00 $ 91,000.00 $5,800.00 $ 81,200.00 $6,500.00 $ 91,000.00 3.13 4' Diameter Drop Manhole, Up to 6' Depth EA 3 $7,500.00 $ 22,500.00 $5,800.00 $ 17,400.00 $8,500.00 $ 25,500.00 3.14 4' Diameter Manhole, Extra Depth Over 6' VF 70 $300.00 $ 21,000.00 $265.00 $ 18,550.00 $185.00 $ 12,950.00 3.15 4' Diameter Drop Manhole, Extra Depth Over 6' VF 30 $300.00 $ 9,000.00 $265.00 $ 7,950.00 $250.00 $ 7,500.00 3.16 4' Diameter Manhole Epoxy Coating VF 191 $525.00 $ 100,275.00 $485.00 $ 92,635.00 $650.00 1 $ 124,150.00 3.17 Standard Manhole Frame and Cover EA 12 $600.00 1 $ 7,200.00 $608.00 1 $ 7,296.00 $987.50 $ 11,850.00 3.18 Watertight Frame and Gasketed Cover EA 5 $1,150.00 $ 5,750.00 $915.00 $ 4,575.00 $1,372.40 $ 6,862.00 3.19 30-inch Minimum Diameter Steel Casing by Bore LF 225 $1,800.00 $ 405,000.00 $2,125.00 $ 478,125.00 $1,800.00 $ 405,000.00 3.2 30-inch Minimum Diameter Steel Casing by Open Cut LF 135 $620.00 $ 83,700.00 $735.00 $ 99,225.00 $734.60 $ 99,171.00 3.21 Remove Existing Manhole EA 1 $3,000.00 $ 3,000.00 $3,450.00 $ 3,450.00 $5,500.00 $ 5,500.00 3.22 Abandon Existing Manhole EA 14 $2,500.00 $ 35,000.00 $3,250.00 $ 45,500.00 $3,500.00 $ 49,000.00 3.23 Cut and Plug Existing Sanitary Sewer EA 7 $2,500.00 $ 17,500.00 $3,200.00 $ 22,400.00 $4,500.00 $ 31,500.00 3.24 Split Steel Encasement LF 1 10 $700.00 $ 7,000.00 $1,300.00 $ 13,000.00 $900.00 $ 9,000.00 3.25 Reconnect Existing Sewer Service EA 12 $2,000.00 $ 24,000.00 $1,750.00 $ 21,000.00 $4,750.00 $ 57,000.00 3.26 4-Inch PVC Sanitary Sewer Service Pie LF 200 $45.00 1 $ 9,000.00 $60.00 $ 12,000.00 $55.00 $ 11,000.00 3.27 6-Inch PVC Sanitary Sewer Service Pipe LF 100 $65.00 $ 6,500.00 $55.00 $ 5,500.00 $65.00 $ 6,500.00 3.28 Post -Construction CCTV Inspection of Sewer Main LF 3,540 $5.00 $ 17,700.00 $2.50 $ 8,850.00 $5.63 $ 19,930.20 3.29 Fence Repair EA 2 $2,500.00 $ 5,000.00 $1,375.00 $ 2,750.00 $1,500.00 $ 3,000.00 3.3 Asphalt Drive Repair LF 20 $120.00 $ 2,400.00 $122.00 $ 2,440.00 $120.00 $ 2,400.00 3.31 Concrete Curb and Gutter Repair LF 60 $300.00 $ 18,000.00 $60.00 $ 3,600.00 $32.00 $ 1,920.00 3.32 Concrete Drive Repair LF 20 $120.00 $ 2,400.00 $112.00 $ 2,240.00 $175.00 $ 3,500.00 3.33 lAsphalt Pavement Repair I SY 370 $225.00 $ 83,250.00 $122.00 $ 45,140.00 $90.00 $ 33,300.00 3.34 Full Depth Class 7 Backfill TON 1,550 $40.00 $ 62,000.00 $29.00 $ 44,950.00 $50.00 $ 77,500.00 3.35 Trench Dam EA 3 $1,000.00 $ 3,000.00 $190.00 $ 570.00 $5,000.00 $ 15,000.00 3.36 Rock Excavation CY 100 $250.00 $ 25,000.00 $300.00 $ 30,000.00 $220.00 $ 22,000.00 3.37 Flowable Fill, as Directed by the Engineer CY 500 $250.00 $ 125,000.00 $270.00 $ 135,000.00 $250.00 $ 125,000.00 3.38 Bank Stabilization Material, as Directed b the Engineer TON 100 $65.00 $ 6,500.00 $115.00 $ 11,500.06 $50.00 $ 5,000.00 SUBTOTAL SCHEDULE 3 - GREENLAND GRAVITY MAIN $ 2,062,225.00 $ 1,994,506.00 $ 2,619,791.85 W:Q021121-2120- Greenland Wastewater System Rehabilitation\Construction DocumenWCertlfeC Bid Tab\21-2120 certified Bid Tab Page 2 of 3 10/25/2023 SCHEDULE 4 - FAYETTEVILLE SEWER UPSIZE Orr Construction Brothers Construction Tri-Star Contractors UNIT PRICE BID SCHEDULE ITEM NO. DESCRIPTION UNIT CITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL 4.01 Mobilization Max. 5 % Total Schedule 4 LS 1 $40,000.00 $ 40,000.00 $40,000.00 $ 40,000.00 $77,078.18 $ 77,078.18 4.02 Bonds &Insurance LS 1 $50,000.00 $ 50,000.00 $7,500.00 $ 7,500.00 $46,246.91 $ 46,246.91 4.03 Act 291,1993 Trench & Excavation Safety System LS 1 $50,000.00 $ 50,000.00 $53,000.00 $ 53,000.00 $100,000.00 $ 100,000.00 4.04 Pre -Construction Video LS 1 $5,000.00 $ 5,000.00 $10,000.00 $ 10,000.00 $10,000.00 $ 10,000.00 4.05 Traffic Control LS 1 $5,000.00 $ 5,000.00 $16,000.00 $ 16,000.00 $85,000.00 $ 85,000.00 4.06 Environmental Compliance & Erosion & Sediment Control LS 1 $40,000.00 $ 40,000.00 $35,000.00 $ 35,000.00 $75,000.00 $ 75,000.00 4.07 18-Inch PVC PS-115 Sewer Main LF 1,860 $140.00 $ 260,400.00 $108.00 $ 200,880.00 $300.00 $ 558,000.00 4.08 8-Inch PVC SDR-26 Sewer Main LF 20 $100.00 1 $ 2,000.00 $43.00 $ 860.00 $85.00 1 $ 1,700.00 4.09 Gravity Sewer Main Trenching & Backfill, 0'-10' Depth LF 240 $40.00 $ 9,600.00 $65.00 $ 15,600.00 $50.00 $ 12,000.00 4.10 Gravity Sewer Main Trenching & Backfill, 10'-14' Depth LF 1,580 $50.00 $ 79,000.00 $82.00 $ 129,560.00 $100.00 $ 158,000.00 4.11 Gravity Sewer Main Trenching & Backfill, 14'-18' Depth LF 100 $150.00 $ 15,000.00 $109.00 $ 10,900.00 $150.00 $ 15,000.00 4.12 5' Diameter Manhole, Up to 6' Depth EA 6 $8,500.00 $ 51,000.00 $9,600.00 $ 57,600.00 $8,100.00 $ 48,600.00 4.13 5' Diameter Drop Manhole, Up to 6' Depth EA 1 $9,000.00 $ 9,000.00 $9,600.00 $ 9,600.00 $10,000.00 $ 10,000.00 4.14 5' Diameter Flat Top Manhole with Vent, Up to 6' Depth EA 2 $12,000.00 $ 24,000.00 $11,900.00 $ 23,800.00 $15,500.00 $ 31,000.00 4.15 5' Diameter Flat Top Drop Manhole with Vent, Up to 6' Depth EA 1 $13,500.00 $ 13,500.00 $11,900.00 $ 11,900.00 $15,500.00 $ 15,500.00 4.16 5' Diameter Manhole, Extra Depth Over 6' VF 36 $350.00 $ 12,600.00 $380.00 $ 13,680.00 $800.00 $ 28,800.00 4.17 5' Diameter Drop Manhole, Extra Depth Over 6' VF 20 $400.00 1 $ 8,000.00 $380.00 $ 7,600.00 $800.00 $ 16,000.00 4.18 5' Diameter Manhole Epoxy Coating VF 110 $650.00 $ 71,500.00 $600.00 $ 66,000.00 $750.00 $ 82,500.00 4.19 4' Diameter Manhole, Up to 6' Depth EA 1 $6,500.00 $ 6,500.00 $5,800.00 $ 5,800.00 $6,500.00 $ 6,500.00 4.20 4' Diameter Manhole, Extra Depth Over 6' VF 2 $300.00 $ 600.00 $265.00 $ 530.00 $185.00 $ 370.00 4.21 4' Diameter Manhole Epoxy Coating VF 8 $525.00 $ 4,200.00 $485.00 $ 3,880.00 $650.00 $ 5,200.00 4.22 Watertight Frame and Gasketed Cover EA 11 $1,150.00 $ 12,650.00 $915.00 $ 10,065.00 $1,372.40 $ 15,096.40 4.23 36-inch Minimum Diameter Steel Casing by Open Cut LF 75 $650.00 $ 48,750.00 $1,190.00 $ 89,250.00 $1,174.51 $ 88,088.25 4.24 Remove Existing Manhole EA 1 $2,500.00 $ 2,500.00 $3,450.00 $ 3,450.00 $5,500.00 $ 5,500.00 4.25 lAbandon Existing Manhole EA 2 $2,500.00 $ 5,000.00 $3,250.00 $ 6,500.00 $3,500.00 $ 7,000.00 4.26 Cut and Plug Existing Sanitary Sewer EA 6 $2,500.00 1 $ 15,000.00 $3,200.00 $ 19,200.00 $4,500.00 $ 27,000.00 4.27 Install lnserta Valve EA 1 $25,000.00 $ 25,000.00 $50,000.00 $ 50,000.00 $35,555.56 $ 35,555.56 4.28 Post -Construction CCTV Inspection of Sewer Main LF 1,910 $5.00 $ 9,550.00 $3.00 $ 5,730.00 $5.63 $ 10,753.30 4.29 Fence Repair EA 1 $2,500.00 $ 2,500.00 $1,375.00 $ 1,375.00 $1,500.00 $ 1,500.00 4.3 Gravel Drive Repair LF 40 $50.00 $ 2,000.00 $10.00 $ 400.00 $80.00 $ 3,200.00 4.31 Asphalt Pavement Repair SY 30 $225.00 $ 6,750.00 $122.00 $ 3,660.00 $90.00 $ 2,700.00 4.32 Full Depth Class 7 Backfill TON 1 210 $40.00 $ 8,400.00 $29.00 $ 6,090.00 $50.00 $ 10,500.00 4.33 Trench Dam EA 3 $1,000.00 $ 3,000.00 $190.00 $ 570.00 $5,000.00 $ 15,000.00 4.34 1 Rock Excavation CY 100 $250.00 $ 25,000.00 $300.00 $ 30,000.00 $220.00 $ 22,000.00 4.35 Flowable Fill, as Directed by the Engineer CY 50 $250.00 $ 12,500.00 $270.00 $ 13,500.00 $250.00 $ 12,500.00 4.36 ITrench and Bank Stabilization Material, as Directed by the Engineer TON 100 $65.00 $ 6,500.00 $170.00 $ 17,000.00 $50.00 $ 5,000.00 4.37 18-Inch DIP Sewer Main LF 40 $300.00 $ 12,000.00 $290.00 $ 11,600.00 $400.00 $ 16,000.00 SUBTOTAL SCHEDULE 4 - FAYETTEVILLE SEWER UPSIZE $ 954,000.00 $ 988,080.00 $ 1,659,888.60 TOTAL AMOUNT BID (SCHEDULES 1 + 2 + 3 + 4) $ 7,799,100.00 $ 8,447,776.00 $ 9,304,269.07 W:Q021121-2120- Greenland Wastewater System Rehabilitation\Construction Documente\Certified Bid TaM21-2120 CertlTed Bid Tab Page 3 of 3 10/25/2023