Loading...
HomeMy WebLinkAbout6-24 RESOLUTION113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 6-24 File Number: 2023-1542 MCCLELLAND CONSULTING ENGINEERS, INC. (SERVICE AGREEMENT): A RESOLUTION TO APPROVE AMENDMENT NO. I TO THE PROFESSIONAL ENGINEERING SERVICES AGREEMENT WITH MCCLELLAND CONSULTING ENGINEERS, INC. IN AN AMOUNT NOT TO EXCEED $48,000.00 FOR ADDITIONAL SERVICES ASSOCIATED WITH THE GREENLAND SEWER COST SHARE PROJECT WHEREAS, on March 14, 2022, Mayor Jordan signed a Professional Engineering Services Agreement with McClelland Consulting Engineers, Inc. for the design of upgrades necessary to accept wastewater from Greenland; and WHEREAS, Amendment No. 1 will increase the scope of engineering services to include construction observation, field accounting, construction engineering support, material submittal reviews, as -built drawing preparation, and all services necessary to manage the project through construction. NOW, THEREFORE, BE IT RESOLVED BV THE CITY COUNCIL OF THE CITY OF FAVETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign Amendment No. 1 to the Professional Engineering Services Agreement with McClelland Consulting Engineers, Inc. in an amount not to exceed $48,000.00 for additional services associated with the Greenland Sewer Cost Share Project, as shown in the scope of services attached to Amendment No. 1. PASSED and APPROVED on January 2, 2024 Page 1 Attest: ``��•��RK l rR''��., A. Al ; FAYETTFV l_!_ Kara Paxton, City le Treasurer ; , .y � .t: ,y . CITY OF FAYETTEVILLE ARKANSAS MEETING OF JANUARY 2, 2024 CITY COUNCIL MEMO 2023-1542 TO: Mayor Jordan and City Council THRU: Susan Norton, Chief of Staff FROM: Tim Nyander, Utilities Director DATE: SUBJECT: Amendment No. 1 to the Engineering Services Agreement with McClelland Consulting Engineers, Inc. for the Greenland Sewer Cost Share Project RECOMMENDATION: Staff recommends approval of Amendment No. 1 to the engineering services agreement with McClelland Consulting Engineers, Inc. for professional services associated with the Greenland Sewer Cost Share Project in an amount not to exceed $48,000.00. BACKGROUND: The majority of Greenland's wastewater is conveyed to Lift Station 18 (LS18 located at 210 N. Sandy Ave.), which is then pumped approximately 5,600 feet via an 8-inch force main into Fayetteville's collection system. LS18 and the 8-inch force main have exceeded their useful lives and are at capacity. As such, improvements to the existing system are necessary to ensure enough capacity for the 20-year growth period. Greenland's proposed improvements include construction of a new lift station in the vicinity of existing LS 18, approximately 6,200 linear feet of 10-inch force main, and approximately 3,500 linear feet of 18-inch gravity sewer that will connect back into Fayetteville's existing 12" gravity sewer north of Drake Field. Fayetteville will need to upsize the gravity sewer from the point Greenland ties -in, downstream to Lift Station 16 and add a 3rd pump at this station to accommodate the increased flows. All of these items have been previously identified in Wastewater Collection System Master Plans and were anticipated. Since McClelland Consulting Engineers was already the design engineer for Greenland on this project, they were previously selected via RFQ# 22-01, Selection #7 to provide these design services for Fayetteville. DISCUSSION: Amendment No. 1 will increase the scope of engineering services to include construction observation, field accounting, construction engineering support, material submittal reviews, as -built drawing preparation, and all services necessary to manage the project throughout construction. This additional scope and effort is based on hourly, not -to -exceed rates at $48,000.00. The original design contract was $33,480.00 therefore increasing the overall engineering contract value to $81,480.00. BUDGET/STAFF IMPACT: The proposed amendment is hourly in the maximum not -to -exceed amount of $48,000.00. Budgeted funds are available in the Sanitary Sewer Rehabilitation account within the Water & Sewer fund. Mailing address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 ATTACHMENTS: SRF (#3), Amendment No. 1 (#4), RFQ 23-01, Selection 7 - Voting Results (#5) Mailing address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 == City of Fayetteville, Arkansas y 113 West Mountain Street Fayetteville, AR 72701 (479)575-8323 - Legislation Text File #: 2023-1542 Amendment No. 1 to the Engineering Services Agreement with McClelland Consulting Engineers, Inc. for the Greenland Sewer Cost Share Project A RESOLUTION TO APPROVE AMENDMENT NO. 1 TO THE PROFESSIONAL ENGINEERING SERVICES AGREEMENT WITH MCCLELLAND CONSULTING ENGINEERS, INC. IN AN AMOUNT NOT TO EXCEED $48,000.00 FOR ADDITIONAL SERVICES ASSOCIATED WITH THE GREENLAND SEWER COST SHARE PROJECT WHEREAS, on March 14, 2022, Mayor Jordan signed a Professional Engineering Services Agreement with McClelland Consulting Engineers, Inc. for the design of upgrades necessary to accept wastewater from Greenland; and WHEREAS, Amendment No. 1 will increase the scope of engineering services to include construction observation, field accounting, construction engineering support, material submittal reviews, as -built drawing preparation, and all services necessary to manage the project through construction. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign Amendment No. 1 to the Professional Engineering Services Agreement with McClelland Consulting Engineers, Inc. in an amount not to exceed $48,000.00 for additional services associated with the Greenland Sewer Cost Share Project, as shown in the scope of services attached to Amendment No. 1. Page 1 Tim Nyander Submitted By City of Fayetteville Staff Review Form 2023-1542 Item ID 1/2/2024 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 12/12/2023 WATER SEWER (720) Submitted Date Division / Department Action Recommendation: Staff recommends approval of Amendment No. 1 to the engineering services agreement with McClelland Consulting Engineers, Inc. for professional services associated with the Greenland Sewer Cost Share Project in an amount not to exceed $48,000.00. 5400.720.5700-5314.00 Account Number 02017.1 Project Number Budgeted Item? Yes Does item have a direct cost? Yes Is a Budget Adjustment attached? No Purchase Order Number: Change Order Number: Original Contract Number: Comments: Budget Impact: Water and Sewer Fund Sanitary Sewer Rehabilitation Total Amended Budget Expenses (Actual+Encum) Available Budget Item Cost Budget Adjustment Remaining Budget Project Title $ 13,071,913.00 $ 12,791,579.39 280,333.61 $ 48,000.00 232,333.61 V20221130 2022-277 Previous Ordinance or Resolution # 1 Approval Date: 2022-17 Amendment No. 1 to the Engineering Services Agreement for Gravity Sewer Upgrade Associated with Greenland Sewer to Fayetteville Project Date: 0 } 11 0� �LL ' WHEREAS, the CITY OF FAYETTEVILLE and McClelland Consulting Engineers, Inc. (ENGINEER) entered into an Agreement for Professional Engineering Services (AGREEMENT) on March 14, 2022; and, WHEREAS, the CITY OF FAYETTEVILLE has requested that ENGINEER perform additional services outside of the scope of the AGREEMENT. NOW THEREFORE, the following modifications will be made to the AGREEMENT to include the additional services requested: MODIFICATIONS: 1. Section 2.1.1 —the additional scope of services are included in the attached Appendix "A-1 ". 2. Section 5.1 — the maximum not -to -exceed amount is increased from $33,480.00 to $81,480.00. Modifications to compensation are included in the attached Appendix "A-2". IN WITNESS WHEREOF, the parties execute this Amendment No. 1, to be effective on the date set out above. McClelland Consulting Engineers, Inc. City of Fayetteville, Arkansas BY: Nicholas R. Batker, P.E. Senior Associate APPENDIX A-1 -SCOPE OF ADDITIONAL SERVICES AMENDMENT NO. 1 TO THE ENGINEERING SERVICES AGREEMENT FOR THE 12-INCH GRAVITY SEWER UPGRADE ASSOCIATED WITH THE GREENLAND SEWER TO FAYETTEVILLE PROJECT 1.0 General The scope of additional services includes construction administration and construction observation services for the referenced project, which consists of approximately 1,900 linear feet of 18-inch gravity sewer, manholes and associated tie-in to Lift Station No. 16. This new 18-inch gravity sewer will replace the existing 12-inch gravity sewer and will provide the necessary capacity to handle sewer flows from the Greenland Sewer to Fayetteville Project. Construction is anticipated to commence in early 2024. 2.0 Basic Services 2.1 Construction Administration Construction administration services are generally included in the ENGINEER's contract with the City of Greenland for the Greenland Sewer to Fayetteville Project. However, the following items are specifically related to the 18-inch gravity sewer main and are included in this scope of work with the CITY OF FAYETTEVILLE: • Review Contractor's submittals related to the 18-inch gravity sewer main; • Review Contractor's Requests for Information (RFIs) related to the 18-inch gravity sewer main and issue clarifications as required; • Conduct final inspection for the 18-inch gravity sewer main with the CITY OF FAYETTEVILLE, and develop a punch list of outstanding items; and • Prepare record drawings of the 18-inch gravity sewer main based upon information furnished by the Contractor and field representatives, and provide to CITY OF FAYETTEVILLE in AutoCAD and PDF format. 2.2 Construction Observation • Provide a field representative to perform comprehensive construction observation services. Field representative shall provide weekly updates to the CITY OF FAYETTEVILLE on construction progress and any issues that may arise. • It is estimated that the level of observation required by the ENGINEER to provide comprehensive services will equate to an average of 30 hours per week for the duration of the construction activities associated with the 18-inch gravity sewer main. The construction duration of the 18-inch gravity sewer main is estimated to be 90 calendar days. Appendix A-1 — Scope of Additional Services Page 1 of 2 12-Inch Gravity Main Upsize 3.0 Compensation In consideration of the performance of the foregoing services by the ENGINEER, the CITY OF FAYETTEVILLE will compensate the ENGINEER as follows: 3.1 Compensation will be paid to the ENGINEER on the basis of ENGINEER's standard hourly rates in effect at the time the work is performed, plus reimbursable expenses. A task hour fee breakdown is provided as Appendix A-2. 3.2 The maximum not -to -exceed fee for Amendment No. 1 will be $48,000.00. 3.3 The maximum not -to -exceed total contract amount is increased from $33,480.00 to $81,480.00. Appendix A-1 — Scope of Additional Services Page 2 of 2 12-Inch Gravity Main Upsize APPENDIX A-2 City of Fayetteville - 12-inch Gravity Main Upsize Amendment No. 1 - Services During Construction Personnel Hour Fee Estimate 11/30/2023 McCLELLAND CONSULTING ENGINEERS, INC. Task Description Sr. Project Manager Project Manager Project Engineer/ Designer CAD/GIS Technician Const. Observer Extended Cost Task 2.1 - Construction Administration Review Contractor's Submittals 1.00 4.00 $750.00 Respond to RFls 2.00 8.00 $1,500.00 Final Inspection and Punch List 4.00 4.00 $1,320.00 As -Built Construction Documents 1.00 8.00 1 20.00 1 $3 5 00.00 Subtotal Labor Hours / Fee -Task 2.11 0.00 1 8.00 1 24.00 1 20.00 1 0.00 1 $7,080.00 Estimated Reimbursable Expenses/Subconsultants Mileage $20.00 Subtotal Reimbursable Expenses -Task 2.1 $20.00 Total Task 2.1 -construction Administration 0.00 8.00 24.00 20.00 0.00 $7,100.00 Task 2.2 - Construction Observation Comprehensive Field Observation Services 400.00 $40 000.00 Subtotal Labor Hours / Fee - Task 2.21 0.00 1 0.00 1 0.00 1 0.00 1 400.00 1 $40,000.00 Estimated Reimbursable Expenses/Subconsultants Mileage $900.00 Subtotal Reimbursable Expenses -Task 2.2 $900.00 Total Task 2.2 -construction Observation 0.00 0.00 0.00 0.00 400.00 $40,900.00 GRAND TOTAL AMENDMENT NO. 21 0.00 1 8.00 1 24.00 1 20.00 1 400.00 1 $48,000.00 Page 1 of 1 SELECTION COMMITTEE — VOTING RESULTS n, C'1" 0- ,Z' RFQ 23-01, Selection #7 - New Selection Description: Lift Station -Greenland Selection Committee Date/Time: 09/11/2023 at 4:00 PM Firms are listed alphabetical order. 1 2 3 Overall RANK Garver, LLC. Hawkings-Weir Engineer, McClelland Consulting Inc. Engineers, Inc. 1st 2nd 3rd OVERALL RANK SUMMARY SCORING 1st ranked firm: 1 'Clf-II �ln.v (% n�fT11�Q UIUIi)�� l I nG 2nd ranked firm: (I 3rd ranked firm: I`=J'j IDS , \,�IDLIJ,r t=i'VA I l�i�„� II l(/• Tallied by: l Amanda Sr Purchasing A e I nny itch, Purchasing Agent Date: �Beilfuss, j I / 1 Date: City of Fayetteville RFQ 23-01, Engineering & Architectural Services Date: 09/11/2023 at 4:00 PM Meeting ID 85412640913 Topic S/C Meeting: RFQ 23-01, Selections 6-8 Start Time 9/11/2023 3:55:32 PM End Time 9/11/2023 4:15:02 PM User Email abeilfuss@favetteville-ar.gov Duration (Minutes) 20 Participants 7 CITY OF FAYETTEVILLE ARKANS ARKANSAS Name (Original Name) User Email Total Duration (Minutes) Guest Amanda Beilfuss abeilfuss@fayetteville-ar.gov 20 No Lyssie Koscheski 17 Yes Mike Wiederkehr 17 Yes Matt Mihalevich mmihalevich@fayetteville-ar.gov 16 No cgranderson 7 Yes Chris Brown 13 Yes wabernathy 12 Yes