Loading...
HomeMy WebLinkAbout284-23 RESOLUTIONa 0 lr �qKA HS"S 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 284-23 File Number: 2023-1435 FLINTCO, LLC (FIRE STATION 2 - CHANGE ORDER #2): A RESOLUTION TO APPROVE CHANGE ORDER #2 WITH FLINTCO, LLC IN THE AMOUNT OF $5,345,663.00 FOR WORK ASSOCIATED WITH THE CONSTRUCTION OF FIRE STATION 2, AND TO APPROVE A BUDGET ADJUSTMENT — FIREFIGHTING FACILITY IMPROVEMENTS BOND PROJECT WHEREAS, in October 2022, Washington County donated 1.4 acres at the corner of North Street and Woolsey Avenue to the City of Fayetteville for the construction of a new fire station; and, WHEREAS, in March 2023, the City Council approved Resolution #58-23 authorizing a contract with Flintco, LLC for Construction Management Services for the new fire station; and WHEREAS, on October 17, 2023, the City Council approved Change Order #I to include site demolition, site grading, site utilities, site concrete, and generator and switchgear; and WHEREAS, Change Order #2 includes the completion of construction of the fire station. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Change Order No. 2 with Flintco, LLC in the amount of $5,345,663.00 for work associated with the construction of Fire Station 2. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. PASSED and APPROVED on December 19, 2023 Approved: _ Attest: `,��i��iii►�t,� i f AYFTTFV', I •' ioneld Jorda or Kara Paxton, City Clerk Treasuref Page 1 �tunaa CITY OF FAYETTEVILLE IN ARKANSAS MEETING OF DECEMBER 19, 2023 TO: Mayor Jordan and City Council CITY COUNCIL MEMO 2023-1435 THRU: Paul Becker, Chief Financial Officer FROM: Waylon Abernathy, Bond Projects & Construction Dir DATE: SUBJECT: Change Order #2 to RFQ# 22-12 with Flintco LLC. for Fire Station 2 Work Package 2. RECOMMENDATION: Approval of Change Order #2 to RFQ# 22-12 with Flintco LLC. for WP-2 for Fire Station 2 in the amount of $5,345,663.00 and approve a Budget Adjustment. An owner contingency is included in the total in the amount of $107,973. BACKGROUND: 10/17/2023 Resolution #58-23 was approved for Change Order #1 to include site demolition, site grading, site utilities, site concrete, building concrete, and generator and switchgear. DISCUSSION: This change order in the amount of $5,345,663 completes the GMP. The trade packages include Masonry, Structural Steel, Wood Framing, Millwork, Glass, finishes, MEP. Included in the total is an owner contingency in the amount of $107,973.00. BUDGET/STAFF IMPACT: Budget Adjustment to include Fire Bond Funds, earned interest, and Fire Impact Fees. PURCHASE ORDER DETAILS GL Account Project Amount 4710.860.7110-5804.00 46100.7110.8040 $3,543,112.00 4610.860.7110-5804.00 46100.7110.8040 $529,534.00 2300.300.9300-5804.00 07003.7110.8040 $1,273,017.00 Total $5,345,663.00 ATTACHMENTS: SRF (#3), BA (#4), CO #2 Compiled (#5), Affidavit of Compliance (#6) Mailing address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 City of Fayetteville, Arkansas 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Legislation Text File #: 2023-1435 Change Order #2 to RFQ# 22-12 with Flintco LLC. for Fire Station 2 Work Package 2. A RESOLUTION TO APPROVE CHANGE ORDER #2 WITH FLINTCO, LLC IN THE AMOUNT OF $5,345,663.00 FOR WORK ASSOCIATED WITH THE CONSTRUCTION OF FIRE STATION 2, AND TO APPROVE A BUDGET ADJUSTMENT — FIREFIGHTING FACILITY IMPROVEMENTS BOND PROJECT WHEREAS, in October 2022, Washington County donated 1.4 acres at the corner of North Street and Woolsey Avenue to the City of Fayetteville for the construction of a new fire station; and, WHEREAS, in March 2023, the City Council approved Resolution #58-23 authorizing a contract with Flintco, LLC for Construction Management Services for the new fire station; and WHEREAS, on October 17, 2023, the City Council approved Change Order #1 to include site demolition, site grading, site utilities, site concrete, and generator and switchgear; and WHEREAS, Change Order #2 includes the completion of construction of the fire station. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Change Order No. 2 with Flintco, LLC in the amount of $5,345,663.00 for work associated with the construction of Fire Station 2. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. Page 1 City of Fayetteville Staff Review Form 2023-1435 Item ID 12/19/2023 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item Wade Abernathy 12/1/2023 FACILITIES MANAGEMENT (140) Submitted By Submitted Date Division / Department Action Recommendation: Approval of Change Order #2 to RFQ# 22-12 contract with Flintco LLC., in the amount of $5,345,663.00 and approval of a budget adjustment. There is $107,973.00 included in the total amount for Owner Contingency. Budget Impact: 4710.860.7110-5804.00 Fire Projects 2019 Bonds 4610.860.7110-5804.00 Fire Projects 2022 Bonds 2300.300.9300-5804.00 Impact Fees Account Number Fund 46100.7110.8040 07003.7110.8040 Project Number Budgeted Item? Yes Does item have a direct cost? Yes Is a Budget Adjustment attached? Yes Purchase Order Number: 2023-540 Change Order Number: tj Original Contract Number: 2023-21 Comments: Fire Projcts (2019/2022 Bonds) Fire Impact Fee Improvements Total Amended Budget Expenses (Actual+Encum) Available Budget Item Cost Budget Adjustment Remaining Budget Project Title $ 7,313,840.00 $ 2,545,182.15 $ 4,768,6S7.85 $ 5,345,663.00 $ 715,101.00 Is 138,095.85 V20221130 Previous Ordinance or Resolution # 58-23, 208-23 Approval Date: 10/3/2023 City of Fayetteville, Arkansas - Budget Adjustment (Agenda) Budget Year Division Adjustment Number FACILITIES MANAGEMENT (140) /Org2 2023 Requestor: Wade Abernathy BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION: Approval of Change Order #2 to RFQ# 22-12 contract with Flintco LLC., in the amount of $5,345,663.00 and approval of a budget adjustment. There is $107,973.00 included in the total amount for Owner Contingency. COUNCIL DATE: 12/19/2023 ITEM ID#: 2023-1435 Holly Black 721712023 7.50 HNl Budget Division Date TYPE: D - (City Council) JOURNALM RESOLUTION/ORDINANCE I GLDATE: CHKD/POSTED: TOTAL Account Number 715,101 715,101 Increase / (Decrease) Expense Revenue Project.Sub# Project Sub.Detl AT v.20231113 Account Name 4710.860.7110-5804.00 3,543,112 - 46100 7110.8040 EX Building Costs 4610.860.7110-5804.00 2300.300.9300-5804.00 529,534 1,273,017 - - 46100 07003 7110.8040 7110.8040 EX EX Building Costs Building Costs 4710.860.7999-5899.00 4610.860.7999-5899.00 (3,543,112) (503,605) - - 46100 46100 7999 7999 EX EX Unallocated - Budget Unallocated - Budget 4610.860.7000-4707.46 2300.300.9300-5801.00 (583,845) 25,929 - 46100 07003 7000 4 RE EX Interest - 2019 Project Funds Fixed Assets 2300.300.9300-4999.99 - 689,172 RE Use Fund Balance - Current 2 Increase / (Decrease) Project.Sub# Account Number Expense Revenue Project Sub.Detl AT Account Name r AIA Document G701" — 2017 Change Order PROJECT: (Name and address) Fayetteville Fire Station No.2 138 W. North Street Fayetteville Arkansas 72703 OWNER: (Name and address) City of Fayetteville 113 West Mountian Street Fayettevill, AR 72701 CONTRACT INFORMATION: Contract For: General Construction Date: March 7s', 2023 ARCHITECT: (Name and address) MBL Architecture 2397 Green Acres Rd, Fayetteville, AR 72703 CHANGE ORDER INFORMATION: Change Order Number: 2 Date: 11/27/2023 CONTRACTOR: (Name and address) Flintco, LLC 184 E. Fanitnel Dr. Springdale, AR 72762 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to -executed Construction Change Directives.) Includes labor, material, equipment, and supervision required for all scopes of work as shown in Exhibit A - GMP Itemization, for the construction of the new Fayetteville Fire Station #2. All earthwork, utilites, and concrete was included in CO#1 and is therefore excluded in this change order. All work to be completed in accordance with Construction Documents issued by Miller Boskus Lack Architects dated 8/18/2023, Revision #1 dated 10/17/2023, Addendum #1 dated 10/25/2023, and Addendum #2 dated 11/02/2023, Exhibit C— Enumeration of documents, an exhibits as listed below. Date Description 11/27/2023 Exhibit A - GMP Itemization 11/27/2023 Exhibit B - Clarificaitons & Assumptions 11/27/2023 Exhibit C - Enumeration of Documents The original Guaranteed Maximum Price was $ 30,000.00 The net change by previously authorized Change Orders $ 1,703,019.00 The Guaranteed Maximum Price prior to this Change Order was $ 1,733,019.00 The Guaranteed Maximum Price will be increased by this Change Order in the amount of $ 5,345,663.00 The new Guaranteed Maximum Price including this Change Order will be $ 7,078,682.00 The Contract Time will be increased by Zero (0) days. The new date of Substantial Completion will be 9/30/2024 NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. MBL Architecture ARCHITECT (Fi rrlte) SIGNATURE Audy G. Lack PRINTED NAME AND TITLE 12.21.2023 DATE Flintco, LLC CONTRACTOR (Firm name) Brent Farmer SIGNATURE Brent Farmer / Vice President PRINTED NAME AND TITLE 11 /27/23 DATE L ionela 9e1(�lan , Maupr PRINTED NAME AND TITLE December N ,1013 DATE AIA Document G701 — 2017. Copyright © 1979, 1987, 2000 , 2001 and 2017. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 11:56:53 ET on 11/30/2023 under Order No.3104239076 which expires on 09/17/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (3139ADA45) rLINTCO COST ITEMIZATION Fayetteville Fire Station #2 - CO#2 Group PtscrjiLvon 01000 GENERAL CONDITIONS 01000 PROJECT REQUIREMENTS 01000 BID PACKAGE #1C - FINAL CLEAN 03000 BID PACKAGE #3C - POLISHED CONCRETE 04000 BID PACKAGE #4A - MASONRY 05000 BID PACKAGE #5A - STRUCTURAL STEEL SUPPLY 05000 BID PACKAGE #5B - STRUCTURAL STEEL ERECTION 06000 BID PACKAGE #6A - MILLWORK 06000 BID PACKAGE #6B - WOOD FRAMING 07000 BID PACKAGE #7A - WATERPROOFING / SEALANTS 07000 BID PACKAGE #7B - ROOFING 07000 BID PACKAGE #7C - METAL PANELS 07000 BID PACKAGE #7D - SPRAY FOAM 08000 BID PACKAGE #8A - DOORS, FRAMES, HARDWARE & SPECIALTIES (SUPPLY) 08000 BID PACKAGE #8B - DOORS, FRAMES, & HARDWARE (INSTALL) 08000 BID PACKAGE #8C - GLASS & GLAZING 08000 BID PACKAGE #8D - OVERHEAD DOOR 09000 BID PACKAGE #9A - DRYWALL, ACT, WOOD CEILINGS, INSULATION, BLOCKING 09000 BID PACKAGE #9C - CARPET, RESILIENT FLOORING, & TILE 09000 BID PACKAGE #9E - PAINTS & COATINGS 10000 BID PACKAGE #10A - SIGNAGE 10000 BID PACKAGE #10D - LOCKERS 12000 BID PACKAGE #12A -WINDOW TREATMENT 21000 BID PACKAGE #21A - FIRE SUPPRESSION SYSTEM 22000 BID PACKAGE #22A / 23A - HVAC & PLUMBING 26000 BID PACKAGE #26A - ELECTRICAL 32000 BID PACKAGE #32C - FENCES & GATES 32000 BID PACKAGE #32D - LANDSCAPING 32000 BID PACKAGE #32F - PAVEMENT MARKINGS, SIGNAGE, WHEEL STOPS Entegrity - LEED Services Rubber Base @ Fitness Allowance Lightning Protection Sidewalk to UAMS Appliances Allowance Unforseen Conditions Allowance EXHIBIT A UPDATED: 11/29/2023 Total Amount $ 430,036 $ 94,245 $ 10,490 $ 27,777 $ 608,626 $ 143,992 $ 51,600 $ 319,776 $ 335,154 $ 72,107 $ 140,527 $ 54,550 $ 23,190 $ 69,747 $ 14,810 $ 104,306 $ 189,402 $ 83,995 $ 23,935 $ 76,650 $ 13,866 $ 10,042 $ 5,090 $ 113,920 $ 839,360 $ 496,132 $ 116,776 $ 51,265 $ 2,966 $ 32,120 $ 240 $ 13,860 $ 3,590 $ 47,000 $ 100,000 SUBTOTAL: $ 4,718,917 P & P BOND: $ 63,467 INSURANCE: $ 32,074 SUB DEFAULT INSURANCE: $ 68,986 BUILDERS RISK: $ 9,836 OWNERS CONTRACTORS PROTECTIVE LIABILITY: $ 9,058 CM CONTINGENCY: $ 100,793 OWNER CONTINGENCY: $ 107,987 FEES: $ 264,656 CO#2 Subtotal $ 5,346,663 Clarifications and Assumptions Exhibit "B" Work Package #2: November 27, 2023 Fayetteville Fire Station #2 ?LINTCO 11.27.23 Fayetteville Fire Station #2 11 Page CHANGE ORDER #2 FIRE STATION #2 CLARIFICATIONS, ASSUMPTIONS, INCLUSIONS AND EXCLUSIONS Scope of Work Change Order #2 includes labor, material, equipment, tools, and supervision required to perform the following scope of work for the new Fayetteville Fire Station #2 Facility in accordance with the construction Documents issued by Miller Boskus Lack Architects dated 8/18/2023, Revision #1 dated 10/13/2023, Addendum #1 dated 10/25/2023, and Addendum #2 dated 11/02/2023, and specifically as listed in Exhibit C - Enumeration of documents. Bid Package 1C - Final Clean Bid Package 3C - Polished Concrete Bid Package 4A - Masonry Bid Package 5A - Structural Steel Supply Bid Package 5B - Structural Steel Erection Bid Package 6A - Millwork Bid Package 6B - Wood Framing Bid Package 7A - Waterproofing and Sealants Bid Package 7B - Roofing Bid Package 7C - Metal Panels Bid Package 7D - Spray Foam Bid Package 8A - Doors, Frames, Hardware & Specialties Bid Package 8B - Doors, Frames, Hardware & Specialties Installation Bid Package 8C - Glass and Glazing Bid Package 8D - Overhead Doors Bid Package 9A - Drywall, ACT, Wood Ceilings, Insulation, Blocking Bid Package 9C - Carpet, Resilient Flooring, Tile, and Rubber Base Bid Package 9E - Paints and Coatings Bid Package 10A - Signage Bid Package 10D - Lockers Bid Package 12A - Window Treatments Bid Package 21A - Fire Suppression System Bid Package 22A - HVAC Bid Package 23A - Plumbing Bid Package 26A - Electrical Bid Package 32C - Fences and Gates Bid Package 32D - Landscaping Bid Package 32F - Pavement Markings, Exterior Signage, and Wheel stops Design Criteria Where possible, items and systems specified by these C&A's are defined and specific to material, finish and intended use. Where materials, finishes and/or quantities are not clearly defined, this proposal assumes the most practical and economical solution consistent with the design concepts and scope. Where scope is unclear, suggested allowance have been provided. \ ,LINTCO 11.27.23 Fayetteville Fire Station #2 Any work referred to as "By Owner", "By Others", "OFCI" (owner furnished contractor installed), or "N.I.C." (not in contract) is not part of the scope of this proposal unless installation is specified. Where the work "allowance" appears, it shall mean that a fixed sum is included in the cost of the work for design, materials, equipment and/or labor for the complete installed product specified. Allowance are identified with a specific dollar amount. Adjustment in the contract amount may be necessary if costs are less than or in excess of these allowances. Code Requirements We exclude any liability with regard to errors and omissions from the bid documents. In addition, we have assumed that the Architect/Engineer has incorporated into the bid documents all code requirements, ADA requirements and has taken all seismic design into consideration. General Conditions & Project Requirements/ General Package General conditions have been included as a lump sum value which will be billed in equal monthly installments. Fixed General Condition Items shall mean the provision of facilities or performance of supervisory work by the Construction Manager with respect to items that are not included in one of the separate trade contracts and are not customarily so included. They shall include all of the Construction Manager's indirect costs and expenses, supervisory or general overhead costs, and personnel and benefit costs related to the administration and supervision of the work. Extension of project duration due to changes in scope of work or unforeseen conditions warrant general conditions extension as well. Project Requirements items will be billed as cost of work; and shall include but are not limited to, cost and expenses incurred by the Construction Manager in operating and maintaining jobsite security, safety, and supporting the work from the subcontractors in the field. Example of project requirements are permits, layout, documentation photos, temporary toilets, utilities use, cleanup, waste disposal, etc. Bonds & Insurance General Insurance (0.6%), (OCP) Owner and Contractor Protective Liability Insurance, General Contractor Bond (1%), and Subcontractor Default Insurance (1.25%) have been included. Qualhy Control Services Costs for testing and special inspection services shall be provided by Owner and are excluded. We will provide coordination and scheduling of said services. These services include, but are not limited to engineering testing services, engineering observation and LEED consultation and testing. Delays If the Contractor is delayed at any time in the progress of the work by labor disputes, unavoidable casualties, changes in the work, or any other causes beyond Contractor's control, the time of completion shall be extended. Claims for extension of time and/or adjustments to the Contract Sum shall be made within a reasonable time after the occurrence of the delay. This proposal excludes any time delays and cost increases arising from or related to the COVID-19 virus and any government or other third -party action in response thereto. Permits. Bonds. and Fees The Architect/Engineer is responsible for permit submission and acceptance by the City of Fayetteville and other Authorities Having Jurisdiction (AHJ). The Owner is responsible for the cost of the building permits, tap fees, impact fees and meters. Payment and performance bonds are included however all other bonds (Right of way or Maintenance Bonds) are excluded. TempQrary Utilities/Facilities Temporary Utilities use fees such as Natural Gas, Water, Sewer and Electric Service is included for the duration of the project until the owner occupies the Facility. r LINTCO 11.27.23 Fayetteville Fire Station #2 3 1 P a g e Construction Access Construction areas will be fenced where possible; all access will be controlled by Flintco personnel. Visitors to the site must sign in with the onsite Flintco Staff. Prevailing Wage Prevailing wage rates do not apply to this project and are not included. Certified Payroll and/or project audit is excluded. Allowances. Contingency. Fees The following are included: 1. Contractor Contingency $100,793 2. Owner Contingency (2%) $107,789 3. Appliance Allowance $47,000 4. Unforeseen Conditions $100,000 General Inclusions/Exclusions 1. Typical hours of construction operations are 7 am through 7 pm. 2. Certain construction procedures such as concrete placement and material deliveries require work outside of normal hours. Work will be scheduled with onsite personnel. 3. Unforeseen conditions and/or items not located and shown on plans are not included in the GMP. Division 1- Final Clean No Exceptions Division 3 - Building & Site Concrete No Exceptions Division 4 Masonry All cast stone shall be a dry tamp cast stone as provided on FS#8 & FS#9. Division 5 - Structural Steel Sup& & Erection No Exceptions Division 6 - Woods. Plastics. and Composites Includes Plastic Laminate (PLAM) in lieu of Solid Phenolic for all Wardrobe Cabinets. All standing and running wood trim shall be a clear finish #2 White Pine. Division 7 - Thermal and Moisture Protection No Exceptions Division 8 - Doors. Frames. Hardware, Overhead Doors. Windows. and Glazing No Exceptions Division 9 - Drywall. ACT, Wood Ceilings, Insulation, Blocking, Floor Coverings. Paints. and Coatings All wood ceilings shall be a clear finish #2 White Pine. Division 10 - Specialties No Exceptions Division 11-Appliances Includes a $47,000 allowance for all appliances. Flintco to coordinate with the owner to make final equipment selections. IFLINTCO 11.27.23 Fayetteville Fire Station #2 4 1 Page Division 12 -Window Shades No Exceptions Division 21— Fire Suppression All sprinkler head escutcheons shall be provided as White or Chrome. Custom colors are not included. Division 22 - Plumbing No Exceptions Division 23 - HVAC No Exceptions Division 26.27.28 — Electrical. Communications. Electronic Safetv. and Security Svstems • Includes lighting protection (L.P. system per UL96A, LP1 175, & NFPA 780, ground ring excluded). • No power supply for irrigation controls was shown on the contract documents but power supply from a general circuit can be run from a nearby location at no charge. • No intercom or clock system is shown on the contract documents so none is included. • Conduit and cabling for Access Control and Security is included per the contract documents, cameras to be owner provided. • Alert System is to be owner provided but tying into the system is included. • Provisions for Conduit and wire at the Car Charger locations are included. Equipment and equipment installation is excluded. Division 32 — Exterior Improvements No Exceptions END OF DOCUMENT r LIIVTCO 11.27.23 Fayetteville Fire Station #2 5 1 Page EXHIBIT C ENUMERATION OF DOCUMENTS G0.0 Cover Sheet 1 10/13/2023 Fayetteville Fire Station #2 100% CDs GO.1 LIFE SAFETY & CODE INFORMATION 1 10/25/2023 Addendum #1 G0.2 GENERAL INFORMATION 0 10/13/2023 Fayetteville Fire Station #2 100% CDs G0.3 ASSEMBLY TYPES 0 10/13/2023 Fayetteville Fire Station #2 100% CDs C0.0 COVER SHEET 2 10/25/2023 Addendum #1 C0.1 GENERAL NOTES 1 10/13/2023 Fayetteville Fire Station #2 100% CDs C3.0 DEMOLITION PLAN 1 10/13/2023 Fayetteville Fire Station #2 100% CDs C1.1 SITE & PAVING PLAN 2 10/25/2023 Addendum #1 C2.0 GRADING PLAN 2 10/25/2023 Addendum #1 C3.0 UTILITY PLAN 2 10/25/2023 Addendum #1 C3.1 FIRE PLAN & PROFILE 1 10/13/2023 Fayetteville Fire Station #2 100% CDs C3.2 STORM PLAN 1 10/13/2023 Fayetteville Fire Station #2 100% CDs C3.3 STORM PLAN & PROFILE 1 1 10/13/2023 Fayetteville Fire Station #2 100% CDs C3.4 STORM PLAN & PROFILE II 1 10/13/2023 Fayetteville Fire Station #2 100% CDs C3.5 STORM PLAN & PROFILE 111 1 10/13/2023 Fayetteville Fire Station #2 100% CDs C4.0 EROSION CONTROL PLAN PH. 1 1 10/13/2023 Fayetteville Fire Station #2 100% CDs C4.1 EROSION CONTROL PLAN PH. 2 1 10/13/2023 Fayetteville Fire Station #2 100% CDs C4.2 EROSION CONTROL DETAILS SHEET 1 1 10/13/2023 Fayetteville Fire Station #2 100% CDs C4.3 EROSION CONTROL DETAILS SHEET 2 1 10/13/2023 Fayetteville Fire Station #2 100% CDs C5.0 DETAILS SHEET 1 1 10/13/2023 Fayetteville Fire Station #2 100% CDs C5.1 DETAILS SHEET 2 1 10/13/2023 Fayetteville Fire Station #2 100% CDs C5.2 DETAILS SHEET 3 1 10/13/2023 Fayetteville Fire Station #2 100% CDs C5.3 DETAILS SHEET 4 1 10/13/2023 Fayetteville Fire Station #2 100% CDs C5.4 DETAILS SHEET 5 1 10/13/2023 Fayetteville Fire Station #2 100% CDs C5.5 DETAILS SHEET 6 1 10/13/2023 Fayetteville Fire Station #2 100% CDs C5.6 DETAILS SHEET 7 1 10/13/2023 Fayetteville Fire Station #2 100% CDs 1-1.0 LANDSCAPE PLAN 1 10/13/2023 Fayetteville Fire Station #2 100% CDs L1.1 LANDSCAPE NOTES & DETAILS 1 10/13/2023 Fayetteville Fire Station #2 100% CDs L2.0 TREE PRESERVATION PLAN 1 10/13/2023 Fayetteville Fire Station #2 100% CDs L2.1 SHEET 0 10/13/2023 Fayetteville Fire Station #2 100% CDs 50.1 GENERAL NOTES 2 10/25/2023 Addendum #1 50.2 SPECIAL INSPECTIONS 1 10/13/2023 Fayetteville Fire Station #2 100% CDs 50.3 ROOF LOADING 0 10/13/2023 Fayetteville Fire Station #2 100% CDs SLIA FOUNDATION PLAN 2 10/25/2023 Addendum #1 S1.1B FOUNDATION PLAN 2 10/25/2023 Addendum #1 52.1 TYP FOUNDATION DETAILS 2 10/25/2023 Addendum #1 52.2 FOUNDATION SECTIONS 2 10/25/2023 Addendum #1 52.3 FOUNDATION SECTIONS 2 10/25/2023 Addendum #1 53.1 LOW ROOF FRAMING PLAN 0 10/13/2023 Fayetteville Fire Station #2 100% CDs 53.2 HIGH ROOF FRAMING PLAN 0 10/13/2023 Fayetteville Fire Station #2 100% CDs 54.1 TYP FRAMING DETAILS 0 10/13/2023 Fayetteville Fire Station #2 100% CDs 54.2 TYP FRAMING DETAILS 0 10/13/2023 Fayetteville Fire Station #2 100% CDs 54.3 FRAMING SECTIONS 0 10/13/2023 Fayetteville Fire Station #2 100% CDs 54.4 FRAMING SECTIONS 0 10/13/2023 Fayetteville Fire Station #2 100% CDs 54.5 FRAMING SECTIONS 0 10/13/2023 Fayetteville Fire Station #2 100% CDs 54.6 FRAMING SECTIONS 0 10/13/2023 Fayetteville Fire Station #2 100% CDs 54.7 FRAMING SECTIONS 0 10/13/2023 Fayetteville Fire Station #2 100% CDs 55.1 TRUSS PROFILES 0 10/13/2023 Fayetteville Fire Station #2 100% CDs 55.2 TRUSS PROFILES 0 10/13/2023 Fayetteville Fire Station #2 100% CDs AS.1 ARCHITECTURAL SITE PLAN 0 10/13/2023 Fayetteville Fire Station #2 100% CDs A1.1 FLOOR PLAN 1 10/25/2023 Addendum #1 A1.2 MEZZANINE PLAN 0 10/13/2023 Fayetteville Fire Station #2 100% CDs A1.3 REFLECTED CEILING PLANS 0 10/13/2023 Fayetteville Fire Station #2 100% CDs A1.4 ROOF PLAN 0 10/13/2023 Fayetteville Fire Station #2 100% CDs A EXHIBIT C ENUMERATION OF DOCUMENTS A2.1 BUILDING ELEVATIONS 1 11/2/2023 Addendum #2 A2.2 BUILDING ELEVATIONS 1 11/2/2023 Addendum #2 A3.1 BUILDING SECTIONS 0 10/13/2023 Fayetteville Fire Station #2 100% CDs A3.2 BUILDING SECTIONS 0 10/13/2023 Fayetteville Fire Station #2 100% CDs A4.1 WALL SECTIONS 1 11/2/2023 Addendum #2 A4.2 WALL SECTIONS 0 10/13/2023 Fayetteville Fire Station #2 100% CDs A4.3 WALL SECTIONS 0 10/13/2023 Fayetteville Fire Station #2 100% CDs A5.1 ENLARGED PLANS & INT. ELEVATIONS 1 11/2/2023 Addendum #2 A5.2 ENLARGED PLANS & INT. ELEVATIONS 1 11/2/2023 Addendum #2 A5.3 ENLARGED PLANS, ELEVATIONS, DETAILS 1 10/25/2023 Addendum #1 A5.5 DETAILS 1 11/2/2023 Addendum #2 A5.6 DETAILS 0 10/13/2023 Fayetteville Fire Station #2 100% CDs A6.1 DOOR & WINDOW SCHEDULE 0 10/13/2023 Fayetteville Fire Station #2 100% CDs A6.2 STOREFRONT & WINDOW DETAILS 0 10/13/2023 Fayetteville Fire Station #2 100% CDs A6.3 DOOR DETAILS 1 11/2/2023 Addendum #2 A6.4 MILLWORK DETAILS 0 10/13/2023 Fayetteville Fire Station #2 100% CDs A7.1 FINISH SCHEDULE & MATERIALS 1 10/25/2023 Addendum #1 U2.1 SITE UTILITY PLAN 0 10/13/2023 Fayetteville Fire Station #2 100% CDs P3.1 PLUMBING NOTES & LEGEND 0 10/13/2023 Fayetteville Fire Station #2 100% CDs P2.1 PLUMBING PLANS 0 10/13/2023 Fayetteville Fire Station #2 100% CDs P2.1A ENLARGED PLUMBING PLAN -AREA A 0 10/13/2023 Fayetteville Fire Station #2 100% CDs P2.113 ENLARGED PLUMBING PLAN -AREA B 1 11/2/2023 Addendum #2 P3.1 PLUMBING DETAILS 0 10/13/2023 Fayetteville Fire Station #2 100% CDs P3.2 PLUMBING DETAILS 1 11/2/2023 Addendum #2 P3.3 PLUMBING DETAILS 0 10/13/2023 Fayetteville Fire Station #2 100% CDs P4.1 SHEET 0 10/13/2023 Fayetteville Fire Station #2 100% CDs P4.2 PLUMBING RISERS 1 11/2/2023 Addendum #2 P4.3 SHEET CONTENTS PLUMBING RISERS 0 10/13/2023 Fayetteville Fire Station #2 100% CDs P4.4 PLUMBING RISERS 1 11/2/2023 Addendum #2 P5.1 PLUMBING SCHEDULES 2 11/2/2023 Addendum #2 M1.1 HVAC NOTES & LEGEND 0 10/13/2023 Fayetteville Fire Station #2 100% CDs M2.1 HVAC PLAN 1 10/25/2023 Addendum #1 M2.2 VRV PIPING LAYOUT 1 10/25/2023 Addendum #1 M3.1 HVAC DETAILS 0 10/13/2023 Fayetteville Fire Station #2 100% CDs M3.2 HVAC DETAILS 0 10/13/2023 Fayetteville Fire Station #2 100% CDs M5.1 HVAC SCHEDULES 1 10/25/2023 Addendum #1 MP2.1 MECHANICAL ROOF PLAN 0 10/13/2023 Fayetteville Fire Station #2 100% CDs E3.1 ELECTRICAL LEGEND, NOTES & DETAILS 1 10/25/2023 Addendum #1 E2.1 LIGHTING PLAN 1 11/2/2023 Addendum #2 E2.2 POWER PLAN 1 10/25/2023 Addendum #1 E2.3 MECHANICAL POWER PLAN 1 11/2/2023 Addendum #2 E2.4 SPECIAL SYSTEMS PLAN 0 10/13/2023 Fayetteville Fire Station #2 100% CDs E3.1 ELECTRICAL DETAILS 0 10/13/2023 Fayetteville Fire Station #2 100% CDs E4.1 ELECTRICAL SCHEDULES 1 11/2/2023 Addendum #2 E4.2 ELECTRICAL SCHEDULES 1 11/2/2023 Addendum #2 ES1.0 ELECTRICAL SITE PLAN 1 11/2/2023 Addendum #2 ES1.1 ELECTRICAL SITE PHOTOMETRIC PLAN 1 11/2/2023 Addendum #2 000000 Cover 1 8/18/2023 50%CDs 000107 Seals Page 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 002100 Geotech 1 8/18/2023 50% CDs 002100 MCE Project Number 1 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 003132 Geotechnical Data 1 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 003143 Environmental Compliance 1 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 5 EXHIBIT C ENUMERATION OF DOCUMENTS 004100 Bid Form 1 8/18/2023 50% CDs 00 43 10 Cost Breakdown Form 1 8/18/2023 50% CDs 00 43 36 Subcontractor Listing 1 8/18/2023 50% CDs i Table of Contents 011100 Summary of Work 1 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 012600 Contract Modification Procedures 3 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 012900 Payment Procedures 3 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 013100 Project Management and Coordination 3 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 013200 Construction Progress Documentation 3 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 013300 Submittal Procedures 1 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 014000 Quality Requirements 3 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 014529 Testing And Inspection Services 1 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 015000 Construction Facilities and Temporary Con 1 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 01 60 00 Product Requirements 3 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 017300 Execution 3 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 017419 Construction Waste Management 3 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 017700 Closeout Procedures 3 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 017900 Minimum Owner Training Requirements 1 8/18/2023 50% CDs 018113 LEED Certification Requirements 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 018119 Indoor Air Quality Management 1 8/18/2023 50% CDs 018181 Sustainable Checklist Requirements 1 8/18/2023 50% CDs 019113 General Commissioning Requirements 2 • 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 033000 Cast -In -Place Concrete 1 8/18/2023 50% CDs 033150 Grout 0 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 03 35 10 Polished Concrete Finishing 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual Architectural Pre -Cast Concrete - Plant 03 45 33 Cast 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 04 20 00 Unit Masonry 3 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 05 12 00 Structural Steel Framing 3 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 052100 Steel Joist Framing 3 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 053100 Steel Decking 3 10/13/2023 100% Fayetteville Fire Station #2 Project Manual Metal Fabrications And Miscellaneous 05 50 00 Metals 3 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 055133 Metal Access Ladder 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual Wood, 061000 Carpentry 3 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 06 16 00 Exterior Grade Sheathing 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 061800 Glue Laminated Structural Units 3 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 06 40 00 Architectural Woodwork 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual Thermal . Moisture Protection 07 19 00 Water Repellent Coating 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 072100 Building Insulation 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 07 21 29 Sprayed Insulation 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 07 27 26 Liquid Applied Air/Vapor Barrier 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 07 42 13 Formed Metal Wall Panels 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 07 46 46 Fiber Cement Siding 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 07 54 00 Thermoplastic Membrane Roofing 1 8/18/2023 50% CDs 07 60 00 Flashing and Sheet Metal 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 07 92 00 Joint Sealants 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual Openings 081113 Hollow Metal Doors and Frames 0 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 0811 13.13 Interior Steel Doors and Frames 1 8/18/2023 50% CDs 0811 13.14 Galvanneal Steel Doors and Frames 1 8/18/2023 50% CDs High Pressure Plastic Laminated Faced 081513 Doors 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 083000 High Speed Rolling Doors 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 083323 Overhead Coiling Doors 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual EXHIBIT C ENUMERATION OF DOCUMENTS 08 36 00 Overhead Sectional Doors 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual Aluminum Entrances, Storefront And 084100 Fixed Framing 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 085213 Metal -Clad Wood Windows 1 8/18/2023 50%CDs 08 54 13 Fiberglass Windows 0 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 087000 Finish Hardware 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 08 80 00 Glazing 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 09 21 16 Gypsum Board 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 09 30 00 Tiling 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 09 51 13 Acoustical Lay -in Ceiling 0 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 09 65 13 Resilient Base And Accessories 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 09 65 19 Luxury Vinyl Tile Flooring 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 09 90 00 Painting 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 101100 Specialties Visual Display Surfaces 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 10 14 00 Channel and Cut Metal Signage 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 10 14 53 Signage 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 102613 Stainless Steel Corner Guards 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 10 28 13 Toilet Accessories 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 10 44 00 Fire Protections Specialties 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 10 51 13 Metal Lockers 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 10 75 00 Flagpole Equipment 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 113000 Appliances 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 12 24 00 Shades SuppressionFire 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 210100 General Fire Suppression Provisions 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual Common Work Results for Fire 210501 Suppression 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual Vibration and Seismic Controls for Fire- 2105 48 Suppression Piping and Equipment 1 10/13/2023 100% Fayetteville Fire Station #2 Project Manual Identification for Fire Suppression Piping 210553 and Equipment 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 21 13 01 Fire -Suppression Sprinkler Systems 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 220100 General Plumbing Provisions 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual Vibration and Seismic Controls for 22 0S 48 Plumbing Piping and Equipment 1 10/13/2023 100% Fayetteville Fire Station #2 Project Manual Identification for Plumbing Piping and 22 05 53 Equipment 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 22 07 19 Piping Insulation 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 22 08 00 Commissioning of Plumbing Systems 0 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 22 1005 Plumbing Piping 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 22 1006 Plumbing Specialties 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 22 1008 Plumbing Solder 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 22 30 00 Plumbing Equipment 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 22 40 00 Plumbing Fixtures 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual Heating, Ventilating, and Air Conditioning 230100 General HVAC Provisions 0 10/13/2023 100% Fayetteville Fire Station #2 Project Manual Vibration & Seismic Controls for HVAC 23 05 48 Piping & Equipment 0 10/13/2023 100% Fayetteville Fire Station #2 Project Manual Identification for HVAC Piping and 23 05 53 Equipment 0 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 23 05 93 Testing, Adjusting, and Balancing 0 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 2307 13 Duct Insulation 0 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 23 08 00 Commissioning of HVAC Systems 0 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 23 09 24 VRV Advanced Multi -Zone Controller 0 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 23 2300 Refrigerant Piping and Specialties 0 10/13/2023 100% Fayetteville Fire Station #2 Project Manual EXHIBIT C ENUMERATION OF DOCUMENTS 233100 Ducts 0 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 23 33 00 Duct Accessories 0 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 23 33 30 Air Duct Sealants 0 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 23 34 23 Power Ventilators 0 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 23 37 00 Air Outlets and Inlets 0 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 23 40 00 Air Cleaning Devices 0 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 23 55 24 Gas -Fired Radiant Heaters 0 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 23 55 33 Electric Wall Heaters 0 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 23 55 36 Electric Duct Heaters 0 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 23 74 33 Dedicated Outside Air Units 0 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 23 75 30 VRV-Outdoor Heat Recovery 0 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 238126 Split -System Air -Conditioners 0 10/13/2023 100% Fayetteville Fire Station #2 Project Manual VRV -Indoor (Indoor Heat Recovery- Heat 238140 Pump) 0 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 260010 General Electrical Provisions 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual Seismic/Vibration Isolation Specification 260015 for Electrical & Conduit 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 26 05 19 Wires and Cables 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 26 05 26 Grounding 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 26 05 29 Supporting Devices 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 26 05 34 Conduit 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 26 05 37 Outlet and Pull Boxes 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 26 05 53 Identification 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 26 05 73 Overcurrent Protective Devices 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 26 08 00 Commissioning of Electrical Systems 0 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 262102 Underground Distribution 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 262416 Panelboards 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual Wall Switches, Receptacles, and Plate 26 27 26 Covers 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 26 28 18 Motor and Circuit Disconnects 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 26 32 15 Generator and Automatic Transfer Switch 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 265100 Interior Building Lighting 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 26 56 00 Exterior Lighting Communications 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual Conduit for Telephone/Data and TV 27 10 05 Raceway System 2 10/13/2023 100% Fayetteville Fire Station #2 Project Manual Structured Telecommunications Cabling 271011 and Enclosures Electronic Safety 2 and 10/13/2023 Security 100% Fayetteville Fire Station #2 Project Manual 283105 Fire Alarm System Earth 2 Work 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 31 10 00 Site Clearing and Demolition 1 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 312000 Earthwork 1 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 312319 Dewatering 1 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 313100 Soil Treatment 3 ImprovementsExterior 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 32 13 13 Concrete Paving 1 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 32 31 19 Steel Ornamental Fence Systern 0 100% Fayetteville Fire Station #2 Project Manual 33 05 00 Common Work Results for Utilities 1 10/13/2023 100% Fayetteville Fire Station #2 Project Manual Standard Specifications for Design and 33 20 00 Construction 1 10/13/2023 100% Fayetteville Fire Station #2 Project Manual 334100 Storm Drainage 1 10/13/2023 100% Fayetteville Fire Station #2 Project Manual AFFIDAVIT OF COMPLIANCE CONSTRUCTION MANAGER -AT -RISK PROJECT: #23082 Fayetteville Fire Station #2 I, Brent Farmer, having been first duly sworn and authorized, provide this Affidavit for and on behalf of Flintco, LLC and state the following in reference to the project solicited and Contracted under RFQ Ex 22- 12J and applicable to Change Order # ": 1. My name is Brent Farmer and I am the VP/Area Manager for Flintco, LLC. I am qualified and authorized to execute this affidavit. 2. Brent Farmer, pursuant to its contract with the City of Fayetteville, hereby certifies that it has reviewed the provisions set forth in Ark. Code Ann. § 14-58-1001, and verifies that it has complied with that statute and all other applicable rules and regulations, whether recited in §14-58-1001 or elsewhere in Arkansas law, for the above -identified project. 3. The City of Fayetteville shall be held harmless and indemnified for any disputes that arise regarding the procurement and bidding processes performed by (Firm Name). FURTHER AFFIANT SAYETH NOT. Signed this 27th day of November, 2023. PRINTED NAME TITLE STATE OF i T �<I.,.5a S ) COUNTYOF L,13aSV\-�Agktn ) l SIGNATURE HEATHER TARVER BENTON COUNTY NOTARY PUBLIC -- kRKAN AS My Commission Expires September 17, 2031 Comrrii,;sion No. 12715988 Subscribed and sworn to me, a Notary Public, this 27th day of November, 2023. Notary Public SEAL My Commission Expires: q—)