HomeMy WebLinkAbout2023-12-13 - Agendas - Final AGENDA
Active Transportation Advisory Committee (ATAC)
Wednesday, December 13th, 2023 5:30 pm
Room 111 of City Hall or Zoom
Members: Citizens-at-Large Expiration
City Council Representative: Holly Hertzberg
Parks & Rec. Board Representative: Yarri Davis
Planning Commission Representative: Joe Holcomb
Staff:
Matt Mihalevich, Active Transportation Manager
Dane Eifling, Mobility Coordinator
Terry Gulley, Transportation Services Director Captain William Brown, Police Dept
Michael Morisette, GIS Chris Brown, Public Works/City Engineer
Brannon Pack, Experience Fayetteville Ted Jack, Parks and Recreation
1. Call to Order / Introductions: Dan Greim
2. Police Update (5 min): Captain William Brown or Lieutenant French
Monthly bike ped crash reports & Citizen Input
3. Trails Program Update (5 min): Matt Mihalevich
Grant updates
Citizen Input
4. Sidewalk Program Update (5 min): Terry Gulley/Keith Shreve
Citizen Input
5. Mobility Coordinator Update (5 min): Dane Eifling
Appleby bikeway
Citizen Input
6. 5-year trail construction plan – preliminary review
Replacement projects on plan
Citizen Input
7. Other Business/Events/Citizen Input
Citizen Input
Next Meetings: Jan. 10th, Feb. 14th, March 13th, April 10th, May 8th
Dan Greim - Chair 12/24
David Chriswell–Vice Chair 12/24
Trey Terral 12/24
Arnold Smith - Bicycle 12/23
Nathan Eikenberry 12/23
Kay Kitterman – ADA 03/24
Vacant 03/24
2024 Prioritization
Score*Funding Rank Ward Feet Miles
Mission Blvd. Trail (Trail Crew) Viewpoint to Rush Drive 47.6 Trail CIP 7 3 5,750 1.09
Hamestring Creek Trail (Developer
Contractor)Salem Rd. to Rupple Rd. (1 Bridge) 42.1
Trail Bond & Cost
Share 12 4 2,338 0.44
Drake Trail Extension to Gordon Long
(Contractor)
Gordon Long Park to College Ave. (Includes
a bridge over Scull Creek)47.8 TAP Grant 6 3 1,157 0.22
Maple Street Cycle Track (Contractor) Razorback Greenway to Garland Ave. 42.8
Transportation
Bond/UofA/Grant 15 2 3,091 0.59
Midtown Trail
Deane/Sycamore/Poplar
Steven Carr Memorial Blvd. to Woodland
(Crossland Heavy)51.1 Trails &Trans. Bond 3 2 11,807 2.24
2025
1.09 Year Total 4.57
Mission Blvd. Trail (Trail Crew) Rush Dr. to Maple St. (Finish) 47.6 Trail CIP 8 3 2,250 0.43
Razorback Greenway Reroute around new Hotel at Metro Bldg. N/A Trail CIP N/A 2 500 0.09
Persimmion Trail (Owl Creek Trail) Betty Jo to Rupple Road 43.7 Trail CIP 13 4 1,952 0.37
Alberta Trail Segments (Fill In Project) Walnut Crossing (Shovel Ready) 33.8 Trail CIP 21 1 1,335 0.25
Highway 112 (North) (ARDOT)Truckers Drive to Howard Nickell
Includes Clabber Creek Connection N/A ARDOT & Grants N/A 4 8,323 1.58
Garland Avenue (Contractor) (ARDOT) Melmar to Drake St. N/A
Trans. Bond CIP &
ARDOT N/A 2 4,707 0.89
Tsa La Gi Trail (Hwy 62 MLK & I-49)
ARDOT Project
Best Way to Lefler Ln. & Shiloh Trail from
15th Street and over 54.2 ARDOT, Ph 2 Trail
Bond + Grants 1 1 1,550 0.29
Trail Reconstruction Various Locations N/A Trail CIP N/A N/A 2,500 0.47
2026
1.62 Year Total 4.38
Hwy 62 (MLK Jr. Blvd.) Lefler Ln. to Rupple Road 52.6 Trail CIP 2 1 3,552 0.67
Clabber Creek Trail Truckers Drive to Highway 112 46.8 Trail CIP Developer? 9 4 1,650 0.31
Old Wire/Old Missouri Trail Gulley Park to Rolling Hills (Includes Hilldale
Connection & Crosswalk)48.4 2025 Trans. Bond 5 3 2,696 0.51
Trail Reconstruction Various Locations N/A Trail CIP N/A N/A 2,500 0.47
2027
1.46 Year Total 1.97
Skillern Rd. (Sidepath South Side) Crossover Rd. to Charleston Crossing 34.8 Trail CIP 22 3 1,590 0.30
Shiloh Trail (Wedington to MLK) & Old
Farmington to Centennial Park
ARDOT Permit Waiting on MLK Work
Watching for Development to occur 49.7 2025 Trail Bond &
CIP 4 4 8,783 1.66
Trail Reconstruction Various Locations N/A Trail CIP N/A N/A 2,500 0.47
2028
2.44 Year Total 2.44
St. Paul Trail Razorback Gwy. to St. Paul Trail 44.6
2025 Trail Bond &
CIP 11 1 6,237 1.18
St. Paul Trail (Contractor Section) Armstrong to Dead House Mtn. 40.4 2025 Trail Bond 11 1 5,842 1.11
Rolling Hills Improvements (Contractor) Old Missouri to Fiesta Square 37.8
Transportation 2025
Bond 21 3 5,411 1.02
Trail Reconstruction Various Locations N/A Trail CIP N/A N/A 2,500 0.47
2029
1.65 Year Total 3.79
Owl Creek Trail Rupple Rd. to Broyles Road 43.7 Trail CIP 13 4 2,570 0.49
Shiloh Trail (Moore Ln. to Wedington)ARDOT Permit & Bridge over Hamestring
Watching for Development to occur 49.7 2025 Trail Bond &
CIP 4 4 5,520 1.05
Midtown Trail Woodland to Sycamore 26.8 2025 Trail Bond 2 2 2,861 0.54
Trail Reconstruction Various Locations N/A Trail CIP N/A N/A 2,500 0.47
In-house Constructed: 1.52 Year Total 2.06
5 Year Total 103,972 19.69
Notes:
In-House Trail Crew Build Bond Project
*Trail development of approximately 2 miles per year is based on continued CIP, Bond and Grant funding
*Prioritization Score reflects weighting established by ATAC - Maximum score if 54.2
Ward 1 Total 18,516 3.51
Ward 2 Total 22,966 4.35
Ward 3 Total 18,854 3.57
Ward 4 Total 31,136 5.90
103,972 19.69
In-house Constructed:
In-house Constructed:
12/11/2023
2024 - 2029 Proposed Shared-Use Paved Trail Construction Projects
In-house Constructed:
In-house Constructed:
In-house Constructed:
4331 1 3114 1 214 1 133142 1 451 1
Nu
m
b
e
r
Project Description Ward LF Location He
a
l
t
h
a
n
d
S
a
f
e
t
y
Hi
g
h
-
I
n
j
u
r
y
C
o
r
r
i
d
o
r
/
I
n
t
e
r
s
e
c
t
i
o
n
Tr
a
i
l
G
a
p
C
l
o
s
u
r
e
(
m
i
s
s
i
n
g
/
d
y
s
f
u
n
c
t
i
o
n
a
l
c
o
n
n
e
c
t
i
o
n
)
Si
d
e
w
a
l
k
G
a
p
C
l
o
s
u
r
e
Si
d
e
w
a
l
k
C
o
n
d
i
t
i
o
n
(
p
a
v
e
m
e
n
t,
d
i
m
e
n
s
i
o
n
s
,
l
i
g
h
t
i
n
g
)
He
a
l
t
h
a
n
d
S
a
f
e
t
y
T
o
t
a
l
S
c
o
r
e
Ec
o
n
o
m
y
Ci
t
y
P
l
a
n
F
u
t
u
r
e
L
a
n
d
-
U
s
e
C
e
n
t
e
r
s
a
n
d
C
o
r
r
i
d
o
r
s
I
m
p
l
e
m
e
n
t
a
t
i
o
n
Co
r
r
i
d
o
r
V
e
h
i
c
l
e
D
e
l
a
y
Co
r
r
i
d
o
r
P
e
r
s
o
n
D
e
l
a
y
Ec
o
n
o
m
i
c
D
e
v
e
l
o
p
m
e
n
t
Ec
o
n
o
m
y
T
o
t
a
l
S
c
o
r
e
En
v
i
r
o
n
m
e
n
t
Tr
e
e
C
a
n
o
p
y
o
n
M
a
j
o
r
W
a
l
k
/
B
i
k
e
R
o
u
t
e
s
St
o
r
m
w
a
t
e
r
-
M
a
p
p
e
d
S
e
r
v
i
c
e
R
e
q
u
e
s
t
A
l
i
g
n
m
e
n
t
Re
d
u
c
e
d
V
e
h
i
c
l
e
M
i
l
e
s
T
r
a
v
e
l
l
e
d
(
V
M
T
/
c
a
p
i
t
a
)
En
v
i
r
o
n
m
e
n
t
T
o
t
a
l
S
c
o
r
e
Eq
u
i
t
y
Fr
e
e
a
n
d
R
e
d
u
c
e
d
-
P
r
i
c
e
L
u
n
c
h
S
c
h
o
o
l
P
r
o
x
i
m
i
t
y
Sc
h
o
o
l
-
A
g
e
d
C
h
i
l
d
r
e
n
i
n
P
o
v
e
r
t
y
Sc
h
o
o
l
W
a
l
k
A
c
c
e
s
s
i
b
i
l
i
t
y
G
a
p
A
n
a
l
y
s
i
s
Tr
a
n
s
i
t
A
c
c
e
s
s
t
o
H
i
g
h
-
D
e
n
s
i
t
y
E
m
p
l
o
y
m
e
n
t
Tr
a
n
s
i
t
S
e
r
v
i
c
e
a
n
d
W
a
l
k
A
c
c
e
s
s
t
o
L
o
w
-
I
n
c
o
m
e
P
o
p
u
l
a
t
i
o
n
s
Ac
c
e
s
s
f
o
r
O
l
d
e
r
A
d
u
l
t
s
o
r
P
e
r
s
o
n
s
w
i
t
h
D
i
s
a
b
i
l
i
t
i
e
s
Eq
u
i
t
y
T
o
t
a
l
S
c
o
r
e
De
l
i
v
e
r
a
b
i
l
i
t
y
a
n
d
F
u
n
d
i
n
g
Pr
o
j
e
c
t
R
e
a
d
i
n
e
s
s
Fu
n
d
i
n
g
P
a
r
t
n
e
r
s
h
i
p
O
p
p
o
r
t
u
n
i
t
y
Ot
h
e
r
R
e
p
a
v
i
n
g
De
l
i
v
e
r
a
b
i
l
i
t
y
a
n
d
F
u
n
d
i
n
g
T
o
t
a
l
S
c
o
r
e
Co
s
t
/
B
e
n
e
f
i
t
To
t
a
l
A
g
g
r
e
g
a
t
e
S
c
o
r
e
1 Hwy 62/I-49 Interchange 1 4224 Tsa La Gi Trail to Rupple Road 545513.0 505510.0 305 8.7 525554 9.8 25512.7 54.2
2 Shiloh Trail (Old Farmington) 1 4,622 Shiloh Trail to Rupple Rd.435511.3 505510.0 314 7.7 53555310.0 45013.7 52.6
3 Porter/Deane/Sycamore/Poplar (Midtown Trail) 2 11807 Mt. Comfort-College Ave.355411.5 33325.8 34510.0 444352 9.2 45314.7 51.1
4 Shiloh Trail 4 14,079 Moore Ln. to MLK (Hwy 62)445512.0 505510.0 005 6.7 524554 9.3 53011.7 49.7
5 Old Wire Road Trail (Extension) 3 3,526 Gulley Park to Rolling Hills 255510.8 50538.0 255 9.7 335105 6.3 45013.7 48.4
7 Drake Street Cycle Track and Trail 3 4,358 College Ave. to Gordon Long Park 555513.8 505510.0 005 6.7 343455 9.7 2307.7 47.8
8 Mission Blvd. Trail 2 5,358 Viewpoint to Prospect 555513.8 505510.0 235 9.0 523505 5.8 3309.0 47.6
9 Clabber Creek Trail 4 10,789 Truckers Dr. to Van Asche 555513.8 50527.0 305 8.7 3 2 4 -1 -1 3 3.7 45013.7 46.8
10 Sublett Creek 2 5,665 Mission & North to Poplar 555012.5 53048.5 325 9.3 425423 7.2 5108.3 45.8
11 St. Paul Trail (Includes replacement of Existing) 1 10,278 Razorback Gwy. To Armstrong 455512.8 50549.0 305 8.7 334552 8.8 4005.3 44.6
12 Hamestring Creek Trail & Bryce Davis Connection 4 5,539 Salem to Rupple 545513.0 505510.0 205 8.0 234442 7.8 3105.7 44.5
14 Owl Creek Trail 4 8,337 Shiloh Trail to Broyles Rd. 34359.5 505510.0 205 8.0 535451 9.2 4107.0 43.7
15 Maple Street Cycle Track 2 2614 Razorback Gwy to Garland 54250.0 505510.0 055 8.3 550551 7.8 55516.7 42.8
17 Markham Hill Trail 4 1,500 Razorback to Centennial 15539.3 50259.3 005 6.7 433555 9.5 5006.7 41.3
18 St. Paul Trail (Paddle Park Connections) 1 7,661 Armstrong to Dead Horse Mtn. 355511.8 505510.0 205 8.0 125201 4.3 1306.3 40.4
19 Crossover Road (Expand Sidewalk East Side) 3 20,554 Hwy 16 to Mission 52006.5 43047.8 50510.0 432323 6.0 52010.0 40.3
20 Crossover Road (Expand Sidewalk West Side) 1 13,973 Hwy 16 to Mission 52006.5 43047.8 50510.0 523222 5.7 52010.0 39.9
21 Rolling Hills Improvements 3 4050 College Ave-Old Missouri Road 23316.8 32214.3 551 6.3 325333 7.5 35213.0 37.8
22 Skillern Rd. 3 1,590 Crossover to Charleston Xing 455011.5 10524.0 405 9.3 120114 3.3 5006.7 34.8
23 Huntsville Road Side Path 1 4,615 Morningside to Hwy 16 55008.8 20045.5 503 7.3 154352 9.2 3004.0 34.8
24 Alberta Trail Segments 1 2,914 Walnut Crossing 245510.0 50505.0 004 5.3 535014 6.8 5006.7 33.8
25 Morningside Trail (Park Meadows) 1 5,194 Town Branch to Hunstville Rd.32004.5 505510.0 303 6.0 331224 5.5 5006.7 32.7
27 Shiloh Trail South (Regional Park Connection) 1 8,840 MLK (Hwy 62 to Regional Park)23236.5 50505.0 002 2.7 1 2 1 -1 -1 2 1.5 35012.3 28.0
28 Regional Park Loop 1 7,420 Kessler Mountain Regional Park 00000.0 50025.8 400 2.7 0 0 0 -2 -2 0 -1.7 53011.7 18.4
Proposed Bond Funded Project (Draft)
WeightingWeighting Weighting Weighting