Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout266-23 RESOLUTION113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Resolution: 266-23
File Number: 2023-1288
TRUMBLE CONSTRUCTION, INC. (BID 23-41 - SERVICE AGREEMENT):
A RESOLUTION TO AWARD BID #23-41 AND AUTHORIZE A CONTRACT WITH TRUMBLE
CONSTRUCTION, INC. IN THE AMOUNT OF $81,172.00 FOR THE RECYCLING & TRASH COLLECTION
TRANSFER STATION AND WATER/SEWER ROOF REHABILITATION PROJECT, AND TO APPROVE A
PROJECT CONTINGENCY IN THE AMOUNT OF $8,117.20
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #23-41 and authorizes Mayor
Jordan to sign a contract with Trumble Construction Inc. in the amount of $81,172.00 for the Recycling and Trash
Collection Transfer Station and Water/Sewer Roof Rehabilitation Project, and further approves a project contingency in
the amount of $8,117.20.
PASSED and APPROVED on December 5, 2023
Page 1
Attest:
ly
Kara Paxton, City Cler reasurer
• •:_ZZ
--tip ••... •-���
CITY OF
FAYETTEVILLE
ARKANSAS
MEETING OF DECEMBER 5, 2023
CITY COUNCIL MEMO
2023-1288
TO: Mayor Jordan and City Council
THRU: Paul Becker, Chief Financial Officer
FROM: Waylon Abernathy, Bond Projects & Construction Dir
DATE:
SUBJECT: Approval of Bid 23-41 Contract with Trumble Construction Inc. for Recycle and Trash
Collection and Water and Sewer Roof rehabs
RECOMMENDATION:
Approval of Bid 23-41 Contract with Trumble Construction Inc., for Recycle and Trash Collection and Water
and Sewer Roof rehabs in the amount of $89,289.20, which includes $8,117.20 in owner contingency.
BACKGROUND:
Resolution 80-23 approved a contract with WER Architects for design, plans and specifications for roof rehab
work on the Recyle and Trash Collection Materials Recovery Facility in advance of the solar array installations
and roof rehab work on the Water and Sewer Administration building.
DISCUSSION:
Both facilities have metal roof building systems. They require periodic upkeep or replacement of fasteners,
calking, roof penetration flashings and closure strips. The RTC materials recovery facility roof is being
refreshed in anticipation of a solar array system.
The City's purchasing division publicly advertised and bid this project with 3 bids received. Trumble
Construction was the low bidder.
BUDGET/STAFF IMPACT:
Funding for this contract will come from the Water and Sewer Building Office Improvements project and the
RTC Office & Transfer Station Exp project.
PURCHASE ORDER DETAILS
ACCOUNT
PROJECT
AMOUNT
5400.720.1840-5400.00
15020.1
$49,110.60
5500.750.5080-5816.00
13021.1000
$40,178.60
TOTAL
$89,289.20
Mailing address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
ATTACHMENTS: SRF (#3), Bid 23-41, Contract - Executed (#4), Bid 23-41, Appendix A - City Issued Bid (#5),
Bid 23-41, Appendix B - Submittal - Trumble Construction, Inc. dba RBT Construction - E (#6), Bid 23-41,
Appendix C - Bid Tab - Final (#7)
Mailing address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
== City of Fayetteville, Arkansas
y 113 West Mountain Street
Fayetteville, AR 72701
(479)575-8323
- Legislation Text
File #: 2023-1288
Approval of Bid 23-41 Contract with Trumble Construction Inc. for Recycle and Trash Collection
and Water and Sewer Roof rehabs
A RESOLUTION TO AWARD BID #23-41 AND AUTHORIZE A CONTRACT WITH TRUMBLE
CONSTRUCTION, INC. IN THE AMOUNT OF $81,172.00 FOR THE RECYCLING & TRASH
COLLECTION TRANSFER STATION AND WATER/SEWER ROOF REHABILITATION
PROJECT, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $8,117.20
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE.)
ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #23-41 and
authorizes Mayor Jordan to sign a contract with Trumble Construction Inc. in the amount of $81,172.00
for the Recycling and Trash Collection Transfer Station and Water/Sewer Roof Rehabilitation Project,
and further approves a project contingency in the amount of $8,117.20.
Page 1
Wade Abernathy
Submitted By
City of Fayetteville Staff Review Form
2023-1288
Item ID
12/5/2023
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
11/17/2023 FACILITIES MANAGEMENT (140)
Submitted Date Division / Department
Action Recommendation:
Approval of Bid 23-41 Contract with Trumble Construction Inc., for Recycle and Trash Collection and Water and
Sewer Roof rehabs in the amount of $89,289.20, which includes $8,117.20 in owner contingency.
Budget Impact:
5400.720.1840-5400.00
5500.750.5080-5816.00
Water & Sewer
Recycling & Trash Collections
Account Number Fund
15020.1 Water & Sewer Bldg Office Impr
13021.1000 RTC - Office & Transfer Station Exp
Project Number
Budgeted Item? Yes
Does item have a direct cost? Yes
Is a Budget Adjustment attached? No
Purchase Order Number:
Change Order Number:
Original Contract Number:
Comments:
Total Amended Budget
Expenses (Actual+Encum)
Available Budget
Item Cost
Budget Adjustment
Remaining Budget
Project Title
$ 313, 045.00
313,045.00
$ 89,289.20
223,755.80
Previous Ordinance or Resolution #
Approval Date:
V20221130
Contract for Services
CITY OF Construction — RTC Transfer Station &
FAYETTEVILLE Water Sewer Roof Rehab
ARKANSAS
Contractor/Vendor: Trumble Construction Inc.
Term: Single Project
THIS AGREEMENT is made this 5 day of December , 2023, by and between City of
Fayetteville, Arkansas, acting by and through its Mayor (hereinafter called CITY OF FAYETTEVILLE or CITY) and Trumble
Construction, Inc. (Vendor or Trumble).
CITY OF FAYETTEVILLE from time to time requires professional construction services in connection with construction
projects. Therefore, CITY OF FAYETTEVILLE and Trumble, in consideration of their mutual covenants, agree as follows:
Work performed by Trumble shall be performed under valid, active, current license with the Arkansas Contractor's
Licensing Board. Trumble shall follow all federal, state, and local laws at all times.
1. Contracted parties and relationship:
a. This agreement shall be binding between all parties. Fees shall be provided as identified in appendices.
i. Trumble Tax identification number (TIN) ending in 3030
ii. Trumble Arkansas Contractor License No. 0162670524
iii. Trumble Secretary of State Filing No. 800088382
b. Parties agree to act on the basis of mutual trust, good faith, and fair dealing, and perform in a fiscally
responsible and timely manner. Parties shall each endeavor to promote harmony and cooperation
among all Project participants.
2. Entire Agreement and Exhibits: This Agreement sets forth the entire agreement and understanding between the
parties on the subject matter of this Agreement. Neither party shall be bound by any conditions, definitions,
representations or warranties with respect to the subject matter of this Agreement other than those as expressly
provided herein.
a. Appendices included under this agreement include the following:
i. Appendix A: Bid package identified as Bid 23-41, Construction — RTC Transfer Station & Water
Sewer Roof Rehab with the specifications and conditions typed thereon inclusive of all bidding
documents, plans and drawings, and issued addenda.
ii. Appendix B: Trumble's bid submittal
iii. Appendix C: Bid Tabulation
iv. Appendix D: Trumble's Certificate of Insurance
v. Appendix E: Trumble's 100% Performance and Payment Bonds
1. Appendix D and E shall be submitted to the City within the timeframe identified in the bid
documents or 10 (ten) calendar days.
b. This agreement may be modified only by a duly executed written instrument signed by the CITY and
Trumble.
c. ORDER OF PRECEDENCE: In case of any inconsistency, conflict, or ambiguity among the Contract
Documents, the documents shall govern in the following order: (a) Change Orders and written
CONTRACT: Bid 23-41, Construction — RTC Transfer Station & Water Sewer Roof Rehab
Page 1 of 20
City of Fayetteville, AR
amendments to this Agreement which are executed by all parties; (b) the Agreement; (c) Trumble's
Proposal (d) City's published bid and associated Addenda.
3. Notices: Any notice required under this Agreement shall be in writing, address to the appropriate party at the
following addresses:
a. City of Fayetteville: Attention: Mayor Lioneld Jordan, 113 W. Mountain, Fayetteville, AR 72701
b. Vendor: Trumble Construction, Inc., 1944 Clear Springs Rd., Texarkana, TX 75501
4. General Provisions:
i. ETHICS: All parties shall perform with integrity. Each shall avoid conflicts of interest and promptly
disclose to any other part any conflicts that may arise. All parties warrant that it has not and shall
not pay or receive any contingent fees or gratuities to or from any other party, including agents,
officer's employers, Subcontractors, Sub subcontractors, Suppliers, Volunteers, Elected Officials,
or Others to secure preferential treatment.
ii. Workmanship: The Work shall be executed in accordance with the Contract Documents in a
workmanlike manner. All materials used in the Work shall be furnished in sufficient quantities to
facilitate the proper and expeditious execution of the Work and shall be new except as otherwise
provided in the Contract Documents.
iii. MATERIALS FURNISHED BY OWNER OR OTHERS: If the Work includes installation of materials or
equipment furnished by City or Others, it shall be the responsibility of the vendor to examine the
items so provided and thereupon handle, store, and install the items, unless otherwise provided
in the Contract Documents, with such skill and care as to provide a satisfactory and proper
installation. Loss or damage due to acts or omissions of the vendor shall be the responsibility of
vendor and may be deducted from any amounts due or to become due. Any defects discovered
in such materials or equipment shall be reported at once to the City and the City's contracted
third -party Design Professional. Following receipt of written notice from vendor of defects, City
and Design Professional shall promptly inform the City what action, if any, vendor shall take with
regard to the defects.
iv. WORKSITE VISIT: Vendor acknowledges that it has visited, or has had the opportunity to visit, the
Worksite to visually inspect the general and local conditions which could affect the Work.
v. Vendor shall perform all duties and responsibilities necessary to coordinate the various parts of
the Work and to prepare its Work for the work of City or Others.
1. Cutting, patching, or altering the work of City or Others shall be done with the prior
written approval of City and Design Professional. Such approval shall not be unreasonably
withheld.
vi. COMPLIANCE WITH LAWS: Vendor shall comply with all the Law at its own cost. Vendor shall be
liable to City for all loss, cost, or expense attributable to any acts or omissions by Vendor its
employees, subcontractors, suppliers, and agents for failure to comply with Laws, including fines,
penalties, or corrective measures.
vii. COST OF CORRECTING DAMAGED OR DESTROYED WORK: With regard to damage or loss
attributable to the acts or omissions of City or Others and not to Vendor, City may either (a)
promptly remedy the damage or loss and assume affected warranty responsibilities, (b) accept
the damage or loss, or (c) issue a Change Order to remedy the damage or loss. If Vendor incurs
costs or is delayed due to such loss or damage, Vendor may seek an equitable adjustment in the
CONTRACT: Bid 23-41, Construction — RTC Transfer Station & Water Sewer Roof Rehab
Page 2 of 20
City of Fayetteville, AR
Cost of the Work, Date of Substantial Completion or Date of Final Completion. Any equitable
adjustment shall be approved by all parties.
viii. Taxes and Permits: Vendor shall give public authorities all notices required by law and shall obtain
and pay for all necessary permits, licenses, and renewals pertaining to the Work. Vendor shall
provide to City copies of all notices, permits, licenses, and renewals required under this
Agreement.
1. Vendor shall pay applicable taxes and permit fees associated with the entire project.
ix. DISCOUNTS: All discounts for prompt payment shall accrue to City. All trade discounts, rebates,
and refunds, and all returns from sale of surplus materials and equipment, shall be credited to
the Cost of the Work, or directly to the City after final payment.
x. City may occupy or use completed or partially completed portions of the Work when (a) the
portion of the Work is designated in a Certificate of Substantial Completion, (b) appropriate
insurer(s) consent to the occupancy or use, and (c) public authorities authorize the occupancy or
use. Vendor shall not unreasonably withhold consent to partial occupancy or use.
xi. EXTENT OF AGREEMENT: Except as expressly provided, this Agreement is for the exclusive
benefit of all Parties, and not the benefit of any third party. This Agreement represents the entire
and integrated agreement between the Parties, and supersedes all prior negotiations,
representations, or agreements, either written or oral. This Agreement and each and every
provision is for the exclusive benefit of all Parties and not for the benefit of any third party.
xii. ASSIGNMENT: Except as to the assignment of proceeds, no Party shall assign their interest in this
Agreement without the written consent of the other Party. The terms and conditions of this
Agreement shall be binding upon all Parties, their partners, successors, assigns, and legal
representatives. No Party shall assign the Agreement without written consent of the other.
xiii. Where figures are given, they shall be preferred to scaled dimensions.
xiv. The drawings and specifications are complementary. If Work is shown only on one but not on the
other, Vendor shall perform the Work as though fully described on both. Vendor shall seek
clarification from the City or the City's third -party Design Professional for any discrepancies.
xv. In case of conflicts between the drawings and specifications, the specifications shall govern
unless otherwise stated in the bidding documents. In any case of omissions or errors in figures,
drawings, or specifications, Vendor shall immediately submit the matter to City and Design
Professional for clarification. The City's clarifications are final and binding, which may include
third -party Design Professional content.
xvi. DEBARMENT AND SUSPENSION: By execution of this agreement, Vendor certifies that to the best
of its knowledge and belief that the Vendor and its principals:
1. Are not presently debarred, suspended, proposed for debarment, declared ineligible, or
voluntarily excluded from covered transactions by any Federal department or agency;
2. Have not within a three year period preceding this proposal been convicted of or had a
civil judgment rendered against them for commission of fraud or a criminal offense in
connection with obtaining, attempting to obtain, or performing a public (Federal, State,
or local) transaction or contract under a public transaction; violation of Federal or State
antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or
destruction of records, making false statements, or receiving stolen property;
CONTRACT: Bid 23-41, Construction — RTC Transfer Station & Water Sewer Roof Rehab
Page 3 of 20
City of Fayetteville, AR
3. Are not presently indicted for or otherwise criminally or civilly charged by a government
entity (Federal, State, or local) with commission of any of the offenses enumerated in
paragraph (2) of this certification; and
4. (d) Have not within a three-year period preceding this application/proposal had one or
more public transactions (Federal, State, or local) terminated for cause or default.
5. Vendor understands that a false statement on certification regarding debarment and
suspension may be grounds for rejection of this proposal or termination of the award. In
addition, under 18 USC Sec. 1001, a false statement may result in a fine. I further certify
that I will obtain a similar certification for each subcontract awarded in excess of
$50,000.
6. Certifications for subcontracts or sub subcontracts executed under this agreement shall
include all language in this section.
5. Definitions:
a. Unless otherwise specifically defined in this Agreement, any terms that have well-known technical or
trade meanings shall be interpreted in accordance with their well-known meanings.
b. "Business Day" means all Days, except weekends and official federal or state holidays where the Project is
located.
c. A "Change Order" is a written order signed by all Parties after execution of this Agreement, indicating
changes in the scope of the Work, and Date of Substantial Completion or Date of Final Completion.
d. "Contract Time" is the period between the Date of Notice to Proceed and the total time authorized to
achieve Final Completion.
e. "Cost of the Work" means the total costs and discounts charged to the City.
f. The "Vendor" is the person or entity identified in this contract and includes Vendor's Representative.
g. "Day" means a calendar day unless otherwise specified.
h. "Defective Work" is any portion of the Work that that does not conform with the requirements of the
Contract Documents.
i. "Design Professional" means the licensed architect retained by the City and its subconsultants, to perform
design services for the Project.
j. "Final Completion" occurs on the date when Vendor's obligations under this Agreement are complete
and accepted by City and final payment becomes due and payable. This date shall be confirmed by a
Certificate of Final Completion signed by all Parties.
k. "Hazardous Material" is any substance or material identified now or in the future as hazardous under the
Law, or any other substance or material that may be considered hazardous or otherwise subject to
statutory or regulatory requirement governing handling, disposal, or cleanup.
I. "Interim Directive" is a written order containing change to the Work directed by and in consultation with
City and Design Professional after execution of this Agreement and before Substantial Completion.
Interim Directives shall be consolidated and formalized in a change order to be signed by all parties.
m. "Law" means federal, state, or local laws, ordinances, codes, rules, and regulations applicable to the Work
with which Vendor must comply that are enacted as of the Agreement date.
CONTRACT: Bid 23-41, Construction — RTC Transfer Station & Water Sewer Roof Rehab
Page 4 of 20
City of Fayetteville, AR
n. "Others" means City's other: (a) contractors/constructors, (b) suppliers, (c) subcontractors, sub
subcontractors, or suppliers of (a) and (b); and others employed directly or indirectly by (a), (b), or (c) or
any by any of them or for whose acts any of them may be liable.
o. "Overhead" means (a) payroll costs, burden, and other compensation of Vendor's employees in Vendor's
principal and branch offices for work associated with this project.
p. "Owner' is the City of Fayetteville, Arkansas (City).
q. The "Owner's Program" is an initial description of Owner's objectives, including budgetary and time
criteria, space requirements and relationships, flexibility and expandability requirements, special
equipment and systems, site requirements, and any requirements for phased occupancy.
r. The "Parties" are collectively City and Vendor.
s. The "Project," is the building, facility, or other improvements for which Vendor is to perform Work under
this Agreement. It may also include construction by Owner or Others.
t. The "Schedule of the Work" is the document prepared by Vendor that specifies the dates on which
Vendor plans to begin and complete various parts of the Work, including dates on which information and
approvals are required from City.
u. "Subcontractor" is a person or entity retained by Vendor as an independent contractor to provide the
labor, materials, equipment, or services necessary to complete a specific portion of the Work. The term
Subcontractor does not include Design Professional or Others.
v. "Substantial Completion" of the Work, or of a designated portion, occurs on the date when the Work is
sufficiently complete in accordance with the Contract Documents so that City may occupy or utilize the
Work, or a designated portion, for the use for which it is intended, without unapproved disruption. This
date shall be confirmed by a certificate of Substantial Completion signed by all Parties.
w. A "Sub subcontractor" is a person or entity who has an agreement with a Subcontractor or another sub
subcontractor or Supplier to perform a portion of the Subcontractor's Work or supply material or
equipment.
x. A "Supplier" is a person or entity retained by Vendor to provide material or equipment for the Work.
y. "Terrorism" means a violent act, or an act that is dangerous to human life, property, or infrastructure,
that is committed by an individual or individuals and that appears to be part of an effort to coerce a
civilian population or to influence the policy or affect the conduct of any government by coercion.
Terrorism includes, but is not limited to, any act certified by the United States government as an act of
terrorism pursuant to the Terrorism Risk Insurance Act, as amended.
z. "Work" means the construction services necessary or incidental to fulfill Vendor's obligations for the
Project in accordance with and reasonably inferable from the Contract Documents. The Work may refer
to the whole Project or only a part of the Project if work is also being performed by Owner or Others.
aa. "Worksite" means the area of the Project where the Work is to be performed.
bb. "Bi-monthly basis" means every fourteen to sixteen calendar days.
6. Contract Document Review and Administration
a. Before commencing the Work, Vendor shall examine and compare the drawings and specifications with
information furnished by the City and Design Professional that are considered Contract Documents,
relevant field measurements made by Vendor, and any visible conditions at the Worksite affecting the
Work.
CONTRACT: Bid 23-41, Construction — RTC Transfer Station & Water Sewer Roof Rehab
Page 5 of 20
City of Fayetteville, AR
b. Should Vendor discover any errors, omissions, or inconsistencies in the Contract Documents, Vendor shall
promptly report them to the City and Design Professional. Following receipt of written notice from
Vendor of defects, City shall promptly inform Vendor what action, if any, Vendor shall take with regard to
the defect.
c. Nothing in this section shall relieve VENDOR of responsibility for its own errors, inconsistencies, or
omissions.
d. COST REPORTING: Vendor shall maintain complete, accurate, and current records that comply with
generally accepted accounting principles and calculate the proper financial management under this
Agreement. Vendor shall maintain a complete set of all books and records prepared or used by Vendor
with respect to the Project. City shall be afforded access to all of Vendor's records, books,
correspondence, instructions, drawings, receipts, vouchers, memoranda, and similar data relating to this
Agreement. Vendor shall preserve all such records for a period of three years after the final payment or
longer where required by Law.
7. Warranty
a. Vendor warrants all materials and equipment furnished under the Construction Phase of this Agreement
will be new unless otherwise specified, of good quality, in conformance with the Contract Documents,
and free from defective workmanship and materials. At City or Design Professional request, Vendor shall
furnish satisfactory evidence of the quality and type of materials and equipment furnished. Vendor
further warrants all Work shall be free from material defects not intrinsic in the design or materials
required in the Contract Documents. Vendor's warranty does not include remedies for defects or
damages caused by normal wear and tear during normal usage beyond the warranty period, use for a
purpose for which the Project was not intended, improper or insufficient maintenance, modifications
performed by the City or others, or abuse. Vendor's warranty shall commence on the Date of Final
Completion of the Project.
b. To the extent products, equipment, systems, or materials incorporated in the Work are specified and
purchased by the City, they shall be covered exclusively by the warranty of the manufacturer. There are
no warranties which extend beyond the description on the face of any such warranty. For such
incorporated items, ALL OTHER WARRANTIES EXPRESSED OR IMPLIED INCLUDING THE WARRANTY OF
MERCHANTABILITY AND THE WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE ARE EXPRESSLY
DISCLAIMED.
c. Vendor shall obtain from its Subcontractors and Suppliers any special or extended warranties required by
the Contract Documents. Vendor's liability for such warranties shall be limited to the one-year correction
period, as further defined in this Agreement. After that period Vendor shall provide full and
comprehensive assistance to the City in enforcing the obligations of Subcontractors or Suppliers for such
extended warranties.
d. Correction of Work
If before Substantial Completion or within two -years after the date of Final Completion of the
Work any Defective Work is found, City shall promptly notify Vendor in writing. Unless City
provides written acceptance of the condition, Vendor shall promptly correct the Defective Work
at its own cost and time and bear the expense of additional services required for correction of
any Defective Work for which it is responsible. If within the two-year correction period City
discovers and does not promptly notify Vendor or give Vendor an opportunity to test or correct
Defective Work as reasonably requested by Vendor, City waives Vendor's obligation to correct
that Defective Work as well as City's right to claim a breach of the warranty with respect to that
Defective Work.
CONTRACT: Bid 23-41, Construction — RTC Transfer Station & Water Sewer Roof Rehab
Page 6 of 20
City of Fayetteville, AR
ii. If Vendor fails to correct Defective Work within a reasonable time after receipt of written notice
from City before final payment, City may correct it in accordance with Owner's right to carry out
the Work. In such case, an appropriate Change Order shall be issued deducting the cost of
correcting the Defective Work from payments then or thereafter due Vendor. If payments then
or thereafter due Vendor are not sufficient to cover such amounts, Vendor shall pay the
difference to City.
iii. Vendor's obligations and liability, if any, with respect to any Defective Work discovered after the
two-year correction period shall be determined by the Law. If, after the two-year correction
period but before the applicable limitation period has expired, City discovers any Work which City
considers Defective Work, City shall, unless the Defective Work requires emergency correction,
promptly notify Vendor and allow Vendor an opportunity to correct the Work if Vendor elects to
do so. If Vendor elects to correct the Work, it shall provide written notice of such intent within
fourteen (14) Days of its receipt of notice from City and shall complete the correction of Work
within a mutually agreed timeframe. If Vendor does not elect to correct the Work, City may have
the Work corrected by itself or Others, and, if City intends to seek recovery of those costs from
Vendor, City shall promptly provide Vendor with an accounting of the actual correction costs.
iv. If Vendor's correction or removal of Defective Work causes damage to or destroys other
completed or partially completed work or existing building, Vendor shall be responsible for the
cost of correcting the destroyed or damaged property.
v. The two-year period for correction of Defective Work does not constitute a limitation period with
respect to the enforcement of Vendor's other obligations under the Contract Documents.
vi. Before final payment, at City option and with Vendor's agreement, City may elect to accept
Defective Work rather than require its removal and correction. In such cases the contract shall be
equitably adjusted for any diminution in the value, as determined by City, of the Project caused
by such Defective Work via formal written change order.
8. Safety of Persons and Property
a. SAFETY PROGRAMS: Vendor holds overall responsibility for safety programs. However, such obligation
does not relieve Subcontractors of their safety responsibilities and to comply with the Law. Vendor shall
prevent against injury, loss, or damage to persons or property by taking reasonable steps to protect: (a)
its employees and other persons at the Worksite; (b) materials and equipment stored at onsite or offsite
locations for use in performing the Work; and (c) property located at the Worksite and adjacent to work
areas, whether or not the property is part of the Worksite.
b. VENDOR'S SAFETY REPRESENTATIVE: Vendor shall designate an individual at the Worksite in its employ as
its safety representative. Unless otherwise identified by Vendor in writing to City, Vendor's project
superintendent shall serve as its safety representative. Vendor shall report promptly in writing all
recordable accidents and injuries occurring at the Worksite. When Vendor is required to file an accident
report with a public authority, Vendor shall furnish a copy of the report to City.
c. Vendor shall provide City with copies of all notices required of Vendor by the Law. Vendor's safety
program shall comply with the requirements of governmental and quasi -governmental authorities having
jurisdiction.
i. Damage or loss not insured under property insurance that may arise from the Work, to the extent
caused by negligent or intentionally wrongful acts or omissions of Vendor, or anyone for whose
acts Vendor may be liable, shall be promptly remedied by Vendor.
CONTRACT: Bid 23-41, Construction — RTC Transfer Station & Water Sewer Roof Rehab
Page 7 of 20
City of Fayetteville, AR
d. If City deems any part of the Work or Worksite unsafe, City, without assuming responsibility for Vendor's
safety program, may require Vendor to stop performance of the Work, take corrective measures
satisfactory to City. If Vendor does not adopt corrective measures, City may perform them and deduct
their cost from the GMP. Vendor agrees to make no claim for damages, or an increase in the GIMP, or for
a change in the Dates of Substantial or Final Completion based on Vendor's compliance with City's
reasonable request.
9. Subcontracts:
a. BINDING OF SUBCONTRACTORS AND SUPPLIERS: Vendor agrees to bind every Subcontractor and Supplier
and require every Subcontractor to so bind its subcontractors and significant supplier, to the Contract
Documents as they apply to the Subcontractor's or Supplier's applicable provisions to that portion of the
Work.
b. Vendor agrees not to subcontract Vendor at risk related services without prior written consent from the
City.
10. Fees, Expenses, and Payments:
a. Trumble, at its own cost and expense, shall furnish all labor, materials, supplies, machinery, equipment,
tools, supervision, bonds, insurance, tax permits, and all other accessories and services necessary to
complete items bid per Bid 23-41 as stated in Trumble's bid response, and in accordance with
specifications attached hereto and made a part hereof under Bid 23-41, all included herein as if spelled
out word for word.
b. This turn -key project providing labor and materials shall be provided to the City for a not to exceed fee of
89 289.20 US Dollars ($81,172.00 total bid plus $8,117.20 for an owner contingency).
c. The City of Fayetteville shall pay Trumble for completion of the project based on a percentage of work
completed. At no point shall payment exceed the percentage of work completed, as determined by the
City.
d. Payments will be made after approval and acceptance of work and submission of invoice Payments will
be made approximately 30 days after approval of invoice. The City of Fayetteville reserves the right to
request receipts for materials purchased for the City of Fayetteville from suppliers, subcontractors, or
other sources. The City of Fayetteville does not agree to any interest or penalty for "untimely" payments.
e. The City reserves the right to withhold five percent (5%) retainage from all payments until project is
completed in full.
f. Not to exceed pricing shall include but not be limited to:
i. Labor wages directly employed by Vendor in performing of the Work.
ii. Salaries of Vendor's employees when stationed at the field office, in whatever capacity employed,
employees engaged on the road expediting the production or transportation of material and
equipment, and employees from the principal or branch office as mutually agreed by the Parties
in writing.
iii. Cost of all employee benefits and taxes, including but not limited to, workers' compensation,
unemployment compensation, social security, health, welfare, retirement, and other fringe
benefits as required by law, labor agreements, or paid under Vendor's standard personnel policy,
insofar as such costs are paid to employees of Vendor who are included in the Cost of the Work.
CONTRACT: Bid 23-41, Construction — RTC Transfer Station & Water Sewer Roof Rehab
Page 8 of 20
City of Fayetteville, AR
iv. Transportation, travel, hotel, and moving expenses of Vendor's personnel incurred in connection
with the Work.
v. Cost of all materials, supplies, and equipment incorporated in the Work, including costs of
inspection and testing if not provided by City, transportation, storage, and handling.
vi. Payments made by Vendor to Subcontractors for work performed under this Agreement.
vii. Cost, including transportation and maintenance of all materials, supplies, equipment, temporary
facilities, and hand tools not owned by the workers that are used or consumed in the
performance of the Work, less salvage value or residual value; and cost less salvage value on such
items used, but not consumed that remain the property of Vendor.
viii. Rental charges of all necessary machinery and equipment, exclusive of hand tools owned by
workers, used at the Worksite, whether rented from Vendor or others, including installation,
repair, and replacement, dismantling, removal, maintenance, transportation, and delivery costs
at competitive market rates.
ix. Cost of the premiums for all insurance and surety, performance or payment bonds which Vendor
is required to procure or deems necessary and approved by City.
x. Sales, use, gross receipts, or other taxes, tariffs, or duties related to the Work for which Vendor is
liable.
xi. Permits, taxes, fees, licenses, tests, royalties.
xii. Losses, expenses, or damages to the extent not compensated by insurance or otherwise, and the
cost of corrective work during the Construction Phase and for the warranty period.
xiii. Costs associated with establishing, equipping, operating, maintaining, mobilizing and
demobilizing the field office and site.
xiv. Water, power, and fuel costs necessary for the Work.
xv. Cost of removal of all nonhazardous substances, debris, and waste materials.
xvi. Costs incurred due to an emergency affecting the safety of persons or property.
xvii. Costs directly incurred in the performance of the Work or in connection with the Project, and not
included in Vendor's Fee, which are reasonably inferable from the Contract Documents.
g. STORED MATERIALS AND EQUIPMENT: Unless otherwise provided in the contract documents,
applications for payment may include materials and equipment not yet incorporated into the Work but
delivered to and suitably stored onsite or offsite including applicable insurance, storage, and costs
incurred transporting the materials to an offsite storage facility. Approval of payment applications for
stored materials and equipment stored offsite shall be conditioned on a submission by Vendor of bills of
sale and proof of required insurance, or such other documentation satisfactory to City to establish the
proper valuation of the stored materials and equipment, City's title to such materials and equipment, and
to otherwise protect City's interests therein, including transportation to the Worksite. Materials and
equipment stored offsite shall be in a bonded and insured secure facility.
h. FINAL PAYMENT: Upon satisfactory completion of the work performed under this Agreement, as a
condition before final payment under this Agreement, or as a termination settlement under this
Agreement, Trumble shall execute and deliver to CITY OF FAYETTEVILLE a release of all claims against CITY
OF FAYETTEVILLE arising under or by virtue of this Agreement, except claims which are specifically
exempted by Trumble to be set forth therein.
CONTRACT: Bid 23-41, Construction — RTC Transfer Station & Water Sewer Roof Rehab
Page 9 of 20
City of Fayetteville, AR
i. Unless otherwise provided in this Agreement or by State law or otherwise expressly agreed to by
the parties to this Agreement, final payment under this Agreement or settlement upon
termination of this Agreement shall not constitute a waiver of CITY OF FAYETTEVILLE's claims
against Trumble or sureties under this Agreement.
11. Project Bonding - Performance and payment bonding: After execution of this contract by all parties, Trumble
shall provide 100% separate performance and payment bonds (inclusive of any approved contingency) from a
bonding company, licensed to do business in the state of Arkansas. Bonds shall be provided within ten (10)
calendar days after this contract has been executed by all parties.
a. All bonds shall be listed with the U.S. Treasury Department listing of approved surety's (T-List) and shall
be rated A+ minimum by A. M. Best.
12. Time:
a. SUBSTANTIAL and FINAL COMPLETION: Date of Substantial Completion and the Date of Final Completion
shall be established in the contract documents as a hard not -to -exceed date. If such dates are not
established upon the execution of this Agreement, a Date of Substantial Completion and Date of Final
Completion of the Work shall be established via Change Order.
b. Time is of the essence with regard to the obligations of the Contract Documents.
c. Unless instructed by City in writing, Vendor shall not knowingly commence the Work before the effective
date of Vendor's required insurance and bonds and formal written and signed Purchase Order issued by
the City of Fayetteville Purchasing Division.
d. Schedule of Work: Before submitting its first application for payment, Vendor shall submit to City and, if
directed, Design Professional a Schedule of the Work showing the dates on which Vendor plans to begin
and complete various parts of the Work, including dates on which information and approvals are required
from City. Except as otherwise directed by City, Vendor shall comply with the approved Schedule of the
Work or Vendor.
City may determine the sequence in which the Work shall be performed, provided it does not
unreasonably interfere with the approved project schedule. City may require Vendor to make
reasonable changes in the sequence at any time during the performance of the Work in order to
facilitate the performance of work by City or Others. If Vendor consequently incurs costs or is
delayed, the Dates of Substantial or Final Completion, or both, Vendor may seek equitable
adjustment.
e. NOTICE OF DELAY CLAIMS: If Vendor requests an equitable extension of the Contract Time or an
equitable adjustment contract as a result of a delay described, Vendor shall give City written notice of the
claim. If Vendor causes delay in the completion of the Work, City shall be entitled to recover its additional
costs.
13. Substantial Completion:
a. Vendor shall notify City and, if directed, Design Professional when it considers Substantial Completion of
the Work or a designated portion to have been achieved. City, with the assistance of its Design
Professional, shall promptly conduct an inspection to determine whether the Work or designated portion
can be occupied or used for its intended use by City without excessive interference in completing any
remaining unfinished Work. If City determines the Work or designated portion has not reached
Substantial Completion, City, with the assistance of its Design Professional, shall promptly compile a list of
items to be completed or corrected so City may occupy or use the Work or designated portion for its
intended use. Vendor shall promptly and accurately complete all items on the list.
CONTRACT: Bid 23-41, Construction — RTC Transfer Station & Water Sewer Roof Rehab
Page 10 of 20
City of Fayetteville, AR
b. When Substantial Completion of the Work or a designated portion is achieved, Vendor shall prepare a
Certificate of Substantial Completion establishing the date of Substantial Completion and the respective
responsibilities of each Party for interim items such as security, maintenance, utilities, insurance, and
damage to the Work, and fixing the time for completion of all items on the list accompanying the
Certificate. The Certificate of Substantial Completion shall be submitted by Vendor to City and, if directed,
to Design Professional for written acceptance of responsibilities assigned in the Certificate of Substantial
Completion.
c. Unless otherwise provided in the Certificate of Substantial Completion, warranties required by the
Contract Documents shall commence on the date of Substantial Completion of the Work or a designated
portion.
Upon City's written acceptance of the Certificate of Substantial Completion, City shall pay to Vendor the
remaining retainage held by City for the Work described in the Certificate of Substantial Completion less a
sum equal to one hundred and fifty percent (150%) of the estimated cost of completing or correcting
remaining items on that part of the Work, as agreed to by the Parties as necessary to achieve Final
Completion, including all close outs. Uncompleted items shall be completed by Vendor in a mutually
agreed upon timeframe.
14. Final Completion:
a. Upon notification from Vendor that the Work is complete and ready for final inspection and acceptance,
City, with the assistance of its Design Professional shall promptly conduct an inspection to determine if
the Work has been completed and is acceptable under the Contract Documents.
b. When the Work is complete, Vendor shall prepare for City's written acceptance a final application for
payment stating that to the best of Vendor's knowledge, and based on City's inspections, the Work has
reached Final Completion in accordance with the Contract Documents.
c. Final payment shall be made to Vendor within thirty (30) Days after Vendor has submitted an application
for final payment, pending the application has been approved by the City, including submissions required,
and a Certificate of Final Completion has been executed by all Parties.
d. Final payment shall be due on Vendor's submission of the following to the City:
i. an affidavit declaring any indebtedness connected with the Work, to have been paid, satisfied, or
to be paid with the proceeds of final payment, so as not to encumber City property;
as -built drawings, manuals, copies of warranties, and all other close-out documents required by
the Contract Documents;
iii. release of any liens, conditioned on final payment being received;
iv. consent of any surety; and
any outstanding known and unreported accidents or injuries experienced by Vendor or its
Subcontractors at the Worksite.
If, after Substantial Completion of the Work, the Final Completion of a portion of the Work is materially
delayed through no fault of Vendor. If approved by City, they shall pay the balance due for any portion of
the Work fully completed and accepted. If the remaining contract balance for Work not fully completed
and accepted is less than the retained amount before payment, Vendor shall submit to City and, if
directed, Design Professional the written consent of any surety to payment of the balance due for
portions of the Work that are fully completed and accepted. Such payment shall not constitute a waiver
of claims, but otherwise shall be governed by this section.
CONTRACT: Bid 23-41, Construction — RTC Transfer Station & Water Sewer Roof Rehab
Page 11 of 20
City of Fayetteville, AR
f. ACCEPTANCE OF FINAL PAYMENT: Unless Vendor provides written identification of unsettled claims with
an application for final payment, its acceptance of final payment constitutes a waiver of such claims.
g. Trumble shall ensure that the City of Fayetteville receives lien waivers from all material suppliers,
subcontractors and sub -subcontractors and before work begins on the project. The contractor shall give
written notice to the material suppliers, subcontractors and sub -subcontractors providing work on the
project that states the following:
i. 'According to Arkansas law, it is understood that no liens can be filed against public property if
valid and enforceable payment and performance bond is in place. Regarding this Project and
Agreement, the valid and enforceable bonds are with ( name of surety ).'
ii. Trumble shall have each subcontractor, sub -subcontractor and material supplier execute a
written receipt evidencing acknowledgment of this statement prior to commencement of the
work of the subcontractor or material supplier.
15. Notices: Any notice required to be given under this Agreement to either party to the other shall be sufficient if
addressed and mailed, certified mail, postage paid, delivery, fax or e-mail (receipt confirmed), or overnight
courier.
16. Jurisdiction: Legal jurisdiction to resolve any disputes shall be Arkansas with Arkansas law applying to the case.
17. Venue: Venue for all legal disputes shall be Washington County, Arkansas.
18. Freedom of Information Act: City of Fayetteville contracts and documents prepared while performing contractual
work are subject to the Arkansas Freedom of Information Act. If a Freedom of Information Act request is
presented to the City of Fayetteville, the VENDOR shall do everything possible to provide the documents in a
prompt and timely manner as prescribed in the Arkansas Freedom of Information Act (A.C.A. 25-19-101 et. Seq.).
Only legally authorized photo coping costs pursuant to the FOIA may be assessed for this compliance.
19. Changes in Scope or Price: Changes, modifications, or amendments in scope, price or fees to this contract shall
not be allowed without a prior formal contract amendment approved by the Mayor and the City Council in
advance of the change in scope, cost or fees.
20. Insurance:
a. Before starting the Work and as a condition precedent to payment, Vendor shall procure and maintain in
force Workers' Compensation Insurance, Employers' Liability Insurance, Business Automobile Liability
Insurance, and Commercial General Liability Insurance ("CGL"). The CGL policy shall include coverage for
liability arising from premises, operations, independent contractors, products -completed operations,
personal injury and advertising injury, contractual liability, pollution coverage, and broad form property
damage. Vendor shall maintain completed operations liability insurance for one year after Substantial
Completion, or as required by the Contract Documents, whichever is longer. Vendor's Employers' Liability,
Business Automobile Liability and CGL policies shall be written with at least the limits of liability presented
in Appendix D.
b. Employers' Liability, Business Automobile Liability, and CGL coverages required may be provided by a
single policy for the full limits required or by a combination of underlying policies with the balance
provided by excess or umbrella liability policies.
c. Vendor shall maintain in effect all insurance coverage required with insurance companies lawfully
authorized to do business in the jurisdiction in which the Project is located. If Vendor fails to obtain or
CONTRACT: Bid 23-41, Construction — RTC Transfer Station & Water Sewer Roof Rehab
Page 12 of 20
City of Fayetteville, AR
maintain any insurance coverage required under this Agreement, City may purchase such coverage and
charge the expense to Vendor or terminate this Agreement.
d. To the extent commercially available to Vendor from its current insurance company, insurance policies
required shall contain a provision that the insurance company or its designee shall give City written notice
transmitted in paper and electronic format: (a) 30 Days before coverage is nonrenewed by the insurance
company and (b) within 10 Business Days after cancelation of coverage by the insurance company. Before
commencing the Work and upon renewal or replacement of the insurance policies, Vendor shall furnish
City with certificates of insurance until one year after Substantial Completion or longer if required by the
Contract Documents. In addition, if any insurance policy required is not to be immediately replaced
without lapse in coverage when it expires, exhausts its limits, or is to be cancelled, Vendor shall give City
prompt written notice upon actual or constructive knowledge of such condition.
e. Certificates of Insurance shall list the City as Additional Insured Parties.
f. PROPERTY INSURANCE:
i. At no time shall any policy be covered by self-insurance or in a self -insured format. All policies
shall be covered by an approved commercial insurance professional properly licensed to do
business in Arkansas.
ii. Unless otherwise directed in writing by City, before starting the Work, Trumble shall obtain and
maintain a Builder's Risk Policy upon the entire Project for the full cost of replacement at the time
of loss, including existing structures. This insurance shall also (a) name Vendor, Subcontractors,
Sub subcontractors, and Design Professional as named insureds; (b) be written in such form to
cover all risks of physical loss except those specifically excluded by the policy; and (c) insure at
least against and not exclude:
1. the perils of fire, lightning, explosion, windstorm, hail, smoke, aircraft (except aircraft,
including helicopter, operated by or on behalf of Vendor) and vehicles, riot and civil
commotion, theft, vandalism, malicious mischief, debris removal, flood, earthquake,
earth movement, water damage, wind damage, testing if applicable, collapse, however
caused;
2. damage resulting from defective design, workmanship, or material;
3. coverage extension for damage to existing buildings, plant, or other structures at the
Worksite, when the Project is contained within or attached to such existing buildings,
plant or structures. Coverage shall be to the extent loss or damage arises out of
Constructor's activities or operations at the Project;
4. equipment breakdown, including mechanical breakdown, electrical injury to electrical
devices, explosion of steam equipment, and damage to steam equipment caused by a
condition within the equipment;
5. testing coverage for running newly installed machinery and equipment at or beyond the
specified limits of their capacity to determine whether they are fit for their intended use;
and
6. physical loss resulting from Terrorism.
iii. The Party that is the primary cause of a Builder's Risk Policy claim shall be responsible for any
deductible amounts or coinsurance payments. If no Party is the primary cause of a claim, then the
Party obtaining and maintaining the Builder's Risk Policy shall be responsible for the deductible
CONTRACT: Bid 23-41, Construction — RTC Transfer Station & Water Sewer Roof Rehab
Page 13 of 20
City of Fayetteville, AR
amounts or coinsurance payments. This policy shall provide for a waiver of subrogation. This
insurance shall remain in effect until final payment has been made or until no person or entity
other than City has an insurable interest in the property to be covered by this insurance,
whichever is sooner. Partial occupancy or use of the Work shall not commence until City has
secured the consent of the insurance company or companies providing the coverage required in
this subsection. Before commencing the Work, City shall provide a copy of the property policy or
policies obtained.
iv. If City elects to purchase the property insurance required by this Agreement, including all of the
coverages and deductibles for the same durations specified, City shall give written notice to
Vendor before the Work is commenced and provide a copy of the property policy or policies
obtained in compliance with this agreement. City may then provide insurance to protect its
interests and the interests of the Constructor, Subcontractors, Suppliers, and Subsubcontractors.
The cost of this insurance shall be paid by City in a Change Order. If City gives written notice of its
intent to purchase property insurance required by this Agreement and fails to purchase or
maintain such insurance, City shall be responsible for costs reasonably attributed to such failure.
v. The Parties each waive all rights against each other and their respective employees, agents,
contractors, subcontractors, suppliers, sub subcontractors, and design professionals for damages
caused by risks covered by the property insurance, except such rights as they may have to the
proceeds of the insurance.
1. To the extent of the limits of Vendor's Commercial General Liability Insurance, Vendor
shall indemnify and hold harmless City against any and all liability, claims, demands,
damages, losses, and expenses, including attorneys' fees, in connection with or arising
out of any damage or alleged damage to any of City's existing adjacent property,
including personal property, that may arise from the performance of the Work, to the
extent caused by the negligent or intentionally wrongful acts or omissions of Vendor,
Subcontractor, Supplier, Sub subcontractor, or anyone employed directly or indirectly by
any of them or by anyone for whose acts any of them may be liable.
g. RISK OF LOSS: Except to the extent a loss is covered by applicable insurance, risk of loss from damage to
the Work shall be upon the Party obtaining and maintaining the Builder's Risk until the Date of Final
Completion.
h. ADDITIONAL GENERAL LIABILITY COVERAGE: City shall require Vendor to purchase and maintain
additional liability coverage. Vendor shall provide:
Additional Insured. City shall be named as an additional insured on Vendor's Commercial General
Liability (CGL) specified, for on -going operations and completed operations, excess/umbrella
liability, commercial automobile liability, and any required pollution liability, but only with respect
to liability for bodily injury, property damage, or personal and advertising injury to the extent
caused by the negligent acts or omissions of Vendor, or those acting on Vendor's behalf, in the
performance of Vendor's work for Owner at the Worksite. The insurance of the Vendor and its
Subcontractors (both primary and excess) shall be primary to any insurance available to the
Additional Insureds. Any insurance available to the Additional Insureds shall be excess and non-
contributory.
ii. OCP. Vendor shall provide an Owners' and Contractors' Protective Liability Insurance ("OCP")
policy with limits equal to the limits on CGL specified, or limits as otherwise required by Owner.
CONTRACT: Bid 23-41, Construction — RTC Transfer Station & Water Sewer Roof Rehab
Page 14 of 20
City of Fayetteville, AR
i. Any documented additional cost in the form of a surcharge associated with procuring the additional
liability coverage in accordance with this subsection shall be paid by VENDOR. Before commencing the
Work, Vendor shall provide either a copy of the OCP policy, or a certificate and endorsement evidencing
that City has been named as an additional insured, as applicable.
i. ROYALTIES, PATENTS, AND COPYRIGHTS: Vendor shall pay all royalties and license fees which may
be due on the inclusion of any patented or copyrighted materials, methods, or systems selected
by Vendor and incorporated in the Work. Vendor shall defend, indemnify, and hold City harmless
from all suits or claims for infringement of any patent rights or copyrights arising out of such
selection.
PROFESSIONAL LIABILITY INSURANCE: To the extent Vendor is required to procure design services,
Vendor shall require its design professionals to obtain a commercial professional liability insurance for
claims arising from the negligent performance of professional services under this Agreement, with a
company reasonably satisfactory to City, including coverage for all professional liability caused by any
consultants to Vendor's design professional, written for not less than one million US dollars ($1,000,000)
per claim and in the aggregate. Vendor's design professional shall pay the deductible. The Professional
Liability Insurance shall contain a retroactive date providing prior acts coverage sufficient to cover all
Services performed by the Constructor's design professional for this Project. Coverage shall be continued
in effect for the entire warranty period.
21. Professional Responsibility: Trumble will exercise reasonable skill, care, and diligence in the performance of
services and will carry out its responsibilities in accordance with customarily accepted professional practices. CITY
OF FAYETTEVILLE will promptly report to Trumble any defects or suspected defects in services of which CITY OF
FAYETTEVILLE becomes aware, so Trumble can take measures to minimize the consequences of such a defect.
CITY OF FAYETTEVILLE retains all remedies to recover for its damages caused by any negligence of Trumble.
22. Responsibility of the City of Fayetteville
a. CITY OF FAYETTEVILLE shall, within a reasonable time, so as not to delay the services of Trumble:
i. Provide full information as to the requirements for the Project.
ii. Assist Trumble by placing at Trumble's disposal all available information pertinent to the
assignment including previous reports and any other data relative thereto.
iii. Assist Trumble in obtaining access to property reasonably necessary for Trumble to perform its
services.
iv. Examine all studies, reports, sketches, cost opinions, proposals, and other documents presented
by Trumble and render in writing decisions pertaining thereto.
v. Review all documents and provide written comments to Trumble in a timely manner.
vi. The City of Fayetteville Facilities Director is the project representatives with respect to the
services to be performed under this Agreement. The Facilities Director Representative shall have
complete authority to transmit instructions, receive information, interpret and define policies and
decisions with respect to materials, equipment, elements and systems to be used in the Project,
and other matters pertinent to the services covered by this Agreement.
23. Cost Opinions and Projections: Cost opinions and projections prepared by the Trumble relating to construction
costs and schedules, operation and maintenance costs, equipment characteristics and performance, cost
estimating, and operating results are based on Trumble experience, qualifications, and judgment as a Trumble
professional.
CONTRACT: Bid 23-41, Construction — RTC Transfer Station & Water Sewer Roof Rehab
Page 15 of 20
City of Fayetteville, AR
24. Period of Service: This Agreement will become effective upon the first written notice by CITY OF FAYETTEVILLE
authorizing services hereunder.
a. The provisions of this Agreement have been agreed to in anticipation of the orderly progress of the
Project through completion of the services stated in the Agreement. Trumble shall proceed with
providing the authorized services immediately upon receipt of written authorization from CITY OF
FAYETTEVILLE. Said authorization shall include the scope of the services authorized and the time in which
the services are to be completed.
25. Termination:
a. This Agreement may be terminated in whole or in part in writing by either party in the event of
substantial failure by the other party to fulfill its obligations under this Agreement through no fault of the
terminating party, provided that no termination may be effected unless the other party is given:
i. Not less than ten (10) calendar days written notice (delivered by certified mail, return receipt
requested) of intent to terminate,
ii. An opportunity for consultation with the terminating party prior to termination.
b. This Agreement may be terminated in whole or in part in writing by CITY OF FAYETTEVILLE for its
convenience, provided that Trumble is given:
i. Not less than ten (10) calendar days written notice (delivered by certified mail, return receipt
requested) of intent to terminate,
ii. An opportunity for consultation with the terminating party prior to termination.
c. If termination for default is affected by CITY OF FAYETTEVILLE, an equitable adjustment in the price
provided for in this Agreement shall be made, but
i. No amount shall be allowed for anticipated profit on unperformed services or other work,
ii. Any payment due to Trumble at the time of termination may be adjusted to cover any additional
costs to CITY OF FAYETTEVILLE because of Trumble's default.
d. If termination for default is affected by Trumble, or if termination for convenience is affected by CITY OF
FAYETTEVILLE, the equitable adjustment shall include a reasonable profit for services or other work
performed. The equitable adjustment for any termination shall provide for payment to Trumble for
services rendered and expenses incurred prior to the termination, in addition to termination settlement
costs reasonably incurred by Trumble relating to commitments which had become firm prior to the
termination.
e. Upon receipt of a termination action under Paragraphs above, Trumble shall:
i. Promptly discontinue all affected work (unless the notice directs otherwise),
ii. Deliver or otherwise make available to CITY OF FAYETTEVILLE all data, drawings, specifications,
reports, estimates, summaries and such other information and materials as may have been
accumulated by Trumble in performing this Agreement, whether completed or in process.
f. Upon termination under sections above CITY OF FAYETTEVILLE may take over the work and may award
another party an agreement to complete the work under this Agreement.
g. If, after termination for failure of Trumble to fulfill contractual obligations, it is determined that Trumble
had not failed to fulfill contractual obligations, the termination shall be deemed to have been for the
convenience of CITY OF FAYETTEVILLE. In such event, adjustments of the agreement price shall be made
as provided in this agreement.
CONTRACT: Bid 23-41, Construction — RTC Transfer Station & Water Sewer Roof Rehab
Page 16 of 20
City of Fayetteville, AR
26. Delays
a. In the event the services of Trumble are suspended or delayed by CITY OF FAYETTEVILLE, or by other
events beyond Trumble's reasonable control, Trumble shall be entitled to additional compensation and
time for reasonable documented costs incurred by Trumble in temporarily closing down or delaying the
Project.
b. In the event the services are suspended or delayed by Trumble, CITY shall be entitled to compensation
and time for reasonable costs incurred in temporarily closing down or delaying the Project.
27. Rights and Benefits
a. Trumble's services shall be performed solely for the benefit of CITY OF FAYETTEVILLE and not for the
benefit of any other persons or entities.
28. Dispute Resolution
a. Scope of Paragraph: The procedures of this Paragraph shall apply to any and all disputes between CITY
OF FAYETTEVILLE and Trumble which arise from, or in any way are related to, this Agreement, including,
but not limited to the interpretation of this Agreement, the enforcement of its terms, any acts, errors, or
omissions of CITY OF FAYETTEVILLE or Trumble in the performance of this Agreement, and disputes
concerning payment.
b. Exhaustion of Remedies Required: No action may be filed unless the parties first negotiate. If timely
Notice is given as described in this agreement, but an action is initiated prior to exhaustion of these
procedures, such action shall be stayed, upon application by either party to a court of proper jurisdiction,
until the procedures in this agreement have been complied with.
c. Notice of Dispute
i. For disputes arising prior to the making of final payment promptly after the occurrence of any
incident, action, or failure to act upon which a claim is based, the party seeking relief shall serve
the other party with a written Notice.
ii. For disputes arising within one year after the making of final payment, CITY OF FAYETTEVILLE
shall give Trumble written Notice at the address listed in this agreement within thirty (30)
calendar days after occurrence of any incident, accident, or first observance of defect or damage.
In both instances, the Notice shall specify the nature and amount of relief sought, the reason
relief should be granted, and the appropriate portions of this Agreement that authorize the relief
requested.
iii. Negotiation: Within seven (7) calendar days of receipt of the Notice, the Project Managers for
CITY OF FAYETTEVILLE and Trumble shall confer in an effort to resolve the dispute. If the dispute
cannot be resolved at that level, then, upon written request of either side, the matter shall be
referred to the President of Trumble, and the Mayor of CITY OF FAYETTEVILLE or his or her
designee. These officers shall meet at the Project Site or such other location as is agreed upon
within 30 calendar days of the written request to resolve the dispute.
29. Sufficient Funds: The CITY represents to have sufficient funds or the means of obtaining funds to remit payment
to Trumble for services rendered by Trumble. All parties agree if funding should become insufficient to complete
the project, VENDOR shall be notified in a timely manner.
CONTRACT: Bid 23-41, Construction — RTC Transfer Station & Water Sewer Roof Rehab
Page 17 of 20
City of Fayetteville, AR
30. Publications:
a. Recognizing the importance of professional services on the part of Trumble's employees and the
importance of Trumble's public relations, Trumble may prepare publications, such as technical papers,
articles for periodicals, promotional materials, and press releases, in electronic or other format,
pertaining to Trumble's services for the Project. Such publications will be provided to CITY OF
FAYETTEVILLE in draft form for CITY OF FAYETTEVILLE's advance review. CITY OF FAYETTEVILLE shall
review such drafts promptly and provide CITY OF FAYETTEVILLE's comments to Trumble, CITY OF
FAYETTEVILLE may require deletion of proprietary data or confidential information from such
publications, but otherwise CITY OF FAYETTEVILLE will not unreasonably withhold approval. Approved
materials may be used in a variety of situations and do not require additional review or approval for each
use. The cost of Trumble's activities pertaining to any such publication shall be for Trumble's account.
31. Indemnification:
a. The CITY requires the Trumble to indemnify, defend and hold harmless the CITY OF FAYETTEVILLE for any
loss caused by negligence and from and against any and all loss where loss is caused or incurred or
alleged to be caused or incurred in whole or in part as a result of the negligence or other actionable fault
of the Trumble, or their employees, agents, Subcontractors, sub consultant and Suppliers of the Trumble.
32. Ownership of Documents:
a. All documents provided by CITY OF FAYETTEVILLE including original drawings, CAD drawings, estimates,
field notes, and project data are and remain the property of CITY OF FAYETTEVILLE. Trumble may retain
reproduced copies of drawings and copies of other documents.
b. Engineering and architectural documents, computer models, drawings, specifications and other hard copy
or electronic media prepared by Trumble as part of the Services shall become the property of CITY OF
FAYETTEVILLE when Trumble has been compensated for all Services rendered, provided, however, that
Vendor shall have the unrestricted right to their use. Trumble shall, however, retain its rights in its
standard drawings details, specifications, databases, computer software, and other proprietary property.
Rights to intellectual property developed, utilized, or modified in the performance of the Services shall
remain the property of Trumble.
c. Any files delivered in electronic medium may not work on systems and software different than those with
which they were originally produced. Trumble makes no warranty as to the compatibility of these files
with any other system or software. Because of the potential degradation of electronic medium over time,
in the event of a conflict between the sealed original drawings/hard copies and the electronic files, the
sealed drawings/hard copies will govern.
33. Additional Responsibilities of Trumble:
a. Review, approval, or acceptance of design drawings, specifications, reports and other services furnished
hereunder by CITY shall not in any way relieve Trumble of responsibility for the technical adequacy of the
work. Review, approval or acceptance of, or payment for any of the services by CITY shall not be
construed as a waiver of any rights under this Agreement or of any cause of action arising out of the
performance of this Agreement.
b. Trumble shall be and shall remain liable, in accordance with applicable law, for all damages to CITY OF
FAYETTEVILLE caused by Trumble's negligent performance, except beyond the Trumble's normal standard
of care, of any of the services furnished under this Agreement, and except for errors, omissions or other
deficiencies to the extent attributable to CITY OF FAYETTEVILLE or CITY OF FAYETTEVILLE-furnished data.
CONTRACT: Bid 23-41, Construction — RTC Transfer Station & Water Sewer Roof Rehab
Page 18 of 20
City of Fayetteville, AR
c. Trumble's obligations under this clause are in addition to Vendor's other express or implied assurances
under this Agreement or State law and in no way diminish any other rights that CITY OF FAYETTEVILLE
may have against Trumble for faulty materials, equipment, or work.
34. Audit and Access to Records:
a. Trumble shall maintain books, records, documents and other evidence directly pertinent to performance
on work under this Agreement in accordance with generally accepted accounting principles and practices
consistently applied in effect on the date of execution of this Agreement.
b. Trumble shall also maintain the financial information and data used by Trumble in the preparation of
support of the cost submission required for any negotiated agreement or change order and send to CITY
OF FAYETTEVILLE a copy of the cost summary submitted. CITY OF FAYETTEVILLE, the State or any of their
authorized representatives shall have access to all such books, records, documents and other evidence
for the purpose of inspection, audit and copying during normal business hours. Trumble will provide
proper facilities for such access and inspection.
c. Records shall be maintained and made available during performance on assisted work under this
Agreement and until three years from the date of final payment for the project. In addition, those
records which relate to any controversy arising out of such performance, or to costs or items to which an
audit exception has been taken, shall be maintained and made available until three years after the date of
resolution of such appeal, litigation, claim or exception.
d. This right of access clause (with respect to financial records) applies to:
i. Negotiated prime agreements
ii. Negotiated change orders or agreement amendments affecting the price of any formally
advertised, competitively awarded, fixed price agreement
iii. Agreements or purchase orders under any agreement other than a formally advertised,
competitively awarded, fixed price agreement. However, this right of access does not apply to a
prime agreement, lower tier sub agreement or purchase order awarded after effective price
competition, except:
1. With respect to record pertaining directly to sub agreement performance, excluding any
financial records of Trumble;
2. If there is any indication that fraud, collusion, gross abuse or corrupt practices may be
involved;
3. If the sub agreement is terminated for default or for convenience.
35. Covenant Against Contingent Fees:
a. Trumble warrants that no person or selling agency has been employed or retained to solicit or secure this
Agreement upon an agreement of understanding for a commission, percentage, brokerage or continent
fee, excepting bona fide employees or bona fide established commercial or selling agencies maintained
by Trumble for the purpose of securing business. For breach or violation of this warranty, CITY OF
FAYETTEVILLE shall have the right to annul this Agreement without liability or at its discretion, to deduct
from the contract price or consideration, or otherwise recover, the full amount of such commission,
percentage, brokerage, or contingent fee.
CONTRACT: Bid 23-41, Construction — RTC Transfer Station & Water Sewer Roof Rehab
Page 19 of 20
City of Fayetteville, AR
36. Gratuities:
a. If CITY OF FAYETTEVILLE finds after a notice and hearing that Trumble or any of Trumble agents or
representatives, offered or gave gratuities (in the form of entertainment, gifts or otherwise) to any
official, employee or agent of CITY OF FAYETTEVILLE or related third party contractor associated with this
project, in an attempt to secure an agreement or favorable treatment in awarding, amending or making
any determinations related to the performance of this Agreement, CITY OF FAYETTEVILLE may, by written
notice to Trumble terminate this Agreement. CITY OF FAYETTEVILLE may also pursue other rights and
remedies that the law or this Agreement provides. However, the existence of the facts on which CITY OF
FAYETTEVILLE bases such finding shall be in issue and may be reviewed in proceedings under the
Remedies clause of this Agreement.
b. The CITY may pursue the same remedies against Trumble as it could pursue in the event of a breach of
the Agreement by Trumble. As a penalty, in addition to any other damages to which it may be entitled by
law, CITY OF FAYETTEVILLE may pursue exemplary damages in an amount, as determined by CITY, which
shall be not less than three nor more than ten times the costs Trumble incurs in providing any such
gratuities to any such officer or employee.
IN WITNESS WHEREOF, CITY OF FAYETTEVILLE, ARKANSAS by and through its Mayor, and TRUMBLE CONSTRUCTION, INC.
by its authorized officer have made and executed this Agreement as of the day and year first above written.
CITY OF F ETTEVILLE, ARKANSAS TRUMB RUCTION, INC.
By: By:
Lio eld Jordan, Mayo Ro—:�:)
b rt Trumb4le, Presiden
TR
ATTEST:
By:
Kara Paxton, City Clerk reasurer :� sf.•
12/OS/2023 ';�ritti+
Date Signed: Date Signed: ZO Z?,
CONTRACT: Bid 23-41, Construction — RTC Transfer Station & Water Sewer Roof Rehab
Page 20 of 20
City of Fayetteville, AR
City of Fayetteville, Arkansas
wis
CITY OF Purchasing Division — Room 306
FAYETTEVILLE 113 W. Mountain
Fayetteville, AR 72701
A R K A N S A S Phone: 479.575.8258
TDD (Telecommunication Device for the Deaf): 479.521.1316
Bid 23-41, Construction — RTC Transfer Station & Water t er Roo Rehab
DEADLINE: TUESDAY, OCTOBER 24, 2023 before 2:00 PM, L a�me 0_4
PRE -BID MEETING: Thursday, October 5, 2023 at 2:00 PM in R #1 ty Hall
SR. PURCHASING AGENT: Amanda Beilfuss, abellfuss@fayettevAe-ar.90
DATE OF ISSUE &ADVERTISEMENT: 09/24/2y3'& 1W202
No late bids shall be accepted. Bids shall be submitt2?ne of t fo owing`: (1) through the City's third -party
electronic bidding platform or (2) delivering in p� a seal a op th ity o Fayetteville Purchasing Division.
Submitting through the City's electronic biddin rm is ly enc . All �djNll be submitted in accordance
with the attached City of Fayetteville specif s and b- me t a ed N ch bidder is required to fill in
every blank and shall supply all informQati� estedQ; I to s y e use s asis of rejection.
NO C TO A IDD
All interested parties can obtain files
distributed electronically from the Cit
aid documents shall be
FILE#00: REQUIRED S,1GJAW,1URE FOR—4Total P es
FILE#01: PROJECT —71 es
FILE #02: PLANS — S eets�
*Additional files added ncums are issued. Addendums will be uploaded and posted to the City's electronic bidding
platform.
*PLAN HOLDER LISTINGS: A listing of vendors who have received documents can be found in the City's electronic bidding
platform under the project section tab titled 'Plan Holders'.
Bidder shall assume all responsibility for receiving updates and any addenda issued to this project by monitoring
http://fayetteville-ar.gov/bids. Failure to acknowledge addenda issued as instructed could result in bid rejection.
Telecommun,cat*ns Device for the Deaf TDD (479) 521-1316 113 We%t Mountain - Fayettevi'l, AP '2 'n'
r
k
THIS PAGE I NTEN, '�� Ir6�BLANK
P G qt J�a
Telecommun,cawns Device for the Deaf TDD (479) 521-1316 113 West Mountain - Fayetteville. AR 72701
CITY OF
P_ FAYETTEVILLE
49W ARKANSAS
Project Check List
This checklist is for the Bidder's use in preparing & submitting a bid. It is not intended to include all details necessary to prepare a
bid and shall not be used as a substitute for the requirements of the bid documents. Use of this checklist does not relieve the Bidder
from the responsibility of meeting all requirements of the Specifications concerning the preparation of an acceptable bid. Bidders
are welcome to use this form as a coversheet for a sealed envelope; however, using this form itself is NOT a requirement.
F-1
5% Bid Bond of the amount bid accompanied by required documentation (Power of Attorney, etc.)
o In lieu of a bid bond, the bidder may submit a cashier's check from a bank located in the State of Arkansas for at
least five percent (5%) of the amount bid (inclusive of any deductive alternates). hier's the s all be made
payable to the City of Fayetteville, AR and received prior to the bid deadlin b ma ing an i - n delivery
appointment with the City Purchasing Division.
All addenda shall be signed, acknowledged, and submitted on the appropriate fo s (sub i actual addendums
or marking acknowledgement on other bid pages).
❑All line items shall be appropriately filled out and extend to reve lir e item as well as the total bid price.
Total base bid should be calculated in the provided ce.
All pages provided with signature lines shall b & iately date ngly, and included with submitted bid
documents
All bids shall be received before the st a deadline u gthe 't ectroni latform or submitting a physical
sealed bid to the City Purchasing i Subm.. In a bid ally is st encouraged. A public bid opening
F-1will be conducted a r eadlin at r ity Hall and livestreamed at
htt s: www. outube.com use cit offs tte '11�ar. La misdire d' As shall not be accepted. The City of
Fayetteville shall not be responsible for to misdir to ds, or fa e,�f bidders technical equipment. If submitting
a physical bid, all bid documents s II b�delivered
�ealed e l Jt to the address stated in the advertisement or
updated deadline issued via Ad da. II 6idsch ul Bed eliv40 th the name of the bidder (contractor) on the sealed
envelope as well as the bidders nsas CoN\Vor s Lice ber.
yid-
5�
Additionallnformatio I
• List of Subco rt*t*at
rs: Sub on O I form or attach if submitting a physical bid.
• AR Secretofe Fil* #: OR submit electronically.
g Y
• Ark ract r #: OR submit electronically.
• Pursu t Arkan ode Annotated §25-1-503, the Contractor agrees and certifies that they do not currently
boycott Isra a will not boycott Israel during any time in which they are entering into, or while in contract,
with an entity as defined in §25-1-503. If at any time during contract the contractor decides to boycott
Isrr f1 ntractor must notify the contracted public entity in writing.
ci Submit electronically or circle applicable answer: YES or NO
Pursuant Arkansas Code Annotated §25-1-1002, the Contractor agrees and certifies that they do not currently
boycott Energy, Fossil Fuel, Firearms, and Ammunition Industries during any time in which they are entering
into, or while in contract, with any public entity as defined in §25-1-1002. If at any time during the contract the
contractor decides to boycott Energy, Fossil Fuel, Firearms, and/or Ammunition Industries, the contractor must
notify the contracted public entity in writing.
o Submit electronically or circle applicable answer: YES or NO
Telecommun,cat*ns Device for the Deaf TDD (479) 521-1316 113WOM Mountain - Fayetteville. AR 72701 11
r
IY**
THIS PAGE W �I �i1 L�FT`BLANK
P G 0& J�a
6A�
Telecommun,cawns Device for the Deaf TDD (479) 521-1316 113 West Mountain - Fayetteville, AR 72701
City of Fayetteville, Arkansas
INVITATION TO BID
Bid 23-41, Construction — RTC Transfer Station & Water Sewer Roof Rehab
The City of Fayetteville is accepting sealed bids from properly licensed firms for the alteration of the two (2) existing
standing seam metal roofs located at the Fayetteville Recycling & Trash Transfer Station and at Fayetteville's Water
and Sewer Operations Center. Questions regarding this bid should be addressed to Amanda Beilfuss, Sr. Purchasing
Agent at abeilfuss@fayetteville-ar.gov.
A non -mandatory Pre -Bid meeting will be held Thursday, October 5, 2023 at 2:00 PM, in Room #111 of Fayetteville
City Hall. Information regarding the pre -bid meeting is available on the project page on the City's electronic bidding
platform. All interested parties are encouraged to attend.
Bidding documents, plans, plan holders, and addenda shall be obtained at t CIt of Faeuescday,
Purchasing
Division's electronic bidding platform at www.fayetteville-ar.gov/bids. All bids shal be rec 'v October
24, 2023 before 2:00 PM, local time utilizing the electronic bidding software or by u Ing a sealed bid to
the City of Fayetteville Purchasing Division. All bids shall ceived prior to the bid dea ine. Late or misdirected
bids shall not be accepted. Submitting a bid electronicall is strongly encouraged. -NA public bid opening will be
conducted shortly after the deadline at City nd li ed at s://www.youtube.com/user/
cityoffayettevillear. The City of Fayetteville shall n1 sponsi lost i j ected bids, or failure of bidder's
technical equipment.
Each bid exceeding $50,000 shall be acco d byi►i"er's a kr6m *ag6ing business in the State of
Arkansas or a corporate bid bond for erc he t�bid. I `ent a bidder opts to submit a
p p p
cashier's check for a bid bond, th al phy ashier's ck shape elivered to the City prior to the
deadline. A one hundred percent 0 °o A�pll �rr once nd se ayment bond is required with the
contract awarded. A State of Arkansas Contl�ct�6r's Licensre(qbids exceeding $50,000 and license
shall be valid at the time of bid dead) e. / rrny vend o�formin vice shall be registered with the Arkansas
Secretary of State. • O
Pursuant to Arkansas Code An ed §�28 he Cit Fa etteville encourages all qualified small, minority and
women business enter ris s id oeceiv* n cts for oods services and construction. Also Citp�g Y
of Fayetteville encoura sal gener I cact s t �cubcontract portions of their contract to qualified small,
minority and women n ss ente es. CO
The City of Fayette5?4�reservqSq right to waive irregularities, reject bids, and postpone the award of any
Contract for a period whici 11 not exceed beyond ninety (90) days from the bid opening date.
City of Fayetteville
By: Amanda Beilfuss
City Sr. Purchasing Agent
P: 479.575.8220 Email: abeilfuss@fayetteville-ar.gov
TDD (Telecommunications Device for the Deaf): (479) 521-1316
Date of advertisement: 09.24.23 & 10.01.23
This publication was paid for by the Purchasing Division of the City of Fayetteville, Arkansas.
Amount paid: $XXX.XX.
Telecommun,cat*ns Device for the Deaf TDD (479) 521-131, I ' 1 West Mountain - Fayette ' '
I_
CITY OF
FAYETTEVILLE
ARKANSAS
TABLE OF CONTENTS
BID 23-41, CONSTRUCTION - RTC TRANSFER STATION & WATER SEWER ROOF REHAB
CITY DOCUMENTS c
INTRODUCTORY INFORMATION
SECTION 00 TITLE PAGE 1- 1
SECTION 00 BIDDER'S CHECKLIST • •`O O 1-1
SECTION 00 ADVERTISEMENT G 1-1
SECTION 01 INSTRUCTION BIDDER 1 - 11
BID FORMS AND SUPPLEM
O a►
SECTION 02 BID FORM G (7, 1-2
SECTION 03 CONTRANOR, tEFERE 1-1
SECTION 04 BID B 1-2
SECTION 05 PE ORM D 1-2
SECTION 06 ABOR N ATE L P�E T BOND 1-3
* '61
CONTRA? ' G NERA IONS
General Require n 1 - 43
CITY OF FAYETTEVILLE, ARKANSAS:
BID 23-41, CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER ROOF REHAB
SECTION 01
INSTRUCTIONS TO BIDDERS
PART ONE - DEFINED TERMS
1.1. Terms used in these Instructions to Bidders which are defined in the General Conditions have the
meanings assigned to them in the General Conditions. Certain additional terms used in these Instructions
to Bidders have the meanings indicated below which are applicable to both the singular and plural thereof.
1.2
1.3
1.4
1.5
Bidder - one who submits a Bid directly to City of Fayetteville as distinct from a sub -bidder, who submits
a bid to a Bidder. C
Issuing Office - the office from which the Bidding Documents are to b sand bidding
procedures are to be administered. n
Successful Bidder - the lowest, responsible, and responsive Bidder thorn �t��h� i of Fayetteville (on
the basis of the City of Fayetteville's evaluation as�inafter pw vvwed) makan award.
Local Time - Local time is defined as the a ayette an s n e due date of the deadline.
Bids shall be received before the deadli as sh n y the clock located in the Purchasing
Division Office. �►
PART TWO -COPIES OF BIDDING DOC
2.1
2.2
Complete sets of the B
Advertisement for Bids
Complete sets of Bidding D%�uments must
Project Manager assume n-ylres�onsib' it,
incomplete sets of Biddincumentk�
2.3 City of Faye
terms do so
any othery�
PART THREE - Q
3.1
num nd for , osit sum, if any, stated in the
g Offic�
Bids. Neither City of Fayetteville nor
isinterpretations resulting from the use of
ofroje lamer i R*copies of Bidding Documents available on the above
e purpo fob n s77for the Work and do not confer a license or grant for
V
SITE AND CONTRACT DOCUMENTS
Bidders are alANIhat the Drawings and Specifications are on file at the City of Fayetteville Purchasing
Division constitute all the information which the City of Fayetteville shall furnish. No other
infornIan iven or sounding made by the City of Fayetteville or any official thereof, prior to the
execution of said contract, shall ever become a part of, or change the contract, drawings, specifications,
and estimates, or be binding on City of Fayetteville.
Prior to submitting any Bid, Bidders are required to: read carefully the Specifications, contract, and Bonds;
examine carefully all Drawings; visit the site of the Work to carefully examine local conditions; inform
themselves by their independent research and sounding of the difficulties to be encountered, and all
INSTRUCTIONS TO BIDDERS
1
CITY OF FAYETTEVILLE. ARKANSAS:
BID 23-41, CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER ROOF REHAB
3.2
3.3
3.4
3.5
3.6
3.7
M
attending circumstances affecting the cost of doing the work, and the time specified for its completion;
and obtain all information required to make an intelligent bid.
Bidders shall rely exclusively upon their surveys, estimates, investigations, and other things which are
necessary for full and complete information upon which the bid may be made and for which a contract is
to be awarded. The Bid Form, providing for unit and lump sum prices bid by the Contractor, contains a
statement that all bids are made with the full knowledge of the difficulties and conditions that may be
encountered, the kind, quality and quantity of the plans, work to be done, excavation, and materials
required and with full knowledge of the drawings, profiles, specifications, and estimates and all provisions
of the contract and Bonds.
Bidders shall promptly notify Project Manager of all conflicts, errors, ambi s, or discr s which
Bidder has discovered in or between the Contract Documents and suc t e ated nts.
Information and data shown or indicated in the Contract Documents wAh respte_c a ting underground
facilities at or contiguous to the site is based upo mation ata furried o City of Fayetteville
and Project Manager by City of Fayetteville'Vespon
itIbcrh�
w er,und fa lit ``s or others, and City of
Fayetteville and Project Manager do not ilr for t c acy or completeness thereof
unless it is expressly provided otherwise & Suppl ry Co '
On request, City of Fayetteville will Avide ea icier a c o he site t c duct such examinations,
V `Z
investigations, explorations, to s, nd StucJ,i� each deem Nary for submission of a Bid.
Bidder must fill all hol(
such explorations, inve
Reference is made to the
is to be performed at the!
that relates to the work fc
will provide to each-Bq
portions thereofje�ted 1
V
The subn f a Bid,
com I' ever
p
performs and fur
methods, tech
or express) 4
of all ,�n,t
Docum
th o its rrmnVonditions upon completion of
ar the id%t-lication of the general nature of work that
or oj1US,such as utilities and other prime contractors)
i VOn request, and as available, City of Fayetteville
Bess o or copies of Contract Documents (other than
representation by Bidder that Bidder has
hout exception the Bid is premised upon
the Work required by the Contract Documents and applying the specific means,
"sequences, or procedures of construction (if any) that may be shown or indicated
by the Contract Documents, that Bidder has given Project Manager written notice
s, ambiguities, and discrepancies that Bidder has discovered in the Contract
and that the written resolutions thereof by Project Manager are acceptable to Bidder, and
that the Contract Documents are generally sufficient to indicate and convey understanding of all terms
and conditions for performing and furnishing the Work.
Mobilization shall not exceed 5% of bid.
INSTRUCTIONS TO BIDDERS
2
CITY OF FAYETTEVILLE, ARKANSAS:
BID 23-41, CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER ROOF REHAB
3.9 Any use of a third -party dumpster or roll -off container shall be procured from the City of Fayetteville
Recycling and Trash Collection Division. Use of a Non -City dumpster or roll -off container is not allowed.
3.10 Open burning and blasting are not allowed on City projects.
3.11 Contractor is responsible for obtaining all applicable permits; however, fees for City -issued permits shall
be waived.
PART FOUR - AVAILABILITY OF LANDS FOR WORK AND WORK BY OTHERS
4.1 The lands upon which the Work is to be performed, rights -of -way and easeme s f access o and
other lands designated for use by Contractor in performing the Work i ied in ntract
Documents. All additional lands and access thereto required for
ora cons facilities,
construction equipment, or storage of materials and equipment to be in rp a t e d i Nvork are to be
obtained and paid for by Contractor. Easements for permanent st5liiiictures vent changes in
existing facilities are to be obtained and paid for ity of Faye�unleth wise provided in the
Contract Documents. `O O
PART FIVE - INTERPRETATION OF CONTRACT DO ♦ TS AN END O
/mod
5.1
5.2
5.3
If any person contemplating sub
meaning of any part of the pOWeE
part of the proposed Contra
to the Project Manage o
submitting the request s
Interpretation or correction
holders of Bidding DocumW
and other interpretationsW
responsible for any (AWexl
Addenda
or Proiec
is in doubt as to the true
ie in or omissions from any
Sst for interpretation thereof
for bid opening. The person
U%g7 will be made only by Addendum to all
Formal written Addenda will be binding. Oral
Ut legal effect. City of Fayetteville will not be
of the proposed Contract Documents.
uments as deemed advisable by City of Fayetteville
5.4 Bidder a�.rmes al�onsibility for checking the City's online bidding portal at www.fayetteville-
ar.gov/bids for Rk,
esand addenda issued to this project.
lb_
CC
PART SIX - AP➢I�QX,I�QATE ESTIMATE OF QUANTITIES
6.1 Estimated` quantities are approximate only and shall be the basis for receiving unit price bids for each item
but shall not be considered by Bidders as actual quantities that may be required for the completion of the
proposed work. However, such quantities, at the unit and lump sum prices bid for each item, shall
determine the amount of each bid for comparison of Bids and aid in determining the low and responsive
Bidder for the purpose of awarding the contract, and will be used as basis for fixing the amount of the
required Bonds.
INSTRUCTIONS TO BIDDERS
3
CITY OF FAYETTEVILLE, ARKANSAS:
BID 23-41, CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER ROOF REHAB
PART SEVEN - UNIT PRICES
7.1 Bidders must state a price for each item of work named in the Bid Form. Unit and Lump Sum prices shall
include amounts sufficient for the furnishing of all labor, materials, tools, equipment, and apparatus of
every description to construct, erect, and finish completely all the work as called for in the Specifications
or indicated on the Drawings.
7.2 Prices bid on the various items in the Bid Form shall bear a fair relationship to the cost of the work to be
done. Bids which appear unbalanced and are deemed not to be in the best interest of City of Fayetteville
may be rejected at the discretion of City of Fayetteville.
7.3 By submission of a Bid, Bidder represents that Bidder has considered theA*ntii�.a'Foject W Work
required and has reviewed the Drawings and Specifications to verify the full scope of t
PART EIGHT - BID FORM
8.1 Bids are due as indicated in the Advertisement for
8.2 Bids which are incomplete, unbalanced, ti nal, or or wScll cdhtain additions not called for,
erasures, alterations, or irregularities kind o ch do not comply with these Instructions to
Bidders may be rejected as informal -res o Ili thee1' nN City Fayetteville. However, City
of Fayetteville reserves the righ aive to ties s onges,`�Ions, or revisions and to
make the award in the best i of City ttevi
8.3 Acceptance of Alternat i s It 1h ty of tteville's d cc tion, as best services the City of
Fayetteville's interest. Eac deductiv ternate is vided C�r the Bid Form. The price of the Bid for
each alternate will be the a%Nountt to bed ed fro e price of the Total Base Bid if the City of
Fayetteville selects any o he �1►ter'nat�s. ht pri unt for each alternate shall be the same as
the unit price amount list the Bide
I
8.4 No Bidder shall i I the i on iro to any person whomsoever, except those having a
partnership th inanc' Kest h' in t e Bid, until after the bids have been opened.
8.5 All biNclude s including but not limited to sales tax, use tax, permits, insurance, etc. The
contraction this is defined b the Arkansas Revenue Laws as the user and is responsible for the
Y p
appropriate ta ere are NO provisions in this bid for a contractor to avoid taxes. The City of
Fayettevilla tax-exempt entity.
4
PART NINE - SIGNRTURE ON BIDS
9.1 If the Bid is made by an individual, the firm name must be given, and the Bid Form signed by the individual
or a duly authorized agent. If the Bid is made by a partnership, the firm name and the names of each
member must be given, and the Bid signed by a member of the partnership, or a person duly authorized.
If the Bid is made by a company or corporation, the company or corporate name must be given, and the
Bid signed by an officer or agent duly authorized. The corporate seal must be affixed and attested by the
INSTRUCTIONS TO BIDDERS
4
CITY OF FAYETTEVILLE, ARKANSAS:
BID 23-41, CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER ROOF REHAB
secretary or an assistant secretary. The corporate address and state of incorporation must be shown
below the signature.
9.2 All names must be typed or printed in black ink below the signature.
9.3 The address and telephone number for communications regarding the Bid must be shown.
9.4 Powers of attorney, properly certified, for agents and others to sign Bids must be in writing and filed with
City of Fayetteville.
9.5 The Bid shall also contain a signed acknowledgment of receipt of all Addend
9.6 Arkansas Contractor's License shall be valid at time of bid.
V
9.7 Vendor shall not be debarred from doing business with any governmeOKt entit .
Q�
PART TEN -BID BOND
10.1 A five percent (5%) bid security, in the f dtsbid b cas r ck from a bank located in the
State of Arkansas, as stated in the Ad ment f r Z�S, shall ac any each bid. Bid bonds for the
l;�
difference in price between low bM 1►and s bi all not acceptable. The Successful
. .
Bidder's security will be retaine ity of F ville r e Sig Are�ment and required Bonds
and Certificates of Insuran e Succ s�idd o execu a deliver the Agreement and
furnish the required con curl �`fifte days ter the tice of Selection, City of Fayetteville
may annul the Notice ofAnd nd a Bid se f that ill be forfeited.
10.2 The City of Fayetteville reser�th%right t 6Zn�*the se f the three low bidders until the Successful
Bidder enters into the C act or W �- (6 ter bid opening, whichever is sooner. Cash
equivalent securityg h cond an iwkilWow biddy be exchanged for an equivalent bid bond after
bid tabulations ` rr lete %r (30) fter bid opening, whichever is sooner. If any Bidder
refuses to a ter Ja
n Agr�t, Ci 0 eville may retain Bidder's bid security as liquidated
damages t,�u pen�/
PART ELEVEN -ORMA D AND PAYMENT BOND
11.1 NOTICE TO PR BONDS AND ORDERING PROCEDURES
1. After c award, the Contractor will provide the City with a 100% performance bond and a
satt ayment bond, as required in the contract.
2. Upon the City receiving and accepting the 100% Performance and Payment Bonds, the City will issue
a Purchase Order along with a Notice of Award (NOA).
a. The Notice of Award shall serve as permission for the Contractor to order any materials needed
to complete the project, specifically those with a long lead time.
3. The City will coordinate with the Contractor on the timing of the Notice to Proceed being issued, which
shall take into consideration the expected delivery of items with a long lead time.
INSTRUCTIONS TO BIDDERS
5
CITY OF FAYETTEVILLE. ARKANSAS:
BID 23-41, CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER ROOF REHAB
4. Calendar days for substantial and final completion shall not start until the day following the issuance
of a Notice to Proceed.
5. The City will make progress payments for materials delivered on site, after verification of delivered
materials by City.
11.2 After the Notice of Award has been issued, Contractor shall furnish two original surety performance bonds
and payment bonds, equal to one hundred percent of the contract price.
11.3 If Required -- Contractor shall include provisions in the bonds which will guarantee the faithful
performance of the prevailing hourly wage clause as required by the Arkansas Prevailing W e Law,
Arkansas Code Annotated § 22-9-308(d).
11.4 Contractor shall pay all expenses in connection with the obtaining s onds. S�Q�hOds shall be
conditioned that Contractor shall faithfully perform the contract and sha ay al dness for labor
and materials furnished or performed in the construction of such altertions n ions as prescribed
in this contract.
11.5 The surety company issuing the Bonds m&X+ed"olvent ny o Xwbe
"rety Companies Annual List"
issued by the U.S. Department of the Treand t ds are issued in an amount greater
than the underwriting limitations for *e urety c as ut t rein.
z �. •`�
11.6 In Arkansas, prevailing law re a that pei nce a �jient 1►public works contracts shall
be executed by a reside t I a as ent cerise t e Ins an ommissioner to represent the
surety company executi oyft a
Wiling such Bondsower of Attorney as his authority.
The mere countersigning the Boill not bec sient.
11.7 The date of the Bonds aNeklPov4erY i'torne not be prior to the date of the contract. At
least two originals of thonds sfurnishedLeach with Power of Attorney attached. The
performance and paIgo
t bond furnis d to'the City of Fayetteville accompanied by a receipt
stamped by th CircO's Office. Before any work is performed under this
contract, theloand all be file ith t cl� of a circuit court of Washington County, Arkansas and
accepted b e Y
it of F teville Projanager.
11.8 BondsVao be a d by City of Fayetteville. If any Bonds contracted for become unsatisfactory or
unacceptable t Ci of Fayetteville after the acceptance and approval thereof, Contractor, upon being
notified toct, shall promptly execute and furnish acceptable Bonds in the amounts herein
specif' on presentation of acceptable Bonds, the unsatisfactory Bonds may be canceled at the
discretion f Contractor.
PART TWELVE —INSURANCE REQUIREMENTS
12.1 The successful bidder shall provide a Certificate of Insurance in accordance with the following guidelines,
prior to commencement of any work: $1,000,000 Commercial Liability, Statutory Worker's Compensation,
and General Automotive, if applicable. Such certificate shall list the City of Fayetteville as an additional
insured. Insurance shall remain valid, when applicable, throughout project completion.
INSTRUCTIONS TO BIDDERS
6
CITY OF FAYETTEVILLE, ARKANSAS:
BID 23-41, CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER ROOF REHAB
12.2 This bid is considered a public improvement bid. Public improvement bids shall submit certificates of
insurance within 10 days of notice of notice to proceed, after City Council approval. Certificates of
insurance are to be addressed to the City of Fayetteville, showing that the contractor carries the following
insurance which shall be maintained throughout the term of the bid. Any work sublet; the contractor
shall require the subcontractor similarly to provide the same insurance coverage. In case any employee
engaged in work on the project is not protected under Workers' Compensation, the Contractor shall
provide, and shall cause each subcontractor to provide, adequate employer's liability insurance for the
protection of such of his employees as are not otherwise protected.
PART THIRTEEN - CONTRACT TIME
13.1 The number of days within which, or the dates by which the Work is to b bially c ed and
also completed and ready for final payment is outlined in the Bid Form.
13.2 Except in connection with the safety or protection of persons or the Work y at the Site or
adjacent thereto, and except as otherwise indicahe Cont r DocumeV,s, a ork at the Site shall
be performed during regular working hours, an Contrac�°'� I not '0�� overtime work or the
performance of Work on Saturday, Sund '�.3�y leg �11�1y with of Fayetteville's written
consent. �I 0
� G
PART FOURTEEN - LIQUIDATED DAMAGES
14.1 Provisions for liquidated dam any, a orth i B*d For `
PART FIFTEEN — SUBCONTRACT P D O a►
15.1 Contractor shall not assign or sublet or an rt of this o without the prior written approval of
City of Fayetteville nor s all%ttgctor uch sub for to commence work until approval of
workman's compensation i rance is lia il' rance as may be required. Approval of each
subcontract by City ayetteville man er ase Contractor from any obligations asset out in
the Drawings, S is ns, " nd B
PART SIXTEEN - SuB TE AND; R EQUAL" EIV
16.1 Any re �to a pasp brand or manufacture is in an effort to establish an acceptable level of quality
for this p chase.Is or manufacturers that are included in a bid that are of at least equal quality, size,
and specificat' l a to what has been specified, will be acceptable for consideration. All requests for
approve e.� hall be submitted by e-mail. Such request to obtain a pre -approved equal shall be made
in wri tolAmanda Beilfuss, Sr. Purchasing Agent, at abeilfuss@favetteville-ar.gov. The Sr. Purchasing
Agent wil orward any such requests to the responsible City Department for review. Approval of all
submittals will be made only by Addendum to all holders of Bidding Documents by the City of Fayetteville
Purchasing Division.
INSTRUCTIONS TO BIDDERS
7
CITY OF FAYETTEVILLE, ARKANSAS:
BID 23-41, CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER ROOF REHAB
PART SEVENTEEN - QUALIFICATIONS AND RESPONSIBILITY OF BIDDERS
17.1 To demonstrate qualifications to perform the Work, each Bidder must be prepared to submit within five
days after bid opening, upon City of Fayetteville's or Project Manager's request, detailed written evidence
such as financial data, present commitments, and other such data as may be called for. Each Bid must
contain evidence of Bidder's qualification to do business in the State of Arkansas.
17.2 CERTIFICATION OF FUNDS:
Notice: bidders are required to provide pricing for all line items. Failure to provide deductive alternate
pricing can result in bid rejection. The City intends to award this contract to the lowest qualified responsive
responsible bidder based on the lump sum bid as long as such bid falls within the m nt of furtified
for the project, plus 25%. v ��J
1. In the event no bid falls within the amount of funds certified for of t, plus I e City will
utilize the deductive alternates in order until bids can be compare i the a il* ertified, plus
25%. In the event all deductive alternates are subtracted and no b� fa s wi
plus 25%, all bids will be rejected.
2. The City shall have the authority to negotiate S award w' appar &ponsive responsible low
bidder but only if the low bid is within 4 --five pr • %) of tification of funds.
17.3 DEDUCTIVE ALTERNATE: &
1.
There are no deductive alter this b�`(
O a►
P
PART EIGHTEEN - DISQUALIFICAT FID E
18.1 Any one or more on
ollowin consid reds sufficient for the disqualification of bidders and
1
the rejection of id •
18.2 More thid For the same Ofrom an individual, firm, partnership, or corporation under
the sa fferen
18.3 Evidence of toll i among bidders. Participants in such collusion may receive no recognition as bidders
for any fut
18.4 UnbalancBid Forms in which the prices for some items are out of proportion to the prices for other
items, or changes written in, or amendments by letter, or failure to submit a unit price for each item of
work for which a bid price is required by the Bid Form, or failure to include all required contract
documents.
INSTRUCTIONS TO BIDDERS
8
CITY OF FAYETTEVILLE, ARKANSAS:
BID 23-41, CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER ROOF REHAB
18.5 Lack of competency as revealed by the financial statement, experience, plant, and equipment statements
submitted. Lack of responsibility as shown by past work judged from the standpoint of workmanship and
progress.
18.6 Uncompleted work which, in the judgment of City of Fayetteville, might hinder or prevent the prompt
completion of additional work if awarded.
18.7 Being in arrears on existing contracts, in litigation with City of Fayetteville, or having defaulted on a
previous contract.
PART NINETEEN - OPENING OF BIDS C
19.1 Bids will be opened and read aloud publicly at the place where Bids are pe% mittNCNwq om to be
designated by City of Fayetteville the day of the bid opening. A bid tabu o of the arts of the base
Bids and major alternates (if any) will be made available to Bidders afVr the op i ids.
PART TWENTY - CONSIDERATION OF BIDS P `
O �O
20.1 After the bids are opened and read, the I�it ies will nded-anti tdtaled in accordance with the
bid prices of the accepted Bids. This rev the Bid onfirm4 the low bidder.
20.2 In evaluating Bids, City of Fayett ill con ' e qu I 'c * s of er whether or not the Bids
comply with the prescribed i ments ch a s, un' and other data as may be
requested in the Bid For o r r o th ice of Se n.
20.3 City of Fayetteville may co sider thificationss experi f Subcontractors, Suppliers, and other
persons and organizations Nnt*hier
ed for },�o portio 4s►the Work as to which the identity of
Subcontractors, Supplier. pie`r on d or ions must be submitted as provided in the
Supplementary Condition,
of Feville aiy consider the operating costs, maintenance
requirements, perf ce data arante of rTiajor items of materials and equipment proposed
for incor oratio i �ork �ch dat r uired to be submitted prior to the Notice of Selection.
PART TWENTY-4;0 I HT ��t
OT BIDS
21.1 City oftevillehe rightto reject any and all Bids, to waive technicalities, and to advertise
for new bids. All subject to this reservation. City of Fayetteville reserves to itself the right to decide
which shall b;ed the lowest responsive and responsible Bid. Due consideration will be given to the
reputN
irit�Icial ability, experience and equipment of the Bidder.
21.2 City of Fayetteville also reserves the right to waive informalities not involving price, time or changes in the
Work and to negotiate contract terms with the Successful Bidder.
PART TWENTY-TWO - AWARDING OF CONTRACT
22.1 City of Fayetteville reserves the right to withhold the awarding of a contract a reasonable period of time
from the date of opening bids, not to exceed sixty (60) days except with the consent of the Successful
INSTRUCTIONS TO BIDDERS
9
CITY OF FAYETTEVILLE, ARKANSAS:
BID 23-41, CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER ROOF REHAB
Bidder. The awarding of a contract upon a successful Bid shall give the Bidder no right to action or claim
against City of Fayetteville upon the contract until the contract is reduced to writing and signed by the
contracting parties. The letting of a contract shall not be complete until the contract is executed, and the
necessary Bonds approved.
PART TWENTY-THREE - RETAINAGE
23.1 The City of Fayetteville shall make progress payments on account of the Contract Price on the basis of
Contractor's Applications for Payment as recommended by Engineer/Architect, on or about the 15th day
of each month during construction. All such payments will be measured by the schedule of values
established as provided in the General Requirements.
1. Prior to Substantial Completion, progress payments will be made/a alount o the
percentage indicated below, but, in each case, less the aggregate o ymants pr ade and
less such amounts as Engineer/Architect shall determine, or The Cit yetteviy withhold, in
accordance with the General Requirements. # V
2. 95% of Work Completed (with the balance kSL f Work b 50% completed as
determined by Engineer/Architect, and if t INcharact d progr '� the Work have been
satisfactory to The City of Fayettevi d En ' rchite City of Fayetteville on
recommendation of Engineer/Archit deter i at o he character and progress of
the Work subsequently remain sa ry to tf�er� ere will no additional retainage on account
of Work subsequently complet which th re rogres sNnments prior to Substantial
Completion will be an amo alto 1 ° the r ple e aggregate of payments
previously made.
3. 100% of Equipment teri sPsac
corpRRra��te the W bu delivered, suitably stored, and
accompanied by doc entati n store City tteville as provided in the General
Requirements.
G
PART TWENTY-FOUR -SIGNING C�1�GR EM �O �'w✓
24.1 When City of Fayet gives a of Selec 'on the Successful Bidder, it will be accompanied by
the number of uwsigned counter of t ment as indicated in the Supplementary Conditions,
with all othe ritten Contract Dn�ume s e . Within ten (10) days thereafter, Contractor shall sign
and deli 4P t�quired Wber of cou t arts of the Agreement and attached documents to City of
Fayet vith the ed Bonds & Certificate of Insurance. Within ten (10) days thereafter City of
Fayettev shall cl �r" one fully signed counterpart to Contractor.
PART TWENTY�FIV� ERIALS GUARANTY
25.1 BeforX all contract is awarded Bidder may be required to furnish a complete statement of the origin,
composition, or manufacture of any or all materials proposed to be used in the construction of the Work,
together with samples, which may be subjected to tests provided for in the Specifications to determine
their quality and fitness for the Work.
PART TWENTY-SIX - FAMILIARITY WITH LAWS
INSTRUCTIONS TO BIDDERS
10
CITY OF FAYETTEVILLE, ARKANSAS:
BID 23-41, CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER ROOF REHAB
26.1 Bidder is presumed to be familiar with all federal, state, and city laws, ordinances, and regulations which
in any manner affect those engaged or employed in the Work, or the materials or equipment used, or that
in any way affect the Work and shall in all respects comply with said laws, ordinances, and regulations. No
claim of misunderstanding or ignorance on the part of Contractor will in any way serve to modify the
provisions of the contract. No representations shall be binding unless embodied in the contract.
PART TWENTY-SEVEN - ADDITIONAL LAWS AND REGULATIONS
27.1 Bidders' attention is called to the following laws and regulations which may have an impact on the Work
and on the preparation of the Bid:
1. Americans with Disabilities Act
2. Storm water discharge regulations enacted under the Clean Water a dminid by the
Arkansas Department of Environmental Quality (ADEQ) under a ge � r pe its prWing
Contractor
may be required to obtain coverage under general permit ARR001000 prior to cwork at
the site. 6. �V
3. If Required -- Arkansas Prevailing Wage Law, nsas Code notated 22�301 to 22-9-315 and
q g g �L���`
the administrative regulations promulgated hereunder% ee Sectiog 01 41 13 - Regulatory
Requirements for PREVAILING WAGE DIET �M
INATIO%'F��tlhis projeci�T
4. Bidder shall perform the Work in corn Nq e with ica ench safety standards set forth in
Occupational Safety and Health Adrlration O Part 19 — Subpart P — Excavations.
co
GJ
PO a.
G �-j- o
01
END OF SECTION 01
INSTRUCTIONS TO BIDDERS
11
CITY OF FAYETTEVILLE, ARKANSAS:
BID 23-41, CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER ROOF REHAB
SECTION 02
BID FORM
*NAME OF FIRM:
*D/B/A or Corporation Name
*BUSINESS ADDRESS:
*CITY:
*PHONE:
*E-MAIL:
Purchase Order/Payments shall be issued to this name
*STATE:
FAX:
*ZIP:
(� I
UNIQUE ENTITY NUMBER: C • 'VIBER: O
*TAX ID NUMBER: V AR O CTORS ENSE #:
Bidder acknowledges receipt of the fol i g adde11z;
Addendum No. Dated: owl e b
�Glf� Y
Addendum No. Dated: Ackno edged by:
Addendum No. Dated: w n edged
Addendum No. Da
Total Completion•T' and Liq . ate✓�d✓/Dam&ecluding Alternative: Substantial completion shall be 45
consecutive c ys fr crate established in a written notice to proceed. Final completion shall be 15
days after subs I com �he bidder must agree also to pay as liquidated damages, the sum of $100.00
for each consecutive calaft5p4lav thereafter.
VThe�tla
bidder u s that the Owner reserves the right to reject any or all bids and to waive any informalities
in the bidding.
g
The bidder agrees that this bid shall be good and may not be withdrawn for a period of 60 calendar days after
the bid opening.
BID FORM
1
CITY OF FAYETTEVILLE, ARKANSAS:
BID 23-41, CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER ROOF REHAB
In compliance with the Instructions to Bidders and other Contract Documents, the undersigned submits the
following names of Subcontractors to be used in performing the Work for:
BID 23-41, CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER ROOF REHAB
Bidder certifies that all Subcontractors listed are eligible to perform the Work.
Subcontractor's Work
MECHANICAL:
Subcontractor's Name
and Address
Expected Percentage
or Value
4-4
PLUMBING: �(
♦�O O
ELECTRICAL:
ROOFING AND SHEET METAL:
P O a►
Other (designate) C) 9,t
GV know
♦ O G✓
Upon receipt of written not' ffictK
cept c is bid, iddZ will execute the formal contract attached within
10 days and deliver a Su ret B 1 or eg4r he General Conditions.
The bid security at4a`/e n the suil�pf $ is to become
the property Owner i 9jent the contract and bond are not executed within the time set forth above,
as liquidated da es fort ay and additional expense to the Owner caused thereby.
*BY: (PRINTED) NA E)
*AUTHORIZED SIGNATURE:
*TITLE:
BID FORM
2
CITY OF FAYETTEVILLE, ARKANSAS:
BID 23-41, CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER ROOF REHAB
Section 03
CONTRACTOR REFERENCES
The following information is required from all Bidders so all bids may be reviewed and properly evaluated:
COMPANY NAME:
NUMBER OF YEARS IN BUSINESS:
TOTAL NUMBER OF CURRENT EMPLOYEES:
HOW LONG IN PRESENT LOCATION:
FULLTIME
PART TI M E
NUMBER OF EMPLOYEES PLANNED FOR THIS CONTRACT: FULLTIME PA TTIME��
PLEASE LIST FOUR (4) REFERENCES THAT YOU HAVE PREVIOUSLY PERFORMED SIMILAR C RA SERVI f6WITHIN
THE PAST FIVE (5) YEARS (All fields must be completed): D'�
V
1. 2.
COMPANY NAME IY** +
COMPAK'ME
Q
CITY, STATE, ZIP ATE
V
CONTACT PERSON �% CO ERSOI\�
�./ `
-t-9)
TELEPHONE 4EPHON
O �►
P
DATE COMPLETED � f'� D E PLETED
E-MAILADDRESS ` -MAILADDRESS
3. ♦ 4.
COMPANY NAME COMPANY NAME
♦ V
CITY, STATE, ZIP w CITY, STATE, ZIP
CONTACT PERSON CONTACT PERSON
TELEPHONE TELEPHONE
DATE COMPLETED DATE COMPLETED
E-MAIL ADDRESS E-MAI L AD DRESS
CONTRACTOR REFERENCES
1
CITY OF FAYETTEVILLE. ARKANSAS:
BID 23-41, CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER ROOF REHAB
SECTION 04
BID BOND
KNOW ALL MEN BY THESE PRESENTS: that we
as Principal, hereinafter called the Principal, and
G �
V
I
�`O O
O
a corporation duly organized under the laws dt State as Surety, hereinafter
called Surety, are held and firmly bound ur�
City of Fayetteville, Arkansas
113 West Mountain Street O
P v
Fayetteville, Arkansas 72701 G � o'
�v
as Obligee, hereinafter called OwWrNiO sur'Qg 7;,A !
and truly to be made, Prin
and assigns, jointly and sr
��C Dolla
rhd said S�s
ind ou efir e pre
�
for the payment of which sum, well
our heirs, executors, administrators, successors
WHEREAS, Princi I s ubmitt Bid for:
BID 23-41, CONS CTION TRANSFER STATION & WATER SEWER ROOF REHAB
NOW, THEREFORE, wner shall accept the Bid of Principal and the Principal shall enter into a Contract with
the Owner in or nce with the terms of such Bid, and give such Bond or Bonds as may be specified in the
Bidding or Contra Documents with good and sufficient surety for the faithful performance of such Contract
and for the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the
failure of Principal to enter such Contract and give such Bond or Bonds, if the Principal shall pay to the Owner
the difference not to exceed the penalty hereof between the amount specified in said Bid and such larger
amount for which the Owner may in good faith contract with another party to perform the Work covered by
said Bid, then this obligation shall be null and void, otherwise to remain in full force and effect.
BID BOND
1
CITY OF FAYETTEVILLE, ARKANSAS:
BID 23-41, CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER ROOF REHAB
Signed and sealed this day of 20
PRINCIPAL
M
(CORPORATE SEAL)
SURETY
G �
V
By P
•�o 0
� G
ATTORNEY -IN -FACT (RRATE SEAL)
Cj
This Bond shall be accompanied 't
Attorney-in-Fact's authority fromIty)
5
END OF SECTION 04
BID BOND
2
CITY OF FAYETTEVILLE, ARKANSAS:
BID 23-41, CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER ROOF REHAB
SECTION 05
PERFORMANCE BOND
KNOW ALL MEN BY THESE PRESENTS: that
as Principal, hereinafter called Contractor, and
G S
V
I
•`O O
O
G
as Surety, hereinafter called Surety, are held rmly b to
•�
City of Fayetteville, Arkansas
113 West Mountain Str
O a►
Fayetteville, Arkansas 72 1 G 0& n•
as Obligee, hereinafter called Own in Ahe a o $ v�J , for the payment whereof
Contractor and Surety bind themstXs, their Igo ecut nistrators, successors and assigns, jointly and
severally, firmly by these pr nth �'
•
WHEREAS Contract r ha writt , reerre 20 entered into
a contract with Qw for BID Z 41, CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER ROOF
REHAB which 4jby r made a part hereof and is hereinafter referred to as the Contract.
NOW, THEREFORE, THE ION OF THIS OBLIGATION is such that, if Contractor shall promptly and faithfully
perform said Contra c� this obligation shall be null and void; otherwise it shall remain in full force and effect.
The Surety he eb al�vvees'notice of any alteration or extension of time made by the Owner. Whenever Contractor
shall be, and declared by Owner to be in default under the Contract, the Owner having performed Owner's
obligations, thereunder, the Surety may promptly remedy the default, or shall promptly:
A. Complete the Contract in accordance with its terms and conditions, or
B. Obtain a bid or bids for completing the Contract in accordance with its terms and conditions, and upon
determination by Surety of the lowest responsible bidder, or, if the Owner elects, upon determination
PERFORMANCE BOND
1
CITY OF FAYETTEVILLE. ARKANSAS:
BID 23-41, CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER ROOF REHAB
by the Owner and the Surety jointly of the lowest responsible bidder, arrange for a contract between
such bidder and Owner, and make available as Work progresses (even though there should be a
default or a succession of defaults under the contract or contracts of completion arranged under this
paragraph) sufficient funds to pay the cost of completion less the balance of the Contract Price; but
not exceeding, including other costs and damages for which the Surety may be liable hereunder, the
amount set forth in the first paragraph hereof. The term "balance of the Contract Price," as used in
this paragraph, shall mean the total amount payable by Owner to Contractor under the Contract and
any amendments thereto, less the amount properly paid by Owner to Contractor.
Any suit under this Bond must be instituted before the expiration of two years from �he date on w ich final
payment under the Contract falls due.
No right of action shall accrue on this Bond to or for the use of any person or r tion oth a the Owner
named herein or the heirs, executors, administrators, or successors of the Owner.
I
Signed and sealed this day of 7(
CONTRACTOR • •`O CORPORATE SEAL)
� G
By
�� •
O
SURETY G �" NTERSIGNED: Resident Agent
Arkansas
O
(This Bond sh.allompanied with
Attorney-in-Fact's authority from Surety)
(CORPORATE SEAL)
Approved as to Form:
Attorney for
PERFORMANCE BOND
2
CITY OF FAYETTEVILLE, ARKANSAS:
BID 23-41, CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER ROOF REHAB
SECTION 06
LABOR AND MATERIAL PAYMENT BOND
This Bond is issued simultaneously with the Performance Bond in favor of Owner conditioned on the full and
faithful performance of the Contract.
KNOW ALL MEN BY THESE PRESENTS: that
G �
0
as Principal, hereinafter called Contractor, and IY**
�o 0
G
as Surety, hereinafter called Sur , e an I boun
i f Fayetteville, V
City ayette eo , Ark an s G
113 West Mountain Street J►
Fayetteville, Arkansas 72
as Obligee, hereinafter c idbner, e an( it of claimants as hereinbelow defined, in the amount
of fo a tf Contractor and Surety bind themselves their heirs
executors, adminigtr , successes and assigns, joptly and severally, firmly by these presents.
WHEREAS, Con r has �n ten Agreement dated , 20 , entered into a
contract with Owner for -41, CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER ROOF REHAB
which contract is by r ce made a part hereof and is hereinafter referred to as the Contract.
NOW THEREFO�HE CONDITION OF THIS OBLIGATION is such that if Contractor shall make payment
promptly
to all claimants as hereinafter defined, for all labor and material used or reasonably required for use in the
performance of the Contract, then this obligation shall be void; otherwise it shall remain in full force and effect,
subject, however, to the following conditions:
A. A claimant is defined as one having a direct contract with the Contractor or with a Subcontractor of
the Contractor for labor, material, or both, used or reasonably required for use in the performance of
LABOR AND MATERIAL PAYMENT BOND
1
CITY OF FAYETTEVILLE. ARKANSAS:
BID 23-41, CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER ROOF REHAB
the Contract, labor and material being construed to include that part of water, gas, power, light, heat,
oil, gasoline, telephone service, or rental of equipment directly applicable to the Contract.
B. The above -named Contractor and Surety hereby jointly and severally agree with the Owner that every
claimant as herein defined, who has not been paid in full before the expiration of a period of 90 days
after the date on which the last of such claimant's work or labor was done or performed, or materials
were furnished by such claimant, may sue on this Bond for the use of such claimant, prosecute the
suit to final judgment for such sum or sums as may be justly due claimant, and have execution thereon.
The Owner shall not be liable for the payment of any costs or expenses of any such suit.
C. No suit or action shall be commenced hereunder by any claimant: n
1. Unless claimant other than one having a direct contrac rincipa Na11► have given
written notice to any two of the following: the Contractor, th canqr uretywithin90
days after such claimant did or performed the last of theAork orIafurnished the last
of the materials for which said claim is"Bade, stati th substtlal accuracy the amount
claimed and the name of the part to Xhom we rnished, or for whom the
work or labor was done or r r d. Suc ;!�rials
sh b rved by mailing the same by
registered mail or certified aiiostag id, in lope addressed to Contractor,
Owner or Surety, at an where a is ular mai ined for the transaction of
business, or served in anner' h le a o ss maY`b s ved in the state in which
the aforesaid Pro'eilocated hat s ice n tube made by a public officer.
2. After the ex of follhe date o w 'ch Contractor ceased Work on the
Contract, it b ing un s od, howee,, that if imitation embodied in this Bond is
prohibited by an �LLaw controllin construct n ereof, such limitation shall be deemed to
be amended a'sil� A ewal�o� mini �eriod of limitation permitted by such Law.
3. Other t a a stat compiker t risdiction in and for the county or other political
sub vi Vli! f th whic4i aject, or any part thereof, is situated, or in the United
Zte!s trict Cour r the istr in which the Project, or any part thereof, is situated, and
►Isewhe
D. The amount ofond shall be reduced by and to the extent of any payment or payments made in
good faith r 'nder, inclusive of the payment by Surety of mechanics' liens which may be filed of
record said improvement, whether or not claim for the amount of such lien be presented
u r a against this Bond.
Signed and sealed this day of 20
LABOR AND MATERIAL PAYMENT BOND
2
CITY OF FAYETTEVILLE, ARKANSAS:
BID 23-41, CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER ROOF REHAB
CONTRACTOR (CORPORATE SEAL)
0
SURETY COUNTERSIGNED: Resident Agent
State of Arkansas
By By
ATTORNEY -IN -FACT (CO EAL)
�o 0
� G
(This Bond shall be accompanied with
Attorney-in-Fact's authority from Suret V �� Aas t
P o
G 0&
�y for
lop
LABOR AND MATERIAL PAYMENT BOND
3
PROJECT MANUAL
FOR
CITY OF FAYETTEVILLE
ROOF MAINTINENCE:
`p
WATER & SEWER OPERATIONS
AND
TRASH & RECYCLING TRANS F R S ATION &
MATERIAL REC `/ER` CII� Y
� G
c J'
-2
P
FOR•rZON T#JCT �1
�ec� `Archit�
W �'I-IW S RKANSAS, PLLC
. CE ,SUITE 410
TT L ANSAS 72701
• (47 9 .4477 OFFICE
�GJ
V ARCHITECT'S PROJECT NUMBER
FAYONC22.00
'< COPYRIGHT 2023/WER
SECTION 00 0105
CERTIFICATIONS PAGE
ARCHITECT
I HEREBY CERTIFY THAT THIS PROJECT MANUAL WAS PREPARED BY ME, OR UNDER MY
DIRECT SUPERVISION, AND THAT I AM A DULY LICENSED ARCHITECT UNDER THE LAWS OF
THE STATE OF ARKANSAS.
FAYONC22.00
City of Fayetteville
Water & Sewer + Recycling & Trash
Roof Maintenance
00 0105 - 1
Certifications Page
09-19-2023
SECTION 00 0110
TABLE OF CONTENTS
PROCUREMENT AND CONTRACTING REQUIREMENTS
CITY OF FAYETTEVILLE PROVIDED DOCUMENTS
INTRODUCTORAY INFORMATION
Section 00 - Title Page
Section 00 - Bidder's Check List
Section 00 - Advertisement
Section 01 - Instructions to Bidders
BID FORMS AND SUPPLEMENTS
Section 02 -Bid Form ( n
Section 03 - Contractor Refernce 0_4
Section 04 - Bid Bond
V
Section 05 - Performance Bond 40,
Section 06 - Labor and Material Payment BdV
CONTRACT GENERAL CONDITIONS
General Requirements ;`+ O
DIVISION 00 -- PROCUREMENT AND CONTRACT EQUITS
00 0105 -Certifications Page
00 0110 - Table of Content�7J• ` •
00 6325 - Substitution t Form `
SPECIFICATIONS
DIVISION 01 -- GENERAL REQUIREMENTS
01 1000 - Summary �G.!
01 2000 - Price and P erA�Proce V
01 2500 - Substituti rocedur +
01 3000 -Ad - -s ive Req bhts
01 3216 -p� st tion ch e
01 500 - T`erteorary Fa if s an4t!,br
01 600 roduct A irements
- Exe*.Ond Closeout Requirements
01 0 - Clout Submittals
DIVISION 02 EXISTING CONDITIONS
0241 emolition
DIVIS(qN 03 -- CONCRETE NOT USED
DIVISION 04 -- MASONRY NOT USED
DIVISION 05 -- METALS NOT USED
DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES NOT USED
DIVISION 07 -- THERMAL AND MOISTURE PROTECTION NOT USED
07 5600 - Liquid Applied Flashing
DIVISION 08 -- OPENINGS NOT USED
FAYONC22.00
City of Fayetteville
Water & Sewer + Recycling & Trash
00 0110 - 1 09-19-2023
Table of Contents
Roof Maintenance
DIVISION 09 -- FINISHES NOT USED
DIVISION 10 --SPECIALTIES NOT USED
DIVISION 11 -- EQUIPMENT NOT USED
DIVISION 12 -- FURNISHINGS NOT USED
DIVISION 14 -- CONVEYING EQUIPMENT NOT USED
DIVISION 15 -- 33 NOT USED
END OF SECTION
FAYONC22.00 Table of Contents
City of Fayetteville
Water & Sewer + Recycling & Trash 00 0110 - 2 09-19-2023
Roof Maintenance
SECTION 00 6325
SUBSTITUTION REQUEST FORM
PRE -BID SEND TO:
AMANDA BEILFUSS
SR. PURCHACING AGENT
CITY OF FAYETTEVILLE
113 W. MOUNTIAN STREET
FAYETTEVILLE, AR 72701
POST -BID SEND TO:
BEN CRUCE
PROJECT ARCHITECT
WEIR ARCHITECTS
112 W. CENTER STREET, SUITE 410
FAYETTEVILLE, AR 72701
PHONE:479-575-8220 PHONE:479-966-4477
SECTION: PARAGRAPH: SPECIFIED ITEM:
PROPOSED SUBSTITUTE:
ATTACH, COMPLETE DESCRIPTION, DESIGNATION, CATALOG OR MODEL NUMBER, SPEC
DATA SHEET, AND OTHER TECHNICAL DATA, IN DING LAB44ATORY TSTS IF
APPLICABLE. O O
ANSWER THE FOLLOWING QUESTIONS. �` (�
WILL SUBSTITUTION AFFECT DIMENSION ���ATE RA — S..IS THE SIZE DIFFERENT
PHYSICAL SIZE►
WILL SUBSTITUTION AFFECT WIP.1 , �IPIN S;WOj, E� INDICATED ON DRAWINGS
THIS INCLUDES LOWER OR HIGH,; ELECTRI LO4VC
D OR VOLTAGE DIFFERENT BTU
HEAT LOAD AND OR OR VEN -REQU F`D CLEAE'S, E C. v
WHAT AFFECT WILL SUBS7ITUTIOt�x4q�E ON OT TRA
v
LIST ANY DIFFERENCES BE RO SCSUB ION AND SPECIFIED ITEM:
IF NECESSARY, WILL THE UNDER PAY F RNA CHITECTS ENGINEERS COSTS,
REQUIRED TO REVISE WORKI INGii' __ __ _T ARE CAUSED BY SUBSTITUTION
r
MANUFACTURERS WARR r Y OF PROPOSED ITEMS ARE SAME DIFFERENT
PROPOSED COST SAV USING SUBSTITUTION PRODUCT:
REVIEW COMMENTS:
APPROVED
APPROVEIJOTED SEE ATTACHED EXPLAINATION
NOT APPRED REJECTED
REJECTED RECEIVED TOO LATE NOT REVIEWED
REMARKS:
FAYONC22.00
City of Fayetteville
Water & Sewer + Recycling & Trash
REVIEWED BY:
Substitution Request Form
00 6325 - 1 09-19-2023
Roof Maintenance
SUBMITTED BY:
FIRM:
ADDRESS:
SIGNATURE:
DATE:
PHONE EMAIL:
FAYONC22.00
City of Fayetteville
Water & Sewer + Recycling & Trash
Roof Maintenance
END OF SECTION
00 6325 - 2
Substitution Request Form
09-19-2023
SECTION 01 1000
SUMMARY
PART 1 GENERAL V.22
1.01 PROJECT
A. Project Name: City of Fayetteville Water & Sewer Operations Center + Trash & Recycling
Transfer Station & Material Recovery Facility Roof Maintenance.
B. Owner's Name: City of Fayetteville Arkansas.
C. Architect's Name: WER Architects.
D. The Project consists of the alteration of two existing standing seam metal roofs located at the
City of Fayetteville Water and Sewer Operations building and the City of Fa tteville Trash
Transfer Station & Material Recovery Facility n
1.02 CONTRACT DESCRIPTION
1.03 DESCRIPTION OF ALTERATIONS WORK ,
A. Scope of alterations work is indicated on drawings.
V
1.04 WORK BY OWNER
A. The Owner, without sacrificing their right to cdo o*does nto unde ke ignificant work
with their own forces within the constructi n site prio'�to antial �tion.
B. Items noted NIC (Not in Contract) 1' plied a $ lled r before Substantial
Completion. � (,
V
C. Items and equipment noted to b ctor F n ed a Co ctor Installed is to be
purchased new by the Contr nd all c a cia a the han installation and
connection should be incl ern -key i t ojec s and'S i ent noted to be
Contractor Installed shall ordina �i pro ' the gd%or shall include all costs
for handling, installati onnec n the �vJ
D. Cooperate fully wit n force r sepa ate co ors, if any, so work on those
contracts may be c ried out mo tTily, with terfeeri or delaying work under this
contract.
1.05 OWNER OCCUPANCY
A. Owner intends to c eio oc �Nacen of the existing building during the entire
construction eriod �-bv
B. Owner inte t cup . ct upo bstantial Completion.
C. Cooperate i wrier maze n to facilitate Owner's operations.
D. Sched he ork t cc mmod e O er occupancy.
1.06 CON U TE AND PR ISES
A. uction ions: Limited to areas noted on Drawings.
1. Loca onduct construction activities in ways that will limit disturbance to site.
B. Arrang o site and premises to allow:
1. occupancy.
rk by Others.
3. ork by Owner.
C. Do not unreasonably encumber site with materials or equipment. Confine stockpiling of
materials to areas authorized by Owner.
D. Provide access to and from site as required by law and by Owner:
1. Emergency Building Exits During Construction: Keep all exits required by code open
during construction period; provide temporary exit signs if exit routes are temporarily
altered.
FAYONC22.00
City of Fayetteville
Water & Sewer + Recycling & Trash
01 1000 - 1
Summary
09-19-2023
Roof Maintenance
2. Do not obstruct roadways, sidewalks, or other public ways without permit.
E. Workers on the jobsite are to be reminded that adjunct areas are occupied and in use on the
campus. W
A
F. Existing building spaces may not be used for storage.
G. Time Restrictions:
1. Limit conduct of especially noisy exterior work to the hours of 7:00 am through 4:00 pm.
H. Utility Outages and Shutdown:
1. Limit disruption of utility services to hours the building is unoccupied.
2. Do not disrupt or shut down life safety systems, including but not limit to fire sprinklers
and fire alarm system, without 7 days notice to Owner and authoritie hav' g jurisdi o
3. Prevent accidental disruption of utility services to other facilities.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
V
END OF SECTION Q
IY**
�o 0
� G
,Q
PO a.
G �-j- o
I
FAYONC22.00
City of Fayetteville
Water & Sewer + Recycling & Trash
Roof Maintenance
01 1000 - 2
Summary
09-19-2023
SECTION 01 2000
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL V.22
1.01 SECTION INCLUDES
A. Procedures for preparation and submittal of applications for progress payments.
B. Documentation of changes in Contract Sum and Contract Time.
C. Change procedures.
D. Correlation of Contractor submittals based on changes.
E. Procedures for preparation and submittal of application for final payment.
1.02 SCHEDULE OF VALUES
A. Use Schedule of Values Form: AIA G-702 Application and Certificate 1Z Oent.
B. Electronic media printout including equivalent information will be considered in lie dard
form specified; submit draft to Architect for approval.
C. Forms filled out by hand will not be accepted.
D. Submit Schedule of Values in duplicate wit 5 days after gate of Ow tractor
Agreement. ` -
E. Format: Utilize the Table of Content4o is rojec r. Identif�ceach line item with
number and title of the specification 21i Iden ' mob' ' fin.
F. Include in each line item, the am Allowan ecifie is section. For unit cost
Allowances, identify quantities ta(N rom C Doc nts ultipli d by the unit cost to
achieve the total for the item �� ��,
G. Revise schedule to list a r Chan ders, t e�c Ap or Payment.
1.03 APPLICATIONS FOR PRRS
P TS
A. Payment Period: t intervals stipul n the Agree e
16
B. Use Form AIA G702 and Form AIA G703, estipul t�i the Agreement.
C. Electronic medirintc t including equiva%nt inform ill be considered in lieu of standard
form specified; sub itto A, Vrit
tfor appr�D. Forms filled out by h94 not
E. For each ite ide a
isting X?the following:
1. Item- F
—<
2. Descri aA of wor
p
3. 4Scheduled Values. Cj
4. Qrevious Applicalhos.
ork in Place and Stored Materials under this Application.
6. uthorized Nnge Orders.
7. Total Comeeted and Stored to Date of Application.
8. P rcer4age of Completion.
9Nete
Kkplte to Finish.
tainage.
F. certification by signature of authorized officer.
G. Use data from approved Schedule of Values. Provide dollar value in each column for each line
item for portion of work performed and for stored products.
H. List each authorized Change Order as a separate line item, listing Change Order number and
dollar amount as for an original item of work.
I. Submit one electronic and three hard -copies of each Application for Payment.
FAYONC22.00 Price and Payment Procedures
City of Fayetteville
Water & Sewer + Recycling & Trash 01 2000 - 1 09-19-2023
Roof Maintenance
1.04 MODIFICATION PROCEDURES
A. For minor changes not involving an adjustment to the Contract Sum or Contract Time, Architect
will issue instructions directly to Contractor.
B. For other required changes, Architect will issue a document signed by Owner instructing
Contractor to proceed with the change, for subsequent inclusion in a Change Order.
1. The document will describe the required changes and will designate method of
determining any change in Contract Sum or Contract Time.
2. Promptly execute the change.
C. For changes for which advance pricing is desired, Architect will issue a document that includes
a detailed description of a proposed change with supplementary or revised drawings and
specifications, a change in Contract Time for executing the change with a s . ulation of any
overtime work required and the period of time during which the requested ric will be
considered valid. Contractor shall prepare and submit a fixed price qu ti thin 15
D. Computation of Change in Contract Amount: As specified in the A m t and C s of
the Contract. `-
1. For change requested by Architect for work falling under a fixe rice Zr amount
will be based on Contractor's price quotation.
E. Substantiation of Costs: Provide full informquired aluation
1. Provide the following data: �1`O O
a. Quantities of products, labor quipm� '
b. Taxes, insurance, and bor�`� V
c. Overhead and profit. ``
d. Justification for any c nV in Co ime.
e. Credit for deletion h `Contra siilarly ted. ,
F. Execution of Change Ordlos.Xchite sue Orde natures of parties as
provided in the Condition N,he Co a
G. After execution ofthange,Or Qr ptly r ise S edule lues and Application for
Payment forms to record ea auized Ge Order parate line item and adjust the
Contract Price.
H. Promptly revise progre schedules t t any cin Contract Time, revise sub -
schedules to adjust ' es r bthar i m�work d by the change, and resubmit.
I. Promptly enter cha in Pro Word Do ts.
1.05 APPLICATIONVonct
L P
A. Prepare Ar F ymenL� ified for progress payments, identifying total
adjuste, previous ym s, and sum remaining due.
B. Apprica for Fin ment will n considered until the following have been
4tcomNished:
1. All closes ocedures specified in Section 01 7000.
PART 2 PRODUC USED
PART 3 EXEC I� - NOT USED
END OF SECTION
FAYONC22.00
City of Fayetteville
Water & Sewer + Recycling & Trash 01 2000 - 2
Roof Maintenance
Price and Payment Procedures
09-19-2023
SECTION 01 2500
SUBSTITUTION PROCEDURES
PART 1 GENERAL V.22
1.01 SECTION INCLUDES
A. Procedural requirements for proposed substitutions.
1.02 RELATED REQUIREMENTS
A. Section 00 6325 - Substitution Request Form: Required form for substitution requests made
prior to or after award of contract (During procurement or construction).
B. Section 01 6000 - Product Requirements: Fundamental product requirements, product options,
delivery, storage, and handling.
1.03 DEFINITIONS
A. General Clarification: Where a definate material is specified it is not the inten to des ; I;[ r r to
against any equal product from another manufacturer. It is the intent to set a defin�lr,,s'Ipndard.
Open competition is expected, but in all cases, complete data musssNe submitted(%
comparrision and test when requested by Architect. No substitution shall bjR made-wnless
authorized in writing by the Architect. If the ontractor proposeslo subs�.tuN an equal product,
he shall make this fact known, in writing, to hitect a�s Qn as po lefFter the award of
the contract. ` ��
•
B. Substitutions: Changes from Contr ents �d ents p by Contractor to
materials, products, assemblies, an'nt.
1. Substitutions for Cause: Pr due to ed Pro j ci umstances beyond
Contractor's control. �`"
a. Unavailability. V ��
b. Regulatory cha
2. Substitutions for ience: sed u ssibilitno ering substantial
advantage t ec .
a. Substitut r q e ,�f1,Ari�fg ad t es solely t h Contractor will not be
considere
PART 2 PRODUCTS - NOT US D
PART 3 EXECUTION • ��/
3.01 GENERAL REQUIREMS �O
A. A Substitutio est for i% aysem li`materials, and equipment constitutes a
represent io tfaa(the •�
1. Hs inv gated ped l�N etermined that it meets or exceeds the quality
•I f t e spe ied productpr, qu ment, assembly, or system including aesthetics of
alp such as av le colors, patterns and textures.
ees to the same warranty for the substitution as for the specified product.
3. rees ide same ore equivalent maintenance service and source of replacement
�9 q p
part applicable.
4. A to coordinate installation and make changes to other work that may be required for
rk to be complete, with no additional cost to Owner.
�ives claims for additional costs or time extension that may subsequently become
pparent.
6. Agrees to reimburse Owner and Architect for review or redesign services associated with
re -approval by authorities.
B. A Substitution Request for specified installer constitutes a representation that the submitter:
1. Has acted in good faith to obtain services of specified installer, but was unable to come to
commercial, or other terms.
FAYONC22.00
Substitution Procedures
City of Fayetteville
Water & Sewer + Recycling & Trash 01 2500 - 1 09-19-2023
Roof Maintenance
C. Document each request with complete data substantiating compliance of proposed substitution
with Contract Documents. Burden of proof is on proposer.
1. Note explicitly any non -compliant characteristics.
D. Content: Include information necessary for tracking the status of each Substitution Request,
and information necessary to provide an actionable response.
1. Forms included in the Project Manual are adequate for this purpose, and must be used.
E. Limit each request to a single proposed substitution item.
1. Submit an electronic document, combining the request form with supporting data into
single document.
3.02 SUBSTITUTION PROCEDURES DURING PROCUREMENT
A. Instructions to Bidders specifies time restrictions for submitting requests fo b titutions,�d' g
the bidding period, and the documents required.
B. Submittal Form (before award of contract): ����
1. Submit substitution requests by completeing the form in Sec ' n 06 5; seeTMis�ection
for additional information and instructions. Use only this form; er for of sLonission
are unacceptable. Substitutions before award of contract m spt b Su it d`the City of
Fayetteville Purchacing Division.
3.03 SUBSTITUTION PROCEDURES DURING CONCTIO
A. Submittal Form (after award of contract - ` + O
1. Submit substitution requests b eting t in S 'ACOO 6325; see this section
for additional information and ins �tions. e my thi ther forms of submission
are unacceptable. Sub tit ter aw contr t sh be s bmitted to the architect.
B. Architect will consider reque substit only days�a ate of Agreement.
C. Substitutions will not be n ered and a or t e fol cumstances:
1. When they are i or im 'Pisho g or ro t ata submittals, without
having recei approv .
2. Without a Sep ate writ n r St.
3. When accepta ce will r i revisions ontrac ments.
3.04 RESOLUTION►
A. Architect may requ adNional ivi min an entation prior to rendering a decision.
Provide this data inxpediti ner.
B. Substitutions uAnItted bef r of co racf`will be accepted or rejected via addendum.
1. Archi 's decisio II rev1 oposed substitution will be noted on the
submitt form to ry n ude t�ndum.
d 11�
C. Substitutions submitt d after awar of ntract, Architect will notify Contractor in writing of
decision to acc p�(of�ject request.
1. Architect's �elfon following review of proposed substitution will be noted on the
submitt
3.05 ACCEPTAN
A. Acce Ctitutions change the work of the Project. The will be recorded into submittal and
9 1 Y
ru ed changes to the Construction Documents will be incorporated into the work by
iss nce of Change Order, Architectural Supplementary Insructions, or similar instruments
proivded for in the Conditions of the Contract.
3.06 CLOSEOUT ACTIVITIES
A. See Section 01 7800 - CLOSEOUT SUBMITTALS, for closeout submittals.
B. Include completed Substitution Request Forms as part of the Project record. Include both
approved and rejected Requests.
END OF SECTION
FAYONC22.00 Substitution Procedures
City of Fayetteville
Water & Sewer + Recycling & Trash 01 2500 - 2 09-19-2023
Roof Maintenance
SECTION 01 3000
ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL V.22
1.01 SECTION INCLUDES
A. Electronic document submittals.
B. Preconstruction meeting.
C. Site mobilization meeting.
D. Progress meetings.
E. Construction progress schedule.
F. Change Order requirements.
G. Contractor Liabiltity requirements.
H. Coordination drawings. 0_4
I. Submittals for review, information, and project closeout.
V
J. Number of copies of submittals.
K. Submittal procedures.
1.02 RELATED REQUIREMENTS
A. Section 01 3216 - Construction Pro ss edule: , co n a administration of
schedules.
1.03 PROJECT COORDINATION ��J' J►v
A. Cooperate with the Project C� Fp plTiator in tion o it ation area f site; for field offices
and sheds, for constructs & deliver ac'��traff'c, rkin ciliti
�' y
B. During construction, c rdiNte use o�slle- and i i thro h oject Coordinator.
C. Comply with Probe �Kiin rr edur for in a-proje mmunications; submittals,
reports and records, chedul s, c ordinatiC d wings, a mmendations; and resolution
of ambiguities and conflicts. 0
9
D. Comply with instructio of tl�e Proje ►o dinator of temporary utilities and
construction facilities . G
E. Coordinate field_engil ring a t work nstructions of the Project Coordinator.
F. Make the followinl types o als to AyiLhitect:
1. Requests farinter e �
2. Requestjlor substi N
3. .S opt rawings, roduct data, n
rOANANna
andi sI/ reports.anufac �`?Fistructions and field reports.
.pplic or payment and change order requests.
7. Pro s chedules.
8. C ation drawings.
9 I out submittals.
PART 2 R UCTS - NOT USED
PART 3 EXECUTION
3.01 ELECTRONIC DOCUMENT SUBMITTALS
A. Any documents transmitted for purposes of administration of the contract will be in electronic
(PDF) format and transmitted via an Internet -based e-mail service.
1. In addition to submittals for review, information, and closeout, this procedure will apply to
requests for information (RFIs), progress documentation, contract modification documents
FAYONC22.00 Administrative Requirements
City of Fayetteville
Water & Sewer + Recycling & Trash 01 3000 - 1 09-19-2023
Roof Maintenance
(e.g. supplementary instructions, proposal requests, change orders), applications for
payment, field reports and meeting minutes, and any other document the Contractor or
Architect wish to make part of the project electronic record.
2. Contractor and Architect will use conventional e-mail for this service, subject to the
limitations of the service provider (file size).
3. It is the Contractor's responsibility to submit documents in PDF format via file attachment
to e-mail directed to ABC Architect. Addressee will be determined at the pre -construction
conference. Documents shall be reviewed and stamped by the contractor prior to
submission. PDF documents without contractors stamp, signature and/or initials, & date
will not be reviewed. Each scan or PDF copy, especially large format documents or
drawings, shall be individually stamped, if transmitted as individual files. Assembled
documents in a single file need only be stamped once.
4. Subcontractors, suppliers, and Architect's consultants are required to use the a-m
transmission of review documents, and provide copies directed to the Architect a
Contractor.
5. Users of the electronic document submission process shall pre�A a an emaiand
Internet access. PDF review software that includes ability to 11r Limp and Z1,
lectronic
stamps (such as Adobe Acrobat, www.adobe.com, or Bluebea PDF
www.bluebeam.com), is encouraged, unless scan to PDF fill capabili vided by the
document generator / provider.
6. Paper documents & transmittals of elec nic sub s will not bgg�eviewed; emailed
PDF documents without transmit tter / for the contractor will not be reviewed.
7. All other specified submittal a� c ment tr ion procedures apply, except that
electronic document requirem nn not physical samples or color selection
charts. ��VVv N
B. Cost: The cost of the electro i cumen i ni tal(spaiQ) tractor; include the
cost of the submittals in t act su . ` L6
C. Project Closeout: Arc ill dete i hic electronument files shall be
archived for the r. hecontr hall provi hesed m seIecr nicaIIyan d
physical compone a rt�Ose o ument sub is � n.
3.02 PRECONSTRUCTION EETIN( V
A. Architect will schedule meeting after gtISe of Aw
B. Attendance Require • O
1. Owner. ��
2. Architec �
3. Contr �
C. Agend `
1. Dution of ntract Docu en
RUbrnissi dFAS f Subcontrac ors, list of Products, schedule of values, and progress
c f edul.e. �GJ
esigna personnel representing the parties to Contract, the Owner and Architect.
4. Procdffur and processing of field decisions, submittals, substitutions, applications for
payments, proposal request, Change Orders, and Contract closeout procedures.
5. ScI•)661ing.
D. R ' rd'minutes and distribute copies within two days after meeting to participants, with
electronic copies to Architect, Owner, participants, and those affected by decisions made.
3.03 SITE MOBILIZATION MEETING
A. Architect will schedule a meeting at the Project site prior to Contractor occupancy.
B. Attendance Required:
1. Contractor.
2. Owner.
FAYONC22.00 Administrative Requirements
City of Fayetteville
Water & Sewer + Recycling & Trash 01 3000 - 2 09-19-2023
Roof Maintenance
3. Architect.
4. Contractor's Superintendent.
5. Major Subcontractors.
C. Agenda:
1. Use of premises by Owner and Contractor.
2. Owner's requirements .
3. Construction facilities and controls provided by Owner.
4. Temporary utilities provided by Owner.
5. Security and housekeeping procedures.
6. Schedules.
7. Application for payment procedures.
8. Procedures for testing. /►
9. Procedures for maintaining record documents. V
10. Requirements for start-up of equipment.
11. Inspection and acceptance of equipment put into service duri ons uction r
D. Record minutes and distribute copies within two days after meetin partici ni two
copies to Architect, Owner, participants, and those affected by depisi ns d
3.04 PROGRESS MEETINGS
A. Schedule and administer meetings throu ho progress Work mum monthly
intervals. • `
B. Make arrangements for meetings, p agend i opie cipants, preside at
meetings. �'
C. Attendance Required: Job s �t nden Jubc tors and pliers, Owner,
Architect, as appropriate to al�i a topic �ch e • �'
D. Agenda: `
1. Review minu es us n .
2. Review of W es 9
3. Field observat ns ro em and dec �+
p
4. Identification of problems that impef� oTEfiill impel"nned progress.
5. Review of submit s schedule anelst�ltus of s S.
6. Maintenance ro ress schedul `�
7. Corrective me s to regatN7necte u es.
8. Planned ss during ceding ork riod.
9. Maint n e f qu ork ds.
10. Effec o p posed s on chedule and coordination.
11. O r b iness lat' to WQk.
E. R • utes a tribute copthin two days after meeting to participants, with
e c copi chitect, Owner, participants, and those affected by decisions made.
3.05 CONS CTIOI IIU GRESS SCHEDULE - SEE SECTION 01 3216
ftf
A. Within 10 after date of the Agreement, submit preliminary schedule defining planned
opera i r the first 60 days of Work, with a general outline for remainder of Work.
B. 04re i ary schedule requires revision after review, submit revised schedule within 10 days.
C. Wit 20 days after review of preliminary schedule, submit draft of proposed complete
schedule for review.
1. Include written certification that major contractors have reviewed and accepted proposed
schedule.
D. Within 10 days after joint review, submit complete schedule.
E. Submit updated schedule with each Application for Payment.
3.06 COORDINATION DRAWINGS
FAYONC22.00 Administrative Requirements
City of Fayetteville
Water & Sewer + Recycling & Trash 01 3000 - 3 09-19-2023
Roof Maintenance
A. Provide information required by Project Coordinator for preparation of coordination drawings.
B. Review drawings prior to submission to Architect.
3.07 DIGITAL DOCUMENT FILES AND RELEASES
A. BIM Models: Projects are created by Architect and Engineers using Building Information
Modelling software and not all projects wil have these files available for Contractor's use. The
final model is a composite of multiple models that will require separate models from
consultants. Contact Architect and Engineers for specific availablity and cost.
B. AutoCAD files: Do not exist for architectural plans. Architect has capabilty to generate
AutoCAD files that resemble the sheets as seen in the Construction Documents as well as
generate entire floor plans of the building. This service can be provided at a cost to the
Contractor per sheet/floor plan desired. See end of section for Digital Rele form.
C. Portable Digital Format (PDF): PDF of issued drawings can be providef�'t Co ractor
cost. Contact Architect for availablity. *4
D. Other documents: Contractor will have to directly contact consult t r trade sp is iles,
such as AutoCAD files for topographical layout, etc.
3.08 REQUESTS FOR CHANGE ORDERS
A. In order to facilitate checking of quotations f as or cr 1 all prop aIs, xcept for those
so minor that their propriety can be seen y i pection, e acco d by a complete
itemization of costs including labor, rya Is and s cts. L d materilas shall be
itemized in manner prescribed abo6XI
ere majq� item contracts, they shall be
itemied also. v
3.09 CONTRACTOR LIABILITY REQUIVENTS
A. The Contractor shall cause mmen lity c `'ily' equir a Contract
Documents to include (1) a wrier,t itec \ it er an itect Engineer's
consulants as additio ed for iicau ole or in y the Contractor's
negligent acts or durin �� ontractor' eration an 2) the Owner as an
additional insured c i s e whol art by the o tractor's negligent acts or
omissions during th Contra is ompleted rations. rchitect / Engineer, Engineer,
and their respective Consultan s are resible fort a Professional Liability coverage.
3.10 SUBMITTALS FOR RE FIEN*A. When the followingpecifie •%�idua e s, submit them for review:
1. Product
2. Shop n
3. Sam e f r selec
4. S ple or veri 'cat+�w�
5. • Ig ed Des- Neferred suds.
B.V?No Arch review for the limited purpose of checking for conformance with
ation g' Md the design concept expressed in the contract documents.
C. Samples eviewed only for aesthetic, color, or finish selection.
D. After r-provide copies and distribute in accordance with SUBMITTAL PROCEDURES
c �bl�ylbw and for record documents purposes described in Section 01 7800 - CLOSEOUT
- 11*Ml'fTALS.
3.11 SUBMITTALS FOR INFORMATION
A. When the following are specified in individual sections, submit them for information:
1. Design data.
2. Certificates.
3. Test reports.
4. Inspection reports.
5. Manufacturer's instructions.
FAYONC22.00 Administrative Requirements
City of Fayetteville
Water & Sewer + Recycling & Trash 01 3000 - 4 09-19-2023
Roof Maintenance
6. Manufacturer's field reports.
7. Other types indicated.
B. Submit for Architect's knowledge as contract administrator or for Owner. No action will be
taken.
3.12 SUBMITTALS FOR PROJECT CLOSEOUT
A. When the following are specified in individual sections, submit them at project closeout:
1. Project record documents.
2. Operation and maintenance data.
3. Warranties.
4. Bonds.
5. Other types as indicated.
B. Submit for Owner's benefit during and after project completion. C
3.13 NUMBER OF COPIES OF SUBMITTALS �►
A. Documents: Submit one electronic copy in PDF format; an electr i marked it will be
returned. Create PDFs at native size and right -side up; illegible file ill be r
B. Documents for Information: Submit one electronic copy.
C. Documents for Project Closeout: Make elec reproducti'�s of sub tal i es originally
reviewed. Include electronic files of any ub ttal,, for inforlrnation. Alt ha copies of
Operational Manuals included with pw and eq t shout collected and retained
for close out documentation. ` ��►`
D. Samples: Submit the number sp in indivi ecifica s ctions; one of which will be
retained by Architect.
1. After review, produce d (ies re or 'job s & veritic i
2. Retained samples will not be retur Co a u ess ccdfly so stated. Digital
documentation of a r vided s will e ed.
p
3.14 SUBMITTAL PROCE
A. Transmit each suXttalllh pp vveed form ontrac rsrztnsmittal form. Transmittal shall
be numbered sequentially ansed s� mit�lfs shouldncl�de original number and a
sequential alphabetic ix. Transmitta(s11g11 includE'lis�f each specification section or
sections that are in ti the VP i Scontentsl Send trasmitted submittal as one complete
PDF; multiple files of be re ' i nd wyl need to be reassembled by Contractor.
B. Identify Proje clitractor, S actor r supplier; pertinent drawing and detail number,
and specifi�tio ctio
C. Apply ontraitOr's stam , i ned o ills rtifying that review, approval, verification of
Produ equired, fi di nsio ad cent construction Work, and coordination of
inf is in aritttals
nce with th cent
of the Work and Contract Documents.
D. hysica to Architect at business address. In some instances, larger physical
samp es can rdinated to be delivered to the construction site, typically for use in a mock-
up. _✓
E. Sched mittals to expedite the Project, and coordinate submission of related items.
Nac
"igher priority submittals first and provide date for anticipated return of submittal.
F. A-o submittal for review, allow 15 days excluding delivery time to and from the Contractor.
When large quantities of submittals are transmitted in a short time frame, review time may take
longer. Mark high priority submittals on trasmittal to notify / assist in an expidited review.
G. Identify variations from Contract Documents and Product or system limitations that may be
detrimental to successful performance of the completed Work. Any proposed change or
deviation from Contract Document plans or specifications must be clearly noted and easily
identifiable on the submittal. Any change must be identified and specifically requesting
approval of proposed deviation by Architet or Engineer of Recod. Failure to follow this
FAYONC22.00 Administrative Requirements
City of Fayetteville
Water & Sewer + Recycling & Trash 01 3000 - 5 09-19-2023
Roof Maintenance
requirement results in submitted deviation bearing the complete responsiblity of the contractor.
H. Comments made in submittals by Architect or Engineer that change contract costs need to be
submitted to Architect as a Potential Change Order for Claims for review and approval by
Owner prior to the change to project scope. Failure to follow this requirement, whether a cost
savings or cost increase, results in the submitted cost change bearing the complete
responsibilty of the providing contractor.
I. Provide space for Contractor and Architect review stamps. Submittals must be reviewed and
stamped by Contractor, unstamped submittals will be not be reviewed and will be returned.
J. Submittals to be as complete, comprehensive and accurate as possible. Include all
components requested to be reviewed in Submittal section 1.03 of the specifications. Do not
split up a single specification section into multiple submittals (ie product data, samples, shop
drawings, etc.). Avoid grouping unrelated specifications sections together in a submittal
K. Each submittals will only be reviewed two times; once for orginal review and then a se e
for a potential revised submittal. Any further additional reviews must include Gen r'
Contractor's explaination for their inablity to conform with requirements. AdditionaEv1ws
beyond aforementioned may have costs associated to complete additional re ie!
L. When revised for resubmission, identify all changes made sinceyrevious ion. Cloud all
changes and revised details / notes. Addre II comment d/or que 'on osed in previous
submission; lack of addressing all previous r comma� We grou or rejections of
submittal. Include previous reviewed su ittA pages aJer' a last p e the new submittal
information. • N`
M. Distribute reviewed submittals as a p iate. I u parti qtp&,o iptly report any inability to
com I with re uirements. ��P Y q �
V_
N. Submittals not requested will recod or pro
09&
O a.
FAYONC22.00 Administrative Requirements
City of Fayetteville
Water & Sewer + Recycling & Trash 01 3000 - 6 09-19-2023
Roof Maintenance
3.15 AUTOCAD RELEASE FORM
A. At your request, Witsell Evans Rasco, P.A. (WER) will provide electronic files for your
convenience and use in the preparation of a bid or shop drawings related to Project:
subject to the following terms and conditions.
B. WER's electronic files are compatible with AutoCad as a dwg. file. WER makes no
representation as to the compatibility of these files with your hardware or your software beyond
the specified release of the referenced specifications.
C. Data contained on these electronic files is part of WER's instruments of service and shall not be
used by you or anyone else receiving this data through or from you for any purpose other than
as a convenience in the preparation of bids or shop drawings for the referenced project. Any
other use or reuse by you or by others, will be at your sole risk and without liability or legal
exposure to WER. You agree to make no claim and hereby waive, to the f st extent
permitted by law, any claim or cause of action of any nature against W is o icers, d' oo
employees, agents or sub -consultants which may arise out of or in co cti ith yo of
the electronic files. C
D. Furthermore, you shall, to the fullest extent permitted by law, inde y nd h I less
WER from all claims, damages, losses and expenses, including for ey's e a' g out of or
resulting from your use of these electronic fit s.
E. T D' a es mvp'�b'Een
t between these
electronic files and corresponding hard c py ntract►d u nts duedschange
orders or other revisions. WER ma esenta �A� ardin racy or
completeness of the electronic files eive. ven nflict arises between the
signed contract documents prep WER a ctronic s, a signed contract
documents shall govern. You aponsiblift ter n if ny c flict exists. By your use
of these electronic files, you t reliev your d Ily COW . h the contract
documents, including an t limita a ne eck, nd coordinate all
dimensions and detail ield m ent , eld co o s and coordinate your
work with that of o r ra tors e project.
F. Because of the pot is t at e i atioQ ented on ctronic files can be modified,
unintentionally or of rwise, reserves tight to r e all indications of its ownership
and/or involvement fro each a ectroni�play G. WER will furnish yo e oilic files st of 1 per building floor or sheet, for the
following: K `0
2. �v
3.
A swv`o& of
H. n lb circus
bR and
fitness for
conseq a
NE SIG,p:rW
FAYONC22.00
10
shape mitted to WER prior to delivery of the electronic files.
Jes shall delivery of the electronic files for use by you be deemed a sale
3kes no warranties, either express or implied, of merchantability and
lar purpose. In no event shall WER be liable for any loss of profit or any
WITSELL EVANS, RASCO PA CONTRACTOR NAME TITLE
DATE:
City of Fayetteville
Water & Sewer + Recycling & Trash
END OF SECTION
ADDRESS PHONE NUMBER
Administrative Requirements
01 3000 - 7 09-19-2023
Roof Maintenance
SECTION 01 3216
CONSTRUCTION PROGRESS SCHEDULE
PART 1 GENERAL V.22
1.01 SECTION INCLUDES
A. Preliminary schedule.
B. Construction progress schedule, bar chart type.
1.02 SUBMITTALS
A. Within 10 days after date of Agreement, submit preliminary schedule.
B. Within 10 days after joint review, submit complete schedule.
1.03 QUALITY ASSURANCE
A. Scheduler: Contractor's personnel or specialist Consultant specializin sched ZQth
one years minimum experience in schedulingconstruction work of m xit c r e to
this Project, and having use of computer facilities capable of deliv i detaile h c
printout within 48 hours of request.
1.04 SCHEDULE FORMAT
A. Listings: In chronological order according to 'art datei r�- ach actiy. 1 entify each
activity with the applicable specification s cti number `
B. Diagram Sheet Size: Maximum 22 es. Pr Pectr i i in PDF format.
PART 2 PRODUCTS - NOT USED
G
PART 3 EXECUTION J►
3.01 PRELIMINARY SCHEDULE �� • a►
A. Prepare preliminary sc I in the f hori I liar ch `
3.02 CONTENT
A. Show complete se ence of on ion b vity, with �s br beginning and completion of
each element of con truction.
B. Identify each item by smcification sect' n mber. J►
C. Provide sub-sched s to_lefine art a rtions ntire schedule.
D. Include conferences meeti chedul
E. Show accu percen omple i of each item, and total percentage of Work
completed 4be fir each sn
F. Provid epa to sch duls.eF sub ittal tes for shop drawings, product data, and samples,
owrie r hed pr cts, product tified under Allowances, and dates reviewed submittals
uire �q�hitect. Indicate decision dates for selection of finishes.
V
G. WIneliv�Pr
tes for owner -furnished products.
H. Provide I symbols and abbreviations used.
3.03 BAR CHAI%
LK
A. lui�a separate bar for each major portion of Work or operation.
B. Ideri'lify the first work day of each week.
3.04 REVIEW AND EVALUATION OF SCHEDULE
A. Participate in joint review and evaluation of schedule with Architect at each submittal.
B. Evaluate project status to determine work behind schedule and work ahead of schedule.
C. After review, revise as necessary as result of review, and resubmit within 10 days.
3.05 UPDATING SCHEDULE
FAYONC22.00 Construction Progress Schedule
City of Fayetteville
Water & Sewer + Recycling & Trash 01 3216 - 1 09-19-2023
Roof Maintenance
A. Maintain schedules to record actual start and finish dates of completed activities. Revised
schedules should show original baseline start and finish dates for activities in comparrison with
actual work started and completed.
B. Indicate progress of each activity to date of revision, with projected completion date of each
activity.
C. Annotate diagrams to graphically depict current status of Work.
D. Identify activities modified since previous submittal, major changes in Work, and other
identifiable changes.
E. Indicate changes required to maintain Date of Substantial Completion.
F. Submit reports required to support recommended changes.
G. Provide narrative report to define problem areas, anticipated delays, and i pa on the
schedule. Report corrective action taken or proposed and its effect.
3.06 DISTRIBUTION OF SCHEDULE �� •�'
A. Distribute copies of updated schedules to Contractor's project site 1�1�, tasubco s,
suppliers, Architect, Owner, and other concerned parties.
B. Instruct recipients to promptly report, in writi roblems a ipated by roj ions indicated in
schedules.
END V
TIO
� •`O O
G
O
,Q
P
O a.
0
FAYONC22.00
Construction Progress Schedule
City of Fayetteville
Water & Sewer + Recycling & Trash 01 3216 - 2 09-19-2023
Roof Maintenance
SECTION 01 5000
TEMPORARY FACILITIES AND CONTROLS
PART 1 GENERAL V.22
1.01 SECTION INCLUDES
A. Temporary utilities.
B. Temporary telecommunications services.
C. Temporary sanitary facilities.
D. Temporary Controls: Barriers, enclosures, and fencing.
E. Security requirements.
F. Vehicular access and parking.
G. Waste removal facilities and services.
H. Project identification sign.
I. Field offices.
V
1.02 TEMPORARY UTILITIES 40'
A. Owner will provide the following: �[
1. Electrical power , consisting of connecti to exis ti iIities. `
2. Water supply, consisting of congeroti to exis ties. O
B. Provide and pay for all lighting, hea cools ven r uired for construction
purposes.
C. Existing facilities may not be
D. Use trigger -operated noz ater o av of
1.03 TELECOMMUNICATION CES
A. Provide, maintain, for I co uni tions rvices be
Id office at time of project
mobilization.
B. Provide telephone, cellular ph , and h-s ed inte nnection to jobsite.
C. Provide on jobsite cap y ' Aviewin �inting sical copies of electronic versions of
construction docum ts, Abmitte6k AS1,
1.04 TEMPORARY SA TA ACILI
A. Provide an a in re sties aclosures. Provide at time of project mobilization.
B. Maintain d it i clean nitary
1.05 BARRIER
A. P i barriernt unauthorized entry to construction areas to prevent access to areas �� �D 4 ry
t11�Cc)uld be I�-,�z� us to workers or the public, to allow for owner's use of site and to protect
exi ng facili k d adjacent properties from damage from construction operations and
demolitio
B. Prov cades and covered walkways required by governing authorities for public rights-of-
1 kr public access to existing building.
C. Pro ct non -owned vehicular traffic, stored materials, site, and structures from damage.
1.06 FENCING
A. Provide 6 foot high fence around construction site; equip with vehicular and pedestrian gates
with locks.
B. Used material may be used for construction fence. Provide duplicate keys of any gate lock to
Owner. Contractor to be responsible for maintainence of fence for duration of project.
FAYONC22.00 Temporary Facilities and
Controls
City of Fayetteville
Water & Sewer + Recycling & Trash 01 5000 - 1 09-19-2023
Roof Maintenance
1.07 SECURITY
A. Provide security and facilities to protect Work, existing facilities, and Owner's operations from
unauthorized entry, vandalism, or theft.
1.08 VEHICULAR ACCESS AND PARKING
A. Coordinate access and haul routes with governing authorities and Owner.
B. Provide and maintain access to fire hydrants, free of obstructions.
C. Provide means of removing mud from vehicle wheels before entering streets.
D. Provide temporary parking areas to accommodate construction personnel. When site space is
not adequate, provide additional off -site parking.
1.09 WASTE REMOVAL
A. Provide waste removal facilities and services as required to maintain t s&i clean a
orderly condition.►
B. Provide containers with lids. Remove trash from site periodicallyqdsite
C. If materials to be recycled or re -used on the project must be storedi uitable
y p t ,
non-combustible containers; locate containers holding flammablematerial the structure
unless otherwise approved by the authoritie ing jurisd
D. Open free -fall chutes are not permitted. er ate cJ�os es int priate containers
with lids. . `�
1.10 PROJECT IDENTIFICATION �`► G� O
A. Provide project identification si psi n a c s ruc ' n a etailed b Architect.
P 1 9 � Y
B. Erect on site at location esta �b Ar t:
y ��
C. Project Identification Sign
1. One painted sig bare fe bot above�o�nd.
2. Content: n r
a. Project ti , logo a n of O indicat ontract Documents.
b. Names an titles o orities.
c. Names and Vles of Architec neer.
d. Name of Prir olttrac�or V
3. Graphic Desig W
lors, St tterirlq
hated by Architect/Engineer.
D. Sign Material
9 #*
1. Struc Fram' woo turally adequate.
2. Sign u s: Ex de I 'th medium density overlay, minimum 3/4-inch
th , st darde es to ini a joints.
3. . in nd Prim Exterior q i , two coats; sign background of color as selected.
ring:r quality paint, contrasting colors as selected.
E. In tion:
1. Instal At identification signs within 15 days after date fixed by Notice to Proceed.
2. Er �'tcation directed by the Architect.
3. upports and framing on secure foundation, rigidly braced and framed to resist wind
ings.
,4`Install signs surface plumb and level, with butt joints. Anchor securely.
5. Paint exposed surfaces of signs, supports, and framing.
F. Maintenance: Maintain signs and supports clean, repair deterioration and damage.
G. Removal: Remove signs, framing, supports, and foundations at completion of Project and
restore the area.
H. No other signs are allowed without Owner permission except those required by law.
FAYONC22.00 Temporary Facilities and
Controls
City of Fayetteville
Water & Sewer + Recycling & Trash 01 5000 - 2 09-19-2023
Roof Maintenance
1.11 FIELD OFFICES
A. Office: Weathertight, with lighting, electrical outlets, heating, cooling equipment, and equipped
with sturdy furniture, drawing rack, and drawing display table.
B. Provide space for Project meetings, with table and chairs to accommodate 6 persons.
C. Locate offices a minimum distance of 30 feet from existing and new structures.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
FAYONC22.00
City of Fayetteville
Water & Sewer + Recycling & Trash
Roof Maintenance
END OF SECTION
01 5000 - 3
Temporary Facilities and
Controls
09-19-2023
SECTION 01 6000
PRODUCT REQUIREMENTS
PART 1 GENERAL V.22
1.01 SECTION INCLUDES
A. General product requirements.
B. Re -use of existing products.
C. Transportation, handling, storage and protection.
D. Product option requirements.
E. Substitution limitations.
F. Procedures for Owner -supplied products.
G. Maintenance materials, including extra materials, spare parts, tools, a s e.
1.02 REFERENCE STANDARDS
A. NFPA 70 - National Electrical Code Most Recent Edition Adopted Quori
Jurisdiction, Including All Applicable Amendments and Supplem7ts.
1.03 SUBMITTALS
A. Proposed Products List: Submit list of major roducts pyep d for u name of
manufacturer, trade name, and mode, ber of e ct. O
1. Submit within 15 days after da reeme
2. For products specified only b e nce st a s, list le reference standards.
B. Product Data Submittals: Sub nufactttand ' uubli ed a. Mark each copy to
identify applicable products, s, optio an ufactOp6r3arranties other data.
Supplement manufacturdard d rovid nipMatio ' o this Project.
C. Shop Drawing Submits "rCepare�I icallA'cation
Project; i to utility and electrical
characteristics, uti ection r ments, atili outlets for service for
functional equipme and ap ianG� 6
D. Sample Submittals: Illustrate functional and�heticteristics of the product, with
integral parts and attackment devices. o inate sa submittals for interfacing work.
1. For selection f��QQ nhrd finis submit s es of the full range of the
manufacturer's.Ndard colors l*t ture a terns.
PART 2 PRODUCTS
2.01 EXISTING PR
A. Do not se rials an�ipm e�from existing premises unless specifically
regL4r, permitte y Contract ocents.
B. ateriquipment indicated to be removed, but not to be re -used, relocated,
r i s lied, de 'vl?�Io the Owner, or otherwise indicated as to remain the property of the
Ow er, bec e property of the Contractor; remove from site.
C. use �ts: Reused products include materials and equipment previously used in this or
other uction, salvaged and refurbished as specified.
2.02 NEV;y'� UCTS
A. Pro a new products unless specifically required or permitted by Contract Documents.
B. Use of products having any of the following characteristics is not permitted:
1. Made of wood from newly cut old growth timber.
C. Where other criteria are met, Contractor shall give preference to products that:
1. If used on interior, have lower emissions.
2. If wet -applied, have lower VOC content.
3. Are extracted, harvested, and/or manufactured closer to the location of the project.
FAYONC22.00 Product Requirements
City of Fayetteville
Water & Sewer + Recycling & Trash 01 6000 - 1 09-19-2023
Roof Maintenance
4. Have longer documented life span under normal use.
5. Result in less construction waste.
6. Are made of recycled materials.
7. Are Cradle -to -Cradle Certified.
8. Have a published GreenScreen Chemical Hazard Analysis.
D. Provide interchangeable components of the same manufacture for components being replaced.
2.03 PRODUCT OPTIONS
A. Products Specified by Reference Standards or by Description Only: Use any product meeting
those standards or description.
B. Products Specified by Naming One or More Manufacturers: Use a product of one of the
manufacturers named and meeting specifications, no options or substitutio allowed.
C. Products Specified by Naming One or More Manufacturers with a Provi ' for ubstitu
Submit a request for substitution for any manufacturer not named. ,
2.04 MAINTENANCE MATERIALS
A. Furnish extra materials, spare parts, tools, and software of types Qn qua s ecified in
individual specification sections.
B. Deliver to Project site; obtain receipt prior to ayment�
2.05 WARRANTY
A. For all products, where no specific y�� warran lord a identified, provide no
less than manufacturer's standard` y for pr du ine f grade specified.
PART 3 EXECUTION J►
3.01 SUBSTITUTION LIMITATIONS
A. See Section 01 2500 - S s ution Pr es.
3.02 OWNER -SUPPLIED P
A. Owner's Res onsi
p O
1. Arrange for an deliver (Cwn)Jr reviewe *p drawiroduct data, and samples, to
Contractor. _ `V
2. Arrange and pay rciluct de' site.
3. On delivery, in ect odu tS ' t with C t' r.
4. Submit claimsVFVansport amag place damaged, defective, or deficient
items.
5. Arrannor anuf �arr1 spections, and service.
' n�s�i
B. Contra ors ponsibi e
1. ♦ w wner viewed sho dra ings, product data, and samples. Notify Owner and
ect i ly if supplie roduct affects installed final work.
ceive a ad products at site; inspect for completeness or damage jointly with
wner.
3. Hand e, install and finish products.
4. R i r replace items damaged after receipt.
3.03 TRA NTION AND HANDLING
A. a ge products for shipment in manner to prevent damage; for equipment, package to avoid
loss of factory calibration.
B. If special precautions are required, attach instructions prominently and legibly on outside of
packaging.
C. Coordinate schedule of product delivery to designated prepared areas in order to minimize site
storage time and potential damage to stored materials.
D. Transport and handle products in accordance with manufacturer's instructions.
FAYONC22.00 Product Requirements
City of Fayetteville
Water & Sewer + Recycling & Trash 01 6000 - 2 09-19-2023
Roof Maintenance
E. Transport materials in covered trucks to prevent contamination of product and littering of
surrounding areas.
F. Promptly inspect shipments to ensure that products comply with requirements, quantities are
correct, and products are undamaged.
G. Provide equipment and personnel to handle products by methods to prevent soiling,
disfigurement, or damage, and to minimize handling.
H. Arrange for the return of packing materials, such as wood pallets, where economically feasible.
3.04 STORAGE AND PROTECTION
A. Designate receiving/storage areas for incoming products so that they are delivered according to
installation schedule and placed convenient to work area in order to minimize waste due to
excessive materials handling and misapplication. See Section 01 7419.
B. Store and protect products in accordance with manufacturers' instructs�Si
C. Store with seals and labels intact and legible.
D. Store sensitive products in weathertight, climate -controlled enclos s i an env' nt
favorable to product.
E. For exterior storage of fabricated products, p`l�ce on sloped pports ab ve und.
F. Provide off -site storage and protection when I e-does n it on-s' rage or protection.
G. Protect products from damage or deter due • uction ons, weather,
precipitation, humidity, temperature 1 ht and et li t, ust, and other
contaminants. � _
H. Comply with manufacturer's w n con it any.
I. Cover products subject to ration ervi
prevent condensation an e radatio duct
J. Store loose granul rP1 t�ia on fl t surfa wellq
foreign matter. '
K. Prevent contact with ateria at nay caus c rosi
L. Provide equipment an ersonnel to sttroducts I
disfigurement, or da C
•
M. Arrange storage of I s to 1 I cesN^a2'
products are a ged and il�intaine
�ND CTION
Ci
5
FAYONC22.00
City of Fayetteville
Water & Sewer + Recycling & Trash 01 6000 - 3
ide ventilation to
Prevent mixing with
iration, or staining.
s to prevent soiling,
Periodically inspect to verify
condition.
Product Requirements
09-19-2023
Roof Maintenance
SECTION 01 7000
EXECUTION AND CLOSEOUT REQUIREMENTS
PART 1 GENERAL V.22
1.01 SECTION INCLUDES
A. Examination, preparation, and general installation procedures.
B. Requirements for alterations work, and selective demolition.
C. Pre -installation meetings.
D. Cutting and patching.
E. Surveying for laying out the work.
F. Cleaning and protection.
G. Closeout procedures, including Contractor's Correction Punch List, exent (4n
procedures.
1.02 REFERENCE STANDARDS
A. NFPA 241 - Standard for Safeguarding Construction, Alteration,snd em i rations
2022, with Errata (2021).
1.03 SUBMITTALS
A. See Section 01 3000 - Administrative,,, uire ent mittal pro ce res.
B. Survey work: Submit name, addre teleph ber f urveyor before starting survey
work.
1. On request, submit docu t 'on veri 11 Ccura&7of s eykrk.2. Submit a copy of site dr y�� signe e Lan or, thptlevations and
locations of the wor l�com li a6ith o r t�ocu
p
3. Submit surveys a ey log pro'e d.
C. Cutting and Patch mit wri a quest in adAnce of ing or alteration that affects:
1. Structural inte ity o a el t of
2. Integrity of wea her exp r moistur sistantjnt.
3. Efficiency, mainte ance, or safety4f Vy operat' dement.
4. Visual ualitie o s tlax ose elements.
q p
5. Work of Owne�eparat �ltractor. G
yyyy�r� `✓
1.04 QUALIFICATIONz 0
�
A. For surveying wor , ern suNrors
gistered in the State of Arkansas and acceptable
to Architect. Submit ev c of surveN and Omissions insurance coverage in the
nce form of Insuraertl�FiEate. Emplq my individual(s) trained and experienced in
c01116 d rec accurate data relevant to ongoing construction activities.
1.05 PR ONDI�Q
A. Usf ex I i not permitted.
B. Ventilat c ed areas to assist cure of materials, to dissipate humidity, and to prevent
accu of dust, fumes, vapors, or gases.
1.06 C09RDI ION
A. CoNinate scheduling, submittals, and work of the various sections of the Project Manual to
ensure efficient and orderly sequence of installation of interdependent construction elements,
with provisions for accommodating items installed later.
B. Notify affected utility companies and comply with their requirements.
C. Verify that utility requirements and characteristics of new operating equipment are compatible
with building utilities. Coordinate work of various sections having interdependent
FAYONC22.00 Execution and Closeout
Requirements
City of Fayetteville
Water & Sewer + Recycling & Trash 01 7000 - 1 09-19-2023
Roof Maintenance
responsibilities for installing, connecting to, and placing in service, such equipment.
D. Coordinate space requirements, supports, and installation of mechanical and electrical work
that are indicated diagrammatically on drawings. Follow routing indicated for pipes, ducts, and
conduit, as closely as practicable; place runs parallel with lines of building. Utilize spaces
efficiently to maximize accessibility for other installations, for maintenance, and for repairs.
E. In finished areas except as otherwise indicated, conceal pipes, ducts, and wiring within the
construction. Coordinate locations of fixtures and outlets with finish elements.
F. Coordinate completion and clean-up of work of separate sections.
G. After Owner occupancy of premises, coordinate access to site for correction of defective work
and work not in accordance with Contract Documents, to minimize disruption of Owner's
activities.
PART 2 PRODUCTS C) A�
2.01 PATCHING MATERIALS
A. New Materials: As specified in product sections; match existing p d s and wor�atching
and extending work.
V
B. Type and Quality of Existing Products: Determine by inspecting,lnd testin Acts where
necessary, referring to existing work as a st . `
C. Product Substitution: For any proposed chaln�ekin mat ubmit r t for substitution
described in Section 01 6000 - ProdV t�guiremer�` O PART 3 EXECUTION 11,
V"
3.01 EXAMINATION
A
B
D
E
F
3.02 P
A.
B.
C.
3.03 P
rr��Verify that existing site conditions and sut e urfa accepA or subsequent work.
Start of work means acceptance of exi nditio � 0
Verify that existing sub tr t%is capa e fi ruc r ort or IN of new work being
applied or attache
Examine and verify peci is ndi des n indivi cification sections.
Take field measurements bef onfirm' g plllEiuct or beginning fabrication, to minimize
waste due to over-orde'ng r isfabri ti ►
Verify that utility se es �lre ava' t the coaracteristics, and in the correct
locations.
Prior to Cuttin amine onditio pri to commencing work, including elements
subject to a or m uri and patching. After uncovering existing work,
assess condi s affec rfor V rk. Beginning of cutting or patching means
9� �d 9 g 9 p g
prior to applying next material or substance.
ngs of substrate prior to applying next material or substance.
icturer required or recommended substrate primer, sealer, or conditioner prior to
new material or substance in contact or bond.
A. When required in individual specification sections, convene a preinstallation meeting at the site
prior to commencing work of the section.
B. Require attendance of parties directly affecting, or affected by, work of the specific section.
C. Notify Architect four days in advance of meeting date.
D. Prepare agenda and preside at meeting:
FAYONC22.00 Execution and Closeout
Requirements
City of Fayetteville
Water & Sewer + Recycling & Trash 01 7000 - 2 09-19-2023
Roof Maintenance
1. Review conditions of examination, preparation and installation procedures.
2. Review coordination with related work.
E. Record minutes and distribute copies within two days after meeting to participants, with two
copies to Architect, Owner, participants, and those affected by decisions made.
3.04 LAYING OUT THE WORK
A. Verify locations of survey control points prior to starting work.
B. Promptly notify Architect of any discrepancies discovered.
C. Protect survey control points prior to starting site work; preserve permanent reference points
during construction.
D. Promptly report to Architect the loss or destruction of any reference point or relocation required
because of changes in grades or other reasons.
E. Replace dislocated survey control points based on original survey con I. e no c NaQ
without prior written notice to Architect.
F. Utilize recognized engineering survey practices.
G. Establish elevations, lines and levels. Locate and lay out by inst i e tat ilar
appropriate means:
1. Site improvements including pavement i��
es for g g, fill anc Q )Soil placement;
utility locations, slopes, and invert a vans. O O
2. Grid or axis for structures. 1.`
3. Building foundation, column locations, and g oor a tior�.
H. Periodically verify layouts by sarye ns.
I. Maintain a complete and acc * og of ,I�fid s ork as it resses.
3.05 GENERAL INSTALLATION ICE I EMEN `
A. Install products as sp i individ�al�cectio i ordance t manufacturer's
instructions and r dation so as to a waste e t necessity for replacement.
B. Make vertical elem is plum an�izont ents le ess otherwise indicated.
C. Install equipment and fittings Pe
b an vel, neatly li !'with adjacent vertical and
horizontal lines, unlessher�vise ind'
D. Make consistent tex orTsurf c� se m nsitions, unless otherwise indicated.
E. Make neat tra do betwee nt surfacc aintaining texture and appearance.
3.06 ALTERATION
A. Drawin6ssh exist c nstrilities are based on casual field observation and
g u i*aexistinor docu nts nly.1.that cGtion and ut arrangements are as indicated.
port di Icies to Architect before disturbing existing installation.
3/eginnir��►alterations work constitutes acceptance of existing conditions.
B. Remove ekisVT work as indicated and as required to accomplish new work.
1. R�
2ate items indicated on drawings.
e items indicated on drawings.
ere new surface finishes are to be applied to existing work, perform removals, patch,
nd prepare existing surfaces as required to receive new finish; remove existing finish if
necessary for successful application of new finish.
4. Where new surface finishes are not specified or indicated, patch holes and damaged
surfaces to match adjacent finished surfaces as closely as possible.
C. Services (Including but not limited to HVAC, Plumbing, Fire Protection, Electrical, and
Telecommunications): Remove, relocate, and extend existing systems to accommodate new
FAYONC22.00 Execution and Closeout
Requirements
City of Fayetteville
Water & Sewer + Recycling & Trash 01 7000 - 3 09-19-2023
Roof Maintenance
construction.
1. Maintain existing active systems that are to remain in operation; maintain access to
equipment and operational components; if necessary, modify installation to allow access
or provide access panel.
2. Where existing systems or equipment are not active and Contract Documents require
reactivation, put back into operational condition; repair supply, distribution, and equipment
as required.
3. Where existing active systems serve occupied facilities but are to be replaced with new
services, maintain existing systems in service until new systems are complete and ready
for service.
a. Disable existing systems only to make switchovers and connections; minimize
duration of outages.
j
b. Provide temporary connections as required to maintain existing sin ser�Cpe�
4. Verify that abandoned services serve only abandoned facilities.
5. Remove abandoned pipe, ducts, conduits, and equipment, incluTlixthose abo 0
accessible ceilings; remove back to source of supply where s ble, therwi c stub
and tag with identification; patch holes left by removal using Is s e ' r new
construction.
D. Protect existing work to remain.
1. Prevent movement of structure; providng and g if ne ary.
2. Perform cutting to accomplish remo als atly an aecified r ting new work.
3. Repair adjacent construction s dam ��,urin a work.
E. Adapt existing work to fit new work: as n smo 1ion as possible.
F. Patching: Where the existing s a is not i d to refin hed,6ath to match the
surface finish that existed pri r utting. W e the is indiWatbe refinished,
patch so that the substrat dy for t1i1 ge* finis
G. Refinish existing surfa indicatSte,
�9
1. Where room es are ' to be r fished, r nis all visible existing surfaces
to remain to t spe ifi o on for material h neat transition to adjacent
finishes.
2. If mechanical or electrical work issed acci n during the work, re-cover and
refinish to match.
H. Clean existing syste equI. Remove dem ' 'o e:nd
s an oned ' em rom alterations areas and dispose of off -site;
do not bur ► b a .
J. Do not `be in �okv cons i in a gal eas before demolition is complete.
K. Compl Ndh a1I other&pglicable r uiA ents of this section.
3.07 CUT]v%pe'QD PA
A. �V ver p execute the work by methods that avoid cutting or patching.
B. See Alter rticle above for additional requirements.
C. Perfor ever cutting and patching is necessary to:
1 0 lete the work.
. Fi products together to integrate with other work.
3. rovide openings for penetration of mechanical, electrical, and other services.
4. Match work that has been cut to adjacent work.
5. Repair areas adjacent to cuts to required condition.
6. Repair new work damaged by subsequent work.
7. Remove samples of installed work for testing when requested.
8. Remove and replace defective and non -complying work.
FAYONC22.00 Execution and Closeout
Requirements
City of Fayetteville
Water & Sewer + Recycling & Trash 01 7000 - 4 09-19-2023
Roof Maintenance
3.08
3.09
D. Execute work by methods that avoid damage to other work and that will provide appropriate
surfaces to receive patching and finishing. In existing work, minimize damage and restore to
original condition.
E. Employ original installer to perform cutting for weather exposed and moisture resistant
elements, and sight exposed surfaces.
F. Cut rigid materials using masonry saw or core drill. Pneumatic tools not allowed without prior
approval.
G. Restore work with new products in accordance with requirements of Contract Documents.
H. Fit work air tight to pipes, sleeves, ducts, conduit, and other penetrations through surfaces.
I. At penetrations of fire rated walls, partitions, ceiling, or floor construction, completely seal voids
with fire rated material in accordance with Section 07 8400, to full thicknes�df t�e penet
element.
�0
J. Patching:
1. Finish patched surfaces to match finish that existed prior to t On co u s
surfaces, refinish to nearest intersection or natural break. For asse I ish entire
unit.
2. Match color, texture, and appearance., �-//�� �
3. Repair patched surfaces that are damaged, lifted, d�it�d1►ed, or s ing other
imperfections due to patching work. f de cts aye (u conditi ubstrate, repair
substrate prior to repairing fini It. �` O
PROGRESS CLEANING G
A. Maintain areas free of waste m s debri n rubb' Mtain 'te in a clean and order)
condition.
•
B. Remove debris and rubb' pipe c ple u s� cs, c I es, and other closed
or remote spaces, prio losing ce.
C. Broom and vacuu inter' r rr prio to sta f surf a inis ing, and continue cleaning
to eliminate dust. �V/ ��►►
D. Collect and remove waste ma Is, de s, trash/ from site periodically and
dispose off -site; do not urn •oar bury. K
PROTECTION OF INS L WO
A. Protect install edwo m da� constr i operations.
B.
Provide
C.
Provide t
work
4arD.JEe
E.
avy
F.
Prohibit)
neceMe,
ve
G. e
3.10 ADJUSTING
ual specification sections.
installed products. Control activity in immediate
ections, jambs, sills, and soffits of openings.
W, stairs, and other surfaces from traffic, dirt, wear, damage, or movement
l,,b protecting with durable sheet materials.
r storage upon waterproofed or roofed surfaces. If traffic or activity is
in recommendations for protection from waterproofing or roofing material
protective coverings when no longer needed; reuse or recycle coverings if possible.
A. Adjust operating products and equipment to ensure smooth and unhindered operation.
3.11 FINAL CLEANING
A. Use cleaning materials that are nonhazardous.
FAYONC22.00 Execution and Closeout
Requirements
City of Fayetteville
Water & Sewer + Recycling & Trash 01 7000 - 5 09-19-2023
Roof Maintenance
B. Clean interior and exterior glass, surfaces exposed to view; remove temporary labels, stains
and foreign substances, polish transparent and glossy surfaces, vacuum carpeted and soft
surfaces.
C. Remove all labels that are not permanent. Do not paint or otherwise cover fire test labels or
nameplates on mechanical and electrical equipment.
D. Clean equipment and fixtures to a sanitary condition with cleaning materials appropriate to the
surface and material being cleaned.
E. Clean filters of operating equipment.
F. Clean debris from roofs, gutters, downspouts, scuppers, overflow drains, area drains, and
drainage systems.
G. Clean site; sweep paved areas, rake clean landscaped surfaces.
H. Remove waste, surplus materials, trash/rubbish, and construction faciH s the sit ,�
dispose of in legal manner; do not burn or bury.
3.12 CLOSEOUT PROCEDURES
o'
A. Make submittals that are required by governing or other authorities. v
B. Accompany Project Coordinator on prelimin inspection tg¢4etermine ' `e listed for
completion or correction in the Contractor's tion Purl iNst for C actor's Notice of
Substantial Completion.
C. Notify Architect when work is consi �r '�dy for ct's a ial Completion
inspection.
D. Submit written certification contn ontra �orre n ch L6t, hatContract
Documents have been reviev(2d, work ha n sp d that ws complete in
accordance with Contract uments a y for r isSCompletion
inspection.
E. Conduct Substant' Cfle ion i ion and c e Final SoIrre on Punch List containing
Architect's and Co lrs p nsiv t f items ide fi to be completed or corrected
and submit to Archit ct.
F. Correct items of work li ted in Final Coon Punc i d comply with requirements for
access to Owner-occu$ atgas.
G. Notify Architect whe rk is co finato and ready for Architect's Substantial
Completion fi in c ion. `
H. Complete i so ork d by ect listed in executed Certificate of Substantial
Completion. n eac com ve each item initialled by Project Superintendent
and dated w comgI t nclu in tect closeout documentation.
` E F SECTION
FAYONC22.00
Execution and Closeout
Requirements
City of Fayetteville
Water & Sewer + Recycling & Trash 01 7000 - 6 09-19-2023
Roof Maintenance
SECTION 01 7800
CLOSEOUT SUBMITTALS
PART 1 GENERAL V.22
1.01 SECTION INCLUDES
A. Project Completion Documents.
B. Project Record Documents.
C. Operation and Maintenance Manuals.
D. Warranties and bonds.
1.02 SUBMITTALS
A. Close Out Document Manuals: All information to be scanned to digital ford subm
Architect. Retain all hard copies for one complete set for the Owner. Q t mplete'
the following:
1. Project Completion Documents:
2. Project Record Documents:
3. Operation and Maintenance Manuals:
B. Final Application for Payment: Submit fully uted
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 PROJECT COMPLETION DOCUMEN
A. Project Directory: Include list o ntract ner,.4white En 6'ineern%Subcontractor
and prime material suppliers. o inclu inv imary ctme,phone
number, mailing address ail add
B. Waiver of Liens: Provi II tradd rim a supp `
C. Warranties: Sub tracto i i9Ilation war ty, ma ct er's warranties and
warranties for equi ent or m t pai quipme panty begins on the date of
acceptance
1. Submit for contra tors installation 4ftanty, ma f rer's warranties and warranties for
equipment or con e�,t parts iprni
2. Warranties ben e D t bstanti letion, unless delayed or specifically
excluded. Pit
3. For item for ceptan is layed beyond the Date of Substantial
Com o r(ork
lis of agce is the beginning of the warranty period.
4. V rify t ocum a in form, contain full information, and are notorized.
5. In
riginallof a ch in o era n and maintenance manuals, indexed separately on
�T I of (.nnfs�nf�
D. Ni ate oF
ial Completion: Provide fully executed form with punch list attached.
E. Cog
o ractor't:Provide completed list of items requiring completion or correction.
Includeants for revisions provided by Architect and/or Engineer. Punch list should
be noli�EjJl'�'t all items were corrected and completed with trade responsible identified.
F. rti e of all
Provide form as issued for authority having jurisdiction.
G. ConSent of Surety: Provide fully executed surety letter when project has associated bonds
provided by contractor.
3.02 PROJECT RECORD DOCUMENTS
A. Record Drawings : Legibly mark construction drawings with each item to record actual
construction including the following:
1. Measured depths of foundations in relation to finish first floor datum.
FAYONC22.00 CLOSEOUT SUBMITTALS
City of Fayetteville
Water & Sewer + Recycling & Trash 01 7800 - 1 09-19-2023
Roof Maintenance
2. Measured horizontal and vertical locations of underground utilities and appurtenances,
referenced to permanent surface improvements.
3. Measured locations of internal utilities and appurtenances concealed in construction,
referenced to visible and accessible features of the Work.
4. Field changes of dimension and detail.
5. Details not on original Contract drawings.
6. Changes made by Addenda and Change Orders.
7. Record information concurrent with construction progress.
B. Specifications: Legibly mark and record at each product section description of actual products
installed, including the following:
1. Manufacturer's name and product model and number.
2. Product substitutions or alternates utilized.
3. Changes made by Addenda, Change Orders and other modificatio
C. Addenda: Insure all addenda items have been includes and posted t or docum t&►
D. Change Orders: Include all executed Change Orders, Allowanceses and r
modifications to the contract.
E. Submittals, Shop Drawings, Product Data and Samples:
1. Shop Drawings: Include records of ma4lnfacturer's in�.Nltion for ce y, installation
and adjusting.
2. Product Data: Include list of all products and n mber pf�.
3. Samples: Include material samples of all sel terio , Samples to include
label indicating manufacturer, product mod I u er, cfiw and other identifying
elements. Full color photographs�are aca for argeVamples.
F. Test Reports and Special Inions:
G. Maintain on site a com I Tof recor me s o act �T6
p � �e � ns to the Work:�
H. Ensure entries are cond ac a , ena re r ere y Owner.
1. Store record docu p o doc e is used for o truction.
J. Record information loncurre wi constr curprogres
3.03 OPERATION AND MAINT&NANwCE MAN ENERAI�►
A. Source Data: For e h pIIPdUct of, s s , list n ddresses and telephone numbers of
Subcontractors andpliers, i local of supplies and replacement parts.
B. Product Data: each early i nti specific products and component parts, and
data applicable to stal lete*i able information.
C. DrawinjLs: Supolement b ct d JilSt to relations of component parts of equipment and
systemd, to show co of and flow iag ms. Do not use Project Record Documents as
ntenance dr
D. e Text: A9 red to supplement product data. Provide logical sequence of instructions
for ch proc%e, incorporating manufacturer's instructions.
3.04 OPERATIOUMb MAINTENANCE DATA FOR MATERIALS AND FINISHES
A. Fo FaCI(Toduct, Applied Material, and Finish:
pkFpduct data, with catalog number, size, composition, and color and texture designations.
2. Ninformation for re -ordering custom manufactured products.
B. Instructions for Care and Maintenance: Manufacturer's recommendations for cleaning agents
and methods, precautions against detrimental cleaning agents and methods, and
recommended schedule for cleaning and maintenance.
C. Where additional instructions are required, beyond the manufacturer's standard printed
instructions, have instructions prepared by personnel experienced in the operation and
maintenance of the specific products.
FAYONC22.00
CLOSEOUT SUBMITTALS
City of Fayetteville
Water & Sewer + Recycling & Trash 01 7800 - 2 09-19-2023
Roof Maintenance
3.05 OPERATION AND MAINTENANCE DATA FOR EQUIPMENT AND SYSTEMS
A. Provide schedule of all equipment that require instruction on operation and/or continual
maintenance. Coordinate instruction for all equipment with Owner and/or Owner's
Representative and record name and contact information of all in attendance. Video recording
of instructions provided is recommended.
B. For Each Item of Equipment and Each System:
1. Description of unit or system, and component parts.
2. Identify function, normal operating characteristics, and limiting conditions.
3. Include performance curves, with engineering data and tests.
4. Complete nomenclature and model number of replaceable parts.
C. Where additional instructions are required, beyond the manufacturer's stan d printed
instructions, have instructions prepared by personnel experienced in the o era n and
maintenance of the specific products. !, 'S n
D. Panelboard Circuit Directories: Provide electrical service charactVLl
sntrols 75
communications; typed. � ;
E
F
G
H
Operating Procedures: Include start-up, break-in, and routine
and sequences. Include regulation, control, topping, shut -do
Include summer, winter, and any special op r instru o
Maintenance Requirements: Include rou ne ocedwe. a
maintenance and trouble shooting; qiS bly, re*ii, d rE
alignment, adjusting, balancing, anc}checking ins4tmc nns. d
Provide servicing and lubr
Include manufacturer's pri
I. Include sequence of opera
J. Provide original manuc
required for maint
K. Additional Require nts:
3.06 CLOSE OUT DOCUMENT_M/
A.
B.
C.
D.
E.
F.
G.
Provide all Close (
ease of navigation
provide file for at
Where paper
include in HarM
Vai-opeririqA.inwuctions
, and epee _ ncy instructions.
✓entative
structions; and
aired.
nb.
, and diagrams
cation sections.
ld"in PDF files, and neatly organized for
as Table of Contents. Architect can
ufacturers, scan into records and combine and
inch three D side ring binders with durable plastic
multiple binders are used, correlate data into related
CCVr Ident h binder with typed or printed title OPERATION AND MAINTENANCE
INSTRUC , identify title of Project; identify subject matter of contents.
Divider vide tabbed dividers for each separate product and system; identify the contents
o d er tab; immediately following the divider tab include a description of product and
or mponent parts of equipment.
Text. Manufacturer's printed data, or typewritten data on 24 pound paper.
Drawings: Provide with reinforced punched binder tab. Bind in with text; fold larger drawings to
size of text pages.
H. Arrange content by systems under specification section numbers and sequence of Table of
Contents of this Project Manual.
FAYONC22.00 CLOSEOUT SUBMITTALS
City of Fayetteville
Water & Sewer + Recycling & Trash 01 7800 - 3 09-19-2023
Roof Maintenance
I. Contents: Prepare a Table of Contents for each volume, with each product or system
description identified, in three parts as follows:
1. Operating instructions.
2. Maintenance instructions for equipment and systems.
3. Maintenance instructions for special finishes, including recommended cleaning methods
and materials, and special precautions identifying detrimental agents.
4. Air and water balance reports.
5. Certificates.
6. Photocopies of warranties and bonds.
J. Provide a listing in Table of Contents for design data, with tabbed dividers and space for
insertion of data.
K. Table of Contents: Provide title of Project; names, addresses, and telephore numbers
Architect , Consultants, and Contractor with name of responsible partie , se ule of p
and systems, indexed to content of the volume.
L. Arrange digital PDF copies of documents in similar fashion using fire rs. Na a ype
with simple explanation of contents using shortest file names type possible. o igital files
on flash USB drives.
M. Provide owner training videos saved electrA41114and tra ted in U dri s. Provide sign -
in sheets for all attendees for Owner Training essions Vcrude in uts.
END *CTIONN O
� G
,Q
P
O a.
0
FAYONC22.00
City of Fayetteville
Water & Sewer + Recycling & Trash
Roof Maintenance
01 7800 - 4
CLOSEOUT SUBMITTALS
09-19-2023
SECTION 02 4100
DEMOLITION
PART 1 GENERAL V.22
1.01 SECTION INCLUDES
A. Selective demolition of building elements for alteration purposes.
1.02 RELATED REQUIREMENTS
A. Section 01 1000 - Summary: Limitations on Contractor's use of site and premises.
B. Section 01 5000 - Temporary Facilities and Controls: Site fences, security, protective barriers,
and waste removal.
C. Section 01 7000 - Execution and Closeout Requirements: Project conditio protection of
bench marks, survey control points, and existing construction to remain st lation ofn
removed products; temporary bracing and shoring.
1.03 REFERENCE STANDARDS
A. 29 CFR 1926 - Safety and Health Regulations for Construction Cur t Editi n'
V
B. NFPA 241 - Standard for Safeguarding Construction, Alteration,49nd Demo perations
2022, with Errata (2021).
PART 2 PRODUCTS -- NOT USED
PART 3 EXECUTION
3.01 SCOPE G
A. Removal and replacement of alh�x gsed fa r .
B. removal and cleaning of al
C. No demolition to be
3.02 GENERAL PROCEDL9
liqui d fa
prov Archi �9wner
D'PR ONDI S X
A. Comply with applicye code an ulati r demoliti rations and safety of adjacent
structures and the public.
1. Obtain required p rmits.
2. Take precautionsre►Yent ca is or u Iled collapse of structures to be
removed; don to wort blic hin range of potential collapse of
unstable struct
3. Provide, r and m m ora barers and securit devices.
pY
4. Cond c I� tion ize p n and interference with adjacent structures and
occu a
P
5. Do not c o's or st t roa ay o sidewalks without permit.
6. Conduct operas to minima struction of public and private entrances and exits; do
c /mot obstru�t�ired exits at any time; protect persons using entrances and exits from
emoval tions.
7. Obtai n permission from owners of adjacent properties when demolition equipment
wi a se, infringe upon or limit access to their property.
B. D n< in removal until receipt of notification to proceed from Owner.
C. c existing structures and other elements that are not to be removed.
1. rovide bracing and shoring.
2. Prevent movement or settlement of adjacent structures.
3. Stop work immediately if adjacent structures appear to be in danger.
3.03 EXISTING UTILITIES
A. Coordinate work with utility companies; notify before starting work and comply with their
requirements; obtain required permits.
FAYONC22.00 Demolition
City of Fayetteville
Water & Sewer + Recycling & Trash 02 4100 - 1
09-19-2023
Roof Maintenance
B. Protect existing utilities to remain from damage.
C. Do not disrupt public utilities without permit from authority having jurisdiction.
D. Do not close, shut off, or disrupt existing life safety systems that are in use without at least 7
days prior written notification to Owner.
E. Do not close, shut off, or disrupt existing utility branches or take -offs that are in use without at
least 3 days prior written notification to Owner.
F. Locate and mark utilities to remain; mark using highly visible tags or flags, with identification of
utility type; protect from damage due to subsequent construction, using substantial barricades if
necessary.
G. Remove exposed piping, valves, meters, equipment, supports, and foundations of
disconnected and abandoned utilities. C)`^
3.04 SELECTIVE DEMOLITION FOR ALTERATIONS �`�
A. Drawings showing existing construction and utilities are based on al Id of drfand
existing record documents only.
1. Verifythat construction and utility arrangements are as indicate
Y g
2. Report discrepancies to Architect before disturbing existingAstallatio
3. Beginning of demolition work constitutes a%eptance gNisting c itio that would be
apparent upon examination prior to startVg demoli '
B. Protect existing work to remain. . �O
1. Prevent movement of structur � e shor' bracing if necessary.
2. Perform cutting to accomplibvals ne d as specified for cutting new work.
3. Repair adjacent constructi d finish �Aage ring work.
4. Patch as specified for p�f�i g new �� �/
3.05 DEBRIS AND WASTE REM v `�+ ♦VV""
A. Remove debris, ju k, d�h fro e.
B. Leave site in clean n d'a sub nt work.
C. Clean up spillage an wind-b�Wdebris fror iblic a to lands.
ENDK%ECTIO►
•p
Cl
nJ !S� IV''��
6 G
FAYONC22.00 Demolition
City of Fayetteville
Water & Sewer + Recycling & Trash 02 4100 - 2 09-19-2023
Roof Maintenance
SECTION 07 5600
LIQUID APPLIED FLASHING
PART1 GENERAL
1.01 SECTION INCLUDES:
A. This section specifies all labor, materials, transportation, equipment, and services necessary
to install KARNAK's 502 RC-W Elasto-Kote SEBS Thermoplastic Rubber Metal Roof Repair
System.
1.02 REFERENCES:
A. Factory Mutual (FM Global) - Approval Guide
B. American Society for Testing and Materials (ASTM) - Annual Book of AST tandards
C. National Roofing Contractors Association (NRCA)
D. American Society of Civil Engineers (ASCE) 1
1.03 DEFINITIONS: n,
A. RoofingTerminology: Refer to ASTM D1079 and the glossary of thelllation I Roofin
9Y 9 rY a g
Contractors Association (NRCA) Roofing and Waterproofing Ma►tal for definitions of roofing
terms related to this section.
1.04 PERFORMANCE REQUIREMENTS:
A. Provide an installed roof coating th t perm •ass e er.
B. Manufacturer shall provide all prim ting ri s that ically and chemically
compatible when installed in ac e with actur 's c ent a plication requirements.
V
1.05 SUBMITTALS:
A. Provide product data she s r eeach t prod t a ed i ion.
B. Provide manufacturer' srd d s nd ap hop ra for the specified system.
C. Installer shall provi n ocu tatiordoin the manuf c er of their authorization to
install the system, a d eligibi y tgobtain the-rnfanty spin this section.
D. Certification showing f�II-time quality cc�Kll�l of produ i iTcilities and that each batch of
material is tested to enjt a agnform �,vi�h the cturer's published physical properties.
E. Manufacturer's certi ion that lI proo kn m products meet current Volatile Organic
Compounds (VOC gulationVOIN ablished e State in which they are being installed;
and stating total C cont�t,ms pe 'ter, or all system components (i.e., primers,
adhesives,1c ti s, et
1.06 QUALITY SU NCE: i
A. Marfuf5cturer's Qtions: Man urer shall demonstrate qualifications to supply materials
of this section &Oacturer
ying the following:
1. 6ating must show evidence that the specified coating has been
�manufa d by the same organization or direct affiliate for fifteen (15) years.
2. Coati anufacturer shall have available an in-house technical staff to assist the
ontw�►cI or, when necessary, in application of the products and final inspection of the
ss *fnbIy.
B. Ins er's Qualifications: The Contractor shall demonstrate qualifications to perform the work of
this Section by submitting the following documentation:
1. Certification or license by the waterproofing membrane manufacturer as a trained
applicator of the product the installer intends to use.
C. Source Limitations: All components listed in this section shall be provided by a single
manufacturer or approved by the primary coating manufacturer.
D. Final Inspection
FAYONC22.00 Liquid Applied Flashing
City of Fayetteville
Water & Sewer + Recycling & Trash 07 5600 - 1 09-19-2023
Roof Maintenance
1. Manufacturer's representative shall provide a comprehensive final inspection after
completion of the coating system. All application errors must be addressed, and the final
punch list completed.
1.07 PRE -INSTALLATION CONFERENCE:
1.08
1.09
1.10
A. Prior to scheduled commencement of the coating installation and associated work, conduct a
meeting at the project site with the installer, architect, owner, manufacturer's representative,
and any other persons directly involved with the performance of the work. The installer shall
record conference discussions to include decisions and agreements reached (or
disagreements) and furnish copies of recorded discussions to each attending party. The main
purpose of this meeting is to review foreseeable methods and procedures related to
waterproofing work.
REGULATORY REQUIREMENTS:
A. All work shall be performed in a safe, professional manner, conformin era,, s I
local codes.
B. All coating system components shall meet current VOC regulatiotablish t e State
in which they are being installed; and stating total VOC content, in g ms p all system
components (i.e., primers, adhesives, coatings, etc.)
DELIVERY, STORAGE AND HANDLING: 0
A. Deliver all coating materials to the site in rigillal contai ei lvith fact Is intact.
Store all pail goods in their originalVk
specified temperature range.
Do not expose materials to moisiii% any f
Reject delivery of materials that show evidQ!
B
C
D
E
Remove manufacturer supplied plastic
"breathable" type covers such as canvas
Pii
weather and mois e. Cover and protVt mE
any protective tarpaulins until imm dj' tely
Materials shall be stored abol�5O°F (10°C)
location within their
delivery to the site.
RLeN',%Kfi such. Use
fftcl protection from
W workday. Do not remove
be installed.
ours prior to application.
PROJECT CONDITIONS: V.
A. Weather: �
1. Proceed with c g only �5cistin rrecasted weather conditions permit.
1.9
E
1.11 W.
2. Coating "
humiYleVe
temp ►r�uJ��s
3. It l recdl ME
!i ion ca whe am P . nt temperatures are above 50°F (10°C),
are low ovided the ambient air and substrate
ire . . of 5the dew point.
id d t over ght peratures be above 40°F (10°C) when applying the
onsult with anufacturer for cold weather installation procedures
peratures are expected to fall below the minimums established herein.
ve the coating shall be free from visible water, dew, frost, snow, and ice.
�ating should be conducted in well ventilated areas.
N9ce life, do not expose coating to a constant temperature below -58°F (-50°C) or in
76°F (80°C) (i.e., hot pipes and vents or direct steam venting, etc.).
A. Provide contractor's 2-year labor warranty and manufacturer's 10 year material warranty.
PART 2 PRODUCTS
2.01 ACCEPTABLE MANUFACTURER:
A. KARNAK
1. 330 Central Avenue Clark, NJ 07066 - 800-526-4236
Fax 732-388-9422 • www.karnakcorp.com
FAYONC22.00 Liquid Applied Flashing
City of Fayetteville
Water & Sewer + Recycling & Trash 07 5600 - 2 09-19-2023
Roof Maintenance
2. Substitutions: See Section 01 6000-Product Requirements.
2.02 PRODUCTS:
A. 502MS Karna-Flex (Karns -Flex): A single component, SEBS thermoplastic rubber sealant for
use in sealing seams, around penetrations and fasteners. Karna-Flex has superior adhesive
and cohesive strength and forms a durable, water-resistant membrane. It's specially selected
polymer blend imparts superior low temperature flexibility.
a. Weight per Gallon: 9.48 lbs.
b. Solids by Weight: 66%, Nominal
c. Solids by Volume: 57%, Nominal
d. Color: White, Black, Gray
e. Elongation: 913%, Nominal ASTM D 412
f. Tensile Strength: 168 PSI, Nominal ASTM D412
g. Reflectance:
D 28
h. ASTM D 2824 (White)
i. Accelerated
j. Weathering: Pass/No Cracks - ASTM G155 after 1,000 o'
k. Firm Set: Pass — ASTM D 2939 ` v
I. Resistance to
m. Water: Pass — ASTM D2939
n. Firm Set: Pass — ASTM D 2939 24s q�7 1^d 50% e i e Humidity
o. Application Temp.: 40°F tg•120°F `
p. Service Temp (Cured Film): -VVF to 18 O
B. 502 RC-W Elasto-Kote: A high) elj�and r I SEBS r ber coating exhibiting
outstanding color stability an �therabi ' coati a s exc nt elongation
properties making it ideal f ing me syst •►
a. Weight per Gal n: 8 lbs.
b. Solids by W g: 4%, N i
c. Solids b e: 4 °° nal
d. Color: W e, Gray h an, P reen, R
e. Hardness, Shore A.
f. Elongation: 7 5%, Nominal J►
g. ASTM D 7*1 •
h. Tensile St the 1,18 omin@I G
i. ASTAID 0 �✓
j. �Pility:0.01l
k. WUs):
sor o • ��
I. (7 0.40
ure Time. 2 to 24 hou�70F
nd ° �tive
Hu
p. A i ion Temp.: 40o F to 1200 F.
q. e ce Temp
r. red Film): -150F to 180°F
C. c ent: 5540 6" Resat -Mat (Resat -Mat)
Na. Weight: 3.0 oz. per yd2
b. Elongation: 62% ASTM D1682t
c. Tear Strength
d. (Trapezoidal): 16 lbs. ASTM D1117
e. Mullen Burst: 177 lbs. ASTM D3786
f. Tensile Strength: 57 lbs. ASTM D1682
D. Roof Cleaner: 799 Wash-N-Prep Roof Cleaner
FAYONC22.00
Liquid Applied Flashing
City of Fayetteville
Water & Sewer + Recycling & Trash 07 5600 - 3 09-19-2023
Roof Maintenance
PART 3 EXECUTION
3.01 INSPECTION:
A. Verify that the surfaces and site conditions are ready to receive work.
B. Verify that the deck is supported and secured.
C. Verify that the deck is clean and smooth, free of depressions, waves, or projections, and
properly sloped to valleys, eaves, or gutters.
D. Verify that the deck surfaces are dry and free of ice or snow.
E. Verify that all roof openings or penetrations through the roof are solidly set.
PREPARATION GUIDELINES:
A. All fasteners in areas to seal should be replaceed with larger fasteners.vA as ners mun
include a neoprene washer.
B. The roof areas to seal should be power washed maintaining a mini ssure f ( si of
working pressure with clean water and in addition with 799 Wash - This s r move
dirt, dust, and waste products, i.e., grease, animal fats, solvents, to roofirili6p c s and
any air borne pollutants.
C. Rusted through panels or sections must be replaced with etal. N m al should be
allowed to age exposed for 30 days. y_
D. Heavily rusted areas must be wired brusJdown t stable nd all surface rust
must be removed. ``''
E. Adhesion tests should be perfor r all v r urfaces
F. Remove any coatings or ce t com a ith produc
•
G. Remove or grind down an nt and/ ings pre^ AK products from
completely sealing the
H. Any damaged co such brane, fl ngs, do dg , etc. that are not repairable
must be replaced. ►
FASTENER SEALING G
A. All fasteners in areas sea�must recA�e� dollopL"oat) of Karna-Flex. Allow to cure 1-2
days before applyin r fl iv coati g�.
CURB FLASHINGS & PE RATION
A. A. All curbgs and tions sh Id sealed using 6" wide 5540 Resat -Mat and
502MS Ka PMP. �Iex
�
`;�
B. Apply ��/16 yer of�ar o 19- base of the curb flashing and extend a minimum of
6" ovt I n�.the roof al d 6" verticalohe curb. Apply Karna-Flex using a 3" or 4" 'chip type'
h`
C. 'I till we&'q*e?diately embed 12" wide Resat -Mat into the wet Karna-Flex. Brush Resat -
Mat o sm99�A� and removed any wrinkles or fishmouths. Overlap side -laps and end -laps of
fabric 2". uEabric over all fasteners to prevent tenting so the fabric lies completely flat into
the sea.
D. I second and final application of Karna-Flex over the embedded Resat -Mat. Apply at an
av ge thickness of 1/16" to completely cover the Resat -Mat, feathering out the Karna-Flex on
to the roof surface. No fabric should be visible.
E. Encapsulate all fasteners with a dollop of Karna-Flex.
F. Allow all repairs to cure 1-2 days before applying reflective finish coat.
HORIZONTAL & VERTICAL SEAMS, PENETRATIONS AND SKYLIGHT CURB FLASHING:
A. A. Make sure all flanges are securely fastened to the roof before sealing.
FAYONC22.00 Liquid Applied Flashing
City of Fayetteville
Water & Sewer + Recycling & Trash 07 5600 - 4 09-19-2023
Roof Maintenance
B. All horizontal and vertical seams, penetrations and flashings should be sealed using Karna-Flex
and 5540 6" Resat -Mat in a three -course application. Karna-Flex should be brushed on in an 8"
inch width over the seam approximately 1/16" thick. Embed Resat -Mat wet sealant immediately
brushing in to ensure complete saturation. Brush apply another coat of Karna-Flex to complete
the three -course application.
C. Allow repairs to cure 1-2 days before applying reflective coating.
REFLECTIVE ELASTOMERIC FINISH COATING
A. Application of reflective elastomeric finish coating over applied Karna-Flex should take place
when temperatures are 50OF - 100°F and humidity levels are 85% or less and dew point is
minimum of YF above the ambient air and substrate temperature.
B. Apply one 502 RC-W Elasto-Kote over all applied Karna-Flex at the rate of gallons per 00
sq. ft. (24 wet mils).
C. Allow reflective elastomeric finish coating to cure 24 hours before ex� rain or
8.02 CLEAN-UP:
A. All work areas are to be kept clean, clear, and free of debris at all
B. Do not allow trash, waste, or debris to collect on the roof. These4tems a �er moved from
the roof on a daily basis.
C. All tools and unused materials must be collec d at the en�Ta'f each w r a and stored
properly off the finished roof surfac protectedrl�,Kosure lements.
D. Dispose of or recycle all trash and matey' in 'Fran r rming to current EPA
regulations and local laws.
E. Properly clean the finished rgd Lwface afi leti makeu e drains and gutters
are not clogged. �J `
F. Clean and restore all d d surf heir onditio
F
a DF S CTIO
a►
P
G o
FAYONC22.00
Liquid Applied Flashing
City of Fayetteville
Water & Sewer + Recycling & Trash 07 5600 - 5 09-19-2023
Roof Maintenance
Bid 23-41, Addendum 1
Date: Friday, September 29, 2023
To: All Prospective Vendors
CITY OF
_ FAYETTEVILLE
ARKANSAS
From: Amanda Beilfuss — 479.575.8220 — abeilfuss@fayetteville-ar.gov
RE: Bid 23-41, Construction — RTC Transfer Station & Water Sewer Roof Rehab
This addendum is hereby made a part of the contract documents to the same extent as though it were originally
included therein. Interested parties should indicate their receipt of same in the a priate bla the Bid.
BIDDERS SHALL ACKNOWLEDGE THIS ADDENDUM ON THE DESIGNATED LOCATIO E BIDNO
'014 N .1.,n
Pre -bid meeting location has changed. The pre -bid me ting will still be hed on u ay, October 5th, 2023 at
2:00 PM but will be located in the Conference Room at ater/SN Divisi
Water/Sew t enanc?'�� lon O
2 ustri V
evllle, 01
P
O a.
City of Fayetteville, AR
Bid 23-41, Addendum 1
Page 111
Telecommunications Device for the Deaf TDD (479) 521-1316 113 West Mountain -Fayetteville, AR 72701
Bid 23-41, Addendum 2
Date: Thursday, October 19, 2023
To: All Prospective Vendors
CITY OF
V_ FAYETTEVILLE
4W ARKANSAS
From: Amanda Beilfuss — 479.575.8220 — abeilfuss@fayetteville-ar.gov
RE: Bid 23-41, Construction — RTC Transfer Station & Water Sewer Roof Rehabilitation
This addendum is hereby made a part of the contract documents to the same extent as though it were originally
included therein. Interested parties should indicate their receipt of same in the ap priate bla the Bid.
CBIDDERS SHALL ACKNOWLEDGE THISADDENDUM ON THE DESIGNATED LOCH Zl E BlD
1. A non -mandatory Pre -Bid meeting was held in the Conference Room ofV�i
of al&i le's
Water/Sewer Department on Thursday, October 5, 2023 at 2:00 PM. 4e sign-i of attendees is
also attached for disclosure to all interested partie�
a. Attendees:
i. City of Fayetteville: O
1. Kenny Fitch, Purcha ent
2. Les McGaugh, P g Dir o�
3. Quin Thom s ilities er
p g �
4. Wade Aber a Bonds ons r t ire r X
5. Aaron Wate S er 0 t s M na r
6. Ben rc E chite s
ii. Vendors: �"
1. John oo Ing
2. M2R f Collinsns
3. TF Thl
tXson RoNX:
O
I
2. Questions: The f61111owi cluestig�iave n ed and answered by the responsible department:
a. Que es t e actor nee course every rib?
o�
nswer• only areas that are to require the "3-coursing" which is requested on page 2,
line i nder scope of work within the drawings are the horizontal seams at panel laps,
a and penetrations, as well as where seams occur at the roof perimeter where metal
ngs are present. Liquid applied fleshings are not required on the standing seams.
b. Question: Is the Contractor to install base and top -coat of coating over entire roof or just treat
seams only?
i. Answer: The liquid applied flashing is only required at roof penetrations and lapped seams.
City of Fayetteville, AR
Bid 2 3- 4 1, Addendum 2
Page 112
Telecommunications Device for the Deaf TDD (479) 521-1316 113 West Mountain -Fayetteville, AR 72701
c. Question: On the water and sewer metal roof on the Southwest parapet wall there are
corrugated metal panels. How wide are the existing panels?
i. Answer: Vertical seams at these locations are not required to receive the liquid applied
flashing.
d. Question: Where the metal roof meets the adjacent roof that is not in scope, will the rise wall
seams be part of the scope of work as well?
i. Answer: No, the vertical panels are not part of the scope. At these locations, only the flat
non -seamed laps of the roof to wall trim are to receive the liquid applied flashing.
City of Fayetteville, AR
Bid 2 3- 4 1, Addendum 2
Page 212
Telecommunications Device for the Deaf TDD (479) 521-1316 113 West Mountain -Fayetteville, AR 72701
CITY OF
FAYETTEVILLE
ARKANSAS
Name
1
2
3
4
S
6 1564 Ccr v[,c
7
8
9
10
11
12
13
14
15
16
17
18
19
NO
City of Fayetteville, Arkansas
Attendance Sheet
FP/RFQ #:_,::713 - 41
Description:1n 'y(\'&l6fl — R"C(:, 1S� Q ao, 321tie--1-
n
Function (circle one) : Bid Opening, Selection Committee Meetin Pre-B n erview R ReVkA_b
Date:_/ 0 5 Time: CQ� ity tall e-mail includes "@faye!r eville-ar.gov"
Company Title hon Email
P Y e/1 V
"' All Bid Openings are also streamed live on the City of Fayetteville's YouTube Channel.
32dd3
,4-�fo-9232,
lµ of
j wlcjn @Mzi2C4r-„s'67 -cars-,
cG 1 ' Cak �aX4,
092
CITY OF
VA FAYETTEVILLE
ARKANSAS
Bid 23-41 Addendum 2
Trumble Construction
Supplier Response
Event Information
Number: Bid 23-41 Addendum 2
Title: Construction - RTC Transfer Station & Water Sewer Roof Rehab
Type: Invitation to Bid
Issue Date: 9/24/2023
Deadline: 10/24/2023 02:00 PM (CT)
Notes: The City of Fayetteville is accepting sealed bids from properly
licensed firms for the alteration of the two (2) existing standing seam
metal roofs located at the Fayetteville Recycling & Trash Transfer
Station and at Fayetteville's Water and Sewer Operations Center.
Questions regarding this bid should be addressed to Amanda
Beilfuss, Sr. Purchasing Agent at abeilfuss(a)fayetteville-ar.gov.
Contact Information
Contact: Amanda Beilfuss - Sr. Purchasing Agent
Address: Purchasing
City Hall
Room 306
113 W. Mountain St.
Fayetteville, AR 72701
Email: abeilfuss@fayetteville-ar.gov
Page 1 of 3 pages Vendor: Trumble Construction Bid 23-41 Addendum 2
Trumble Construction Information
Address: 1944 Clear Springs Road, Texarkana, TX, USA
TEXARKANA, TX 75501
Phone: (903) 278-0975
By submitting your response, you certify that you are authorized to represent and bind your company.
Robert Trumble
Signature
Submitted at 1012412023 08:38:26 AM (CT)
uested Attachments
Bid 23-41, Bid Bond
contracts@trumbleconstruction.com
Email
Please attach a signed and completed copy of your bid bond. Bid bonds in the form of a cashier's check shall be
delivered to City Hall, Purchasing Division before bid deadline and have a copy of the cashier's check uploaded with
submittal.
Bid 23-41, Required Signature Forms
Bid 23 41 Construction RTC
Transfer Station Roof Rehab
Trumble Construction Inc
Proposal.pdf
Please attach your completed forms. These documents can be found in the Project Manual or as a convenience file in
the 'Attachments' tab titled File #00.
Bid Attributes
1
Arkansas Secretary of State Filing Number:
800088382
2
Arkansas Contractor License Number:
0162670524
3
Check Yes or No:
Pursuant Arkansas Code Annotated §25-1-503, the Contractor agrees and certifies that they do not currently
boycott Israel and will not boycott Israel during any time in which they are entering into, or while in contract,
with any public entity as defined in §25-1-503. If at any time during contract the contractor decides to boycott
Israel, the contractor must notify the contracted public entity in writing.
2 Yes, I agree
❑ No, I don't agree
4
Check Yes or No:
Pursuant Arkansas Code Annotated §25-1-1002, the Contractor agrees and certifies that they do not currently
boycott Energy,
Fossil Fuel, Firearms, and Ammunition Industries during any time in which they are entering into, or while in
contract, with any
public entity as defined in §25-1-1002. If at any time during the contract the contractor decides to boycott Energy,
Fossil Fuel,
Firearms, and/or Ammunition Industries, the contractor must notify the contracted public entity in writing.
2 Yes, I agree
❑ No, I don't agree
Page 2 of 3 pages Vendor: Trumble Construction Bid 23-41 Addendum 2
5 Addendum Acknowledgement:
By selecting "I agree", you acknowledge that you have read and understand any addendums that have been issued
for this bid.
2 1 agree
Bid Lines
1 Bonds and Insurance
Quantity: 1 UOM: Lump Sum Price: $1,287.00 1 Total: $1,287.00
2
Mobilization
- Shall not exceed 5% of Total Base Bid
Quantity: 1
UOM: Lump Sum
Price:
$4,058.00
Total:
1 $4,058.00
3
Total Base Bid - DO NOT INCLUDE PRICING FOR MOBILIZATION OR BONDS AND INSURANCE IN THIS
LINE ITEM
Quantity: 1 UOM: Lump Sum Price: $75,827.00 1 Total: $75,827.00
Item Notes: This bid is being bid as a total lump sum. This line item shall include the total construction price for the
entire scope of work for this bid.
Response Total: $81,172.00
Page 3 of 3 pages Vendor: Trumble Construction Bid 23-41 Addendum 2
CITY OF FAYETTEVILLE, ARKANSAS:
BID 23-41, CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER ROOF REHAB
SECTION 04
BID BOND
KNOW ALL MEN BY THESE PRESENTS: that we
Trumble Construction, Inc. dba RBT Construction
1944 Clear Springs Rd.
Texarkana, TX 75501
as Principal, hereinafter called the Principal, and
Liberty Mutual Insurance Company
2255 Ridge Road, Ste 333
Rockwall, TX 75087
a corporation duly organized under the laws of the State of Massachusetts
called Surety, are held and firmly bound unto
City of Fayetteville, Arkansas
113 West Mountain Street
Fayetteville, Arkansas 72701
as Surety, hereinafter
as Obligee, hereinafter called Owner, in the sum of Five Percent of the Greatest Amount Bid
Dollars ($ 5% GAB ), for the payment of which sum, well
and truly to be made, Principal and said Surety, bind ourselves, our heirs, executors, administrators, successors
and assigns, jointly and severally, firmly by these presents.
WHEREAS, Principal has submitted a Bid for:
BID 23-41, CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER ROOF REHAB
NOW, THEREFORE, if the Owner shall accept the Bid of Principal and the Principal shall enter into a Contract with
the Owner in accordance with the terms of such Bid, and give such Bond or Bonds as may be specified in the
Bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract
and for the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the
failure of Principal to enter such Contract and give such Bond or Bonds, if the Principal shall pay to the Owner
the difference not to exceed the penalty hereof between the amount specified in said Bid and such larger
amount for which the Owner may in good faith contract with another party to perform the Work covered by
said Bid, then this obligation shall be null and void, otherwise to remain in full force and effect.
BID BOND
1
CITY OF FAYETTEVILLE, ARKANSAS:
BID 23-41, CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER ROOF REHAB
Signed and sealed this 24th day of
PRINCIPAI
October 20 23
Trumble Construction, Inc. dba RBT Construction
By
SURETY
Liberty M tual I I ance Company
By �_ W.
Jade Porter, Attornev-i n -Fact
ATTORNEY -IN -FACT
Jade P rter, 1AttoqApyjffact
— � i I - 1�' � tN
Ivall
(This Bondbe accompanied with
Attorney-in-Fact's authority from Surety)
END OF SECTION 04
BID BOND
2
(CORPORATE SEAL)
`111111111111IIIII
Gonstrucr�o•�'',
v m _
SEAL
2p06
1011111100
(CORPORATE SEAL)
This Power of Attorney limits the acts of those named herein, and they have no authority to
bind the Company except in the manner and to the extent herein stated.
r
Liberty Mutual Insurance Company
The Ohio Casualty Insurance Company
West American Insurance Company
SURETY
POWER OF ATTORNEY
Certificate No: 8205285-022082
KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire, that
Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly organized
under the laws of the State of Indiana (herein collectively called the "Companies"), pursuant to and by authority herein set forth, does hereby name, constitute and appoint, Jack
Nottingham Jade Porter Jay Jordan Jeremy Barnett- Johnny Moss; Mistie Beck Robert G. Kanuth Robert J. Shuya; Tony Fierro
all of the city of Rockwall state of TX each individually if there be more than one named, its true and lawful attorney -in -fact to make,
execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations, in pursuance
of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper
persons.
IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed
thereto this 15th day of April , 2021 .
to
a)
a)
c
fu
M State of PENNSYLVANIA
amr„ County of MONTGOMERY ss
Liberty Mutual Insurance Company
P� 1NSUO? P�1v INS& 1NSUgq The Ohio Casualty Insurance Company
1 �� 4oNPORgr Lc, y.`oaPORgrR9y �VPooNP0`�rFyo West American Insurance Company
r mo 1n u� 3 Fo m a s o�
Z 1912 0 1919 s 1991
Y S y 0 Z ry O Q O
~dJl9SSACHUS.dD SO hAMP6D� `(S �NDIANP' .da GL 7:
f.d" jr
David M. Carey, Assistant Secretary
- On this 15th day of Aril , 2021 before me personally appeared David M. Care who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance
,� � y p P Y PP Y, 9 ry rtY
o m Company, The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do, execute the foregoing instrument for the purposes
0) > therein contained by signing on behalf of the corporations by himself as a duly authorized officer. >
a)m
:3 IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at King of Prussia, Pennsylvania, on the day and year first above written.
ca o � PASS
�s 4nnes Ulf �'. Commonwealth of Pennsylvania -Notary Seal
O Teresa Pastella, Notary Public
i�� N
�' " �' Montgomery County
p a) �'F My commission expires March 28, 2025 B �(
v Commission number 1126044 y'
, eresa Pastella, NotaryPublic
N }, �� ,Syy $^ Member, Pennsylvania Association of Notaries
N5D aT&WY
00 This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company, Liberty Mutual Insurance
•� Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows: Ct_
ARTICLE IV— OFFICERS: Section 12. Power of Attorney. b
@ Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such limitation as the Chairman or the President
may prescribe, shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety any and all
> C undertakings, bonds, recognizances and other surety obligations. Such attorneys -in -fact, subject to the limitations set forth in their respective powers of attorney, shall have full
o power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so executed, such instruments shall
Z c0i be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attomey-in-fact under the provisions of this LO
article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority. tL
ARTICLE XIII — Execution of Contracts: Section 5. Surety Bonds and Undertakings.
Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe,
shall appoint such attomeys-in-fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings,
bonds, recognizances and other surety obligations. Such attorneys -in -fact subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the
Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as if
signed by the president and attested by the secretary.
Certificate of Designation — The President of the Company, acting pursuant to the Bylaws of the Company, authorizes David M. Carey, Assistant Secretary to appoint such attorneys -in -
fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety
obligations.
Authorization — By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the
Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shall be valid and binding upon the Company with
the same force and effect as though manually affixed.
I, Renee C. Llewellyn, the undersigned, Assistant Secretary, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company do
hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy of the Power of Attorney executed by said Companies, is in full force and effect and
has not been revoked. Y(,l r
IN TESTIMONY WHEREOF, I have hereunto s9t fny hand and affixed the seals of said Companies this day of
INSUR 111 INS&p � 1NSUR
j �4&PORgro'% , �JQ'4oNPo�l uqy- Q' `Orn
RPURgrG'L�tN
F F
4912 h o 1919 0 2 1991 0
C By rd�9s'rgCNUS" .d ' y� Z"hg MpS�D30 `�s �NptANP ,aD Renee C. Llewellyn, Assistant Secretary
LMS-12873 LMIC OCIC WAIC Multi Co 02/21
Bid 23-411
Construction —
RTC Transfer
Station &
Water Sewer
Roof Rehab
Proposal
;_.:._:
MMF
1
Q w ,
i l9r7ua�
'Il
1944 CLEAR SPRINGS RD.
TEXARKANA.TX 75501
903-691 -0931
BID 23-41, CONSTRUCTION - RTC TRANSFER STATION & WATER SEWER
5MOI01 a ILI 4 ■_C 'C•'•
TABLE OF CONTENTS
Section
1. Bid Form / Acknowledgement of Amendments
2. Contractor References
3. Bid Bond
4. Reference Letters
5. SAMPLE COI, BID BOND REFERENCE LETTER & BANK REFERENCE LETTER
A
ROOF REHAB — BID 23-41
1944 CLEAR SPRINGS RD.
TEXARKANA.TX 75501 CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER
903-691 -0931
Section 1— Bid Form / Acknowledgement of Amendments
CITY OF
P_ FAYETTEVILLE
49W ARKANSAS
Project Check List
This checklist is for the Bidder's use in preparing & submitting a bid. It is not intended to include all details necessary to prepare a
bid and shall not be used as a substitute for the requirements of the bid documents. Use of this checklist does not relieve the Bidder
from the responsibility of meeting all requirements of the Specifications concerning the preparation of an acceptable bid. Bidders
are welcome to use this form as a coversheet for a sealed envelope; however, using this form itself is NOT a requirement.
5% Bid Bond of the amount bid accompanied by required documentation (Power of Attorney, etc.)
o In lieu of a bid bond, the bidder may submit a cashier's check from a bank located in the State of Arkansas for at
least five percent (5%) of the amount bid (inclusive of any deductive alternates). Cashier's checks shall be made
payable to the City of Fayetteville, AR and received prior to the bid deadline by making an in -person delivery
appointment with the City Purchasing Division.
All addenda shall be signed, acknowledged, and submitted on the appropriate forms (submitting the actual addendums
x or marking acknowledgement on other bid pages).
All line items shall be appropriately filled out and extended to reveal the line item price as well as the total bid price.
1_x Total base bid should be calculated in the provided space.
All pages provided with signature lines shall be appropriately signed, dated accordingly, and included with submitted bid
F I documents
All bids shall be received before the stated deadline utilizing the City's electronic bidding platform or submitting a physical
F
sealed bid to the City Purchasing Division. Submitting a bid electronically is strongly encouraged. A public bid opening
will be conducted shortly after the deadline at City Hall and livestreamed at
https://www.youtube.com/user/cityoffayettevillear. Late or misdirected bids shall not be accepted. The City of
Fayetteville shall not be responsible for lost or misdirected bids, or failure of bidders technical equipment. If submitting
a physical bid, all bid documents shall be delivered in a sealed envelope to the address stated in the advertisement or
updated deadline issued via Addenda. All bids should be delivered with the name of the bidder (contractor) on the sealed
envelope as well as the bidders Arkansas Contractor's License Number.
Additional Information Required:
x • List of Subcontractors: Submit form on bidding platform or attach if submitting a physical bid.
• AR Secretary of State Filing #: 800088382 OR submit electronically.
• Arkansas Contractor License #: 0162670524 OR submit electronically.
• Pursuant Arkansas Code Annotated §25-1-503, the Contractor agrees and certifies that they do not currently
boycott Israel and will not boycott Israel during any time in which they are entering into, or while in contract,
with any public entity as defined in §25-1-503. If at any time during contract the contractor decides to boycott
Israel, the contractor must notify the contracted public entity in writing.
o Submit electronically or circle applicable answer: YES or NO
Pursuant Arkansas Code Annotated §25-1-1002, the Contractor agrees and certifies that they do not currently
boycott Energy, Fossil Fuel, Firearms, and Ammunition Industries during any time in which they are entering
into, or while in contract, with any public entity as defined in §25-1-1002. If at any time during the contract the
contractor decides to boycott Energy, Fossil Fuel, Firearms, and/or Ammunition Industries, the contractor must
notify the contracted public entity in writing.
o Submit electronically or circle applicable answer: YES or NO
Telecommun,cat*ns Device for the Deaf TDD (479) 521-1316 113WOM Mountain - Fayetteville. AR 72701 11
CITY OF FAYETTEVILLE, ARKANSAS:
BID 23-41, CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER ROOF REHAB
SECTION 02
BID FORM
*NAME OF FIRM: Trumble Construction Inc
Purchase Order/Payments shall be issued to this name
*D/B/A or Corporation Name RBT Roofing
*BUSINESS ADDRESS: 1944 Clear Springs Rd
*CITY: Texarkana
*PHONE: 903-691-0931
*E-MAIL: contracts@trumbleconstruction.com
UNIQUE ENTITY NUMBER: LFTTUSCLFDB5
*TAX ID NUMBER: 20-4273030
*STATE: TX *ZIP: 75501
FAX: 903-334-9580
CAGE NUMBER: 6CD16
AR CONTRACTORS LICENSE #: 0162670524
Bidder acknowledges receipt of the following addendum:
Addendum No. 1
Addendum No. 2
Addendum No.
Addendum No.
Dated: 09/29/2023 Acknowledged by: Robert Trumble - President
Dated: 10/19/2023 Acknowledged by: Robert Trumble - President
Dated: Acknowledged by:
Dated: Acknowledged by:
Total Completion Time and Liquidated Damages Including Alternative: Substantial completion shall be 45
consecutive calendar days from the date established in a written notice to proceed. Final completion shall be 15
days after substantial completion. The bidder must agree also to pay as liquidated damages, the sum of $100.00
for each consecutive calendar day thereafter.
The bidder understands that the Owner reserves the right to reject any or all bids and to waive any informalities
in the bidding.
The bidder agrees that this bid shall be good and may not be withdrawn for a period of 60 calendar days after
the bid opening.
BID FORM
1
CITY OF FAYETTEVILLE, ARKANSAS:
BID 23-41, CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER ROOF REHAB
In compliance with the Instructions to Bidders and other Contract Documents, the undersigned submits the
following names of Subcontractors to be used in performing the Work for:
BID 23-41, CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER ROOF REHAB
Bidder certifies that all Subcontractors listed are eligible to perform the Work.
Subcontractor's Work Subcontractor's Name
and Address
MECHANICAL: N/A
PLUMBING: N/A
N/A
ELECTRICAL:
ROOFING AND SHEET METAL: N/A (Self Performing)
Other (designate) N/A
Expected Percentage
or Value
N/A
N/A
N/A
r\I /A
Upon receipt of written notice of acceptance of this bid, bidder will execute the formal contract attached within
10 days and deliver a Surety Bond or Bonds as required by the General Conditions.
The bid security attached in the sum of $ (5% of Greatest Amount Bid) is to become
the property of the Owner in the event the contract and bond are not executed within the time set forth above,
as liquidated damages for the delay and additional expense to the Owner caused thereby.
*BY: (PRINTED NAME) Robert Trumble
*AUTHORIZED SIGNATURE:
*TITLE: President
BID FORM
2
Bid 23-41, Addendum 1
Date: Friday, September 29, 2023
To: All Prospective Vendors
CITY OF
_ FAYETTEVILLE
ARKANSAS
From: Amanda Beilfuss — 479.575.8220 — abeilfuss@fayetteville-ar.gov
RE: Bid 23-41, Construction — RTC Transfer Station & Water Sewer Roof Rehab
This addendum is hereby made a part of the contract documents to the same extent as though it were originally
included therein. Interested parties should indicate their receipt of same in the appropriate blank of the Bid.
BIDDERS SHALL ACKNOWLEDGE THIS ADDENDUM ON THE DESIGNATED LOCATION ON THE BID FORM.
1. Pre -bid meeting location has changed. The pre -bid meeting will still be held on Thursday, October 5th, 2023 at
2:00 PM but will be located in the Conference Room at the Water/Sewer Division.
Water/Sewer Maintenance Division
2435 Industrial Dr.
Fayetteville, AR 72701
Acknowledgment of Addendum:
Robert Trumble - President
09/29/2023
City of Fayetteville, AR
Bid 2 3- 4 1, Addendum 1
Page 111
Telecommunications Device for the Deaf TDD (479) 521-1316 113 West Mountain -Fayetteville, AR 72701
Bid 23-41, Addendum 2
Date: Thursday, October 19, 2023
To: All Prospective Vendors
CITY OF
V_ FAYETTEVILLE
4W ARKANSAS
From: Amanda Beilfuss — 479.575.8220 — abeilfuss@fayetteville-ar.gov
RE: Bid 23-41, Construction — RTC Transfer Station & Water Sewer Roof Rehabilitation
This addendum is hereby made a part of the contract documents to the same extent as though it were originally
included therein. Interested parties should indicate their receipt of same in the appropriate blank of the Bid.
BIDDERSSHALL ACKNOWLEDGE THISADDENDUM ON THE DESIGNATED LOCATION ON THE BID FORM.
1
A non -mandatory Pre -Bid meeting was held in the Conference Room of the City of Fayetteville's
Water/Sewer Department on Thursday, October 5, 2023 at 2:00 PM. The sign -in sheet of attendees is
also attached for disclosure to all interested parties.
a. Attendees: Acknowledgment of Addendum:
i. City of Fayetteville: Robert Trumble - President
1. Kenny Fitch, Purchasing Agent 10/19/2023
2. Les McGaugh, Purchasing Director
3. Quin Thompson, Facilities Manager
4. Wade Abernathy, Bonds and Construction Director
5. Aaron Watkins, Water/Sewer Operations Manager
6. Ben Cruce, Architect — WER Architects
ii. Vendors:
1. John Collins Roofing
2. M2 Roofing
3. TF Thompson Roofing
2. Questions: The following questions have been received and answered by the responsible department:
a. Question: Does the Contractor need to three course every rib?
i. Answer: The only areas that are to require the "3-coursing" which is requested on page 2,
line item 2 under scope of work within the drawings are the horizontal seams at panel laps,
at curbs and penetrations, as well as where seams occur at the roof perimeter where metal
fleshings are present. Liquid applied fleshings are not required on the standing seams.
b. Question: Is the Contractor to install base and top -coat of coating over entire roof or just treat
seams only?
i. Answer: The liquid applied flashing is only required at roof penetrations and lapped seams.
City of Fayetteville, AR
Bid 2 3- 4 1, Addendum 2
Page 112
Telecommunications Device for the Deaf TDD (479) 521-1316 113 West Mountain -Fayetteville, AR 72701
In 900
'II
1944 CLEAR SPRINGS RD.
TEXARKANA.TX 75501
903-691 -0931
Section 2 — Contractor References
ROOF REHAB — BID 23-41
CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER
CITY OF FAYETTEVILLE, ARKANSAS:
BID 23-41, CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER ROOF REHAB
Section 03
CONTRACTOR REFERENCES
The following information is required from all Bidders so all bids may be reviewed and properly evaluated:
COMPANY NAME: Trumble Construction Inc RBT Roofing
NUMBER OF YEARS IN BUSINESS: 21
HOW LONG IN PRESENT LOCATION: 6 years
TOTAL NUMBER OF CURRENT EMPLOYEES: 74
FULLTIME 0 PART TIME
NUMBER OF EMPLOYEES PLANNED FOR THIS CONTRACT:
6 FULLTIME 0 PARTTIME
PLEASE LIST FOUR (4) REFERENCES THAT YOU HAVE PREVIOUSLY PERFORMED SIMILAR CONTRACT SERVICES FOR WITHIN
THE PAST FIVE (5) YEARS (All fields must be completed):
1. USPS Jersey City International NDC
2. NAVFAC Port Hueneme Buildings 1423 and 1000
COMPANY NAME
COMPANY NAME
Jersey City, NJ 07097
Port Hueneme, CA 93041
CITY, STATE, ZIP
CITY, STATE, ZIP
George Forst
Amna Chaudhry
CONTACT PERSON
CONTACT PERSON
201-714-6202
805-989-4890
TELEPHONE
TELEPHONE
08/21/2023
09/30/2021
DATE COMPLETED
DATE COMPLETED
George.e.forst@usps.gov
amna.t.chaudhry.civ@us.navy.mil
E-MAIL ADDRESS
E-MAIL ADDRESS
3. Morse Federal Court House
4. USPS Philadelphia, PA NDC
COMPANY NAME
COMPANY NAME
Eugene, OR 97401
Philadelphia, PA 19116
CITY, STATE, ZIP
CITY, STATE, ZIP
Kimberly Johnson
Jonathan Maschak
CONTACT PERSON
CONTACT PERSON
253-709-7780
724-776-6233
TELEPHONE
08/18/2021
DATE COMPLETED
kimberlym.johson@gsa.gov
a A 0\IWTI H0]:1w
TELEPHONE
08/31/2021
DATE COMPLETED
Jonathan.e.maschak2@usps.gov
E-MAIL ADDRESS
CONTRACTOR REFERENCES
1
AE�n�
1944 CLEAR SPRINGS RD.
TEXARKANA.TX 75501
903-691-0931
Section 3 — Bid Bond
ROOF REHAB — BID 23-41
CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER
CITY OF FAYETTEVILLE, ARKANSAS:
BID 23-41, CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER ROOF REHAB
SECTION 04
BID BOND
KNOW ALL MEN BY THESE PRESENTS: that we
Trumble Construction, Inc. dba RBT Construction
1944 Clear Springs Rd.
Texarkana, TX 75501
as Principal, hereinafter called the Principal, and
Liberty Mutual Insurance Company
2255 Ridge Road, Ste 333
Rockwall, TX 75087
a corporation duly organized under the laws of the State of Massachusetts
called Surety, are held and firmly bound unto
City of Fayetteville, Arkansas
113 West Mountain Street
Fayetteville, Arkansas 72701
as Surety, hereinafter
as Obligee, hereinafter called Owner, in the sum of Five Percent of the Greatest Amount Bid
Dollars ($ 5% GAB ), for the payment of which sum, well
and truly to be made, Principal and said Surety, bind ourselves, our heirs, executors, administrators, successors
and assigns, jointly and severally, firmly by these presents.
WHEREAS, Principal has submitted a Bid for:
BID 23-41, CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER ROOF REHAB
NOW, THEREFORE, if the Owner shall accept the Bid of Principal and the Principal shall enter into a Contract with
the Owner in accordance with the terms of such Bid, and give such Bond or Bonds as may be specified in the
Bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract
and for the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the
failure of Principal to enter such Contract and give such Bond or Bonds, if the Principal shall pay to the Owner
the difference not to exceed the penalty hereof between the amount specified in said Bid and such larger
amount for which the Owner may in good faith contract with another party to perform the Work covered by
said Bid, then this obligation shall be null and void, otherwise to remain in full force and effect.
BID BOND
1
CITY OF FAYETTEVILLE, ARKANSAS:
BID 23-41, CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER ROOF REHAB
Signed and sealed this 24th day of
PRINCIPAI
October 20 23
Trumble Construction, Inc. dba RBT Construction
By
SURETY
Liberty M tual I I ance Company
By �_ W.
Jade Porter, Attornev-i n -Fact
ATTORNEY -IN -FACT
Jade P rter, 1AttoqApyjffact
— � i I - 1�' � tN
Ivall
(This Bondbe accompanied with
Attorney-in-Fact's authority from Surety)
END OF SECTION 04
BID BOND
2
(CORPORATE SEAL)
`111111111111IIIII
Gonstrucr�o•�'',
v m _
SEAL
2p06
1011111100
(CORPORATE SEAL)
This Power of Attorney limits the acts of those named herein, and they have no authority to
bind the Company except in the manner and to the extent herein stated.
r
Liberty Mutual Insurance Company
The Ohio Casualty Insurance Company
West American Insurance Company
SURETY
POWER OF ATTORNEY
Certificate No: 8205285-022082
KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire, that
Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly organized
under the laws of the State of Indiana (herein collectively called the "Companies"), pursuant to and by authority herein set forth, does hereby name, constitute and appoint, Jack
Nottingham Jade Porter Jay Jordan Jeremy Barnett- Johnny Moss; Mistie Beck Robert G. Kanuth Robert J. Shuya; Tony Fierro
all of the city of Rockwall state of TX each individually if there be more than one named, its true and lawful attorney -in -fact to make,
execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations, in pursuance
of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper
persons.
IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed
thereto this 15th day of April , 2021 .
to
a)
a)
c
fu
M State of PENNSYLVANIA
amr„ County of MONTGOMERY ss
Liberty Mutual Insurance Company
P� 1NSUO? P�1v INS& 1NSUgq The Ohio Casualty Insurance Company
1 �� 4oNPORgr Lc, y.`oaPORgrR9y �VPooNP0`�rFyo West American Insurance Company
r mo 1n u� 3 Fo m a s o�
Z 1912 0 1919 s 1991
Y S y 0 Z ry O Q O
~dJl9SSACHUS.dD SO hAMP6D� `(S �NDIANP' .da GL 7:
f.d" jr
David M. Carey, Assistant Secretary
- On this 15th day of Aril , 2021 before me personally appeared David M. Care who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance
,� � y p P Y PP Y, 9 ry rtY
o m Company, The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do, execute the foregoing instrument for the purposes
0) > therein contained by signing on behalf of the corporations by himself as a duly authorized officer. >
a)m
:3 IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at King of Prussia, Pennsylvania, on the day and year first above written.
ca o � PASS
�s 4nnes Ulf �'. Commonwealth of Pennsylvania -Notary Seal
O Teresa Pastella, Notary Public
i�� N
�' " �' Montgomery County
p a) �'F My commission expires March 28, 2025 B �(
v Commission number 1126044 y'
, eresa Pastella, NotaryPublic
N }, �� ,Syy $^ Member, Pennsylvania Association of Notaries
N5D aT&WY
00 This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company, Liberty Mutual Insurance
•� Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows: Ct_
ARTICLE IV— OFFICERS: Section 12. Power of Attorney. b
@ Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such limitation as the Chairman or the President
may prescribe, shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety any and all
> C undertakings, bonds, recognizances and other surety obligations. Such attorneys -in -fact, subject to the limitations set forth in their respective powers of attorney, shall have full
o power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so executed, such instruments shall
Z c0i be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attomey-in-fact under the provisions of this LO
article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority. tL
ARTICLE XIII — Execution of Contracts: Section 5. Surety Bonds and Undertakings.
Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe,
shall appoint such attomeys-in-fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings,
bonds, recognizances and other surety obligations. Such attorneys -in -fact subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the
Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as if
signed by the president and attested by the secretary.
Certificate of Designation — The President of the Company, acting pursuant to the Bylaws of the Company, authorizes David M. Carey, Assistant Secretary to appoint such attorneys -in -
fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety
obligations.
Authorization — By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the
Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shall be valid and binding upon the Company with
the same force and effect as though manually affixed.
I, Renee C. Llewellyn, the undersigned, Assistant Secretary, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company do
hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy of the Power of Attorney executed by said Companies, is in full force and effect and
has not been revoked. Y(,l r
IN TESTIMONY WHEREOF, I have hereunto s9t fny hand and affixed the seals of said Companies this day of
INSUR 111 INS&p � 1NSUR
j �4&PORgro'% , �JQ'4oNPo�l uqy- Q' `Orn
RPURgrG'L�tN
F F
4912 h o 1919 0 2 1991 0
C By rd�9s'rgCNUS" .d ' y� Z"hg MpS�D30 `�s �NptANP ,aD Renee C. Llewellyn, Assistant Secretary
LMS-12873 LMIC OCIC WAIC Multi Co 02/21
In q ua
'II
1944 CLEAR SPRINGS RD.
TEXARKANA.TX 75501
903-691 -0931
Section 4— Reference Letters
ROOF REHAB — BID 23-41
CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER
FORT WORTH
December29, 2020
Re: City of Fort Worth— Will Rogers Memorial Center Richardson Bass Roof Replacement
To Whom It May Concern:
1 am pleased to provide letter ofrecommendation relating to RBTConstruction's project management and
construction performance on the City of Fort Worth's Richardson Bass Roof Replacement project located at the Will
Rogers Memorial Center.
Critical to the success ofthis project was RBT's construction team. Ican recommend them highly without
reservation.
The construction teamcxceeded the City's expectations by completing the project ahead oftime and within budget.
The qualityofwork performed was exceptional. RBT's experience working with municipalities proved essential to
the successful completionofthe project.
As the City ofFort Worth considers other roofing projects, RBT Construction willcertainly be included in any
consideration for future projects. Ifyou have any questions feel free to contact me at
(817) 392-8072.
Sincerely, /l
James Diestel
Construction Superintendent
Property Management Department
P RO P EWN NIANACB'IENI T DEPARTMENT
FACILITIES DIyISION
TIIF. CITY OF FORT WORT11 * 401 NEST 13TO STREET * FORT WORTH, TEXAS 76102
(817) 392-2586 * FkX (817) 392-8488
UNITED STATES
P T13L SERVICE
To whom it may concern,
On behalf of USPS, I would like to provide this recommendation for Trumble or RBT
Roofing for their exceptional work at our USPS Philadelphia NDC project.
Tremble performed this project at the highest level of workmanship, attention to detail
and quality along with a focus of professionalism.
This project was a high profile project for USPS with environmental issues within the
roof and interior. The roof was approximately 300,000 SF.
This work was performed under a very tight schedule with high visibility. In addition to
the roofing work, Tremble needed to follow strict instructions to keep the site safe while
fulfilling our demanding schedule.
It was a pleasure to work with the many members of their team especially, Ryan
Campbell, just to name one.
look forward to working with Trumble on future projects with USPS.
Sincerely,
Jonathan E. Maschak
Team Leader, USPS Repair & Alterations West
724-776-6233 (o) 724-971-0803 (c) I Jonatlian.e.riaschak2(ajusps.gov
Facilities Service Office, Design & Construction, Pittsburgh Domicile
PO BOX 2000,�Warr/endale, PA 15095-2000 1 FSSP Hotline 1-855-444-
6375I httpS,IlfaCIIItI('J.LIJt)S.gc�VICrIWp/ir�du>
General Services Administration
Northwest/Arctic Region 10
Capital Projects and Customer Contracting
400 15th St. SW, Auburn, WA 98001
Date: January 23, 2020
Trumble Construction
1944 Clear Springs Rd.
Texarkana, TX. 75501-1234
(DUNS: 847117418)
Subject: Reference Letter
Dear Mr. Trumble,
The General Services Administration Project Team is pleased to recommend the services and staff of
Trumble Construction.
GSA Region 10 had the opportunity to work with Trumble Construction (aka RBT Roofing), for a large,
complex roofing project on one of our newest federal courthouses. Currently, Trumble has two active
purchase order contracts with GSA and will be executing the work this coming spring.
The professionalism received by your project team to the GSA was and still is extremely helpful
in determining the best solution for our courthouse. GSA appreciated the flexibility of the staff of
Trumble and the positive relationship Trumble has with roofing partners. An example of Trumble in
action:
During pricing review of proposals, Trumble worked with GSA to provide an alternate solution
that met the intent of the original design without having to de -scope or degrade the project. Additionally,
Trumble took the time to be on site and talk with the project team, work with responsible subcontractors
and coordinate with the court staff to ensure a safe and complete project.
I am confident that Trumble will be a successful contractor to ANY federal agency. The integrity
and approach provided by Trumble will surpass any expectation. I fully recommend Trumble and its staff
to be considered for federal contract work with the United States.
In the event the GSA project team needs to be contacted, I have provided our business information.
Kimberly Johnson, FAC-C III
Contracting Officer
Capital Projects and Customer Contracting
HQ Region 10
Email: kimberlm.johnson&gsa.gov
Phone: 253.709.7780
1/M3/2020
v Kimberly Johnson
Kinbelry Johnson
Contracting Officer, Region 10
Signed by: iCVffRM0HUS0N
Stephen L Anderson, FAC P/PM, COR III
Project Manager/CCR
Design and Construction
SE Project Delivery Team IOPCA
Email: Stephen.anderson&gsa og_v
Phone: 503.308.2493
i
00
TexAmericas
CENTER' 107 CHAPEL LANE I NEW BOSTON, TEXAS 75570
April 12, 2023
Trumble Construction Inc.
1944 Clear Springs Rd.
Texarkana, TX 75501
Dear Robert & Team:
I am pleased to provide a letter of recommendation for Trumble Construction & R.B.T.
Roofing related to projects that have taken place at TexAmericas Center over the past
several years.
In 2006, we constructed a new residence that we call the Commander's House because its
purpose is to house the family of the Commander at Red River Army Depot. The home
was well built, has stood the test of time, and lots of great memories have been created in
that home. Trumble Construction did a great job on the construction of the house.
Over the years we have used R.B.T. Roofing for large and small roofing projects. Such
projects include roofing of two facilities at the same time that were over 200,000 sgft
each, too much smaller structures. Recently, it was time to put a new roof on the
Commanders House and R.B.T. Roofing won the bid on that project and they did an
excellent job replacing the roof.
We have a very good working relationship with the entire team at Trumble Construction
& R.B.T. Roofing and we welcome them to bid on any future projects we have here at
TexAmericas Center. They are a great organization to work with on any construction
project.
Sincerely,
Scott Norton
Executive Director/CEO
ph:903-223-9841 1 fax:903-223-8742 1 texamericascenter.com
Joe I ev a ar
D E S _ % G R Q U P
Aug. 2, 2023
To Whom It May Concern,
I am pleased to write this letter of recommendation for RBT Construction. I worked closely with
the RBT team on the roof replacement for both the upper and lower roofs of the John W. Peck
Federal Building in downtown Cincinnati, OH. The Peck Building is a 10-story office building for
several federal organizations and is eligible for the historic buildings list.
This roof replacement project entailed overcoming numerous obstacles inherent with a building
surrounded by urban spaces requiring careful attention to street -level activity and maximizing
the limited staging space. Of utmost importance to this project was coordinating with the
building representative. RBT was sensitive to the representative's timeframes to coordinate
access for RBT to work in the tenant spaces. RBT was able to look ahead at schedule times and
keep the team on task.
There were several areas of the building that posed unique challenges and required
modification to the design to accommodate the challenges. RBT was able to navigate through
those obstacles, performing superb construction services throughout both phases of the
project. As the Project Architect on this project, I worked closely with RBT, providing unified
construction solutions to the owner. From their project coordination skills to their project
delivery, I was nothing but pleased working with RBT Construction as the Roofing Contractor on
this project.
The RBT team, from the start, possessed acute understanding of the project's challenges.
Because of this, the project delivery was exceptional.
I look forward to working with RBT again on future endeavors.
Sincerely,
4-IC-1 4r-le
Kristina Hamill
RA, RRC, RRO, LEED AP, UAS Pilot I Senior Architect
555 Carr Street Cincinnati, OH 45203 (513) 721-0600
I ROOF REHAB — BID 23-41
1944 CLEAR SPRINGS RD.
TEXARKANA.TX 75501 CONSTRUCTION — RTC TRANSFER STATION & WATER SEWER
903-691 -0931
Section 5 — SAMPLE COI, BID BOND REFERENCE LETTER & BANK REFERENCE LETTER
75/22/2023
(MM/DD/YYYY)
,acoRo° CERTIFICATE OF LIABILITY INSURANCE
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on
this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
PRODUCER CONTACT
Hone COUntS
NAME:
K&S Rockwall 0104 FAX PHONE
,
2255 Ridge Rd, Ste 333 C No EM: 972-771-4071 A/c No:972-771-4695
Rockwall TX 75087 ADDRESS: Honey.Counts@kandsins.com
INSURER A: Im erium Insurance Company 35408
INSURED TRUMCON-01 INSURERB: Continental Casualty Company 20443
Trumble Construction Inc dba RBT Construction INsuRERc: American Casual Company of R 20427
RB Trumble Construction, LLC dba RBT Construction
1944 Clear Springs Road INSURERD:
Texarkana TX 75501 INSURERE:
INSURER F :
COVERAGES CERTIFICATE NUMBER: 170669438 REVISION NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR
LTR
TYPE OF INSURANCE
ADDL
SUBR
NUMBER
PICPOLICY
MM DDY/YYYY
EXP
MM DDY/YYYY
LIMITS
A
X
COMMERCIAL GENERAL LIABILITY
CON-IIC-GL-0000028-01
3/12/2023
3/12/2024
EACH OCCURRENCE
$ 1,000,000
CLAIMS -MADE � OCCUR
DAMAGES( RENTED
PREMISES Ea occurrence)
$ 100,000
MED EXP (Any one person)
$ 5,000
PERSONAL & ADV INJURY
$1,000,000
GEN'L AGGREGATE LIMIT APPLIES PER:
GENERAL AGGREGATE
$ 2,000,000
POLICY JE LOC
PRODUCTS - COMP/OP AGG
$ 2,000,000
$
OTHER:
A
AUTOMOBILE
LIABILITY
CON-IIC-CA-0000081-01
3/12/2023
3/12/2024
COMBINED SINGLE LIMIT
Ea accident
$1,000,000
X
BODILY INJURY (Per person)
$
ANY AUTO
OWNED SCHEDULED
AUTOS ONLY AUTOS
BODILY INJURY (Per accident)
$
X
PROPERTY DAMAGE
Per accident
$
HIRED Ix NON -OWNED
AUTOS ONLY AUTOS ONLY
A
UMBRELLA LIAB
X
OCCUR
CON-IIC-CX-0000025-01
3/12/2023
3/12/2024
EACH OCCURRENCE
$ 5,000,000
X
AGGREGATE
$ 5,000,000
EXCESS LIAB
CLAIMS -MADE
DED I X RETENTION $ n
$
C
WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY Y / N
7039533388
5/12/2023
5/12/2024
X I PER OTH-
STATUTE ER
ANYPROPRIETOR/PARTNER/EXECUTIVE Y
E.L. EACH ACCIDENT
$ 1,000,000
OFFICER/MEMBEREXCLUDED? I
N / A
E.L. DISEASE - EA EMPLOYEE
$ 1,000,000
(Mandatory in NH)
If yes, describe under
DESCRIPTION OF OPERATIONS below
E.L. DISEASE - POLICY LIMIT
$ 1,000,000
B
Inland Marine
C7018630984
3/12/2023
3/12/2024
Leased/Rented Equip
$350,000
Deductible
$2,500/$1OK Theft
DESCRIPTION OF OPERATIONS I LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)
GENERAL LIABLITY:
General Liability policy includes additional insured endorsement that provides additional insured status to the certificate holder only when there is a written
contract between the named insured and the certificate holder that requires such status.
General Liability policy contain an endorsement with "Primary and Noncontributory" wording.
General Liability policy includes waiver of subrogation endorsement that provides this feature only when there is a written contract between the named insured
and the certificate holder that requires it.
See Attached...
CERTIFICATE HOLDER CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
***For Bidding Purposes Only***
AUTHORIZED REPRESENTATIVE
© 1988-2015 ACORD CORPORATION. All rights reserved.
ACORD 25 (2016/03) The ACORD name and logo are registered marks of ACORD
K&S INSURANCE
NAVIGATING RISK. ENHANCING BUSINESS.
May 23, 2023
kandsins.com
Re: Trumble Construction, Inc. dba RBT Construction - Bond Reference Letter
To Whom It May Concern:
We are pleased to write this letter on behalf of our valued client, Trumble Construction, Inc. dba RBT
Construction. Over the years, Trumble Construction, Inc. dba RBT Construction has proven to be a leader
in their industry. Based on our review we can offer bonding for a single job in the amount of 70,000,000.
We have also extended Trumble Construction, Inc. dba RBT Construction total aggregate bonding capacity
of 100,000,000.
The surety's approval of such a request would be conditioned upon applicable underwriting considerations
at the time of the bond request. This letter is not an assumption of liability. We have issued this letter only
as a bonding reference requested by our client.
Trumble Construction, Inc. dba RBT Construction surety company is Hudson Insurance Company (Hudson
Insurance Company), which is rated "A (Excellent) XV" by AM Best rating service and is the recognized
leader in rating property/casualty companies. Hudson Insurance Company (Hudson Insurance Company )
appears on the Department of the Treasury Circular 570 as one of those "Companies Holding Certificates of
Authority as Acceptable Sureties on Federal Bonds and Acceptable Reinsuring Companies."
We highly recommend Trumble Construction, Inc. dba RBT Construction for your next project.
Sincere ,
� v V
Jade Porter
Partner
� CADENCE
Bank
March 1, 2023
RE: Trumble Construction Inc.
To whom it may concern:
Trumble Construction Inc. has been a valued customer for many years. The company moved their
banking relationship to Cadence Bank in March 2011. The company has borrowed in the six figure range
several times and has repaid all prior loans as agreed. The company currently has the following
accounts with Cadence Bank.
Business Checking — Average Balance of $601,802 - The account was opened 3/10/2011. The account
has no history of overdrafts.
Business Money Market —Average balance of $2,291,876
Operating line of credit -- $4,000,000 line amount —The line has not had a balance in the past 12
months. The line matures on December 17, 2023.
Trumble Construction's credit rating is considered outstanding. The company's accounts are in good
standing and Robert Trumble is considered a valued customer.
Trumble Construction, Inc has the financial strength and experience to complete the commercial
construction projects on which they choose to bid.
You can mail correspondence to:
Cadence Bank
Attn: John May
2200 N. Stateline Ave
Texarkana, AR 71854
Sincerely,
X
J in May
Senior Vice President
2200 North State Line Avenue' Texarkana, AR 71854 1 P: (870) 773-5571
CITY OF
FAYETTEVILLE
ARKANS
ARKANAS
BID TABULATION
Bid 23-41, Construction - RTC Transfer Station & Water Sewer Roof Rehab
DEADLINE: Tuesday, October 24, 2023 at 2:00 PM
Certification of Funds $70,000.00 ($87,5&- C," m!ol 2llD— d'
7rumble Construction
Terra Firma Restorations
Guarantee Roofing, Inc.
Total
$81,172.00
$100,000.00
$129,640.00
Uned
Description
CITY
UOM
Unit
Extended
Unn
Extended
Unit
Extended
1
Bonds and Insurance
1
LS
$1,28].00
$1,28].00
$2,000.00
$2,000.00
$1,000.00
$1,000.00
2
Mobilization -Shall not exceed 5%of Total Base Bid
1
LS
$4,068.00
$4,068.00
$2,000.00
$2,000.00
$2s0B.00
$2,5DD.DB
Total Base Bid - DO NOT INCLUDE PRICING FOR MOBIDZATION OR BONDS AND INSURANCE
B
IN THI5 LINE ITEM
1
LS
$]5,82].00
$]5,82].00
$9fi,000.00
$96,000.00
$126,140A0
$126,140.00
-MII aumannuon 1, uF orunais.
Kenny Fitch, Purchasing Agent
L
Amanda Beilfuss, ar.P casing Agenf
/0 2y 23