HomeMy WebLinkAbout43-88 RESOLUTION RESOLUTION NO. 43-88 JCAN 1 ED A RESOLUTION APPROVING A CHANGE ORDER TO THE CONTRACT WITH HUBER, HUNT AND NICHOLS FOR CONSTRUCTION OF THE NEW WASTEWATER TREATMENT PLANT. BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF FAYETTEVILLE, ARKANSAS: That the Board of Directors hereby approves a Change Order to the contract with Huber, Hunt and Nichols for construction of the new Wastewater Treatment Plant. A copy of the aforesaid Change Order is attached hereto marked Exhibit "A" and made a part hereof. PASSED AND APPROVED this 7th day of June , 1988 . APPROVED By: I Ila.. Mayor 'flFY jIt A ' ST. L BY,= : ": g- A6g27 K; I ` . _ 8.. 1.10J • CONTRACT MODIFICATION (Change Order) DATE: 4110 Contract Modification No. : 22 (HH&N #1) Owner: Fayetteville, Arkansas Project Name: Wastewater Treatment Plant Improvements Project No. : MG18766.D3 Completion Contractor: Huber, Hunt & Nichols, Inc. The following modifications to the contract are hereby ordered: Phase I Delete quarry tile from Admin. Bldg. $ 750 $2,540 entry Change gas lines in Prim. Inf. P.S. to meet 3,290 code Change gas lines in Filter Bldg. to meet code 5,289 Phase II Relocate locks & latches in C12 Bldg. & furnish 665 four new L-2 locks Provide 10 life rings at Aeration Basins 750 Add conduit, wire & selector switch for EF-2 331 in Filter Bldg. (CR 469A) Add wiring & conduit for digester switches 2,163 (CR 292B) • Provide for high oil temp protection for 522 aerator motors Extend lighting for entrance sign (CMR 99) 193 Provide conduit and wire for Blower field 407 panels (CMR #97B) Add I & C to dampen flow signal to 3,460 chlorinators/sampler (CPO 97A) Provide Aerobic Digester valve vaults to protect interlock switches Add additional paving to existing plant Revise pipe connections in old plant - 6" GTS 1,760 Revise pipe connection in old plant - 8" PSD 793 Revise sludge piping in Operation Bldg. 1,980 basement. Provide for temporary air connection to existing sludge holding tank. Change size of OSS pipe and header and change 12,890 valve material (CMR 92) Add water line & hydrants to entrance planting 2,080 (CMR 96) Remove exist fuel tank from path of ALP pipe 2,135 (CR 634) Provide painting of exterior PVC pipe 3,920 Replace Manhole #9 5,394 Rebuild 2 existing plant manholes, pay 2 cost 2,348 Replace 2 existing 6x6x4 tees with 6x6x6 tees 526 • for Digested Sludge P.S. r 1.11J GontractModification No. : 22 (HH&N #1) Wastewater Treatment Plant Improvement 40 • Fayetteville, Arkansas Page Two Provide long Dresser coupling for 18" IRR pipe $812 Provide long Dresser coupling for 8" sludge 448 Phase III pipe $4,344 Provide paint on Aerobic Digester and 2,000 Sludge Storage Basin walls over cementitious coating Change gas lines in Equip. Stor. Bldg. to 1,896 meet code This contract modification constitutes full and mutual accord and satisfaction for all time and all costs related to this change. By acceptance of this contract modification, the Contractor hereby agrees that the modification represents an equitable adjustment to the contract, and further, agrees to waive all right to file any further claims or changes arising out of or as a result of this change, or the accumulation of executed Contract Modifications on this Contract. Original Previous This Revised Contract*** Changes** Change Contract*** Contract Amount: $21,232,000 $171,599 $ $ Contract Duration/Completion Date: Belt Filter Press *14 Weeks *14 Weeks 4111 Administration 365 Days 90 Days 455 Days Building Phase I&II 1/1/1987 6/1/1988 30 7/1/1988 calendar days Phase III 9/1/1987 6/1/1988 30 7/1/1988 calendar days *From receipt of written order. Completion date is 12/5/85. **CM #8, a force account modification estimated to cost $500, was approved. CM #9, a force account modification estimated to cost $300, was approved. CM #10, a force account modification estimated to cost $500, was approved. CM #16, a time extension modification was rejected by Olson Construction Company. ***Amounts based on original contract. Huber, Hunt & Nichols' completion contract: Original : $3,008,867 This Change: Revised: APPROVED: FAYETTEVILLE HUBER, HUNT & NICHOLS, INC. CH2M HILL P. 0. Drawer F 2040 Empire Central 2567 Fairlane Drive Fayetteville, AR 72701 Dallas, TX 75235 Montgomery, AL 36116 By: By: B: 111/ Date: Date: Date: