HomeMy WebLinkAbout222-23 RESOLUTION113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 222-23 File Number: 2023-1133 MCCLELLAND CONSULTING ENGINEERS, INC. (AMENDMENT NO. 3): A RESOLUTION TO APPROVE AMENDMENT NO. 3 TO THE ENGINEERING SERVICES AGREEMENT WITH MCCLELLAND CONSULTING ENGINEERS, INC. IN THE TOTAL AMOUNT OF $1,446,340.00 FOR FINAL ENGINEERING DESIGN FOR THE WEST CORRIDOR WATER TRANSMISSION LINE PROJECT, AND TO APPROVE A BUDGET ADJUSTMENT WHEREAS, in 2012, the City Council approved Resolution 120-12 to approve the contract with McClelland Consulting Engineers to establish a preliminary alignment for waterline along the Western corridor and begin easement acquisitions; and WHEREAS, in 2021 the City Council approved Resolution 179-21 to increase funds for appraisals and acquisition support; and WHEREAS, in 2022 the City Council approved Resolution 200-22 to increase funds again for appraisals and acquisition support; and WHEREAS, Amendment No. 3 will allow the detailed design to progress from 30% to 100%, including all related permitting and coordination with state and federal agencies. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Amendment No. 3 to the Engineering Services Agreement with McClelland Consulting Engineers, Inc. in the total amount of $1,446,340.00 for final engineering design for the West Corridor Water Transmission Line Project. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. PASSED and APPROVED on October 17, 2023 Page 1 Resolution: 222-23 File Number.' 2023-1133 Page 2 Attest: ```���ttr irrrrrry rr Kara Paxton, City C rk Treasurer �r (in� u•�'`- CITY OF FAYETTEVILLE ARKANSAS MEETING OF OCTOBER 17, 2023 CITY COUNCIL MEMO 2023-1133 TO: Mayor Jordan and City Council THRU: Susan Norton, Chief of Staff FROM: Tim Nyander, Utilities Director DATE: SUBJECT: McClelland Consulting Engineers, Inc. - Amendment No. 3 for the West Water Transmission Main Project RECOMMENDATION: Staff recommends approval of Amendment No. 3 in the amount of $1,446,340.00 to the Engineering Services Agreement with McClelland Consulting Engineers, Inc. for Final Engineering Design for the West Corridor Water Transmission Line Project, and approval of a budget adjustment. BACKGROUND: The City of Fayetteville owns and operates two parallel water transmission lines from Beaver Water District (BWD) in Lowell that enter from the northeast corner of the City. These lines are a 36-inch pipe installed in 1967 and a 42-inch pipe installed in 1993. BWD intends to build a western water distribution point near HWY- 112 and the newly constructed Springdale Northern Bypass, HWY-612. This facility will supply a western water transmission feed to all four customer cities, helping with hydraulics, critical redundancy, and overall utility resiliency. Fayetteville's 11.3-mile connection to the proposed BWD facility has been identified in water master plans for many years, but the timeline was previously unknown. In 2012, the City of Fayetteville hired McClelland Consulting Engineers (MCE) to establish a preliminary alignment for a waterline along this western corridor (Res. 120-12) and begin easement acquisitions. The contract was amended in 2021 (Res. 179-21) to increase funds for appraisals and acquisition support and again in 2022 to bring the design up to 30% (Res. 200-22). DISCUSSION: In July 2023 the Arkansas Department of Agriculture Natural Resources Division (ANRD) approved $85M of low interest rate funding through the state's drinking water Revolving Loan Fund program. In July, the City conducted a formal Engineering Selection Committee meeting (RFQ 23-05) and selected Garney to provide CMAR services for the project. Amendment No. 3 with McClelland will allow the detailed design to progress from 30% to 100%, including all related permitting and coordination with state and federal agencies, coordination with Garvey during CMAR preconstruction services, and release of early procurement specifications. A detailed scope and fee narrative and schedule have been provided with the amendment document. This amendment consists of $1,446,340.00 in engineering services, increasing the total contract amount from Mailing address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 $1,547,085.00 to $2,993,425.00. BUDGET/STAFF IMPACT: Budgeted Funds will be transferred from the Sanitary Sewer Rehabilitation account to the West Water Transmission Line project to cover the cost of this item. ATTACHMENTS: SRF (#3), BA (#4), Revised BA (#9), Amendment No. 3 - West Transmission Main - FINAL (#5), 120-12 RESOLUTION (#6), 179-21 RESOLUTION (#7), 200-22 RESOLUTION (#8) Mailing address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 == City of Fayetteville, Arkansas y 113 West Mountain Street Fayetteville, AR 72701 (479)575-8323 - Legislation Text File #: 2023-1133 McClelland Consulting Engineers, Inc. - Amendment No. 3 for the West Water Transmission Main Project A RESOLUTION TO APPROVE AMENDMENT NO. 3 TO THE ENGINEERING SERVICES AGREEMENT WITH MCCLELLAND CONSULTING ENGINEERS, INC. IN THE TOTAL AMOUNT OF $1,446,340.00 FOR FINAL ENGINEERING DESIGN FOR THE WEST CORRIDOR WATER TRANSMISSION LINE PROJECT, AND TO APPROVE A BUDGET ADJUSTMENT WHEREAS, in 2012, the City Council approved Resolution 120-12 to approve the contract with McClelland Consulting Engineers to establish a preliminary alignment for waterline along the Western corridor and begin easement acquisitions; and WHEREAS, in 2021 the City Council approved Resolution 179-21 to increase funds for appraisals and acquisition support; and WHEREAS, in 2022 the City Council approved Resolution 200-22 to increase funds again for appraisals and acquisition support; and WHEREAS, Amendment No. 3 will allow the detailed design to progress from 30% to 100%, including all related permitting and coordination with state and federal agencies. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Amendment No. 3 to the Engineering Services Agreement with McClelland Consulting Engineers, Inc. in the total amount of $1,446,340.00 for final engineering design for the West Corridor Water Transmission Line Project. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. Page 1 Tim Nyander Submitted By City of Fayetteville Staff Review Form 2023-1133 Item ID 10/17/2023 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 9/29/2023 WATER SEWER (720) Submitted Date Division / Department Action Recommendation: Staff recommends approval of Amendment No. 3 in the amount of $1,446,340.00 to the Engineering Services Agreement with McClelland Consulting Engineers, Inc. for Final Engineering Design for the West Corridor Water Transmission Line Project, and approval of a budget adjustment. Budget Impact: 5400.720.5600-5314.00 Water & Sewer Account Number Fund 18015.2201 West Water Transmision Line Project Project Number Budgeted Item? Yes Does item have a direct cost? Yes Is a Budget Adjustment attached? Yes Purchase Order Number: Change Order Number: Original Contract Number: Comments: Project Title Total Amended Budget $ 766,177.00 Expenses (Actual+Encum) $ 766,177.00 Available Budget Item Cost $ 1,446,340.00 Budget Adjustment $ 1,446,340.00 Remaining Budget V20221130 2021-460 Previous Ordinance or Resolution # 200-22 3 Approval Date: 2021-42 City of Fayetteville, Arkansas - Budget Adjustment (Agenda) Budget Year Division Adjustment Number WATER SEWER (720) /Org2 2023 Requestor: Cheryl Partain BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION: A budget adjustment is needed to transfer budgeted funds to the West Water Transmission Line Project for the final engineering design for the West Corridor Water Transmission Line Project. Budgeted funds from the Water Impact Fee Improvement Project will be transferred and utilized for a majority of the cost of this project. This project will increase capacity and meets the requirements to utilize Impact Fee Budgeted Funds. Budgeted funds from the Water System Rehabilitation and Replacement project will also be transferred to cover the cost of this project. COUNCIL DATE: ITEM ID#: 10/17/2023 2023-1133 Kevin Springer 912912023 70:57 Mn Budget Division TYPE: JOURNAL#: Date D - (City Council) RESOLUTION/ORDINANCE I GLDATE: CHKD/POSTED: TOTAL Account Number 1,792,680 1,792,680 Increase / (Decrease) Expense Revenue Project.Sub# Project Sub.Detl AT v.202398 Account Name 5400.720.5600-5314.00 1,096,340 - 18015 2201 EX Professional Services 5400.720.5600-6602.30 2300.720.9300-7602.40 - 1,096,340 1,096,340 - 18015 07002 2201 8015.2201 RE EX Transfer from Fund - Impact Fee Transfers To Funds - Water & Sewer Fund 2300.720.9300-4999.99 5400.720.5600-5314.00 - 350,000 696,340 - 18015 2201 RE EX Use Fund Balance - Current Professional Services 5400.720.5600-5808.00 2300.720.9300-5808.00 (350,000) (400,000) - - 12009 07002 1 1 EX EX Improvements - Water Line Improvements - Water Line I of 1 Received By Shea Fankhouser 10/02/2023 City of Fayetteville, Arkansas - Budget Adjustment (Agenda) Budget Year Division Adjustment Number /Org2 WATER SEWER (720) 2023 Requestor: Cheryl Partain BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION: A budget adjustment is needed to transfer budgeted funds to the West Water Transmission Line Project for the final engineering design for the West Corridor Water Transmission Line Project. Budgeted funds from the Sanitary Sewer Rehabilitation project will be transferred to cover the cost of this project. COUNCIL DATE ITEM ID# 10/17/2023 2023-1133 RESOLUTION/ORDINANCE Budget Division Date TYPE: D - (City Council) JOURNAL#: GLDATE: CHKD/POSTED: TOTAL Account Number - - Increase / (Decrease) Expense Revenue Prolect.Sub# Project Sub.Detl AT v.202398 Account Name 5400.720.5600-5314.00 1,446,340 - 18015 2201 EX Professional Services 5400.720.5700-5815.00 (1,446,340) - 02017 1 EX Improvements - Sewer C:\Users\jshelton\Desktop\Revised BA a 1 of 1 Amendment No. 3 to the Engineering Services Agreement for Water Transmission Line Layout and Easement Acquisition Date: 10/17/2023 WHEREAS, the CITY OF FAYETTEVILLE and McClelland Consulting Engineers, Inc. (ENGINEER) entered into an Agreement for Professional Engineering Services (AGREEMENT) on June 5, 2012; and, WHEREAS, the CITY OF FAYETTEVILLE and ENGINEER entered into Amendment No. 1 to the AGREEMENT on July 6, 2021 to perform additional services outside of the scope of the AGREEMENT; and, WHEREAS, the CITY OF FAYETTEVILLE and ENGINEER entered into Amendment No. 2 to the AGREEMENT on September 6, 2022 to perform additional services outside of the scope of the AGREEMENT; and, WHEREAS, the CITY OF FAYETTEVILLE has requested that ENGINEER perform additional services outside of the scope of the AGREEMENT, Amendment No. 1 and Amendment No. 2. NOW THEREFORE, the following modifications will be made to the AGREEMENT to include the additional services requested: MODIFICATIONS: 1. Section 2.2.1 — the additional scope of services is included in the attached Appendix "A- I". 2. Section 5.1.1 —the maximum not -to -exceed amount is increased from $1,547,085.00 to $2,993,425.00. Modifications to compensation are included in the attached Appendix "A-1". IN WITNESS WHEREOF, the parties execute this Amendment No. 3, to be effective on the date set out above. McClelland Consulting Engineers, Inc. City of Fayetteville, Arkansas BY: G Bti Nicholas R. Batker, P.E. Senior Associate APPENDIX A-1 — SCOPE OF ADDITIONAL SERVICES AMENDMENT NO. 3 TO THE ENGINEERING SERVICES AGREEMENT FOR THE WEST CORRIDOR WATER TRANSMISSION MAIN 1.0 General The ENGINEER is currently under contract with the CITY OF FAYETTEVILLE to perform preliminary design services for the future 48-inch water transmission main extending from Highway 112 (between Van Asche Drive and Truckers Drive) in Fayetteville to the future Beaver Water District (BWD) pump station located north of the intersection of Highway 612 and Miller Road in Springdale. The total length of this pipeline is approximately 59,700 linear feet, or 11.3 miles. The CITY OF FAYETTEVILLE's goal is to have this pipeline installed and ready to be placed into operation by the first quarter of 2026. In an effort to meet this deadline, the CITY OF FAYETTEVILLE has recently selected a Construction Manager at -Risk (CMAR) to perform preconstruction services, potential early materials procurement and/or work packages, and overall construction management services. In addition, the CITY OF FAYETTEVILLE recently accepted an $85 million loan for this project from the Drinking Water State Revolving Loan Fund (DWSRF), administered by the Arkansas Department of Agriculture, Natural Resource Division (ANRD). The loan must be closed including first disbursement of funds on or before July 1, 2024 in order to obtain the 1.75% interest rate offered. In order to continue assisting the CITY OF FAYETTEVILLE with this project, the following scope of additional services covers the effort required by the ENGINEER to complete the final design phase for the water transmission main in order to meet the loan closing deadline and overall project schedule. ENGINEER's services in this Amendment No. 3 shall meet the DWSRF program requirements. 2.0 Scope of Additional Services 2.1 Project Management and Coordination The ENGINEER will continue to provide project management and coordination services to the CITY OF FAYETTEVILLE in this Amendment No. 3. The following services are included in this task: • Conduct progress meetings with the CITY OF FAYETTEVILLE and CMAR. At this time, it is assumed that progress meetings will be held biweekly; however, the ENGINEER is available to meet more frequently if required. A total of twenty-four (24) progress meetings have been assumed for this scope. • Attend up to three (3) Fayetteville Water & Sewer Committee meetings. • Attend up to twelve (12) meetings with other stakeholders such as BWD, Springdale Water Utilities, Arkansas Department of Transportation (ARDOT), Washington County, Benton County and the cities of Tontitown, Springdale and Elm Springs. • Attend up to fifteen (15) meetings with property owners to assist in negotiating and finalizing easements required for the project. Appendix A-1 — Scope of Additional Services — West Corridor Water Transmission Main — Amendment No. 3 Page 1 of 7 9/24/2023 • Coordinate with ANRD on meeting DWSRF program requirements. This shall include items such as Memorandum of Agreement preparation assistance, period progress updates, etc. • Prepare and submit invoices with monthly progress summaries. Up to twelve (12) summaries are assumed. 2.2 Additional Surveying Services As part of the Amendment No. 2 scope of work, the ENGINEER performed additional topographic surveys to cover changes in alignment and/or grades that occurred since the original project corridor topographic surveys were completed in 2013-2014. Under this Amendment No. 3, the ENGINEER will perform necessary surveys to complete the final design of the project and final easement acquisitions. Services shall include: • Additional mapping of surface features identified by the ENGINEER and/or CMAR that are required to finalize the design drawings. • Field ties to potholed utilities identified by the ENGINEER and/or CMAR. • Staking of proposed permanent and/or temporary easements requested by the property owner. Project control points used to complete additional surveys will be shown for future use during construction. The ENGINEER will contact Arkansas 811 and wait the allotted 48 hours prior to beginning the survey to allow time to have utilities field located. The ENGINEER will coordinate with CMAR on field locating utilities not marked by Arkansas 811 to minimize conflicts during construction. 2.3 Environmental Services An Environmental Information Document (EID) will need to be prepared to satisfy DWSRF requirements for the loan. Additional required items in conjunction with the EID will include a cultural resources survey and may also include a Threatened & Endangered (T&E) Species evaluation. The ENGINEER will subcontract EID services and the T&E Species evaluation (if determined to be required by ANRD) to FTN Associates Ltd. The ENGINEER will subcontract the cultural resources survey to Flat Earth Archeology, LLC. Following is a detailed scope of work for these items. 2.3.1 Environmental Information Document This task will include the following: • Assemble the documentation necessary for and completing the ANRD Environmental Checklist & Information Document. This checklist/document includes a variety of environmental topics, each of which will be answered/discussed specific to the project. • Coordinate with various agencies (e.g., US Fish & Wildlife Service, Arkansas Historic Preservation Program, etc.) to comply with EID requirements. • Complete one (1) public meeting in accordance with EID requirements. • Coordinate with ANRD regarding EID requirements specific to the project and submittal. Address comments as necessary from ANRD and agencies to obtain concurrence on the EID. Appendix A-1 — Scope of Additional Services — West Corridor Water Transmission Main — Amendment No. 3 Page 2 of 7 9/24/2023 2.3.2 Cultural Resources Survey This task will include the following: Conduct a Phase I archeological survey covering the entire length of the project within the limits of permanent and temporary easements. A pedestrian survey will be performed utilizing shovel test excavations in 20- meter intervals along transect(s) within the project limits to identify and assess the status of any cultural deposits or features inside the project limits. Prepare the cultural resources report based on the background research as well as the field work. The report will include information on any archeological sites identified and recommendation for the proposed project to be in compliance with federal and state regulations regarding cultural resources. The exact locations of any significant prehistoric or historic archeological sites found will be supplied to the OWNER for planning purposes only, with the stipulation that their locations will not be part of any document released to the public. • All work will conform to the standards set for the State of Arkansas which are described in A State Plan for the Conservation of Archeological Resources in Arkansas (Davis, ed. 1982, amended 2010) and the standards set by the U.S. Secretary of Interior's Standards and Guidelines for Archeological and Historic Preservation. Submit the cultural resources report to ANRD, Arkansas Historic Preservation Program, and other agencies/tribes if required for review. Respond to comments and/or questions if required to obtain concurrence on the report. • Phase II (significance testing, deep trenching, removal of cultural features, etc.) and Phase III (site mitigation) are not included in this scope of work. 2.3.3 T&E Species Evaluation If required as part of the agency coordination process of the EID, conduct a T&E species evaluation and submit to ANRD and relevant agencies for review. Address comments as necessary to obtain concurrence on the evaluation. 2.4 Additional Geotechnical Investigations As part of the Amendment No. 2 scope of work, the ENGINEER performed a detailed geotechnical investigation along the project alignment which included up to 81 borings, laboratory testing and analysis and preparation of a geotechnical report. Under this Amendment No. 3, the ENGINEER will perform additional geotechnical borings, laboratory analysis and reporting for up to 15 additional boring locations. Additional investigations may be required at trenchless crossings, major stream crossings and other areas of concern that may be identified by the ENGINEER OR CMAR. The methods of exploration, field services, laboratory analysis and reporting shall be as outlined in Amendment No. 2. Appendix A-1 — Scope of Additional Services — West Corridor Water Transmission Main — Amendment No. 3 Page 3 of 7 9/24/2023 2.5 Final Design The ENGINEER will perform final design phase services as part of this Amendment No. 3 and will utilize the following subconsultants to assist in completing scope items in this task: • Carollo Engineers — development of special details and technical specifications for steel pipe and large diameter valves; and quality control/quality assurance review of plans, specifications, surge analysis and CMAR guaranteed maximum price (GMP) • Coffman Engineers — development of plans, details and technical specifications associated with the impressed current cathodic protection system; and preparation of the final corrosion report • Brown Engineers — development of plans, details and technical specifications for electrical service required for the two (2) proposed cathodic protection rectifier fields • Bennett Trenchless Engineers — development of plans, details and technical specifications for trenchless installations required on the project • Black & Veatch — update the hydraulic surge analysis (previously completed for BWD) of the proposed water transmission main system and associated final report In accordance with DWSRF requirements, selection of iron and steel products to be used in this project shall be in compliance with the American Iron & Steel (AIS) provisions as outlined on EPA's website: https://www.epa.gov/cwsrf/state-revolving- fund-american-iron-and-steel-ais-requirement. Following is a detailed breakdown of services to be provided during the final design phase. 2.5.1 30% Design Review Workshop • Conduct workshop with CITY OF FAYETTEVILLE and CMAR to review 30% design submittal 2.5.2 60% Design The following items are included in the 60% Design Phase: 60% Plans o Cover and general sheets o Plan & profile sheets o Trenchless installation plan & profile sheets o Creek crossing details o Existing utility protection details o Standard project details o Cathodic protection plans and details o Electrical site plans, one -line diagrams and details • 60% Technical Specifications o Preliminary technical specifications with emphasis on spiral welded steel pipe and large diameter valves Appendix A-1 — Scope of Additional Services — West Corridor Water Transmission Main — Amendment No. 3 Page 4 of 7 9/24/2023 • Surge Analysis and Report o Hydraulic surge analysis utilizing information obtained from the BWD pump station surge analysis o Brief summary report on findings o Recommended minimum pipe thickness for design purposes • Final Corrosion Report • Technical Memorandum on Additional Design Considerations o Connections to valves and other appurtenances o Coatings for fittings and other appurtenances o Sampling ports o Internal and external access considerations • 60% Design Review Workshop o Conduct workshop with CITY OF FAYETTEVILLE and CMAR to review 60% design submittal o Address comments from workshop o Review and comment on CMAR's 60% GMP • ADH Submittal/Coordination o Address comments from ADH on 30% design submittal o Submit 60% design package for review o Address comments from ADH on 60% design submittal o Obtain ADH conditional approval on potential Early Work Packages (steel pipe, large diameter valves, trenchless installations) 2.5.3 90% Design The following items are included in the 90% Design Phase: • 90% Plans o Same as 60% plans, except to a final review level • 90% Technical Specifications o Final review level technical specifications • Roadway/Highway Crossing Permits o ARDOT crossings o City roadway crossings o County roadway crossings • 90% Design Review Workshop o Conduct workshop with CITY OF FAYETTEVILLE and CMAR to review 90% design submittal o Address comments from workshop o Review and comment on CMAR's 90% GMP • ADH Submittal/Coordination o Submit 90% design package for review o Address comments from ADH on 90% design submittal o Obtain ADH approval on overall project Appendix A-1 — Scope of Additional Services — West Corridor Water Transmission Main — Amendment No. 3 Page 5 of 7 9/24/2023 2.5.4 100% Design The following items are included in the 100% Design Phase: • 100% Plans o Final signed and sealed plans for CMAR use in bidding/construction of work packages • 100% Technical Specifications o Final signed and sealed specifications for CMAR use in bidding/construction of work packages 2.5.5 Early Work Packages It is anticipated that the CMAR will issue Early Work Packages in order to meet the project schedule. Early Work Packages may include pipe procurement, valve procurement, clearing and grubbing, and trenchless installations. As such, the ENGINEER shall provide the following services in this task: • Compilation of contract documents and submittal to ANRD for concurrence. Note that ANRD standard contract forms for construction must be used. All other contract documents shall be subject to approval by the CITY OF FAYETTEVILLE and ANRD. CMAR shall be responsible for preparing bid schedules for the Early Work Packages. • Assist CMAR during the bidding phase of Early Work Packages: o Respond to bidder's questions and requests for information (RFIs) o Assist CMAR with the preparation of addenda o Attend bid openings o Review bid tabulations. CMAR shall be responsible for preparing bid tabulations. o Provide assistance to CITY OF FAYETTEVILLE on recommendation of award on Early Bid Packages. 3.0 Project Deliverables 3.1 Environmental Reports — PDF and one (1) hard copy of each: 3.1.1 Draft EID 3.1.2 Final EID 3.1.3 Cultural Resources Survey Report 3.1.4 T&E Species Evaluation Report 3.2 Supplemental Geotechnical Report — PDF and (1) hard copy. 3.3 60% Design Submittal — PDF and one (1) hard copy of each: 3.3.1 60% Plans (11x17 hard copy) 3.3.2 60% Technical Specifications 3.3.3 Surge Analysis Report 3.3.4 Final Corrosion Report 3.3.5 TM on Additional Design Considerations Appendix A-1 — Scope of Additional Services — West Corridor Water Transmission Main — Amendment No. 3 Page 6 of 7 9/24/2023 3.4 90% Design Submittal — PDF and one (1) hard copy of each: 3.4.1 90% Plans (22x34 hard copy) 3.4.2 90% Technical Specifications 3.4.3 Roadway and Highway Crossing Permits 3.5 100% Design Submittal — PDF and one (1) hard copy of each: 3.5.1 100% Sealed Plans 3.5.2 100% Sealed Technical Specifications 3.6 Other electronic files as requested by the CITY OF FAYETTEVILLE. 4.0 Compensation In consideration of the performance of the foregoing services by the ENGINEER, the CITY OF FAYETTEVILLE will by to the ENGINEER compensation as follows: 4.1 Compensation will be paid to the ENGINEER on the basis of ENGINEER's standard hourly rates in effect at the time the work is performed, plus reimbursable expenses. A task hour fee breakdown is provided as Appendix A-2. ENGINEER's current rate schedule is attached hereto as Appendix A-3. 4.2 The maximum not -to -exceed for Amendment No. 3 will be $1,446,340.00. 4.3 The maximum not -to -exceed total contract amount is increased from $1,547,085.000 to $2,993,425.00 5.0 Project Schedule The ENGINEER will begin work under Amendment No. 3 immediately upon receipt of a Notice to Proceed (NTP). The overall anticipated project schedule is provided in Exhibit A. 6.0 Additional Future Services Additional future services will include, but not be limited to the following: Bid Phase Services for Primary Work Package(s); and Construction Phase Services. The scope for these future additional services will be defined by the ENGINEER and CITY OF FAYETTEVILLE prior to completion of the services under this Amendment No. 3, and will be authorized under future amendment(s) to this Agreement. Appendix A-1 — Scope of Additional Services — West Corridor Water Transmission Main — Amendment No. 3 Page 7 of 7 9/24/2023 APPENDIX A-2 City of Fayetteville - West Corridor Water Transmission Main MCCLELLAND Amendment No. 3 - Preliminary Design Personnel Hour Fee Estimate CONSULTING 9/24/2023 murnwarnim ENGINEERS, INC. Task Description Sr. Project Project Manager Manager Structural Engineer Project Engineer/ ner 'Designer CAD/GIS Technician Reg. Land Surveyor Survey Technician Field Survey Crew Lab Tech I Lab Tech II Geotech Engineer Extended Cost Task 2.1 - Project Management and Coordination Biweekly Progress Meetings 24 total assumed 48.00 48.00 48.00 $27,840.00 Water & Sewer Committee Meetings 3 total assumed 12.00 12.00 $5 280.00 Other Stakeholder Meetings 12 total assumed 24.00 24.00 6.00 $11,400.00 Property Owner Coordination/Meetings 15 assumed 60.00 30.00 $15 600.00 Coorindation with ANRD on DWSRF Program Requirements 4.00 32.00 4.00 $7,640.00 Monthlv Prowess Reports 12 total assumed 12.00 24.00 12.00 9 240.00 Subtotal Labor Hours / Fee - Task 2.11 100.00 1 200.00 0.00 100.00 1 0.00 1 0.00 0.00 1 0.00 1 0.00 0.00 1 0.00 $77,000.00 Estimated Reimbursable Expenses/Subconsultants Mileage $1,000.00 Subtotal Reimbursable Expenses - Task 2.11 $1,000.00 Total Task 2.1 - Project Management and Coordination 1 100.00 200.00 0.00 1 100.00 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $78,000.00 Task 2.2 - Additional Surveying Services Additional Mapping of Surface Features 30.00 $4,950.00 Field Ties to Potholed Utilities 40.00 $6 600.00 Easement Staking 30.00 $4,950.00 Drafting 5.00 20.00 9 $2 300.00 QA/QC 5.00 $700.00 Subtotal Labor Hours / Fee - Task 2.21 0.00 1 0.00 1 0.00 1 0.00 1 0.00 1 10.00 1 20.00 1 100.00 1 0.00 1 0.00 1 0.00 1 $19,500.00 Estimated Reimbursable Expenses/Subconsultants Mileage $500.00 Utility Locates Arku s $500.00 Subtotal Reimbursable Expenses -Task 2.21 $1,000.00 Total Task 2.2 - Additional Survey Servicesl 0.00 1 0.00 1 0.00 1 0.00 1 0.00 1 10.00 1 20.00 1 100.00 1 0.00 1 0.00 1 0.00 1 $20,500.00 Task 2.3 - Environmental Services Subconsultant Coordination 4.00 16.00 $4,040.00 Provide EID Info to Subconsultant 2.00 4.00 24.00 $4 620.00 Review EID and Coordinate with ANRD 4.00 8.00 8.00 $3,640.00 A enc Coordination 6.00 24.00 16.00 $8 300.00 Review Cultural Resources Survey Report 4.00 1 8.00 1 1 12.00 1 1 1 1 $4 200.00 Subtotal Labor Hours / Fee - Task 2.31 20.00 1 60.00 1 0.00 1 60.00 1 0.00 1 0.00 1 0.00 1 0.00 1 0.00 1 0.00 1 0.00 $24,800.00 Estimated Reimbursable Expenses/Subconsultants Subconsulant - FTN Associates Ltd. Environmental Information Document $10,000.00 Subconsulant - FTN Associates Ltd. T&E Species Survey) - only if required and authorized by City of Fayetteville $30,000.00 Subconsulant - Flat Earth Archeology, LLC Cultural Resources Survey) $30,000.00 Subtotal Reimbursable Expenses - Task 2.3 $70,000.00 Total Task 2.3 - Environmental Servicesl 20.00 1 60.00 1 0.00 1 60.00 1 0.00 1 0.00 0.00 0.00 0.00 0.00 0.00 1 $94,800.00 Task 2.4 - Additional Geotechnical Investigations Geotech Exploration & Field Services 40.00 $4 000.00 Lab Testing & Analysis see below $0.00 Geotech Reporting & Coordination 20.00 1 10.00 4 800.00 Subtotal Labor Hours / Fee - Task 2.41 0.00 1 0.00 1 0.00 1 0.00 1 0.00 1 0.00 1 0.00 1 0.00 1 40.00 1 20.00 1 10.00 1 $8,800.00 Estimated Reimbursable Expenses/Subconsultants Equipment Mobilization/Demobilization assume 2 truck rig mob/demob 0 $300/EA; 2 track rig mob/demob Q $600/EA $1,800.00 Boring Setup 15 bores @ $40/EA $600.00 SPT Auger Drilling assumed 300 LF a $13/LF $3,900.00 Water -Based Rock Coring Diamond Bit assumed 75 LF @ $40/LF $3,000.00 In -House Laboratory Testing Moisture Content, Atterberg Limits, Gradation, Comp. Strength of Rock Cores $1,500.00 Third Party Laboratory Testing Soil Resistivity, H, Sulfates, Chlorides, Sulfides, Redox Potential $2,500.00 Pavement Patching assumed 4 patches a $35/EA $140.00 Diamond Rock Bits assumed 2 bits P $650/EA $1,300.00 Subtotal Reimbursable Expenses - Task 2.4 $14,740.00 Total Task 2.4 - Geotechnical Investigations 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 40.00 20.00 10.00 $23,540.00 Task 2.5 - Final Design 30 % Design Review/Kickoff Workshop with City and CMAR 10.00 10.00 10.00 $5 800.00 60% Design 60% Plans 100.00 240.00 60.00 340.00 640.00 $199 400.00 60% Technical Specifications 20.00 120.00 20.00 200.00 $59,400.00 Surge Analysis and Report Review and Coordination with Sub 10.00 40.00 40.00 $15,700.00 Final Corrosion Report Review and Coordination with Sub 10.00 20.00 20.00 $9,100.00 TM on Additional Design Considerations 10.00 20.00 40.00 $11,900.00 60% Design Review Workshop incl. address comments 20.00 20.00 40.00 40.00 1 $18,800.00 ADHSubmittal/Coordination 20.00 40.00 100.00 60.00 $33200.00 QA/QC 40.00 80.00 10.00 80.00 120.00 $51,400.00 90 % Design 90% Plans 80.00 160.00 20.00 240.00 440.00 $136,000.00 90 % Technical Specifications 20.00 80.00 5.00 160.00 $43,500.00 Roadway/Highway Crossing Permits 10.00 40.00 120.00 $26,900.00 90 % Design Review Workshop incl. address comments 20.00 20.00 40.00 $14,400.00 ADH Submittal/Coordination 20.00 40.00 100.00 60.00 $33,200.00 QA/QC 40.00 60.00 10.00 80.00 120.00 1 $47 600.00 100% Design 100% Plans 10.00 40.00 10.00 100.00 200.00 $47,900.00 100% Technical Specifications 10.00 40.00 5.00 80.00 $22,200.00 QA/QC 10.00 20.00 10.00 40.00 40.00 $18100.00 Early Work Packages Compile Contract Documents and Obtain ANRD Concurrence 10.00 30.00 30.00 $12,400.00 Bid Phase Assistance (up to 4 EW Ps 50.00 100.00 1 10.00 100.00 60.00 1 $53 900.00 Subtotal Labor Hours / Fee - Task 2.51 520.00 1 1220.00 1 160.00 1960.00 1780.00 0.00 0.00 1 0.00 1 0.00 1 0.00 1 0.00 $860,800.00 Estimated Reimbursable Expenses/Subconsultants Mileage $1,000.00 Subconsultant- Coffman Engineers Corrosion Protection Design) $38,200.00 Subconsultant - Brown Engineers Electrical $6,500.00 Subconsultant- BennettTrenchlessEngineers TrenchlessDesign) $100,000.00 Subconsultant- Black & Veatch (Surge Anal is $20,000.00 Subconsultant- Carollo Technical Advisor/QAQC on TMs $203,000.00 Subtotal Reimbursable Expenses - Task 2.5 $368,700.00 Total Task 2.5 - Final DesignJ 520.00 1220.00 160.00 1960.00 1780.00 0.00 0.00 0.00 0.00 1 0.00 1 0.00 $1,229,500.00 GRAND TOTAL AMENDMENT NO. 21 640.00 1480.00 160.00 2120.00 1780.00 10.00 20.00 100.00 40.00 1 20.00 1 10.00 $1,446,340.00 Page 1 of 1 APPENDIX A-3 MEEMcCLELLAND CONSULTING mmmmgmam ENGINEERS, INC. 8/7/2023 McCLELLAND CONSULTING ENGINEERS, INC. *STANDARD HOURLY RATES Chief Draftsman $110 - $120 Clerical $45 - $85 Construction Observer $75 - $165 Draftsman $70 - $120 Environmental Scientist/Designer $125 - $145 Geotech Engineer $125 - $200 GIS Technician $80 - $140 HR/Payroll Admin $75-$115 Landscape Architect $95 - $200 Media Specialist $85 - $120 Principal $185 - $275 Project Accountant $70 - $155 Project Designer - Intern $50 - $80 Project Designer $80 - $165 Project Engineer $120 - $175 Project Manager $130 - $210 Registered Land Surveyor $100 - $175 Soils Lab Technician $50 - $140 Specification Writer $50 - $100 Sr. Project Manager $160 - $250 Structural Engineer $140 - $180 Survey (2 man or Robotic) Crew $115 - $165 Survey (3 man) Crew $150 - $200 Survey Field (1 Man or Rodman) $45 - $120 Survey GPS $75 - $135 Survey Technician $65 - $110 Expenses @ Cost Mileage .705/mi * Standard Hourly Rates may be adjusted annually in accordance with the normal salary review practices of McClelland Consulting Engineers. City of Fayetteville - West Corridor Water Transmission Main Amendment No. 3 - Preliminary Design Preliminary Schedule - 9/ 1 /2023 EMcCLELLAND CONSULTING ammiz -my ENGINEERS, INC. Project Phase Easment Acquisition (Current Contract) 60% Design ' 1' • Design RESOLUTION NO. 120-12 A RESOLUTION APPROVING A CONTRACT WITH MCCLELLAND CONSULTING ENGINEERS, INC. IN THE AMOUNT OF $388,600.00 FOR WATER TRANSMISSION LINE LAYOUT AND EASEMENT ACQUISITION RELATED TO A THIRD CONNECTION TO BEAVER WATER DISTRICT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves a contract with McClelland Consulting Engineers, Inc. in the amount of $388,600.00 for water transmission line layout and easement acquisition related to a third connection to Beaver Water District. A copy of the contract is attached to this Resolution as Exhibit "A". PASSED and APPROVED this 5t' day of June, 2012. /_�» TOLVA a��i an ATTEST: By: d c a- S. SONDRA E. SMITH, City Clerk/Treasurer `e,Nnntiirririvi ° ® m FAYETTEVILLE o G) °mow "NA NSP.; j s os'a'JVG +O�Ae,�',,,. 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 179-21 File Number: 2021-0436 MCCLELLAND CONSULTING ENGINEERS, INC. AMENDMENT NO. 1: A RESOLUTION TO APPROVE AMENDMENT NO. 1 TO THE ENGINEERING SERVICES AGREEMENT WITH MCCLELLAND CONSULTING ENGINEERS, INC. IN THE AMOUNT OF $261,000.00 FOR EASEMENT ACQUISITION SUPPORT FOR THE WEST WATER TRANSMISSION LINE PROJECT, AND TO APPROVE A BUDGET ADJUSTMENT WHEREAS, on June 5th, 2012, the City Council approved Resolution No. 120-12, approving a contract with McClelland Consulting Engineers, Inc. for the water transmission line layout and easement acquisition related to a third connection to Beaver Water District; and WHEREAS, Amendment No. I will provide the necessary funds to acquire the remaining 53 easements over the next 3 years. THEREFORE, BE IT RESOLVED BV THE CITY COUNCIL OF THE CITY OF FAVETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Amendment No. 1 to the Engineering Services Agreement with McClelland Consulting Engineers, Inc. in the amount of $261,000.00 for easement acquisition support for the West Water Transmission Line Project. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. PASSED and APPROVED on 7/6/2021 Page 1 Printed on 717121 Resolution: 179-21 File Number: 2021-0436 Attest: ��y• CITY �•r9�% V. , 'm- Kara Paxton, City Clerk TreasLaer AYt l EV/LLE C,0 COU,N````�� Page 2 Printed on 717121 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 200-22 File Number: 2022-0777 MCCLELLAND CONSULTING ENGINEERS, INC. AMENDMENT NO. 2: A RESOLUTION TO APPROVE AMENDMENT NO. 2 TO THE ENGINEERING SERVICES AGREEMENT WITH MCCLELLAND CONSULTING ENGINEERS, INC. IN THE AMOUNT OF $897,485.00 FOR PRELIMINARY ENGINEERING DESIGN FOR THE WEST CORRIDOR WATER TRANSMISSION LINE PROJECT, AND TO APPROVE A BUDGET ADJUSTMENT WHEREAS, on June 5th, 2012, the City Council approved Resolution No. 120-12, approving a contract with McClelland Consulting Engineers, Inc. for the water transmission line layout and easement acquisition related to a third connection to Beaver Water District; and WHEREAS, Amendment No. 2 will provide the necessary funds for preliminary design, permit consulting services and associated coordination with state and federal agencies, geotechnical investigations, and additional topographic surveys in the project corridor. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Amendment No. 2 to the Engineering Services Agreement with McClelland Consulting Engineers, Inc. in the amount of $897,485.00 for preliminary engineering design for the West Corridor Water Transmission Line Project. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. PASSED and APPROVED on 9/6/2022 Page 1 Printed on 917122 Resolution: 200-22 File Number: 2022-0777 Attest: Fly —TEVJ 1.1, Kara Paxton, City Clerk Treasurer C00 x,,' Q�-,,qzoo Page 2 Printed on 917122