HomeMy WebLinkAbout211-23 RESOLUTION113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Resolution: 211-23
File Number: 2023-1121
JACK TYLER ENGINEERING, INC. (EQUIPMENT RENTAL):
A RESOLUTION TO APPROVE A TWO -MONTH EXTENSION OF THE PUMP RENTAL FROM JACK TYLER
ENGINEERING, INC. BEING USED AT THE GREGG AVENUE SEWER LIFT STATION FOR A TOTAL COST
OF $41,675.00.
WHEREAS, the Gregg Ave. sewer lift station has four pumps total, and recently had two pump failures; and
WHEREAS, due to lead time on parts for replacing the pump failures, a purchase order was approved with Jack Tyler
Engineering for three months of rental and inbound/outbound freight for a pump, but the City needed the use of the
pump for two additional months.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign a two -
month extension of the pump rental from Jack Tyler Engineering, Inc. for a total cost of $41,510.00.
PASSED and APPROVED on October 3, 2023
Page 1
Attest:
���•' GITY0;,.
0
. fAV� . .
Kara Paxton, City Clerk reasurer
CITY OF
FAYETTEVILLE
ARKANSAS
MEETING OF OCTOBER 3, 2023
CITY COUNCIL MEMO
2023-1121
TO:
Mayor Jordan and City Council
THRU:
Susan Norton, Chief of Staff
FROM:
Tim Nyander, Utilities Director
DATE:
SUBJECT:
Jack Tyler Engineering, Inc. — Extension of Rental Pump for the Gregg Avenue Sewer
Lift Station (LS5)
RECOMMENDATION:
Staff recommends approval of a pump rental in the total amount of $41,675.00 plus applicable taxes from Jack
Tyler Engineering, Inc. for the Gregg Avenue sewer lift station.
BACKGROUND:
The Gregg Ave. sewer lift station has four pumps total, and recently had two pump failures. The pumps were
sent in for repair, and due to the lead time on parts the City had to have a working pump in its place. Jack Tyler
Engineering provided a rental pump at the rate of $7,255 per month. The purchase order was approved in the
amount of $27,165.00 plus tax and the pump was installed. This included 3 months of rental, and the
inbound/outbound freight for the pump.
DISCUSSION:
A two -month extension of the pump rental is needed which will put the total cost over $35,000, requiring City
Council approval. The estimated cost of the two -month extension is $14,510.00 plus tax, for a total estimated
cost of $41,675.00 plus tax.
Staff recommends approval of the pump rental extension with Jack Tyler Engineering.
BUDGET/STAFF IMPACT:
Funds are available in the Upgrade/Replace Lift Stations account within the Water & Sewer fund.
ATTACHMENTS: SRF - Jack Tyler Engineering, Inc. (#3), Jack Tyler Engineering, Inc. Pump Rental Quote
#04072023VS (#4)
Mailing address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
== City of Fayetteville, Arkansas
y 113 West Mountain Street
Fayetteville, AR 72701
(479)575-8323
- Legislation Text
File #: 2023-1121
Jack Tyler Engineering, Inc. — Extension of Rental Pump for the Gregg Avenue Sewer Lift Station
(LS5)
A RESOLUTION TO APPROVE A TWO -MONTH EXTENSION OF THE PUMP RENTAL FROM
JACK TYLER ENGINEERING, INC. BEING USED AT THE GREGG AVENUE SEWER LIFT
STATION FOR A TOTAL COST OF $41,675.00.
WHEREAS, the Gregg Ave. sewer lift station has four pumps total, and recently had two pump
failures; and
WHEREAS, due to lead time on parts for replacing the pump failures, a purchase order was approved
with Jack Tyler Engineering for three months of rental and inbound/outbound freight for a pump, but the
City needed the use of the pump for two additional months.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan
to sign a two -month extension of the pump rental from Jack Tyler Engineering, Inc. for a total cost of
$41,510.00.
Page 1
Tim Nyander
Submitted By
City of Fayetteville Staff Review Form
2023-1121
Item ID
10/3/2023
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
9/14/2023 WASTEWATER TREATMENT (730)
Submitted Date Division / Department
Action Recommendation:
Staff recommends approval of a pump rental in the total amount of $41,675.00 plus applicable taxes from Jack
Tyler Engineering, Inc. for the Gregg Avenue sewer lift station.
5400.730.5800-5414.00
Account Number
02068.1
Project Number
Budgeted Item? Yes
Does item have a direct cost? Yes
Is a Budget Adjustment attached? No
Budget Impact:
Water and Sewer
Fund
Upgrade/Replace Lift Stations
Total Amended Budget
Expenses (Actual+Encum)
Available Budget
Item Cost
Budget Adjustment
Remaining Budget
Project Title
$ 1,030,701.00
$ 344,658.49
a 686,042.51
$ 15,924.73
e. 670,117.78
V20221130
Purchase Order Number: 2023-438 Previous Ordinance or Resolution #
Change Order Number: 1 Approval Date:
Original Contract Number: N/A
Comments: The current purchase order has $27,165.00 plus tax as the total cost, this agenda item would add
$14,510.00 plus tax for a total of $15,924.73 to the purchase order upon City Council approval.
to
�v
co
a
7corpora'e
Friday, April 7, 2023
RENTAL QUOTATION# 04072023VS
Jack Tyler Engineering, Inc.
6301 S. University Avenue
Little Rock, AR 72209
Office: 501-562-2296
Toll Free: 800-562-2296
Jack Tyler Engineering, Inc. is pleased to offer the following items for your inclusion in the above
referenced project. If you wish for us to supply any items not listed below, please inform us
as soon as possible. Please continue reading below for our detailed scope of supply. We look
forward to working with you.
PUMPING EQUIPMENT TO INCLUDE:
ONE (1) FLYGT MODEL 3301.095 SEWAGE SUBMERSIBLE PUMP
• 10" DISCHARGE, NS634MT IMPELLER
• 85 HP, 460 VOLT, 3 PHASE
• 100 FEET OF POWER CABLE FM FLS SSCJ
• FV ANSI HI LHC
DAILY RATES WEEKLY RATES MONTHLY RATES
$849.00 $2,545.00 $7,255.00
INBOUND FREIGHT CHARGE: $1,750.00
OUTBOUND FREIGHT CHARGE: $1,750.00
IN SHOP SETUP: $1,900.00
This pricing information is for internal use only. We ask that these items and terms be kept confidential.
All applicable taxes will be added to invoices. All quotations are subject to credit approval. All quotations are
valid for 30 days. All prices quoted in US dollars. See attached Terms and Conditions which are part of this
quote.
Jack Tyler Engineering, Inc.
6301 S. University Avenue
Little Rock, Ar 72209
Tel +1.501.562.2296 Fax +1.501.562.4273
TERMS AND DEFINITIONS
Rental Day: One Calendar day; for diesel units, not exceeding eight (8) hours running.
Rental Week: Seven (7) calendar days; for diesel units, not exceeding 48 hours running in aggregate during a Rental Week.
Rental Month: Twenty-eight (28) calendar days; for diesel units, not exceeding 192 hours running.
Standby Rate: The Standby Rate is 75% of the scheduled rate. Standby is for a "second" or additional back-up pump to be run in the
event the primary pump cannot. If the standby pump operates for any reason other than failure of a primary pump,
the standard rate will apply.
Overtime For diesel units, all scheduled rates are based on an 8 hour per day shift. If diesel equipment is used for a double shift, the
Running: 8-hour rate will be multiplied by 1'/z times the schedule rate. If used for a triple shift, the rate will be multiplied by 2
times the scheduled rate.
Billing Cycles
3 - 7 Days
= 1 Week
Based on Open
8 Days
= 1 Week and 1 Day
Terms Approval
9 Days
= 1 Week and 2 Days
10 - 14 Days
= 2 Weeks
15 Days
= 2 Weeks and 1 Day
16 Days
= 2 Weeks and 2 Days
17 - 28 Days
= 1 Month
Billing Cycle -
3 - 7 Days
= 1 Week
COD Customers
Fees Environmental Fee is charged at 4% of rental charge for all applicable equipment with a minimum charge of $10 and
maximum charge of $95 per individual piece of equipment. If there is not a certificate of insurance on file at the time of
billing there will be a $50.00 rental protection plan fee applied and the customer is still responsible for any damages to the
equipment.
Off Rent: It is the responsibility of the Customer to call into the Owner's local branch office and obtain an Off Rent Call Confirmation
Number. This call serves as notification that equipment is disassembled, properly decontaminated, and stockpiled in one
readily -accessible area available for immediate pick-up. Rental and/or labor charges will accrue if equipment is not cleaned
and staged for removal. All equipment must be returned at the fuel level in which it was delivered, if not the customer will
be charged for refueling on final invoice.
IMPORTANT: Obtaining an Off Rent Call Confirmation Number does not release Customer from its obligations
to safeguard and secure equipment, including maintaining required insurance coverages, while equipment remains
under Customer's care, custody or control pending return of all rented equipment to Owner, Customer shall
remain responsible for all loss or damage arising from Customer's failure to safeguard and secure equipment while
awaiting pick up.
� TERMS AND CONDITIONS
1. This quotation is valid for 30 days, however, prices may change without written notification. Quotations for sales of HDPE pipe are valid for
seven (7) days.
2. This quotation is our estimate of equipment and material required. Actual installation may vary in cost due to site requirements. Additional
equipment or time to set-up will be charged at the above itemized rates or based upon our published rental rate schedule.
3. Payment terms: Net 30 based on credit approval.
4. Taxes are not included in any rental, sale or labor quotes. Customer is responsible for paying applicable taxes on the equipment and services,
including sales and use tax. Customer will only be considered exempt when a valid Sales Tax Exemption Certificate is received when ordering
any rental equipment, pumping services and/or sale goods.
5. Delivery and Pick -Up available at Customer's request via Lessor's/Supplier's truck for an additional charge.
6. Customer shall be responsible for providing adequate labor and material handling equipment onsite to unload/load and setup/breakdown
equipment, including chains or cables of sufficient capacity along with cribbing material to support pumps, piping and accessories.
7. Customer responsible for daily monitoring of all equipment on site, including but not limited to cleaning of suction screen(s) as necessary. Diesel
driven pumps require routine service including changing oil, oil filter, fuel filter, and performing general maintenance every 250 hours of running
time, and also replacing the air filter every 500 hours of running time. As requested, Lessor/Supplier will service the equipment for an additional
charge.
8. Customer shall be responsible for any required secondary containment around and under each pump to contain possible spills during operation or
refueling of the equipment.
9. Customer shall be responsible for compliance with permitting, licensing or other regulatory requirements associated with setup, installation, or
operation of the equipment.
This order is subject to the Standard Terms and Conditions of Rental - Jack Tyler Engineering, Inc. effective on the date the order is accepted which terms are available at
www.Jack TylerEngineering.com and incorporated herein by reference and made a part of the agreement between the parties.
Product Type
Performance Curve NP3301.095 MT
Date
Project
Curve No
Issue
2015-01-30
63-634-00-3130
5
1/1-Load
3/4-Load
1/2-Load
Rated
Impeller Diameter
Power ...
85
hp
404 mm
Power Factor
0.80
0.75
0.64
Starting
Motor #
Stator
Rev
Efficiency
91.0 %
91.5 %
90.5 %
Current ... 685 A
Motor Data
---
---
-
Rated
Current ...
Rated
109
1185
A
35-29-6AA
01 D
11
Comments
Inlet/Outlet
Freq.
Phases
Voltage
Poles
4 10 inch
Tot. Mom. of
rpm
60 Hz
1 3
460 V
6
Inertia ...
1.3
kgm2
Imp. Throughlet
Geartype
Ratio
No. of
---
Blades
2
---
---
[hp]
N
60
O
n
40
Duty -Point
B.E.P.
[m] [ft]
45
140
40
120
35
30 -
2
M 25 -
N
100
20
60
Lq
15
r;
40
10
U
Q
U)
20
5
O
(D
w
0
ISM
w W
_ w
m a
`m E
O' a
Flow[usgpm] Head[ft] Power [hp] Eff. [%] NPSHre[ft] Guarantee O �c
3249 75.8 ( <81.4) ( <74.5) 76.6 (83.7) 17.9 ISO/HI grade 2Be X N PS H re
[ft]
70
\
\
60
�
50
40
\
\
30
RIPS
re 6
ft
20
G
10
.o
a
w
N
N
m
F
Eff.
1%]
70
60
50
40
30
20
10
ry
0
0
0 1000 2000 3000
4000 5000
6000 [u S g p m]
I I I I I
I I
I I
O
0 50 100 150 200
250 300
350 400
[i/S]
Q
Flow (Q)
X
NPSHre = NPSH3% + min. operational margin
GUARANTEEMITS
ISO/H 1 grade Me X
(G)
BETWEEN LICURVES
SHOW PERFORMANCE WITH CLEAR COLD WATER
ACC. TO TEST -CODE: