Loading...
HomeMy WebLinkAbout190-23 RESOLUTION113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 190-23 File Number: 2023-1022 ARKANSAS DEPARTMENT OF TRANSPORTATION (UTILITY RELOCATION AGREEMENT): A RESOLUTION TO APPROVE A UTILITY RELOCATION AGREEMENT WITH THE ARKANSAS STATE HIGHWAY COMMISSION FOR UTILITY RELOCATIONS RELATED TO THE HIGHWAY 62 INTERCHANGE IMPROVEMENTS PROJECT WHEREAS, the Arkansas Department of Transportation has requested utility relocations to prepare for the widening of Martin Luther King, Jr. Blvd. (Highway 62) from S. Leflar Way to S. Sang Ave including reconstruction of the interstate overpass and creation of a new overpass at 15th Street; and WHEREAS, the utility relocations are estimated to cost a total of $5,308,725.00 with reimbursement to the City for 100% of the costs. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign a utility relocation agreement, a copy of which is attached to this Resolution, with the Arkansas State Highway Commission for utility relocations related to the Highway 62 Interchange Improvements Project. PASSED and APPROVED on September 5, 2023 Page 1 Attest: • �ITy . ��U:'• o Kara Paxton, City lerk Treasurer ::.e- 9 f�Y` i'/�•�,�! I �; ij � �c '• �` CITY OF FAYETTEVILLE ARKANSAS MEETING OF SEPTEMBER 5, 2023 CITY COUNCIL MEMO 2023-1022 TO: Mayor Jordan and City Council THRU: Susan Norton, Chief of Staff FROM: Tim Nyander, Utilities Director DATE: SUBJECT: ARDOT - Utility Relocation Agreement for 1-49/MLK Interchange Project 040846 RECOMMENDATION: Staff recommends approval of the agreement with the Arkansas Department of Transportation (ARDOT) related to the Interstate-49 MILK Interchange Improvements ARDOT Project 040846. BACKGROUND: ARDOT has requested utility relocations to prepare for the widening of Martin Luther King, Jr. Blvd. (Highway- 62) from S. Leflar Way to S. Sang Ave. including reconstruction of the interstate overpass and creation of a new overpass at 15th Street. ARDOT will phase the project, to begin in just the vicinity of 15th Street. The water and sanitary sewer relocations for this first phase are estimated to cost approximately $5,308,725.00, subject to public bidding, inclusive of engineering fees and easement acquisitions. The relocations are estimated to be 100% reimbursable to the City of Fayetteville by ARDOT. This agreement is primarily to establish the reimbursable percentage for both parties. DISCUSSION: Hawkins -Weir Engineers, Inc. was selected for and has completed design of the utility relocations necessary for the 15th Street phase of this project. Arkansas Department of Health project review and easement acquisition is underway, then the project can proceed to bidding. BUDGET/STAFF IMPACT: No impact at this time. Funds would be obligated to this project at the time a construction bid award is presented. ATTACHMENTS: SRF ARDOT 149 and MILK, 040846 - City of Fayetteville - Agrmt for Signatures, 2022129 Pre -Final Cost Estimate -15th Street Mailing address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 == City of Fayetteville, Arkansas y 113 West Mountain Street Fayetteville, AR 72701 (479)575-8323 - Legislation Text File #: 2023-1022 ARDOT - Utility Relocation Agreement for I-49/MLK Interchange Project 040846 A RESOLUTION TO APPROVE A UTILITY RELOCATION AGREEMENT WITH THE ARKANSAS STATE HIGHWAY COMMISSION FOR UTILITY RELOCATIONS RELATED TO THE HIGHWAY 62 INTERCHANGE IMPROVEMENTS PROJECT WHEREAS, the Arkansas Department of Transportation has requested utility relocations to prepare for the widening of Martin Luther King, Jr. Blvd. (Highway 62) from S. Leflar Way to S. Sang Ave including reconstruction of the interstate overpass and creation of a new overpass at 15th Street; and WHEREAS, the utility relocations are estimated to cost a total of $5,308,725.00 with reimbursement to the City for 100% of the costs. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign a utility relocation agreement, a copy of which is attached to this Resolution, with the Arkansas State Highway Commission for utility relocations related to the Highway 62 Interchange Improvements Project. Page 1 Tim Nyander Submitted By City of Fayetteville Staff Review Form 2023-1022 Item ID 9/5/2023 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 8/17/2023 WATER SEWER (720) Submitted Date Division / Department Action Recommendation: Staff recommends approval of the agreement with the Arkansas Department of Transportation (ARDOT) related to the Interstate-49 MLK Interchange Improvements ARDOT Project 040846. Budget Impact: N/A N/A Account Number Fund N/A N/A Project Number Budgeted Item? No Does item have a direct cost? No Is a Budget Adjustment attached? No Purchase Order Number: Change Order Number: Original Contract Number: Comments: Project Title Total Amended Budget Expenses (Actual+Encum) Available Budget Item Cost Budget Adjustment Remaining Budget Previous Ordinance or Resolution # Approval Date: V20221130 Rev. 11 /09/2022 ARKANSAS STATE HIGHWAY COMMISSION HIGHWAY - UTILITY CONSTRUCTION/RELOCATION AGREEMENT State Job No 040846 (Utilities) County Washington Federal Aid Project NHPP-9142(51 Job Location Hwy. 62 Intchng. Impvts. (Fayetteville)(F) Route 1-49 Section 28 Utility Owner City of Fayetteville THIS AGREEMENT, made andentered into this 12th day of September, 2023, by and between the Arkansas State Highway Commission, acting by and through the duly authorized representatives of the Arkansas Department of Transportation, with headquarters at Little Rock, Arkansas, hereinafter referred to as the "Department," and the City of Fayetteville, Arkansas acting by and through its duly authorized representatives, hereinafter referred to as the "Owner" WITNESSETH: The Department proposes to make highway improvements as specified under the above referenced job number and the Owner will adjust or relocate its existing facilities as set out in the attached plans and cost estimate. The Department will participate in the cost of said adjustment/relocation to the extent that eligibility is hereinafter established. Payment will be made on actual cost basis as mutually agreed between Owner and Department. This agreement is governed by all applicable State and Federal laws, rules, and regulations including the Arkansas State Highway Commission Utility Accommodation Policy adopted by Commission Minute Order 2010-146 as amended and supplemented, the Federal Aid Program Guide on Utility Adjustments and Accommodation on Federal Aid Highway Projects as amended and supplemented, and the provisions of 23 CFR § 645 as amended and supplemented. DESCRIPTION OF WORK: See Exhibit A on Page 4 The Department agrees that the required adjustment is 100% eligible for reimbursement for the total cost which is estimated to be $5,307,746.00 of which $5,307,746.00 is to be paid by the Department and $0.00 is to be borne by Owner. Page 1 of 4 Rev. 08/07/2017 Job 040846 City of Fayetteville Owner will not commence work until authorized by the Department, and will then endeavor to begin within 180 calendar days and complete within 300 calendar days thereafter. On completion of said work, Owner is responsible for the cleanup and restoration of the work area including the disposal of surplus materials and debris. Final billing must include all supporting detail. Owner shall also submit one (1) set of as -built drawings at this time. Payment will be 100% of lump sum bills and actual cost bills, at the discretion of the Department a 10% retainage can be withheld and released upon completion of an audit review. All final bills for utility relocation are subject to review and audit by state and/or federal auditors. Expenses incurred under an actual cost agreement may be billed to the Department monthly in increments of $5,000.00 or more. Owner must maintain cost records and accounts to support the agreed adjustment/relocation work. Said records to be retained and available for inspection for a period of three (3) years from date of final payment. Owner shall be responsible for any and all hazards to persons, property, and traffic. With respect to traffic control, Owner shall adhere to the requirements of the Manual of Uniform Traffic Control Devices as amended and supplemented. To the extent applicable to this agreement, the Owner shall comply with the Buy America and Build America, Buy America requirements (as specified in 23 U.S.C. 313, 23 CFR 635.410 and the Infrastructure Investment and Jobs Act (IIJA)). The Owner is not required to change its existing standards for materials as long as these requirements are met. These requirements take precedence over regulations pertaining to the accommodation or regulation of the Owner's facilities (as specified in 23 CFR 645) on contracts and agreements involving Federal -Aid Highway Program funding and precedence over regulations which allow the Owner to furnish materials from company stock (as specified on 23 CFR 645.117(e)). Company Stock materials that do not meet these requirements may not be permanently incorporated into a Federal -Aid Highway Program funded project. The Owner must provide a definitive statement that all products permanently incorporated into the project are covered under these requirements. This requirement is fulfilled via proper signature and submission of the statement of charges form. In some circumstances, a waiver of these requirements may be granted by the Federal Highway Administration, to be determined on a project -by -project basis. Page 2 of 4 Rev. 08/07/2017 Job 040846 City of Fayetteville Owner shall be responsible for and shall hold harmless the Arkansas State Highway Commission, the Department and their officers and employees from any and all claims, actions, causes of action, suits, damages, losses or liability whatsoever, arising out of Owner's performance of the work subject to this Agreement. Notwithstanding anything hereinbefore written, neither the Owner nor the Department by execution of this Agreement waives or relinquishes any rights which either may legally have within the limits of the Law or Constitution, either State or Federal. City of Fayetteville L. i one l d l brd art Name (Typed or Printed) Title ARKANSAS HIGHWAY COMMISSION Acting By and Through The ARKANSAS DEPARTMENT of TR`�p RTATION (For) Dire ,,r T. Right of Way Division Head ature j / - for Section Head -Utilities Section FEDERAI_ TAXPAYER IDENTIFICATION # bra BW-DO Name (Typed or Printed) Title .��\�:• G�TY•'4;9s�,,� SignatureLV %ti; • h�I rd Wit';. `� ��. Page 3 of 4 Rev. 08/07/2017 Job 040846 City of Fayetteville EXHIBIT A This agreement has been prepared to address the Phase 1 (15th St. Relocation) portion of this project. Phase II (Hwy. 62 Relocation) portion will be included via change order at a later date. Adjust water facilities to clear highway construction by abandoning 1,260 LF of 24" water main complete with appurtenances. Restore service by installing 2,014 LF of 18" water main complete with appurtenances. Adjust sewer facilities to clear highway construction by abandoning 400 LF of 24" sewer main and 778 LF of 12" sewer main complete with appurtenances. Restore service by installing 399 LF of 30" sewer main, 15 LF of 24" sewer main, and 216 LF of 12" sewer main complete with appurtenances. All of the facilities to be abandoned are located on private property; therefore, this work is 100% reimbursable. Owner will perform this work by competitively bid contract forces. Owner has elected to utililize O.R. Colan for easement acquisition services, as allowed under the existing CMGC contract for this project. Summary of Cost Construction $ 4,367,875.00 Preliminary Engineering $ 544,550.00 Construction Engineering $ 294,800.00 Easement Acquisition $ 99,021.00 Advertising $ 1,000.00 ADH Review Fee $ 500.00 TOTAL COST $ 5,307,746.00 Reimbursable Cost $5,307,746.00 X 100% _ $5,307,746.00 Page 4 of 4 C7KANSAS DEPARTMENT AR OF TRANSPORTATION Mr. Corey Granderson City of Fayetteville 2435 S. Industrial Drive Fayetteville, AR 72701 Dear Mr. Granderson: ARKANSAS DEPARTMENT OF TRANSPORTATION ARD019ov I IDriveArkansas.conn Lorie H. Tudor, P.E., Director 10324 Interstate 30 1 P.O. Box 2261 Little Rock, AR 72203-2261 Phone:501.569.2000 I Voice/TTY 7111 Fax:501.569.2400 September 12, 2023 RE: Job 040846 (Utilities) Hwy. 62 Intchng. Impvts. (Fayetteville)(F) Route 1-49 Section 28 Washington County Enclosed is your copy of the utility agreement approved on September 12, 2023, covering reimbursement for the adjustment of your facilities on the referenced job. You are authorized to proceed with advertising for bids. If you need additional right of way to accomplish your adjustments, you may proceed with the acquisition of this right of way. Please make sure Buy America and Build America, Buy America requirements will be met. You are required to furnish a copy of each bid received and the bid tabulation sheet for our review and concurrence. Should you elect to award the contract to other than the low qualified bidder, the Department will participate only in the amount of the low bid. No construction work should be performed until you receive a written work order from this office. If I may be of assistance, please advise. Sincerely, Keith Mashburn Utility Coordinator Utilities Section Right of Way Division Enclosures C: "C" File District Engineer W/Enclosures Resident Engineer W/Enclosures #43 "U" File Construction Division — System Administrator Hawkins -Weir Engineers Job Files\Job #\Utility\Authorization to Bid Revised August 8, 2017 HN Pre -Final Design Cost Estimate ArDOT 1-49 Utility Relocations - 15th Street City of Fayetteville, Arkansas HWEI Project No. 2022129 July 21, 2023 I_ CITY OF FAYETTEVILLE ARKANSAS Item No. Description Quantity/Unit Unit Price Total Price 1 Performance and Payment Bonds 1 LS $ 100,000 $ 100,000 2 Mobilization 1 LS $ 50,000 $ 50,000 3 Trench Safety/Protective Systems 1 LS $ 50,000 $ 50,000 4 Construction Erosion Control and Sediment Control 1 LS $ 15,000 $ 15,000 5 Site Preparation 1 LS $ 75,000 $ 75,000 6 Remove and Dispose of Concrete Sidewalks and Driveways 475 SY $ 25 $ 11,875 7 Remove and Dispose of Concrete Curb or Curb & Gutter 175 LF $ 15 $ 2,625 8 Remove and Dispose of Storm Drain Pipe (up to 24") 34 LF $ 25 $ 850 9 Clearing and Grubbing 1 LS $ 50,000 $ 50,000 10 Construction Dewatering 1 LS $ 25,000 $ 25,000 11 Bypass Pumping 1 LS $ 90,000 $ 90,000 12 Granular Backfill (Trenches) 200 CY $ 75 $ 15,000 13 Select Backfill (Trenches) 200 CY $ 40 $ 8,000 14 Select Backfill (Excavations) 300 CY $ 50 $ 15,000 15 Flowable Fill (Trenches) 100 CY $ 150 $ 15,000 16 Class 7 Aggregate Base Course 200 CY $ 100 $ 20,000 17 Rock Excavation (Trenches) 1 LS $ 100,000 $ 100,000 18 Pipe Casing - 24" Steel (Open Cut) 100 LF $ 750 $ 75,000 19 Pipe Casing - 36" Steel (Bored) 100 LF $ 3,000 $ 300,000 20 Pipe Casing - 36" Steel (Open Cut) 340 LF $ 1,250 $ 425,000 21 Pipe Casing - 48" Steel (Open Cut) 360 LF $ 1,500 $ 540,000 22 Sanitary Sewer Trenching and Backfilling, 4-8' Deep (12-Inch) 154 LF $ 75 $ 11,550 23 Sanitary Sewer Trenching and Backfilling, 4-8' Deep (30-Inch) 30 LF $ 125 $ 3,750 24 Sanitary Sewer Trenching and Backfilling, 8-12' Deep (12-Inch) 62 LF $ 100 $ 6,200 25 Sanitary Sewer Trenching and Backfilling, 8-12' Deep (24-Inch) 15 LF $ 150 $ 2,250 26 Sanitary Sewer Trenching and Backfilling, 8-12' Deep (30-Inch) 369 LF $ 175 $ 64,575 27 Seeding, Fertilizing and Mulching 1,600 SY $ 6 $ 9,600 28 Solid Sodding 700 SY $ 12 $ 8,400 29 Asphalt Pavement Repair (Type 3, 3" Thickness) 360 SY $ 150 $ 54,000 30 Cold Milling Asphalt Pavement 360 SY $ 50 $ 18,000 31 Asphalt Cold Mix (3" Thickness) 2751 SY $ 100 $ 27,500 32 Curb and Gutter (Type A - Barrier) 175 LF $ 75 $ 13,125 33 Concrete Trail (12' width, 4" thickness) 200 SY $ 100 $ 20,000 34 18" ADS-N12 34 LF $ 100 $ 3,400 35 Reconstruct Inlet Top 2 EA $ 1,500 $ 3,000 36 Water Pipe (18" PVC, AWWA C900, Class 305, DR 14) 2,042 LF $ 175 $ 357,350 37 Ductile Iron Fittings 9,000 LBS $ 18 $ 162,000 38 18" Butterfly Valve with Valve Box 61 EA $ 25,000 $ 150,000 39 Fire Hydrant Assembly (Regular) 4 EA $ 7,500 $ 30,000 40 Connect to Existing 24" Water Main 2 EA $ 10,000 $ 20,000 41 Remove and Dispose Water Line (24-Inch) 1,260 LF $ 500 $ 630,000 42 Cut & Cap Existing 6" Water Line 1 EA $ 2,500 $ 2,500 43 Cut & Cap Existing 24" Water Line 4 EA $ 6,000 $ 24,000 44 Concrete Blocking 60 CY $ 175 $ 10,500 45 Water Line Marker Post 5 EA $ 150 $ 750 46 4" Combination Air/Vacuum Release Valve with Vault 1 EA $ 25,000 $ 25,000 47 1" Water Service Connection 2 EA $ 1,600 $ 3,200 48 Water Service Line (1" Copper Tubing, Type K) 20 LF $ 40 $ 800 49 1" Single Water Meter Box 1 EA $ 1,400 $ 1,400 50 Sewer Pipe (12" PVC, SDR 26) 216 LF $ 200 $ 43,200 51 Sewer Pipe (24" PVC, SDR 26) 15 LF $ 275 $ 4,125 52 Sewer Pipe (30" PVC, SDR 26) 399 LF $ 350 $ 139,650 53 Sewer Line Marker Post 6 EA $ 150 $ 900 54 Standard Depth Manhole (4' Diameter, 0-6' Deep) 4 EA $ 7,500 $ 30,000 55 Additional Manhole Depth (4' Diameter) 8 VF $ 300 $ 2,400 56 Standard Depth Manhole (6' Diameter, 0-6' Deep) 2 EA $ 12,000 $ 24,000 57 Additional Manhole Depth (6' Diameter) 9 VF $ 800 $ 7,200 58 Manhole Frame and Cover (Hinged & Locking) 6 EA $ 1,000 $ 6,000 59 Connect Sewer Main Pipe to Existing Manhole 1 EA $ 1,500 $ 1,500 60 JAbanclon Existing Manhole 2 EA $ 1,800 $ 3,600 61 1 Remove and Dispose of Manhole 2 EA $ 2,000 1$ 4,000 2022129 Pre -Final Cost Estimate -15th Street 1 Of 2 HN Pre -Final Design Cost Estimate ArDOT 1-49 Utility Relocations - 15th Street City of Fayetteville, Arkansas HWEI Project No. 2022129 July 21, 2023 9% CITY OF FAYETTEVILLE ARKANSAS Item No. Description Quantity/Unit Unit Price Total Price 62 Remove and Dispose of Sewer Main (12-Inch) 778 LF $ 150 $ 116,700 63 Remove and Dispose of Sewer Main (24-Inch) 233 LF $ 200 $ 46,600 64 Abandon & Grout Fill Sewer Main (12-Inch) 70 LF $ 150 $ 10,500 65 Abandon & Grout Fill Sewer Main (24-Inch) 172 LF $ 200 $ 34,400 66 Cut & Plug Existing 12" Sewer Main 2 EA $ 1,200 $ 2,400 67 Cut & Plug Existing 24" Sewer Main 1 EA $ 2,500 $ 2,500 68 Concrete Anchor Collar (12" Sewer Line) 6 CY $ 2,500 $ 15,000 69 Concrete Anchor Collar (30" Sewer Line) 16 CY $ 2,500 $ 40,000 70 Remove and Replace Fence (6' Tall, Security Steel) 258 LF $ 500 $ 129,000 71 Remove and Reinstall Light Pole 1 EA $ 8,000 $ 8,000 72 Stream Bank Protection and Restoration 1 LS $ 50,000 $ 50,000 TOTAL ESTIMATED CONSTRUCTED COST $ 4,367,875 2022129 Pre -Final Cost Estimate -15th Street 2 of 2