Resolution: 180-23
File Number: 2023-953
NABHOLZ CONSTRUCTION CO. (CHANGE ORDER):
A RESOLUTION TO APPROVE CHANGE ORDER NO. 13 TO THE CONTRACT WITH NABHOLZ
CONSTRUCTION CORPORATION IN THE AMOUNT OF $5,521,396.00 FOR WORK RELATED TO THE
CULTURAL ARTS CORRIDOR, AND TO APPROVE A BUDGET ADJUSTMENT — 2019 CULTURAL ARTS
CORRIDOR BOND PROJECT
WHEREAS, Change Order No. 13 includes the remaining bid packages in the Arts Corridor Project for the Civic Plaza
construction and street lighting infrastructure along West Avenue from Dickson Street to Watson Street.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Change Order No. 13 to the
Construction Manager at Risk Services Contract with Nabholz Construction Corporation, a copy of which is attached to
this Resolution, in the amount of $5,521,396.00 for the remaining bid packages in the Arts Corridor Project for the
Civic Plaza construction and street lighting infrastructure along West Avenue from Dickson Street to Watson Street.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of
which is attached to this Resolution.
PASSED and APPROVED on August 15, 2023
Page 1
Attest:
3
.f .:n:
�7 •z��
KaAY
ra Paxton, City Clerk Treasurer ��
lh•A-
N c.
CITY OF
FAYETTEVILLE
ARKANSAS
MEETING OF AUGUST 15, 2023
CITY COUNCIL MEMO
2023-953
TO:
Mayor Jordan and City Council
THRU:
Paul Becker, Chief Financial Officer
FROM:
Waylon Abernathy, Bond Projects & Construction Dir
DATE:
SUBJECT:
Resolution to approve Change Order #13 to RFQ-18-11 with Nabholz Construction
Corporation in the amount of $5,521,396.00 for Civic Plaza construction in the Arts
Corridor Project; to recognize interest revenue earned on the Arts Corridor and
Streets bonds; and to approve a budget adjustment.
RECOMMENDATION:
Resolution to approve Change Order #13 to RFQ-18-11 with Nabholz Construction Corporation in the amount
of $5,521,396.00 for the remaining bid packages in the Arts Corridor Project for the Civic Plaza construction
and street lighting infrastructure from Dickson to Watson; to recognize interest revenue earned on the Arts
Corridor and Streets bonds; and to approve a budget adjustment.
BACKGROUND:
Resolution 117-23 passed in May of this year for many of the Civic Plaza Bid Packages. This resolution is for
the remaining items.
DISCUSSION:
The scope of this change order includes demolition, earthwork, storm drainage, electrical, Structural and
Miscelanious Steel, Permeable Pavers, and Architectural Precast. Also included is the addition of
infrastructure for new street lighting from Dickson to Watson, which will connect the Arts Corridor to the deck.
BUDGET/STAFF IMPACT:
A budget adjustment is provided that will allocate funding from the following accounts.
G/L ACCT
PROJECT
AMOUNT
4708.860.7800-5804.00
46080.7800
5,350,000.00
4608.860.7800-5804.00
46080.7800
68,495.00
4602.860.7214-5814.00
46020.7214.1030
102,901.00
TOTAL
5,521,396.00
ATTACHMENTS: 2023-953 SRF Nabholz CO 13 Civic Plaza, 2023-953 BA Nabholz C013 Civic Plaza, PCCO
013 - Upper Ramble Civic Plaza Rebid GMP - To Be Executed, Nabholz Bidding Affidavit
Mailing address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
== City of Fayetteville, Arkansas
y 113 West Mountain Street
Fayetteville, AR 72701
(479)575-8323
- Legislation Text
File #: 2023-953
Resolution to approve Change Order #13 to RFQ-18-11 with Nabholz Construction Corporation
in the amount of $5,521,396.00 for Civic Plaza construction in the Arts Corridor Project; to
recognize interest revenue earned on the Arts Corridor and Streets bonds; and to approve a
budget adjustment.
A RESOLUTION TO APPROVE CHANGE ORDER NO. 13 TO THE CONTRACT WITH
NABHOLZ CONSTRUCTION CORPORATION IN THE AMOUNT OF $5,521,396.00 FOR WORK
RELATED TO THE CULTURAL ARTS CORRIDOR, AND TO APPROVE A BUDGET
ADJUSTMENT — 2019 CULTURAL ARTS CORRIDOR BOND PROJECT
WHEREAS, Change Order No. 13 includes the remaining bid packages in the Arts Corridor Project for
the Civic Plaza construction and street lighting infrastructure along West Avenue from Dickson Street to
Watson Street.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Change Order
No. 13 to the Construction Manager at Risk Services Contract with Nabholz Construction Corporation, a
copy of which is attached to this Resolution, in the amount of $5,521,396.00 for the remaining bid
packages in the Arts Corridor Project for the Civic Plaza construction and street lighting infrastructure
along West Avenue from Dickson Street to Watson Street.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget
adjustment, a copy of which is attached to this Resolution.
Page 1
City of Fayetteville Staff Review Form
2023-953
Item ID
8/15/2023
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
Wade Abernathy 7/28/2023 FACILITIES MANAGEMENT (140)
Submitted By Submitted Date Division / Department
Action Recommendation:
Resolution to approve Change Order #13 to RFQ-18-11 with Nabholz Construction Corporation in the amount of
$5,521,396.00 for the remaining bid packages in the Arts Corridor Project for the Civic Plaza construction and street
lighting infrastructure from Dickson to Watson; to recognize interest revenue earned on the Arts Corridor and
Streets bonds; and to approve a budget adjustment.
Budget Impact:
4708.860.7800-5804.00 Arts Corridor 2022 Bonds
4608.860.7800-5804.00 Arts Corridor 2019 Bonds
4602.860.7214-5814.00 Streets Protects 2019 Bonds
Account Number Fund
MIT-1 :11
46020.7214.1030
Project Number
Budgeted Item? Yes
Does item have a direct cost? Yes
Is a Budget Adjustment attached? Yes
Arts Corridor Improvements
Streets Bond Projects - Dickson St Pedestrian Impr
Total Amended Budget
Expenses (Actual+Encum)
Available Budget
Item Cost
Budget Adjustment
Remaining Budget
Project Title
$ 8,222,810.00
$ 8,026,858.23
195,951.77
$ 5,521,396.00
$ 5,418,495.00
93,050.77
V20221130
Purchase Order Number: 2023-000589 Previous Ordinance or Resolution # 117-23
Change Order Number: 13 Approval Date:
Original Contract Number: 2018-00000042
Comments:
City of Fayetteville, Arkansas - Budget Adjustment (Agenda)
Budget Year Division Adjustment Number
FACILITIES MANAGEMENT (140)
/Org2
2023
Requestor: Wade Abernathy
BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION:
Resolution to approve Change Order #13 to RFQ-18-11 with Nabholz Construction Corporation in the amount of
$5,521,396.00 for the remaining bid packages in the Arts Corridor Project for the Civic Plaza construction and street lighting
infrastructure from Dickson to Watson; to recognize interest revenue earned on the Arts Corridor and Streets bonds; and to
approve a budget adjustment.
COUNCIL DATE:
ITEM ID#:
8/15/2023
2023-953
Holly Black
7/26'/2023 9: 2S RM
Budget Division
TYPE:
JOURNAL#:
Date
D - (City Council)
RESOLUTION/ORDINANCE
I
GLDATE:
CHKD/POSTED:
TOTAL
Account Number
578,843 578,843
Increase / (Decrease)
Expense Revenue
Project.Sub#
Project Sub.Detl
AT
v.202373
Account Name
4708.860.7800-5804.00
5,350,000
-
46080
7800
EX
Building Costs
4708.860.7999-5899.00
4608.860.7800-5804.00
(5,350,000)
68,495
-
-
46080
46080
7999
7800
EX
EX
Unallocated - Budget
Building Costs
4608.860.7999-5899.00
(68,495)
-
46080
7999
EX
Unallocated - Budget
4708.860.7000-4707.47
4708.860.7999-5899.00
-
419,100
419,100
-
46080
46080
7000
7999
RE
EX
Interest - 2022 Project Funds
Unallocated - Budget
4608.860.7000-4707.46
4608.860.7999-5899.00
-
37,031
37,031
-
46080
46080
7000
7999
RE
EX
Interest - 2019 Project Funds
Unallocated - Budget
4602.860.7000-4707.46
4602.860.7999-5899.00
-
122,712
122,712
-
46020
46020
7000
7999
RE
EX
Interest - 2019 Project Funds
Unallocated - Budget
1 of 1
DocuSign Envelope ID: 066408B7-4B1A-44D3-9E5D-5F317A6FA40F
ILI is �NrEsnnr
1
Prime Contract Change Order
Fayetteville Cultural Arts Corridor Project # 02-19-2526 Nabholz Construction Corporation
113 W. Mountain St. Tel: Fax:
Fayetteville, AR 72701
Date: 7/27/2023
To Contractor:
Nabholz Construction Corporation
The Contract is hereby revised by the following items:
Upper Ramble Civic Plaza Rebid GMP
PCO Description
136 Upper Ramble Civic Plaza Rebid GMP
137 West Ave. Lighting
Architect's Project No:
Contract Date: 4/18/2018
Contract Number: 02-19-2526
Change Order Number: 013
Amount
5,521,396.00
0.00
This is a partial change order for the remaining bid packages procured for the project identified as Upper Ramble Civic Plaza. Nabholz
continues to seek opportunities for Value Engineering options. The following packages are included:
1. Cast -in -Place Concrete
2. Structural Steel & Misc Metals
3. Joint Sealants
4. Plumbing
5. Electrical
6. Site Demolition
7. Earthwork
8. Storm Drainage
9. Pavement Marking
10. Architectural Precast Concrete
11. Fencing & Gates
12.Pavers
13. Landscaping & Irrigation
These bids were based on 100% CD drawings dated 1/11/2023 and include the Addendum 1 drawings dated 1/30/2023. Included within
this change is the remaining cost (77%) of the overall project GC/GR's and Fee.
This project is scheduled for a 10-month duration with no weather days incorporated. This project will be impacted significantly by weather
events such as rain, snow, and wind. Therefore, it should be anticipated based on historical data that there will be approximately 90 days
of weather impacts to the overall schedule. This work will start at the completion of the Parking Deck project, and the project start date
and completion date will be established via zero -dollar change order upon completion of the Parking Deck.
Allowances are to be reconciled once the design documents are updated to reflect the approved Value Engineering options. Site Utilities
and Electrical Systems designs should be updated by the relevant design consultant of record. Contractor agrees to coordinate with the
City and Design Team to incorporate approved Value Engineering options into revised design documents under the criteria considered by
the Subcontractors while obtaining deductions.
PROJECT CONFIDENTIAL
Property of Nabholz Construction Corporation Not for Duplication or Distribution
This document includes data prepared in conjunction with the Project that is deemed trade secret or proprietary to Nabholz. This document is shared with
the Project team solely for use on this Project consistent with the responsibilities of the Project team. The Recipients shall not duplicate, use, or disclose, in
whole or in part, to any person, entity, or party outside the Project team without Nabholz' prior written authorization.
Prolog Manager Printed on: 7/27/2023 Nabholz Page 1
DocuSign Envelope ID: 066408B7-4B1A-44D3-9E5D-5F317A6FA40F
INTEGgIr�
I
Prime Contract Change Order
Private Confidential
The original Contract Value was..................................................................................................................... $
Sum of changes by prior Prime Contract Change Orders........................................................................... $
The Contract Value prior to this Prime Contract Change Order was................................................................ $
The Contract Value will be changed by this Prime Contract Change Order in the amount of .......................... $
The new Contract Value including this Prime Contract Change Order will be .................................................. $
The Contract duration will be changed by.....................................................................................................
The revised Substantial Completion date as of this Prime Contract Chance Order is .....................................
Nabholz Construction Corporation City of Fayetteville
CONTRACTOR
Address
BY Rob Do DocuSigned by:
SIGNATURE �°OIe 0
DATE 7/27/ r 72^EC1AFZ7454
OWNER
80, 000.00
10, 859, 585.28
10, 939, 585.28
5,521, 396.00
16,460,981.28
31 Days
10/31/2024
113 W. Mountain St
Address
By Lioneld o , Ma '
SIGNATURE
DATE 08 15 2023
PROJECT CONFIDENTIAL
Property of Nabholz Construction Corporation Not for Duplication or Distribution
This document includes data prepared in conjunction with the Project that is deemed trade secret or proprietary to Nabholz. This document is shared with
the Project team solely for use on this Project consistent with the responsibilities of the Project team. The Recipients shall not duplicate, use, or disclose, in
whole or in part, to any person, entity, or party outside the Project team without Nabholz' prior written authorization.
Prolog Manager Printed on: 7/27/2023 Nabholz
Page 2
DocuSign Envelope ID: 066408B7-4B1A-44D3-9E5D-5F317A6FA40F
JAA
Rebid Packages GMP
PROJECT NAME
Civic Plaza
PROD LOCATION
Fayetteville, AR
NABHOIZ
R VIEW DATE
23
/OByrd
ARCHITECT
Nelson Woltz
ESTIMATED DURATION
13 Mnth
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
Job Phasel
Nabholz
Description
Takeoff Quantity
Grand Total
Amount
01
Civic Space
03-0010
Concrete
Global Concrete Allowance
1.00 Isum
1,187,431
03-0010 Concrete
1.00 Isum
1,187,431
05-1205
Structural Steel & Misc Metals
Shade Structure Allowance
1.00 Isum
161,598
05-1205 Structural Steel & Misc Metals
1.00 Isum
161,598
07-1000
Joint Sealants
Crum & Marshall
1.00 Isum
17,848
07-1000 Joint Sealants
1.00 Isum
17,848
22-0000
Plumbing
Allied Plumbing
1.00 Isum
148,639
22-0000 Plumbing
1.00 Isum
148,639
26-1000
Electrical
Arnold & Blevins Allowance
1.00 Isum
2,254,717
26-1000 Electrical
1.00 Isum
2,254,717
31-0000
Site Demolition
Garrett X
1.00 Isum
197,053
31-0000 Site Demolition
1.00 Isum
197,053
31-1000
Earthwork
Garrett X - no topsoil
1.00 Isum
344,316
SWPPP Maintenance Allowance
1.00 Isum
10,161
31-1000 Earthwork
1.00 Isum
354,477
32-0000
Storm Drainage
Garrett X Allowance
1.00 Isum
704,358
32-0000 Storm Drainage
1.00 Isum
704,358
32-1000
Pavement Marking
Custom Pavement
1.00 Isum
3,949
32-1000 Pavement Marking
1.00 Isum
3,949
32-2000
Architectural Precast Concrete
Crete Cast Products
1.00 Isum
49,005
Precast Bench Install Allowance
1.00 Isum
50,805
32-2000 Architectural Precast Concrete
1.00 Isum
99,810
32-3113
Fencing & Gates
Temp Fence Allowance
1.00 Isum
18,290
32-3113 Fencing & Gates
1.00 Isum
18,290
32-6000
Pavers
Elevated Paver Systems Allowance
1.00 Isum
937,960
32-6000 Pavers
1.00 Isum
937,960
32-9323
Landscaping & Irrigation
Topsoil Add for Building Exteriors
1.00 Isum
38,408
32-9323 Landscaping & Irrigation
1.00 Isum
38,408
01 Civic Space
1.00 Isum
6,124,537
DocuSign Envelope ID: 066408B7-4B1A-44D3-9E5D-5F317A6FA40F
PROJECT NAME
PROD
NABHOIZ R EVIEW DATE
ARCHITECT
ESTIMATED DURATION
Rebid Packages GMP
Civic Plaza
Fayetteville, AR
7/26/2023
Nelson Byrd Woltz
13 Mnth
Estimate Totals
Cost of Work
6,124,537
6,124,537
Building Permit NIC
Municipal Fees
6,124,537
General Liability
68,595
Builder's Risk
9,387
Performance Payment Bond
36,103
Insurance
114,085
6,238,622
Construction Contingency
30,000
Contingency
30,000
6,268,622
GCs & GRs
620,492
Entegrity Sustainability Consulting
GCs/GRs
620,492
6,889,114
Preconstruction Services Fee
Project Fee
331,423
4.590
Contractors Fee
331,423
7,220,537
Total
7,220,537
- Pricing excludes any/all work in the areas that are designated as future development
and are highlighted in yellow on the attached Appendix A sheets.
- Only demolition work will be performed in the area highlighted in red on the attached
Appendix A sheets.
- In the absence of a Geotechnical Report on the project site, the demolition pricing
assumes the existing asphalt thickness is 3 inches.
PROJECT CONFIDENTIAL
Property of Nabholz Construction Corporation Not for Duplication or Distribution
This document includes data that is deemed trade secret or proprietary to Nabholz and prepared in
conjunction with the Project. This document is shared with the Project team solely for use on this Project
consistent with the responsibilities of the Project team. The Recipients shall not duplicate, use, or disclose,
in whole or in part, to any person, entity, or party outside the Project team without Nabholz' prior written authorization.
DocuSign Envelope ID: 066408B7-4B1A-44D3-9E5D-5F317A6FA40F
Appendix A: Scope Clarifications (1 of 3)
0
NO WORK IN THESE AREAS
THE AREAS HIGHLIGTED IN YELLOW ARE
FUTURE CONSTRUCTION AND HAVE BEEN
ELIMINATED FROM THE PROJECT.
BENCHMARKS
DEMOLITION NOTES:
1. ALL DEMOLITION IS TO BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE
CITY, COUNTY, STATE AND/OR GOVERNING BODYS STANDARDS.
2. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS ASSOCIATED
WITH THE DEMOLITION WORK AS DESCRIBED & SHOWN ON THESE PLANS.
3. ALL WORK WITHIN CITY RIGHT—OF—WAY WILL REQUIRE AN EXCAVATION PERMIT
IT IS THE CONTRACTORS RESPONSIBILITY TO OBTAIN THIS PERMIT.
4. THE EXISTING UTILITY LOCATIONS SHOWN ON THE PLANS ARE APPROXIMATE
AND MAY NOT INCLUDE ALL UNES PRESENT. THE CONTRACTOR SHALL BE
RESPONSIBLE TO CALL "811", AND COORDINATE FIELD LOCATION OF EXISTING
UNDERGROUND UTILITIES PRIOR TO BEGINNING DEMOUTION ACTINTIES. HKNOW
WHAT'S BELOW. CALL BEFORE YOU DIGH
5. CONTRACTOR SHALL COORDINATE WITH WATER, GAS, ELECTRIC,
TELEPHONE/FIBER, CABLE AND SANITARY SEWER PROVIDERS TO TERMINATE ALL
EXISTING SERVICES TO BUILDINGS MARKED FOR DEMOUTION ON THESE PLANS.
CONTRACTOR SHALL VERIFY WITH UTILITY PROVIDERS THAT SERVICES HAVE BEEN
DISCONNECTED PRIOR TO ANY REMOVAL OF INTERNAL SERVICE UNES.
6. THE DEMOLITION PLAN AND EXISTING CONDITIONS SHOWN ARE APPROXIMATE.
CONTRACTOR SHALL INSPECT AND FIELD VERIFY THE EXISTING SITE CONDITIONS
TO BECOME ACQUAINTED WITH ALL EXISTING CONDITIONS WHICH EFFECT ANY AND
ALL WORK ASSOCIATED WITH THE DEMOLITION PLANS.
7. ALL EXISTING SANITARY SEWER, STORM SEWERS, WATER SERVICE, GAS SERVICE,
TELEPHONE SERVICE, ETC. WITHIN THE AREA OF THE BUILDINGS AND OUTSIDE THE
BUILDINGS TO BE DEMOLISHED SHALL BE REMOVED FROM THE SITE AND DISPOSED
BY THE CONTRACTOR.
8. ALL EXISTING BUILDING FOUNDATIONS, CONCRETE, ASPHALT PAVEMENT, CURB &
GUTTER, RETAINING WALLS AND MISCELLANEOUS STRUCTURES INCLUDING BUT NOT
LIMITED TO LIGHT POLES AND BASES, AND MISCELLANEOUS DEBRIS SHALL BE
DEMOLISHED AND REMOVED FROM THE SITE AND SHALL BE DISPOSED OFF —SITE
AT CONTRACTORS EXPENSE TO AN APPROVED DUMP SITE, UNLESS OTHERWISE
NOTED.
9. IN THE EVENT THE CONTRACTOR ENCOUNTERS MATERIAL ON —SITE REASONABLY
BELIEVED TO BE ASBESTOS, LEAD —BASED PAINT OR ANY OTHER HAZARDOUS
MATERIAL, SAID MATERIAL SHALL BE REMOVED AND DISPOSED BY THE
CONTRACTOR IN ACCORDANCE WITH CITY, COUNTY, STATE & FEDERAL
REGULATIONS.
10. DEBRIS SHALL NOT BE BURIED ONSITE. ALL UNSUITABLE MATERIAL AND
DEBRIS SHALL BE REMOVED FROM THE SITE AND PROPERLY DISPOSED OFF —SITE
IN ACCORDANCE WITH ALL CITY, STATE, COUNTY & FEDERAL LAWS AND
ORDINANCES.
11. IF EXISTING UN —CAPPED WATER WELLS ARE DISCOVERED ON —SITE,
CONTRACTOR SHALL COORDINATE WITH AN AUTHORIZED COMPANY TO HAVE WELLS
PLUGGED AND CAPPED IN ACCORDANCE WITH ALL CITY, COUNTY, STATE &
FEDERAL LAWS AND ORDINANCES.
12. IF EXISTING SEPTIC SYSTEMS ARE DISCOVERED ON —SITE, CONTRACTOR SHALL
COORDINATE WITH A SEPTIC HAULER TO PUMP ANY REMAINING WASTEWATER AND
SLUDGE FROM ALL THE TANKS IN THE SYSTEM. CONTRACTOR SHALL REMOVE
EXISTING SEPTIC TANKS, LATERAL FIELDS AND ALL OTHER PARTS OF THE SYSTEM
IN ACCORDANCE WITH CITY, COUNTY, STATE & FEDERAL LAWS AND ORDINANCES.
13. ANY AREA DISTURBED BY DEMOLITION THAT WILL NOT BE DISTURBED IN
PROPOSED GRADING ACTIVITIES SHOWN ON THESE PLANS SHALL HAVE TOPSOIL
PLACED, SEEDED AND MULCHED ACCORDING TO THE CONTRACT SPECIFICATIONS.
14. ALL GAS MAINS & STRUCTURES SHALL BE PROTECTED IN PLACE
LEGEND
AREA OF DEMOLITION: REMOVE AND
DISPOSE OF EXISTING CONCRETE,
ASPHALT, SIDEWALK AND CURB AND
GUTTER.
SAW CUT EXISTING CONCRETE, CURB
AND GUTTER, ASPHALT, OR SIDEWALK.
— — — — — —
— — — RIGHT—OF—WAY LINE
— — —
— PROPERTY LINE
— — — — — —
— — — BUILDING SETBACK
-----------------
UTILITY EASEMENT
—SD—SD
SD EXIST. STORM LINE
EXIST. WATER LINE
cns
EXIST. GAS UNE
—
— EXIST. CONTOUR
®
BENCHMARK
^
EXIST. LIGHT POLE TO REMAIN
OO
EXIST. TRANSFORMER TO REMAIN
®
EXIST. GRATE INLET TO REMAIN
EXIST. TREE TO REMAIN
I
L
EXIST. CURB AND GUTTER TO REMAIN
a
EXIST. LIGHT POLE TO BE REMOVED
UJI
EXIST. TRANSFORMER TO BE REMOVED
99
EXIST. GRATE INLET TO BE REMOVED
EXIST. TREE TO BE REMOVED
II
EXIST. CURB AND GUTTER TO BE REMOVED
yL
iV i
EXIST. TREE TO BE REMOVED
I 1
EXIST. TREE TO REMAIN
r 1
L—J
EXIST. STRUCTURE TO REMAIN
CHISELED "+" IN CONCRETE BESIDE
SEAT WALL AT SW CORNER OF
INTERSECTION OF DICKSON ADN WEST
N - 637841.242
E - 672341.530
ELEV. - 1331.48
H
MAG NAIL AT NORTH SIDE OF TRAIL
I
CROSSING ALONG SPRING ST.
N - 637289.968
E - 672245.678
0' 15' 30' 80'
SCALE IN FEET
ELEV.- 1324.44
3
CIIIIIIlMmpuaig.
Nelson Byrd Woltz
Landscape Architects
310 East Market Street
Charlottesville, VA 22902
T.434.984.1358
F.434.984.4158
www.nbwla.com
flintlock
encxitsctuns '��exoscenc
olsson
TILLETT
ENS]AFINGINEERING
.,. :illfS LAC
-. Suit, 2G"30
»IEJtlA161Hl�lI�
dro 'i
_^MM^tig
A
ARCHETYPE
NO. Date Issues/Revisions
I IU-UI-2I /U7o UU
2 10-29-21 100% DID
3 07-22-22 50%CD
4 11-11-22 90%CD
5 12-02-22 100%CD
6 01-26-23 ADDENDUM I
PROFESSIONAL
ENGINEER
01/26/2023
Upper Ramble
Public Spaces
Fayetteville,
Arkansas
100% CONSTRUCTION DOCUMENTS
PROJECT NO.: FVLI814
DRAWN BY: NF, ZP, EH, AG
CHECKED BY: ZP, NF, JA
DEMOLITION PLAN
DATE: JANUARY, 262023
SCALE:
—911,i
DocuSign Envelope ID: 066408B7-4B1A-44D3-9E5D-5F317A6FA40F
I
CROSS -HATCHED AREA TO
BE CONSTRUCTED AFTER
DEVELOPMENT IS
COMPLETED - TO BE BID
WITH CURRENT PROJECT
D'
W
I_
12'
w
_ 42 -- -- -- �
-j-EX. SANITARY MANHOLE
FL= 1330.54 F-
49 O
DICKSON STREET
KEYNOTES:
O
INSTALL COBBLES. SEE LANDSCAPE ARCHITECT PLANS
FOR DETAIL.
Appendix A: Scope Clarifications (2 of 3)
O
INSTALL CONCRE E. SEE LANDSCAPE ARCHITECT PLANS
FOR DETAIL.
O
INSTALL ASPHALT. SEE SHEET C6.00 FOR DETAIL
®
®
INSTALL PAVERS. SEE LANDSCAPE ARCHITECT PLANS
II
FOR DETAIL.
INSTALL GUTTER. SEE LANDSCAPE ARCHITECT PLANS
FOR DETAIL.
I
I
6
O
INSTALL CONCRETE. SEE LANDSCAPE ARCHITECT PLANS
FOR DETAIL.
li cASEMENTA _ �
W o-
Z _
0
N I
18 �ti O) y L
� V7i D
17 7 n 21 27 Oi
O
-EXTENTS OF FUTURE /
BUILDING PER SEPARATE -
/PLANS & CONSTRUCTED /
UNDER SEPARATE CONTRACT
/® L
/2J 4'
2
33 1
42'
33
�.0 ' 74 S' .9•
II I 24 - -
8 /
1 s
14
-
E 24
Q- 7 24 ° 24 ,
5
23
5 24
0 7 R972' 33 / 3��?" ��ONry 14 O
I 6
5
O /
a / 3
12' 11
7 41 / 2
/ 32 � O I �
/
� I I >✓
o MATCH LINE - REFER TO C2.01 - SITE PLAN AND UTILITY PLAN SOUTH
U
o PAVEMENT MARKING NOTES: GENERAL NOTES:
a
5
CO TR T 0 TE T W
O
i INSTALL CONCRETE. SEE LANDSCAPE
ARCHITECT PLANS FOR DETAIL
" w
NO WORK IN THESE AREAS
INSTALL GRANITE. SEE LANDSCAPE ARCHITECT PLANS
FOR DETAIL.
O
ADA ACCESSIBLE CURB RAMP. SEE SHEET C6.00 FOR DETAIL
H EX. SANITARY MANHOLE
FL= 1323.61
10
& GUTTER.SEE
SHEETRCUCT 6.00 FORDDARD ETAILCURB
11
PROVIDE 2' CURB TRANSITION TO PAVEMENT. SEE SHEET C6.00 FOR
DETAIL
46
12
CONSTRUCT CONCRETE SIDEWALK FLUSH WITH PAVEMENT
�-
WATER - CP
PROFILE
13
CONSTRUCT OPEN AIR CHANNEL SEE LANDSCAPE
ARCHITECT PLANS FOR DETAILS.
R A 'hh 1
4
ARCHITECT PLANSRFOR DETAILS L SEE LANDSCAPE
R25
I
15
VALVE. VALVE 2 UD"MUST TAPPINGMUSTPAINTED RED WTH THCONSTRUCT SADDLE AND EnON
WORD "FIRE" CAST ON IT
43 LF WATER 8" D.I.P PUBLIC WATER MAIN W/ 42" MIN.
25'
76
R.
BUILD I1340
8" GATE VALVE, CAP, & RESTRAINED COUPUNG
-TO -ZONE
w�
1340
17
m
1g
8" FlRELINE STUB AND 2" METER BOX
1B
4' DIAMETER SANITARY SEWER MANHOLE. SEE SHEET
C6.01 FOR DETAIL
O
24
F,¢-
co
20
23 LF 6" SANITARY SERVICE LINE
-�
I
SANITARY SEWER CLEANOUT AND CAP
'^
STEEL SHADE STRUCTURE. REFER TO STRUCTURAL
�EX.I 40' R/W-�
22
ENGINEER FOR DETAIL AND SPECIFICATIONS.
--
01335
I
1335
23
PROPOSED CONTROLS ROOM. SEE LANDSCAPE ARCHITECT
AND STRUCTURAL PLANS FOR DETAILS.
LANDSCAPE FURNISHINGS. REFER TO LANDSCAPE
�-
24
ARCHITECT PLANS FOR DETAILS
STA: 0+17.57
EXISTING WATER LINE STUB FOR FUTURE BUILDING
I
EXISTING SANITARY CSD ROSSING
10.42 LF
25
CONNECTION
- 11
INV. 1330.73
DIP SDR-26 01.43%
EXISTING SANITARY SEWER STUB FOR FUTURE BUILDING
O
O
INSTAL 25.23
fINSTAL
26
CONNECTION
6" DIP ®1 00%
27
EXISTING 36" RCP STORM RE-ROUTE.
24
CONSTRUCT 12'X8" TAPPING
8" GATE VALVE, CAP, &
RESTRAINED COUPUNG
CONSTRUCT CONCRETE STAIRS SEE LANDSCAPE
1� I SADDLE AND VALVE 28 ARCHITECT PLANS FOR DETAIL.
1330
. / I' I- INSTALL 4.24 LF 29 INSTALL 6" HOPE STORM PIPE
T _ 45 DEGREE VERTICAL BEND
CD Oj 8" DIP SDRPZ
-26 ® 1.00% STA: 0+32.46 ROOF RAIN 30 LANDSCAPE ARCHITECTON TO PLANS FOR DETAILS
R F R TO
FL= 1329.78
45 DEGREE VERTICAL BEND INSTALL 6" UNDERDRAIN. CONNECT TO PROPOSED STORM
STA: 0+04.24 W FIRE NE STUB 31 SYSTEM
20 FL= 1330.04 AND 2" METER BOX Q INSTALL 12" HOPE STORM PIPE (TYP.)
L I 45 DEGREE VERTICAL BEND 45 DEGREE VERTICAL BEND
- STA: 0+05.74 STA: 0+30.96
_LIT I � IO
24
TPI
FL= 1328.54 i FL= 1328.28
33
APPROX. LOCATION OF EXISTING 6 XB BOX CULVERT
34
INSTALL 45 DEGREE BEND
~
INSTALL FOUNTAIN DRAIN UNE, CONTRACTOR TO REFER
TO FOUNTAIN MANUFACTURER FOR DETAILS
<n f'm STA: 0+37
PROPOSED IRRIGATION CISTERN. REFER TO IRRIGATION
M 24" RCP EXISTING STORM CROSSING
36
PLANS FOR DESIGN AND DETAILS
o+H
INV. 1324.55
ASPHALT PATCH FOR NEW SANITARY SERVICE
-
37
CONNECTION. SEE SHEET C6.01 FOR DETAIL
10'
38
ELECTRIC TRANSFORMER PAD LOCATION
39
ELECTRIC METER LOCATION
40
IRRIGATION CABINET LOCATION
5
EXISTING IRRIGATION CISTERN. EXTENDED MANHOLE TO
0+00 0+42.88
41
FINISHED GRADE. SEE SHEET C6.01 FOR DETAIL
2.5'
42
ASPHALT PATCH FOR NEW WATER SERVICE CONNECTION.
SEE SHEET C6.01 FOR DETAIL
0'
®
FURNISH AND INSTALL 43 LF 6" FIRE UNE STUB OUT
0' 10' 2
40'
IN
SCALE IN FEET
FURNISH AND INSTALL 44 LF 2" DOMESTIC WATERUNE
44
STUB OUT
- _ ® EXISTING Y WATER METER
CONSTRUCT MOUNTABLE CURB & GUTTER ALONG
I� ® EFFECTIVE RADIUS. SEE SHEET C6.00 FOR DETAIL
ICI = 0
U- 1. DO NOT APPLY PAVEMENT MARKING PAINT UNTIL LAYOUT, COLORS AND
PLACEMENT HAVE BEEN VERIFIED WITH THE ARCHITECT.
1(. CONTRACTOR SHALL HAVE ONE (1) SIGNED COPY THE PLANS
10. CONTRACTOR SHALL TAKE CARE NOT TO DAMAGE ANY EXISTING
DO
(WiHPROVED BY CITY OF FAYETTEVILLEONS, AR AND ONE ((1 COPY OF
DSTANDA�DS &
GSITE N
STREET, CURB AND GUTTER, SIDEWALK, DRIVEWAYS OR STRUCTURE
UNLESS SHOWN TO BE REMOVED.
U 2. ALLOW CONCRETE PAVING TO AGE FOR 28 DAYS BEFORE MARKING.
SPECIFICATIONSAPPROP ATTE
THE ATALLTIMES.ON
11. ALL WORK WITHIN ROAD RIGHT-OF-WAY SHALL CONFORM TO
U 3. ALL PAVEMENT SURFACES SHALL BE CLEANED/CLEARED OF ANY DEBRIS OR
Z CURING COMPOUNDS IN ACCORDANCE WITH MANUFACTURES REQUIREMENTS PRIOR
2. ALL REFERENCES CONTAINED WITHIN THESE PLANS TO THE
OWNER'S ENGINEER ARE HEREBY REFERENCED OLSSON, INC.
THE CITY OF FAYETTEVILLE, AR REQUIREMENTS, UNLESS OTHERWISE
NOTED.
LD TO ANY MARKING APPUCATIONS.
3. THE EXISTING UTILITY LOCATIONS SHOWN ON THE PLANS ARE
12. ALL TRAFFIC CONTROL SHALL BE IN CONFORMANCE WITH THE
`N 4. DETAILS NOT SHOWN SHALL BE IN CONFORMITY WITH THE STATE STANDARDS
APPROXIMATE AND MAY NOT INCLUDE ALL LINES PRESENT. THE
MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES MUTCD
( )
t FOR TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS, AND SIMILAR
CONTRACTOR SHALL BE RESPONSIBLE TO CALL 811 OR
1-800-482-8998, AND COORDINATE FIELD LOCATION OF EXISTING
13. CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL
REQUIREMENTS ESTABLISHED BY THE U.S. DEPARTMENT OF TRANSPORTATION,
FEDERAL HIGHWAY ADMINISTRATION.
p
UNDERGROUND UTILITIES PRIOR TO BEGINNING GRADING ACTIVITIES.
IISTOPII CALL BEFORE YOU DIGIT
PROPERTY CORNERS. ANY PROPERCORNER DISTURBED OR
TY
DAMAGED BY GRADING ACTIVITIES SHALL BE RESET BY A
PROFESSIONAL LAND SURVEYOR LICENSED IN THE STATE OF
- 5. PAINT FOR MARKING PAVEMENT SHALL CONFORM TO FEDERAL HIGHWAY
4. UTILITIES AS SHOWN WERE OBTAINED FROM INFORMATION
ARKANSAS, AT THE CONTRACTORS EXPENSE.
p MARKING STANDARDS. USE SHERWIN WILLIAMS PROFESSIONAL FAST DRY ACRYLIC
INDICATED ON THE SURVEY OR BY FIELD OBSERVATION.
_ LATEX TRAFFIC MARKING PAINT OR EQUAL, USE WHITE, BLUE OR YELLOW, WHERE
APPROPRIATE. UNLESS OTHERWISE DIRECTED, USE THE FOLLOWING:
CONTRACTOR SHALL FIELD VERIFY ALL HORIZONTAL AND VERTICAL
ONES AND GRADES OF EXISTING UTIUTIES PRIOR TO THE
CONSTRUCTION OF IMPROVEMENTS. CONTRACTOR SHALL NOTIFY THE
14. CONTRACTOR AND SUBCONTRACTOR SHALL BE RESPONSIBLE
FOR DETERMINING ALL EARTHWORK QUANTITIES. CONTRACTOR SHALL
PROVIDE ALL WORK AND MATERIALS AS SHOWN TO COMPLETE
IN SYSTEM. SEE LANDSCAPE
NOTE:
UNLESS OTHERWISE STATED ON THESE PLANS, T ♦Y ASH IS NOT AASH IS NOT A
CONTRACTOR TO REFER LANDSCAPE PLANS FORREE
VERTICAL BEND
dM�
SUITABLEREPLACEMENTFORLAYOUT
OF ALL SITE FURNISHINGS LIGHTPOLES
MENT. SEE SHEET C6.03 FOR
SHALL BE FORTHE
AING
ND FREEPOFLIC
STREETS IINCTOR
THE VICINITY OFRESPTHEONSIBLE JOB SITE
LEGEND
ROCKS, SOIL/MUD AND DEBRIS DURING ALL PHASES OF
CONSTRUCT N.
- - - RIGHT-OF-WAY UNE
- - - - - - PROPERTY UNE
22. CONTRACTOR SHALL CLEAN OUT ALL EXISTING AND PROPOSED
INLETS, PIPES AND MANHOLES OF DEBRIS AND SEDIMENTATION AT
-----------------
UTILITY EASEMENT
PROPOSED BUILDING SETBACK
COMPLETION OF SIIEWORK. THIS WORK SHALL BE DONE TO THE
SATISFACTION OF THE OWNER AND THE CITY OF FAYETTEVLLE, AR.
A BENCHMARK
23. CONTRACTOR SHALL RETAIN FLOATABLE WIND BLOWN MATERIALS
ON SITE BY STORING ALL TRASH AND BUILDING MATERIAL WASTE IN
INSTALL DOMESTIC WATER SERVICE LINE
GAS INSTALL GAS SERVICE
ENCLOSURES UNTIL PROPER DISPOSAL AT AN OFF -SITE FACILITY.
5G INSTALL STORM SEWER PIPE
CONTRACTOR TO CHECK ADJACENT AREAS DAILY AND PICK UP
CONSTRUCTION WASTE MATERIALS AND DEBRIS THAT HAVE BLOWN
OR WASHED OFF -SIZE.
55 INSTALL SANITARY SEWER SERVICE
FG INSTALL COMMUNICATION UNE
LICE UGE INSTALL UNDERGROUND ELECTRIC LINE
Q A. BLACKTOP OR BITUMINOUS ASPHALT PAVING: USE YELLOW COLOR.
B. PORTLACE CEMENT CONCRETE PAVING: USE YELLOW COLOR.
ENGINEER IMMEDIATELY UPON DISCOVERY OF A DISCREPANCY
CONSTRUCTION SHOWN ON PLANS.
24. CONTRACTOR IS RESPONSIBLE FOR PROVIDING BERMS, SILT
®
LOCATION OF PROPOSED STORM STRUCTURE
U
a C. ADA ACCESSIBLE PARKING AND ENTRYWAYS: USE YELLOW COLOR.
BETWEEN THE CONTRACT DRAWINGS AND ACTUAL FIELD CONDITIONS.
15. THE CONTOUR UNES, SPOT ELEVATIONS AND BUILDING FLOOR
FENCES, OR OTHER MEANS TO PREVENT ERODED MATERIALS FROM
REACHING THE PUBLIC RIGHT-OF-WAY AND ADJACENT PROPERTIES.
♦
BENCHMARK
D. PROVIDE PAINTED CURBS AT FIRE LANE DESIGNATIONS PER FIRE MARSHAL
Q
5. CONTRACTOR SHALL NOT CHANGE OR DEVIATE FROM THE PLANS
ELEVATIONS SHOWN ARE TO FINISH GRADE FOR TOP OF PAVEMENT,
IN THE EVENT THE PREVENTION MEASURES ARE NOT EFFECTIVE, THE
BENCHMARKS:
O
EXIST. LIGHT POLE
REQUIREMENTS.
WITHOUT FIRST OBTAINING WRITTEN APPROVAL FROM THE OWNER
AND ENGINEER.
SIDEWALKS, CURBS AND FLOOR SLABS, ETC. REFER TO TYPICAL
SECTIONS FOR PAVING, SLAB AND AGGREGATE BASE THICKNESS TO
CONTRACTOR SHALL REMOVE ANY DEBRIS, SILT, OR MUD AND
RESTORE THE RIGHT-OF-WAY TO ORIGINAL OR BETTER CONDITION.
©
0
EXIST. TRANSFORMER
EXIST. WATER METER
a+ 6. APPLY ALL MARKINGS USING APPROVED MECHANICAL EQUIPMENT (WITH
DEDUCT FOR GRADING LINE ELEVATIONS.
25. CONTRACTOR SHALL BE RESPONSIBLE TO CONTROL
"+"
®
EXIST. GRATE INLET
N PROVISIONS FOR CONSTANT AGITATION OF PAINT, CAPABLE OF APPLYING THE
6 CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN ALL PERMITS
AND PAY ALL FEES AS REQUIRED BY THE CONSTRUCTION COVERED
16. CONTRACTOR SHALL FINISH GRADE SLOPES AS SHOWN NO
DOWNSTREAM EROSION AND SILTATION DURING ALL PHASES OF
CHISELED IN CONCRETE BESIDE
Q MARKING WIDTHS AS SHOWN. PROVIDE A MINIMUM WET FILM THICKNESS OF 15
IN THESE PLANS.
STEEPER THAN 1 FOOT VERTICAL IN 3 FEET HORIZONTAL.
CONSTRUCTION. EROSION CONTROL PROCEDURES SHALL BE IN
SEAT WALL AT SW CORNER OF
EXIST. POWER POLE
v MILS. USE PNEUMATIC SPRAY GUNS FOR HAND APPLICATION OF PAINT. ALL
PLACE PRIOR TO BEGINNING GRADING ACTIVITIES.
INTERSECTION OF DICKSON ADN WEST
EXIST. POWER POLE W/ LIGHT
PAINTING EQUIPMENT AND OPERATIONS SHALL BE UNDER THE CONTROL OF
EXPERIENCED TECHNICIANS THOROUGHLY FAMILIAR WITH EQUIPMENT AND
7, ALL WORK AND MATERIALS SHALL BE SUBJECT TO INSPECTION
AND APPROVAL BY THE OWNER OR THE OWNER'S REPRESENTATIVE.
17. THE CONTRACTOR SHALL GRADE LANDSCAPED AREAS AT A MIN.
OF 1% TO PROVIDE POSITIVE DRAINAGE AWAY FROM BUILDINGS AND
26. CONSTRUCTION ACCESS TO THE SITE SHALL BE UMITED TO THE
N - 637841.242
®
g`^'�
EXIST. STEEL POST
EXIST. WATER VALVE
MATERIALS AND MARKING LAYOUTS.
SIDEWALKS
S WHEN FINISH LANDSCAPE MATERIALS ARE IN PLACE,
SAP HEET TEMPORARY CONSTRUCTION ENTRANCE(S) AS SHOWN ON
PROP. LIGHT POLE LOCATION. SEE LANDSCAPE
E; 7. DETAIL PAVEMENT MARKINGS SHALL BE THAT MARKING, EXCLUSIVE OF ACTUAL
TRAFFIC LANE MARKING, AT EXIT AND ENTRANCE ISLANDS AND TURNOUTS, ON
8. ANY ESTIMATES OF QUANTTIES ARE FOR INFORMATIONAL
PURPOSES ONLY. CONTRACTOR AND SUBCONTRACTOR SHALL BE
RESPONSIBLE FOR DETERMINING ALL QUANTITIES. CONTRACTOR
18. ALL BACKFlLL SHALL BE TAMPED. BACKFlLL WITHIN THE
27. TEMPORARY CONSTRUCTION ENTRANCE SHALL HAVE SHOT ROCK
E - 672341.530
ELEV. - 1331.48
ARCHITECT PLANS FOR DETAIL
01
CURBS, AT CROSSWALKS, AT PARKING BAYS AND AT SUCH OTHER LOCATIONS AS
g
SHALL PROVIDE ALL WORK AND MATERIALS TO COMPLETE
CONSTRUCTION AS SHOWN ON PLANS.
RIGHT-OF-WAY SHALL BE COMPACTED TO 95% MAX. DENSITY AS
PER ASTM-D698 (STANDARD PROCTOR COMPACTION)
FOR ITS SURFACE.
SHOWN. ADA ACCESSIBLE PARKING SPACES SHALL BE MARKED BY THE
28. EROSION CONTROL DEVICES SHALL BE MAINTAINED DURING THE
INTERNATIONAL ACCESSIBLE SYMBOL AT INDICATED PARKING SPACES. USE A
SUITABLE TEMPLATE THAT WILL PROVIDE A PAVEMENT MARKING WITH TRUE,
SHARP EDGES AND ENDS.
9, THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE RESTORATION
OF THE RIGHT-OF-WAY AND FOR DAMAGED IMPROVEMENTS SUCH
AS CURBS, SIDEWALKS, STREET LIGHT AND TRAFFIC SIGNAL
19. THE CONTRACTOR IS RESPONSIBLE FOR ATTENDING TO AND
CORRECTING UNSUITABLE SOIL CONDITIONS RELATED TO PLOW
ZONES, WET SOILS AND OTHER CONDITIONS. THE UNSUITABLE
CONDITIONS MUST BE CORRECTED PER THE GEOTECHNICAL
WHOLE CONSTRUCTION PERIOD BY THE CONTRACTOR.
29. CONTRACTOR SHALL PROTECT ANY STORM INLETS FROM
SEDIMENT THAT TAKE STORM WATER FROM THE AREA OF
MAG NAIL AT NORTH SIDE OF TRAIL
CROSSING SPRING ST.
_
JUNCTION BOXES, TRAFFIC SIGNAL LOOP LEAD INS, SIGNAL POLES,
ETC. DAMAGED IMPROVEMENTS SHALL BE REPAIRED IN
ENGINEER'S REPORT, WHERE REQUIRED, TO MEET PROJECT NEEDS.
CONSTRUCTION.
ALONG
N - 637289.968
b��YI1810Y0.
'i
CONFORMANCE WITH THE LATEST CITY STANDARDS AND TO THE
CITYS SATISFACTION.
20. ALL EXTERIOR CONCRETE SHALL HAVE A MINIMUM 28-DAY
COMPRESSIVE STRENGTH OF 4000 PSI AND BE AIR ENTRAINED.
30. ALL DISTURBED AREAS SHALL BE STABILIZED IN ACCORDANCE
WITH THE APPROVED EROSION CONTROL PLAN.
E - 672245.678
0'
10' 20' 4d Cr YmTc9El9.
SCALE IN FEET
ELEV.- 1324.44
Nelson Byrd Woltz
Landscape Architects
310 East Market Street
Charlottesville, VA 22902
T.434.984.1358
F.434.984.4158
www.nbwla.com
flintlock
e.cxl Tsc]u.. '&Ueel9sce9c
olsson
TILLETT s
FNSAENGINEERING
iM OLD J III L-0.
47 IN, j,ekBI 1 SCR, 26.830
II 0 4
MC
r au
J^MMObc,
A
ARCHETYPE
2 10-29-21 100% DID
3 07-22-22 501
4 11-11-22 90%CD
5 12-02-22 100%CD
6 01-26-23 ADDENDUM I
PROFESSIONAL
ENGINEER
`iG� Ne. 199]9�y19�,,
0l/26/2023
Upper Ramble
Public Spaces
Fayetteville,
Arkansas
100% CONSTRUCTION DOCUMENTS
PROJECT NO.: FVLI814
DRAWN BY: NF, ZP, EH, AG
CHECKED BY: ZP, NF, JA
SITE PLAN AND
UTILITY PLAN NORTH
DATE: JANUARY, 262023
SCALE:
MR
DocuSign Envelope ID: 066408B7-4B1A-44D3-9E5D-5F317A6FA40F
` _I_-ATC�HLINE REFER TOC2.00-: Appendix A: Scope Clarifications (3 of 3)
-MUST REMAIN ON
\ TIMES. PE
\ I - -- -- -- -- — — Z
N
un
——_<N O- -
9an11ary MH
Ra=131TO
NO WORK IN THESE AREAS
. NO IMPROVEMENTS IN THIS AREA. AREA
TO BE DEMOED AND STABILIZED FOR
IMPROVEMENTS IN A FUTURE PROJECT.
BUILD —TO —ZONE
40' R/W
NOTE:
CONTRACTOR TO REFER LANDSCAPE PLANS FOR
LAYOUT OF ALL SITE FURNISHINGS, LIGHTPOLES,
HARDSCAPE MATERIALS, AND STRUCTURES.
BENCHMARKS:
KEYNOTES:
O INSTALL COBBLES. SEE LANDSCAPE ARCHITECT PLANS
FOR DETAIL.
O INSTALL CONCRETE. SEE LANDSCAPE ARCHITECT PLANS
Is
FOR DETAIL.
O3 INSTALL ASPHALT. SEE SHEET C8.00 FOR DETAIL
® E INSTALL PAVERS. SEE LANDSCAPE ARCHITECT PLANS
FOR DETAIL.
O INSTALL GUTTER. SEE LANDSCAPE ARCHITECT PLANS
FOR DETAIL.
© INSTALL CONCRETE. SEE LANDSCAPE ARCHITECT PLANS
�FOORR DDEETA^IL.
O INSTALL CONCRETE. SEE LANDSCAPE
ARCHITECT PLANS FOR DETAIL
INSTALL GRANITE. SEE LANDSCAPE ARCHITECT PLANS
FOR DETAIL.
O ADA ACCESSIBLE CURB RAMP. SEE SHEET C6.00 FOR DETAIL
10 II' CONSTRUCT STANDARD CURB & GUTTER.SEE
SHEET C6.00 FOR DETAIL
11 PROVIDE 2' CURB TRANSITION TO PAVEMENT. SEE SHEET C6.00 FOR
DETAIL
12 CONSTRUCT CONCRETE SIDEWALK FLUSH WITH PAVEMENT
OCONSTRUCT OPEN AIR CHANNEL. SEE LANDSCAPE
13 ARCHITECT PLANS FOR DETAILS.
CONSTRUCT CONCRETE SEAT WALL. SEE LANDSCAPE
14 ARCHITECT PLANS FOR DETAILS
15 CONSTRUCT 12'X6" TAPPING SADDLE AND VALVE
16 37 LF WATER 6" D.I.P FIRELINE W/ 42" MIN. COVER.
17 8" GATE VALVE, PLUG, & RESTRAINED COUPLING
1g B" FREUNE STUB AND 2" METER BOX
1g 4' DIAMETER SANITARY SEWER MANHOLE
20 20 LF 6" SANITARY SERMCE LINE
21 SANITARY SEWER CLEANOUT
STEEL SHADE STRUCTURE. REFER TO STRUCTURAL
22 ENGINEER FOR DETAIL AND SPECIFICATIONS.
PROPOSED CONTROLS ROOM. SEE LANDSCAPE ARCHITECT
23 AND STRUCTURAL PLANS FOR DETAILS.
LANDSCAPE FURNISHINGS. REFER TO LANDSCAPE
24 ARCHITECT PLANS FOR DETAILS
EXISTING WATER LINE STUB FOR FUTURE BUILDING
25 CONNECTION
EXISTING SANITARY SEWER STUB FOR FUTURE BUILDING
26 CONNECTION
27 EXISTING 36" RCP STORM RE-ROUTE.
CONSTRUCT CONCRETE STAIRS. SEE LANDSCAPE
28 ARCHITECT PLANS FOR DETAIL.
2g INSTALL 6" HOPE STORM PIPE
ROOF DRAIN CONNECTION TO BUILDING. REFER TO
30 LANDSCAPE ARCHITECT PLANS FOR DETAILS
INSTALL 6" UNDERDRAIN. CONNECT TO PROPOSED STORM
31 SYSTEM
32 INSTALL 12" HOPE STORM PIPE (TYP.)
33 APPROX. LOCATION OF EXISTING 6'X6' BOX CULVERT
34 INSTALL 45 DEGREE BEND
OINSTALL FOUNTAIN DRAIN UNE, CONTRACTOR TO REFER
35 TO FOUNTAIN MANUFACTURER FOR DETAILS
PROPOSED IRRIGATION CISTERN. REFER TO IRRIGATION
36 PLANS FOR DESIGN AND DETAILS
ASPHALT PATCH FOR NEW SANITARY SERMCE
37 CONNECTION. SEE SHEET G6.01 FOR DETAIL
38 ELECTRIC TRANSFORMER PAD LOCATION
3g ELECTRIC METER LOCATION
® IRRIGATION CABINET LOCATION
EXISTING IRRIGATION CISTERN. EXTENDED MANHOLE TO
41 FINISHED GRADE. SEE SHEET C6.01 FOR DETAIL
CONSTRUCT CONCRETE WALL SEE LANDSCAPE
42 ARCHITECT PLANS FOR DETAILS
® FURNISH AND INSTALL 43 LF 6" FIRE UNE STUB OUT
OFURNISH AND INSTALL 44 LF 2" DOMESTIC WATERUNE
44 STUB OUT
® EXISTING 2" WATER METER
®CONSTRUCT MOUNTABLE CURB & GUTTER ALONG
EFFECTIVE RADIUS. SEE SHEET C6.00 FOR DETAIL
47 20 LF MULTIFLOW UNDERDRAIN SYSTEM. SEE LANDSCAPE
ARCHITECT SHEET L5.10 FOR DETAIL
® INSTALL 12" X 18" TEE
LEGEND
RIGHT-OF-WAY UNE
- - - - — PROPERTY LINE
- - - - - UTILITY EASEMENT
PROPOSED BUILDING SETBACK
A BENCHMARK
w INSTALL DOMESTIC WATER SERMCE UNE
GAs INSTALL GAS SERMCE
so INSTALL STORM SEWER PIPE
INSTALL SANITARY SEWER SERMCE
INSTALL COMMUNICATION LINE
uGE ucE INSTALL UNDERGROUND ELECTRIC UNE
® LOCATION OF PROPOSED STORM STRUCTURE
BENCHMARK
d EXIST. UGHT POLE
EXIST. TRANSFORMER
EXIST. WATER METER
I-+ EXIST. GRATE INLET
EXIST. POWER POLE
CHISELED "+" IN CONCRETE BESIDE
EXIST. POWER POLE W/ LIGHT
EXIST. STEEL POST
SEAT WALL AT SW CORNER OF
EXIST. WATER VALVE
�^
INTERSECTION OF DICKSON ADN WEST
PROP. UGHT POLE LOCATION. SEE LANDSCAPE
ARCHITECT PLANS FOR DETAIL
N - 637841.242
E - 672341.530
ELEV. - 1331.48
N
MAG NAIL AT NORTH SIDE OF TRAIL
,
CROSSING ALONG SPRING ST.
Or(/Clr/I/JG/J
N - 637289.968
E - 672245.678 0'
10' 20' 4d �9MmFNal9.
SCALE IN FEET
ELEV.- 1324.44
Nelson Byrd Woltz
Landscape Architects
310 East Market Street
Charlottesville, VA 22902
T.434.984.1358
F.434.984.4158
www.nbwla.com
flintlock
ns 'REeHoscenE
olsson
TILLETT
FNSAENGINEERING
I TCC',;)LJ J 111 S LJC
41 lack BI 1 S t_ 2660
g:, III s GOFy4
»IEJtlA161H✓�91�
ciro
_^MM^tig
A
ARCHETYPE
NO. Date Issues/Revisions
I IU-UI-21 /U% DID
2 10-29-21 100% DID3 07-22-22 50% CD
4 11-11-22 90%CD
5 12-02-22 100% CID
6 01-26-23 ADDENDUM I
P-�/RO�FESS1aN�Al
ENGINEER
��L' Ne. 19979Opyrr••
O1/26/2023
Upper Ramble
Public Spaces
Fayetteville,
Arkansas
100% CONSTRUCTION DOCUMENTS
PROJECT NO.: 1814
DRAWN BY: NF, ZP, EH, AG
CHECKED BY: ZP, NF, JA
SITE PLAN AND
UTILITY PLAN SOUTH
DATE: JANUARY, 262023
SCALE:
A"/ff
DocuSign Envelope ID: O664O8B7-4B1A-44D3-9E5D-5F317A6FA4OF
VALUE ANALYSIS •O•
PROJECT NAME: Civic Plaza Re -Bid Packages GMP
NA OLZ
REPORT DATE: 7/27/2023
ItemDate
Comments
Alternates
Alternate #1 Provide alternate paver options for all
($308,972.00)
2
1
but paver type P4.
Alternate #2 Provide alternate paver options for all
2
pavertypes.
x
($408,212.00)
1
Alternate #3 Provide alternate pricing to remove
black granite aggregate and use typical aggregate
x
($83,479.00)
3
with a sandblast finish.
Alternate #4 Provide deductive alternate to remove
4
the demolition of the existing asphalt.
x
($31,550.00)
Value Engineering
Remove Shade Structure Allowance from scope
Footings for Shade Structure would remain. An
x
($159,038.00)
allowance would have to be held to provide an
1
enclosure for the electrical panels.
Allowance to reduce Signage and Wayfinding scope
This allowance is based on carrying 0 for the
to only include the signage along the trail.
x
($94,000.00)
signage package along the trail.
trail.
2
Removal of Site Furnishings scope completely
x
($261,678.00)
3
included CO #12.
Omit L Shaped Lounge Custom Furniture Piece
4
included in CO #12.
x
($60,671.00)
City to provide and install the MMCITE Bike Racks.
Adjustment to pricing included in CO #12.
x
($13,364.00)
5
6
Allowance for OFCI Multi -duct Comm Lines
x
($15,700.00)
7
Allowance to Omit Camera Poles
x
($116,025.00)
8
Allowance to Omit Lane Counter
x
($37,480.00)
9
Allowance to Reduce 400A Company Switch to 200A
x
($12,500.00)
Allowance for alternate Lighted Bollards
x
($20,000.00)
Excludes Bollards at fountain. Proposed alternate not
10
accepted for fountain bollards.
11
Allowance to reduce Power Pedestals (6 Total)
x
($3,500.00)
Allowance to reduce the lighting from Spring St. to
x
($147,840.00)
12
Dickson.
Allowance to remove the Irrigation Cistern from the
Earthwork Scope.
x
($15,000.00)
13
VE to utilize Nyoplast basins in lieu of concrete at
Granite Cobble Gutter.
$0.00
Pending further evaluation by the design team.
14
VE to utilize alternate steel grates at Granite Cobble
Gutter.
$0.00
Pending further evaluation by the design team.
15
Allowance to reduce the storm drainage piping depth
16
and simplify the backfill requirements
x
($211,200.00)
17
lAllowance to downsize the 7 & 5 Gallon plants
x
($4,108.00)
Allowance to reduce 6" Trees to 4" and 4" Trees to
x
($16,955.00)
Combination of some trees and some shrub size
18
3„
reduction
19
Allowance to substitute Patriot Bermuda Sod for
x
($11,900.00)
20
Allowance to omit Irrigation Pump
x
($62,000.00)
Allowance to downsize the Pennsylvania Sedge from
x
($9,370.00)
21
1 gal to plugs
22
OH&P
x
($133,837.00)
23
$0.00
24
Use of owner contingency
x
($63,223.00)
25
$0.00
Add for Street Light Infrastructure Dickson to Watson
x
$102,901.00
OH&P was already applied to the change order
26
previously.
27
$0.00
28
$0.00
29
$0.00
30
$0.00
31
$0.00
32
$0.00
:I an HIM IT TOTAL REJECTEM 190,588.00
SUMMARY
WORKING BUDGET: $7,220,537.00 TARGET BUDGET: $5,521,396.09
ANTICIPATED SAVINGS: $1,699,141.00 CONTINGENCY / ESCALATION: $0.00
REVISED WORKING BUDGET: $5,521,396.00 DIFFERENCE: $0.00
Page 1 of 1
Value Analysis and/or Constructability Suggestions are advisory only and not professional design services. Nabholz takes no responsibility for design.
AFFIDAVIT OF COMPLIANCE
CONSTRUCTION MANAGER -AT -RISK
PROJECT: _Upper Ramble Public Spaces
I, Kyle Stout, having been first duly sworn and authorized, provide this Affidavit for and on behalf of
Nabholz Construction Company and state the following to the best of my knowledge and belief in
reference to the project solicited and Contracted under RFQ 18-11 and applicable to Change Order # 13:
1. My name is Kyle Stout and I am the Project Executive for Nabholz Construction Companv. I am
qualified and authorized to execute this affidavit.
2. Nabholz Construction Company, pursuant to its contract with the City of Fayetteville, hereby
certifies that it has reviewed the provisions set forth in Ark. Code Ann. § 14-58-1001, and verifies
that it has complied with applicable provisions of that statute and all other applicable rules and
regulations, whether recited in §14-58-1001 or elsewhere in Arkansas law, for the above -identified
project.
3. The City of Fayetteville shall be held harmless and indemnified for any disputes that arise regarding
the procurement and bidding processes performed by Nabholz Construction Companv.
FURTHER AFFIANT SAYETH NOT.
Signed this25 day of July 2023.
Kyle Stout
PRINTED NAME
Project Executive
TITLE
STATE OF Arkansas )
COUNTYOF Benton )
ATURE
Subscribed and sworn to before me, a Notary Public, this 25 day of July . 2023.
LEAH B MACKEY
NOTARY PUBLIC
BENTON C ARKANSAS
COMM 3/17132
COMMISSION NO, 12718311
o ry Public
My Commission Expires: �7%�
Co
'pt,w
113 West Mountain Street
Fayetteville, AR 72701
(479)575-8323
Resolution: 31-24
File Number: 2023-1556
NABHOLZ CONSTRUCTION,CO.(CHANGE ORDER):
A RESOLUTION TO APPROVE CHANGE ORDER NO. 14 TO THE CONTRACT WITH NABHOLZ
CONSTRUCTION CORPORATION IN THE AMOUNT OF $137,742.40 FOR WORK RELATED TO THE
CULTURAL ARTS CORRIDOR REPLACEMENT PARKING DECK PROJECT, AND TO APPROVE A BUDGET
ADJUSTMENT—2019 CULTURAL ARTS CORRIDOR BOND PROJECT
WHEREAS, Change Order No. 14 includes items required by the Fire Marshal for the parking deck life safety
systems, as well as masonry walls, bullet resistant glass and frames, and plumbing for the Police Department
substation.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Change Order No. 14 to the
Construction Manager at Risk Services Contract with Nabholz Construction Corporation,a copy of which is attached to
this Resolution, in the amount of$137,742.40 for the additional work related to the Replacement Parking Deck Project.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of
which is attached to this Resolution.
PASSED and APPROVED on January 18,2024
Approve : Attest:
•‘\\V\ 1 'I ;7 '
vY ,�
y =
lone c Jordan,Ma or Kara Paxton,City('lt • Treasurer '▪ �'
may'.▪ -', • •�.'
Page 1
CITY of CITY COUNCIL MEMO
%orARKANS EVILLE
ARKANSAS 2023-1556
MEETING OF JANUARY 18, 2024
TO: Mayor Jordan and City Council
THRU: Paul Becker, Chief Financial Officer
FROM: Waylon Abernathy, Bond Projects & Construction Dir
DATE:
SUBJECT: Approval of Change Order#14 to RFQ 18-11 Contract with Nabholz Construction for
the Replacement Parking Deck and approve a Budget Adjustment.
RECOMMENDATION:
Approval of Change Order#14 to RFQ 18-11 Contract with Nabholz Construction for the Replacement Parking
Deck in the amount of$137,742.40 and approve a Budget Adjustment.
BACKGROUND:
Resolution 117-23 approved underground plumbing and Bullet Resistant Storefronts for the west ave. PD
Substation in the replacement parking deck. Individual contracts for slab, metal stud and drywall, and
electrical, have been administered by our Facilities Maintenance Division.
DISCUSSION:
This change order includes items required by the Fire Marshal for the Parking Decks Life Safety systems,
which included 2 way comm system and Voice module in the elevator lobby, and additional cable steel railings
at floor level transitions. It also includes PD substation vestibule masonry walls, Bullet Resistant Glass and
Frames, and the Plumbing above slab piping and fixtures.
BUDGET/STAFF IMPACT:
The PD Substation funding from project 07001.7820 Police Substation Project. The life safety items funding
from interest and 2019 Arts Corridor Bond Funds accounts with a Budget Adjustment. The contract will be
expensed in the following GLACCOUNT/Project:
GLACCOUNT PROJECT AMOUNT
2300.200.9300-5804.00 - Building Costs 07001.7820 - Police Substation $100,328.40
4608.860.7820-5804.00 - Building Costs 46080.7820 - Parking Deck $ 37,414.00
$ 137,742.40
ATTACHMENTS: SRF (#3), BA (#4) , Prime Contract Change Order#014-
Vestibule,_Comm_Sys_and_Barrier_Cables-2023-12-19 KS (#5)
Mailing address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
City of Fayetteville, Arkansas
Legislation Text 113 West Mountain Street
Fayetteville,AR 72701
(479)575-8323
r
File #: 2023-1556
Approval of Change Order#14 to RFQ 18-11 Contract with Nabholz Construction for the
Replacement Parking Deck and approve a Budget Adjustment.
A RESOLUTION TO APPROVE CHANGE ORDER NO. 14 TO THE CONTRACT WITH
NABHOLZ CONSTRUCTION CORPORATION IN THE AMOUNT OF $137,742.40 FOR WORK
RELATED TO THE CULTURAL ARTS CORRIDOR REPLACEMENT PARKING DECK
PROJECT, AND TO APPROVE A BUDGET ADJUSTMENT — 2019 CULTURAL ARTS
CORRIDOR BOND PROJECT
WHEREAS, Change Order No. 14 includes items required by the Fire Marshal for the parking deck life
safety systems, as well as masonry walls, bullet resistant glass and frames, and plumbing for the Police
Department substation.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE,ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Change Order
No. 14 to the Construction Manager at Risk Services Contract with Nabholz Construction Corporation, a
copy of which is attached to this Resolution, in the amount of $137,742.40 for the additional work
related to the Replacement Parking Deck Project.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget
adjustment, a copy of which is attached to this Resolution.
Page 1
City of Fayetteville Staff Review Form
2023-1556
Item ID
1/16/2023
City Council Meeting Date-Agenda Item Only
N/A for Non-Agenda Item
Wade Abernathy 12/21/2023 FACILITIES MANAGEMENT(140)
Submitted By Submitted Date Division/Department
Action Recommendation:
Approval of a Resolution to authorize Change Order#14 to the RFQ-18-11 Contract with Nabholz Construction
Corporation for Life Safety Items and PD Substation items for the Replacement Parking Deck in the amount of
$137,742.40 and approval of a Budget Adjustment.
Budget Impact:
4608.860.7820-5804.00 4608-Arts Corridor
2300.200.9300-5804.00 2300- Impact Fee
Account Number Fund
46080.7820 46080.7820-Arts Corridor Bonds,Parking Deck
07001.7820 07001.7820-Police Impact Fee Improvements,Police Substation
Project Number Project Title
Budgeted Item? Yes Total Amended Budget $ 107,674.00
Expenses (Actual+Encum) $ -
Available Budget $ 107,674.00
Does item have a direct cost? Yes Item Cost $ 137,742.40
Is a Budget Adjustment attached? Yes Budget Adjustment $ 30,069.00
Remaining Budget
V20221130
Purchase Order Number: 2020-689 Previous Ordinance or Resolution# 180-23
Change Order Number: 14 Approval Date: 9/19/2023
Original Contract Number: 2018-00000042
Comments:
City of Fayetteville,Arkansas- Budget Adjustment (Agenda)
Budget Year Division Adjustment Number
BUDGET&INFORMATION MGMT(133)
/O rg2
2024 (BY)
Requester: Kevin Springer
BUDGET ADJUSTMENT DESCRIPTION/JUSTIFICATION:
Approval of a Resolution to authorize Change Order#14 to the RFQ-18-11 Contract with Nabholz Construction Corporation
for Life Safety Items and PD Substation items for the Replacement Parking Deck in the amount of$137,742.40 and approval
of a Budget Adjustment.
COUNCIL DATE: 1/16/2024
ITEM ID#: 2023-1556
Kevin Springer
12/22/2023 70:53 A/YI
Budget Division Date
D - (City Council)
TYPE:
JOURNAL#:
GLDATE:
RESOLUTION/ORDINANCE CH KD/POSTED:
TOTAL 30,069 30,069 v.20231213
Increase/(Decrease) Project.Sub#
Account Number Expense Revenue Project Sub.Detl AT Account Name
4608.860.7820-5804.00 37,414 - 46080 7820 EX Building Costs
4608.860.7999-5899.00 (10,477) - 46080 7999 EX Unallocated-Budget
4608.860.7999-5899.00 3,132 - 46080 7999 EX Unallocated-Budget
4608.860.7000-4707.46 - 30,069 46080 7000 RE Interest-2019 Project Funds
1 (>r I
%NtEcr PCPCCO #014
NAOLZ
Nabholz Construction-Rogers Project:02-22-2674-Downtown Parking Deck
3301 N 2nd Street 325 N.West Ave
Rogers,Arkansas 72756 Fayetteville,Arkansas 72701
Phone:+14796597800
Prime Contract Change Order #014: PD Substation Vestibule, Comm
System and Barrier Cables
TO: CITY OF FAYETTEVILLE FROM: Nabholz Construction Corporation
113 W MOUNTAIN
FAYETTEVILLE, Arkansas 72701
DATE CREATED: 12/19/2023 CREATED BY: Chad Robinson(NABHOLZ
CONSTRUCTION CORP/ROG)
CONTRACT STATUS: Pending-In Review REVISION: 0
DUE DATE: REVIEW DATE:
SCHEDULE IMPACT: 137 days EXECUTED: No
REVISED SUBSTANTIAL 02/23/2024 SIGNED CHANGE ORDER
COMPLETION DATE: RECEIVED DATE:
CONTRACT FOR: 1:City of Fayetteville Contract TOTAL AMOUNT: $137,742.40
DESCRIPTION:
Funding for barrier cables on grid line 9 on levels 2-5,a 2-way emergency communications system for each level of the elevator lobbies with an added
module to make the system compatible for a VOIP phone system and the police substation vestibule with bullet resistant door and window plus all
plumbing for the substation.
ATTACHMENTS:
CHANGE ORDER REQUESTS IN THIS CHANGE ORDER:
COR# Title Schedule Impact Amount
075 Vest,Comm and Cabl $137,742.40
Total: $137,742.40
POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER:
PCO# Title Schedule Impact Amount
75A Gridline 9 Barrier Cable Steel $20,250.00
75B 2-Way Comm System $16,621.00
75C VOIP Module $543.00
75D Police Substation Vestibule 173 days $100,328.40
Total: $137,742.40
The original(Contract Sum) $11,629,483.00
Net change by previously authorized Change Orders $1,200,246.61
The contract sum prior to this Change Order was $12,829,729.61
The contract sum would be changed by this Change Order in the amount of $137,742.40
The new contract sum including this Change Order will be $12,967,472.01
The contract time will be Increased by this Change Order by 137 days.
The Revised Substantial Completion Date will be 2/23/2024
Nabholz Construction-Rogers Page 1 of 2 Printed On: 12/19/2023 03:38 PM
surr
�`tt PCCO #014
NA ' oli
CITY OF FAYETTEVILLE Nabholz Construction Corporation
VI9
SIGNATURE,- DATE 1(_i TUR D TE
Printed Na a loylet.01.10+(ota,l'1 Printed Name Kyle Stout
Title MA or Title Project Executive
Nabholz Construction-Rogers Page 2 of 2 Printed On: 12/19/2023 03:38 PM
,N„cerrr PCCO #014
NA ' 011
Nabholz Construction- Rogers Project:02-22-2674-Downtown Parking Deck
3301 N 2nd Street 325 N.West Ave
Rogers,Arkansas 72756 Fayetteville,Arkansas 72701
Phone:+14796597800
Prime Contract Change Order #014: PD Substation Vestibule, Comm
System and Barrier Cables
TO: CITY OF FAYETTEVILLE FROM: Nabholz Construction Corporation
113 W MOUNTAIN
FAYETTEVILLE, Arkansas 72701
DATE CREATED: 12/19/2023 CREATED BY: Chad Robinson(NABHOLZ
CONSTRUCTION CORPIROG)
CONTRACT STATUS: Pending-In Review REVISION: 0
DUE DATE: REVIEW DATE:
SCHEDULE IMPACT: 137 days EXECUTED: No
REVISED SUBSTANTIAL 02/23/2024 SIGNED CHANGE ORDER
COMPLETION DATE: RECEIVED DATE:
CONTRACT FOR: 1:Cly of Fayetteville Contract TOTAL AMOUNT: $137,742.40
DESCRIPTION.
Funding for barrier cables on grid line 9 on levels 2-5,a 2-way emergency communications system for each level of the elevator lobbies with an added
module to make the system compatrh'n ror a VOIP;none system and the police substation vestibule with bullet resistant door and window plus all
pk;mu ny for the substation
ATTACHMENTS:
CHANGE ORDER REQUESTS IN THIS CHANGE ORDER:
COR# Title Schedule Impact Amount
075 Vest,Comm and Cabi $137,742.40
Total: $137,742.40
POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER:
PCO# Title Schedule Impact Amount
75A Gridline 9 Berner Cable Steel $20,250.00
75B 2-Way Comm System $16,621.00
75C VOIP Module $543.00
75D PolIce Substation Vestibule 173 days $100,328.40
Total: $137,742.40
The original(Contract Sum) $11,829,483.00
Net change by previously authorized Change Orders $1,200,248.61
The contract sum prior to this Change Order was 512,829,729.61
The contract sum would be changed by this Change Order In the amount of $137,742.40
The new contract sum including this Change Order will be $12,987,472.01
The contract time will be increased by this Change Order by 137 days.
The Revised Substantial Completion Date will be 2/23/2024
Nabholz Construction-Rogers Page 1 of 2 Printed On:12/19/2023 03:38 PM