Loading...
2022-06-28 - Agendas - FinalCITY OF _! FAYETTEVILLE ARKANSAS MEETING AGENDA City Council Transportation Committee Tuesday, June 28, 2022 5:30 pm or Immediately Following Agenda Session NOTICE: THE TRANSPORTATION COMMITTEE WILL BE HELD VIRTUALLY WITH NO PHYSICAL LOCATION TO ATTEND VIDEO CONFERENCING BY ZOOM WILL BE USED FOR THIS MEETING. TO REGISTER FOR THE MEETING GO TO THIS Registration Link Members: Sarah Bunch, Chairperson; Sonia Harvey; Holly Hertzberg; Mark Kinion City Staff: Chris Brown, Public Works Director/City Engineer; Terry Gulley, Asst. PW Director for Operations/Transportation Services Director Agenda: 1. New Business: A. Appleby Bikeway Striping: Review of proposed bike lane improvements along sections of Appleby Road B. ARDOT 1-49 / MLK Interchange Improvements: Project update. https://vpiph03-job-040846-hwy-62-interchange-improvements-ardot.hub.arcqis.com/ 2. Adjourn Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 CITY OF -- ! FAYETTEVILLE ARKANSAS TO: Transportation Committee THRU: Chris Brown, Public Works Director Matt Mihalevich, Active Transportation Manager FROM: Dane Eifling, Mobility Coordinator DATE: June 231h, 2022 SUBJECT: Appleby Bikeway STAFF MEMO RECOMMENDATION: Staff is recommending improvements to the bike lanes on sections of Appleby Rd in conjunction with repaving in fall of 2022. BACKGROUND: Appleby Rd has had bike lanes since 2011. The street is 30 feet wide and currently has 10-foot driving lanes and two 5-foot bike lanes on each side. Average speeds on this street are 33 MPH with an ADT of 5,446. The existing 5-foot striped bike lanes do not meet current All -Ages -And - Abilities standard for on -street bicycle facilities. Staff is proposing an 8-foot two-way protected bike facility on the south side of the street from the Goodwill parking lot to Bishop Street. Between the Razorback Regional Greenway and Bob Younkin Dr, staff is proposing a 7-foot protected eastbound climbing lane and shared downhill lane westbound. DISCUSSION: The scope of this project is limited to the asphalt portions of Appleby Rd and will not include work on concrete sections. Protection for the bike facilities will consist of a bolt -down modular plastic "Tuff Curb" specifically designed for protected bike lanes. The Tuff Curbs will be spaced every 10 feet include built-in reflectors and will be green in color. The Tuff Curbs are 8" wide x 40" long x 2" high and will not negatively impact street sweeping or emergency vehicles. Traffic delineators have not been included the design but could be easily added to Tuff Curbs to increase visibility for drivers and or snow plow operators. This protected bike lane will be an important connection for future Plainview extension and Rolling Hills Dr improvements which include side paths. The long-term goal for this bikeway will be to replace the plastic Tuff Curbs with more permanent concrete curbs for better protection and lowered maintenance costs. BUDGET/STAFF IMPACT: Estimated cost for materials and striping, tuff curbs and thermoplastic installed by transportation crews $35,565.91 budgeted through trails on -street CIP fund. Attachments: Concept Designs/ Images/Budget Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 i i, U i 11.0' -- --------------— f-- '': _ / � � ��� -� � � � 1:O'er• �, 1 'mot �� ` ► �' r •' ` r b +�cRr f 11111001111111111 1 Scale: 1" = 50' Is ORIA THERMOPLASTIC "qs!1 �• OR CYCLEGRIP �; • ` \- w f !� "`+ Q 11.0' 10.0' DTAL) s y, N 00 Appleby Road mRazorback Greenway to Bob Younkin Dr. Aft CITY OF F YETTEVILLE APPLEBY ROAD Jun. 22, 2022 �' ARKANSAS ENGINEERING N DIVISION113 W. STREET STRIPING PLAN d C) Z Y Z w Z) O a w 0 w GREEN SPACE WIDTH VARIES 0 0 T� (� Ko U y0 _ m o� W �3 w z 3Z >m K0 oN ow 0 U , O Q O Z Y mm a w w n �U m'� N3 T 7 I GREEN SPACE WIDTH VARIES J X3 W W h N LLI CL Q IT_Y 8" WHITE SKIP STRIPE- 2' PAINT, 2' GAP BISHOP DR. r z z H Q I � 1 0 f'— U) W LL m W Z SKIP STRIPE- J 3' PAINT, 9' GAP • I- 10.01 10.0' r" I,r 8.0' 1 z 1 ` Z r f �a.• a� 1 •� Scale: 1" = 50' Uj w z �� Z z Q U 10..0' 10, T 101.0' I T ,r CITY OFAPPLEBY ROAD Jun. 22, 2022 T �� ARKANSAS EVILLE ENGINEERING DIVISION STRIPING PLAN ' • . ' I Y �^ (.n 13 W. MOUNTAIN STREET-_ U w Z -- U 10.0' —low 1 W J w w Y U r I r 10. Ir10, } 10 jffC \ 'GIs r.sliruii� �40"� Tuff Curb XLP Extreme Low Profile Curbing System GOO G \-01 P PR�UN >J> N > w U) w a� 5 LU U o 0 w w b � m U O (} O Z J■ylT_ �� O 3 ro N of a 7 U m J N � } I GREEN SPACE WIDTH VARIES J Xa w3 in 0 Appleby Road Bishop Dr. to Goodwill Parking Lot 13.0' Scale: 1" = 50' I Aft CITY OF AYETT EVILLE APPLEBY ROAD Jun. 22, 2022 AS .� RKANS ENGINEERING DIVISION 3 113 W. MOUNTAIN STREET STRIPING PLAN ►i CITY OF FAYETTEVILLE ARKANSAS CITY OF FAYETTEVILLE TRANSPORTATION BOND PROGRAM PROGRESS REPORT — JUNE 2022 The Transportation Bond Program consists of projects that will be designed, contracted, and administered by City Staff or consultants/contractors working for the City. Funding for the Bond Program includes $36 million in bonds for the first phase of the program. UPCOMING CONSTRUCTION PROJECTS PROJECT NAME BID DATE ESTIMATED CONST. COST Prairie and West TBD $3,000,000 CURRENT CONSTRUCTION PROJECTS PROJECT NAME ESTIMATED CONSTRUCTION COMPLETION CONTRACT Zion Rd. (Vantage to Crossover) August $4,395,109.35 2022 Sain St. Extension August *$607,900.29 2022 Shiloh Fulbright Intersection October $1,680,751.00 2022 Midtown Corridor — Porter and Deane at November $4,169,565.00 PD Site 2022 Center/Harmon Intersection February $1,752,736.50 2023 Archibald Yell Blvd. Safety Improvements May *$2,678,711.32 2023 *Transportation Bond Program portion of the contract. Mailing Address: 113 W. Mountain Street Fayetteville, AR 72701 www.fayetteville-ar.gov COMPLETED PROJECTS PROJECT NAME COMPLETION YEAR ORIGINAL BUDGET FINAL PROJECT COST Rupple Road 2021 $3,000,000 $3,532,722.51 Steamboat Dr./Dorothy Jeanne 2021 $670,000 $410,979.35 Centennial Park Entrance Drive 2021 $1,000,000 $834,721.75 For details regarding each of the Transportation Bond Projects, use the links provided below for each project. 1) RUPPLE ROAD (TANYARD DR. TO WEIR RD.) https://www.favetteville-ar.gov/3597/Rupple-Road-Extension 2) ZION ROAD PHASE II (VANTAGE DR TO CROSSOVER RD) https://www.fayetteville-ar.gov/3586/Zion-Road-I mprovements 3) STEAMBOAT / DOROTHY JEANNE CONNECTION https://www.favetteville-ar.gov/3596/SteamboatDorothy-Jean ne-St-Connection 4) SHILOH DR. / FULBRIGHT EXPRESSWAY INTERSECTION https://www.fayetteville-ar.gov/3594/Shiloh-DrFuIbright-Expressway-Intersecti 5) CENTER / HARMON INTERSECTION https://www.favetteville-ar.gov/3595/CenterHarmon-Intersection 6) MIDTOWN CORRIDOR https://www.faVetteville-ar.gov/3877/Midtown-Corridor-Promect 7) SAIN STREET EXTENSION (FRONT ST. TO JOYCE BLVD.) https://www.favetteville-ar.gov/3598/Sain-Street-Extension 8) MAPLE ST. CYCLE TRACK https://www.favetteville-ar.gov/3581 /Maple -Street -Cycle -Track 9) 15t" ST. / RAZORBACK RD. INTERSECTION https://www.favetteville-ar.gov/3592/15th Razorback -Intersection 10) HIGHWAY 71 B CORRIDOR 2 https://www.fayetteville-ar.gov/3588/Highway-71 B-Corridor 11) APPLEBY / PLAINVIEW / ROLLING HILLS CONNECTION https://www.favetteville-ar.gov/3771 /ApplebyPlainviewRolling-Hills-Connection 12) ARCHIBALD YELL BLVD. SAFETY IMPROVEMENTS https://www.fayetteville-ar.gov/3584/Arch ibald-Yell-Blvd-Safety-Improvements 13) ROLLING HILLS IMPROVEMENTS (COLLEGE TO OLD MISSOURI) https://www.fayetteville-ar.gov/3585/Rolling-Hills-Improvements 14) JOYCE BLVD. SAFETY IMPROVEMENTS https://www.faVettevi I le -a r. g ov/3732/Joyce-Blvd-Safety-Improvements 15) NORTH ST. / MISSION BLVD. CORRIDOR https://www.fayetteville-ar.gov/3589/North-Street-Corridor 16) OLD WIRE RD. CYCLE TRACK (EXTENSION) https://www.favetteville-ar.gov/3583/Old-Wire-Road-Cycle-Track 17) PAVEMENT MAINTENANCE / OVERLAYS https://www.fayetteville-ar.gov/3600/Pavement-Mai ntenance0verlays • 20.85 Miles of overlays have been completed as of June 2022 • $2,706,434.87 of the $2,700,000 has been spent or encumbered as of May 2022. 18) TRAFFIC SIGNAL HARDWARE / UPGRADES nttps://www.fayetteville-ar.gov/3599/Signal-HardwareSoftware-Upgrades • 103 of 110 signal controllers and 56 of 66 Video Detectors have been upgraded as of March of 2022. • $1,399,999.51 of the $1,400,000 has been spent or encumbered as of June 2022. 6/22/2022 Status Ward Street From To 2022 Sidewalk Projects Placement Type Complete 2 Mt. Comfort Rd. Addington Ave. Garland Ave. South New Constructed new 12 foot wide sections with curbs and storm drainage improvements. Complete 4 Heritage Ave. Reliance St. Wedin ton Dr/ West Rep Replaced damaged sections of sidewalk Complete 4 Vanike Dr. at Deane Solomon Rd. Both New Installed new access ramps and sidewalk connections On Going 2 Church Ave. Spring St. Mountain St. West Rep Waiting on utility relocations On Going All Ramps / Maintenance Various Locations Any Rep Maintenance repairs Underway 2 Dickson St. Arkansas Ave. College Ave. Both Rep Maintenance repairs School Ave. to locust Ave. Underway 1 Eleventh St. Duncan Ave. Hill Ave. North IRep Repair deteriorated areas of sidewalk and curbs Pending 2 Mountain St. West Ave. School Ave. South Rep Schedule after Dickson St. repairs completed Pending 2 Spring St. (Phase 1) West Ave. Church Ave. Both Rep Schedule after light improvements completed Pending 1 Hollywood Ave. MLK Jr. Blvd. Parnell Dr. West New Engineering working on design Pending 3 College Ave. Sunbridge Dr. Township St. East Rep Install pedestrian crossing with access ramps Pending 3 Old Missouri Rd. Frazier Terrace Stearns St. West New Complete sidewalk connection Pending 4 Salem Rd. lCilearwood Dr. I Mt. Comfort Rd. JWest New Complete sidewalk connection. Engineering working on design/right of way. Pending 1 Happy Hollow Rd. lAcacia Crossing Fourth St. lWest I New Design pending Pending 2 Lewis Ave. I Deane St. lWedington Dr. lWest New Design pending Pending 2 Leverett Ave. Sycamore St. Hazel St. West Rep Design complete, working on right of way. Bid pending. Maintenance Repairs (Completed to date 2022) Amber Dr. Old Wire Rd. Cypress Lane South Rep Replace deteriorated sidewalk, repair drop inlet Candleshoe Dr. Madison Dr. Arapaho Dr. East Rep Replace deteriorated sidewalk Fletcher Ave. Lafayette St. Dickson St. East New Construct drop inlet Homespun Dr. Tumbleweed Dr. Broyles Ave. West Rep Added 4 ea. 8 foot extensions to drain boxes (2) Lewis Ave. Nettleship St. Maine St. West New Install trench grate Loxley Ave. Oakcliff St. Oaks Manor Dr. West Rep Replace deteriorated curb and gutter One Mile Rd Old Farmington Rd. MLK Jr. Blvd. East New Concrete for truck/bus turning radius Square (Block Ave.) Center St. Mountain St. East Rep Replace deteriorated sidewalk and steps to Old Post Office Proposed 2023 - 2025 Sidewalk Projects Sidewalk Ward Street From To Placement Type Length 2 Center St. Gregg Ave. School Ave. Both Rep Replace deteriorated sidewalk 2 Cleveland St. Levered Ave. Whitham Ave. North New Fill gaps 2 Lindell Ave. Douglas St. Maple St. East Rep Replace deteriorated sidewalk 2 Lindell Ave. Hughes St. Cleveland St. West Gap Fill gaps 2 Oakland Ave. Cleveland St. Existing sidewalk West New Fill gaps 2 Reagan St. Arkansas Ave. Gregg Ave. South Rep Replace deteriorated sidewalk 21 Rebecca St. College Ave. Mission Blvd. North New New construction to complete connection between College Ave. and Mission Blvd. 2 School Ave. Spring St. Center St. West Rep Replace deteriorated sidewalk 2 Spring St. (Phase 2) Church Ave. College Ave. Both Rep Improve access ramps 2 Watson St. Campbell Ave. Thompson Ave. South Rep Replace deteriorated sidewalk 3 Mission Blvd. Winwood Dr. Libby Ln. North New Fill gaps 3 Mission Blvd. Libby Ln. Lisa Ln. North New Fill gaps 4 Salem Rd. Fairfax St. Wedington Dr. Both Rep Install missing access ramps 2022 Overlay Projects COMPLETED Street To From Length (ft) Government Dead End MILK 540 Old Wire Rd. Skillern Rd. City Limits 2472 West Ave. Center St. South St. 1735 Gregg Ave. Prairie St. MILK 460 Mount Comfort Rd. Garland Ave. Addington Ave. 1005 Old Wire Rd. Oak Bailey Dr. Crossover Rd. 1452 Old Wire Rd. Skillern Rd. City Limits 2472 Goff Farms Deaad Horse Mt. SAg Habor Ave. 5307 Shiloh Gregg St. Steele Blvd. 1350 Lincoln Ave. Maple St. Louise St. 632 McConnell Ave. Knapps St. Drake St. 2640 Mekeig Ct. Warwick Dr. Cul de sac 190 Roberts Rd. Huntsville Rd. Isag Habor Ave. 1 1770