2022-01-11 - Agendas - FinalCITY OF
9im FAYETTEVILLE
4VARKANSAS
MEETING AGENDA
Water, Sewer, and Solid Waste Committee
11 January 2022
5:30 P.M.
(Or immediately following City Council Agenda Session)
This is a Virtual Meeting
Committee: Council Member Sloan Scroggin, Council Member Teresa Turk, Council Member
D'Andre Jones,
Copy to: Mayor Lioneld Jordan, Paul Becker, Kara Paxton, Susan Norton, Chris Brown,
Alan Pugh, Terry Gulley, Peter Nierengarten, Jeff Coles, Brian Pugh, Andrea
Foren, Mark Rogers, Corey Granderson, Aaron Watkins, Greg Weeks, Monty
Sedlak, Shannon Jones
From: Tim Nyander, Utilities Director
CALL TO ORDER
ROLL CALL
UPDATES
OLD BUSINESS:
NEW BUSINESS:
1. Temporary Drying Solution at BMS
The biosolids dryer suffered a catastrophic failure on December 13, 2021. The dryer
suffered an explosion at the bearing housing like the failure experienced on September 11,
2021. The second failure was more damaging. We are waiting for the manufacturer's
representative to come to the site to evaluate the damage.
Given the number of breakdowns the existing dryer has experienced, and the safety hazard
associated with any explosion, the Department is not heavily considering repairing the unit.
For that reason, we are looking into a temporary drying option until a permanent solution
can be selected.
We have been in contact with a company that has offered a short-term solution to drying
that is a less expensive alternative to sending our solids to the local landfill. This process will
be discussed. The City and the drying contractor are writing a Letter of Intent for
consideration. The Letter of Intent will be discussed.
STAFF REQUESTS THIS BE FORWARDED TO THE CITY COUNCIL FOR
CONSIDERATION FOR APPROVAL
2. Budget Adjustment for Landfill Tipping Fees
As we consider temporary drying options for the Biosolids Management Site, we will have
no choice at this time but to take our partially dried biosolids to the landfill. On average, the
Biosolids Management Site produces 1,321 dry tons of partially dried solids per month. We
will discuss the funding we will need for this temporary solution.
STAFF REQUESTS THIS BE FORWARDED TO THE CITY COUNCIL FOR
CONSIDERATION FOR APPROVAL
3. 2022 Cured In Place Pipe Sewer Rehab. — Insituform Technologies
Staff recommends approval of a one-year extension of the contract with Insituform
Technologies, Inc., as amended by Resolutions 144-18 and 81-19, in an amount not to
exceed $528,693.55 for City of Fayetteville sewer rehabilitation in 2022 using cured -in -place
sanitary sewer linings.
On March 7, 2018, the City of Fayetteville accepted sealed competitive bids for sanitary
sewer main line and service lateral lining services. Insituform Technologies, Inc. submitted
the lowest bid (Resolution 84-18, Bid #18-22). The bid schedule includes unit pricing for
various items of work to complete the annual rehabilitation program.
Direct contracting with Insituform Technologies, Inc. allows the City to execute its sanitary
sewer rehabilitation program efficiently. Pipes being repaired with liners under this contract
are either identified through normal City maintenance operations or by consultants during
Sanitary Sewer Evaluation Studies (i.e., Smoke Testing). Engineering and administrative
costs are minimized as these services are handled by city staff. This work is an integral part
of the City's ongoing program to maintain its sewer system in the most long-term yet cost
effective fashion, with cured -in -place linings being by far the lowest cost strategy for
applications where it is appropriate. 2022 will be the 51" and final year of a 5-year renewable
contract with Insituform. The project will need to be publicly bid again in 2023. Funds are
available for this project in the Sanitary Sewer Rehabilitation account.
STAFF REQUESTS THIS BE FORWARDED TO THE CITY COUNCIL FOR
CONSIDERATION FOR APPROVAL
4. Wastewater Collection System Master Plan Update
On June 12, 2018, the City of Fayetteville formally selected RJN Group, Inc. via RFQ 18-01
to perform routine updates and analyses of the City's Wastewater Collection System Master
Plan. Staff has worked with RJN to verify the accuracy of the hydraulic model and re -asses
changes in service area due to population and development increases. The Arkansas
Department of Health, and industry best practices, recommend updating master plans every
5-years for systems like Fayetteville experiencing significant change and growth. The last
update to this plan was completed in 2014.
A wastewater hydraulic model is only accurate when field -verified and calibrated using both
dry and wet -weather flow monitoring (measuring the actual flow in the pipes). A large portion
of the effort in this model update was placing and maintaining flow monitors in strategic
locations throughout the City in the Spring of 2020. The model was also updated to include
all changes and additions in the wastewater system due to new developments and capital
improvement projects. RJN Group will present the findings and recommendations of the
updated plan.
INFORMATION ONLY
5. Overview of WWTP Monthly Report
Discussion of November's Monthly WWTP Report
PRESENTATIONS
ATTACHMENTS
Landfill ing/Drying Cost Comparison
Wastewater Collection System Master Plan Update Presentation
November WWTP Monthly Report
ADJOURN
Next Water, Sewer, Solid Waste Committee meets on
Tuesday, February 8, 2022, at 5:30 p.m.
Monthly
Hauling
Annual
Revenue
Wet Tons
DryTons
Loads To
Landfill
Total
Dry Tons
Average
Monthly
Monthly
Cost $296
Cost Per
Temporar
Monthly
Sold Per
From
Year
18%From
From
Landfill If
Tip
Landfilling
Year
From
Tons
Adjusted Cost
Landfill Cost
Per Load
Ton
y Dryer
Drying Cost
Ton
Fertilizer
Presses
Solar
No Dryer
Fee/Ton
Cost
Solar
produced
of Drying
(From)
Fee/Ton
Produced
(Fleet)
for Resale
2020
21,620
13,983
608
$ 44.00
$ 615,252
$ 179,968
$ 795,220
$ 56.87
2020
13,983
$ 55.00
$ 769,065
2,256
$ 20.00
$ 45,120
$ 723,945
2021
23,824
15,408
670
$ 44.00
$ 677,963
$ 198,297
$ 876,260
$ 56.87
2021
15,408
$ 55.00
$ 847,454
2,256
$ 20.00
$ 45,120
$ 802,334
2-Year Total 45,444 29,391 1,278 $ 1,293,215 $ 378,265 $ 1,671,480
Annual Average 22,722 14,696 639 $ 646,607 $ 189,133 $ 835,740 $ 56.87
Truck Costs = $3.52/Mile Round Trip to Landfill = 34 miles
Trailer Costs = $5.18/ Mile
Total Cost = $8.70/Mile 34 x $8,70 = $296 per trip (load)
Costs Include:
Fuel
Insurance
Replacement
2-Year Total 29,391 $1,616,519 4,512
Annual Average 14,696 $ 808,259 2,256
Annual Savings Using
$ 90,240 $ 1,526,279
$ 45,120 $ 763,139
$ 72,601
87
Design Storm (in/hr)
-------------------- ----------------------
..........
------------- .............
............. ...........
���T-9944499 .. 99 .. 99 .. 9993.9993.999-999..
WASTEWATER COLLECTION
SYSTEM MASTER PLAN UPDATE
17 19 City of Fayetteville, AR
CITY OF
FAYETTEVILLE
ARKANSAS January 11, 2022
Shannon Jones, PE
rjn roup
enge.wet >V frastructure for tomorrow
Hydraulic Modeling - Flow Monitoring
RG-06
125 W Mountain St
Courts Building
Peak
60-Minute
Total Dail- Rainfall
Rainfall Intensity
Table ?-B
RAINFALL SUMMARY
RG-07
123 N Block Avenue
Lift Station #46
Peak
60-Minute
Total Dail• Rainfall
Rainfall Intensity
RG-08
1813 E Mission Blvd
Tim's Pizza East
Peak
60-Minute
Total Daily Rainfall
Rainfall Intensity
RG-09
3010 N College Ave
Phillios 66 Gas
Peak
60-1%linute
Total Daily Rainfall
Rainfall Intensity
RG-10
3896 N Gregg Ave
Lift Station #5
Peak
60-Minute
Total Dail Rainfall
Rainfall Intensity
Date
fin
in/hr
in
in/hr
in
in/hr
in
in/hr
in
in/hr
21
0.03
0.02
0.2
0.26
0.03
0.02
0.03
0.01
0.0'
0.01
22
0.53
0.36
0.68
0.62
0.56
0.50
0.65
0.48
0.64
0.33
24
1/
1/
1/
1/
0.11
0.07
0.01
0.01
1/
1/
25
1.11
0.36
1.18
0.73
1.375
0.87
1.79
0.72
1.77
0.63
26
0.20
0.12
0.13
0.05
0.20
0.16
0.24
0.18
0.24
0.20
27
0.16
O.OS
0.18
0.12
0.16
0.13
0.25
0.20
1.38
1.30
28
1/
1/
0.01
0.01
0.01
0.01
1/
1/
0.01
0.01
June 1
1/
1/
0.04
0.03
1/
1/
1/
1/
1/
1/
2
1/
1/
1/
1/
11
1/
l/
1/
11
1/
3
1/
1/
0.02
0.02
1/
1/
1/
1/
1
11
4
1.01
0.60
1.10
0.68
1.24
0.75
1.44
0.81
1.50
0.89
5
1/
1/
0.02
0.02
1/
1/
1/
1/
11
11
7
1/
1/
0.03
0.03
1l
11
1/
1!
1/
1/
8
0.205
0.065
0.10
0.03
0.13
0.05
0.15
0.06
0.15
0.06
Total
16.09
17.55
16.92
18.63
21.47
1/ No rainfall recorded.
■ Information uploaded into
InfoWorks ICM
■ Connectivity and slope
check
■ Field visits conducted
■ All data sources tracked
within model (color
coded)
■ Notes and information
stored
■ Quality control checks
User Defined Flag,
Name
display Colour I Obsolete
4A
= ❑
...............................
4D
= ❑
_
G
❑
#!
_ ❑
#S
= ❑
;cV
❑
AC
❑
IAR
❑
ICA
❑
CD
❑
Cp
. ( ❑
DM
❑
:.!
EJ
❑
_
ES
❑
FG
❑
FS
❑
FU
❑
iFV
❑
GI
❑
IF
IF
Impart.., I I Export... l}elete
Description
Asset Data
System Default
Data From GeoPlan
Model Import
System Calculated
CShcmport
From CttyAs Built Plans
Awaiting Confirmation
Assumed raised manhole
Catibration Adjustment
2GIG Census Data
Curedln Place Pipe (CIPP) Input
From Previous Detailed Models
Enainee€ina ludoement
Estimated
Future Grawth
Raw Survey Data
Future Upgrade
Fierd Verified
From GIS
Inferred Data
lJ '
t7K Cancel
Dry leather Residential Profiles
2.5
—Profile I
—Profile 2
Profile 3
2
—
1.5
L
0
i.l
LL
1
0.5
0
0:00
2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00
Time
45
2
1.5
O
1
0.5
0
Dry leather Commerical/Industrial Profiles
fi]I�I�i�[�i�=l;[�I�=�[�I���[�I�� ��A�Ii� �►�I�I�� � �[�I�� �:�[fl�� �:�[�I��►��AfIii�'�[fI���A�If]
Time
Design Storm (in/hr)
2.00
1.80
1.60
1.40
1.20
1.00
0.80
0.60
0.40
0.20
h.
0.00
O N M 0 N 00 O -N RV to lD I, 00 OO N O N M 0 N 00 O -N 4 to lG I, 00 OO N
O 0 O O O O 0 0 O 0 c-I c-I c-I a -I '-I N N N N O 0 O O O O 0 0 O 0 c-I c-I c-I r-I '-I '-I '-I '-I N N N N
m m rn rn rn rn rn rn m m m m m m rn rn rn rn rn rn m m m m m rn rn rn rn rn rn m m m m m m rn rn rn rn rn rn m m m m m
m m rn rn rn rn rn rn m m m m m m rn rn rn rn rn rn m m m m m rn rn rn rn rn rn m m m m m m rn rn rn rn rn rn m m m m m
ti ti ti ti ti ti ti ti ti ti ti ti ti ti ti ti ti ti ti ti ti ti ti ti ti ti ti ti N N N ti ti ti ti ti ti ti N N N N N ti ti ti ti ti
O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
ci c-I c-I c-I c-I .--I ei ei c-I c-I c l c l c l c l � q 'i 'i '-I r-I -q c-I c-I c-I c-I rV N N N N N N N N N N N N N N N N N N N N N N N
N N N N N N N N N rV rV " N N N N N N N N N N N fV rV N N N N N N N N N N N N N N N N N N N N N N N
�412211996 00:00:0
3 4z
1225.0 —
0
C
122D.0
1215.0 --
1210.0 --
iK}i41J
1200.0
1< 0 262 567
975
1292 1546
1941 2036 2277 2445 2547 2757 1
Link
W,*;188!C;101AA
W(188'C)186P.1
WpBft(C;185R.1
W.OSOIC18512.1
W.,1881C)i$4P.1
w.(188JQ183P.1
W418BJC;180P.1
w;15',029C.1
length (R)
2624
305A
407.7
317.1
254.1
3%71
241.0
AIM
1195
101.7
21 U
width (in)
1&0
1SA
15.0
73A_
190
1t1A
18.0
1SA
18.0
us Inv (R AD)
1231350
1225Ao0
1220.950
is!
1208.720
CIS Inv (R AD)
1225DW
®
1214A90
1206.720
1203.122
2A97
1.328
1 5 ;4
0.173
0.126
0.137
0
QA54
0.109
3366
2.655
pk (MGD)
7.92
5.78
6 31
2A9
1.78
125
1.14
1.16
323
1AS
21AS
8.17
IDS flow (MGD)
0.9817
0.9819
0.9792
tA139
1A109
1A226
1044
1.0307
1.24M
12438
12115
Node
W [18WQ186P
W.(188/Q185R
W418WQ185P W-(18WQ184P W-OK/0183P
W-(18B/C)181P
W{15)029C
ground (ti AD)
1232Ao0
1219m -
1215.720
Tr
1240.0 -
------- - ----------------- -- -- - --------------.......
........................
4
1215A -
----- ------
1210A -
1205A -
P
o
P
12000
R 0
271
576
964
1301 1555
1950 2045
2236
2454 2555 2766
Unk
W-(188/C;101p.f
W,186/C]186P.1
W-(t86lC;185R.1
4V-18151C,188P.1
5Y4188/C)184P.1
W-f1881C,`183P.1
W(188'Cy180P.f
-
W-0
5?029C.1
iengtn(n)
262A
305.0
407.7
377.1
2541
394a
955 241.0 46.11
119.5
141.7
210,8
width (in)
18A
18.0
18A
18A
18.0
18.0
18A 18.4 16.01
18.4
24,0
18A
us imr (R AD)
123155/1
1225.OD0
122(�gSB
1213940
1213b20
12731M 121A3 30
- 121L700
121L570
1208.720
ds irn� (R AD)
1225A00
1220.950
12'I4i496),
�b20
1213A80
1213A30 121L900
1
1208.720
1203.722
grad (%)
2A97
1.328
1.684
0.173
0.12fi
C,157
0.052 O.054
0.109
3.786
2.655
WC (MGD)
7.92
5.78
631
2.09
178
155
1.14 1.16 323
1.65
21.15
6.17
D5 flow (MGD)
3.53t2
35387
3.5384
3b279
3.6220
3.6557
3.678- 3.6897
3.9568
3.9588
3.9813
Node
-
W-(18B/CCj186P
Wd188/C)18SR
W-(188JC)18SP
W-(188/C)184P
W-(18B/C)783P 66". f61P -
-
-
LY-(15;029C
ground(R AD)
1232A00
1219A30 1218310
1216.000
-
=
1215.720
Hydraulic Model- 2030 Improvements
Capital Improvements Through 2030
Fayetteville Wastewater Master Plan
Project
Estimated
ConsumcnonCost
P-opose3
Budget feat
202_
'd'
2024
2025
1016
Line Rork
':,W Creek oatfau
S 1.029.930
S 1.029.930
)IallyWagnonomfall
2.720.266
S 1,72026S
S 1.000.000
Aom North PS maw line
1.337.040
S 1.337.040
StonenoodPSinterceptor
S 1253,61E
1,253,64S
Croon Creek outf LU - mtreau to 15-
S 1.134,000
S 719,624
S 414,376
Dot Tipton PS elimiwtim
S s s2,OSO
S 222,090
Deadhorse to NfOy Wagnon outfall at S11rte Ri-er bridge
S 1.983,600
Stonebndge Meadows BPS ehmmat en
S 399.376
399.376
Crescent Lake PS eb-imtion
S 136,SSO
136.SSO
Stonebridge Meadon-s V PS *hmtmnm
60.S00
S 60.S00
Stonebndge )leadon: s PS elim=tion
10.11S
S M44S
Stanms Upgrades
Stone,00dPS
666.624
Airpon North PS
611.072
S 611.072
Greenland PS
416,610
S 416.640
Industnal Park PS
S 1.666.560
S 933.290
S S33.260
0- 1Creek- PS
144.41E
S =4•»:6
Total
S 140 3 8:
1 S :,OF7.611
S 1.698.061
5 1. 86,.1E
5 1.9-3.4%
5 1.7:0,:68
S 1.000.MO
S 1,993,00
S 1,140.-94
1 5 833 :80
TABLE 6-D
Questions ?
CITY OF
WA FAYETTEVILLE
ARKANSAS
.;acobs
Fayetteville
Client Monthly Report for November 2021
December 20, 2021
City of Fayetteville
Ml,a hea conservation
8th Annual
Blue -Green Infrastructure
Fall Event
Jacobs Fayetteville Client Monthly Report for November 2021 Jacobs
Contents
ExecutiveSummary..................................................................................................................................................ii
1.
Plant Operations.........................................................................................................................................3
1.1
Process Control........................................................................................................................................................... 3
1.2
Biosolids Process........................................................................................................................................................3
1.3
Compliance..................................................................................................................................................................4
1.4
Successes...................................................................................................................................................................... 4
1.5
Issues/Resolutions.................................................................................................................................................... 5
1.6
Revenue.........................................................................................................................................................................5
Table 1-1:
Revenue generated from the BMS............................................................................................................... 5
Figure 1-1: Revenue generated from the BMS via hay, fertilizer, and WTR.......................................................6
2.
Maintenance................................................................................................................................................7
2.1
West Side....................................................................................................................................................................... 7
2.2
Noland............................................................................................................................................................................7
2.3
Lift Stations..................................................................................................................................................................8
2.4
BMS Maintenance......................................................................................................................................................8
2.5
Key Performance Indicators/Measures.............................................................................................................9
Figure 2-1: Labor Hours by Work Order Type................................................................................................................9
Figure2-2: Work Order Count by Type.............................................................................................................................9
2.6
Capital Improvement Projects(CIP)................................................................................................................
10
3.
Laboratory/Industrial Pretreatment...................................................................................................11
Table 3-1:
Revenue generated from the Industrial Pretreatment Program(IPP)........................................
12
Figure 3-1: IPP revenue total from surcharges, fees, and fines...........................................................................
12
Figure 3-2: Loads of hauled waste -by hauler and cumulative loads per month ..........................................
12
4.
Woolsey Wet Prairie................................................................................................................................13
5.
Community Outreach.............................................................................................................................14
6.
Sustainability............................................................................................................................................15
7.
Health & Safety/Training.......................................................................................................................19
Appendix A. Additional Information.................................................................................................................20
A.1
Effluent & Influent Data.......................................................................................................................................
20
A.2
White River Effluent Characteristics................................................................................................................
20
Jacobs — Fayetteville Project
Jacobs Fayetteville Client Monthly Report for November 2021
Executive Summary
,jacobs
As we are winding down for the year, we have realized a savings in labor costs through the month of
November. The current run -rate puts us at a labor expenditure of $20,233 under budget. The costs for non -
labor have continued to increase because of landfill costs. These costs were averted for about a month, from
mid -November to mid -December.
The November budget is over by $71,981 as non -labor continued to grow due to the landfill fees. We do
expect the budget to be over at year's end by $115,000. This number could grow because of the recent
dryer failures. The graph below shows the state of the budget through November.
Budget Performance
$71,981
$58,102 $60,101
$44,573
$32,123 i L .
$16,797 $7,957 �
� a e
P �
$(27,204)
$(113,194)
�o
�J Jy- e e� e,
�
■ Labor a Non -Labor ■ Budget - Over (Under)
Labor
Non -Labor
Budget - Over
(Under)
March
$
10,470
$
(123,664)
$ (113,194)
April
$
35,404
$
(62,608)
$ (27,204)
May
$
36,558
$
(19,761)
$ 16,797
June
$
37,208
$
7,365
$ 44,573
July
$
20,719
$
(12,762)
$ 7,957
August
$
25,275
$
6,848
$ 32,123
September
$
24,910
$
33,192
$ 58,102
October
$
13,262
$
46,839
$ 60,101
November
$
(20,233)
$
92,214
$ 71,981
Jacobs — Fayetteville Project
Jacobs Fayetteville Client Monthly Report for November 2021 Jacobs
1. Plant Operations
The Noland and West Side Water Resource Recovery Facilities (WRRF's) effluent discharges were 100% in
compliance with the National Pollutant Discharge Elimination System (NPDES) permit. Details of effluent
quality and influent loadings are shown in Appendix A.
1.1 Process Control
Noland
The annual ozone channel inspection and clean -out was completed during the seven-day period that
discharge was halted for filter cell bleaching. The ozone channel's structural integrity and all submerged
ozone assets were in good condition and no issues were found.
Noland Ozone Channel
West Side
Decreasing temperatures in the biological units required adjustments to the RAS (return activated sludge)
and WAS (wasted activate sludge). The adjustments increased the MLSS (mixed liquor suspended solids)
concentration and met the new target of 2200 mg/L. These changes will help ensure proper treatment and
the production of a high -quality effluent.
1.2 Biosolids Process
During the month of November, the WRRF's produced 1,957 wet tons of biosolids with approximately 1,277
wet tons of biosolids applied into the solar houses prior to the thermal dryer and 599 wet tons processed
directly through the thermal dryer. Final repairs were made to the thermal dryer mid -November.
Approximately 81 wet tons were washed to the Noland WRRF for reseeding the microorganism population.
Prior to thermal dryer operation, a total of 493 tons of belt filter pressed, partially dried biosolids were
transferred to area landfills due to dryer down time for bearing replacement. The total cost of landfill
Jacobs — Fayetteville Project
Jacobs Fayetteville Client Monthly Report for November 2021 Jacobs
biosolids disposal was $23,762. The biosolids drying operation saved an estimated $34,122 in disposal
costs this month, compared to if all biosolids were landfill disposed.
1.3 Compliance
BMS staff collected the 60-day fertilizer compliance samples on November 22" d with all samples passing
all analytical criterion. The samples are tested for MPN/fecal, percent dry solids, and 503 regulated metals
content. The results of these tests demonstrate compliance to the State and Federal regulations governing
biosolids processing and the continued classification of Exceptional Quality Class A fertilizer for the City of
Fayetteville customers.
1.4 Successes
During the month of November, the Noland WRRF stopped discharge to the White River for a total of 7 days
for the quarterly preventive maintenance filter cell bleaching. A total of 3800 Gallons of 12.5% bleach was
fed to the filter cells over a 2-day period. Filter cell efficiency increased after bleaching, resulting in lower
turbidity in the filter cell effluent and enhanced ozone disinfection.
The Parshall Flume was also cleaned for aesthetic improvements and to ensure the optical accuracy of
instrumentation used for state reporting.
Parshall
Flume
Cleaning
On November 12", Jacobs IT programmers completed the installation of new thermal temperature sensors.
The new sensors monitor the temperature of the thermal dryer's drive and discharge ends. Specifically, the
sensors monitor the temperature of the thermal dryer bearings, inlet transfer fluid plumbing, and outlet
transfer fluid plumbing. They are programmed to shut the equipment down if temperature set points are
exceeded. The goal of the sensors is to prevent operating equipment to the point of overheating. The new
Scada software program also gives the operator the ability to operate the thermal dryer remotely.
Jacobs — Fayetteville Project
Jacobs Fayetteville Client Monthly Report for November 2021
Thermal Dryer Temperature Sensors
AM
1.5 Issues/Resolutions
,jacobs
A weld repair was performed on a fracture of the #1 biosolids screw -type fill auger and normal operation
was resumed.
BMS
Biosolids
Fill Auger
1.6 Revenue
Product
Hay
Fertilizer
Table 1-1: Revenue generated from the BMS
Water Treatment Residuals
Tons Sold/Received
119
142
215
Revenue Generated
$9,498.28
$2,835.60
$6,875.14
Jacobs — Fayetteville Project
Jacobs Fayetteville Client Monthly Report for November 2021
Figure 1-1: Revenue generated from the BMS via hay, fertilizer, and WTR
,jacobs
Revenue Generated
Biosolids Management Site
$160,000
$140,000
$120,000
$100,000
$80,000
$60,000
$40,000 n
$20'000 I-1k
,aF, �epc P PJ� Q�O&o o z 2'0
he o O
O Monthly 2020 O Monthly 2021 Cumulative 2021
Jacobs — Fayetteville Project 6
Jacobs Fayetteville Client Monthly Report for November 2021
2. Maintenance
2.1 West Side
,jacobs
A perforated roller and new belts were installed on the damaged West Side belt filter press before returning
the equipment to service.
A routine inspection of the West Side inlet facility dumpster bay revealed a broken grating over the drains.
The grating was replaced and proper draining was resumed.
West Side
Inlet Facility
Dumpster Bay
r - -
2.2 Noland
New bearings were installed in the Noland biosolids sludge feed pump.
Noland
Biosolids Sludge
Feed Pump
Jacobs — Fayetteville Project
Jacobs Fayetteville Client Monthly Report for November 2021 Jacobs
2.3 Lift Stations
The new lift station 57 was put into service after successful test operation was performed on all equipment.
New
Lift Station 57
Put Into Service
= _ Lift Station 7
f Hamestring
Repairs were made
to broken curb
2.4 BMS Maintenance
The thermal dryer bearing replacement was completed by the BMS staff on November 1211 and normal
thermal dryer operation resumed.
Jacobs — Fayetteville Project
Jacobs Fayetteville Client Monthly Report for November 2021
2.5 Key Performance Indicators/Measures
,jacobs
Figure 2-1: Labor Hours by Work Order Type
El0.00, OP. 121.29, 6%
148.50, 8% r ❑ 22.50, 1%
487.18, 25%
❑ 171.05,'
❑ administrative
❑ corrective maintenance
emergency
corrective maintenance non
emergency
corrective maintenance from
pm/pdm
preventive maintenance
project
❑ safety
❑ administrative
❑ corrective maintenance
emergency
❑ corrective maintenance non
emergency
corrective maintenance from
pm/pdm
preventive maintenance
❑ 975.22, 51%
project
Figure 2-2: Work Order Count by Type
1697,90%
2, 0%
❑ 0, 0% n
II
❑ safety
❑ 25, 1%
❑ 5, 0%
103, 6%
T 47, 3%
Jacobs — Fayetteville Project 9
Jacobs Fayetteville Client Monthly Report for November 2021 Jacobs
2.6 Capital Improvement Projects (CIP)
A purchase order was issued to replace effluent pump 3 at the Noland facility. This purchase was the final
encumbered project from 2020.
A rebuild of Hamestring lift station pump 3 was added as a break-in project.
A purchase order was issued for new strainers at the Noland headworks. This project was presented as a
non -agenda item after receiving administrative approval.
Jacobs — Fayetteville Project 10
Jacobs Fayetteville Client Monthly Report for November 2021 Jacobs
3. Laboratory/Industrial Pretreatment
West Side Goose Creek samples were collected and sent to Ramboll US Consulting to complete the Whole
Effluent Toxicity Screening (WET) test as outlined in the Toxicity Reduction Evaluation (TRE) Plan. The test
passed, showing no toxicity for survival to the fathead minnow, Pimephales promelas.
Samples were collected for the White River (WR) outfall at the Noland facility and sent to American Interplex
Corporation (AIC) for WET testing. The samples passed WET testing for both species; Ceriodaphnia Dubia,
water flea, for survival and reproduction and the Pimepholes promelas, fathead minnow, for growth
assessment showing neither lethal nor sublethal effects in the dilution series 97%, 73%, 55%, 41 %, 31 %,
and 0%for WR. This completes the third and final re -test required for the failed toxicity testing from August.
An ammonia retest for the DMR-QA41 study was completed and submitted to the ADEQ Quality Assurance
coordinator. This retest became necessary after shipping delays with ammonia equipment resulted in a
rescheduled analytical test. DMR-QA is an ungraded study required by the USEPA for NPDES permit holders.
All permitted industries had shutdowns during the Thanksgiving holiday.
Annual compliance inspections were completed for significant industrial users Marshalltown Tools and
Hiland Dairy to determine compliance status with the industrial waste discharge permit, City of Fayetteville
Code, and 40 CFR Part 433 and 403 respectively. Both were found in compliance.
Quarterly surcharge sampling for BOD, TSS, T-Phos, and pH was performed for the three food industries:
ConAgra, Hiland Dairy, and Tyson. Data reports from this sampling event are sent to the industries to use
for their daily and monthly average calculations in the verification of compliance.
Monthly surcharge and waste hauler reports were completed and sent to the City for billing. For revenue
generated from the IPP, see Table 3-1 and Figure 3-1.
Jacobs — Fayetteville Project
Jacobs Fayetteville Client Monthly Report for November 2021
,jacobs
Table 3-1: Revenue generated from the Industrial Pretreatment Program (IPP)
Revenue
$91,930.81
Surcharges on October data
$2,200.00
Fees from hauled waste accepted in November
$0.00
Other fees paid in November
$0.00
Fines assessed in November
Zero violations for all industrial users
Violations on October data
Figure 3-1: IPP revenue total from surcharges, fees, and fines
Revenue Generated
Industrial Pretreatment Program
$120,000
$100,000
$80,000
$60,000
$20,000
Ile '3
❑ 2020 Monthly Surcharge Fees plus Hauled Waste Fees
❑ 2021 Monthly Surcharge Fees plus Hauled Waste Fees
Figure 3-2: Loads of hauled waste -by hauler and cumulative loads per month
Hauled Waste Summary
60
50
40
30 b
20
10 n
0 n II n H fl I n n ❑
I III
,a <<e��
coe � O
❑ 2020 Arkansas Portable Toilets
❑ 2020 Best Jet
2020 White River Enviro. Services
2020 TOTAL
2021 Arkansas Portable Toilets
❑ 2021 Best Jet
❑ 2021 White River Enviro. Services
❑ 2021 TOTAL
Jacobs - Fayetteville Project
Jacobs Fayetteville Client Monthly Report for November 2021 Jacobs
4. Woolsey Wet Prairie
November project activity largely focused on prescribed burn preparations. More than 1.5 inches of rainfall
at 3 inches less than the normal average, provided plenty of good weather and cooperative site conditions
for removing standing dead vegetation from around structures and establishing bare soil burn area
containment lanes. This level of safety becomes especially important when considering the proximity of
infrastructures for the West Side WRRF and nearby solar arrays. The Jacobs team anticipates being complete
with all burn preparations early next month. November's unseasonably warm, dry weather also provided an
ideal opportunity for the Jacobs team to target Japanese Honeysuckle with herbicide applications within
Woolsey Wet Prairie. Vine honeysuckle can be especially difficult to treat within the growing season as it
intertwines itself within surrounding, desirable native vegetation. Mild winters can provide an ideal
treatment window as the invasive honeysuckle retains its green foliage against dormant vegetation.
Bare Soil
Burn Containmen
-Op
. • •
1 y
r r
r
Sarah Garrison, Jacobs Engineering Intern, attended and helped promote the Watershed Conservation
Resource Center (WCRC) native grass collection event at the Woolsey Wet Prairie, as well as a Project
Wingspan collection event for Smooth Blue Aster at Cricket Creek in North Central Arkansas.
"ry
WATERSHED CONSERVATION
PE -11 [fniER
Jacobs assisted
WCRC with their
Native Seed
Collection Event
Volunteer Native Seed Collection
At Woolsey Wetlands Prairie
Jacobs — Fayetteville Project
Jacobs Fayetteville Client Monthly Report for November 2021
5. Community Outreach
Thanksgiving Food Drive
for
Life Source International
,jacobs
The Jacobs team collects
enough food items to feed
several families during the
Thanksgiving season.
Alone we can do so little,
Together we can do so mush..
Hellen Keller
Jacobs — Fayetteville Project 14
Jacobs Fayetteville Client Monthly Report for November 2021 Jacobs
6. Sustainability
The Jacobs Fayetteville team hosted the 811 Annual Blue -Green Infrastructure Fall Event at the West Side
WRRF and Woolsey Wet Prairie Sanctuary. In partnership with numerous regional organizations, this event
focuses on environmental education, nature conservation and blue-green infrastructure development.
Attendees were educated on the facility's water recovery process, environmental health, native plant
species, and harvesting methods. Additionally, volunteers learned how they could get more engaged with
their educational and volunteer opportunities in Northwest Arkansas. Throughout the morning, nearly 120
local volunteers and 30 support staff from Jacobs and partnering organizations worked together to collect
and broadcast seeds from a variety of native species, such as Common Boneset, Slender Mountain Mint,
Sweet Black -Eyed Susan, Rattlesnake Master, Ironweed Big Bluestem, Stiff -Leaf Goldenrod, and more. The
native seeds help enhance the rain gardens, bioswales, and wildlife corridor spaces, which work to improve
storm water quality, enhance habitat ecology and biodiversity, safeguard native pollinators, and multiple
mammal populations to increase climate resiliency.
This event originally started in 2013, with only a handful of volunteers, as a Saturday morning roadside
collection of native grasses along Broyles Avenue for use in local streambank restoration projects. The event
has grown to include collection and planting of seeds for improvement of the WRRF rain gardens and
bioswales. In recent years, this event has significantly grown from a few dozen to 120+ volunteers and has
developed into an opportunity for education through the inclusion of environmental groups with interests
in natural resource conservation, wildlife ecology, and native plant biodiversity.
As a thank you to our participants for their efforts that morning, in addition to wanting to provide them with
tangible resources to practice what they learned about sustainable BGI practices, they were provided with
twenty varieties of locally collected native seed for each person to take with them as well as information on
how to turn their own property into mini native BGI gardens. Additionally, a large portion of the harvested
seeds were also donated to the WCRC that specializes in the design and implementation of streambank
restoration sites in NWA as a best management practice for source -water protection.
To support their ongoing BGI efforts, check out the team's Facebook pag and Instagram account which
were created to further promote their initiatives!
https://facebook.com/nwa.blueQreeninfrastructures/
https://www.insta(iram.com/nwa bluegreeninfrastructures/
Jacobs — Fayetteville Project is
Jacobs Fayetteville Client Monthly Report for November 2021 Jacobs
Jacobs — Fayetteville Project 16
Jacobs Fayetteville Client Monthly Report for November 2021 Jacobs
MTURATUmTe
Jacobs — Fayetteville Project 17
Jacobs Fayetteville Client Monthly Report for November 2021 Jacobs
More high-pressure sodium lights were replaced with LED's to reduce consumption of electricity.
Jacobs — Fayetteville Project 18
Jacobs Fayetteville Client Monthly Report for November 2021 Jacobs
7. Health & Safety/Training
The facilities have attained a safe working record of 748 days without a recordable incident. The Jacobs Area
Safety Professional, Wes Cloud, hosted multiple training sessions focusing on OSHA standard 1910.212
Machine Guarding, while also introducing the Jacobs safety culture flagship "Beyond Zero". The training is
an ongoing process within the function of safety providing value for the staff and client while also teaching
the employees to work safer and healthier. The safety committee completed weekly safety inspections
throughout the facility and continues to work with the maintenance staff to get issues corrected within a
timely and efficient manner. The future goals of the safety committee will be discussed in the upcoming
month. The committee will always look at innovative ways to provide value for the staff and client.
John Byrd attended Jacob's IPP webinar reviewing EPA's "Introduction to the National Pretreatment
Program Guidance Manual". He also completed the "Advanced Industrial Pretreatment" course through
South Arkansas University in preparation for license testing next month.
Jacobs — Fayetteville Project 19
Jacobs Fayetteville - Client Monthly Report for November 2021
Appendix A. Additional Information
A.1 Effluent & Influent Data
A.2 White River Effluent Characteristics
.;acobs
2021 Monthly WR WR WR
Average CBOD CBOD TSS
Flow (mg/L) (lbs/d) (mg/L)
(MGD)
Permit 5.5 578 5.0
Limit
November
WR WR WR WR WR D.O. pH
TSS Phos Phos Ammonia Ammonia Avg Min
(lbs/d) (mg/L) (lbs/d) (mg/L) (lbs/d) Min (s.u.)
(mg/L)
525 1.00 105.0 2.4 252 7.5 6.0
pH Fecal
Max Coliform
(s.u.) (MPN/
loom[)
9.0 1,000
January
5.8
2.7
128
2.8
131
0.14
6.3
0.2
8
15.0
7.0
7.5
77
February
5.1
4.3
174
4.4
181
0.19
7.7
0.5
22
16.6
6.9
7.4
174
March
6.3
3.7
199
3.0
166
0.15
7.9
0.2
12
14.9
7.3
7.4
22
April
5.1
3.4
188
1.1
62
0.09
4.9
0.3
15
12.8
7.3
7.6
54
May
10.0
3.8
308
1.6
133
0.11
9.3
0.2
13
12.3
7.4
7.6
17
June
7.4
3.5
214
1.5
94
0.31
17.8
0.1
6
12.3
7.2
7.5
35
July
5.1
3.3
136
2.1
85
0.37
15.4
0.2
8
13.1
7.2
7.8
74
August
4.4
3.3
113
1.1
41
0.42
14.7
0.3
12
15.5
7.1
7.7
73
September
4.2
2.7
90
1.3
45
0.24
8.3
0.1
4
17.6
7.1
7.5
110
October
5.0
2.8
103
1.8
68
0.26
10.0
0.1
4
18.2
7.4
7.5
198
November
5.7
4.0
199
4.0
200
0.27
13.7
0.1
4
16.4
7.4
7.7
244
December
Average
5.8 3.4
168
2.3
110
0.23
10.6
0.2
10
15.0
7.2
7.6
98
White River Effluent Characteristics- Minerals
2021 WR WR WR
TDS TDS Sulfate
(mg/L) (lbs/d) (mg/L)
Permit 500 52,542 119
Limit
November
WR WR WR
Sulfate Nitrate Nitrate
(lbs/d) (mg/L) (lbs/d)
12,505 report report
January
342
15,871
62
3,154
4
204
February
351
14,818
67
3,392
5
253
March
347
18,845
72
3,741
6
291
April
335
18,124
72
3,609
3
135
May
320
26,059
56
3,167
4
221
June
338
20,861
50
4,391
6
483
July
347
15,391
61
2,478
7
292
August
400
14,214
66
2,064
10
310
September
378
12,889
47
1,740
12
444
October
380
13,820
55
1,738
10
316
November
375
18,470
53
2,794
11
580
December
Average
356
17,215
60
2,933
7
321
Jacobs - Fayetteville Project 20
MI
Jacobs Fayetteville - Client Monthly Report for November 2021 oaco S
Goose Creek Effluent Characteristics
2021
Monthly
Average
Flow
(MGD)
GC
CBOD
(mg/L)
GC
CBOD
(Lbs/d)
GC TSS
(mg/L)
GC TSS
(lbs/d)
GC Phos
(mg/L)
GC Phos
(lbs/d)
GC
Ammonia
(mg/L)
GC
Ammonia
(lbs/d)
D.O. Avg
Min
(mg/L)
pH
Min
(s.u.)
pH
Max
(s.u.)
Fecal Coliform
(MPN/100ml)
Permit Limit November
6.6
550.4
10.0
834
1.00
83.4
2.3
191.8
7.5
6.0
9.0
1,000
January
10.8
2.0
174.3
1.1
95
0.08
7.2
0.2
18.4
10.7
7.0
7.4
8
February
9.7
2.0
161.9
1.0
81
0.08
6.4
0.1
8.1
11.1
7.0
7.4
5
March
11.8
2.1
202.0
1.0
101
0.13
12.8
0.1
13.3
10.4
7.1
7.5
7
April
12.1
2.0
202.1
1.0
101
0.08
7.6
0.1
13.5
9.9
7.2
7.5
6
May
14.2
2.0
236.1
1.0
118
0.06
7.2
0.1
13.6
9.7
7.3
7.5
5
June
10.9
2.0
188.4
1.0
94
0.06
5.9
j 0.11
10.2
9.3
7.1
7.6
6
July
9.1
2.4
177.9
1.0
75
0.22
19.9
0.2
19
9.0
7.3
7.7
10
August
7.4
2.1
129
1.0
62
0.06
3.9
0.1
9
8.7
7.5
7.7
6
September
7.0
1.9
113.7
1.0
59
0.05
3.1
0.1
7.8
8.8
7.4
7.6
6
October
8.9
2.0
149.4
1.0
75
0.06
4.6
0.28
25.5
9.2
7.2
7.6
9
November
8.0
2.4
162.7
1.0
69
0.06
3.8
0.03
1.7
9.9
7.4
7.6
5
December
Average
10.0
2.1
172.5
1.0
85
0.09
7.5
0.1
12.7
9.7
7.2
7.5
7
Paul R. Noland Influent Characteristics
Noland I Monthly Hydraulic
WRRF Average Loadings
Flow Percent of
(MGD) Design
Designed 12.6
(Annual
Avg.)
BOD Organic TSS TSS
Loading Loading Loading Loading
(Lbs/d) Percent (lbs/d) Percent
of of
Design Design
29,666 23,198
PO4 PO4 NH3 NH3
Loading Loading Loading Loading
(lbs/d) Percent (Lbs/d) Percent of
of Design
Design
765 2,250
January
6.3
49.9%
16,471
55.5%
8,150
35.1%
192
25.1%
699
31.1%
February
5.1
40.1%
11,850
39.9%
7,368
31.8%
175
22.9%
720
32.0%
March
6.7
53.2%
14,260
48.1%
7,846
33.8%
196
25.6%
826
36.7%
April
7.1
56.6%
17,335
58.4%
9,693
41.8%
209
27.3%
939
41.7%
May
7.7
60.8%
15,173
51.1%
9,797
42.2%
222
29.0%
788
35.0%
June
5.7
45.1%
13,062
44.0%
8,110
35.0%
176
23.0%
543
24.1%
July
5.0
39.7%
13,984
47.1%
7,746
33.4%
207
27.1%
559
24.8%
August
4.1
32.5%
14,698
49.5%
9,221
39.7%
187
24.4%
789
35.0%
September
4.2
33.1%
16,082
54.2%
9,571
41.3%
215
28.1%
881
39.1%
October
5.3
42.1%
19,869
67.0%
12,089
52.1%
232
30.3%
956
42.5%
November
5.1
40.3%
17,970
60.6%
9,899
42.7%
220
28.8%
843
37.5%
December
Average
5.7
44.9%
15,523
52.3%
9,045
39.0%
203
26.5%
776
34.5%
Jacobs - Fayetteville Project 21
I
Jacobs Fayetteville - Client Monthly Report for November 2021 oaco S
West Side Influent Characteristics
West Side Monthly
WRRF Average
Flow
(MGD)
Hydraulic
Loadings
Percent
of Design
Boo Organic TSS TSS PO4 PO4 NH3 NH3
Loading Loading Loading Loading Loading Loading Loading Loading
(lbs/d) Percent of (lbs/d) Percent (lbs/d) Percent (lbs/d) Percent
Design of Design of Design of Design
14,595 14,595 584 1918
Designed
(Annual
Avg.)
10.0
January
10.8
107.6%
12,508
85.7%
12,331
84.5%
218
37.4%
1,605
83.7%
February
9.6
95.9%
13,110
89.8%
12,291
84.2%
160
27.4%
1,406
73.3%
March
11.8
118.1%
15,216
104.3%
12,918
88.5%
252
43.1%
1,850
96.4%
April
12.1
121.0%
12,799
87.7%
13,164
90.2%
219
37.5%
1,917
100.0%
May
14.1
141.2%
12,171
83.4%
14,193
97.2%
194
33.2%
1,448
75.5%
June
10.8
108.3%
11,669
80.0%
12,705
87.0%
195
33.4%
1,760
91.8%
July
9.1
91.1%
12,941
88.7%
15,103
103.5%
176
30.2%
1,443
75.2%
August
7.4
74.0%
16,394
112.3%
14,720
100.9%
153
26.2%
1,612
84.0%
September
7.0
69.8%
17,354
118.9%
18,155
124.4%
181
31.1%
1,626
84.8%
October
8.9
89.0%
13,940
95.5%
13,892
95.2%
188
32.2%
1,696
88.4%
November
8.1
80.7%
12,741
87.3%
11,814
80.9%
195
33.4%
1,509
78.7%
December
Average
10.0
99.7%
13,713
94.0%
13,753
94.2%
194
33.2%
1,625
84.7%
Jacobs - Fayetteville Project 22
7
oaco S
Jacobs Fayetteville -
Client Monthly Report for November 2021
Labor Status
Department Job Title
Employee Name
Fayetteville
/o FTE
Admin
Project Manager
Monty Sedlak
95.00%
Admin
Assistant Project Manager
Leonides Moreno
100.00%
Admin - Operations
Operations Manager
Tim Luther
100.00%
Admin
Environmental Specialist
Jeff Hickle
100.00%
Admin
Health, Safety, Compliance Professional
Wes Cloud
70.00%
Admin
Project Coordinator
Brandi Miller-DeWeese
90.00%
Admin
Administrative Assistant
Christy Taylor
100.00%
Admin
Administrative Assistant
Kassandra Foster
100.00%
BMS
BMS Supervisor
Peter Burrow
100.00%
BMS
Lead Operator
Jerry Genz
100.00%
BMS
Lead Operator
John Tenberge
100.00%
BMS
Equipment Operator
Charlie Boger
100.00%
BMS
Equipment Operator
Rick Witherspoon
100.00%
BMS
Equipment Operator
Vacant
100.00%
BMS
Operator I
David Dajani
100.00%
BMS
Operator In Training
Ben Shondelmyer
100.00%
BMS
Operator In Training
Vacant
100.00%
BMS
Operator In Training
Robert Donnell
100.00%
BMS
Operator In Training
Matthew Goud
100.00%
BMS
Mechanic
Mike Reed
100.00%
Admin
Admin-Ops Supervisor
Thom Vinson
90.00%
LAB
Laboratory Director
Donna McChristian
90.00%
LAB
Industrial Pretreatment Coordinator
John Byrd
100.00%
LAB
Lead Laboratory Analyst
Matt Benton
60.00%
LAB
Laboratory Analyst
Walter Choder
100.00%
Maint
Maintenance Supervisor
Joshua Apeman
100.00%
Maint
Lead Mechanic
Brian Daniels
95.00%
Maint
Lead Electrician
Tim Marr
70.00%
Maint
Mechanic
Robert Ingram
100.00%
Maint
Mechanic
Buddy Carter
100.00%
Maint
Mechanic
Steve Cook
100.00%
Maint
Mechanic
Michael Spohn
100.00%
Maint
Mechanic
Rick Dollarhide
100.00%
Maint
Mechanic in Training
Abram Gibson
100.00%
Maint
Mechanic in Training
Nathan Eastwood
100.00%
Operations
Operations Supervisor
Austin Ramsfield
100.00%
Operations
Operator II
Shawn Santellanes
100.00%
Operations
Operator I
Anthony Ramsfield
100.00%
Operations
Operator I
Travis Patton
100.00%
Operations
Operator
Justin Sweeney
100.00%
Operations
Operator In Training
Tom Meunier
100.00%
Operations
Operator In Training
Paul Goolsby
100.00%
Operations
Operator In Training
Chandler Smothers
100.00%
Operations
Operator In Training
Jeremy Johnson
100.00%
Operations
Operator In Training
Brittney Doyle
100.00%
SCADA
SCADA Supervisor
Mayo Miller
100.00%
Jacobs - Fayetteville Project
Jacobs Fayetteville - Client Monthly Report for November 2021
SCADA
SCADA
Instrument & Control Tech
Instrument & Control Tech
.;acobs
Pat Cooley 95.00%
Mark Gleber 100.00%
Authorized Positions = 48.0
Filled Positions = 46.0
Filled FTE's= 44.6
TEMPS
BMS Engineering Intern, U of A Vacant 100.00%
Admin Engineering Intern, U of A Sarah Garrison 100.00%
Maint Engineering Intern, U of A Vacant 100.00%
SPECIAL PROJECTS (Performed in
scope)
Area Reason Name Hours
SCADA
Maintenance
Maintenance
Network Upgrade Campos, Edgar 3.5
Asset Manager Support Bass, Edward Lee 2.1
Asset Manager Support Turley, Johnny D (JD) 50.5
Jacobs — Fayetteville Project 24