2021-12-08 - Agendas - FinalCITY OF
FAYETTEVILLE
ARKANS
ARKANSAS
Active Transportation Advisory Committee (ATAC)
Wednesday, December 81", 2021 5:30 pm
Room 326 of City Hall
Members:
City Council Representative: D'Andre Jones
Parks & Rec. Board Representative: Nicole Claesen
Planning Commission Representative: Matt Johnson
Staff:
Citizens -at -Large Expiration
Nathan Eikenberry - Chair
12/21
Dan Greim — Vice Chair
12/22
John Ray
12/22
Arnold Smith
12/21
Jeremy Rawn
12/22
Matt Mihalevich, Trails Coordinator Dane Eifling, Mobility Coordinator
Terry Gulley, Transportation Director Captain William Brown, Police Dept
Michael Morisette, GIS Chris Brown, Public Works/City Engineer
Brannon Pack, Experience Fayetteville
1. Call to Order / Introductions: Matt Mihalevich
Citizen Input
2. Police Update (5 min): Captain William Brown
Citizen Input
3. Mobility Coordinator Update (5 min): Dane Eifling
Citizen Input
4. Trails Program Update (5 min): Matt Mihalevich
Citizen Input
5. 2022-2027 Trail Construction Plan: Matt Mihalevich
Citizen Input
6. 2022-2023 Sidewalk Plan: Terry Gulley
Citizen Input
7. Trail Loop Identity: Dane Eifling
Citizen Input
8. Other Business/Events/Citizen Input
Next Meetings: Jan 12t", Feb, 9t", March 9tn
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
DRAFT 12/6/2021
CITY OF
FAYETTEVILLE
ARKANSAS 12-6-21 2022 - 2027 Proposed Shared -Use Paved Trail Construction Projects
A I(
Prioritization
2022 Score* Funding Rank Ward Feet Miles
Lake Fayetteville Trail Replacement
Across the Dam (Finish)
N/A
RTP Grant $150K
N/A
3
1,970
0.37
Rupple Road Trail
Starry Night to Best Friend (Finish)
47.9
Trail CIP
6
4
1,000
0.19
Mission Blvd. Trail (Trail Crew)
Viewpoint to Maple St. and Prospect &
476
Trail CIP
8
3
3,000
0.57
Rebecca Bikeway (Start)
Maple Street Cycle Track (Contractor)
Razorback Greenway to Garland Ave.
42.8
Transportation
15
2
3,091
0.59
Bond/UofA/Grant
Old Wire & Old Missouri Trail
Gulley Park to Rolling Hills
48.4
Transportation Bond
5
3
4,358
0.83
Highway 112 (North) (ARDOT)
Truckers Drive to Howard Nickell Includes
N/A
ARDOT & Grants
N/A
4
8,323
1.58
Clabber Creek Connection
Midtown Trail
1-49 to College Avenue
51.1
Trails &Trans. Bond
3
2
11,807
2.24
Deane/Sycamore/Poplar (Contractor)
+ Grant
Cultural Arts Corridor (Nabh
Prairie Street to Center Street (Finish)
N/A
Ph 1 Trail Bond/CAC
N/A
2
2,198
0.42
Razorback Greenway Replacement
in-house constructea: 1.13 Year Total 6.77
2023
Mission Blvd. Trail (Trail Crew)
Viewpoint to Maple St. and Prospect &
47.6
Trail CIP
8
3
6,007
1.14
Rebecca Bikeway (Continue and Finish)
Alberta Trail Segments (Fill In Project)
Walnut Crossing
29
Trail CIP
26
1
1,335
0.25
Rolling Hills Improvements (Contractor)
Old Missouri to Fiesta Square
37.8
Transportation Bond
21
3
5,411
1.02
Cultural Arts Corridor (Contractor)
Center Street to Dickson Street
N/A
Ph 2 Trail Bond/CAC
N/A
2
1,550
0.29
Civic Plaza Reroute
Garland Avenue (Contractor)
Melmar to Drake St.
N/A
Trans. Bond CIP &
N/A
2
4,707
0.89
ARDOT
Tee La Gi Trail along Hwy 62
Rupple Road to 1-49
54.2
Trail Bond & ARDOT
1
1
8,840
1.67
(MLK Jr. Blvd.) (Contractor)
(ARDOT schedule dependent)
College/School Improvements
Archibald Yell to Cato Springs Rd.
N/A
Transportation Bond
N/A
1
8,600
1.63
in-nouse constructea: 1.3H Year I otal 6.91)
2024
Hamestring Creek Trail
Salem Rd. to Rupple Rd. (1 Bridge)
42.1
Trail CIP
12
4
2,338
0.44
Old Farmington Trail (Shiloh Trail to Rupple
Centennial Park to MLK & Old Farmington
52.6
Trail CIP
2
1
4,880
0.92
Rd.)
west to Rupple Road.
Clabber Creek Trail
Truckers Drive to Highway 112
46.8
Trail CIP
9
4
1,650
0.31
m-nouse constructea: 1.15d Year I otal 1.68
20255 Begin Phase 3 Bond I
Shiloh Trail (Moore Ln. to MLK) Moore Ln. to MLK Jr. Blvd (ARDOT 49.7 Ph 3 Trail Bond & 4 4 13,063 2.47
Permit) (Bridge over Hamestring) CIP
In-house Constructed: 2.47 Year Total 2.47
2026
Shiloh Trail to Broyles Road
Owl Creek Trail
Connection to Boys & Girls Club
43.7
Trail CIP
13
4
8,377
1.59
Ph 3 Trail &
St. Paul Trail
Razorback Gwy. to St. Paul Trail
44.6
11
1
6,237
1.18
PBond
CI
Markham Hill Trail Connector
Razorback Road to Cross Ave.
41.3
Trail CIP
17
4
1,500
0.28
m-nouse constructea: 3.u0 Year I otal 3.U5
2027
Skillern Rd. (Sidepath South Side)
Crossove to Charleston Crossing
34.8
Trail CIP
22
3
1,590
0.30
Morningside Trail (Park Meadows)
Town Branch to Huntsville Road
32.7
Trail CIP
25
1
5,194
0.98
St. Paul Trail (Existing Trail Upgrade)
Morningside to Armstrong
44.6
Ph 3 Trail PBond &
CI
11
1
4,227
0.80
St. Paul Trail (Contractor Section)
Armstrong to Dead House Mtn.
40.4
Ph 3 Trail Bond
11
1
5,842
1.11
m-nouse constructea: 2.us Year I otal 2.89
5 Year Total 127,095 24.07
Notes:
In -House Trail Crew Build Bond Project
*Trail development of approximately 2 miles per year is based on continued CIP, Bond and Grant funding
*Prioritization Score reflects weighting established by ATAC - Maximum score if 54.2
Year 2022-2027 Trail Construction Plan
Note: Planned trail projects are based
on continued CIP at current
levels, 2019 bond program and ALL"R°
grant funding.
— 7
—
PR
OJJ
1 Hwy!12 Trail
`-
DR
1 —
' a�
1 A.6
2
_
1 1 1 1 1
to
j Clabba G
..
KG
1
v
•
jG' •
�a Meado
o ape
�a
6
�R • ~j- ���! .
amestring Croor
r
�
rar
yQ��O :
1
.
�
a
Midtown Trail
— 1--- 16— i
;� • '`
�
m
.a'
• Y
Owl Greek Trail
n
m
— j
• •
—
P
Markham -Maple Street
•
—
3
a N
•
d
CINI
�111n 9R.
Le end
- !T
—1
1
2022 Planned Trail Projects
n Te La Gr Trail
a
? •'
—00
Town aq°bT rail
•'
.
2023 Planned Trail Projects
1
1
1 —-
2024 Planned Trail Projects
2025 Planned Trail Projects
2026 Planned Trail Projects
2027 Planned Trail Projects
Existing Shared -Use Paved Trail
— t
Kesler Mountain --
— —
—
• • • • • • • Future Shared -Use Paved Trails
Regional Park �•1
1
j School
`----�':♦
Stream
�
ail
1
Lake/Pond x Tunnel
" • �•.
1 —
1 1 1
Parks
;I CITY OF
FAYETTEVILLE
ARKANS
I ARKANSAS
etteville Ira\\ I — i — —
LakeFay
Greek Trail � ' •
G\ear L 1 1
1 1
1 1
1 Mod Creek Trail r -
. 1
Niokaska 1
Rolling Hills r •:1 v
CF Orake S1 rrai/ 3 lR •�&BrLg o y o
ll
• o
Midtown Trail,
r-�
r
0
' ,• 1 — — — U�'Tcc
ss`°n Trail -1 j
M 1,
Sublett Creek Trail 1 _�
AlignmentStudy Area •"':'1—
T L n 1 1
• •-• ....... r. D
V WYMAN RD
� . •�� y9 0. •L t i — —
t� •: 1 1 ••�'ie—� IJ.
'F 'DTI — 1� 1 • HPJ;7TS 1_ -RD' • :�+.+..—.ate..
St Paul Trail 1 1�." - •.
J 1L T`•,
ao\Trail il', .1
S' P • 1 it
1
YR 1 — @•�"'�L v -- - - - -- 1 .:" Miles
1 % 0 0.5 1 2 3 4
ft Proposed 2022 Sidewalk Projects
x
1. m 11/10/2021 Sidewalk Ramps Drives Curb Pipe Drain Bx R. Wall R. Wall Street Need Eng
2 Ward Street From To Placement Type Length Width Each Each Feet Feet Each L Ft. Ht. Repair R/W Comments
17.5
21.6
NR
25.7
24.5
20.6
NR
NR
17.0
13.1
NR
NR
Const. Est. Material
Time Cost
1
Happy Hollow Rd.
Acacia Crossing
Fourth St.
West
New
950
6
1
4
950
950
6
0
0
950
Yes
Yes
Complete sidewalk connection.
74
$165,533
1
Hollywood Ave.
MLK Jr. Blvd.
Parnell Dr.
West
New
380
8
2
5
800
380
6
0
0
800
No
Yes
Complete sidewalk connection with curb and drainage
57
$112,710
2
Dickson St.
Arkansas Ave.
College Ave.
Both
Rep
250
8
10
5
350
0
0
0
0
0
No
Yes
Repair deteriorated areas of sidewalk and curbs
21
$63,853
2
Leverett Ave.
Sycamore St.
Hazel St.
West
Rep
1,600
8
3
17
1,850
0
3
0
0
1,850
Yes
Yes
Turn key contract project
0
$440,907
2
Lewis Ave.
Deane St.
Wedington Dr.
West
New
1,370
6
4
10
940
450
4
0
0
940
No
Yes
Fill gaps in sidewalk connection
73
$187,170
2
Mountain St.
West Ave.
School Ave.
South
Rep
300
8
2
1
0
0
0
0
01
0
No
No
Brick border and sidewalk in poor condition
6
$31,660
2
Spring St. (Phase 1)
West Ave.
Church Ave.
Both
Rep
350
8
9
7
200
0
0
0
0
200
No
Yes
Improve walkability in conjunction with lighting improvements.
25
$60,915
3
College Ave.
Sunbridge Dr.
Township St.
East
Rep
100
10
1
2
100
0
0
0
0
100
No
Yes
Install pedestrian crossing with access ramps
7
$23,268
3
Old Missouri Rd.
Frazier Terrace
Stearns St.
West
New
650
8
2
5
690
400
4
0
0
690
No
Yes
Complete sidewalk connection
51
$127,431
4
Salem Rd.
Clearwood Dr.
Mt. Comfort Rd.
West
New
500
8
0
3
500
500
2
0
0
500
Yes
Yes
Complete sidewalk connection
36
$96,659
4
Vanike Dr.
at
Deane Solomon Rd.
Both
New
120
6
2
0
20
0
0
0
0
20
No
No
Install ramps, complete sidewalk
2
$9,468
Ramps / Maintenance
Various
Locations
Any
Rep
1,500
6
10
5
250
0
0
01
01
250
No
No
Repairs as needed
33
$130,193
8,070 46 64 6,650 2,680 25 0 0 6,300
Proposed 2023+ Sidewalk Projects
11/10/2021 Sidewalk Ramps Drives Curb Pipe Drain Bx R. Wall R. Wall Street Need Eng
Ward Street From To Placement Type Length Width Each Each Feet Feet Each L Ft. Ht. Repair R/W Comments
25.3
24.5
22.6
26.1
25.6
22.6
22.6
23.0
NR
25.3
16.5
16.8
NR
385 $1,449,765
Const. Est. Material
Time Cost
2
Center St.
Gregg Ave.
School Ave.
Both
Rep
920
8
4
9
0
0
0
700
3
0
Yes
Yes
Replace deteriorated sidewalk
43
$155,888
2
Cleveland St.
Leverett Ave.
Whitham Ave.
North
New
300
6
3
4
300
150
1
0
0
300
No
Yes
Complete sidewalk connection
24
$51,704
2
Lindell Ave.
Douglas St.
Maple St.
East
Rep
500
6
2
1
0
0
0
250
3
0
No
Yes
Grade problems. Current sidewalk has steps.
13
$53,764
2
Lindell Ave.
Hughes St.
Cleveland St.
West
Gap
1,075
6
7
8
1,150
1,000
10
0
0
1,150
No
Yes
Fill gaps in sidewalk connection
106
$211,303
2
Oakland Ave.
Cleveland St.
Existing sidewalk
West
New
475
6
1
2
475
300
3
0
0
475
Yes
Yes
Complete sidewalk connection.
34
$76,729
2
Reagan St.
Arkansas Ave.
Gregg Ave.
South
Rep
450
81
2
3
4501
0
01
0
0
450
No
No
I Replace deteriorated sidewalk
18
$64,999
2
Rebecca St.
College Ave.
Mission Blvd.
North
New
2,260
6
9
9
2,260
950
10
200
4
2,260
Yes
Yes
Connect College Ave. to Mission Blvd.
140
$345,890
2
School Ave.
Spring St.
Center St.
West
Rep
680
8
8
5
680
0
3
0
0
680
No
No
Replace deteriorated sidewalk
42
$112,880
2
Spring St. (Phase 2)
Church Ave.
College Ave.
Both
Rep
300
8
7
5
150
0
0
0
0
150
No
Yes
Improve walkability in conjunction with lighting improvements.
19
$48,559
2
Watson St.
Campbell Ave.
Thompson Ave.
South
Rep
300
8
4
2
300
0
0
0
0
300
No
No
Replace deteriorated sidewalk
13
$43,799
31
Mission Blvd.
lWinwood Dr.
I Libby Ln.
North
New
225
8
1
1
0
100
1
1201
81
0
No
IYes
Fill gap. Extend box culvert, Arpot R/W
17
$56,227
31
Mission Blvd.
Libby Ln.
Lisa Ln.
North
INew
1 3201
81
1
31
01
01
01
01
0
No
IYes
I Fill gaps in sidewalk connection
10
$43,667
41
Salem Rd.
I Fairfax St.
1wedington Dr.
Both
IRep
1 2001
81
24
01
2501
0
01
01
01
250
No
INo
I Install ADA access ramps
17
$30,557
8,005 73 52 6,015 2,500 28 1,270 18 6,015 493 $1,295,965