Loading...
2021-12-08 - Agendas - FinalCITY OF FAYETTEVILLE ARKANS ARKANSAS Active Transportation Advisory Committee (ATAC) Wednesday, December 81", 2021 5:30 pm Room 326 of City Hall Members: City Council Representative: D'Andre Jones Parks & Rec. Board Representative: Nicole Claesen Planning Commission Representative: Matt Johnson Staff: Citizens -at -Large Expiration Nathan Eikenberry - Chair 12/21 Dan Greim — Vice Chair 12/22 John Ray 12/22 Arnold Smith 12/21 Jeremy Rawn 12/22 Matt Mihalevich, Trails Coordinator Dane Eifling, Mobility Coordinator Terry Gulley, Transportation Director Captain William Brown, Police Dept Michael Morisette, GIS Chris Brown, Public Works/City Engineer Brannon Pack, Experience Fayetteville 1. Call to Order / Introductions: Matt Mihalevich Citizen Input 2. Police Update (5 min): Captain William Brown Citizen Input 3. Mobility Coordinator Update (5 min): Dane Eifling Citizen Input 4. Trails Program Update (5 min): Matt Mihalevich Citizen Input 5. 2022-2027 Trail Construction Plan: Matt Mihalevich Citizen Input 6. 2022-2023 Sidewalk Plan: Terry Gulley Citizen Input 7. Trail Loop Identity: Dane Eifling Citizen Input 8. Other Business/Events/Citizen Input Next Meetings: Jan 12t", Feb, 9t", March 9tn Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 DRAFT 12/6/2021 CITY OF FAYETTEVILLE ARKANSAS 12-6-21 2022 - 2027 Proposed Shared -Use Paved Trail Construction Projects A I( Prioritization 2022 Score* Funding Rank Ward Feet Miles Lake Fayetteville Trail Replacement Across the Dam (Finish) N/A RTP Grant $150K N/A 3 1,970 0.37 Rupple Road Trail Starry Night to Best Friend (Finish) 47.9 Trail CIP 6 4 1,000 0.19 Mission Blvd. Trail (Trail Crew) Viewpoint to Maple St. and Prospect & 476 Trail CIP 8 3 3,000 0.57 Rebecca Bikeway (Start) Maple Street Cycle Track (Contractor) Razorback Greenway to Garland Ave. 42.8 Transportation 15 2 3,091 0.59 Bond/UofA/Grant Old Wire & Old Missouri Trail Gulley Park to Rolling Hills 48.4 Transportation Bond 5 3 4,358 0.83 Highway 112 (North) (ARDOT) Truckers Drive to Howard Nickell Includes N/A ARDOT & Grants N/A 4 8,323 1.58 Clabber Creek Connection Midtown Trail 1-49 to College Avenue 51.1 Trails &Trans. Bond 3 2 11,807 2.24 Deane/Sycamore/Poplar (Contractor) + Grant Cultural Arts Corridor (Nabh Prairie Street to Center Street (Finish) N/A Ph 1 Trail Bond/CAC N/A 2 2,198 0.42 Razorback Greenway Replacement in-house constructea: 1.13 Year Total 6.77 2023 Mission Blvd. Trail (Trail Crew) Viewpoint to Maple St. and Prospect & 47.6 Trail CIP 8 3 6,007 1.14 Rebecca Bikeway (Continue and Finish) Alberta Trail Segments (Fill In Project) Walnut Crossing 29 Trail CIP 26 1 1,335 0.25 Rolling Hills Improvements (Contractor) Old Missouri to Fiesta Square 37.8 Transportation Bond 21 3 5,411 1.02 Cultural Arts Corridor (Contractor) Center Street to Dickson Street N/A Ph 2 Trail Bond/CAC N/A 2 1,550 0.29 Civic Plaza Reroute Garland Avenue (Contractor) Melmar to Drake St. N/A Trans. Bond CIP & N/A 2 4,707 0.89 ARDOT Tee La Gi Trail along Hwy 62 Rupple Road to 1-49 54.2 Trail Bond & ARDOT 1 1 8,840 1.67 (MLK Jr. Blvd.) (Contractor) (ARDOT schedule dependent) College/School Improvements Archibald Yell to Cato Springs Rd. N/A Transportation Bond N/A 1 8,600 1.63 in-nouse constructea: 1.3H Year I otal 6.91) 2024 Hamestring Creek Trail Salem Rd. to Rupple Rd. (1 Bridge) 42.1 Trail CIP 12 4 2,338 0.44 Old Farmington Trail (Shiloh Trail to Rupple Centennial Park to MLK & Old Farmington 52.6 Trail CIP 2 1 4,880 0.92 Rd.) west to Rupple Road. Clabber Creek Trail Truckers Drive to Highway 112 46.8 Trail CIP 9 4 1,650 0.31 m-nouse constructea: 1.15d Year I otal 1.68 20255 Begin Phase 3 Bond I Shiloh Trail (Moore Ln. to MLK) Moore Ln. to MLK Jr. Blvd (ARDOT 49.7 Ph 3 Trail Bond & 4 4 13,063 2.47 Permit) (Bridge over Hamestring) CIP In-house Constructed: 2.47 Year Total 2.47 2026 Shiloh Trail to Broyles Road Owl Creek Trail Connection to Boys & Girls Club 43.7 Trail CIP 13 4 8,377 1.59 Ph 3 Trail & St. Paul Trail Razorback Gwy. to St. Paul Trail 44.6 11 1 6,237 1.18 PBond CI Markham Hill Trail Connector Razorback Road to Cross Ave. 41.3 Trail CIP 17 4 1,500 0.28 m-nouse constructea: 3.u0 Year I otal 3.U5 2027 Skillern Rd. (Sidepath South Side) Crossove to Charleston Crossing 34.8 Trail CIP 22 3 1,590 0.30 Morningside Trail (Park Meadows) Town Branch to Huntsville Road 32.7 Trail CIP 25 1 5,194 0.98 St. Paul Trail (Existing Trail Upgrade) Morningside to Armstrong 44.6 Ph 3 Trail PBond & CI 11 1 4,227 0.80 St. Paul Trail (Contractor Section) Armstrong to Dead House Mtn. 40.4 Ph 3 Trail Bond 11 1 5,842 1.11 m-nouse constructea: 2.us Year I otal 2.89 5 Year Total 127,095 24.07 Notes: In -House Trail Crew Build Bond Project *Trail development of approximately 2 miles per year is based on continued CIP, Bond and Grant funding *Prioritization Score reflects weighting established by ATAC - Maximum score if 54.2 Year 2022-2027 Trail Construction Plan Note: Planned trail projects are based on continued CIP at current levels, 2019 bond program and ALL"R° grant funding. — 7 — PR OJJ 1 Hwy!12 Trail `- DR 1 — ' a� 1 A.6 2 _ 1 1 1 1 1 to j Clabba G .. KG 1 v • jG' • �a Meado o ape �a 6 �R • ~j- ���! . amestring Croor r � rar yQ��O : 1 . � a Midtown Trail — 1--- 16— i ;� • '` � m .a' • Y Owl Greek Trail n m — j • • — P Markham -Maple Street • — 3 a N • d CINI �111n 9R. Le end - !T —1 1 2022 Planned Trail Projects n Te La Gr Trail a ? •' —00 Town aq°bT rail •' . 2023 Planned Trail Projects 1 1 1 —- 2024 Planned Trail Projects 2025 Planned Trail Projects 2026 Planned Trail Projects 2027 Planned Trail Projects Existing Shared -Use Paved Trail — t Kesler Mountain -- — — — • • • • • • • Future Shared -Use Paved Trails Regional Park �•1 1 j School `----�':♦ Stream � ail 1 Lake/Pond x Tunnel " • �•. 1 — 1 1 1 Parks ;I CITY OF FAYETTEVILLE ARKANS I ARKANSAS etteville Ira\\ I — i — — LakeFay Greek Trail � ' • G\ear L 1 1 1 1 1 1 1 Mod Creek Trail r - . 1 Niokaska 1 Rolling Hills r •:1 v CF Orake S1 rrai/ 3 lR •�&BrLg o y o ll • o Midtown Trail, r-� r 0 ' ,• 1 — — — U�'Tcc ss`°n Trail -1 j M 1, Sublett Creek Trail 1 _� AlignmentStudy Area •"':'1— T L n 1 1 • •-• ....... r. D V WYMAN RD � . •�� y9 0. •L t i — — t� •: 1 1 ••�'ie—� IJ. 'F 'DTI — 1� 1 • HPJ;7TS 1_ -RD' • :�+.+..—.ate.. St Paul Trail 1 1�." - •. J 1L T`•, ao\Trail il', .1 S' P • 1 it 1 YR 1 — @•�"'�L v -- - - - -- 1 .:" Miles 1 % 0 0.5 1 2 3 4 ft Proposed 2022 Sidewalk Projects x 1. m 11/10/2021 Sidewalk Ramps Drives Curb Pipe Drain Bx R. Wall R. Wall Street Need Eng 2 Ward Street From To Placement Type Length Width Each Each Feet Feet Each L Ft. Ht. Repair R/W Comments 17.5 21.6 NR 25.7 24.5 20.6 NR NR 17.0 13.1 NR NR Const. Est. Material Time Cost 1 Happy Hollow Rd. Acacia Crossing Fourth St. West New 950 6 1 4 950 950 6 0 0 950 Yes Yes Complete sidewalk connection. 74 $165,533 1 Hollywood Ave. MLK Jr. Blvd. Parnell Dr. West New 380 8 2 5 800 380 6 0 0 800 No Yes Complete sidewalk connection with curb and drainage 57 $112,710 2 Dickson St. Arkansas Ave. College Ave. Both Rep 250 8 10 5 350 0 0 0 0 0 No Yes Repair deteriorated areas of sidewalk and curbs 21 $63,853 2 Leverett Ave. Sycamore St. Hazel St. West Rep 1,600 8 3 17 1,850 0 3 0 0 1,850 Yes Yes Turn key contract project 0 $440,907 2 Lewis Ave. Deane St. Wedington Dr. West New 1,370 6 4 10 940 450 4 0 0 940 No Yes Fill gaps in sidewalk connection 73 $187,170 2 Mountain St. West Ave. School Ave. South Rep 300 8 2 1 0 0 0 0 01 0 No No Brick border and sidewalk in poor condition 6 $31,660 2 Spring St. (Phase 1) West Ave. Church Ave. Both Rep 350 8 9 7 200 0 0 0 0 200 No Yes Improve walkability in conjunction with lighting improvements. 25 $60,915 3 College Ave. Sunbridge Dr. Township St. East Rep 100 10 1 2 100 0 0 0 0 100 No Yes Install pedestrian crossing with access ramps 7 $23,268 3 Old Missouri Rd. Frazier Terrace Stearns St. West New 650 8 2 5 690 400 4 0 0 690 No Yes Complete sidewalk connection 51 $127,431 4 Salem Rd. Clearwood Dr. Mt. Comfort Rd. West New 500 8 0 3 500 500 2 0 0 500 Yes Yes Complete sidewalk connection 36 $96,659 4 Vanike Dr. at Deane Solomon Rd. Both New 120 6 2 0 20 0 0 0 0 20 No No Install ramps, complete sidewalk 2 $9,468 Ramps / Maintenance Various Locations Any Rep 1,500 6 10 5 250 0 0 01 01 250 No No Repairs as needed 33 $130,193 8,070 46 64 6,650 2,680 25 0 0 6,300 Proposed 2023+ Sidewalk Projects 11/10/2021 Sidewalk Ramps Drives Curb Pipe Drain Bx R. Wall R. Wall Street Need Eng Ward Street From To Placement Type Length Width Each Each Feet Feet Each L Ft. Ht. Repair R/W Comments 25.3 24.5 22.6 26.1 25.6 22.6 22.6 23.0 NR 25.3 16.5 16.8 NR 385 $1,449,765 Const. Est. Material Time Cost 2 Center St. Gregg Ave. School Ave. Both Rep 920 8 4 9 0 0 0 700 3 0 Yes Yes Replace deteriorated sidewalk 43 $155,888 2 Cleveland St. Leverett Ave. Whitham Ave. North New 300 6 3 4 300 150 1 0 0 300 No Yes Complete sidewalk connection 24 $51,704 2 Lindell Ave. Douglas St. Maple St. East Rep 500 6 2 1 0 0 0 250 3 0 No Yes Grade problems. Current sidewalk has steps. 13 $53,764 2 Lindell Ave. Hughes St. Cleveland St. West Gap 1,075 6 7 8 1,150 1,000 10 0 0 1,150 No Yes Fill gaps in sidewalk connection 106 $211,303 2 Oakland Ave. Cleveland St. Existing sidewalk West New 475 6 1 2 475 300 3 0 0 475 Yes Yes Complete sidewalk connection. 34 $76,729 2 Reagan St. Arkansas Ave. Gregg Ave. South Rep 450 81 2 3 4501 0 01 0 0 450 No No I Replace deteriorated sidewalk 18 $64,999 2 Rebecca St. College Ave. Mission Blvd. North New 2,260 6 9 9 2,260 950 10 200 4 2,260 Yes Yes Connect College Ave. to Mission Blvd. 140 $345,890 2 School Ave. Spring St. Center St. West Rep 680 8 8 5 680 0 3 0 0 680 No No Replace deteriorated sidewalk 42 $112,880 2 Spring St. (Phase 2) Church Ave. College Ave. Both Rep 300 8 7 5 150 0 0 0 0 150 No Yes Improve walkability in conjunction with lighting improvements. 19 $48,559 2 Watson St. Campbell Ave. Thompson Ave. South Rep 300 8 4 2 300 0 0 0 0 300 No No Replace deteriorated sidewalk 13 $43,799 31 Mission Blvd. lWinwood Dr. I Libby Ln. North New 225 8 1 1 0 100 1 1201 81 0 No IYes Fill gap. Extend box culvert, Arpot R/W 17 $56,227 31 Mission Blvd. Libby Ln. Lisa Ln. North INew 1 3201 81 1 31 01 01 01 01 0 No IYes I Fill gaps in sidewalk connection 10 $43,667 41 Salem Rd. I Fairfax St. 1wedington Dr. Both IRep 1 2001 81 24 01 2501 0 01 01 01 250 No INo I Install ADA access ramps 17 $30,557 8,005 73 52 6,015 2,500 28 1,270 18 6,015 493 $1,295,965