Loading...
2021-11-10- Agendas - FinalCITY of FAYETTEVILLE ARKANSAS AGENDA Active Transportation Advisory Committee (ATAC) Wednesday, November 10t", 2021 5:30 pm The meeting will be all virtual at the link below Webinar ID: 850 3197 7483 Public Registration Link: https://us06web.zoom.us/webinar/register/WN InT940DkQaC dXtEx4yEfQ Members: Citizens -at -Large: City Council Representative: D'Andre Jones Nathan Eikenberry - Chair Dan Greim — Vice Chair Parks & Rec. Board Representative: Nicole Claesen John Ray Jeremy Rawn Planning Commission Representative: Matt Johnson Arnold Smith Staff: Matt Mihalevich, Trails Coordinator Dane Eifling, Mobility Coordinator Connie Edmonston, Parks & Recreation Director Terry Gulley, Transportation Director Captain William Brown, Police Dept. Michael Morisette, GIS Chris Brown, City Engineer Brannon Pack, Experience Fayetteville 1. Call to Order / Introductions: Matt Mihalevich Citizen Input 2. Police Update (5 min): Captain William Brown Citizen Input 3. Mobility Coordinator Update (5 min): Dane Eifling America Walks https://americawalks.org/ Citizen Input 4. Trails Program Update (5 min): Matt Mihalevich Citizen Input 5. Sidewalk Program Update (5 min): Terry Gulley Citizen Input 6. 2022-2027 Trail Construction Plan: Matt Mihalevich Citizen Input 7. Other Business/Events/Citizen Input Cultural Arts Corridor Tours Next Meetings: Dec 8t", Jan 12t", Feb, 9t", March 9t" Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 CITY Or FAYETTEVILLE ARKANS A I(AS 2022 DRAFT 11 /8/2021 11-8-21 2022 - 2027 Proposed Shared -Use Paved Trail Construction Projects Prioritization Score* Fundino Rank Ward Feet Miles Lake Fayetteville Trail Replacement Across the Dam (Finish) N/A RTP Grant $150K N/A 3 1,970 0.37 Rupple Road Trail Starry Night to Best Friend (Finish) 47.9 Trail CIP 6 4 1,000 0.19 Mission Blvd. Trail (Trail Crew) Viewpoint to Maple St. and Prospect & 47.6 Trail CIP 8 3 3,000 0.57 Rebecca Bikeway (Start) Maple Street Cycle Track (Contractor) Razorback Greenway to Garland Ave. 42.8 Transportation 15 2 3,091 0.59 Bond/UofA/Grant Old Wire & Old Missouri Trail Gulley Park to Rolling Hills 48.4 Transportation Bond 5 3 4,358 0.83 Highway 112 (North) (ARDOT) Truckers Drive to Howard Nickell Includes N/A ARDOT & Grants N/A 4 8,323 1.58 Clabber Creek Connection Midtown Trail I-49 to College Avenue 51.1 Trails &Trans. Bond 3 2 11,807 2.24 Deane/Sycamore/Poplar (Contractor) + Grant Cultural Arts Corridor (Nabholtz) Prairie Street to Center Street (Finish) N/A Ph 1 Trail Bond/CAC N/A 2 2,198 0.42 Razorback Greenway Replacement In-house Constructed: 1.13 Year Total 6.77 2023 Mission Blvd. Trail (Trail Crew) Viewpoint to Maple St. and Prospect & 47 6 Trail CIP 6 3 6,007 1.14 Rebecca Bikeway (Continue and Finish) Alberta Trail Segments (Fill In Project) Walnut Crossing 29 Trail CIP 24 1 1,335 0.25 Rolling Hills Improvements (Contractor) Old Missouri to Fiesta Square 37.8 Transportation Bond 21 3 5,411 1.02 Cultural Arts Corridor (Contractor) Center Street to Dickson Street N/A Ph 2 Trail Bond/CAC N/A 2 1,550 0.29 Civic Plaza Reroute Garland Avenue (Contractor) Melmar to Drake St. N/A Trans. Bond CIP & N/A 2 4,707 0.89 ARDOT College/School Improvements Archibald Yell to Cato Springs Rd. N/A Transportation Bond N/A 1 8,600 1.63 In-house Constructed: 1.39 Year Total 5.23 2024 Hamestring Creek Trail Salem Rd. to Rupple Rd. (1 Bridge) 42.1 Trail CIP 12 4 2,338 0.44 Old Farmington Trail (Shiloh Trail to Rupple Centennial Park to MLK & Old Farmington 52.6 Trail CIP 2 1 4,880 0.92 Rd.) west to Rupple Road. Clabber Creek Trail Truckers Drive to Highway 112 46.8 Trail CIP 9 4 1,650 0.31 Tsa La Gi Trail along Hwy 62 Rupple Road to 1-49 54.2 Trail Bond & ARDOT 1 1 8,840 1.67 (MLK Jr. Blvd.) (Contractor) I (ARDOT schedule dependent) In-house Constructed: 1.68 Year Total 3.35 2025 Begin Phase 3 Bond I Shiloh Trail (Moore Ln. to MLK) Moore Ln. to MLK Jr. Blvd (ARDOT 49.7 Ph 3 Trail Bond & 4 4 13,063 2.47 Permit) (Bridge over Hamestring) CIP In-house Constructed: 2.47 Year Total 2.47 2026 Shiloh Trail to Broyles Road Owl Creek Trail Connection to Boys & Girls Club 43.7 Trail CIP 13 4 8,377 1.59 Ph 3 Trail & St. Paul Trail Razorback Gwy. to St. Paul Trail 44.6 11 1 6,237 1.18 PBond CI Markham Hill Trail Connector Razorback Road to Cross Ave. 41.3 Trail CIP 17 4 1,500 0.28 In-house Constructed: 3.05 Year Total 3.05 2027 Morningside Trail (Park Meadows) Town Branch to Huntsville Road 32.7 Trail CIP 22 1 5,194 0.98 St. Paul Trail (Existing Trail Upgrade) Morningside to Armstrong 44.6 Ph 3 Trail PBond & 11 1 4,227 0.80 St. Paul Trail (Contractor Section) Armstrong to Dead House Mtn. 40.4 Ph 3 Trail Bond 11 1 5,842 1.11 In-house Constructed: 1.78 Year Total 2.89 5 Year Total 125,505 23.77 Notes: In -House Trail Crew Build Bond Project *Trail development of approximately 2 miles per year is based on continued CIP, Bond and Grant funding *Prioritization Score reflects weighting established by ATAC - Maximum score if 54.2 Year 2022-2027 Trail Construction Plan Note: Planned trail projects are based on continued CIP at current levels, 2019 bond program and rR° grant funding. 1 F O'N , Hwy 112 Trail — \ �a 1 A •� • 1 1 1 C 1 1 • r c wol'G 1 Meac �1 O Q�=G9 `S+r �'�-'�a-'L • amestring Cro rr Midtown Trail 16 a Legend 2022 Planned Trail Projects 2023 Planned Trail Projects 2024 Planned Trail Projects 2025 Planned Trail Projects 2026 Planned Trail Projects 2027 Planned Trail Projects Existing Shared -Use Paved Trail ------- Future Shared -Use Paved Trails j School Stream Lake/Pond x Tunnel Parks Creek Troll , .... Markham iO , 7� r Y Ni, L2 1, Tratl 1 Alberta Trail — PP Old Farmington • 1 aGt Trail' TsaL �,• I � ' 1 I 1 1 _ I . �r Kesler Mountain Regional Park •.1 Y Y� �I CITY OF FAYETTEVILLE � atteville Ira\1 Cr, ARKANSAS Oreek Trail � � ' 1 , , A , GUY TfRRYRO o, _I 1 1 1 Med r Creek Trail 1 • : Nlokaska U� R ' • Rollins Hills rak P — I � h a o � Y , Midtown Trail Y 3a\ - �• + r 9 a Maple Street . i Taa La Gi Trap Town BranorT rail 1%o r.Mss\on Trail � !� 1 � 1 UWTF JO 1 1 W Sublett Creek Trail _ Alignment Study Area 1 O - ZAFAYETTE ST 1 A C U ♦y j WYMANRD ��► •f y•y� •� —! /r ul 15TH ST Z . , ter, .I� ,11 1 J. 1 �� ♦ L 1_1� % Un SLPaulT— rail � , ,�4 ,' _ — — — — — 7 — — •' 1 r S` Pao\'Ccak . ^ ,' • .'' , / ' a N1 1_______• Miles 1 •" 0 0.5 1 2 3 4