2020-12-29 - Agendas - FinalCITY OF
FAYETTEVILLE
\.� ARKANSAS
MEETING AGENDA
City Council Transportation Committee
Tuesday, December 29, 2020
5:30 pm or Immediately Following Agenda Session
NOTICE: THE TRANSPORTATION COMMITTEE WILL BE HELD VIRTUALLY WITH NO
PHYSICAL LOCATION TO ATTEND
VIDEO CONFERENCING BY ZOOM WILL BE USED FOR THIS MEETING. TO REGISTER
FOR THE MEETING GO TO: https://zoom.us/webinar/register/WN-uMb-2miQ2gq-
OAe6zm9OA
Members: Matthew Petty, Chairperson; Sarah Marsh; Sarah Bunch; Kyle Smith
City Staff: Chris Brown, City Engineer; Terry Gulley, Transportation Director
Agenda:
1. Old Business:
A. None.
2. New Business:
A. 2021-2022 TRANSPORTATION WORKPLAN: Review of Transportation Division
pavement management and sidewalk construction and maintenance workplans for 2021
and 2022. A map of the proposed pavement management (overlay) projects may be
found at: https://maps.favetteville-
ar.gov/viewer/index. html?webmap=18a1 f221 e99a4031800b683780a5edff&config=basic.
ison (Staff requests a recommendation from the Committee to the City Council
on this item.)
B. HIGHWAY 16 WIDENING PLANS BY ARDOT: Review of preliminary plans for
widening Highway 16, from Stonebridge Road to Roberts Road. Staff memo and
preliminary plans attached. (Staff requests a recommendation from the Committee
to the Administration on this item.)
C. ROLLING HILLS/APPLEBY/PLAINVIEW CONNECTION: Review of preliminary plans
for the extension of Rolling Hills west of College Avenue, to connect to Appleby Road
and Plainview Avenue. Preliminary plans are attached. (Staff requests a
recommendation from the Committee to the Administration on this item.)
D. DOWNTOWN SQUARE LIGHTING: Review of a proposal to supplement Parks Bond
funding for lighting improvements to the downtown square. This funding is proposed to
come from the Downtown Walkability project established in the Transportation Bond
Program. Staff memo attached. (Staff requests a recommendation from the
Committee to the City Council on this item.)
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
3. Reports:
A. Transportation Bond Program Update
B. Transportation Division Workplan Update
4. Adjourn
Proposed 2021 Sidewalk Projects
12ni2020 Sidewalk Ramps Drives Curb Pipe Drain Bx R. Wall R. Wall Street Need Eng Const. Est. Material
Ward Street From To Placement T e Length Width Each Each Feet Feet Each L Ft. Ht. Re air JW T e Comments Time Cost
1 Bus Shelter Pads Various Locations Per Ian New 0 0 0 0 0 0 0 0 0 0 No Yes Shelter Pad Construct concrete pad and access for bus shelters 1 3 $1,850
Huntsville Rd. Seven Hills Dr. Erika Ave. South New
1
Cato Springs Rd.
Razorback Rd.
Vale Ave.
North
Rehab
700
6
0
0
0
0
0
0
0
0
No
No
Maintenance
Clean and seal joints
2
$250
1
Eleventh St.
Duncan Ave.
Hill Ave.
North
Rehab
30
4
0
0
0
0
0
0
0
0
No
No
Maintenance
Clean, replace failingsections
2
$1,000
1
Finger Rd.
MLK Jr. Blvd.
Walmart drivewayWest
New
150
5
3
0
250
0
0
0
0
200
Yes
Yes
Bus StopWiden
street for bus pull off
19
$18,773
1
RayAve.
Cul de sac
Pinyon Pt.
East
Rehab
30
4
0
0
01
0
0
0
0
0
No
INo
IMaintenance
Clean, replace failing sections
1 2
$1,000
21 Bus Shelter Pads
lVarious
I Locations
I Per plan
I New 1 01 01 01 01 01 01 01 01 01 0 Yes IYes IShelterPad I Construct concrete pad and access for bus shelters 1 15 $9,250
Hill Ave.
Putman St.
Stone St.
West
New
Hill Ave.
Putman St.
Stone St.
East
New
Hill Ave.
Stone St.
MLK Jr. Blvd.
West
New
Hill Ave.
Stone St.
MLK Jr. Blvd.
East
New
Lewis Ave.
Deane St.
Mt. Comfort Rd.
West
New
2
College Ave.
Lafayette St.
Dickson St.
Both
New
50
10
2
0
50
0
0
0
0
50
No
Yes
Request
Install pedestrian crossing with access rams
10
$13,218
2
Mountain St.
West Ave.
School Ave.
South
Rep
300
8
2
1
0
0
0
0
0
0
No
No
Request
Brick border and sidewalk in poor condition
6
$13,597
2
Mt. Comfort Rd.
Addington Ave.
Garland Ave.
South
New
765
12
1
3
1,665
900
8
600
6
700
Yes
Yes
Walk
Complete sidewalk/trail connection
107
$247,658
2
Sycamore St.
Saddlehorn Ave.
Porter Rd.
South
Rep
100
4
2
0
50
0
0
0
0
50
Yes
No
Maintenance
Install 2 access rams
3
$4,965
2
University Ave.
Whiteside St.
Powerhouse Ave.
East
Rep
390
4
0
4
390
0
0
0
0
390
No
No
Maintenance
Replace failing sections of sidewalk
11
$25,569
2
Whitham Ave.
Taylor St.
Douglas St.
West
Rep
100
4
1
0
0
0
0
0
0
0
No
No
Maintenance
Replace failing sections of sidewalk
2
$3,645
3 Bus Shelter Pads lVarious I Locations I Per plan I New 1 01 01 01 01 01 01 01 01 01 Was IYes IShelterPad I Construct concrete pad and access for bus shelters 1 15 $9.250
Mall Ave. Joyce Blvd. Van Asche Dr. West New
Mall Ave. Joyce Blvd. Van Asche Dr. East New
3
Birdie Dr.
I Par Ct.
I Crossover Rd.
I North
I Rep 1
1001
41
01
01
01
01
01
01
01
0
No
INo
IMaintenance
I Replace failing sections of sidewalk
1
$3,495
3
1 Creekwood Ave.
ITownship St.
Cul-de-sac
I North
I New 1
8351
61
41
01
7501
01
01
2501
31
0
No
IYes
IlRequest
lConnect neighborhood to Gulley Park and trails stem
23
$69,423
3
1 Stearns St.
JAbington /ct.
101d Missouri Rd.
I North
I Rehab 1
2101
41
01
01
01
01
01
01
01
0
No
INo
IMaintenance
I Clean and seal joints
1
$150
3
1 Warwick Dr.
I Pine St.
I Notting Hill Dr.
I North
I Rep 1
1001
41
01
01
01
01
01
01
01
0
No
INo
IMaintenance
I Replace failing sections of sidewalk
1
$3,495
4
Bentgrass Rd.
Hay Meadows Ave.
Salem Rd.
Both
Rep
100
5
2
0
100
25
1
0
0
100
No
Yes
Maintenance
Replace access rams
1 8
$10,640
4
Cleveland St.
Oliver Ave.
Sunset Dr.
Both
Rep
100
4
2
1
100
0
0
0
0
100
No
No
Maintenance
install 2 access ramps, correct driveway sloe
5
$8,947
4
Heritage Ave.
Reliance St.
Wedin ton Dr.
Both
Rep
250
4
4
0
100
0
0
0
0
100
No
No
Maintenance
Replace heaved sidewalk and add access rams
6
$11,678
4
Persimmon St.
Salem Rd.
Betty Jo Dr.
North
New
60
6
4
0
60
01
0
0
0
60
No
Yes
Maintenance
Install 4 access rams
3
$4,101
4
Verona Ln.
Ika Ln.
Miramar Dr
West
Ran
250
4
0
0
0
01
0
0
0
0
No
No
Maintenance
Replace failing sections of sidewalk
3
$8,738
Traffic Calming Various I Locations I I I I I I I I I I I I I I I I Installation of traffic calming devices 1 51 TBD
Total 4,620 27 9 3,515 925 9 850 1,750 253 $470,692
Feet Each Each Feet Feet Each Feet Feet
Proposed Project for complete construction by contractor 2021
2
1 Leverett Ave.
ISycamore St.
I Hazel St.
West
I Rep
1 1,6001
51
51
121
1,6001
01
01
01
01
1,600
Yes
IYes
I
I Replace deteriorated, non ADA sidewalk
2
1 Prairie St.
I GreggAve.
lArchibald Yell Blvd.
Both
I New
1 1,4351
101
81
71
1,6751
5601
101
01
01
0
Yes
IYes
I
I Improvement Project - Bond
2
1 West Ave.
I South St.
I Prairie St.
I Both
I New
1 8901
61
21
61
8901
01
01
401
41
0
Yes
IYes
I
I Improvement Project - Bond
Total 3,925 15 25 4,165 560 10 40 4 1,600
Feet Each Each Feet Feet Each Feet Feet
Possible 2022 Projects
2
Lewis Ave.
Deane St.
Wedin ton Dr.
West
New
1,165
5
10
12
1,165
1,165
6
0
0
1,165
No
Yes
Fill gaps in sidewalk to complete connections
2
Lindell Ave.
Hu hes St.
Cleveland St.
West
New
1,075
5
7
8
1,150
1,000
10
0
01
1,150
No
Yes
Fill gaps in sidewalk to complete connections
IlHollywoodAve.
MLK Jr. Blvd.
Best Wa St.
West
I New
7501
5
3
9
2,0001
7501
8
0
01
2,000
No
Yes
I
New sidewalk with storm drainage
2
Dickson St.
Arkansas Ave.
College Ave.
Both
I Rep
750
Varies
10
3
1,0001
01
0
0
01
0
No
Yes
I
Improvement/Rehab project - Bond
Page 1 of 1
2021 PROPOSED STREET MAINTENANCE PLAN (21.2 miles)
EE
p
�
a
_
Q
r
K
o
ci
Ti
O
a
rc
,
Y
NWASHINGTONAVE
1200
254
63
db6 Edge Mill+ Thin Overlay (1.5 - 2.0)
$2,607.00
27TH CIR
S COUNTRY CLUB DR
EAST END
1840
3,218
43
FWM + Thick Overlay (> 2.0 - 3.0)
$117,418.00
91
28TH CIR
S COUNTRY CLUB DR
EAST END
1840
3,218
43
FWM + Thick Overlay (> 2.0 - 3.0)
$117,418.00
91
29TH CT
S CLUB OAK DR
WEST END
1840
3,218
43
FWM + Thick Overlay (> 2.0 - 3.0)
$117,418.00
91
CLUB OAK DR
WRAVENSWOOD LN
W29TH CT
1840
3218
43
1 FWM +Thick Overlay (> 2.0 - 3.0)
$117,418.00
90
COUNTRY CLUB DR
E 29TH CIR
S SAND TRAP LN
1840
3,218
43
FWM +Thick Overlay (> 2.0 - 3.0)
$117,418.00
91
RAVENSWOOD LN
S COUNTRY CLUB DR
S CLUB OAK DR
1840
3,218
43
FWM +Thick Overlay (> 2.0 - 3.0)
$117,418.00
91
SAND TRAP LN
W 29TH CT
SOUTH END
1840
3,218
43
FWM + Thick Overlay (> 2.0 - 3,0)
$117,418.001
91
RAY AVE
DS@591S S WOODSPRINGS DR
DS@809SSWOODSPRINGSDR
1990
1,789
63
Edge Mill+ Thin Overlay (1.5 - 2.0)
$29,069,00
88
AVE
DS@809S S WOODSPRINGS DR
E4TH ST
1990
1,789
63
Edge Mill+ Thin Overlay (1.5 - 2.0)
$29,069.00
87
lbRAY
Y AVE
ANSON ST
E 4TH ST
SW END
E HUNTSVILLE RD
NRUTH AVE
1990
1789
63
Edge Mill + Thin Overlay (1.5 - 2.0)
Edge Mill+ Thin Overlay (1.5 - 2.0)
$29,069.00
88
88
2300
2,407
64
$39,913.00
ANSON ST
N RUTH AVE
EAST END
2300
2407
64
Edge Mill +Thin Overlay (1.5 - 2.0)
$39,913.00
88
CLARK ST
SW END
NRUTH AVE
2300
2,407
64
Edge Mill+ Thin Overlay (1.5 - 2.0)
$39,913.00
88
CLARK ST
NAINSWORTH AVE
EAST END
2300
2,407
64
Edge Mill+ Thin Oveday(1.5-2.0)
$39,913.00
88
KENILWORTH AVE
SOUTH END
E ROCKWOOD TRL
2300
2,407
64
Edge MIII +Thin Overlay (1.5- 2.0)
$39,913,00
88
KINGS DR
MEMENKRLINGTONT
ECOLUMBUS BLVD
2370
1,148
64
Edge Mill+ Thin Overlay (1.5 - 2.0)
$22,263.00
88
KINGS DR
E COLUMBUS BLVD
E HOPE ST
2370
1,148
64
Edge Mill +Thin Overlay (1.5 - 2.0)
$22,263.00
88
KINGS DR
E HOPE ST
E MISSION BLVD
2370
1,148
64
Edge Mill +Thin Overlay (1.5 - 2.0)
$22,263.00
88
ASH ST
NWALNUT AVE
NRAYVIEW DR
2520
4,205
73
Super Thin -3/4"Overlay +Strctrl Ptch
$54,528.00
85
ASH ST
NRAYVIEW DR
IN WHEELER AVE
2520
4205
73
Super Thin -3/4"Overlay+Strctrl Ptch
$54,528.00
85
ASH ST
N WHEELER AVE
N AUSTIN DR
2520
4205
73
Super Thin - 3/4" Overlay + Strobl Ptch
$54,528.00
85
ASH ST
N AUSTIN DR
N PITTMAN DR
2520
4,205
73
Super Thin - 3/4" Overlay+ Strctrl Etch
$54,528.00
86
ASH ST
N PITTMAN DR
N JUNEWAY TER
2520
4205
73
Super Thin - 3/4" Overlay + Strctrl Ptch
$54,528.00
85
ASH ST
N JUNEWAY TER
N BEAR TREE CT
2520
4205
73
Super Thin - 3/4" Overlay + Strctrl Etch
$54,528.00
86
ASH ST
N BEAR TREE CT
N OLD WIRE RD
2520
4,205
73
Super Thin - 3/4" Overlay + Strctrl Ptch
$54,528.00
85
SYCAMORE ST
N COLLEGE AVE
DS@547E N COLLEGE AVE
2520
4,205
73
Super Thin - 3/4" Overlay + Strctrl Etch
$54,528.00
85
SYCAMORE ST
DS@547E N COLLEGE AVE
DS@595E N COLLEGE AVE
2520
4,205
73
Super Thin - 3/4" Overlay + Strctrl Ptch
$54,528.00
85
SYCAMORE ST
DS@595E N COLLEGE AVE
N WALNUT AVE
2520
4,205
73
Super Thin - 3/4" Overlay + Strctrl Etch
$54,528.00
86
WALNUT AVE
E SYCAMORE ST
E ASH ST
2520
4205
73
Super Thin - 3/4" Overlay + Strctrl Ptch
$54,528.00
86
CHARLEE AVE
ISSION BL
E CHARLEE ST
2550
1165
64
Super Thin - 3/4" Overlay
$11,799.00
86
CHARLESTON XING
SOUTH END
E FREDRICKSBURG CIR
4350
987
47
EM/FWM+ Moderate Overlay (2.0 - 3.0)
$33,300.00
89
HUNTSVILLE RD
ESOUTH ST
ALLEY 267
4720
1,940
67
Edge Mill Thin Oveday(1.5-2.0)
$35,79T00
87
HUNTSVILLE RD
ALLEY 267
SCOMBS AVE
4720
1940
67
1 Edge Mill+ Thin Overlay (1.5 - 2.0)
$35,797.00
87
HUNTSVILLE RD
SCOMBS AVE
SWILLOW AVE
4720
1,940
67
Edge Mill+ Thin Oveday(1.5-2.0)
$35,79T00
87
HUNTSVILLE RD
8WILLOW AVE
8BAR70N AVE
4720
1,940
67
Edge Mill+ Thin Overlay (1.5 - 2.0)
$35,797.00
87
HUNTSVILLE RD
S BARTON AVE
S WOOD AVE
4720
1,940
67
Edge Mill +Thin Overlay (1.5-2.0)
$35,797.00
87
HUNTSVILLE RD
SWOOD AVE
ALLEY 399
4720
1940
67
Edge Mill+ Thin Overlay (1.5 - 2.0)
$35,797.00
87
HUNTSVILLE RD
ALLEY 399
S MASHBURN AVE
4720
1,940
67
Edge Mill +Thin Overlay (1.5-2.0)
$35,797.00
87
MASHBURN AVE
E MARTIN LUTHER KING BLVD
E HUNTSVILLE RD
4720
1,940
67
Edge Mill +Thin Overlay (1.5 - 2.0)
$35,797.00
87
HUNTSVILLE RD
E MARTIN LUTHER KING BLVD
S LYTTON AVE
4760
2,674
66
1 Edge MIII +Thin Overlay (1.5- 2.0)
$52,775,00
87
HUNTSVILLE RD
S LYTTON AVE
S MORNINGSIDE DR
4760
2,674
66
Edge Mill +Thin Overlay (1.5 - 2.0)
$52,775.00
87
MARTIN LUTHER KING BLVD
SWASHINGTONAVE
SWILLOW AVE
4760
2,674
66
Edge Mill+ Thin Overlay (1.5 - 2.0)
$52,775.00
87
MARTIN LUTHER KING BLVD
SWILLOWAVE
SWOOD AVE
4760
2,674
66
Edge Mill+ Thin Overlay (1.5 - 2.0)
$52,775.00
87
MARTIN LUTHER KING BLVD
S WOOD AVE
S GRACE AVE
4760
2674
66
Edge Mill +Thin Overlay (1.5 - 2.0)
$52,775.00
87
MARTIN LUTHER KING BLVD
S GRACE AVE
S MASHBURN AVE
4760
2,674
66
Edge Mill +Thin Overlay (1.5 - 2.0)
$52,775.00
87
MARTIN LUTHER KING BLVD
S MASHBURN AVE
E MIRACLE DR
4760
2,674
66
Edge Mill +Thin Overlay (1.5 - 2.0)
$52,775.00
87
MARTIN LUTHER KING BLVD
E MIRACLE DR
S BLAIR AVE
4760
2674
66
Edge Mill +Thin Overlay (1.5-2.0)
$52,775.00
87
WOOD AVE
E MARTIN LUTHER KING BLVD
E 7TH ST
4760
2,674
66
Edge Mill +Thin Overlay (1.5- 2.0)
$52,775,00
87
OLIVE AVE
E MAPLE ST
E GUNTER ST
4900
1508
62
1 Edge Mill +Thin Overlay (1.5 - 2.0)
$19,525.00
88
OLIVE AVE
E GUNTER ST
E JOHNSON ST
4900
1,508
62
Edge Mill +Thin Overlay (1.5 - 2.0)
$19,525+00
88
OLIVE AVE
EJOHNSONST
EREBECCA ST
4900
1,508
62
Edge Mill+ Thin Overlay (1.5 - 2.0)
$19,525.00
88
OLIVE AVE
E REBECCA ST
E PROSPECT ST
4900
1,508
62
Edge Mill +Thin Overlay (1.5 - 2.0)
$19,525.00
88
JOHNSON ST
NWALNUT AVE
ALLEY 444
4925
450
70
Edge Mill+ Thin Overlay (1.5 - 2.0)
$5,907.00
88
JOHNSON ST
ALLEY 444
ALLEY 456
4925
450
70
Edge Mill+ Thin Overlay (1.5 - 2.0)
$5,907.00
88
JOHNSON ST
ALLEY 456
IN OLIVE AVE
4925
450
70
Edge Mill+ Thin Overlay (1.5 - 2.0)
$5,907.00
88
COLLEGE AVE
E SOUTH ST
E SOUTH ST
5400
1105
53
Edge Mill +Thin Overlay (1.5 - 2.0)
$19,241.00
87
COLLEGE AVE
ESOUTH ST
E4TH ST
5400
1,105
53
Edge Mill+ Thin Overlay (1.5 - 2.0)
$19,241.00
87
COLLEGE AVE
E 4TH ST
E MARTIN LUTHER KING BLVD
5400
1,105
53
Edge Mill + Thin Overlay (1.5 - 2.0)
$19,241.00
87
COLLEGE AVE
E MARTIN LUTHER KING BLVD
E 7TH ST
5440
4,400
72
Super Thin - 3/4" Overlay
$42,286.00
86
COLLEGE AVE
E 7TH ST
E 9TH ST
5440
4,400
72
Super Thin - 3/4" Overlay
$42,286.00
86
COLLEGE AVE
E 9TH ST
E 11TH ST
5440
4,400
72
Super Thin - 3/4" Overlay
$42,286.00
86
COLLEGE AVE
E 11TH ST
E 12TH ST
5440
4,400
72
Super Thin - 3/4" Overlay
$42,286.00
86
COLLEGE AVE
E 12TH ST
E 13TH ST
5440
4,400
72
Super Thin - 3/4" Overlay
$42,286.00
86
COLLEGE AVE
E 13TH ST
E ELLA ST
5440
4400
72
Super Thin - 3/4" Overlay
$42,286.00
86
COLLEGE AVE
E ELLA ST
E 15TH ST
5440
4400
72
Super Thin - 3/4" Overlay
$42,286.00
86
MARTIN LUTHER KING BLVD
S COLLEGE AVE
S WASHINGTON AVE
5440
4,400
72
Super Thin - 3/4" Overlay
$42,286.00
86
WOOD AVE
E 7TH ST
E MCCLINTON ST
5440
4400
72
Super Thin - 3/4" Overlay
$42,286.00
86
CHURCH
SCHURCH AVE
68
Edge Mill Thin Overlay (1.5 - 2.0)
$15,882.00
88
CHURCH AVE
ALLEY 51
WMEADOW ST
5475
738
68
Edge Mill+ Thin Overlay (1.5 - 2.0)
$15,882.00
88
CHURCH AVE
W MEADOW ST
W SPRING ST
5475
738
68
Edge Mill +Thin Overlay (1.5-2.0)
$15,882.00
88
JAMESTOWN RD
E NATCHEZ TRCE
NE END
5620
1,917
43
FWM + Thick Overlay (> 2.0 - 3.0)
$88,973.00
91
NATCHEZ TRCE
N WILLIAMSBURG LN
NJAMESTOWN RD
5620
1917
43
FWM +Thick Overlay (> 2.0 - 3.0)
$88,973.00
91
OLD DOMINION WAY
E NATCHEZ TRCE
E SKILLERN RD WC 536
5620
1,917
43
FWM +Thick Overlay (> 2.0 - 3.0)
$88,973.00
91
RALIEGH CIR
N CHARLESTON XING
EAST END
5620
1917
43
FWM +Thick Overlay(>2.0-3.0)
$88,973.00
91
WILLIAMSBURG LN
ENATCHEZ TRCE
NE END
5620
1,917
43
FWM +Thick Overlay (>2.0-3.0)
$88,973,00
91
OAKS MANOR DR
E ROLLING HILLS DR
E GLENN LN
5750
2002
78
Edge Mill + Thin Overlay (1.5 - 2.0)
$40,626.00
88
OAKS MANOR DR
E GLENN LN
E BONNIE LN
5750
2002
78
Edge Mill + Thin Overlay (1.5 - 2.0)
$40,626.00
88
OAKS MANOR DR
E BONNIE LN
N SHERYL AVE
5750
2,002
78
Edge Mill +Thin Overlay (1.5 - 2.0)
$40,626.00
88
WALNUT AVE
EGUNTER ST
EJOHNSON ST
6025
1,170
68
Edge Mill+ Thin Overlay (1.5 - 2.0)
$15,107.00
88
WALNUT AVE
EJOHNSONST
EREBECCA ST
6025
1,170
68
Edge Mill+ Thin Overlay (1.5 - 2.0)
$15,107.00
88
WALNUT AVE
EREBECCA ST
EPROSPECT ST
6025
1,170
68
Edge Mill+ Thin Overlay (1.5 - 2.0)
$15,107,00
88
COLLEGE AVE
E ROCK ST
E SOUTH ST
6180
64
Edge Mill +Thin Overlay (1.5 - 2.0)
$15,886.00
87
MILL AVE
EROCK ST
EHUNTSVILLE RD
6180
965
64
Edge Mill+ Thin Overlay (1.5 - 2.0)
$15,886600
87
ROCKST
S COLLEGE AVE
ALLEY 119
6190
533
86
Edge MIII +Thin Overlay (1.5-2.0)
$8,899.00
87
ROCKST
ALLEY 119
SWASHINGTONAVE
6190
533
86
Edge Mill+ Thin Overlay (1.5 - 2.0)
$8,899.00
87
ROCKST
SWASHINGTON AVE
SMILL AVE
6190
533
86
Edge Mill+ Thin Overlay (1.5 - 2.0)
$8,899,00
87
STEEPLE CHASE DR
WEST END
S TALLY HO DR
6520
1,473
43
FWM + Thick Overlay (> 20 - 3.0)
$62,635.00
91
STEEPLE CHASE DR
S TALLY HO DR
S HUNT LN
6520
1,473
43
FWM + Thick Overlay (> 2.0 - 3.0)
$62,635.00
91
TALLY HO DR
S HUNT LN
E STEEPLE CHASE DR
6520
1473
43
FWM + Thick Overlay (> 2.0 - 3.0)
$62,635.00
91
TALLY HO DR
E STEEPLE CHASE DR
SOUTH END
6520
1473
43
FWM + Thick Overlay (> 2.0 - 3.0)
$62,635.00
91
HILLSIDE TER
SOUTH END
E VALERIE DR
6530
1,489
67
Edge MIII +Thin Overlay (1.5- 2.0)
$23,326.00
88
HILLSIDE TER
E VALERIE DR
N CROSSOVER RD
6530
19489
67
Edge MIII +Thin Overlay (1.5- 2.0)
$23,326,00
88
VALERIE DR
NHILLSIDE TER
NVALERIE DR
6800
2,300
53
Edge Mill+ Thin Overlay (1.5 - 2.0)
$35,075.00
87
VALERIE DR
JOYCE BLV
E VALERIE DR
6800
2,300
53
Edge Mill +Thin Overlay (1.5-2.0)
$35,075.00
88
85TH AVE
S 85TH AVE
W ATHENS LN
7220
3985
60
Edge MIII + Thin Overlay (1.5 - 2.0)
$63,759.00
87
85TH AVE
W ATHENS LN
W FOREST HILLS DR
7220
3,985
60
Edge Mill + Thin Overlay (1.5 - 2.0)
$63,759.00
87
85TH AVE
W FOREST HILLS DR
W VISTA TERRACE DR
7220
3985
60
Edge Mill +Thin Overlay (1.5 - 2.0)
$63,759600
87
85TH AVE
W VISTA TERRACE DR
WWESTRIDGE DR
7220
3985
60
Edge Mill+ Thin Overlay, (1.5 - 2.0)
$63,759.00
87
85TH AVE
W WESTRIDGE DR
W WEDINGTON DR
7220
3,985
60
Edge Mill+ Thin Overlay (1.5 - 2.0)
$63,759.00
87
LINDELLAVE
mmmmSOUTH END
WHOLLY ST
7270
225
25
FWM +Thick Overlay (> 2.0 - 3.0) + Strctrl Ptch
$14,934.00
91
CEDAR RIDGE LN
SOUTH END
W FOREST HILLS DR
8100
3,621
60
Super Thin - 3/4" Overlay
$53,546.00
86
CEDAR RIDGE LN
W FOREST HILLS DR
NORTH END
8100
3621
60
Super Thin - 3/4" Overlay
$53,546.00
86
FOREST HILLS DR
N 85TH AVE
N CEDAR RIDGE LN
8100
3,621
60
Super Thin - 3/4" Overlay
$53,546600
86
FOREST HILLS DR
N CEDAR RIDGE LN
N RIDING RIDGE LN
8100
3,621
60
Super Thin - 3/4" Overlay
$53,546.00
86
FOREST HILLS DR
N RIDING RIDGE LN
N WALNUT RIDGE IN
8100
3,621
60
Super Thin - 3/4" Overlay
$53,546900
86
BIRCH AVE
mw WPOPLAR ST
NORTH END
8120
1,452
42
FWM +Thick Overlay (> 2.0 - 3.0)
$51,499.00
91
CHESTNUT AVE
W POPLAR ST
W VAN GOGH PL
8120
1,452
42
djkWM + Thick Overlay (> 2.0 - 3.0)
$51,499.00
91
CHESTNUT AVE
WVAN GOGH 1211
NORTH END
8120
1452
42
M+Thick Overlay 1
$51,499.00
91
DEANE SOLOMON RD
N SHILOH DR
W EMIL DR
8420
2,015
47
Edge Mill +Thin Overlay (1.5 - 2.0)
$35,946600
87
DEANE SOLOMON RD
W EMIL DR
W MOORE LN
a420
2015
47
Edge Mill +Thin Overlay (1.5 - 2.0)
$35,946.00
87
DEANE SOLOMON RD
W MOORE LN
W LORI DR
8420
2015
47
Edge Mill +Thin Overlay (1.5 - 2.0)
$35,946600
87
DEANE SOLOMON RD
W LORI DR
W PINEHILLS DR
8420
2015
47
Edge Mill +Thin Overlay (1.5-2.0)
$35,946.00
87
DEANE SOLOMON RD
N HARRIER DR
N HARRIER DR
8440
4,241
47
Edge Mill + Thin Overlay (1.5 - 2.0)
$68,362.00
87
DEANE SOLOMON RD
N HARRIER DR
W SALEM RD
8440
4241
47
Edge Mill +Thin Overlay (1.5 - 2.0)
$68,362.00
87
DEANE SOLOMON RD
W SALE M RD
W HONEY LN
8440
4,241
47
Edge Mill +Thin Overlay (1.5 - 2.0)
$68,362.00
87
DEANE SOLOMON RD
W HONEY LN
W HWY 112
8440
4,241
47
Edge Mill +Thin Overlay (1.5 - 2.0)
$68,362.00
87
DEANE SOLOMON RD
W PINEHILLS DR
W CRANE CT
8460
2476
65
Edge MIII +Thin Overlay (1.5- 2.0)
$42,589900
87
DEANE SOLOMON RD
W CRANE CT
N FLORAL CT
8460
2476
65
Edge Mill +Thin Overlay (1.5 - 2.0)
$42,589.00
87
DEANE SOLOMON RD
N FLORAL CT
N HARRIER DR
8460
2,476
65
Edge Mill +Thin Overlay (1.5 - 2.0)
$42,589.00
87
DOUBLE SPRINGS RD
DS@694E W GOOSE CREEK RD
S FOSTER LN
8540
4,024
72
Edge Mill +Thin Overlay, (1.5 - 2.0)
$60,849.00
87
DOUBLE SPRINGS RD
S DOUBLE SPRINGS RD
DS@287N S DOUBLE SPRINGS RD
8540
4024
72
Edge Mill + Thin Overlay (1.5 - 2.0)
$60,849.00
87
DOUBLE SPRINGS RD
DS@287N S DOUBLE SPRINGS RD
DS@537N S DOUBLE SPRINGS RD
8540
4,024
72
Edge Mill +Thin Overlay (1.5 - 2.0)
$60,849.00
87
DOUBLE SPRINGS RD
DS@537N S DOUBLE SPRINGS RD
W DOT TIPTON RD
8540
4,024
72
Edge Mill +Thin Overlay (1.5 - 2.0)
$60t849.00
87
DOUBLE SPRINGS RD
N DOUBLE SPRINGS RD
DS@6815 N DOUBLE SPRINGS RD
8540
4024
72
Edge Mill +Thin Overlay (1.5 - 2.0)
$60,849.00
87
DOUBLE SPRINGS RD
DS@6815 N DOUBLE SPRINGS RD
DS@11195 N DOUBLE SPRINGS RD
8540
4,024
72
Edge Mill + Thin Overlay (1.5 - 2.0)
$60,849.00
87
DOUBLE SPRINGS RD
DS@11198 N DOUBLE SPRINGS RD
W SELLERS RD
8540
4,024
72
Edge Mill +Thin Overlay (1.5 - 2.0)
$60,849.00
87
DOUBLE SPRINGS RD
W SELLERS RD
W SHREVE DR
8540
4024
72
Edge Mill +Thin Overlay (1.5 - 2.0)
$60,849600
87
DOUBLE SPRINGS RD
W SHREVE DR
DS@1305 W SHREVE DR
8540
4,024
72
Edge Mill +Thin Overlay (1.5-2.0)
$60,849.00
87
DOUBLE SPRINGS RD
DS@1305 W SHREVE DR
DS@5385 W SHREVE DR
8540
4,024
72
Edge Mill +Thin Oveday (1.5 - 2.0)
$60t849.00
87
HARTMAN AVE
W CENTER ST
W HOTZ DR
9420
2,360
59
Edge MIII +Thin Overlay (1.5-2.0)
$40,445.00
88
HARTMAN AVE
WCENTER ST
WPALMER PL
9420
2,360
59
Edge Mill+ Thin Oveday (1.5 - 2.0)
$40,445600
88
HARTMAN AVE
WPALMER PL
WNETTLESHIP ST
9420
2,360
59
Edge Mill+ Thin Overlay (1.5 - 2.0)
$40,445.00
88
HOTZ DR
N PALMER AVE
N HARTMAN AVE
9420
2,360
59
Edge Mill +7hin Overlay (1.5 - 2.0)
$40,445.00
88
PALMER AVE
WCENTER ST
WPALMER PL
9420
2360
59
Edge Mill+ Thin Overlay (1.5 - 2.0)
$40,445.00
88
PALMER PL
S PALMER AVE
S HARTMAN AVE
9420
2,360
59
Edge MIII +Thin Overlay (1.5- 2.0)
$40,445900
88
KATHERINE AVE
N OAK BAILEY DR
N W ROXTON CT
9640
1,925
70
Super Thin - 3/4" Overlay + Strctrl Etch
$29,102.00
86
OAK BAILEY DR
NOLD WIRE RD
NSTRAWBERRY DR
9640
1,925
70
Super Thin-3. Overlay+Strcirl Ptch
$29,102.00
86
OAK BAILEY DR
N STRAWBERRY DR
DS@365N N STRAWBERRY DR
9640
1,925
70
Super Thin - 3/4" Overlay + Strctrl Ptch
$29,102.00
86
OAK BAILEY DR
DS@365N N STRAWBERRY DR
NWARWICK DR
9640
1,925
70
Super Thin -3/4"Overlay +Strcirl Etch
$29,102.00
86
OAK BAILEY DR
NWARWICK DR
NWARWICK DR
9640
1925
70
Super Thin -3/4"Overlay +Strctrl Ptch
$29,102.00
86
OAK BAILEY DR
NWARWICK DR
NKATHERINE AVE
9640
1,925
70
Super Thin -3/4"Overlay +Strctrl Ptch
$29,102.00
86
LEVERETT AVE
WDOUGLAS ST
WTAYLOR ST
9740
2,097
72
EM/FWM+ Moderate Overlay (2.0 - 3.0)
$56,370.00
89
LEVERETT AVE
W TAYLOR ST
ALLEY 675
9740
2097
72
EM/FW M + Moderate Overlay (2.0 - 3.0)
$56,370.00
89
LEVERETT AVE
ALLEY 675
WCLEVELAND ST
9740
2,097
72
EM/FWM+ Moderate Overlay (2.0 - 3.0)
$56,370.00
89
LEVERETT AVE
WCLEVELAND ST
WEAGLE ST
9740
2097
72
EM/FWM+ Moderate Overlay (2.0 - 3.0)
$56,370600
89
LEVERETT AVE
W EAGLE ST
W BERRY ST
9740
2,097
72
EM/FWM+ Moderate Overlay (2.0 - 3.0)
$56,370.00
89
LEVERETT AVE
W BERRY ST
W HUGHES ST
9740
2,097
72
EM/FW M + Moderate Overlay, (2.0 - 3.0)
$56,370.00
89
LEVERETT AVE
WHUGHES ST
WNORTH ST
9740
2,097
72
EM/FWM+ Moderate Overlay (2.0 - 3.0)
$56,370.00
89
HUGHESST
NLEVERETT AVE
ALLEY 848
9960
1193
40
EM/FWM+ Moderate Overlay (2.0 - 3.0)
$28,538,00
90
HUGHESST
ALLEY 1048
NGARLAND AVE
9960
1193
40
EM/FWM+ Moderate Overlay (2.0 - 3.0)
$28,538.00
89
LINDELL AVE
W EAGLE ST
W BERRY ST
9960
1,193
40
EIWFWM+ Moderate Overlay (2.0 - 3.0)
$28,538.00
89
LINDELLAVE
W BERRY ST
W HUGHES ST
9960
1,193
40
EM/FWM+ Moderate Overlay (2.0 - 3.0)
$28,538.00
89
W HUGHES ST
NORTH END
9960
1193
40
EM/FWM+ Moderate Overlay (2.0 - 3.0)
$28,538.00
8
HOLLY ST
NLEVERETT AVE
NSTORER AVE
10300
21040
59
Edge Mill+ Thin Overlay (1.5 - 2.0)
$38,019.00
88
HOLLY ST
N STORER AVE
N OAKLAND AVE
10300
2,040
59
Edge Mill + Thin Overlay (1.5 - 2.0)
$38,019.00
88
HOLLY ST
N OAKLAND AVE
N LINDELL AVE
10300
2,040
59
Edge Mill +Thin Overlay (1.5 - 2.0)
$38,019.00
88
MOUNT COMFORT RD
N GARLAND AVE
W JAMES ST
10300
2,040
59
Edge Mill +Thin Overlay (1.5 - 2.0)
$38,019.00
88
MOUNT COMFORT RD
W JAMES ST
N ADDINGTON AVE
10300
2040
59
Edge Mill +Thin Overlay (1.5 - 2.0)
$38,019.00
88
CARDWELL LN
IN RAZORBACK RD
IN OLIVER AVE
10700
2,165
43
FWM +Thick Overlay (> 2.0 - 3.0)
$80,691.00
91
MAPLE ST
N RAZORBACK RD
N OLIVER AVE
10700
2,165
43
FWM + Thick Overlay (> 2.0 - 3.0)
$80,691.00
91
RAZORBACK RD
WMAPLE ST
WCARDWELL LN
10700
2,165
43
FWM +Thick Overlay (>2.0-3.0)
$80,691.00
91
RAZORBACK RD
WCARDWELL LN
PUBLIC 591
10700
2165
43
FWM +Thick Overlay (>2.0-3.0)
$80,691.00
91
RAZORBACK RD
PUBLIC 591
W CLEVELAND ST
10700
2,165
43
FWM + Thick Overlay (> 2.0 - 3.0)
$80,691.00
91
SANG AVE
WCLEVELAND ST
WBERRY ST
10860
1,328
63
Edge MIII+ Thin Overlay (1.5 - 2.0)
$29,426.00
87
SANG AVE
WBERRY ST
WORA DR
10860
1,328
63
Edge Mill+ Thin Overlay (1.5 - 2.0)
$29,426.00
87
SANG AVE
W ORA DR
W WEDINGTON DR
10860
11328
63
Edge Mill +Thin Overlay (1.5- 2.0)
$29,426.00
87
54TH AVE
S 54TH AVE
DS@6635 S 54TH AVE
11440
6,570
71
Super Thin - 3/4" Overlay + Strctrl Ptch
$71,139.00
85
54TH AVE
DS@663S S 54TH AVE
W WOOLSEY FARM RD
11440
6570
71
Super Thin - 3/4" Overlay + Strctrl Ptch
$71,139.00
85
SELLERS RD
S 54TH AVE
N OTOE ST
11440
6,570
71
Super Thin - 3/4" Overlay + Strctrl Ptch
$71,139.00
85
SELLERS RD
N OTOE ST
N TACOMA ST
11440
6570
71
Super Thin - 3/4" Overlay + Strctrl Ptch
$71,139.00
85
SELLERS RD
N TACOMA ST
S DOUBLE SPRINGS RD
11440
6,570
71
Super Thin - 3/4" Overlay + Strctrl Ptch
$71,139.00
85
WOOLSEY FARM RD
N BROYLES ST
S 54TH AVE
11440
6,570
71
Super Thin - 3/4" Overlay + Strctrl Ptch
$71,139.00
85
ARBUCKLE LN
W MARTIN LUTHER KING BLVD
SOUTH END
11500
491
40
EM/FWM+ Moderate Overlay (2.0-3.0)
$10,583.00
89
EASTERN AVE
W MARTIN LUTHER KING BLVD
W FARMINGTON ST
11500
491
40
EWFWM+ Moderate Overlay (2.0 - 3.0)
$10,583.00
89
BEECHWOOD AVE
W MARTIN LUTHER KING BLVD
WFARMINGTON ST
11600
2,927
62
Edge Mill+ Thin Overlay (1.5 - 2.0)
$57,695.00
87
BEECHWOOD AVE
WFARMINGTON ST
WCAPELLA ST
11600
2,927
62
Edge Mill+ Thin Overlay (1.5 - 2.0)
$57,695.00
87
BEECHWOOD AVE
WCAPELLA ST
WPERIMETER DR
11600
2927
62
Edge Mill+ Thin Overlay (1.5 - 2.0)
$57,695.00
87
BEECHWOOD AVE
WPERIMETER DR
W TOWNE VILLAGE DR
11600
2,927
62
Edge Mill+ Thin Overlay (1.5 - 2.0)
$57,695.00
87
BEECHWOOD AVE
W TOWNE VILLAGE DR
DS@237S W TOWNE VILLAGE DR
11600
2,927
62
Edge Mill+ Thin Overlay (1.5 - 2.0)
$57,695.00
87
BEECHWOOD AVE
DS@237S W TOWNE VILLAGE DR
WSAN GABRIEL CIR
11600
2,927
62
Edge Mill+ Thin Overlay (1.5 - 2.0)
$57,695.00
87
BEECHWOOD AVE
WSAN GABRIEL CIR
WBEECH PL
11600
2,927
62
Edge Mill+ Thin Overlay (1.5 - 2.0)
$57,695.00
87
BEECHWOOD AVE
WBEECH PL
WBAUM DR
11600
2927
62
Edge Mill+ Thin Overlay (1.5 - 2.0)
$57,695.00
87
BEECHWOOD AVE
WBAUM DR
W15TH ST
11600
21927
62
Edge Mill+ Thin Overlay (1.5 - 2.0)
$57,695.00
87
BROOKS AVE
W 15TH ST
W WALKER ST
11720
2,841
70
Edge MIII +Thin Overlay (1.5-2.0)
$48,933,00
87
BROOKS AVE
W WALKER ST
S GARLAND AVE
11720
2,841
70
Edge Mill +Thin Overlay (1.5 - 2.0)
$48,933.00
87
GARLAND AVE
WBOONE ST
DS@441SW BOONE ST
11720
2,841
70
Edge Mill+ Thin Overlay (1.5 - 2.0)
$48,933.00
87
GARLAND AVE
DS@4415 W BOONE ST
W SUNCHASE CT
11720
2,841
70
Edge Mill +Thin Overlay (1.5 - 2.0)
$48,933.00
87
GARLAND AVE
WSUNCHASE CT
WPETTIGREW ST
11720
2,941
70
Edge Mill+ Thin Overlay (1.5 - 2.0)
$48,933.00
87
GARLAND AVE
W PETTIGREW ST
W CATO SPRINGS RD
11720
2,841
70
Edge MIII +Thin Overlay (1.5- 2.0)
$48,933,00
87
EASTERN AVE
WNETTLESHIP ST
WMAINE ST
12140
5163
53
Edge Mill+ Thin Overlay (1.5 - 2.0)
$88,021.00
88
EASTERN AVE
WMAINE ST
WSTONE ST
12140
5,163
53
Edge Mill+ Thin Overlay (1.5 - 2.0)
$88,021.00
88
EASTERN AVE
WSTONE ST
WNEPTUNE ST
12140
5,163
53
Edge Mill+ Thin Overlay (1.5 - 2.0)
$88,021.00
88
EASTERN AVE
W NEPTUNE ST
W MITCHELL ST
12140
5,163
53
Edge Mill +Thin Overlay (1.5 - 2.0)
$88,021.00
88
EASTERN AVE
W MITCHELL ST
W VENUS ST
12140
5,163
53
Edge Mill +Thin Overlay (1.5 - 2.0)
$88,021.00
88
EASTERN AVE
W VENUS ST
W MARTIN LUTHER KING BLVD
12140
5,163
53
Edge Mill +Thin Overlay (1.5 - 2.0)
$88,021.00
88
MAINE ST
S EASTERN AVE
S LEWIS AVE
12140
5163
53
Edge Mill +Thin Overlay (1.5 - 2.0)
$88,021.00
88
MITCHELL ST
S RAZORBACK RD
S EASTERN AVE
12140
5,163
53
Edge Mill +Thin Overlay (1.5 - 2.0)
$88,021.00
87
MITCHELL ST
S EASTERN AVE
S LEWIS AVE
12140
5,163
53
Edge Mill +Thin Overlay (1.5 - 2.0)
$88,021.00
88
MITCHELL ST
S LEWIS AVE
S GABBARD DR
12140
5,163
53
Edge Mill +Thin Overlay (1.5 - 2.0)
$88,021.00
88
MITCHELL ST
SGABBARD DR
8PHILLIP DR
12140
5,163
53
Edge Mill+ Thin Overlay (1.5 - 2.0)
$88,021.00
88
NEPTUNE ST
SEASTERN AVE
WEST END
12140
5,163
53
Edge Mill+ Thin Overlay (1.5 - 2.0)
$88,021.00
88
VENUSST
SEASTERN AVE
8LEWIS AVE
12140
5,163
53
Edge Mill+ Thin Overlay (1.5 - 2.0)
$88,021.00
88
GREGG AVE
WCENTER ST
SUNIVERSITY AVE
12280
1,887
48
EM/FWM+ Moderate Overlay (2.0-3.0)
$38,360,00
89
GREGG AVE
SUNIVERSITY AVE
WPRAIRIE ST
12280
1,887
48
EM/FWM+ Moderate Overlay (2.0 - 3.0)
$38,360.00
89
SOUTH ST
SSCHOOL AVE
ALLEY 417
12290
351
20
EM/FWM+ Moderate Overlay (2.0-3.0)
$11,175.00
89
SOUTHST
ALLEY,
SWEST AVE
12290
351
20
EM/FWM+Moderate Overlay(2.0-3.0)
$11,175.00
89
GOVERNMENTAVE
NORTH END
W PRAIRIE ST
12300
553
33
EM/FWM + Moderate Overlay (2.0 - 3.0) + Strctrl Ptch
$28,711.00
89
GOVERNMENTAVE
WPRAIRIE ST
DS@342S W PRAIRIE ST
12300
553
33
EM/FWM+ Moderate Overlay (2.0 - 3.0) + Strctrl Rich
$28,711.00
88
GOVERNMENTAVE
DS@3425 W PRAIRIE ST
DS@4935 W PRAIRIE ST
12300
553
33
EM/FWM+Moderate Overlay (2.0-3.0)+Strctrl Rich
$28,711,00
88
GREGG AVE
WPRAIRIE ST
W MARTIN LUTHER KING BLVD
12320
1,462
62
EM/FWM+ Moderate Overlay (2.0-3.0)+Strctrl Ptch
$51,958.00
89
PRAIRIE ST
SSCHOOLAVE
ALLEY 417
12320
1462
62
EM/FWM+ Moderate Overlay (2.0-3.0)+Strctrl Ptch
$51,958.00
89
PRAIRIE ST
ALLEY 417
SWEST AVE
12320
1462
62
EM/FWM+ Moderate Overlay (2.0 - 3.0) + Strctrl Ptch
$51,958.00
89
PRAIRIE ST
SWEST AVE
DS@126W S WEST AVE
12320
1,462
62
EM/FWM+ Moderate Overlay (2.0-3.0)+Strctrl Ptch
$51,958.00
89
PRAIRIE ST
DS@126W SWEST AVE
SGREGG AVE
12320
1,462
62
EM/FWM+ Moderate Overlay (2.0 - 3.0) + Strctrl Ptch
$51,958.00
88
PRAIRIE ST
SGREGG AVE
SGREGG AVE
12320
1,462
62
EM/FWM+ Moderate Overlay (2.0 - 3.0) + Strctrl Ptch
$51,958.00
89
PRAIRIE ST
SGREGG AVE
SGOVERNMENT AVE
12320
1,462
62
EM/FWM+ Moderate Overlay (2.0 - 3.0) + Strctrl Ptch
$51,958.00
88
HILL AVE
W STONE ST
W MARTIN LUTHER KING BLVD
12410
987
58
Edge MIII +Thin Overlay (1.5- 2,0)
$12,238,00
87
SCHOOL AVE
W SOUTH ST
S ARCHIBALD YELL BLVD
12790
448
65
Edge Mill +Thin Overlay (1.5 - 2.0)
$9,854.00
90
ILA ST
N PARK AVE
N LINCOLN AVE
13400
1,521
70
Edge MIII +Thin Overlay (1.5- 2.0)
$29,313,00
88
ILA ST
N LINCOLN AVE
N SHADY AVE
13400
1521
70
Edge Mill +Thin Overlay (1.5 - 2.0)
$29,313.00
88
ILA ST
NSHADY AVE
N VANDEVENTER AVE
13400
1,521
70
Edge Mill+ Thin Overlay (1.5 - 2.0)
$29,313.00
88
ILA ST
N VANDEVENTER AVE
NWILSON AVE
13400
1,521
70
Edge MIII+ Thin Overlay (1.5 - 2.0)
$29,313,00
89
OLD FARMINGTON RD
S SHILOH DR
S GREEN POINT TRCE
13760
2,168
61
9§rEdge Mill + Thin Overlay (1.5 - 2.0)
$39,937.00
87
OLD FARMINGTON RD
S GREEN POINT TRCE
S CENTENNIAL PARK LN
13760
2168
61
Edge Mill +Thin Overlay (1.5 - 2.0)
$39,937.00
87
OLD FARMINGTON RD
S CENTENNIAL PARK LN
W SCOTTSWOOD PL
13760
2,168
61
Edge Mill +Thin Overlay (1.5 - 2.0)
$39,937.00
87
OLD FARMINGTON RD
W SCOTTSWOOD PL
S ONE MILE RD
13760
2,168
61
Edge Mill +Thin Overlay (1.5 - 2.0)
$39,937.00
87
PROSPECT ST
N PARK AVE
N WOOLSEY AVE
13840
1566
60
Edge Mill + Thin Overlay (1.5 - 2.0)
$25,762.00
87
PROSPECT ST
N WOOLSEY AVE
N VANDEVENTER AVE
13840
1566
60
Edge Mill +Thin Overlay (1.5 - 2.0)
$25,762.00
87
PROSPECTST
N VANDEVENTER AVE
NWILSONAVE
131540
1,566
60
Edge Mill+ Thin Overlay (1.5 - 2.0)
$25,762.00
88
FINGER RD WC 411
W MARTIN LUTHER KING BLVD
DS@3445 W MARTIN LUTHER KING BLVD
90080
1759
55
Edge Mill + Thin Overlay (1.5 - 2.0)
$36,010.00
87
FINGER RD WC 411
DS@3445 W MARTIN LUTHER KING BLVD
S PLUMBEROSA DR WC 412
90080
1,759
55
Edge Mill + Thin Overlay (1.5 - 2.0)
$36,010.00
87
FINGER RD WC 411
S PLUMBEROSA DR WC 412
W FINGER RD WC 411
90080
1,759
55
Edge Mill + Thin Overlay (1.5 - 2.0)
$36,010.00
87
WEST AVE
W11TH ST
W13TH ST
90150
11749
43
FWM+ Thick Overlay (> 2.0-3,0)
$62,487,00
91
WEST AVE
W13TH ST
W15TH ST
90150
1749
43
FWM+Thick Overlay (>2.0-3,0)
$62,487,00
91
WEST AVE
W15TH ST
WSALVATION LN
90150
1,749
43
FWM+ Thick Overlay(> 2.0-3,0)
$62,487,00
91
WEST AVE
WCENTER ST
WMOUNTAIN ST
90170
1,257
40
FWM+Thick Overlay(>2.0-3.0)
$52,274.00
90
WEST AVE
WCENTER ST
WMEADOW ST
90170
1,257
40
FWM+Thick Overlay (> 2.0 - 3.0)
$52,274.00
90
WEST AVE
WMOUNTAIN ST
WROCK ST
90170
1,257
40
FWM+Thick Overlay(>2.0-3.0)
$52,274.00
90
WEST AVE
W ROCK ST
W SOUTH ST
90170
1,257
40
FWM +Thick Overlay (> 2.0 - 3.0)
$52,274.00
90
WEST AVE
WSOUTH ST
WPRAIRIE ST
90170
1,257
40
FWM+Thick Oveday (> 2.0 - 3.0)
$52,274.00
90
PLUMBEROSA DR
W MARTIN LUTHER KING BLVD
CITY LIMITS
90200
2,584
-
EM/FWM + Moderate Overlay (2.0 - 3.0)
$79,920.00
89
UN -NAMED RIGHT-OF-WAY
N DOUBLE SPRINGS RD
CITY LIMITS
90220
865
-
EM/FWM+ Moderate Overlay (2.0 - 3.0)
$17,304.00
89
2022 PROPOSED STREET MAINTENANCE PLAN (19.1 miles)
N
Zz
EE
�
a
U
Q
L
K
o
ci
O
a
o
Y
ALLEY 624
W LAFAYETTE ST
W REAGAN ST
1620
294
63
Edge Mill +Thin Oveday (1.5 - 2.0)
$1,887.00
89
ALLEY 848
W BERRY ST
W HUGHES ST
1700
638
62
Edge MITI +Thin Overlay (1.5- 2.0)
S7,326.00
89
ALLEY 848
W HUGHES ST
W NORTH ST
1700
638
62
Edge MITI +Thin Overlay (1.5- 2,0)
$7,326,00
89
4TH ST
S HAPPY HOLLOW RD
S RAY AVE
1980
2080
45
FWM + Thick Overlay (> 2.0 - 3.0)
$55,884.00
92
CHERRY LN
NORTH END
E HUNTSVILLE RD
1980
2,080
45
FWM + Thick Overlay (> 2.0 - 3.0)
$55,884.00
92
DOCKERY LN
DS@393S NORTH END
E HUNTSVILLE RD
1980
2,080
45
FWM +Thick Overlay (> 2.0 - 3.0)
$55,884.00
92
BORICK DR
S BLACK OAK RD WC 57
S BORICK DR
2800
1897
64
Edge MITI +Thin Overlay (1.5- 2.0)
$41,500,00
89
CANTERBURY CIR
N CANTERBURY RD
EAST END
3040
4237
63
Edge MIII +Thin Overlay (1.5 - 2.0)
$94,006.00
89
LOVERS LN
N CROSSOVER RD
DS@850S N CROSSOVER RD
3040
4,237
63
Edge Mill +Thin Overlay (1.5 - 2.0)
$84,006.00
89
LOVERS LN
DS@850S N CROSSOVER RD
N GADDY LN
3040
4237
63
Edge Mill + Thin Overlay (1.5 - 2.0)
$84,006.00
89
LOVERS LN
N GADDY LN
N CANTERBURY RD
3040
4,237
63
Edge MITI + Thin Overlay (1.5 - 2.0)
$84,006.00
89
CENTURY DR
WEST END
IN OLD WIRE RD
3300
3600
63
Edge Mill+ Thin Overlay (1.5 - 2.0)
$71,676.00
89
ELIZABETH AVE
N STANTON AVE
E MEADOWCLIFF DR
3300
3,600
63
Edge Mill +Thin Overlay (1.5 - 2.0)
$71,676.00
89
STAGECOACH DR
SOUTH END
E HILLDALE DR
3300
3,600
63
Edge Mill +Thin Overlay (1.5 - 2.0)
$71,676.00
89
WOODBROOK DR
WEST END
IN STANTON AVE
3300
3,600
63
Edge Mill+ Thin Overlay (1.5 - 2.0)
$71,676.00
89
CINNAMON WAY
NW END
NWYNDHAM CT
3460
1218
46
MIWWM+Thick Oveday (>2.0-3.0)
$53,778.00
92
CINNAMON WAY
NWYNDHAM CT
NOLD MISSOURI RD
3460
1,218
46
FWM+Thick Overlay (>2.0-3.0)
$53,778.00
92
WYNDHAM CT
ECINNAMON WAY
NORTH END
3460
1,218
46
FWM +Thick Overlay (> 2.0 - 3.0)
$53,778.00
92
ARROWHEAD ST
SASHWOOD AVE
ECUSTER LN
3740
3798
62
Edge MITI+ Thin Overlay (1.5 - 2.0)
$63,132.00
89
ARROWHEAD ST
ECUSTER LN
WCUSTER LN
3740
3,798
62
Edge Mill+ Thin Overlay (1.5 - 2.0)
$63,132.00
89
CUSTER LN
S CUSTER LN
W ARROWHEAD ST
3740
3798
62
Edge Mill +Thin Overlay (1.5 - 2.0)
$63,132.00
89
CUSTER LN
E CUSTER LN
W CUSTER LN
3740
3,798
62
Edge Mill +Thin Overlay (1.5 - 2.0)
$63,132.00
89
CUSTER LN
W18TH ST
WARROWHEAD ST
3740
3,798
62
Edge Mill+ Thin Overlay (1.5 - 2.0)
$63,132.00
89
CUSTER LN
W ARROWHEAD ST
S CUSTER LN
3740
3,798
62
Edge MIII +Thin Overlay (1.5- 2.0)
$63,132,00
89
DICKSON ST
N HIGHLAND AVE
ALLEY 21
3900
3,176
58
Edge Mill +Thin Oveday (1.5 - 2.0)
$81,599.00
88
DICKSON ST
ALLEY 21
N COLLEGE AVE
3900
3,176
58
Edge Mill +Thin Overlay (1.5 - 2.0)
$81,599.00
88
DICKSON ST
N HIGHLAND AVE
N EAST AVE
3900
3,176
58
Edge Mill +Thin Oveday (1.5 - 2.0)
$81,599.00
88
DICKSON ST
N EAST AVE
N BLOCK AVE
3900
3,176
58
Edge Mill +Thin Overlay (1.5 - 2.0)
$81,599.00
88
DICKSON ST
N BLOCK AVE
N SAINT CHARLES AVE
3900
3,176
58
Edge Mill +Thin Oveday (1.5 - 2.0)
$81,599.00
88
DICKSON ST
N SAINT CHARLES AVE
ALLEY 160
3900
3,176
58
Edge Mill +Thin Overlay (1.5 - 2.0)
$81,599.00
88
DICKSON ST
ALLEY 150
N CHURCH AVE
3900
3176
58
Edge Mill +Thin Overlay (1.5 - 2.0)
$81,599.00
88
DICKSON ST
IN CHURCH AVE
NTHOMPSON AVE
3900
3,176
58
Edge Mill+ Thin Overlay (1.5 - 2.0)
$81,599.00
88
DICKSON ST
N THOMPSON AVE
N LOCUST AVE
3900
3176
58
Edge Mill +Thin Overlay (1.5 - 2.0)
$81,599.00
88
DICKSON ST
NLOCUST AVE
NCAMPBELL AVE
3900
3,176
58
Edge Mill+ Thin Overlay (1.5 - 2.0)
$81,599.00
88
DICKSON ST
N CAMPBELL AVE
N SHIPLEY ALY
3900
3176
58
Edge Mill +Thin Oveday (1.5 - 2.0)
$81,599.00
88
DICKSON ST
NSHIPLEY ALY
NSCHOOLAVE
3900
3,176
58
Edge Mill+ Thin Overlay (1.5 - 2.0)
$81,599.00
88
DICKSON ST
IN SCHOOL AVE
NWEST AVE
3900
3,176
58
Edge Mill+ Thin Oveday(1.5-2.0)
$81,599.00
88
DICKSON ST
IN WEST AVE
DS@216W N WEST AVE
3900
3176
58
Edge Mill+ Thin Overlay (1.5 - 2.0)
$81,599.00
88
DICKSON ST
DS@216W N WEST AVE
DS@374W N WEST AVE
3900
3,176
58
Edge Mill+ Thin Overlay (1.5 - 2.0)
$81,599.00
88
DICKSON ST
N GREGG AVE
N UNIVERSITY AVE
3900
3,176
58
Edge Mill +Thin Overlay (1.5 - 2.0)
$81,599.00
88
DICKSON ST
N UNIVERSITY AVE
N ARKANSAS AVE
3900
3176
58
Edge Mill + Thin Overlay 1.5 - 2.0
$81,599.00
88
MCCLINTON ST
SWOOD AVE
SJANELLE AVE
4200
1,328
62
Edge Mill+ Thin Overlay (1.5 - 2.0)
$18,107.00
89
MCCLINTON ST
SJANELLE AVE
SELMHURST AVE
4200
1328
62
Edge Mill+ Thin Overlay (1.5 - 2.0)
$18,10T00
89
MCCLINTON ST
S ELMHURST AVE
S MORNINGSIDE DR
4200
1,328
62
Edge MIII +Thin Overlay (1.5- 2.0)
$18, 107,00
89
HILLDALE DR
N LOXLEY AVE
N STANTON AVE
4640
4,345
63
Edge Mill +Thin Overlay (1.5 - 2.0)
$86,651.00
89
LOXLEY AVE
EMEADOWCLIFF DR
EHILLDALE DR
4640
4345
63
Edge Mill+ Thin Overlay (1.5 - 2.0)
$86,651.00
89
LOXLEY AVE
E HILLDALE DR
E OAKS MANOR DR
4640
4345
63
Edge Mill +Thin Overlay, (1.5 - 2.0)
$86,651.00
89
LOXLEY AVE
E OAKS MANOR DR
E OAKCUFF ST
4640
4,345
63
Edge Mill +Thin Overlay (1.5 - 2.0)
$86,651.00
88
MEADOWCLIFF DR
NCENTERWOOD RD
NLOXLEY AVE
4640
4,345
63
Edge Mill+ Thin Overlay (1.5 - 2.0)
$86,651.00
89
OAKCLIFF ST
N LOXLEY AVE
N STANTON AVE
4640
4,345
63
Edge Mill +Thin Overlay (1.5 - 2.0)
$86,651.00
89
STANTON aMIL
EHILLDALE DR
E OAKCUFFjdhL
4640
4,345
63
Edge Mill+ Thin Overlay (1.5 - 2.0)
$86,651.00
89
INWOOD LN
IN CROSSOVER RD
E WHIPPOORWILL LN
4840
3143
63
Edge MIII+ Thin Overlay (1.5-20)
$59,588.00
89
WHIPPOORWILL LN
NCROSSOVER RD
NSTARDUST LN
4840
31143
63
Edge Mill Thin Overlay (1.5 - 2.0)
$59,588.00
89
WHIPPOORWILL LN
NSTARDUST LN
EINWOOD LN
4840
3143
63
Edge Mill+ Thin Overlay (1.5 - 2.0)
$59,588.00
89
MAPLE ST
N COLLEGE AVE
N WASHINGTON AVE
5360
2265
62
Edge Mill +Thin Overlay (1.5 - 2.0)
$34,692.00
88
MAPLE ST
NWASHINGTON AVE
NWILLOW AVE
5360
2,265
62
Edge Mill+ Thin Overlay (1.5 - 2.0)
$34,692.00
88
MAPLE ST
NWILLOW AVE
NWALNUT AVE
5360
2,265
62
Edge Mill+ Thin Oveday(1.5-2.0)
$34,692.00
88
MAPLE ST
NWALNUT AVE
ALLEY 456
5360
2,265
62
Edge Mill+ Thin Overlay (1.5 - 2.0)
$34,692.00
88
MAPLE ST
ALLEY 456
N OLIVE AVE
5360
2265
62
Edge Mill +Thin Overlay (1.5 - 2.0)
$34,692.00
88
MAPLE ST
NOLIVE AVE
5360
2,265
62
Edge Mill+ Thin Overlay (1.5 - 2.0)
$34,692.00
88
BROADVIEW DR
N OLD WIRE RD
E BROADVIEW DR
6000
1,960
46
FWM +Thick Overlay (> 2.0 - 3,0)
$58,347,00
92
RANCH DR
N OLD WIRE RD
N RANCH DR
6000
1,960
46
FWM + Thick Overlay (> 2.0 - 3.0)
$58,347.00
92
RANCH DR
E MISSION BLVD
DS@167N EMISSION BLVD
6000
1,960
46
FWM + Thick Overlay (> 2.0 - 3.0)
$58,347.00
92
RANCH DR
DS@167N E MISSION BLVD
DS@238N EMISSION BLVD
6000
1,960
46
FWM + Thick Overlay (> 2.0 - 3.0)
$58,347.00
92
RANCH DR
DS@238N E MISSION BLVD
E RANCH DR
6000
1960
46
FWM +Thick Overlay (> 2.0 - 3,0)
$58,347,00
92
SYCAMORE ST
W SYCAMORE ST
N RENO DR
6640
2,787
74
Super Thin - 3/4" Overlay
$29,800.00
87
SYCAMORE ST
N RENO DR
N COLLEGE AVE
6640
2,787
74
Super Thin - 3/4" Overlay
$29,800.00
87
SYCAMORE ST
E SYCAMORE ST
N GREENVALLEY AVE
6640
2,787
74
Super Thin - 3/4" Overlay
$29,800.00
87
SYCAMOREST
N GREENVALLEY AVE
NWOOLSEY AVE
6640
2,787
74
Super Thin -3/4"Overlay
$29,800.00
87
SYCAMORE ST
N WOOLSEY AVE
N FOREST HTS
6640
7774
Super Thin - 3/4" Overlay
$29,800.00
87
SYCAMORE ST
N FOREST HTS
N VANDEVENTER AVE
6640
2787
74
Super Thin - 3/4" Overlay
$29,800.00
87
SYCAMORE ST
N VANDEVENTER AVE
N GREGG AVE
6640
2,787
1 74
Super Thin - 3/4" Overlay
$29,800.00
87
STONE BRIDGE RD
E TUPELO HONEY DR
E WYMAN RD WC 48
6920
6,947
73
Super Thin - 3/4" Overlay + Strcirl Ptch
$88,870.00
87
STONE BRIDGE RD
EWYMAN RD WC 48
ETRAVIS ST
6920
6,947
73
Super Thin -3/4"Overlay +Strctrl1
$88,870.00
87
STONE BRIDGE RD
E TRAVIS ST
E HOLMES DR
6920
6,947
73
Super Thin - 3/4" Overlay + Streit! 1
$88,870.00
87
STONE BRIDGE RD
E HOLMES DR
E HUNTSVILLE RD
6920
6,947
73
Super Thin - 3/4" Overlay+ Streir! 1
$88,870.00
87
WYMAN RD WC 48
S CROSSOVER RD
S STONE BRIDGE RD
6920
6947
73
Super Thin - 3/4" Overlay, + Streid 1
$88,870.00
87
WYMAN RD WC 48
S STONE BRIDGE RD
DS@2338E S STONE BRIDGE RD
6920
6,947
73
Super Thin - 3/4" Overlay+ Strctr! 1
$88,870.00
87
WYMAN RD WC 48
DS@2338E S STONE BRIDGE RD
DS@2651E S STONE BRIDGE RD
6920
6947
73
Super Thin - 3/4" Overlay + Strctrl Ptch
$88,870,00
86
BLUEBERRY LN
SOUTH END
N STRAWBERRY DR
6980
4188
63
Edge MIII +Thin Overlay (1.5- 2.0)
$88,626,00
89
COLETTE AVE
SOUTH END
E YVONNE DR
6980
4,188
63
Edge Mill +Thin Overlay (1.5 - 2.0)
$88,626.00
89
COLETTE AVE
E YVONNE DR
E STANWYK DR
6980
4,188
63
Edge Mill +Thin Overlay (1.5 - 2.0)
$88,626.00
89
COLETTE AVE
ESTANWYK DR
IN OLD WIRE RD
6980
4,188
63
Edge Mill+ Thin Overlay (1.5 - 2.0)
$88,626.00
89
HUCKLEBERRY LN
SE END
NSTRAWBERRY DR
6980
4,188
63
Edge Mill+ Thin Overlay (1.5 - 2.0)
$88,626.00
89
MAYBERRY LN
BE END
IN STRAWBERRY DR
6980
4,188
63
Edge Mill+ Thin Overlay (1.5 - 2.0)
$88,626.00
89
STRAWBERRY DR
N OLD WIRE RD
N HUCKLEBERRY LN
6980
4,188
63
Edge Mill +Thin Overlay (1.5 - 2.0)
$88,626.00
89
STRAWBERRY DR
N HUCKLEBERRY LN
N MAYBERRY LN
6980
4,188
63
Edge Mill + Thin Overlay (1.5 - 2.0)
$88,626.00
89
STRAWBERRY DR
N MAYBERRY LN
N BLUEBERRY LN
6980
4,188
63
Edge Mill +Thin Overlay (1.5 - 2.0)
$88,626.00
89
STRAWBERRY DR
N BLUEBERRY LN
N OAK BAILEY DR
6980
4,188
63
Edge Mill +Thin Overlay (1.5 - 2.0)
$88,626.00
89
YVONNE DR
N COLETTE AVE
EAST END
6980
4,188
63
Edge Mill +Thin Overlay (1.5 - 2.0)
$88,626.00
89
BLOCK AVE
WCENTER ST
WMEADOW ST
7720
3,203
72
Super Thin -3/4"Overlay
$32,906,00
87
BLOCK AVE
W MEADOW ST
W SPRING ST
7720
3,203
72
Super Thin - 3/4" Overlay
$32,906.00
87
BLOCK AVE
W SPRING ST
W DICKSON ST
7720
3,203
72
Super Thin - 3/4" Overlay
$32,906.00
87
BLOCK AVE
W CENTER ST
W MOUNTAIN ST
7720
3,203
72
Super Thin - 3/4" Overlay
$32,906.00
87
EAST AVE
E CENTER ST
E MEADOW ST
7720
3,203
72
Super Thin - 3/4" Overlay
$32,906.00
87
EAST AVE
E MEADOW ST
E SPRING ST
7720
3,203
72
Super Thin - 3/4" Overlay
$32,906.00
87
EAST AVE
E SPRING ST
W DICKSON ST
7720
3,203
72
Super Thin - 3/4" Overlay
$32,906.00
87
EAST AVE
E CENTER ST
E MOUNTAIN ST
7720
3,203
72
Super Thin - 3/4" Overlay
$32,906,00
87
CAMPBELL AVE
WDICKSON ST
WWATSON ST
7980
399
64
Edge Mill+ Thin Overlay (1.5 - 2.0)
$5,819.00
89
ERNIE JACKS BLVD
EAST END
N TULL AVE
9540
2388
63
Edge MIII +Thin Overlay (1.5- 2.0)
$34,463,00
89
ERNIE JACKS BLVD
NTULL AVE
WBOB PL
9540
2388
63
Edge Mill+ Thin Overlay (1.5 - 2.0)
$34,463,00
89
ERNIE JACKS BLVD
WBOB PL
NGARLAND AVE
9540
2388
63
Edge Mill+ Thin Overlay (1.5 - 2.0)
$34,463.00
88
JANICE AVE
W DEANE ST
N GARLAND AVE
9540
2388
63
Edge Mill +Thin Overlay (1.5 - 2.0)
$34,463.00
89
LYNNS PL
SOUTH END
W DEANE ST
9540
2388
63
Edge MIII +Thin Overlay (1.5-2.0)
$34,463,00
89
LINC LN AVE
W MAPLE ST
W ILA ST
9840
2,785
46
FWM + Thick Overlay (> 2.0 - 3.0)
$92,904.00
92
LINCOLN AVE
W ILA ST
W LOUISE ST
9840
2,785
46
FWM + Thick Overlay (> 2.0 - 3.0)
$92,904.00
92
LOLLAR LN
W TRENTON BLVD
NORTH END
9840
2,785
46
FWM + Thick Overlay (> 2.0 - 3.0)
$92,904.00
92
LOUISE ST
FAST END
N FOREST AVE
9840
2,785
46
FWM +Thick Overlay (> 2.0 - 3.0)
$92,904.00
92
LOUISE ST
N FOREST AVE
N PARK AVE
9840
2785
46
FWM +Thick Overlay (> 2.0 - 3.0)
$92,904.00
92
LOUISE ST
N VANDEVENTER AVE
NWILSON AVE
9840
2785
46
FWM +Thick Overlay (>2.0-3.0)
$92,904.00
92
SHADY AVE
W MAPLE ST
W ILA ST
9840
2,785
46
FWM + Thick Overlay (> 2.0 - 3.0)
$92,904.00
92
SHADY AVE
WILA ST
WLOUISE ST
9840
2785
46
FWM +Thick Overlay (> 2.0 - 3.0)
$92,904.00
92
VANDEVENTER AVE
WILA ST
WLOUISE ST
9840
2785
46
FWM +Thick Overlay I>2.0-3.0)
$92,904.00
92
DRAKE ST
IN GARLAND AVE
IN MCCONNELL AVE
10080
3,539
32
FWM+ Thick Overlay (> 2.0 - 3.0) + Strctrl 1
$174,639.00
92
MCCONNELL AVE
DS@293N W RED TIP DR
WDRAKE ST
10080
3,539
32
FWM +Thick Overlay (>2.0-3.0)+Streid1
$174,639.00
92
MCCONNELL AVE
W KNAPP ST
W BURR OAK DR
10080
3,539
32
FWM + Thick Overlay (> 2.0 - 3.0)+ Str trl 1
$174,639.00
92
MCCONNELL AVE
W BURR OAK DR
W RED TIP DR
10080
3,539
32
FWM + Thick Overlay (> 2.0 - 3.0) + Strctd 1
$174,639.00
92
MCCONNELL AVE
WRED TIP DR
DS@293N W RED TIP DR
10080
3,539
32
FWM+ Thick Overlay (> 2.0-3,0)+Strctrl1
$174,639.00
92
MOUNTAIN RANCH BLVD
BE END
W TECHNOLOGY WAY
10160
1,595
62
Edge Mill +Thin Overlay (1.5 - 2.0)
$28,231.00
89
TECHNOLOGY WAY
N SHILOH DR
N MOUNTAIN RANCH BLVD
10160
1,595
62
Edge Mill + Thin Overlay (1.5 - 2.0)
$28,231.00
89
OLD WIRE RD
N STANTON AVE
DS@1290N N STANTON AVE
10400
6,336
69
EMIFW M + Moderate Overlay (2.0 - 3.0)
$184,358,00
90
OLD WIRE RD
DS@l 290N N STANTON AVE
ESTANWYK DR
10400
6336
69
EM/FWM+ Moderate Overlay (2.0 - 3.0)
$184,358.00
90
OLD WIRE RD
ESTANWYK DR
NOLD MISSOURI RD
10400
6,336
69
EM/FWM+ Moderate Overlay (2.0 - 3.0)
$184,358.00
90
OLD WIRE RD
NOLD MISSOURI RD
NCOLETTE AVE
10400
6,336
69
EM/FWM+ Moderate Overlay (2.0 - 3.0)
$184,358.00
90
OLD WIRE RD
N COLETTE AVE
N AZALEA TER
10400
6,336
69
EM/FWM + Moderate Overlay (2.0 - 3.0)
$184,358.00
90
OLD WIRE RD
NAZALEA TER
NSTRAWBERRY DR
10400
6,336
69
EM/FWM+ Moderate Overlay (2.0 - 3.0)
$184,358.00
90
OLD WIRE RD
IN STRAWBERRY DR
NBOXWOOD DR
10400
6,336
69
EM/FWM+ Moderate Overlay (2.0 - 3.0)
$184,358.00
90
OLD WIRE RD
NBOXWOOD DR
NRAINTREE DR
10400
6336
69
EM/FWM+ Moderate Overlay (2.0 - 3.0)
$184,358.00
90
OLD WIRE RD
N RAINTREE DR
N OAK BAILEY DR
10400
6336
69
EMIFW M + Moderate Overlay (2.0 - 3.0)
$184,358.00
90
OLD WIRE RD
N OAK BAILEY DR
N CROSSOVER RD
10400
6336
69
EM/FWM + Moderate Overlay (2.0 - 3.0)
$184,358.00
90
PEMBROKE RD
E ROCKWOOD TRL
N SHREWSBURY LN
10540
2,305
73
Super Thin - 3/4" Overlay + Strctrl Ptch
$29,651.00
86
PEMBROKE RD
N SHREWSBURY LN
N APPLEBURY PL
10540
2305
73
Super Thin - 3/4" Overlay + Strctrl Ptch
$29,651.00
87
PEMBROKE RD
N APPLEBURY PL
N SHREWSBURY LN
10540
2,305
73
Super Thin - 3/4" Overlay + Strcirl Ptch
$29,651.00
87
RIDGEWAY DR
N SHREWSBURY LN
E RIDGEWAY DR
10540
2,305
73
Super Thin - 3/4" Overlay +Strctr! Ptch
$29,651.00
87
RIDGEWAY DR
E RIDGEWAY DR
N CRESTWOOD DR
10540
2,305
73
Super Thin - 3/4" Overlay + Strctd 1
$29,651.00
87
RIDGEWAY DR
DDR
N6WWPOINT DR
10540
2,305
73
Super Thin - 3/4" Overlay+Strctd Pt
$29,651.00
87
LAWSONST
N VANDEVENTER AVE
NGREGG AVE
11280
1,362
29
FWM +Thick Overlay I> 2.0 - 3.0) + Strctd 1
$48,962.00
92
VANDEVENTER AVE
WSPRUCE ST
WSYCAMORE ST
11280
11362
29
FWM+ Thick Overlay (> 2.0 - 3.0) + Strctrl 1
$48,962.00
92
VILLA BLVD
SOUTH END
ESUNBRIDGE DR
11320
860
29
EM/FWM+ Moderate Overlay (2.0 - 3.0)
$25,058.00
90
PUBLIC 2401
IN GREGG AVE
WTOWNSHIP ST
11420
1,401
45
FWM +Thick Overlay (>2.0-3.0)
$50,054,00
92
85TH AVE
N 85TH AVE
W ASTORIA LN
11460
2068
62
Edge Mill + Thin Overlay (1.5 - 2.0)
$34,834,00
88
85TH AVE
W ASTORIA LN
W PARK RIDGE DR
11460
2,068
62
Edge M!!! +7hin Overlay (1.5 - 2.0)
$34,834.00
88
85TH AVE
W PARK RIDGE DR
W GOOSE CREEK RD
11460
2,068
62
Edge Mill + Thin Overlay (1.5 - 2.0)
$34,83C00
88
18TH ST
SASHWOOD AVE
SBEECHWOOD AVE
11560
1,926
64
Edge Mill+ Thin Overlay (1.5 - 2.0)
$33,788.00
88
ASHWOOD AVE
W18TH ST
WSLIGO ST
11560
1,926
64
Edge Mill+ Thin Overlay (1.5 - 2.0)
$33,788.00
88
ASHWOOD AVE
WSLIGO ST
WARROWHEAD ST
11560
1926
64
Edge Mill+ Thin Overlay (1.5 - 2.0)
$33,788.00
88
ASHWOOD AVE
WARROWHEAD ST
SRAZORBACK RD
11560
1,926
64
Edge Mill +Thin Oveday (1.5-2.0)
$33,788.00
89
CATO SPRINGS RD
S GARLAND
S VALE AVE
11730
2,117
74
Super Thin - 3/4" Overla
$20,972.00
87
.AT. SPRINGS RD
S VALE AVE
S RAZORBACK RD
11730
2,117
74
Super Thin - 3/4" Overla
$20,972.00
87
26TH ST
S DENVER AVE
S HADDON AVE
12020
4929
62
Edge Mill +Thin Overlay (1.5 - 2.0)
$65,726.00
89
26TH ST
S HADDON AVE
S SCHOOL AVE
12020
4,929
62
Edge Mill +Thin Overlay (1.5 - 2.0)
$65,726.00
89
CHERRY ST
EAST END
S HADDON AVE
12020
4,929
62
Edge Mill + Thin Overlay (1.5 - 2.0)
$65,726.00
89
CHERRY ST
S HADDON AVE
S SCHOOL AVE
12020
4,929
62
Edge Mill +Thin Overlay (1.5 - 2.0)
$65,726.00
89
DENVER AVE
W26TH ST
WPEACH ST
12020
4,929
62
Edge Mill+ Thin Overlay (1.5 - 2.0)
$65,726.00
89
HADDON AVE
W26TH ST
WPEACH ST
12020
4,929
62
Edge Mill+ Thin Overlay (1.5 - 2.0)
$65,726.00
89
HADDON AVE
W LESTER ST
SOUTH END
12020
4,929
62
Edge Mill +Thin Overlay (1.5 - 2.0)
$65,726.00
89
LESTER ST
S HADDON AVE
S SCHOOL AVE
12020
4,929
62
Edge Mill +Thin Overlay (1.5 - 2.0)
$65,726.00
89
PEACH ST
S DENVER AVE
S HADDON AVE
12020
4,929
62
Edge Mill +Thin Overlay (1.5 - 2.0)
$65,726.00
89
PEACH ST
S HADDON AVE
S SCHOOL AVE
12020
4929
62
Edge Mill +Thin Overlay (1.5 - 2.0)
$65,726.00
89
LEWISAVE
WMAINE ST
WSTONE ST
12200
322
45
EM/FWM+ Moderate Overlay (2.0 - 3.0) + Strctrl Ptch
$11,501.00
90
GABBARD DR
WMITCHELL ST
WKAYWOOD LN
12220
1,449
34
Edge Mill+ Thin Overlay (1.5 - 2.0)
$26,307.00
89
GABBARD DR
W KAYWOOD LN
SOUTH END
12220
1449
34
Edge Mill +Thin Overlay (1.5 - 2.0)
$26,307.00
89
KAYWOOD LN
EAST END
SGABBARD DR
12220
1449
34
Edge Mill+ Thin Overlay (1.5 - 2.0)
$26,307.00
89
LEWISAVE
WSTONE ST
WMITCHELL ST
12220
1449
34
Edge Mill+ Thin Overlay (1.5 - 2.0)
$26,307.00
89
MITCHELL ST
SPHILLIP DR
SANG AVE
12220
1449
34
Edge Mill+ Thin Overlay (1.5 - 2.0)
$26,307.00
89
BEST WAY ST
SLAGUNALOOP
SFUTRALL DR
12420
2,706
44
EM/FWM+ Moderate Overlay (2.0-3.0)
$71,861,00
90
HOLLYWOOD AVE
SSANG AVE
WPASADENA LNK
12420
2706
44
EM/FWM+ Moderate Overlay (2.0 - 3.0)
$71,861.00
90
HOLLYWOOD AVE
WPASADENA LNK
WPARNELL DR
12420
2,706
44
EM/FWM+ Moderate Oveday(2.0-3.0)
$71,861.00
90
HOLLYWOOD AVE
WPARNELL DR
DS@3568 W PARNELL DR
12420
2706
44
EM/FWM+ Moderate Overlay(2.0-3.0)
$71,861.00
90
HOLLYWOOD AVE
DS@356S W PARNELL DR
WBEST WAY ST
12420
2706
44
EM/FWM+ Moderate Overlay (2.0 - 3.0)
$71,861.00
90
PARNELL DR
SHOLLYWOOD AVE
WEST END
12420
2,706
44
EM/FWM+ Moderate Overlay (2.0 - 3.0)
$71,861.00
90
PASADENA LNK
SHOLLYWOOD AVE
SSAN GABRIEL CIR
12420
2706
44
EM/FWM+ Moderate Overlay (2.0 - 3.0)
$71,861.00
90
OAK RD
W RUTLEDGE LN
W MARTIN LUTHER KING BLVD
12600
3034
62
Edge Mill +Thin Overlay (1.5 - 2.0)
$46,826.00
89
ONE MILE RD
W OLD FARMINGTON RD
W VELDA CT
12600
3034
62
Edge Mill + Thin Overlay (1.5 - 2.0)
$46,826.00
89
ONE MILE RD
W VELDA CT
W SANDRA ST
12600
3,034
62
Edge Mill +Thin Overlay (1.5 - 2.0)
$46,826.00
89
ONE MILE RD
W SANDRA ST
S FINGER RD WC 411
12600
3,034
62
Edge Mill +Thin Overlay (1.5 - 2.0)
$46,826.00
89
RUTLEDGE LN
EAST END
SOAK RD
12600
3,034
62
Edge Mill+ Thin Overlay (1.5 - 2.0)
$46,826.00
89
RUTLEDGE LN
S OAK RD
WEST END
12600
3034
62
Edge Mill +Thin Overlay (1.5 - 2.0)
$46,826.00
89
SANDRA ST
S ONE MILE RD
W OLD FARMINGTON RD
12600
3,034
62
Edge Mill +Thin Overlay (1.5 - 2.0)
$46,826.00
89
VELDA CT
EAST END
S ONE MILE RD
12600
3,034
62
Edge Mill +Thin Overlay (1.5 - 2.0)
$46,826.00
89
VAN HOOSE DR
E HUNTSVILLE RD
DS@357W E HUNTSVILLE RD
12920
357
44
FWM +Thick Overlay (> 2.0 - 3,0) +Strctrl Plch
$15,615.00
91
CLYDESDALE DR
S SCHOOL AVE
DS S SC
13260
705
46
FWM +Thick Overlay (> 2.0 - 3.0)
$37,277.00
92
OLD FARMINGTON RD
S ONE MILE RD
W SANDRA ST
13740
2,462
73
Super Thin - 3/4" Overlay
$18,113,00
87
OLD FARMINGTON RD
WSANDRA ST
STUDOR AVE
13740
2462
73
Super Thin -3/4"Overlay
$18,113.00
87
OLD FARMINGTON RD
S TUDOR AVE
W MARTIN LUTHER KING BLVD
13740
2,462
73
Super Thin - 314" Overlay
$187113000
87
POPLAR ST
N GREGG AVE
N SHADY AVE
13820
73
Super Thin - 3/4" Overlay
$16,455.00
87
POPLAR ST
N SHADY AVE
N EASY AVE
13820
1,685
73
Super Thin - 3/4" Overlay
$16,455.00
87
POPLAR ST
N EASY AVE
N BIRCH AVE
13820
1,585
73
Super Thin - 3/4" Overlay
$16,455.00
87
POPLAR ST
N BIRCH AVE
DS@647W N BIRCH AVE
13820
1585
73
Super Thin - 3/4" Overlay
$16,455.00
87
POPLAR ST
DS@647W N BIRCH AVE
N CHESTNUT AVE
13820
1585
73
Super Thin - 3/4" Overlay
$16,455.00
87
SYCAMORE ST
N GREGG AVE
N DAWN DR
13900
1,230
70
Super Thin - 3/4" Overlay
$20,256.00
87
SYCAMORE ST
N DAWN DR
N CHESTNUT AVE
13900
1230
70
Super Thin - 3/4" Overlay
$20,256.00
87
SYCAMORE ST
NCHESTNUT AVE
DS@377W N CHESTNUT AVE
13900
1,230
70
Super Thin -3/4"Overlay
$20,256.00
87
ANDREW AVE
SOUTH END
N ASSEMBLY DR
90190
1910
63
Edge Mill +Thin Overlay (1.5- 2.0)
$35,232.00
89
ASSEMBLY DR
N SKYLINE DR
E DOGWOOD LN
90190
1,910
63
Edge Mill +Thin Overlay (1.5-2.0)
$35,232.00
88
ASSEMBLY DR
E REX DR
N ANDREW AVE
90190
1910
63
Edge Mill +Thin Overlay (1.5 - 2.0)
$35,232.00
88
ASSEMBLY DR
N ANDREW AVE
E MAPLE ST
90190
1,910
63
Edge Mill +Thin Overlay (1.5-2.0)
$35,232.00
88
ASSEMBLY DR
E MAPLE ST
E TRUST ST
90190
1,910
63
Edge Mill +Thin Overlay (1.5 - 2.0)
$35,232.00
88
ASSEMBLY DR
E TRUST ST
N FALLIN AVE
90190
1910
63
Edge Mill +Thin Overlay (1.5 - 2.0)
$35,232.00
88
ASSEMBLY DR
N MISSION BLVD
N FALLIN AVE
90190
1,910
63
Edge Mill +Thin Overlay (1.5 - 2.0)
$35,232.00
88
CITY OF
FAYETTEVILLE
. ARKANSAS
TO: City Council Transportation Committee
THRU: Garner Stoll, Development Services Director
FROM: Chris Brown, City Engineer
DATE: December 22, 2020
STAFF MEMO
SUBJECT: Arkansas Department of Transportation Highway 16 Widening-Stonebridge
Road to Roberts Road
The Arkansas Highway and Transportation Department is planning to widening Highway 16 on
the east side of Fayetteville, between Stonebridge Road and Roberts Road. The plans for this
widening were presented at a virtual public meeting on December 10`h; a video of this
presentation is available at: https://vpiph02-stone-brdq-rd-e-roberts-rd-favetteville-hwv-8cb29-
ardot.hub.arcgis.com/ . ArDOT is soliciting comments on this project at this time.
Planning improvements consist of 4 11-foot vehicular lanes, a 4-foot bike lane along each curb,
3 feet of greenspace, and a 5-foot wide sidewalk on each side of the road. This cross section
matches the one to the west of Stonebridge, and the one planned when the bridge over the
West Fork of the White River was widened.
The bike lanes as proposed are inadequate in meeting City goals of an all ages and abilities
facility, as evidenced by the lack of use on other sections of Highway 16 and on Highway 265
north of Mission. In the case of this corridor, a parallel bicycle facility is planned along the West
Fork, so a multi -use trail is not recommended in the highway right of way.
However, if the City requests that the bike lanes be removed, ArDOT will likely reduce the cross
section but keep the greenspace the same. The net effect of this change will be that the buffer
distance from vehicular traffic will be reduced to the 3-foot greenspace. Therefore, if ArDOT is
not willing to increase the greenspace, then the bike lanes are recommended to be left as is.
East of the bridge, there are several street intersections that induce left turn movements. In this
segment, it appears that an auxiliary left turn lane should be considered to reduce rear -end
accidents.
Finally, staff has received many requests for a signal at the intersection with River Meadows
Drive and Hwy 16. Signalization at this intersection would be beneficial for the roadway network
overall, both from a vehicular traffic and a pedestrian/bicycle safety standpoint.
Therefore, staff recommendations for comments to ArDOT on this project are as follows:
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
1. Bike lanes may be eliminated on this project. Instead of the paved bike lanes, an
additional 4 feet of berm/greenspace is recommended between the curb and the
sidewalk for pedestrian safety and comfort. If ArDOT is unwilling to provide more
greenspace, the bike lanes should remain in the project.
2. A 5-lane section east of the West Fork bridge should be considered to safely
accommodate turning vehicles in this area.
3. Signalization at River Meadows Drive and Hwy 16 is recommended.
If the Committee concurs with these recommendations, they will be submitted to ARDOT. Any
additional comments the Committee recommends will be considered for submission as well.
Attachments:
ARDOT Public Meeting Exhibits
( a I
JOB 040785
E STONE BRI 4 4` D';. - EAST ROBERTS RD. (FA' ETTEVILLE) �S) ,
H WY. 16
A.SHINGTAQNUNTY =- -
----------------
ti
s ;
I -ti, f •aka � 2 -aT
t
� - -- --- PROPOSED CONSTRUCTION LIMITS n \
PROP
OGED RIGHT OF WRY
-- --- TEMPORARY CDNS EASEMENT
RIGHT F AY
' P.
GUTTER
PROPOSED LK 5 0' - - - T-
' • o' li a' �axs i' o' uxs o' vN[ �
/ PROPo:EO.ORAI E LINE/STRUCTURE coxc wurc z, �I R- iav[ V
( (' V.a) coxc urc t \
-- EXISTING DRAINAGE LINE/STRUCTURE TO RETAIN of I (x t) \ \
j - - ---- --- R PSED PAVEMENT WIDTH I E \
P�
_----------- FLOUD HAZARD AREA OPOxoia to WIN '
LEGEND o °:x•_x•) A.Ppr A A.zP °°xr
l.wc
SITE 1
TYPICAL SECTION #1
h„ <
S 0 D E A S T TS - z* .,
r ,� ,.' aI
♦' � . �� � � :.�,} t' A 4 TI[1N LI II
�. fBJC �r
`. ASLI N STUN 5OU E
CTURC
iek
a
_ --------- — — — — — — — — --- _ A,a
———— —— --< —-- P ———
a
_
EaN
o �,�E „ o• ��,E E
-----------------
� — o.ozo� ,00�ox=n��o.�NE�T ,a�A�oo� . o za ♦
SITE 2
TYPICAL SECTION A- - .0.
L
J4,
7vol
Plainview Avenue Typical Section
Note: Utility Easamemts may be required m
toohnon to the hght-.I-way shown.
1.
Sidewalk
11
Ggnace
—ei
W "y 'o 10 1%,
Drive lane Center t'M lane Drive lane
a, a, I
Greeng,.. Sidewalk
16
YIELD
i2i;-
L0
77
44
loiw
W
It
-7711�
Mir
•Ink
01 50, 100, 200' 300' V11
(IN FEET)
-gn to
YIELD
In,
OWN
2 81 a 91 10 9 6 8
Nom: Utithy Easements may beneq—edm
MODIFIEDaddition to the right of way shown. Bid—lk G—apoe Drive lane Fit— Drive lane Greamip— Slo.eark
TRAFFIC SIGNAL
rq
e.
2
01
4p
CITY OF
FAYETTEVILLE
ARKANSAS
+o
w
N
0' 20' 40' 80, 120'
(IN FEET)
ROLLING HILLS DRIVE AND COLLEGE AVENUE
INTERSECTION CONCEPTUAL LAYOUT
Ilk
ONLY e
7:5' {ROW=
37 1
n
Nole: Urilrly Eacemenls pray Oe requiretlin �' 8' B' 1n9' 1G' 10' 9' 1h' O 10' 1'
- - arlOinon lol enghl-o'-way mown. SlOewalk Groenspaco Turn bne give lane Turn lane Onve lane Greenzpace Trell ��{{
a � j
_ y CITY OF
FAYETTEVILLE
1Ha ram" r � � ARKANSAS
CITY OF
._ FAYETTEVILLE
ARKANSAS
TO: Transportation Committee
THRU: Chris Brown, City Engineer
Connie Edmonston, Parks and Recreation Director
FROM: Byron Humphry, Park Maintenance Superintendent
DATE: 12/22/20
SUBJECT: Square Lighting Project
STAFF MEMO
RECOMMENDATION:
Provide funding from the Downtown Sidewalk/Walkability Improvements project to add sidewalk
lighting to the interior of the downtown square.
BACKGROUND:
The Downtown square lighting and electrical service was last renovated in 2008 and included
new streetlights on the exterior of the square, bollard lighting in gardens, and better distribution
of electrical service to accommodate the Lights of the Ozarks display.
Since that renovation, much has changed with the electrical and lighting requirements around
the square. The use of LED lighting for both Lights of the Ozarks and streetlights decreased the
amount of electrical service required in some areas whereas the popularity of food trucks and
street vendors has increased the demand for larger service in other areas. In addition, the Old
Post Office building has changed ownership and use, now as a restaurant, requiring better
pedestrian lighting and visibility for the interior sidewalks to create a safer and more inviting
nighttime environment.
The 2019 Bond Program included $85,000 to upgrade the electrical service around the square
to accommodate food trucks and vendors, eliminating the need for noisy generators. The
project also called for enhanced lighting within the Square Gardens to highlight the gardens and
the Old Post Office building.
Engineering Elements was selected to design the electrical and lighting improvements. It was
quickly realized that the best approach to improve the lighting on the interior sidewalks of the
square, to attract and encourage nighttime use of the Old Post Office building (Cheers) along
with other local merchants, would be to add streetlights around the interior sidewalk.
DISCUSSION:
The current budget for the Downtown Square Gardens project, to enhance the garden lighting
and improve the electrical infrastructure for vendors, does not support the expense of additional
streetlights. The Downtown Sidewalk/Walkability Improvements project was approved by voters
with the goal of improving pedestrian safety and poor lighting within the entertainment and
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
downtown square areas. By utilizing this project to fund new lights around the interior sidewalk
of the Downtown Square, ample funding would be available in the Downtown Square Gardens
project to provide 50- and 20-amp service around the square for vendors while providing accent
lights for the gardens and the Old Post Office Building. The addition of streetlights around the
interior of the square would increase visibility and safety for pedestrians and create a more
inviting atmosphere to attract patronage to business within and around the Square.
BUDGET/STAFF IMPACT:
The eight (8) existing lights on the Town Center plaza will be repurposed to include painting and
converting to LED. In addition, seven (7) additional lights will be purchased, fifteen (15) total to
install around the interior of the square. King Electric will purchase the new lights, install pole
bases, poles, and associated wiring and conduit for $78,872. A ten (10%) percent contingency
of $7,887 brings the estimated cost to $86,759.
KING ELECTRICAL CONTRACTORS, INC.
2145 WEST MOORE LANE
FAYETTEVILLE, AR 72704
479-443-0006 FAX 479-443-2594
Email: gordon@ckingelectric.net
PROPOSAL
TO:
PHONE
DATE
City Of Fayetteville
December 22, 2020
Attn: Byron Humphry
JOB NAME
Fayetteville
Square Garden Lighting Upgrade Phase
2, Pole lights
JOB DESCRIPTION
See attached scope sheet
We have seen two (2) addendum(s) or revision(s) or clarification(s)
Contractor's License #0063870421
PROPOSAL GOOD FOR 30 DAYS
DOLLARS:
$78,872.00
TERMS: PAYMENT DUE UPON RECEIPT OF INVOICE
AUTHORIZED SIGNATURE
A FINANCE CHARGE WILL BE CHARGED ON ALL
PAST DUE ACCOUNTS OF .0833% PER MONTH. ALL
ATTORNEY FEES WILL BE COLLECTED ON PAST DUE
7
ACCOUNTS.
Gordon Ray
Project Manager / Estimator
THE ABOVE PRICES SPECIFICATIONS AND CONDITIONS
ACCEPTANCE SIGNATURE
ARE SATISFACTORY AND ARE HEREBY ACCEPTED.
YOU ARE AUTHORIZED TO DO WORK AS SPECIFIED.
PAYMENT WILL BE MADE AS OUTLINED ABOVE.
KING ELECTRICAL CONTRACTORS
Scope Sheet
Fayetteville Square Garden Lighting Upgrade Phase 2 Light Poles
Inclusions
1. Wiring per plans and specifications Division 26 electrical. Lighting wiring
and installation per plans as modified by the owner dated 10/12/2020 sheet
E2.213.
2. Furnish and install 7 new type P2 light fixtures per the owner and 8 LED retro
fit kits for existing light poles. Light fixtures and LED retro fit kits per Elliott
Electric Supply quote 125-70489 dated 12/21/2020.
3. No additional panels, disconnects, contactors or transformers.
4. Re -use existing conduits as much as possible.
5. Permit and inspection fees.
6. Division 26 excavation.
7. Hand digging.
8. Trenches backfilled with existing dirt and tamped.
9. Equipment Connections: none.
10. Taxes.
11. Lift rental.
12. Fire caulking.
13. Boring.
14. Concrete bases for light poles.
15. Division 26 excavations dirt or spoils removal from site.
Exclusions
1. Payment, Bid or Performance Bond.
2. Overtime labor.
3. No painting or finish touch up of re -used existing poles and fixtures.
4. Furnishing or installing bollards, up lighting fixtures and tape light.
5. No additional panels, disconnects, contactors or transformers.
6. Any equipment, material or labor delays due to COVID-19 infections,
government or CDC recommended or required quarantine, restrictions or
policies.
7. Engineering services, stamps or plans.
8. Liquidated damages.
9. Furnishing or installing wiring and equipment for Fire Alarm, Phone, Data,
CATV, VOIP, POS, Fiber Optic, CCTV, Security, Access control, Audio, and
Video systems.
10. Allowances or unit prices.
11. Electrical System coordination and/or Arc Flash investigation, studies,
calculations or reports.
12. Access panels for electrical equipment.
13. Demolition/debris or trash removal from site.
2
14. Cutting, painting, penetrations, backing or repair & patching of concrete,
asphalt, walls, ceiling, roof or floors for electrical conduit & equipment.
15. Ditch compaction testing.
16. Back filling Division 26 excavations with classified rock.
17. Any type of rock excavation.
18. Landscaping or repair due to Division 26 excavation.
19. Seismic bracing for fixtures or gear.
20. Transformer or housekeeping pads.
21. Backboards.
22. Cutting millwork for electrical raceway, wiring or devices.
23. Formed or finished concrete.
24. Asbestos or hazardous material abatement.
3
CITY OF
FAYETTEVILLE
ARKANSAS
CITY OF FAYETTEVILLE
TRANSPORTATION BOND PROGRAM
PROGRESS REPORT — DECEMBER 2020
The Transportation Bond Program consists of projects that will be designed, contracted, and
administered by City Staff or consultants/contractors working for the City. A summary of the
status of all projects in the program follows below.
Funding for the Bond Program includes $36 million in bonds for the first phase of the program.
1) RUPPLE ROAD (TANYARD DR. TO WEIR RD.)
Project Summary
• Completion of the last missing segment of Rupple Road.
• Improvements include 4 travel lanes, a center median, sidewalk on the east
side, a 12' wide multi -use trail on the west side, storm sewer, lighting and
street trees.
• This portion of the project is being constructed as a cost -share between the
City and the developer of the Magnolia Park Subdivision.
a. Phase 1 — Cost Share
This portion of the project is being constructed as a cost -share between the City
and the developer of the Magnolia Park Subdivision.
• Recent Actions:
1. Cost share in the amount of $2,295,267.72 was approved at the
10/18/18 City Council meeting.
2. Construction began in November 2019 and was scheduled to be
completed in July 2020.
3. Waterline installation is complete.
4. Aggregate base has been installed.
5. Curb and gutter installation is complete.
6. Sidewalk and trail installation mostly complete.
7. Final layer of asphalt paving has started.
• Upcoming Activities:
1. Final paving.
2. Striping and Sign Installation
3. Lighting installation.
b. Phase 2 — City Portion
This portion of the project is fully funded by the City and was bid as a separate
project. This portion of the work will connect Phase 1 to both the east and west
sections of Weir Road.
• Recent Actions:
1. City Council approved the design contract with Crafton Tull and
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
Associates in July 2019.
2. Final design was submitted to the City at the end of January 2020.
3. Bid opening was March 11, 2020. Emery Sapp and Sons was the low
bidder.
4. City Council approved the construction contract with Emery Sapp and
Sons on April 7, 2020.
5. A contract amendment with Crafton, Tull and Associates was approved by
the city council for construction phase engineering services on May 19tn
6. A notice to proceed for construction was issued for 6/6/20.
7. Waterline installation is complete.
8. Curb and gutter installation is complete.
9. Asphalt binder has been placed.
10. Sidewalks and trail installation complete.
11. Final layer of asphalt paving has started.
12. Began work on the change order adding the stacking lane by Holt Middle
School.
Upcoming Activities:
1. Final paving.
2. Striping and Sign Installation
3. Lighting installation.
4. Finish stacking lane at Holt Middle School.
2) ZION ROAD PHASE II (VANTAGE DR TO CROSSOVER RD)
a. Project Summary/Status
• Improvements include 2 travel lanes, a center turn lane, sidewalk on the
south side, a 10' wide trail on the north side, storm sewer, lighting and street
trees.
b. Recent Actions:
• City Council approved the design contract amendment with McClelland
Consulting in July 2019.
• City Council approved a contract amendment to add lighting and street trees
to the project design on January 7, 2020.
• Plans are complete.
• Land acquisition was finalized in May 2020.
• A bid opening was held on June 24, 2020. Tri Star Contractors, LLC was the
low bidder. This was approved by the city council at the July 21, 2020 council
meeting.
• A pre -construction conference was held on September 231
• A notice to proceed was issued and time began on the project starting
September 19tn
• Waterline installation has started at Highway 265 on the east end of the
project.
c. Upcoming Activities:
• Waterline installation will continue.
• Completion of construction is expected in January 2022.
3) STEAMBOAT / DOROTHY JEANNE CONNNECTION
a. Project Summary/Status
• This project is being designed in-house by the City Engineering Division.
• Improvements include 2 travel lanes, sidewalk on the south/east side, a 10'
wide trail on the north/west side and street trees.
b. Recent Actions:
• Land acquisition is complete.
• Design and land acquisition are 100%.
• A bid opening was held on May 28, 2020. Sweetser Construction was the
low bidder.
• Curb and gutter installation is complete.
• The first layer of asphalt has been place.
c. Upcoming Activities:
• Placing the final layer of asphalt.
• Striping and sign installation.
• Construction is expected to be complete by January 2021.
4) SHILOH DR. / FULBRIGHT EXPRESSWAY INTERSECTION
a. Project Summary/Status
• Improvements include the construction of a roundabout at the intersection of
Steele and Shiloh with on and off ramps to the Fulbright Expressway. The
existing on and off ramps are proposed to be removed with this project.
b. Recent Actions:
• City Council approved the design contract with Garver Engineers in
September 2019.
• Surveys and the traffic study have been developed.
• Correspondence with ArDOT concerning the proposal.
• The conceptual design was submitted to the City for review along with the
traffic study.
• The traffic study, report and conceptual plans were submitted to ArDOT for
review.
• Transportation committee recommended to go with the option to install two
new signals and an additional right turn lane on Shiloh at the Fulbright ramps.
• Garver presented a design contract amendment which was approved by the
city council on November 17,2020.
c. Upcoming Activities:
• Final design phase is underway. Design should be completed in March 2021.
5) CENTER / HARMON INTERSECTION
a. Project Summary/Status
• Improvements include widening to accommodate turn lanes, sidewalks on the
south side, multi -use trail on the north and west sides, installation of a traffic
signal, and pedestrian accommodations.
b. Recent Actions:
• City council approved the design contract with McClelland Engineers in
November 2019.
• 30% conceptual plans were submitted and reviewed in January 2020.
• 60% Design Plans were submitted on May 15, 2020. Plans were reviewed
and comments sent to MCE.
• Land acquisition is underway.
• 95% plans were submitted on September 18t"
0 MCE submitted a design contact amendment to include additional survey and
design for off -site storm sewer necessary for the construction of this project.
This contract amendment will be presented at the December 1, 2020 council
meeting.
c. Upcoming Activities:
• MCE is working on the final construction plans.
• Land acquisition continues.
6) MIDTOWN CORRIDOR
a. Project Summary/Status
• The corridor improvements include the evaluation of the on and off ramp
intersection of 149 at Porter Road, street , bicycle and pedestrian
improvements along Porter, Deane and Sycamore to the Razorback
Greenway, and the Mid -town Trail from the Razorback Greenway to College
Avenue. The specific cross sections will be determined in the conceptual
phase of the design.
b. Recent Actions:
• City council approved the design contract with Olsson in November 2019.
• Survey work has been underway.
• Design charette was held March 11t" and 12t" at the Methodist Church at the
corner of Garland and Sycamore.
• The consultant has submitted the 30% conceptual design. Staff has provided
comments to Olsson.
• Olsson submitted a design contract amendment which was approved at the
November 17, 2020 city council meeting.
c. Upcoming Activities:
• 60% plans were submitted to the City for review for the Deane and Sycamore
portion of the project as well as for the Poplar Street portion. 30% plans were
submitted for the Porter Rd portion along the PD site.
• City review of the plan submittals.
• Public input will be sought through mailers and a Speak Up page.
7) SAIN STREET EXTENSION (JOYCE BLVD TO FLYOVER)
a. Project Summary/Status
• This project was recently selected for federal STP-A funding. The funding is
for planning, design, and environmental review of a connection between
Vantage Drive and Sain Street, including a connection to the flyover bridge at
71 B and the Fulbright Expressway. Burns & McDonnell is the design
consultant.
b. Recent Actions:
• The FHWA has obligated $4,500,000 of Federal -aid funding for the
construction of Sain Street.
• The project has been advertised inviting contractors to submit bids for
construction.
• A Pre -Bid meeting was held on Tuesday, October 20t"
• Bids were opened for the project on November 4,2020.
• A construction contract with Crossland Heavy was presented to the city
council at the December 1, 2020 meeting.
c. Upcoming Activities:
• Construction is scheduled to begin in January of 2021.
4
8) MAPLE ST. CYCLE TRACK
a. Project Summary/Status
• This project will include street improvements and the creation of a bicycle
corridor between the Razorback Greenway and Garland Ave. along the south
side of Maple St. Major project elements include construction of a 2-way
cycle track along the south side of Maple St., signalization at Gregg Ave. and
Maple St., storm drainage and new sidewalks along both sides of Maple St.
between Gregg Ave. and Garland Ave.
b. Recent Actions:
• Meetings with the U of A to discuss the plan updates and funding. Request
has been made for matching private grant funding for construction.
• Emery Sapp and Sons was selected as the construction manager. Contract
negotiations have begun with the intent of presenting the proposed contract
for preconstruction services at the September 15 City Council meeting.
• A preliminary cost estimate was presented by Emery Sapp. Design changes
were discussed to bring the project costs down to within the budget.
c. Upcoming Activities:
• Bid opening will be scheduled for January 12, 2021.
• Construction planned to begin March of 2021.
9) 15t" ST. / RAZORBACK RD. INTERSECTION
a. Project Summary/Status
• This project is being designed in-house by the City Engineering Division.
• Improvements include an additional lane on the eastern leg of the
intersection to provide a dedicated left-hand turn lane. The intersection will
be signalized with pedestrian accommodations. Sidewalks will be included on
both the north and south sides of 1511 Street for the length of the project.
b. Recent Actions:
• Design is complete.
• Plans have been submitted to the railroad to coordinate the design of the
railroad modifications.
c. Upcoming Activities:
• Railroad agreement development is underway.
10) HIGHWAY 71 B CORRIDOR
a. Project Summary/Status
• Improvements to these corridors could include striping, widening and/or
narrowing of the roadway, utility relocation (including burial of overhead
utilities), sidewalk/trail installation, accommodations for transit systems,
elimination or reconfiguration of driveways, additional traffic signals, medians,
plazas, art installations, lighting, wayfinding, protected intersections, parking,
LID stormwater strategies and other corridor improvements to be identified in
the design process.
b. Recent Actions:
• Engineering selection committee was held on March 5, 2020. Consultants
were selected for the Archibald Yell Safety Improvements project and the
Appleby/Plainview/Rolling Hills Connection project. Two consultants were
selected to be interviewed for the remaining Highway 71 B projects. Garver
Engineers was selected for the design
• Design contract with Garver Engineers was approved at the July 7, 2020 city
council meeting.
• A design kick-off meeting was help with staff and Garver Engineers on July
30th
• A project walk-through was held on October 8t". City staff and part of the
design team walked the project site to discuss various aspects of the project
development.
• On November 6t" a project update meeting was held between city staff and
the design team.to discuss notes and topics identified in the project walk-
through.
c. Upcoming Activities:
• Traffic studies and conceptual designs are underway.
11) APPLEBY / PLAINVIEW / ROLLING HILLS CONNECTION
a. Project Summary/Status
• This project includes an extension of Rolling Hills Drive into the Fiesta Square
Shopping Center, a direct connection from Appleby Road to Rolling Hills and
an extension of Plainview Drive south into the Fiesta Square Shopping
Center. These streets will all intersect at a roundabout on the east side of the
shopping center.
b. Recent Actions:
• Engineering selection committee was held on March 5, 2020. Garver
Engineers was selected for the design of this project.
• The design contract was approved the City Council at the June 4, 2020
council meeting.
• A design kick-off meeting was held with Garver on June 18, 2020.
• The traffic study and survey are complete.
c. Upcoming Activities:
• Conceptual design has been submitted for City review.
12) ARCHIBALD YELL BLVD. SAFETY IMPROVEMENTS
a. Project Summary/Status
• The goals of this project include providing safe pathways for pedestrians to
cross Archibald Yell Blvd., increasing safety at the College Ave./Rock
St./Archibald Yell Blvd. intersection, and providing space for pedestrian and
bicycle facilities along Archibald Yell Blvd.
b. Recent Actions:
• Engineering selection committee was held on March 5, 2020. Garver
Engineers was selected for the design of this project.
• The design contract was approved the City Council at the June 4, 2020
council meeting.
• A design kick-off meeting was held with Garver on June 18, 2020.
• The traffic study and survey are complete.
c. Upcoming Activities:
• Conceptual design was submitted on November 13,2020 for the city's review.
• Public input will has been requested through mail outs and a survey posted
on a Speak Up page.
13) ROLLING HILLS IMPROVEMENTS (COLLEGE TO OLD MISSOURI)
a. Project Summary/Status
• Improvements include street narrowing with new curb and gutter, storm
sewer, mini -roundabouts, and bicycle/pedestrian facilities.
b. Recent Actions:
• Garver Engineers was selected as the design engineer for this project.
• A design contract with Garver Engineers was approved at the November 1,
2020 city council meeting.
c. Upcoming Activities:
• Site survey work.
14) JOYCE BLVD. SAFETY IMPROVEMENTS
a. Project Summary/Status
• Safety improvements to Joyce Blvd. between Vantage Dr. and Old Missouri
Rd. Specific improvements will be identified by a study of the corridor to
identify mechanisms and causes of crashes in the area. A turn lane will be
investigated as a solution, but other solutions will be considered as well.
b. Recent Actions:
c. Upcoming Activities:
• Design is scheduled to begin in the second quarter of 2021.
15) NORTH ST. / MISSION BLVD. CORRIDOR STUDY
a. Project Summary/Status
• Garland Ave. to Gregg Ave. — Pedestrian improvements to connect retail and
restaurant areas on Garland Ave. to residential areas and the Razorback
Greenway. Pedestrian safety improvements at the Garland/North
intersection.
• Highway 71 B (College Ave) Intersection — Left turn lane for west bound traffic
east of 71 B and signalization upgrades to reduce congestion.
• Highway 71 B to Mission Blvd. — Pedestrian improvements and intersection
improvements at Hillcrest.
• Mission Blvd. to Old Wire Rd. — Additional lane for vehicles turning right on
North St. with pedestrian and bicycle accommodations.
b. Recent Actions:
• Selection of Crafton Tull for design of North Street/Mission Blvd intersection
and trail along Mission Blvd. This project will be partially funded with Trail
Bond funding.
• A design contract with Crafton, Tull and Associates was approved at the July
7, 2020 city council meeting.
• Selection of McClelland Consulting Engineers for the overall corridor study.
• Survey is complete.
• Conceptual plans were submitted in November 2020.
• City review comments were sent to the engineer in December 2020.
c. Upcoming Activities:
• Public input will be sought through mailers and a Speak Up page.
• Staff is working with MCE to develop a scope and contract for the overall
corridor that will be sent to the City Council for approval.
16) OLD WIRE RD. CYCLE TRACK (EXTENSION)
a. Project Summary/Status
• An extension of the cycle track completed in 2019. This project will extend
from Gulley Park to the Old Wire/Old Missouri intersection where it will turn
north and continue to the intersection with Rolling Hills Drive.
• The design will include curb and gutter, a 4' stamped concrete median, a 9.5'
wide cycle track and an elevated 5' sidewalk adjacent to the cycle track.
b. Recent Actions:
• Field survey is complete.
c. Upcoming Activities:
• Design is scheduled to begin in the second quarter of 2021.
17) PAVEMENT MAINTENANCE / OVERLAYS
a. Project Summary/Status
• Allocation of $2.7 million in additional funds for pavement maintenance and
overlays, to be selected based on results of a pavement inventory.
b. Recent Actions:
• 12.92 Miles of overlays have been completed as of November 2020.
• $940,054.96 of the $2,700,00 has been spent or encumbered as of
November 2020.
18) TRAFFIC SIGNAL HARDWARE / UPGRADES
a. Project Summary/Status
• Allocation of $1 AMillion in additional funds for the upgrade of signal
controllers and equipment citywide as necessary so that all intersections are
using the same hardware and software.
b. Recent Actions:
• 49 of 109 signal controllers and 40 of 55 Video Detectors have been
upgraded as of November 2020.
• $590,690.29 of the $1,400,000 has been spent or encumbered as of
November 2020.